Loading...
HomeMy WebLinkAboutX2014-0481 - MiscDate: To: From: Re: (2 ON- MI ON 4 h- 201 y- Plan Check Correction Summary I Nt9 br March 18, 2014 City of Newport Beach Vernon Orwig Hoag — Site Improvements/Lighting (PC#: 0446-2014) WBSA ARCHITECTS Item Sheet Topic Discussion Planning Dept. 1 A000 Campus Plan Identify the building (its location on Hoag Campus) where the new patio and landscape are proposed. Response: Added campus plan with callout for location of project. 2 A100 Partial Site Plan Provide dimensions from the patio's posts to the nearest street curbs. Response: Added dimensions. 3 E410 Lighting Photometric Plan Lighting in the patio is too bright. Please explain the need to stay this bright. How late will the patio stay open? Response: We have reduced the number of lighting fixtures and footcandle levels. See sheet E410. Building Dept. 1 A211 Keynotes-Misc Provide spec for Kalwall w/ smoke index/fire resistance. Response: Added Kalwall UL Card to cover sheet A000. 2 A211 New Gate 5'-0" Landing and 24" clear approach required. Response: Plan has been revised to comply. Electrical/Mechanical/Plumbing Dept. 1 Provide electrical panel load, schedules are to show the following: Number of fixtures on each circuit; Load at 180 watts per general use receptacle or U.L. nameplate rating; total wattage per each phase balanced; long continuous loads [LCL] calculations to be shown at 125%. Response: Concur — See sheet E030. 2 Provide unique circuit descriptions on panel schedule. "Existing Load" is not acceptable description. CEC 408.4 Response: Concur— See sheet E030. 3 Electrical circuitry diagrams are to be accurate; provide numbers next to each circuit on plans. Response: Concur— See sheet E410. 4 Provide electrical Title 24 and 2008 Calif. Energy Efficiency Standards. All required compliance forms and mandatory measures are to be on the plans; LTG-1-C is required to be on the plans, (LTG-2-C, LTG-3-C, LTG-4- C, LTG-5-C, LTG-6-C, LTG-7-C, LTG-8-C, LTG-9-C, OLTG when applicable). 1800 Quail • Newport Beach, California 92660 • wbsarch.com • 949.552.2061 Plan Check Correction Summary Date: To: From: Re: March 18, 2014 City of Newport Beach Vernon Orwig Hoag — Site Improvements/Lighting (PC#: 0446-2014) WBSA ARCHITECTS Response: Title 24 calculations not required for a hospital building. 5 Add note to plans, "Comply with City of Newport Beach amendments to 2013 CEC. Use rigid metal conduit in all areas exposed to weather. Use ground wire inside all flexible metal conduits. Metal conduit shall not be installed in contact with earth." Response: Concur; See General Note #27, sheet E030. End of Summary - 1800 Quail • Newport Beach, California 92660 • wbsarch.com • 949.552.2061