Loading...
HomeMy WebLinkAbout25 - Newport 32nd Street Street Modifications - PowerPoint (Staff)Right -of -Way Acquisition Agenda Item No. 25 August 12, 2014 3201 Newport Boulevard & 3204 Marcus Avenue Newport Boulevard Modification between Via Lido to 30TH Street Preferred Conceptual Plan e I af_ I `r Ss 7 Proposed Project Improvements ➢ Add 3rd NB through lane from 30th Street to 32nd Street ➢ Add 3rd SB through lane from Via Lido to 32nd Street ➢ Add bike lanes on both sides of Newport Blvd. from Via Lido to 32nd Street ➢ Relocate Newport Blvd. on- street parking between 30th Street & Via Lido into new public parking lot at NW corner of Newport Blvd & 32nd Street ➢ New landscaped medians on Newport Blvd from 30th Street to Via Lido ➢ Increase left turn storage at traffic signals ➢ Closure of left turn movement to and from 31St Street Right -of -Way Acquisitions I 3,20 MARCUS mrrrrrr��r�w° ^°u. 1� •6,74 y �� �� 1 SFi ^� y 3305 NEW °0� R/W - 4i SF L• iTCE = 237 SF I i (P) R/N (P) TCE - - W 3531 NEWPORT BLVD - ' Q _ _ R/W = 1,224 SF H _ E) R co fPl 3/W � C - - - - (D -P -WWP — - W —� `I(E) R /W" 7, a:. fP) R / W M 3301 NEWPOP '_VC` a.. .R /W = 10, _- J I y Aff Former Wachovia Bank Wachovia Bank Parking Lot Retail Strip Center Former City Hall Gateway Park * Voluntary Acquisition. Not required to complete project Lido Pacific, LLC Lido Pacific, LLC Terra Cotta Realty Fund, LLC City of Newport Beach City of Newport Beach Full Acquisition Full Acquisition Partial Acquisition Partial Dedication Partial Dedication PUBLIC PARKING Relocation of 26 on- street parking spots to a new public parking lot at NW corner of Newport Blvd and 32nd Street Three existing public parking lots at 30th Street with 76 spaces Existing angled on- street public parking on 32nd Street with 51 spaces 4 Private parking lots on Newport Blvd between 32nd Street & Short Street SPOTS PF )POSES [ri dF'JTJ' h ������771111������T; 1 t _ 11 PUBLIC I`�' t m ILLA WAY J' N 2c A x�A e 6 POD ATE SPd 10 PRIVATE SLOTS , 1 Q PROJECT SCHEDULE • Complete Environmental Documentation —Sept. 2014 • Coastal Permitting — Nov. 2014 to Sept. 2015 • Complete R/W Acquisition — Dec. 2014 • Complete Final Design — Oct. 2015 (Dependent on Coastal Development Permit) • Award Construction Contract — Dec. 2015 • Construction —Jan. 2015 to Jun. 2016 PRQJECT CAST Right -of -Way Acquisition $3,451,587 $0 $3,0481413 $6,500,000 Construction Capital $0 $806,000 $1,194,000 $2,000,000 Total $3,4511587 $978,000 $4,467,413 $8,897,000 General Fund Measure M Grant Environmental, Preliminary and Final $0 $172,000 $225,000 $397,000 Design Right -of -Way Acquisition $3,451,587 $0 $3,0481413 $6,500,000 Construction Capital $0 $806,000 $1,194,000 $2,000,000 Total $3,4511587 $978,000 $4,467,413 $8,897,000 QUESTIONS &COMMENTS \1FOat% Public Works Department A Well- Engineered Machine Protecting and Providing Quality Public Improvements and Services CLOSURE OF 31ST STREET ➢ U -turn at 301h Street will be permitted ➢ Left turn /U -turn pocket at 30th Street will be lengthened TRAFFIC CIRCULATION engthened' } 1 Left turn e storage po ket _ ��Itl.l l.i. -�.� 4 tum g 0 RECONFIGURE ALLEY ACCESS ➢ Close existing alley access from 32nd Street ➢ Access alley from Marcus Avenue or Finley Avenue ➢ Marcus Ave from alley access to 32nd Street will be converted to 2 -way traffic T Yi 1 r