HomeMy WebLinkAbout14 - C-3225 - Newport Theatre Arts Center AdditionJune 14,1999 CITY COUNCIL AGENDA ITEM NO. 14 TO: Mayor and Members of the City Council FROM: Public Works Department SUBJECT: NEWPORT THEATRE ARTS CENTER ADDITION AWARD OF CONTRACT NO. 3225 RECOMMENDATIONS: 1. Approve the plans and specifications. 2. Award Contract No. 3225 to L.T.G. Construction Co. for the Total Bid Amount of $118,800, and authorize the Mayor and the City Clerk to execute the contract. 3. Establish an amount of $6,500 to cover the cost of unforeseen work. 4. Approve Amendment No. 1 to the Professional Services Agreement with Brion S. • Jeannette & Associates, Inc. DISCUSSION: At 11:00 A.M. on June 2, 1999, the City Clerk opened and read the following bids for this project: BIDDER TOTAL BID AMOUNT Low LTG Construction Co. 118,800.00 2 A & G Design & Construction 134,600.00 3 Ally Construction, Inc. 144,890.00 4 TLS Construction, Inc. 156,486.00 The low total bid amount is 1 % below the Engineer's Estimate of $120,000. The low bidder, LTG Construction Co., possesses a General Building contractor's license as required by the project specifications. LTG has satisfactorily completed similar remodeling and repair projects for the City and for other Southern California agencies. The work includes constructing a 2 story, 1232 square foot addition to the backside of . the Newport Theatre Arts Center (NTAC). This 15 -foot addition will provide a costume storage room downstairs, a back stage area upstairs, and an interior stairway to Subject: Newport Theatre Arts Center Addition — Award of Contract No. 3225 June 14, 1999 Page: 2 connect the 2 areas. The addition will be handicap accessible; including a back stage mechanized lift to elevate /lower wheelchairs between the auditorium and stage elevations. Once the work is completed, the metal storage container for costume storage will be emptied and removed from the lower parking lot. General Services staff will then reconstruct and re- stripe the parking lot and replace the landscaping and irrigation systems as necessary. Six eucalyptus trees will be removed and 2 parking spaces eliminated from the lower parking lot to provide the space needed for the addition (see attached exhibit). The loss of trees will be mitigated by replacing 6 King Palm trees along the easterly side of the 100 block of Riverside Drive. Bids will be obtained to perform that work. An agreement with the adjoining property owners to water the trees will also be needed. This is part of a beautification program for Riverside Avenue that was begun a number of years ago. The architectural firm of Brion S. Jeannette, Inc. (Jeannette) has prepared plans and specifications for the project. Jeannette was compensated for design under the terms of a $25,900 Professional Services Agreement that was authorized last fall by the City Manager. At staffs request, Jeannette has submitted a proposal to provide construction support services as follows (see attached letters dated December 23, 1998 and June 3, 1999): • Respond to requests for clarification or information, and prepare change orders • Attend onsite construction meetings • Review shop drawings • Provide minutes and telephoning • Prepare as -built drawings • Prepare punch lists, manuals and warranties Jeannette's fee for such services will not exceed $6,200. The total amount of Jeannette's services will therefore be $32,100, and staff requests that the City Council approve Amendment No. 1 to their Professional Services Agreement for construction support services. The NTAC addition is funded by the City's appropriation of $67,500 and a $90,000 contribution from the Friends of NTAC. Sufficient funds to award the construction contract, pay for unforeseen work and provide for construction support services are available under Account Nos. 7011- C4120430 (Facilities Rehab /Remodel Newport Theatre Arts Center) and 7251 - C4120430 (Contribution Newport Theatre Arts Center). The parking lot restoration, landscaping and irrigation system will be funded from appropriate accounts in the FY 1999 -2000 budget. \ \MIS- 1 \SYS\Users \PBW\Shared \COUNCIL \FY98- 99\June -14 \Newport Theatre Arts C- 3225.doc 7 i 0 0 Subject: Newport Theatre Arts Center Addition — Award of Contract No. 3225 June 14,1999 Page: 3 . To facilitate current stage productions and those scheduled for this fall, the contract specifies that work shall be completed within a short 50 consecutive working day time period. The completion date is the first week in September. Liquidated damages for late completion are $500 per calendar day. 1] Re cttu ly subm' ed, IC WORKS DEPARTMENT Don Webb, Director Dalton, Design Engineer Attachment: Bid summary Exhibit Letters dated December 23, 1998 and June 3, 1999 Amendment No. 1 to Agreement \WIIS- 1\SYS \Users\PBW\Shared\ COUNCIL \FY98- 99\June- 14Wewport Theatre Arts C- 3225.doc LL O w a H = Z V W a� W a mQ w Oo CL w� z0 U. O U J � m a a w Sa 0 ui F- m F- x U a' O 0 O W x U m � W U ? x N U U Z W O Q U U 3 O co J �p 0 m c 0 v °a `m c U N Q d f 3 wail wl �l W Q a' W W Q U W W Z_ 30 Z ce Wa c 0 v a e U A n J F r o o r o m o � O w J W W W Er _Z W C9 O Z w wa N r E N a n J d d 0 g z y�Q b m N 3 Brio'n s } Jeannette & Associates, Inc. ARCHITECTURE June 3, 1999 Lloyd Dalton P.O_ Box 1768 Newport Beach, CA 92658 Re: Newport Beach Theatre Arts Building Dear Lloyd: Below is the breakdown we used to figure out the construction phase fee. Please review the information below and let me know if you want to increase or decrease our involvement? Construction Phase 1. Respond to RFI, RFC and possible C.O.'s: 2. Site Meetings (at least twice a month) 1.25 hours each for a total of 8 meetings 3. Shop Drawing Review 4. Phone conversations, minutes, etc. 5_ As -Built Drawings 6. Punch LisyWnuals & Warranty TOTAL Please give me a call if you have any questions_ Sincerely, Robert Williams Architect, AIA 11 Hours 10 Hours 9.5 Hours 5 Hours 5 Hours 7 Hours 47.5 Hours ENERGY EFFICIENT ARCHITECTURE 6 470 Old Newport Boulevard • Newport Beach, CA • 92663 • Tel 949.645.5854 • Fax 949.645.5983 Members AIA & NCARB • U • • J 6rro S- 7."'Jeannette & Associates, Inc. December 23, 1998 Lloyd R. Dalton, P.E. Design Engineer- Public Works Department City of Newport Beach P.O. Box 1768 Newport Beach, Calif. 92658 -8915 FAX: (949) 644 -3318 Dear Lloyd, A R C T F CTlj -R E RC': DEC 2 8 1998 5 Pages I am enclosing our revised fee schedule for the Threater Arts Centre remodel. I am prepared to execute the City's 'Professional Services Agreement' as revised by Robin Clauson and I with the exception of the following three changes, approval for which she leaves compeletely to you. (NOTE: Robyn has the master.) Item 3.4.A The actual costs plus 10% of any subvconsultants for performance of any of the services which Consultant agrees to render pursuant to this AGreement which have been approved in advance by City and awarded in accordance with the terms and conditions of this Agreement. NOTE: The fees we have quoted in the enclosed fee schedule include this 10 %. The fees quoted are based upon fees available to us by our consultants as of this date. It is possible that these fees secured December 8'h could be subject to a fee adjustment, of not to exceed 10 %, by the consultants when the time actually comes to contract their work, several months from now. If so, we will not proceed without your prior written approval. Item 3.4.B. Actual computer data processing and reproduction charges plus 15 %. Item 3.5 Notwithstanding any other paragraph or provision of this Agreement, beginning on the effective date of this Agreement, City will not withhold a retention. All fees are due and payable within 30 days of invoicing unless appropriateness of fees billed is found to be unsubstantiated. As I hope you are aware, we will be closing Thursday, December 24'h at noon and will reopen Monday morning, January 4'h. If you have any questions I hope you can reach me Thursday morning. 1 look forward to receiving your original revised contract document soon. Kind regards, '61� Bonnie Jeannette Vice President ENERGY EFFICIENT ARCHITECTURE ® 470 Old Newport Boulevard • Newport Beach, CA • 92663 • Tel 949.645.5854 • Fax 949.645.5983 Members AIA & NCARB 0 AGREEMENT FOR ARCHITECTURAL SERVICES Thank you for the opportunity of submitting this Agreement to you for the remodel and addition to the Newport Theatre Arts Centre located on Cliff Drive in Newport Beach, California. This Agreement is being submitted to you on December 23, 1998 as defined in the original revised and approved schematic plans. We propose to provide the following services: Research - Study and examine the site in relationship to its environment & governing codes for the proposed remodel and addition. Review and verify client provided As -built drawings for the portions of the existing building affected by this project. Our research will of course, include the affected existing structure, but will necessarily involve assumptions about hidden or difficult -to- access areas. Detailed "as- built" drawings will not be prepared, however, nor will expensive efforts be made to ascertain the conditions of any existing construction. 2. Schematic Design Phase - No additional Schematic Design work is contracted. Plans will progress directly into Construction Documents based upon the marked up set provided by the city. 3. Preliminary Design Phase - No additional Preliminary Design work is contracted. Plans will • progress directly into Construction Documents based upon the marked up set provided by the city. 4. Construction Documents - Drawings and specifications set forth the requirements for the construction of the Project, including Building Department submittal for building permits. We specify and delineate interior finishes and trims for: walls, types of floor and ceiling finishes, windows, doors and hardware, plumbing and electrical finishes. Consulting Engineer- Secure, hire and coordinate structural engineer, Title 24 energy consultant, electrical engineer, mechanical engineer and spec writer. NOTE: Specifications and formatting will be handled by City of Newport Beach. City will provide a finished Spec Book. 6. Bidding or Negotiation Phase - Assist the Client with one bidding process, prebid site meeting with bidders, distributing bid plans, obtaining bids, negotiating proposals for construction and answering questions of the bidders. If additional bids are required after initial bid process time spent will be billed according to our normal hourly rates. 5. Construction Phase - Make periodic site visits & other visits needed and provide telephone assistance. . Brion S. Jeannette & Associates, Inc. ARCHITECTURE Agreement for Architectural Services Page 2 of 4 SECTION III FEE SCHEDULE 1. RESEARCH / BINDER /ASSUILT DRAWINGS ............................. $ 1,500.00 2. SCHEMATIC DESIGN PHASE ... ...... ............................... $ -0- 3. PRELIMINARY DESIGN PHASE ........ ............................... $ -0- 4. CONSTRUCTION DOCUMENT PHASE We specify and delineate interior finishes and trims for: wood will finishes, types of floor and ceiling finishes, windows, doors and hardware, plumbing and electrical finishes and cabinet elevations ............................. •............ $14,400.00 5. BIDDING AND NEGOTIATION PHASE .. ............................... $ -0- Services can be provided as requested according to our normal hourly rates. • 6. CONSTRUCTION PHASE ............ ............................... $ 6,200.00 ARCHITECTURAL SUBTOTAL $22,100.00 7. CONSULTANT FEES A. Model ...................... ............................... $ -0- B. Artist Rendering .............. ............................... $ -0- C. Preliminary Cost estimating service .............................. $ Eliminated C. Structural Engineering ... (Not Including property /landscape walls) .... $ 4,000.00 D. Mechanical and layout Title 24 - Energy Calculations ................. $ 2,750.00 E. Electrical Engineering .......... ............................... $ 2,650.00 F. Specification Writer ............ ............................... $ 600.00 G. Landscape Construction package . ............................... $ -0- ENGINEERING CONSULTANT SUBTOTAL $10,000.00 ARCHITECTURE AND CONSULTANT TOTAL $32,100.00 (�zoo•4�) • Z.S; 94!) . dD Brion S. Jeannette & Associates, Inc. ARCHITECTURE 17 Agreement for Architectural Services Page 3 of 4 ADDITIONAL SERVICES At the express request of the Client, the Architect shall provide any of the following additional services at the Architect's normal hourly rates or per fixed fees as determined appropriate: 1. Make revisions to the documents previously approved by Client. 2. Make revisions to documents previously prepared by the Architect and necessitated by site conditions that were neither foreseen nor reasonably foreseeable by the Architect at the time of preparation of original documents. 3. Provide design review or other agency or governmental appeal processing and hearings as may be necessary or desired by either the government agencies or Client. This includes modifications or variance conditions relative to your property or Project. 4. Assist the Client in retaining additional design consultants, including but not limited to civil, acoustical, archeological and landscape architects, communication experts and interior designers . 5. Interior design coordination and meetings beyond the normal scope of service. Specialized interior design consultation, drawings, or revisions to the plans generated by an interior designer. 6. Prepare rendering or models. 7. Bidding or negotiation - At the request of the Client and following the Client's approval of the construction documents, Architect and /or Project Manager shall assist the Client in obtaining bids, negotiating proposals for construction and answering questions of the bidders. 8. Prepare record documents which reflect construction phase design changes; however, the Architect shall not undertake to prepare documents which purport to reflect how the construction was actually performed. Information to generate Record drawings will be provided by the contractor. 9. Prepare to serve or serve as a consultant or witness for the Client or any other party in a litigation, public hearing or other legal or administrative proceeding involving the Project. REGARDING ADDITIONAL SERVICES Work requested by the Client beyond the scope herein will be considered as additional services and shall be charged at the following hourly office rates. These rates may be increased once each 12 months in light of market and economic conditions. Increases, if appropriate, will not exceed 10% in each 12 month period. Current rates as of the date of this Agreement are: Principal Project Architect Project Manager Senior Draftsman Intermediate Draftsman Junior Draftsman $180.00 per hour $130.00 per hour $100.00 per hour $ 80.00 per hour $ 70.00 per hour $ 48.00 per hour Brion S. Jeannette & Associates, Inc. ARCHITECTURE 0 • • Agreement for Architectural Services Page 3 of 4 E Please call with any questions regarding this proposal. I look forward to hearing from you soon. Sincerely, Bonnie Jea6atte Vice President i Brion S. Jeannette & Associates, Inc. ARCHITECTURE AMENDMENT NO. 1 TO PROFESSIONAL SERVICES AGREEMENT FOR NEWPORT THEATER ARTS THIS AMENDMENT NO. 1 TO PROFESSIONAL SERVICES AGREEMENT, made and entered into this day of ,1999, by and between the CITY OF NEWPORT BEACH, a municipal corporation, (hereinafter referred to as "CITY ") and Brion S. Jeannette & Associates, Inc., whose address is 470 Old Newport Boulevard, Newport Beach, California 92663 (hereinafter referred to as "CONSULTANT "), is made with reference to the following: RECITALS A. On January 15, 1999, a Professional Services Agreement was entered into by and between CITY and CONSULTANT, hereinafter referred to as "AGREEMENT ". B. CITY and CONSULTANT mutually desire to amend the AGREEMENT to include construction support services as set forth in CONSULTANT's letter proposal dated June 3, 1999. NOW, THEREFORE, it is mutually agreed by and between the undersigned parties as follows: 1. SERVICES TO BE PERFORMED CONSULTANT shall diligently perform all the duties set forth in the scope of services described in the June 3, 1999, letter attached hereto as Exhibit "A" and incorporated herein by reference. 0 ►_.J 0 2. COMPENSATION TO CONSULTANT CITY shall compensate CONSULTANT for construction support services an additional amount not to exceed $6,200, with total compensation to CONSULTANT for all services specified under AGREEMENT increased from $25,900 to a new not to exceed amount of $32,100. IN WITNESS WHEREOF, the parties have caused this AMENDMENT NO. 1 to be executed on the day and year first written above. APPROVED AS TO FORM: in Robin Clauson Assistant City Attorney ATTEST: M LaVonne Harkless City Clerk f: luserslpbvAldalton lagreemtsyeanette.002.doo CITY OF NEWPORT BEACH A Municipal Corporation By: Dennis D O'Neil, Mayor City of Newport Beach CONSULTANT: L0 Brion S. Jeannette, Owner Brion S. Jeannette & Associates, Inc. 4011 bid' "A " gr onS." �Ieannette & Associates, Inc. ARCHITECTURE June 3, 1999 Lloyd Dalton P.O. Box 1768 Newport Beach, CA 92658 Re: Newport Beach Theatre Arts Building Dear Lloyd: Below is the breakdown we used to figure out the construction phase fee. Please review the information below and let me know if you want to increase or decrease our involvement? Construction Phase 1. Respond to RFI, RFC and possible C.O.'s: 11 Hours 2. Site Meetings (at least twice a month) 1.25 hours each for a total of 8 meetings 10 Hours 3. Shop Drawing Review 9.5 Hours 4.I Phone conversations, minutes, etc. 5 Hours 5. As -Built Drawings 5 Hours 6. Punch Lisvmanuals & Warranty 7 Hours TOTAL 47.5 Hours Please give me a call if you have any questions. 4 Sincerely, 1� . f Robert Williams Architect, AIA ENERGY EFFICIENT ARCHITECTURE .................... .... .... — ... ........... ...._........ ....__...._.. _._- ...._._._...__._... ® 470 Old Newport Boulevard • Newport Beach, CA • 92663 • Tel 949.645.5854 • Fox 949.645.5983 Members AIA & NCARB ,,