HomeMy WebLinkAbout03 - Big Canyon DiversionCITY OF NEWPORT BEACH City Council Staff Report July 22, 2014 Agenda Item No. 3. TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: David A. Webb, Public Works Director- (949) 644 -3330, dawebb @newportbeachca.gov PREPARED BY: Bob Stein, Assistant City Engineer PHONE: (949) 644 -3322 TITLE: Big Canyon Diversion - Completion and Acceptance of Contract No. 5556 (CAP 14- 0029) ABSTRACT: On February 25, 2014, City Council awarded Big Canyon Diversion Contract No. 5556 to Bali Construction, Inc. for a total contract amount of $119,323.58. The required work is now complete and staff requests City Council acceptance and close out of the contract. RECOMMENDATION: a) Accept the completed work and authorize the City Clerk to file a Notice of Completion for the project; and b) Authorize the City Clerk to release the Labor and Materials Bond 65 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code; and release the Faithful Performance Bond one year after this Council acceptance. FUNDING REQUIREMENTS: The following table summarizes costs for the project: The final construction cost was 8.9 percent above the original contract amount. Upon initiation of the project, a change in the topography at the outlet of the energy dissipater was discovered. This provided an opportunity to improve the project design with only a modest increase in project cost. The cost breakdown is as follows: % Due Awarded Final Cost at Contingency to % Due to Contract Completion Allowance Actual Contract Change Directed Unforeseen Amount Change Change $119,323.58 $129,975.93 10% or less 8.9% 0.0% 8.9% Allowed Contract Time 15 Actual Time Under ( -) 0 (days) or Over + The final construction cost was 8.9 percent above the original contract amount. Upon initiation of the project, a change in the topography at the outlet of the energy dissipater was discovered. This provided an opportunity to improve the project design with only a modest increase in project cost. The cost breakdown is as follows: Actual cost of bid items constructed: $ 86,821.93 Total change orders: $ 43,154.00 Final contract cost: $ 129,975.93 Funds for the construction contract were expended from the following accounts: Account Description Account Number Sewer Diversion Improvements 7541- C7002004 Sewer Pipeline Point Repairs & Lining 7541- C7001002 Total: The project was completed on schedule: Estimated Completion Date per 2013 Baseline Schedule Project Awarded for Construction Contract Completion Date with Approved Extensions Actual Substantial Construction Completion Date Amount $ 117,975.93 $ 12,000.00 $ 129,975.93 5/01/2014 2/25/2014 4/30/2014 4/30/2014 DISCUSSION: Upon finding elevated concentration of selenium in birds and fish in Big Canyon, a study in 2010 revealed that one of the small streams feeding Big Canyon Wash had high levels of selenium. A design to divert this small flow to the sanitary sewer was prepared in coordination with staff from the Orange County Sanitation District (OCSD). The Big Canyon Country Club provided excellent support throughout the project. The contract is now complete to the satisfaction of the Public Works Department. This project, located near the 11th Fairway of the Big Canyon Country Club, has now been completed with the stream's low flow to the sanitary sewer. The diversion appears to have cut selenium concentrations in Big Canyon Wash by at least 50 %. The diversion will stay in place during the dry season and will be turned off during the rainy season. While downstream selenium levels have been cut significantly with the completion of this project, staff still anticipates that one future project, to enhance mixing in the golf course lakes, will still be necessary to mitigate the build -up of selenite in the sediments of the lakes. ENVIRONMENTAL REVIEW: Staff found this project exempt from the California Environmental Quality Act ( "CEQA ") pursuant to Sections 15301 (minor alteration of existing public facilities) and 15302(c) (replacement of existing facilities involving negligible expansion of capacity) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on the environment. NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). ATTACHMENTS: Description Attachment A. Location Map 1✓ FASHION ISLAND 'ROXIMATE TION GATED kNCE TO SITE BIG CANYON COUNTRY CLUB ATTACHMENT A L� W c/ O m CANYON im ",of ••i APPROXIMATE EL ... • LOCATION TO ACCESS SITE -po �PGP LOCATION MAP NOT TO SCALE STORM DRAIN DIVERSION I CITY OF NEWPORT BEACH BIG CANYON COUNTRY CLUB ALONG FAIRWAY 11 1 PUBLIC WORKS DEPARTMENT LOCATION MAP C -5556 1 7/22/14