HomeMy WebLinkAboutSS2 - Lower Castaways Concept - PowerPoint (Staff)0
T
4
0
0
Lm
Easl C08S� Hwy
■ Recreational hub (bikers, hikers and
water craft)
■ Connected to Upper Castaways
r �
human - powered
a. Historical element— McFadden's Landing et al
LC is in an MPA —Water Element
Overwhelming support for project since the process
began
y
Ad
I
14vwylq
W I "
MIN pro
I
0
Harbor Commission Objective
r �
■ Background (The Irvine Company Grant Deed)
Historic Photos
The Lower Castaways Parcel
Presented by City staff on 3/13/2o13 at Harbor Commission Study
Session (zoning, access, etc.)
M PA
4
Outline —Lower Castaways (cont'd)
k Anchor QEA study (bulkhead)
■ Preliminary Renderings
■ Timeline to date
Challenges
Next Steps
Q &A
Harbor Commission Goals & 40
nhIPCtIVPS
Harbor Commission Responsibility: Ensure the Long
Term Welfare of Newport Harbor
Objective #2: Complete the development of
recommendations for the best public use of Lower
Castaways, the last remaining undeveloped city -owned
waterfront property. Collaborate with the Parks, Beaches
and Recreation Commission in developing specific
recommendations for presentation to the City Council.
[Girling, Avery, Rhyne]
1-0 0+,,,,
Lower
Castaways Site
c",
Vommovjm
S2
04S O
C P
14, IIVFRL♦ DH
.,OL
07
yi tr
t
IL
100
@ Iim
i
nv
site
In exchange for development
Center, The Irvine Company
property to the City
r �
rights in Newport
(TIC) granted the
■ Grant Deed recorded October 3-7, 2oo8
Deed includes easements and restrictions on use
Historical Photos
Property
M
10
[F
12
Proper
Property
f_
l4
G
�5
4 i,
e
• • , I` 1t
WA
i
.�.R •oe � N
16
Historical Photos - 2005
t�
� CS
a
V
O
PlaWing Division 20
q On -Site Uses
Staging for dredging projects, Civic Center mock-
ups, and other smaller area projects
Off -site parking for construction related projects
Mariner's Pointe — Lease Agreement expires JUIy2014
Bayshores HOA — Lease Agreement expires Nov 2014
California Recreation (Cal Rec, TIC) Usage
Marina maintenance & operation activities
Easement expires upon 6o day written notice
21
FM
General Plan
: us
•
Recreational and Marine Commercial (CM)
Coastal Land Use Plan
Recreational and Marine Commercial (CM -A)
Deed Restrictions
Permits marine - related uses
Prohibits private commercial marina
Zoning
Planned Community (inconsistent with deed)
L --
22
Plan: Recreational &
ommercial (CMS
The CM designation is intended to provide for commercial
development on or near the bay in a manner that will:
Encourage continued coastal- dependent and coastal - related uses
• Maintain marine theme and character
• Encourage mutually supportive businesses
• Encourage visitor - serving and recreational uses
• Encourage physical and visual access to the bay on waterfront
commercial and industrial building sites on or near the bay
2,000 square -foot maximum development limit (Anomaly
No. 54)
• Increased development - GP Amendment required
• Charter Section 423 considerations
23
FE
•
0
Same purpose as General Plan
F1
L -- J
CM -A allows 0.0 to 0.3 Floor Area Ratio
Equates to 52,717 SF maximum, but still limited by 2,000 SF
General Plan development limit
CLUP includes
several
policies that govern
the use of the
property,
public
access
and
recreation,
and
coastal
resource
protection.
Future plan would need to be consistent with these policies
Shoreline Height Limitation Zone= 35 feet max
Z,
0
T ■ al'
i) Use of Property
•
•ITL:
Municipal or municipally- sponsored use
CM uses per General Plan
Includes park, marine educational or research facility
In Furtherance of Tideland Trust:
Marine /harbor dependent uses, fishing, water - oriented
recreation, public access, conservation, etc.
Prohibits transfer, sale, exchange to private, for - profit
entity for operation of commercial marina
D =AbIIT_
•
•ITL:
2) Review of Improvement Plans
Provides Grantor opportunity to review and
comment on proposed improvements
3) Maintenance and Repairs
Maintain in safe and attractive condition
4) No Transfer of Property
Exceptions such as utilities, other gov't entities,
operation of permitted uses
6
•
i
•
■ Currently zoned Planned Community District No.
37 (Castaways Marina)
Adopted in 1992 to allow the development of a
commercial marina use
One allowed use — commercial marina
Inconsistent with Deed Restriction (unless public)
Zoning Compliance Options:
Amend PC Development Plan to allow proposed use
Rezone to Commercial Recreation & Marine
City Council may exempt City facilities from zoning
07AM
Ah
•
California Environmental Quality Act
Exemptions, Mitigated Negative Declaration, or
Environmental Impact Report
Analyze and disclose potential impacts
Aesthetics, Bio, Air, Water, Land Use, Traffic,
Utilities, Noise, Cultural, Public Services, Recreation,
Housing
Avoid or mitigate impacts where feasible
28
FA 0" r" d
0
Ah
Ln Existing Driveway
Right turn in
Right turn out
Future Driveway
Location
Current location or
shift north
® Considerations
U -turn at Cliff Drive to
access Coast Highway
No U -turn permitted
at SB Dover at Coast
Hwy.
Merge lane on Dover
Dr. occurs in front of
driveway
;C
Easements
a= 7f I
II
,r
II ��
°u
w
o�
�a
T -
,»
„w
\c
I ,♦
i
r,.
IF"-]
Lower Castaways is in a Marine Protected
Area ( "MPA ") called the Upper Newport Bay
State Marine Conservation Area
In applying for permit w/ the Coastal
Commission, DFW would provide comment
that LC development is in conflict w/ current
law and CC would not approve
z
Revolves around definition of `take" which is
defined as damage to habitat or organisms
killed.
Take is allowed for existing facilities. DFW is
working on a new policy /approach to include
new structures / facilities (dock or pier).
32
Wall length: 300'w/ 6' wide concrete panels
Wall is reaching or has reached the end of it usable service
life
No immediate danger of failure or collapse, but appears
unstable and may be further weakened in an earthquake
(some cracking), but structure is not reliable for site use &
development
City should monitor on an annual basis
General order of magnitude cost for a simple sheet pile
wall installed would range from $500,000 to $1,000,000
z3
"By water— By land — By bike"
Restaurant on site (e.g., Castaways, Wil Wright's, etc.)
Connecting Upper and Lower Castaways
Commercial use boat launch given shortage in City (could be limited to
smaller craft such as kayaks & canoes). Staging area for
renovation /rebuilding boats
Rental facility for boats, bikes & SUP
Public dock or pier
Education and restoration center —could include growing & planting kelp
& eel grass
"Clean water camp" — staging area for volunteers to bring trash from bay
Marine recycling center / marine waste disposal facility (County might
participate)
Commercial crane w/ boat storage facility
34
Base for a water taxi operation
Area for unloading lobster pots
Community garden
Regular parking, overflow parking or parking for special events in the City
Multi -use site incorporating many of above - listed ideas
Public restrooms
Work with Bike Master Plan Committee
Concessions (food trucks)
3C
Currently zoned as commercial marina — needs to be rezoned. City
attorney confirmed that they believe the intent of the Grant Deed is to
permit the City to provide municipal services and activities but to preclude
the City from contracting with a commercial operator and operate a boat
marina.
Multi -use, recreational hub incorporating biking, hiking and boating
activities along with 85 -90 parking spaces, public restrooms and a
stairway connecting to the Upper Castaways
Built in phases (overall approval applied for at outset)
Minimalist approach
36
"
`" Q
W
>
C
O
K
W
O
0
0
Ah
J UPPER
CASTAWAYS
�MMZIMIM
Mrt:r. r.
LEGEND
A
PPIWNG 9)iOTAL BPACE51
B
ELECTRIC VEHICLE CHARGING STATIONS
C
WATER GVALT' DESIGN FEATURE
D
TPAILHEAD
OUTDOOR STAGE WITH GRASS& INFORMAL SEATING
(BICYCLE WORK SLAT ONG DRINKING FOUNTAIN, PICNIC
TABLES AND BENCHES)
E
RESTRWM& STORAGE BUILDING
F
EXISTINGTREES TO BE PROTECTED AND UNDERSTORY
PLANTINGS TO BE RESTORED
BACK
BAY
pY
PACIFIC COPgT NIGH
W
L7
G FLEXIBLE GPACE TO A6CtaAODATE GdAMV w
N
LOW FREEBOARD DOCK
BOB n L1E FARMERS MARKET. FOOD Ti41CKG)
Q
OUTDOOR STAGE WITH GRASS& INFORMAL SEATING
H LARGE LANDSCAPE BEUDGERS
P
GRAND STAIRCASE & FITNESS STEPS
CGIIOURED OPEN LAWN
Q
VIEW DEGK AND G..O
J TIDALTOWER'FEATURE
R
HILLSIDE RESTORARON
K BOARDWALK
$
CAFE TAKE& SHADE CANDPY
L CAMILEVEREO DECK wI UMBREW BCAFE TABLES
WFAODEN UxowG HISTORY WALL
MT
POESISLE FUTURE tlVERWATER' PIER
CONCEPT
`_ vir�
LOWER CASTAWAYS PARK N
yyP.4 8B
C I T Y ❑ F NEWPORT B E A C H wk
37
Preliminary Rendering
I.
'1
0
I
uurr.>
rs Y
r ►6'r�6 o
0
40
LOWER CASTAWAYS PARK
C I T Y O F N E W P O R T B E A C H
CONCEPT B
L'L^�
�� LLY]llli
41
Preliminary Renderings
i
PW
W ig,
r
UVOL"'4
43
Preliminary Renderings
y
r *A , , 19 -
S
l
,k
-1vid IToli. 104• %i4pn
Preliminary Renderings
�4
Ir
Li.6
7
Timeline
10/5/2012 — First meeting (Karen Rhyne, Brad Avery)
■ 2/14/2013 — Contacted PBR Commission
3/5/2013 — Spoke at PBR Commission meeting
■ 3/13/2013 — Harbor Commission Study Session, City presented
6/28/2013 — Met with City Manager & PBR commissioners
■ 8/6/2013 — PB &R Commissioners appointed
9/6/2013 —First meeting w/ PBR as official members
11/5/2013 —Committee meeting — received renderings
3/3/2014 —Committee meeting — received revised renderings
3/12/2014 — Harbor Commission
4/1/2014 — PB &R Commission
■ 4/16/2014 — Department of Fish & Wildlife
4/23/2014 — Tidelands Management Committee
5/7/2014 — Committee meeting
5/14/2014 — Harbor Commission
47
Consider property as a revenue - producing asset.
■ Consider property for commercial marine uses.
Has this been fully vetted?
■ TIC influence on final plan?
■ MPA concerns with DFW. Ventura meeting on
April 16.
■ Ready to present to City Council for direction.
The right mix of parking based on planned use is
important to refine
■ Adequate parking for bikes
■ Move historical monument to park from across
the street
Low level light to avoid spillover to Kings Road
homes
■ Small craft access is desirable
[i. C
Programmable waterfront flat lawn
Metered parking
Remove the grand stair case since there is a
pre- existing connection along Dover
Fire rings
J�
Public comments
Water Currents
Access (in & out)
h
DFW Commission meeting 4/16/2014 in Ventura
w/ Dave Girling and Chris Miller
Met the members of the DFW Commission,
supporting staff and presented (2) 3- minute public
comments
Commissioner Rogers grew up in Newport and
spearheaded the development of the MPA
boundaries.
Laid the groundwork for follow -up discussions.
Parking seems too prevalent
to have less parking
Metered vs. free parking
—look at options
Moving seawall inland as workaround to MPA
boundary
�3
Call with Steve Wertz & Becky Ota of DFW
■ Existing vs. new structures
Explored options: Exception to current Policy for MPA
restrictions, alternative location under bridge (see
photo)
Need to justify reason for exception to DFW
Commission — may be better than alternative use.
Eelgrass may be an issue
54
Alternative Dock Locatia
55
Alternative Dock Loratir
r.
56
Alternative Dock Loratir
*014;
57
Alternative Dock Locatia
a
■ DFW / MPA boundaries
Coastal Commission
Bulkhead / Seawall
Water currents
Traffic patterns / limitations
Utilities
■ Bayside Village Marina - monitor
Cost
C9
Direction from City Council
■ Continued dialogue w/ DFW re: dock
Formal Budget: Development and operational
costs
■ Studies: Currents, traffic patterns /access,
parking, bulkhead, dock under bridge
■ Funding
no
omm�
Questions and
Answers
1
For more information contact:
Chris Miller
949-644 -3043
cmil ler(a) newportbeachca.gov
www.newportbeachca.gov
- �.