Loading...
HomeMy WebLinkAbout03 - Bayside Dr and Area Streets Rehabilitation NOCTO: FROM: PREPARED BY: PHONE: TITLE: ABSTRACT: CITY OF NEWPORT BEACH City Council Staff Report June 24, 2014 Agenda Item No. 3. HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL David A. Webb, Public Works Director- (949) 644 -3330, dawebb @newportbeachca.gov Alfred Castanon, Associate Civil Engineer 949 - 644 -3314 Bayside Drive and Area Streets Pavement Rehabilitation Project - Notice of Completion and Acceptance of Contract No. 5212 (CAP13 -0003) On November 12, 2013, City Council awarded Contract No. 5212, Bayside Drive and Area Streets Pavement Rehabilitation Project to All American Asphalt, for a total contract cost of $1,207,207.00 plus $120,000.00 allowance for contingencies. The required work is now complete and staff requests City Council acceptance and close out of the contract. RECOMMENDATION: a) Accept the completed work and authorize the City Clerk to file a Notice of Completion for the project; b) Authorize the City Clerk to release the Labor and Materials Bond 65 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code; and c) Release the Faithful Performance Bond one year after acceptance by the City Council. FUNDING REQUIREMENTS: Funds for the construction contract were expensed from the following accounts: Account Description Gas Tax Contributions (Grant Funds) Water Enterprise Wastewater Enterprise Account Number 7181- C2002061 7251- C2002061 7521- C2002061 7541- C2002061 Amount $ 1,163,954.07 $ 81,600.00 $ 25,435.00 $ 53,350.00 Total: DISCUSSION: Overall Contract Cost /Time Summary $ 1,324,339.07 The work necessary to complete this contract included replacing the existing sidewalk, curb and gutter, curb access ramps, driveway approaches, removing the existing pavement, and re- paving with new rubberized asphalt concrete for Bayside Drive (from El Paseo Drive to Marguerite Avenue), Avocado Avenue (from East Coast Highway to San Joaquin Hills Road), Harbor Island Drive and Harbor Island Road. The contract is complete to the satisfaction of the Public Works Department. A summary of the contract cost is as follows: Original bid amount: $1,207,207.00 Actual cost of bid items constructed: $1,258,377.81 Total change orders: $ 65,961.26 Final contract cost: $1,324,339.07 The actual cost of bid items constructed was $51,170.81 more than the original bid amount due to more concrete needing replacement than originally estimated. The final contract cost was approximately 9.7 percent above the original bid amount with three change orders totaling $65,961.26. The change orders included additional concrete replacement at Bayside Drive; along with tree removals, irrigation and median work at Harbor Island Road, delay costs due to coordination efforts with the Balboa Yacht Club to assist with their on -site reconstruction, and the reconstruction of the Pacific Coast Highway and Avocado Avenue pork -chop median, which included traffic signal modifications and three new handicap access ramps. Additionally, the paving work for Bayside Drive was delayed 4 weeks in order to allow a separate city contractor to complete water main work associated with the Corona Del Mar Transmission Main Improvement project. Grant Funding was provided by an award from the California Department of Resources Recycling and Recovery (CalRecycle) for the use of recycled rubber from tires into the asphalt pavement. Actual Awarded Final Cost at Contingency Contract % Due to % Due to Contract Amount Completion Allowance Change g Directed Unforeseen Change Change $1,207,207.00 $1,324,339.07 10% or less +9.7% 100% 0% Actual Time Allowed Contract Time (days) 45 0 Under ( -) or Over ( +) The work necessary to complete this contract included replacing the existing sidewalk, curb and gutter, curb access ramps, driveway approaches, removing the existing pavement, and re- paving with new rubberized asphalt concrete for Bayside Drive (from El Paseo Drive to Marguerite Avenue), Avocado Avenue (from East Coast Highway to San Joaquin Hills Road), Harbor Island Drive and Harbor Island Road. The contract is complete to the satisfaction of the Public Works Department. A summary of the contract cost is as follows: Original bid amount: $1,207,207.00 Actual cost of bid items constructed: $1,258,377.81 Total change orders: $ 65,961.26 Final contract cost: $1,324,339.07 The actual cost of bid items constructed was $51,170.81 more than the original bid amount due to more concrete needing replacement than originally estimated. The final contract cost was approximately 9.7 percent above the original bid amount with three change orders totaling $65,961.26. The change orders included additional concrete replacement at Bayside Drive; along with tree removals, irrigation and median work at Harbor Island Road, delay costs due to coordination efforts with the Balboa Yacht Club to assist with their on -site reconstruction, and the reconstruction of the Pacific Coast Highway and Avocado Avenue pork -chop median, which included traffic signal modifications and three new handicap access ramps. Additionally, the paving work for Bayside Drive was delayed 4 weeks in order to allow a separate city contractor to complete water main work associated with the Corona Del Mar Transmission Main Improvement project. Grant Funding was provided by an award from the California Department of Resources Recycling and Recovery (CalRecycle) for the use of recycled rubber from tires into the asphalt pavement. A summary of the project schedule is as follows: ;Estimated Completion Date per 2013 Baseline Schedule February 21, 2014 Project Awarded for Construction November 12, 2013 !Contract Completion Date with Approved Extensions May 22, 2014 Actual Substantial Construction Completion Date (April 18, 2014 ENVIRONMENTAL REVIEW: City Council found this project exempt from the California Environmental Quad ity Act ( "CEQA ") pursuant to Section 15301(c). This exemption covers the minor alteration of existing public facilities with negligible expansion of the faci I ities i n areas that are not environmentally sensitive. NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). ATTACHMENTS: Description Attachment A - Proiect Location Maps L ATTACHMENT A Q I t CQ L� \� \ Z i JL \ � F �V � BALB Ai,AC�rr BALBOA ISLAND CHAiVNEL BAYSIDE DRIVE & AREA STREETS PAVEMENT REHABILITATION LOCATION MAP CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT C -5212 1 06/24/2014 N a a rrrr ���rrurrinit ru „ ORr�f F4S cy T r o c col D TRH Rr�r uii� wq BAYSIDE DRIVE u T <I �I BAYSIDE DRIVE & AREA STREETS CITY OF NEWPORT BEACH PAVEMENT REHABILITATION PUBLIC WORKS DEPARTMENT LOCATION MAP C -5212 06/24/2014 �< l vie Dl cl N \ J` o�o le �o m �c" " R DRIVE � J L 0q,/ ` x Z/vz, AVOCADO AVENUE BAYSIDE DRIVE & AREA STREETS CITY OF NEWPORT BEACH PAVEMENT REHABILITATION PUBLIC WORKS DEPARTMENT LOCATION MAP C -5212 06/24/2014