Loading...
HomeMy WebLinkAbout06 - Sidewalk, Curb & Gutter ReplacementTO: FROM PREPARED BY: PHONE: TITLE: CITY OF NEWPORT BEACH City Council Staff Report August 12, 2014 Agenda Item No. 6. HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL David A. Webb, Public Works Director- (949) 644 -3330, dawebb @newportbeachca.gov Alfred Castanon, Associate Civil Engineer (949) 644 -3314 2013 -2014 Sidewalk, Curb & Gutter Replacement Project - Notice of Completion and Acceptance of Contract No. 5491 (CAP13 -0020) ABSTRACT: On November 26, 2013, City Council awarded Contract No. 5491, 2013 -2014 Sidewalk, Curb & Gutter Replacement project to Grigolla & Sons Construction Company, Inc., for a total contract cost of $639,950.00 plus $96,000.00 allowance for contingencies. The required work is now complete and staff requests City Council acceptance and close out of the contract. RECOMMENDATION: a) Accept the completed work and authorize the City Clerk to file a Notice of Completion for the project; b) Authorize the City Clerk to release the Labor and Materials Bond 65 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code; and c) Release the Faithful Performance Bond one year after acceptance by the City Council. FUNDING REQUIREMENTS: Funds for the construction contract were expended from the following accounts: Account Description Account Number Amount General Fund 7013- C2001009 $ 305,850.00 Measure M 7282- C2001009 $ 413,200.00 GS Street Trees 3180 -80806 $ 16,900.00 Total: $ 735,950.00 DISCUSSION: Overall Contract Cost /Time Summary The work necessary to complete this contract consisted of reconstructing sidewalk, curb and gutter, curb access ramps, driveways, and pruning tree roots in the Newport Heights and Lido Isle Communities. The contract was completed to the satisfaction of the Public Works Department. A summary of the contract cost is as follows: Original bid amount: Actual cost of bid items constructed: Total change orders: Final contract cost: $ 639,950.00 $ 692,116.50 $ 43,833.50 $ 735,950.00 The actual cost of bid items constructed was $52,166.50 more than the original bid amount due to additions to the concrete replacement bid quantity as a result of favorable bid prices. Also, during construction, Municipal Operation staff identified 15 trees along 15th Street that required removal in order to complete the reconstruction of sidewalk, curb and gutter and residential driveways work desired. The final contract cost was approximately 15 percent above the original bid amount with three change orders totaling $43,833.50. The change orders included additional concrete replacement adjacent to Eastbluff Elementary School and the Balboa Yacht Basin; along with costs to pump concrete for the strada walkways on Lido isle. A summary of the project schedule is as follows: Estimated Completion Date per 2012 Baseline Schedule May 30, 2014 Project Awarded for Construction November 26, 2013 Contract Completion Date with Approved Extensions July 7, 2014 Actual Substantial Construction Completion Date June 13, 2014 ENVIRONMENTAL REVIEW: City Council found this project exempt from the California Environmental Quality Act ( "CEQA ") pursuant to Section 15301(c). This exemption covers the minor alteration of existing public facilities with negligible expansion of the facilities in areas that are not environmentally sensitive. NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). ATTACHMENTS: Description Attachment A - Location Mar) Actual Awarded Contract Final Cost at Contingency Contract % Due to Directed % Due to Unforeseen Amount Completion Allowance Change Change Change $639,950.00 $735,950.00 15% or less +15% +15% 0% Allowed Contract Time (days) 85 Actual Time -15 Under ( -) or Over ( +) The work necessary to complete this contract consisted of reconstructing sidewalk, curb and gutter, curb access ramps, driveways, and pruning tree roots in the Newport Heights and Lido Isle Communities. The contract was completed to the satisfaction of the Public Works Department. A summary of the contract cost is as follows: Original bid amount: Actual cost of bid items constructed: Total change orders: Final contract cost: $ 639,950.00 $ 692,116.50 $ 43,833.50 $ 735,950.00 The actual cost of bid items constructed was $52,166.50 more than the original bid amount due to additions to the concrete replacement bid quantity as a result of favorable bid prices. Also, during construction, Municipal Operation staff identified 15 trees along 15th Street that required removal in order to complete the reconstruction of sidewalk, curb and gutter and residential driveways work desired. The final contract cost was approximately 15 percent above the original bid amount with three change orders totaling $43,833.50. The change orders included additional concrete replacement adjacent to Eastbluff Elementary School and the Balboa Yacht Basin; along with costs to pump concrete for the strada walkways on Lido isle. A summary of the project schedule is as follows: Estimated Completion Date per 2012 Baseline Schedule May 30, 2014 Project Awarded for Construction November 26, 2013 Contract Completion Date with Approved Extensions July 7, 2014 Actual Substantial Construction Completion Date June 13, 2014 ENVIRONMENTAL REVIEW: City Council found this project exempt from the California Environmental Quality Act ( "CEQA ") pursuant to Section 15301(c). This exemption covers the minor alteration of existing public facilities with negligible expansion of the facilities in areas that are not environmentally sensitive. NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). ATTACHMENTS: Description Attachment A - Location Mar) ATTACHMENT A LIDO ISLE & NEWPORT HEIGHTS FY 2013 -2014 Sidewalk, Curb and Gutter Replacement Project Location Map CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT 08/12/2014 1 C -5491