Loading...
HomeMy WebLinkAbout13 - C-2975 - Section 5 Sewage Pump Station on Little Balboa Island0 0 April 26, 1999 CITY COUNCIL AGENDA ITEM NO. 13 TO: Mayor and Members of City Council FROM: Public Works Department SUBJECT: SECTION 5 SEWAGE PUMP STATION ON LITTLE BALBOA ISLAND CONTRACT NO. 2975 - NOTICE OF COMPLETION 17= [�Z�I�I�I�r t • 1. Accept the work. 2. Authorize the City Clerk to file a Notice of Completion. 3. Authorize the City Clerk to release the bonds 35 days after the Notice of Completion has been recorded in accordance with applicable portion of the Civil Code. DISCUSSION: The Contract for construction of the Section 5 Sewage Pump Station has been completed to the satisfaction of the Public Works Department. The contractor was Advanco Constructors of Upland, California (a division of Zurn Constructors, Inc.). Original bid price Amount of change orders Total contract cost $1,665,150.00 212,495.30 $1,877,645.30 A total of 33 change orders were issued to complete the project. The change orders covered a wide range of items from project completion date extensions to design and field changes. In addition, several significant change orders were initiated by the City to minimize impacts to the community. The first of these change orders was to leave the costly shoring in place. The original plan had allowed for the removal of the sheet pile shoring system. However, based on a significant number of complaints from the neighboring residents, it was decided to not disrupt the community a second time by removing the sheet pile shoring system. Along the same lines of thinking, Little Balboa Island is currently in the process of designing the undergrounding of the power, phone and cable television utility lines. In an effort to prepare for this, the City Council approved a budget amendment that funded the undergrounding within the project area. These funds will be reimbursed to the City through a future assessment district. The following is a summary of the change orders: Subject: SECTION 5 SEWAGE PUMP STATION ON LITTLE BALBOA ISLAND CONTRACT NO. C -2975 - NOTICE OF COMPLETION April 26, 1999 Page 2 Change Order No. Description Amount 1 City Construction Manager Trailer. $ 4,413.70 2 Revised Scope of Work & Construction Period in Jade Avenue. 0.00 3 Removal and transplanting of 2 palm trees to Park Avenue median. 4,403.19 4 Time extensions. 0.00 5 Installation of public notice sign in the median of Park Avenue. 319.24 6 Delete Clow eccentric plug valves and install Dezurik eccentric plug valves. 3,091.25 7 Install 6" and 4" water line valve. 0.00 8 Credit to City for revisions to electrical control panel. <17,633.20> 9 Eight calendar -day time extension for weather related delays to Section 5 Pump Station. 0.00 10 Five calendar -day time extension for weather related delays to Jade Avenue work. 0.00 11 Bonus for early completion of Jade Avenue construction. 14,000.00 12 Loss of production (encountering unknown underground utilities). 574.01 13 Install sewer service connection for apartments at 127 E. Bay Front and credit to modify Manhole No. 6. 344.81 14 One day time extension for weather. 0.00 15 Sheet piling to remain in place at pump station. 25,000.00 16 Replacement of public notice sign in median of Park Avenue. 341.19 17 Install electrical, telephone and cable TV conduit in east alley and Park Avenue ( Undergrounding). 4,414.33 18 Labor and Equipment for cleanup from seawater intrusion. 1,008.18 19 Install electrical, telephone and cable TV conduit and vaults in south alley, east alley, Park and Jade Avenues, (undergrounding). 27,094.00 20 Install 1 -inch conduit from Section 5 control panel to sea wall for tide gauge monitoring. 3,472.00 21 Rotate plug valve and fabricate special valve operator handle. 639.56 22 Modifications to force main, valve vault and mechanical detail in South Alley. 9,293.00 23 Increase motors, motors starters and power cables. 7,071.07 24 Remove and replace 607 sq ft of concrete pavement. 8,332.56 25 Extra work to demolish /remove abandoned valve vault and force main in south alley. 5,025.65 26 Utility support from Southern California Edison and Gas Company. Reduce manholes from 60" diameter to 48" diameter. 1,647.74 27 Install power cable from meter pedestal to control panel in Park Avenue. Modify south alley valve vault to match alley slope for drainage and garage approach. 1,658.03 Subject: SECTION 5 SEWAGE PUMP STATION ON LITTLE BALBOA ISLAND CONTRACT NO. C -2975 - NOTICE OF COMPLETION April 26, 1999 • Page 3 Change Order No. Description Amount 28 Modify 100kVA generator to operate Cameo Shores pump station. 3,839.94 Install Bilco "Ladder -Up" safety post ladder extensions. 29 Modify pump station valve vault hatch, vent piping and 4" bypass 2,624.63 piping configuration. 30 Bonus earned for early substantial completion of project. 90,000.00 31 Locate fire hydrant service connection in south alley, abandon 2" line 1,940.39 and relocate street lighting junction box. 32 Install 1/4" thick neoprene seals on the undersides of the pump station 7,803.37 hatches. Seal 3 hatches and manhole. Install sewer drop pipe and stainless steel screens. Remove pump station exhaust air vent stack. 33 Modify sewer drop piping in pump station wet well. Relocated 1,776.36 stainless steel low -level float switch bracket in pump station wet well. Approved Change Order Total (12.76 %) $ 212,495.30 The original contract completion date for this project was July 10, 1998. The construction schedule • was revised on various change orders for weather - related construction delays, utility conflicts, and additional work requested by the City of Newport Beach. The final completlon date was revised to August 8, 1998. Advanco Constructors substantially completed the project on June 24, 1998. Substantial completion included testing and placing the new pump station in service, demolishing the old pump station, and replacing pavement and opening streets and alleys to the public. In an effort to reduce impacts to the community and in accordance with the contract specifications, Advanco was credited with an early completion bonus of $14,000 for the Jade Avenue improvements (Change Order No. 11). In addition, the contractor was paid $90,000 for early completion of the overall project (Change Order No. 30). Respectfully submitted, 4' 171. PUBLIC WORKS DEPARTMENT Don Webb, Director By: Michael =ner ori, P.E. Utilities Attachment: Final Project Report by Daniel Boyle Engineering, Inc. f.Wserslpblshared4 unciIVy98-99'apri1.26tsMion.SAa PROJECT REPORT Section 5 Sewage Pump Station On Little Balboa Island January, 1999 Daniel Boyle Engineering, Inc. �aEWPpgT SECTION 5 SEWAGE PUMP STATION ON LITTLE BALBOA ISLAND FINAL PROJECT REPORT • JANUARY 1999 INTRODUCTION Advanco Constructors, Inc., the Contractor for the Section 5 Sewage Pump Station on Little Balboa Island, has completed construction of the project. The following is a brief summary of the project with photographs illustrating the actual work performed between the April 1998 Project Status Report and project completion in December, 1998. WORK COMPLETED The following major work components of the project have been completed since the beginning of construction on December 1, 1997: Establish groundwater, inclinometer, and settlement survey monitoring program. 2. Remove and replace concrete pavement in Park Avenue, Jade Avenue, and South Alley. • 3. Construct 473 11 of 8 -inch and 12 -inch gravity sewer and six manholes in Park Avenue, Jade Avenue, and South Alley. 4. Construct 5821.f. of 8 -inch sewer force main in Park Avenue, Jade Avenue, and South Alley. 5. Install sheet piles and excavate for pump station and valve vault in Park Avenue. 6. Construct reinforced concrete pump station wet well with T -lock liner and exterior moisture barrier in Park Avenue. 7. Install pre -cast concrete valve vault in Park Avenue. 8. Install pre -cast concrete valve vault in South Alley. 9. Construct temporary sewer force main bypass and connect to existing force main. 10. Cutoff sheet piles three feet below grade, backfill and compact around pump station and valve vault. CITY OF NEWPORT BEACH DANIEL BOYLE ENGINEERING, INC. SECTION 5 SEWAGE PUMP STATION NO3- 107-01 Page 1 �EWPoRT O� 6P U w S c �� �< /PORE SECTION 5 SEWAGE PUMP STATION ON LITTLE BALBOA ISLAND FINAL PROJECT REPORT - JANUARY 1999 11. Install miscellaneous underground utilities such as; air vent piping, potable water main, water service line, and sewer services. 12. Demolish and remove portions of old pump station and sewer force main in South Alley. Backfill remaining portions of old pump station with concrete slurry mix. 13. Relocate two palm trees. 14. Install electrical and telephone conduit for Section 5 project in Park Avenue. 15. Construct brick wall and electrical control panel enclosure. 16. Install electrical control panel, RTU, and miscellaneous electrical equipment. 17. Install electrical, telephone, and cable tv conduits and vaults within the limits of construction in Park Avenue, East Alley, Jade Avenue, and South Alley in support of the • proposed Rule 20 underground utility project. 18. Install RTU in control panel and a one -inch conduit from the control panel to the sea wall in support of project to install tide gauge on public dock at Park Avenue. 19. Install plug and check valves, piping, miscellaneous fittings, camlock fitting, and ventilation fans in the pump station valve vault. 20. Install plug valves in the South Alley valve vault. 21. Install one 5 -hp submersible pump, and two 25 -hp submersible pumps in the pump station. 22. Modifications to pump station wet well influent sewer piping. CITY OF NEWPORT BEACH DANIEL BOYLE ENGINEERING, INC. SECTION 5 SEWAGE PINT STATION NO3- 107 -01 Page 2 0 r1 i °� om SECTION 5 SEWAGE PUMP STATION � ON LITTLE BALQOA ISLAND U w S C��IPOPP`C PROJECT COMPLETION DATES FINAL PROJECT REPORT �/iHI •_62 Z Construction of the Jade Avenue portion of the project was completed on February 16, 1998, seven days ahead of the adjusted completion date of February 23, 1998. The completion date was adjusted for weather related delays from the original completion date of February 15, 1998. Advanco met the requirements for substantial completion of the entire project on June 24, 1998, forty -five days ahead of the adjusted completion date of August 8, 1998. The project completion date was adjusted from the original completion date of July 15, 1998 for weather delays and extra work added during the course of construction. Substantial completion of the project included installation of all underground piping, testing and placing the new pump station in operation, demolishing the old pump station, replacing pavement, and opening streets and alleys to public use. A draft Notice of Completion was prepared and forwarded to the City on January 4, 1999. Filing of the Notice of Completion establishes the beginning of the two -year general warranty period for the project for Advanco Constructors. Delivery and installation of the permanent pumps on December 10, 1998 establishes the beginning of the ten -year warranty period for the ESSCO pumps. APPROVED CHANGE ORDERS Change Order No. 1: Construction Management Trailer A trailer was provided on a month - to-month basis until July 1, 1998 for a monthly cost of $495.91, which includes 15% O &M and 1% bond. Electrical power for trailer hookup and operation was provided along with telephone hookup. Change Order No. 2: Revised Phase H Scope of Work in Jade Avenue Phase 11 of the construction was redefined as all work to be performed in Jade Avenue between Sewer Station 1 +50 and Sewer Station 4+60. This work included, but was not limited to, all demolition, pipe work, dewatering and street improvements from Park Avenue to South Alley. The Contractor was allowed to shutdown Jade Avenue to traffic and parking. The Phase II period of construction was not to exceed 45 calendar days. Liquidated damages of $2,000 per day was to be assessed and an incentive bonus of the same daily amount will be awarded as identified in the Contract Documents after 45 calendar days. Phase II work in Jade Avenue commenced January 5, 1998. CRY OF NEWPORT BEACH SECTION 5 SEWAGE PUMP STATION DANIEL, BOYLE ENGINEERING, INC. NO3 -107 -01 Page 3 SECTION 5 SEWAGE PUMP STATION ON LITTLE BALBOA ISLAND FINAL PROJECT REPORT JANUARY 1999 Change Order No. 3: Remove and Transplant Two Palm Trees Removal of two palm trees on the north side of Park Avenue at the wet well site was deleted. The transplanting of two palm trees from the north side of Park Avenue at the wet well site to the median in Park Avenue at a location as directed by the City was added. The removal of the palm trees was required to construct the project and was included in the project construction plans. The residents of Little Balboa Island, through the public review process, requested that the two mature palm trees be transplanted to the median planter in Park Avenue near the bridge, rather than planting two smaller trees at that location. Change Order No. 4: Weather Delay & Holiday Time Extension On December 11, 1997, a one day time extension was granted due to high winds preventing sheet pile threading. A one day time extension for Advanco Constructors to work half -day on Christmas Eve and not to work on December 26, 1997 was granted to promote community relations. In addition, another one day time extension to promote community relations for Advanco to work half -day on New Year's Eve and not to work on January 2, 1998 was also granted. Change Order No. 5: Parking Notice Sign on Little Balboa Island A parking notice sign in the median of Park Avenue near the entrance to Little Balboa Island was installed. The parking notice sign was required to inform residents and visitors that between January 5, 1998 and March I, 1998 parking permits will be required for public parking on Little Balboa Island. The sign provides public information about the parking restrictions and how residents and visitors may obtain parking permits. Change Order No. 6: Installation of Dezurik Eccentric Plug Valves Two 8 -inch Clow eccentric plug valves in the force main valve vault, three 8 -inch Clow eccentric plug valves and one 4 -inch Clow eccentric plug valve in the pump station valve vault were deleted. Installation of two 8 -inch Dezurik eccentric plug valves in the force main valve vault, three 8 -inch Dezurik eccentric plug valves and one 4-inch Dezurik eccentric plug valve in the pump station valve vault was performed. Advanco Constructors, Inc. submitted Clow plug valves as "equal' equipment. The City of Newport Beach has standardized its plug valves throughout the City with Dezurik brand valves, and for maintenance purposes, requires that the valves on the Section 5 Sewage Pump Station be compatible with the existing valves in the system. A gear operator and 2 -inch nut was added to the 4 -inch valve to allow operation of the valve from the street with a key. Change Order No. 7: Temporary Removal of Water Line at Park Avenue & Jade Avenue Advanco Constructors requested to install at no cost one 6 -inch and one 4 -inch water line valve to be provided by the City at no cost. Advanco temporarily removed portions of the water lines at Park Avenue and Jade Avenue intersection during construction of the sewer and force main pipelines. In order to facilitate the project work the CITY OF NEWPORT BEACH DANIEL BOYLE ENGINEERING, INC. SECTION 5 SEWAGE PUMP STATION NO3 -107 -01 Page 4 "¢wPpq SECTION 5 SEWAGE PUMP STATION ON LITTLE BALBOA ISLAND U � S FINAL PROJECT REPORT JANUARY 1999 City loaned pipe and fittings to Advanco to perform the work. Advanco agreed to return materials of the same make, model, and size supplied by the City no later than March 16, 1998. Advanco restored the water line to its original location prior to completion of the project using C -900, Class 200 PVC water pipe. Change Order No. 8: Revisions to Electrical Control Panel The City Utilities Department reviewed the specification for the electrical control panel and deleted various equipment items in the panel. Change Order No. 9: Weather Delay - Section 5 Pump Station The project completion date was adjusted for the weather - related loss of working days which occurred on January 29, 1998, and February 3, 6, and 9, 1998. The project duration was based on calendar days, so the project completion date was adjusted to include additional calendar days, as appropriate. Change Order No. 10: Weather Delay -Jade Avenue Construction The project completion date was adjusted for the weather - related loss of working days which occurred on January 29, 1998, and February 3, and 6, 1998. The project duration was based on calendar days, so the project completion date was adjusted to include additional calendar days, as appropriate. Change Order No. 11: Bonus For Early Completion of Jade Avenue -Phase II Construction The bonus for completion of the Jade Avenue portion of the project on February 16, 1998, seven days prior to the scheduled completion date of February 23, 1998. The bonus totaled $14,000 at the rate of $2,000 per day for the bonus. Change Order No. 12: Loss of Production Time from Encountering Unknown Underground Utilities On February 5, 1998 Advanco Constructors uncovered two previously unknown underground pipes in the vicinity of manhole no. t at Park Avenue and Jade Avenue. Trenching operations were shut down for one hour while the pipes were identified as abandoned and could be removed. The pipes were not identified on the construction plans. Change Order No. 13: Install a Sewer Service Connection from the Apartment at 127 E. Bay Front and Modify Sewer Manhole No. 6 A sewer service connection was installed to improve a previously constructed service for the apartments at 127 E. Bay Front. The original sewer service for the apartments connected directly to the main drain line for the house with a 90- degree elbow, creating a potential for plugging of the service line. Connection of the sewer service was performed on a time and materials basis. CITY OF NEWPORT BEACH DANIEL. BOYLE ENGINEERWG, INC. SECTION 5 SEWAGE PUMP STATION NO3 -107 -01 Page 5 a r U w S c"/<IPOR��' SECTION 5 SEWAGE PUMP STATION ON LITTLE BALBOA ISLAND FINAL PROJECT REPORT a JANUARY 151 Utility conflicts required the construction of a 48 -inch diameter manhole at manhole no. 6 at the north end of East Alley. The plans originally called for a 60 -inch diameter manhole to be installed. The contractor provided to the City a credit for the cost difference. Change Order No. 14: Weather Delay and Work on President's Day Holiday One working day time extension was requested and granted due to a weather - related delay on February 19, 1998. One working day time deletion to the project completion date was approved for allowing the Contractor to work on President's Day, February 16, 1998. President's Day is a holiday recognized by the City, but not by the Advanco Constructors or the labor unions. Change Order No. 15: Sheet Piling to Remain in Place at Pump Station The City directed Advanco Constructors to cut off the sheet piling at the pump station three feet below street grade and leave the sheet piling in place at the site. A time extension of three working days was added to the project completion date. Change Order No. 16: Installation of Parking Notice Sign on Little Balboa Island At the request of the Little Balboa Island Property Owner's Association the temporary permit parking notice sign in the median of Park Avenue near the entrance to Little Balboa Island was replaced to extend the effective date of the permit parking policy until further notice. The parking notice sign was required to inform residents and visitors that parking permits are required for public parking on Little Balboa Island. The sign provided public information about the parking restrictions and how residents and visitors may obtain parking permits. Change Order No. 17: Install Electrical, Telephone, and Cable TV Conduit in East Alley and Park Avenue The proposed Rule 20 utility undergrounding project scheduled for 1999 includes relocating all of the above ground electrical, telephone, and cable tv transmission lines and poles on Little Balboa Island underground. The City directed Advanco Constructors to install buried conduit for the overhead utilities in areas of Park Avenue and East Alley under construction for the Section 5 Pump Station project. Installation of the underground conduits prior to repaving for the Section 5 project will eliminate the future need to remove and replace portions of the new concrete pavement reduce and disruption to the residents. Change Order No. 18: Weather Delay/Damage from Seawater Intrusion 9 The project completion date was adjusted due to weather - related loss of work days and damage caused by flooding from relatively high tides on March 25 and 30, 1998 and April I, 1998. The high tides caused seawater to enter the excavation on March 30, 1998 and flooding from stormwater runoff from rainfall on April I, 1998. This . change order included time and materials costs to clean up damage from flooding. CITY OF NEWPORT BEACH DANIEL BOYLE ENGINEERING, INC. SECTION 5 SEWAGE PUMP STATION NO3 -107 -01 Page 6 lEWPpgT SECTION 5 SEWAGE PUMP STATION ON LITTLE BALEOA ISLAND FINAL PROJECT REPORT JANUARY 1999 Change Order No. 19: Install Rule 20 Underground Utility Conduits and Structures The proposed Rule 20 utility undergrounding project scheduled for 1999 includes relocating all of the above ground electrical, telephone, and cable tv transmission lines and poles on Little Balboa Island underground. The City directed Advarco Constructors to install buried conduit for the overhead utilities in the areas of Park Avenue, Jade Avenue and South Alley under construction for the Section 5 Pump Station project. Installation of the underground conduits prior to repaving for the Section 5 project will eliminate the future need to remove and replace portions of the new concrete pavement and reduce disruption to the residents. This change order includes an extension of five working days and two calendar days to the project completion date. Change Order No. 20: Install 1" conduit from Section 5 Control Panel to Sea Wall for Tidal Gauge on Public Dock The City requested that Advanco Constructors install a one -inch PVC coated, galvanized steel conduit from the Section 5 control panel to the end of Park Avenue and through the seawall. The conduit will connect a sonic meter to be mounted at the public dock with instrumentation and communication equipment in the Section 5 control panel. The City will be able to continuously monitor tide levels via the City SCADA system. • Change Order No. 21: Modify Orientation of Plug Valve and Fabricate Valve Handle, Revise Water Service Connection and Eliminate Backflow Preventer Limited space in the pump station valve vault required that the center plug valve be rotated on its side and a specially shaped valve handle be fabricated to clear adjacent piping and valves and provide a full field of travel for the valve operating nut. The use of soft solder connections on work done previously by Advanco Constructors on the two -inch water service was rejected. A one -inch service was installed at another location on the water main to replace the abandoned 2- inch service. Credit for labor was provided to the City for not installing the backflow preventer. The backflow preventer was delivered to the City operations department. Change Order No. 22: Modifications to Force Main and Valve Vault in South Alley, Delays from existing Sea Wall Tieback and Storm Drain Catch Basin, and Credit for not Removing fill concrete Revisions to the force main and valve vault in South Alley included raising the force main grade, decreasing the valve vault depth, increasing the vault size, and changes to fittings, pipe stands, etc. The air /vacuum valves were deleted. Additional labor and materials were required by Advanco Constructors due to the location of the sea wall tieback and the storm drain catch basin. The plans showed these obstacles to be far enough away from the new force main ialignment to require minimal effort to protect them during construction. The sea wall tieback was uncovered and CITY OF NEWPORT BEACH DANIEL BOYLE ENGINEERING, INC. SECTION 5 SEWAGE PUMP STATION NO3 -107 -01 Page 7 SECTION 5 SEWAGE PUMP STATION ON LITTLE 13ALEOA ISLAND FINAL PROJECT REPORT • JANUARY1999 determined to be located between the two force mains. The corner of the catch basin was located above one of the force mains. A credit to the City was provided for not having to remove fill concrete shown on the plans at the old force main valve vault under the sidewalk at the sea wall. Change Order No. 23. Modifications to Sewage Pumps Motor Size, Motor Starters, and Power Cables The motor size on the two large sewage pumps was increased from 15 hp to 25 hp in order to provide future flexibility in operation and to allow for changes to the pumping system which may require additional power for the pumps. Increasing the motor size required that the motor starters and power cables be upgraded to match the motor horsepower. Due to problems with casting the two large pumps which resulted in poor operating efficiencies, Advanco and their pump supplier agreed to provide at no additional cost two cast -iron pumps on an interim basis until the permanent, stainless steel pumps can be remanufactured, delivered, and installed. Change Order No. 24: Remove and Replace Concrete Pavement at Gas Line Relocations, and Credit for Damage to Beaches Caused by Dewatering System The City requested that Advanco Constructors remove and replace concrete and temporary asphalt in East Alley and South Alley at areas where the gas line was relocated in December, 1997 in support of the Section 5 project. The work was done in coordination with other pavement removal and replacement work on the project. The discharge from the contractor's dewatering system caused erosion of the beaches at the east end of Park Avenue and the south end Jade Avenue. Erosion of the beach sand caused material to be deposited under public and private docks. Material was dredged from under docks and returned to the beach areas. A credit was provided to the City for a portion of the cost of the dredging operation. Change Order No. 25: Extra Work to Demolish and Remove Valve Vault and Abandoned Force Main, Construct Access Hole in Roof of Existing Pump Station Advanco Constructors excavated an old, abandoned force main valve vault and force main in South Alley. Demolition of the force main and valve vault was required in order to proceed with construction of the new force main. In addition, the gas line to be relocated in the east end of South Alley was not relocated as shown on the plans and interfered with construction of the new force main. \_J The City requested that Advanco Constructors core drill a 30 -inch diameter hole in the roof of the old pump station above the pumps in order to provide interim access to the equipment in the pump station following installation of . the 18 -inch force main casing pipe through the pump station walls. CITY OF NEWPORT BEACH DANIEI. BOYLE ENGINEERING, INC. SECTION 5 SEWAGE PUMP STATION NO3 -107 -01 Page 8 � SEW OqT ° mm SECTION 5 SEWAGE PUMP STATION � � ^ ON LITTLE BALHOA ISLAND FINAL PROJECT REPORT • JANUARY 1999 Change Order No. 26: Reduce Diameter of South Alley Manholes, Utility Support for Utility Obstructions, and Weather Delay Time Extension Advanco Constructors requested that the 60 -inch diameter manholes in South Alley be reduced to 48 -inch diameter in order to avoid utility conflicts during construction. All revised manholes are less than twelve feet deep. City standards require manholes twelve feet or deeper to be 60 -inch diameter. Credit was given to the City for the reduced manhole size. A power pole approximately two feet from the gravity sewer alignment in South Alley and a gas service line for 106 Jade Avenue were not shown on the plans. Support from Southern California Edison to hold the power pole during construction of the gravity sewer and temporary relocation of the gas service was required by Advanco Constructors. Time extensions due to rain on May 5, 1998 and May 13, 1998 were granted. Change Order No. 27: Install Power Cables from Meter to Control Panel, Modify South Alley Valve Vault, Delete Landscape Restoration . The plans show that Southern California Edison (SCE) was to pull the power cables through the conduit from the meter pedestal to the control panel in Park Avenue. SCE normally does not install cable on the customer side of the meter and refused to do so on this project. Advanco Constructors installed the power cable on a time and materials basis. The top of the force main valve vault in South Alley was constructed too low based on the approximate finish elevation shown on the plans. One of the vault rings was removed and replaced with a taller section that sloped in the direction of the finished alley grade to match the alley flow line and garage approach at 1810 S. Bay Front. The City paid for a new vault section. Advanco Constructors paid for all labor to remove and replace the vault section. The landscape restoration work in the median in Park Avenue was deleted from the contract and a credit provided to the City. Landscape restoration work will be performed by the City landscaping contractor as part of the City landscape improvement plan for the area. Change Order No. 28: Modify Portable Generator and Install Ladder -Up Safety Posts The City requested that the I00kVA portable generator supplied with the project be modified to allow its use at the Cameo Shores Pump Station (200 amp) as well as at the Section 5 Pump Station (100 amp). Modifications include installing a 100 amp 3 -pole circuit breaker and 200 amp receptacle. Forty feet of 200 amp power cord was also supplied. A forty-foot 100 amp cord was supplied by the City and credit for it given to the City by Advanco. • Installation of two "Ladder -Up" safety poles manufactured by Bilco was added at the suggestion of Advance, Constructors. The safety poles were installed at the pump station manway hatch and in the South Alley valve vault. CITY OF NEWPORT BEACH DANIEL BOYLE ENGNEERING, INC. SECTION 5 SEWAGE PUMP STATION NO3 -107 -01 Page 9 lEWPORT O� 6P a � r � U ,� C P SECTION 5 SEWAGE PUMP STATION ON LITTLE BALBOA ISLAND FINAL PROJECT REPORT JANUARY 1999 Change Order No. 29: Revisions to Pump Station Valve Discharge Piping and Valve Vault Hatch Revisions to plan sheets 3, 13, 16, 20, and 28 made on December 29, 1997 included enlarging the stainless steel access hatch, installing 1 -inch vent piping between each discharge pipe in the valve vault and the pump station, and reconfiguration of the 4 -inch bypass piping. Revisions to the plans were made to provide better pump operation and access to the bypass piping. A one day time extension for construction of the vent piping was included in the change order. Change Order No. 30: Bonus for Early Completion of Project Bonus earned for reaching substantial completion of project forty-five (45) days prior to the scheduled completion date. In accordance with Special Provision 1 -5, the bonus for each calendar day completed in advance of the scheduled completion date is $2,000 per day. The project completion date was August 8, 1998 after adjustments for weather delays and extra work added during the course of construction. Advanco Constructors substantially completed the project on June 24, 1998. Substantial completion of the project included installation of all underground piping, testing and placing the new pump station in operation, demolishing the old pump station, replacing pavement, and opening streets and alleys to public use. Change Order No. 31: Abandon Two-Inch Fire Hydrant Service Line in South Alley and Relocate Street Light Junction Box The plans show the two -inch fire hydrant at the old pump station site in South Alley to be removed with a connection to the water main located in a section of water main to be abandoned. The hydrant connection was actually located outside area of the abandoned water line and required additional effort to locate and abandon the water line, and remove and replace alley concrete. The contractor potholed the fire hydrant and the connection to the water main and abandoned the service line at the water main. Work was performed on a time and materials basis. The street light junction box was constructed in the center of the driveway to I I I E. Bayfront at the direction of the SCE inspector. Future construction of a street light at that location would have blocked driveway access for the residence, so thejunction box was relocated to the former fire hydrant location next to the existing power pole. Work was performed on a time and materials basis. Change Order No. 32: Install Seals in Pump Station Hatches, Install Sewer Drop Pipe and Screen in Pump Station The City directed Advanco Constructors to install strips of neoprene rubber to the underside of the hatches at the pump station. The rubber strips are being installed to seal against the inside hatch frame lip. Work was performed on a time and materials basis. CITY OF NEWPORT BEACH DANIEL BOYLE ENGINEERING, INC. SECTION 5 SEWAGE PUMP STATION NO3 -107 -01 Page 10 11 • PORT SECTION 5 SEWAGE PUMP STATION � = ON LITTLE BALHOA ISLAND FINAL PROJECT REPORT • JANUARY1999 The City directed Advanco Constructors to fabricate and install in the pump station sump a PVC drop structure consisting of a 12 -inch tee, pipe, and 45- degree elbow. The tee was bolted to the pump station wall at the end of the influent sewer line. Sewer influent flow is directed downward to a point submerged below the normal low water surface elevation in the sump. The basket strainer was removed and two stainless steel screens were bolted to the lower part of the basket strainer frame. Work was performed on a time and materials basis. The City directed Advanco Constructors to apply silicone caulk and Rap-0 Seal sealant to the pump station hatches. The City directed Advanco Constructors to modify the wet well exhaust vent stack in the Park Avenue median by cutting it off at grade, removing the solvent weld fitting, installing reducer bushings to reduce the outlet diameter from 12 inches to 6 inches, installing a 6 -inch PVC 90- degree elbow, and connecting to a drum filter of activated carbon provided by the City. Change Order No. 33: Modify Sewer Drop Pipe in Pump Station Wet Well, Relocate Low -Level Float Switch Mounting Bracket in Wet Well, Electrical Sub - Contractor Extra Work Claim Resolution • The City directed Advanco Constructors to further modify the sewer drop pipe in the pump station wet well. The stainless steel screen was removed and the sewer pipe discharge was extended to the wet well sump floor and a 45- degree elbow was attached to direct influent sewer flows to the bottom of the wet well sump. Work was performed on a time and materials basis. The City directed Advanco Constructors to relocate the existing stainless steel low -level float switch bracket on the wall of the pump station wet well to improve operation of the pump station. Work was performed on a time and materials basis. The electrical sub - contractor, Beard Electric, submitted a claim for extra work to place red -oxide concrete encasement in single and dual conduit trenches in Park Avenue. Contractor claimed a discrepancy between plans and standard SCE specifications. The City does not recognize the validity of the claim, but to avoid further administrative costs agreed to pay fifty percent of the claim amount. Table 1 is a summary of the change orders to date required for the completion of the pump station project. CITY OF NEWPORT BEACH DANIEL BOYLE ENGINEOUNG, INC. SECTION SEWAGE PUMP STATION NO3 -107 -01 Page 11 na- SECTION 5 SEWAGE PUMP STATION ON LITTLE BALEOA ISLAND TABLE 1 FINAL PROJECT REPORT JANUARY 1999 SECTION 5 SEWAGE PUMP STATION ON LITTLE BALBOA ISLAND CHANGE ORDER SUMMARY DESCRIPTION COST Change Order No. 1 Trailer on a month - to-month basis up to July 1, 1998 $3,496.12 Electrical power hookup 348.44 Telephone hookup to trailer 569.14 Subtotal $4,413.70 Change Order No. 2 Revised Phase 11 Scope of Work & Period of Construction in Jade Avenue 0.00 Change Order No. 3 Delete removal of 2 palm trees on the north side of Park Avenue $ <1,198.00> Add transplanting of 2 palm trees from north side of Park Ave. to median in Park Ave. 501.59 • Subtotal $4,403.19 Change Order No. 4 One day time extension due to high winds on December 11, 1997 0.00 One day time extension to not work on December 26, 1997 0.00 One day time extension to not work on January 2, 1998 0.00 Change Order No. 5 Installation of parking notice sign in the median of Park Avenue $319.24 Change Order No. 6 Delete five 8" and one 4" Clow eccentric plug valves $<3,061.20> Install five 8" and one 4" Dezurik eccentric plug valves 6,152.45 Subtotal $3,091.25 Change Order No. 7 Install one 6" and one 4" water line valve and temporarily remove water line 0.00 Change Order No. 8 Revisions to electrical control panel $<17,633.20> Change Order No. 9 Eight calendar day time extension for weather - related delays to Section 5 Pump Station 0.00 Change Order No. 10 Five calendar day time extension for weather- related delays to Jade Avenue work 0.00 • CITY OF NEWPORT BEACH DANIEL BOYLE ENGMEERMG, INC. SECTION 5 SEWAGE PUMP STATION NO3 -107 -01 Page 12 a SECTION 5 SEWAGE PUMP STATION ON LITTLE BALBOA ISLAND FINAL PROJECT REPORT is JANUARY 1999 TABLE 1 SECTION 5 SEWAGE PUMP STATION ON LITTLE BALBOA ISLAND CHANGE ORDER SUMMARY DESCRIPTION COST Change Order No. 11 Bonus for early completion of Jade Avenue - Phase 11 Construction $14,000.00 Change Order No. 12 Loss of production time from encountering unknown underground utilities $574.01 Change Order No. 13 Install sewer service connection from apartments at Lewis house(127 E. Bay Front) $1,221.49 Modify manhole no. 6 :5 6. 8> Subtotal $ 344.81 Change Order No. 14 . One day time extension for weather - related delay to Section 5 Pump Station 0.00 One day time deletion for working on President's Day holiday 0.00 Change Order No. 15 Sheet piling to remain in place at pump station $25,000.00 Three daytime extension for additional work on Section 5 Pump Station 0.00 Subtotal $25,000.00 Change Order No. 16 Replacement of parking notice sign in the median of Park Avenue $341.49 Change Order No. 17 Install electrical, telephone, and cable TV conduit in East Alley $1,476.63 Install electrical, telephone, and cable TV conduit in Park Avenue 2,937.70 Subtotal $4,414.33 Change Order No. 1S One day time extension due to rain on March 25, 1998 0.00 Calendar day adjustment of two days on July 25 -26, 1998 0.00 One day time extension due to seawater intrusion on March 30/31, 1998 0.00 Labor and equipment for cleanup from seawater intrusion $1,008.18 One day time extension due to flooding of site on April 1, 1998 0.00 Subtotal $1,008.18 CITY OF NEWPORT BEACH DANIEL BOYLE ENGINEERING, INC. SECTION 5 SEWAGE PUMP STATION NO3 -107 -01 Page 13 �EWPpRT O� 6m r U, w SECTION 5 SEWAGE PUMP STATION ON LITTLE 13ALBOA ISLAND TABLE 1 FINAL PROJECT REPORT SECTION 5 SEWAGE PUMP STATION ON LITTLE BALBOA ISLAND CHANGE ORDER SUMMARY JANUARY DESCRIPTION COST Change Order No. 19 Install electrical, telephone, cable TV conduit and vaults in Park Avenue, lade Avenue, $27,094.00 East Alley, and South Alley Five daytime extension for underground conduit work 0.00 Calendar day adjustment of two days on August 1 -2, 1998 0.00 Subtotal $27,094.00 Change Order No. 20 Install 1 -inch conduit from Section 5 control panel to sea wall for tide gauge $3,472.00 Change Order No. 21 Rotate plug valve and fabricate special valve operator handle $719.56 Replace 2" water service with I" service, eliminate backflow preventer <80.00> Subtotal $639.56 Change Order No. 22 Modifications to force main, valve vault, and mechanical details in South Alley $7,986.00 Sea wall tieback and catch basin obstruction 1,717.00 Credit for not removing fill concrete from valve vault <410.00> Subtotal $9,293.00 Change Order No. 23 Increase motors, motors starters, and power cables from 15 hp to 25 hp on three peak $7,071.07 flow pumps Install interim cast iron submersible pumps and install final pumps upon delivery 0.00 Subtotal $7,071.07 Change Order No. 24 Remove and replace 207 sq ft of concrete pavement in South Alley east of Jade Avenue $ 4,101.91 Remove and replace 400 sq ft of concrete pavement in East Alley north of Park Avenue 5,730.65 Credit for damage to beaches at end of Park Avenue and Jade Avenue <I.500.00> Subtotal $8,332.56 Change Order No. 25 Extra work to demolish/remove abandoned valve vault and force main in South Alley $3,285.75 Core drill 30" hole in roof of old pump station 1,739.90 Subtotal $5,025.65 CITY OF NEWPORT BEACH DANIEL BOYLE ENGINEERING, INC. SECTION 5 SEWAGE PUMP STATION NO3 -107 -01 Page 14 0 1] 0 11 0 a¢WPogr m' SECTION 5 SEWAGE PUMP STATION U ^ S ON LITTLE BALBOA ISLAND FINAL PROJECT REPORT r LWX TABLE 1 SECTION 5 SEWAGE PUMP STATION ON LITTLE BALBOA ISLAND CHANGE ORDER SUMMARY DESCRIPTION COST Change Order No. 26 Reduce manholes from 60" diameter to 48" diameter $ <1,573.10> Utility support from SCE and Gas Company 3,220.84 One day time extension due to rain on May 5, 1998 0.00 One day time extension due to rain on May 13, 1998 0.00 Subtotal $1,647.74 Change Order No. 27 Install power cable from meter pedestal to control panel in Park Avenue $1,825.95 Modify South Alley valve vault to match alley slope for drainage and garage approach 1,255.58 Credit to City for deleting landscape restoration in Park Avenue median LI 423.50> Subtotal $1,658.03 Change Order No. 28 Modify IOOkVA generator to operate Cameo Shores pump station $2,413.34 Install Bilco "Ladder -Up" safety post ladder extensions 1 42 Subtotal $3,839.94 Change Order No. 29 Modify pump station valve vault hatch, vent piping, and 4" bypass piping configuration $2,624.63 One day time extension for installing vent piping on pump discharge pipes 0.00 Subtotal $2,624.63 Change Order No. 30 Bonus earned for early substantial completion of project $90,000.00 Change Order No. 31 Locate fire hydrant service connection in South Alley, abandon 2" line, relocate street $1,940.39 lighting junction box Change Order No. 32 Install 1/4 -inch thick neoprene seals on the undersides of the pump station hatches $1,051.28 Seal three pump station hatches and manhole no. I with caulk 371.06 Install sewer drop pipe and stainless steel screens in pump station wet well. 5,626.83 Remove pump station exhaust air vent stack, install 6 -inch dia. 90- degree elbow and attach to flex hosing to activated carbon cannister. 754.20 CITY OF NEWPORT BEACH SECTION 5 SEWAGE PUMP STATION Subtotal $7,803.37 DANIEL BOYLE ENGMF.ERING, INC. NO3 -107 -01 Page 15 SECTION 5 SEWAGE PUMP STATION ON LITTLE BALBOA ISLAND DESCRIPTION FINAL PROJECT REPORT TABLE 1 SECTION 5 SEWAGE PUMP STATION ON LITTLE BALBOA ISLAND CHANGE ORDER SUMMARY Change Order No. 33 Modify sewer drop piping in pump station wet well Relocated stainless steel low -level float switch bracket in pump station wet well Beard Electric resolution of claim for extra work for concrete encasement of conduits Subtotal SUMMARY Approved Change Order Total Original Contract Amount PROPOSED TOTAL CONTRACT AMOUNT PROJECT SAFETY $ 212,495.30 (12.76 %) 99-MAMIXIT11 SL,877,645.30 JANUARY 1999 COST $ 764.31 143.03 869.02 $1,776.36 Construction areas were fenced and barricaded throughout the project in order to keep residents and visitors safely out of harms way. Advanco Constructors, Inc., the Contractor, was responsible for site safety and placed a very high importance on site safety per OSHA requirements. No accidents were reported at the project site throughout the duration of the project. An accident at the staging area was reported to have occurred on January 7, 1998 when a crane tipped over while unloading a clamshell bucket from a flatbed trailer. Injuries to the operator consisted of a broken ankle. The accident was attributed to operator error with too much boom for the load being lifted. The operator, Mr. Steve Guidas, was authorized to operate this equipment. CITY OF NEWPORT BEACH DANIEL, BOYLE ENGINEERING, INC. SECTION 5 SEWAGE PUMP STATION NO3 -107 -01 Page 16 E 0 0 0 0 • � t>�POAT ° mm SECTION 5 SEWAGE PUMP STATION ON LITTLE BALBOA ISLAND FINAL PROJECT REPORT JANUARY 1999 COMMUNITY RELATIONS Residents were kept fully informed of the project progress and schedule through various means. The construction schedule was posted on the dewatering tank at the end of Park Avenue and provided an overview of the construction schedule. The project team worked closely with the Little Balboa Island Property Owner's Association to distribute information to residents through the Property Owner's Association monthly newsletter. The onsite construction representative fielded questions at the jobsite and by telephone at the construction management trailer. In spite of the general disruption and the parking and traffic inconvenience, residents have expressed their appreciation for the work that Advanco Constructors has done to maintain the project site in a clean and orderly manner, and the respect and demeanor towards the residents displayed by the construction workers. PROJECT STATUS PHOTOS The following photographs depict various elements of construction from April, 1998 to substantial project completion in June, 1998 and final project completion at the end of 1998: CITY OF NEWPORT BEACH SECTION 5 SEWAGE PUMP STATION PMW AVENUE (APRIL, 1998): A 30 -ton crane and flatbed tractor /trailer was used to transplant two palm trees from the project site to the median in Park Avenue near the bridge. Survival rate for the transplanted palm trees was 50 percent. DANIEL BOYLE ENGNEERNG, INC. NO3 -107 -01 Page 17 ��PORT °N �m SECTION 5 SEWAGE PUMP STATION ON LITTLE BALBOA ISLAND C �! �<�POPP FINAL PROJECT REPORT JANUARY1999 PUMP STATION VALVE VAULT (APRIL, 1998): The pre -cast concrete valve vault next to the pump station in Park Avenue was delivered in five pieces. Half of the bottom slab is being lowered into position with an 80 -ton crane. PUMP STATION VALVE VAULT (APRIL, 1998): The upper section of the pre -cast concrete valve vault in Park Avenue is being lowered and guided into position. CITY OF NEWPORT BEACH DANIEL BOYLE ENGINEERING, INC. SECTION 5 SEWAGE PUMP STATION NO3 -107 -01 Page 18 0 0 e�'"Ox> oa om V w S C,< /POP�`C SECTION 5 SEWAGE PUMP STATION ON LITTLE BALBOA ISLAND FINAL PROJECT REPORT JANUARY1999 PUMP STATION VALVE VAULT (APRIL, 1998): The soil backfill and compaction operation around the pump station valve vault in Park Avenue. The sheet piling was later cut off to three feet below grade. PUMP STATION (MAY, 1998): The electrical contractor is placing a colored (red oxide) concrete slurry mix over the electrical conduits between the control panel, pump station, and valve vault. The colored concrete slurry identifies the electrical conduit bank and protects the conduits from damage if future excavation is performed in the area. i- PUMP STATION CONTROL PANEL (MAY, 1998): View of the stainless steel control panel, wiring, and electrical controls at Park Avenue. OTY OF NEWPORT BEACH DANIEL BOYLE ENGINEERING, INC. SECTION 5 SEWAGE PUMP STATION NO3 -107 -01 Page 19 SECTION 5 SEWAGE PUMP STATION ON LITTLE BALBOA ISLAND C��IPOP�`r FINAL PROJECT REPORT JANUARY 1999 PUMP STATION WET WELL (MAY, 1998): A single 5 horsepower submersible sewage pump and a pair of 25 horsepower submersible sewage pumps as installed prior to beginning testing of the pump station. The two large pumps are temporary units to be replaced with stainless steel models prior to final acceptance of project. SOUTH ALLEY SEWER FORCE MAIN (APRIL, 1998): Installation of the 8 -inch sewer force main in the steel casing pipe previously installed through the old pump station in South Alley. Yelomine restrained joint PVC sewer pipe was used in the majority of the sewer force main construction. CITY OF NEWPORT BEACH DANA. BOYLE ENGINEERAIG, INC. SECTION 5 SEWAGE PUMP STATION NO3 -107 -01 Page 20 • • • SECTION 5 SEWAGE PUMP STATION ON LITTLE BALHGA ISLAND FINAL PROJECT REPORT • JANUARY 1999 SOUTH ALLEY SEWER FORCE MAIN (MAY, 1998): View looking east of the sewer force main connection to the sewer force main under the channel. Temporary bypass piping was used during construction to allow removal of the existing force main and installation of the South Alley valve vault while the old pump station remained in operation. SOUTH ALLEY SEWER FORCE MAIN VALVE VAULT (JUNE, 1998): The pre -cast concrete South Alley force main valve vault was delivered to the site in several pieces. One of the vault rings is being lifted by the truck - mounted crane and set in place. CRY OF NEWPORT BEACH DANIEL. BOYLE ENGDMMMG, INC. SECTION 5 SEWAGE PUMP STATION NO3 -107 -01 Page 21 o' SECTION 5 SEWAGE PUMP STATION ON LITTLE BALBOA ISLAND FINAL PROJECT REPORT JANUARY 1999 OLD PUMP STATION IN SOUTH ALLEY (JUNE, 1998): The Old pump station at South Alley and East Alley was demolished. The steel casing pipe installed earlier to carry the �zh' sewer force main can be seen. Older style square reinforcing j� steel was seen throughout the pump station structure. Following demolition of the deck and upper portion of the ;fit :walls of the old pump station, the remainder was filled with a concrete slurry mix. PARK AVENUE STREET REPLACEMENT (MAY, 1998): Concrete is being placed on the north side of Park Avenue at the end of the street. Street pavement in Park Avenue was replaced with an 8 -inch thick concrete section. CITY OF NEWPORT BEACH SECTION 5 SEWAGE PUMP STATION f y I 4{ SOUTH ALLEY STREET REPI.ACEM ENT (JUNE, 1998): View looking east while a 6 -inch thick layer of concrete pavement is being placed in South Alley. Much of the concrete pavement was placed using a small concrete pumper due to inaccessibility at the end of the alley. DANIEL BOYLE ENGINEERING, INC. NO3 -107 -01 Page 22 0 0 aem SECTION 5 SEWAGE PUMP STATION � ON LITTLE BALBOA ISLAND FINAL PROJECT REPORT JANUARY 1999 SOUTH ALLEY (JUNE, 1998): View of South Alley looking east after the street pavement has been replaced and the alley has been opened to public use. PARK AVENUE (JUNE, 1998): View of Park Avenue from the sea wall after the street pavement has been replaced and the street has been opened to the public. The pump station access hatches are in the center of Park Avenue. CITY OF NEWPORT BEACH DANIEL BOYLE ENO NEEmo, INC. SECTION 5 SEWAGE PUMP STATION NO3 -107 -01 Page 23