HomeMy WebLinkAbout15 - C-3245 Storm Drain ImprovementsJuly 26, 1999
CITY COUNCIL AGENDA
ITEM NO. 15
TO: Mayor and Members of the City Council
FROM: Public Works Department
SUBJECT: MITIGATED NEGATIVE DECLARATION FOR 32ND STREET /NEWPORT
BOULEVARD STREET REHABILITATION AND 30TH STREET/
NEWPORT BOULEVARD STORM DRAIN IMPROVEMENTS,
CONTRACT NO. 3245
RECOMMENDATION:
Adopt the Mitigated Negative Declaration for the 32nd Street/Newport Boulevard Street
Rehabilitation and 30th Street/Newport Boulevard Storm Drain Improvements Project
DISCUSSION:
The City's Capital Improvement Program includes the 32nd Street/Newport Boulevard
Street Rehabilitation and 30th Street/Newport Boulevard Storm Drain Improvements
Project. The proposed project consists of the following:
• Replacement of an existing deteriorated storm drain with a new 36 inch storm
drain along Newport Boulevard between 300' Street and 31St Street
• Installation of a new 36 inch storm drain along 30th Street between Newport
Boulevard and Newport Harbor
• Installation of a new storm drain outlet into Newport Harbor at the eastern
terminus of 30th Street
• Resurfacing of the streets after the storm drain replacement is complete
• Resurfacing of 32nd Street between Newport and Balboa Boulevards
A Draft Initial Study for the proposed project was prepared pursuant to the California
Environmental Quality Act. It was filed with the Governor's Office of Planning and
Research State Clearinghouse for State review. The review period started on June 24,
1999 and concluded on July 23, 1999. The Draft Initial Study was provided to various
agencies including the California Coastal Commission, Department of Fish and Game,
Department of Health Services, Department of Parks and Recreation, Regional Water
Quality Control Board, State Coastal Conservancy and State Lands Commission.
The Draft Initial Study has determined that if the proposed conditions and mitigation
measures are applied to the project's design and operation, the project will not have a
significant effect on the environment. The suggested mitigation measures can be
incorporated into the plans and specifications for the project.
SUBJECT: Mitigated Negative Declaration for 32nd Street/Newport Boulevard Street Rehabilitation and 301" Street/Newport
Boulevard Storm Drain Improvements, Contract No. 3245
July 26, 1999
Page 2
Council adoption of the Mitigated Negative Declaration is a requirement prior to
submitting an application for the California Coastal Commission Permit.
Respectfully submitted,
PUBLIC WORKS DEPARTMENT
Don Webb, Director
By: /'G✓
Ed Wimmer
Senior Civil Engineer
Attachment: Draft Initial Study
0
f: \users\pbvAshared \council \fy99 -00\ uly- 26\32nd newport c- 3245.doc
DRAFT
NEGATIVE DECLARATION
To: From:
Office of Planning and Research City of Newport Beach
X® 1400 Tenth Street, Room 121 Public Works Department
Sacramento, CA 95814 3300 Newport Blvd
Newport Beach, CA 92663
(Orange County)
OCounty Clerk, County of Orange
Public Services Division
P.O. Box 238 Date received for filing at OPR/County Clerk:
Santa Ana, CA 92702
Public review period: June 24,1999 —July 269 1999
Name of Project: 32nd Street/Newport Boulevard Street Rehabilitation and
30" Street/Newport Boulevard Storm Drain Improvements
Project Location: Newport Boulevard between 30th and 32nd Streets, 30th Street from
Newport Boulevard to Newport Harbor, and 32nd Street between
Newport Boulevard and Balboa Boulevard, Newport Beach
Project Description: Please see attached Environmental Checklist
Fin": Pursuant to the provisions of City Council K -3 pertaining to procedures and guidelines to
implement the California Environmental Quality Act, the Environmental Affairs Committee has evaluated the
proposed project and determined that the proposed project would not have a significant effect on the environment.
A copy of the Initial Study containing the analysis supporting this finding is attached. The Initial Study
may include mitigation measures that would eliminate or reduce potential environmental impacts. This document
will be considered by the decision- maker(s) prior to final action on the proposed project. If a public hearing will
be held to consider this project, a notice of the time and location is attached.
Additional plans, studies and/or exhibits relating to the proposed project may be available for public
review. If you would like to examine these materials, you are invited to contact the undersigned.
If you wish to appeal the appropriateness or adequacy of this document, your comments should be
submitted in writing prior to the close of the public review period. Your comments should specifically identify
what environmental impacts you believe would result from the project, why they are significant, and what changes
or mitigation measures you believe should be adopted to eliminate or reduce these impacts. There is no fee for
this appeal. If a public hearing will be held, you are also invited to attend and testify as to the appropriateness of
this document.
If you have any questions or would like further information, please contact the undersigned at
(949- 644 - 33111). 77
fiP.P 9'Gt/�iwvt. Date 6 ��� 9 9
Edward V11mer, P.E.
ENVIRONMENTAL CHECKLIST
1. PROJECT TITLE;
32nd Street/Newport Blvd. Street Rehabilitation and
30th Street/Newport Blvd. Storm Drain Replacement
2. LEAD AGENCY NAME AND ADDRESS:
City of Newport Beach
3300 Newport Blvd.
Newport Beach, CA 92663
3. CONTACT PERSON AND PHONE NUMBER:
Ed Wimmer, P.E.
Senior Civil Engineer
City of Newport Beach Public Works Department
949 - 644 -3311
4. PROJECT LOCATION:
Newport Boulevard between 32nd and 30d' Streets, 32 "d Street between Newport
Boulevard and Balboa Boulevard, and 300' Street from Newport Boulevard to Newport
Harbor. (See Exhibit 1, Vicinity Map)
5. PROJECT SPONSOR'S NAME AND ADDRESS:
City of Newport Beach
3300 Newport Blvd.
Newport Beach, CA 92663
6. GENERAL PLAN DESIGNATION: Mixed Commercial
7. ZONING: SP -6 (Cannery Village/McFadden Square Specific Plan)
8. DESCRIPTION OF PROJECT (Describe the whole action involved, including but not
limited to, later phases of the project, and any secondary, support, or off =site features
necessary for its implementation. Attach additional streets if necessary):
The proposed project consists of the following components:
• Replacement of an existing deteriorated storm drain with a new 36" storm drain
along Newport Boulevard between 30" Street and 31" Street
City of Newport Beach initial Study/Draft Negative Declaration
32 "d Street/Newport Blvd. Street Rehabilitation and
30" Street/Newport Blvd. Storm Drain Improvements Page 1
Is
0
0
0
a Q BAKER ST.
m
U ADAMS AVE. $~
m COAST
CITY OF
Z ORANGE CO.
of G COSTA g FAIRGROUND o CITY
Z MESA s in 4?fry� IRVINE
1e'
LL MCTORIA ST. P�Sv cy
UPPER UNIVERSI,
NEKPOR
�1
U 19TH < ST. �P r BA% �° U.C.I.
s CITY
ry
F OF 9TSON AVE
NEWPrr4
BEAC
`'
SAN p R0.
e:
Cbr�
\� ,>
\ \
,o y CEENT TY
,9 i tr saN sTORA
`/0
PROJECT ir,
LOCATION 0
_
4'9ilr
VICINITY MAP
NOT TO SCALE
32ND SUNEWPORT BLVD. STREET REHABILITATION AND
30TH SUNEWPORT BLVD. STORM DRAIN IMPROVEMENTS
• Installation of a new 36" storm, drain along 301i Street between Newport Boulevard
and Newport Harbor
• Installation of a new storm drain outlet into Newport Harbor at the caste m terminus
of 30th Street
• Resurfacing of the streets after the storm drain replacement is complete
• Resurfacing of 32nd Street between Newport and Balboa Boulevards
Exhibit 2, Site Plan illustrates the locations of these project components.
It is anticipated that project construction will occur over a period of approximately two
months, between late September and November 1999.
9. SURROUNDING LAND USES AND SETTING (Briejly describe the project's
surroundings):
The project area and its immediate vicinity are characterized by mixed commercial, light
industrial and scattered residential uses in the area generally known as Cannery Village
(see Exhibit 3, Site Photos).
10. OTHER PUBLIC AGENCIES WHOSE APPROVAL IS REQUIRED (e.g., permits,
financing approval, or participation agreement):
The actions and approvals required to implement the project, which are part of this
analysis, include the following:
• Approval of plans and specifications by the Newport Beach City Council
• Approval of a discharge permit from the Regional Water Quality Control Board
• Approval of a Coastal Development Permit by the California Coastal Commission
Other agencies having review or permit authority over the project may be identified
during the environmental review process.
City of Newport Beach .
32"d Street/Newport Blvd. Street Rehabilitation and
301i Street/Newport Blvd. Storm Drain Improvements
Initial Study/Draft Negative Declaration
Page 3
0
E
32ND ST./NEWPORT BLVD. STREET REBILITATION AND
30TH ST. /NEWPORT BLVD. STORM DRAIN IMPROVEMENTS
�uali
LOCATION MAP
r= TO SME
Insert Exhibit 3 — Site Photos
0
Ll
City of Newport Beach Initial Study/Draft Negative Declaration
32 "d Street/Newport Blvd. Street Rehabilitation and
300' Street/Newport Blvd. Storm Drain Improvements Page 5
LOW
1
6�
n.l
J
IA
17: r
33!t
1
6�
I.
Jr,
WIS.
Lalt- 1 ;. - -
w457
1_7
�7il
I
Lalt- 1 ;. - -
w457
y#
3 4
3
• .r
rk
f-
ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED
The environmental factors checked below would be potentially affected by this proj lect, involving
at least one impact that is a "Potentially Significant Impact," as indicated by the chef klist on the
following pages.
DETERMINATION: (To be completed by the Lead Agency)
On the basis of this initial evaluation:
QI find that the proposed project COULD NOT have a significant effect on the
environment, and a NEGATIVE DECLARATION will be prepared.
7 I find that although the proposed project could have a significant effect on the
environment, there will not be a significant effect in this case because revisions in the project
have been made by or agreed to by the project proponent. A MITIGATED NEGATIVE
DECLARATION will be prepared.
QI find that the proposed project MAY have a significant effect on the environment, and an
ENVIRONMENTAL IMPACT REPORT is required.
I find that the proposed project MAY have a "potentially significant impact" or
"potentially significant unless mitigated" impact on the environment, but at least one effect 1) has
been adequately analyzed in an earlier document pursuant to applicable legal standards, and 2)
has been addressed by mitigation measures based on the earlier analysis as described on attached
sheets. An ENVIRONMENTAL IMPACT REPORT is required, but it must analyze only the
effects that remain to be addressed.
❑ I find that although the proposed project could have a significant effect on the
environment, because all potentially significant effects (a) have been analyzed adequately in an
earlier EIR or NEGATIVE DECLARATION pursuant to applicable standards, and (b) have been
avoided or mitigated pursuant to that earlier EIR or NEGATIVE DECLARATION, including
revisions,QL=gigation ameasust are imposed upon the proposed project, nothing further is
requi i
Signature Date
Don Webb, P.E.
Director of Public Works
Ciry of Newport Beach
32 "" Street/Newport Blvd. Street Rehabilitation and
30s' Street/Newport Blvd. Storm Drain Improvements
Initial Study/Draft Negative Declaration
Page 6
9
0
CJ
Aesthetics
Agricultural Resources Air ualit
Biological Resources
Cultural Resources Geology/ Soils
Hazards &Hazardous Materials
H fdrology / Water Quality Land Use/ Planning
Mineral Resources
Noise Population / Housing
Public Services
Recreation Transportation / Tramc
Utilities /services stern
Mandatory findings of Sig nificanee
DETERMINATION: (To be completed by the Lead Agency)
On the basis of this initial evaluation:
QI find that the proposed project COULD NOT have a significant effect on the
environment, and a NEGATIVE DECLARATION will be prepared.
7 I find that although the proposed project could have a significant effect on the
environment, there will not be a significant effect in this case because revisions in the project
have been made by or agreed to by the project proponent. A MITIGATED NEGATIVE
DECLARATION will be prepared.
QI find that the proposed project MAY have a significant effect on the environment, and an
ENVIRONMENTAL IMPACT REPORT is required.
I find that the proposed project MAY have a "potentially significant impact" or
"potentially significant unless mitigated" impact on the environment, but at least one effect 1) has
been adequately analyzed in an earlier document pursuant to applicable legal standards, and 2)
has been addressed by mitigation measures based on the earlier analysis as described on attached
sheets. An ENVIRONMENTAL IMPACT REPORT is required, but it must analyze only the
effects that remain to be addressed.
❑ I find that although the proposed project could have a significant effect on the
environment, because all potentially significant effects (a) have been analyzed adequately in an
earlier EIR or NEGATIVE DECLARATION pursuant to applicable standards, and (b) have been
avoided or mitigated pursuant to that earlier EIR or NEGATIVE DECLARATION, including
revisions,QL=gigation ameasust are imposed upon the proposed project, nothing further is
requi i
Signature Date
Don Webb, P.E.
Director of Public Works
Ciry of Newport Beach
32 "" Street/Newport Blvd. Street Rehabilitation and
30s' Street/Newport Blvd. Storm Drain Improvements
Initial Study/Draft Negative Declaration
Page 6
9
0
CJ
EVALUATION OF ENVIRONMENTAL IMPACTS
A brief explanation is required for all answers except "No Impact" answers that are adequately
supported by the information sources a lead agency cites in the parentheses following each
question. A "No Impact" answer is adequately supported if the referenced information sources
show that the impact simply does not apply to projects like the one involved (e.g., the project falls
outside a fault rupture zone). A "No Impact" answer should be explained where it is based on
project - specific factors, as well as general standards (e.g., the project would not expose sensitive
receptors to pollutants, based on a project - specific screening analysis).
All answers must take account of the whole action involved, including off -site as well as on -site,
cumulative as well as project - level, indirect as well as direct, and construction as well as
operational impacts.
Once the lead agency has determined that a particular physical impact may occur, then the
checklist answers must indicate whether the impact is potentially significant, less than significant
with mitigation, or less than significant. "Potentially Significant Impact" is appropriate if there is
substantial evidence that an effect may be significant. If there are one or more "Potentially
Significant Impact' entries when the determination is made, and EIR is required.
"Negative Declaration: Less Than Significant With Mitigation Incorporated" applies where the
incorporation of mitigation measures has reduced an effect from "Potentially Significant Impact'
to a "Less Than Significant Impact'. The lead agency must describe the mitigation measures, and
briefly explain how they reduce the effect to a less than significant level (mitigation measures
from Section XVII, "Earlier Analyses ", may be cross - referenced).
Earlier analyses may be used where, pursuant to the tiering, program EIR, or other CEQA
process, an effect has been adequately analyzed in an earlier EIR or negative declaration. Section
15063(c)(3)(D). Earlier analyses are discussed in Section XVII at the end of the checklist. In this
case, a brief discussion should identify the following:
a) Earlier Analysis Used. Identify and state where they are available for review
b) Impacts Adequately Addressed. Identify which effects from the above checklist were
within the scope of and adequately analyzed in an earlier document pursuant to applicable legal
standards, and state whether such effects were addressed by mitigation measures based on the
earlier analysis.
C) Mitigation Measures. For effects that are "Less than Significant with Mitigation
Measures Incorporated ", describe the mitigation measures which were incorporated or refined
from the earlier document and the extent to which they address site - specific conditions for the
project.
Lead agencies are encouraged to incorporate into the checklist references to information sources
for potential impacts (e.g., general plans, zoning ordinances). Reference to a previously prepared
or outside document should, where appropriate, include a reference to the page or pages where
the statement is substantiated. A source list should be attached, and other sources used or
individuals contacted should be cited in the discussion.
City of Newport Beach Initial Study/Draft Negative Declaration
32nd Street/Newport Blvd. Street Rehabilitation and
30d' Street/Newport Blvd. Stoma Drain Improvements Page 7
Supporting Information Sources: A source list should be attached, and other sources used or
individuals contacted should be cited in the discussion.
This is only a suggested form, and lead agencies are free to use different formats; however, lead
agencies should normally address the questions from this checklist that are relevant to a project's
environmental effects in whatever format is selected.
The explanation of each issue should identil[y:
a) The significance criteria or threshold, if any used to evaluate each question; and
b) The mitigation measure identified, if any, to reduce the impact to less than significant.
City of Newport Beach
32nd Street/Newport Blvd. Street Rehabilitation and
30d' Street/Newport Blvd. Storm Drain Improvements
Initial Study/Draft Negative Declaration
Page 8
9
E
C�
0
City of Newport Beach
32nd Street/Newport Blvd. Street Rehabilitation and
30d' Street/Newport Blvd. Storm Drain Improvements
Initial Study/Draft Negative Declaration
Page 9
Lcss Than
Potentially
Significant
Less Than
No
Issues
Significant
With
Significant
Impact
Impact
Mitigation
Impact
-
Incorporated
I. AESTHETICS Would the proposal.
a) Have a substantial adverse effect on a
X
scenic vista?
b) Substantially damage scenic resources,
including, but not limited to, trees, rock
X
outcroppings, and historic buildings within a state
scenic highway?
C) Substantially degrade the existing visual
character or quality of the site and its
X
surroundings?
d) Create a new source of substantial light or
glare, which would adversely affect day or
X
nighttime views in the area?
II. AGRICULTURE RESOURCES. In determining whether impacts to agricultural
resources are significant environmental effects, lead agencies may refer to the
California Agricultural Land Evaluation and Site Assessment Model (1997)
prepared by the California Dept. of Conservation as an optional model to use in
assessing impacts on agriculture and farmland. Would the ro'ect:
a) Convert Prime Farmland, Unique
Farmland, or Farmland of Statewide Importance
(Farmland), as shown on the maps prepared
X
pursuant to the Farmland Mapping and
Monitoring Program of the California Resources
Agency, to non-agricultural use?
b) Conflict with existing zoning for
X
agricultural use or a Williamson Act contract?
C) Involve other changes in the existing
environment which, due to their location or
nature, could result in conversion of Farmland, to
X
non - agricultural use?
III. AIR QUALITY. Where available, the significance criteria established by the.
applicable air quality management or air pollution control district may be relied
upon to make the following determinations. Would the project:
a) Conflict with or obstruct implementation
X
of the applicable air quality Ian?
b) Violate any air quality standard or
contribute substantially to an existing or projected
X
air quality violation?
City of Newport Beach
32nd Street/Newport Blvd. Street Rehabilitation and
30d' Street/Newport Blvd. Storm Drain Improvements
Initial Study/Draft Negative Declaration
Page 9
City of Newport Beach
32 "" Street/Newport Blvd. Street Rehabilitation and
30'h Street/Newport Blvd. Storm Drain Improvements
Initial Study/Draft Negative Declaration
Page 10
11
0
Less Than
Potentially
Significant
Less Than
No
Issues
Significant
With
Significant
Impact
Impact
Mitigation
Impact
Incorporated
C) Result in a cumulatively considerable net
increase of any criteria pollutant for which the
project region is non - attainment under an
applicable federal or state ambient air quality
X
standard (including releasing emissions, which
exceed quantitative thresholds for ozone
precursors)?
d) Expose sensitive receptors to substantial
X
concentrations?
—pollutant
e) Create objectionable odors affecting a
substantial number of people?
X
IV. BIOLOGICAL RESOURCES. Would the rAeet:
a) Have a substantial adverse effect, either
directly or through habitat modifications, on any
species identified as a candidate, sensitive, or
special status species in local or regional plans,
X
policies, or regulations, or by the California
Department of Fish and Game or U.S. Fish and
Wildlife Service?
b) Have a substantial adverse effect on any
riparian habitat or other sensitive natural
community identified in local or regional plans,
X
policies, regulations, or by the California
Department of Fish and Game or U.S. Fish and
Wildlife Service?
C) Have a substantial adverse effect on
federally protected wetlands as defined by Section
404 of the Clean Water Act (including, but not
X
limited to, marsh, vernal pool, coastal, etc.)
through direct removal, filling, hydrological
interruption, or other means?
d) Interfere substantially with the movement
of any native resident or migratory fish or wildlife
species or with established native resident or
X
migratory wildlife corridors, or impede the use of
native wildlife nursery sites?
e) Conflict with any local policies or
ordinances protecting biological resources, such
X
as a tree preservation policy or ordinance?
p Conflict with the provisions of an adopted
Habitat Conservation Plan, Natural Community
Conservation Plan, or other approved local,
regional or state habitat conservation plan?
X
City of Newport Beach
32 "" Street/Newport Blvd. Street Rehabilitation and
30'h Street/Newport Blvd. Storm Drain Improvements
Initial Study/Draft Negative Declaration
Page 10
11
0
0
E
City of Newport Beach Initial Study/Draft Negative Declaration
32°" Street/Newport Blvd. Street Rehabilitation and
30°i Street/Newport Blvd. Storm Drain Improvements Page I I
Less Than
Potentially
significant
Less Than
No
Issues
Significant
With
Significant
Impact
Impact
Mitigation
Impact
Incorporated
V. CULTURAL RESOURCES. Would the project:
a) Cause a substantial adverse change in the
significance of a historical resource as defined in
X
15064.5?
b) Cause a substantial adverse change in the
significance of an archaeological resource
X
pursuant to § 15064.5?
C) Directly or indirectly destroy a unique
paleontological resource or site or unique geologic
X
feature?
d) Disturb any human remains, including
those interred outside of formal cemeteries?
X
VI. GEOLOGY AND SOILS. Would the project:
a) Expose people or structures to potential
substantial adverse effects, including the risk of
loss injury, or death involving:
i) Rupture of a known earthquake fault, as
delineated on the most recent Alquist -Priolo
Earthquake Fault Zoning map, issued by the State
Geologist for the area or based on other
X
substantial evidence of a known fault? Refer to
Division of Mines and Geology Special
Publication 42.
ii) Strong seismic ground shaking?
X
iii) Seismic - related ground failure, including
X
liquefaction?
iv Landslides?
X
b) Result in substantial soil erosion or the
X
loss of topsoil?
C) Be located on a geologic unit or soil that
is unstable, or that would become unstable as a
result of the project, and potentially result in on-
X
or off -site landslide, lateral spreading, subsidence,
liquefaction or collapse?
d) Be located on expansive soil, as defined
in Table 18 -1 -B of the Uniform Building Code
X
(1994), creating substantial risks to life or
property?
e) Have soils incapable of adequately
supporting the use of septic tanks or alternative
wastewater disposal systems where sewers are not
available for the disposal of wastewater?
X
City of Newport Beach Initial Study/Draft Negative Declaration
32°" Street/Newport Blvd. Street Rehabilitation and
30°i Street/Newport Blvd. Storm Drain Improvements Page I I
City of Newport Beach
32nd Street/Newport Blvd. Street Rehabilitation and
3e Street/Newport Blvd. Storm Drain improvements
Initial Study/Draft Negative Declaration
Page 12
0
1` 1
Less Than
Potentially
Significant
Less Than
No
Issues
Significant
With
Significant
Impact
Impact
Mitigation
Impact
Incorporated
VII. HAZARDS AND HAZARDOUS MATERIALS. Would the project:
a) Create a significant hazard to the public
or the environment through the routine transport,
X
use or disposal of hazardous materials?
b) Create a significant hazard to the public
or the environment through reasonable
foreseeable upset and accident conditions
X
involving the release of hazardous materials into
the environment?
C) Emit hazardous emissions or handle
hazardous or acutely hazardous materials,
X
substances, or waste within one - quarter mile of an
existing or proposed school?
d) Be located on a site which is included on
a list of hazardous materials sites compiled
pursuant to Government code Section 65962.5
X
and, as a result, would it create a significant
hazard to the public or the environment?
e) For a project located within an airport
land use plan or, where such a plan has not been
adopted, within two miles or a public airport or
X
public use airport, would the project result in a
safety hazard for people residing or working in the
project area?
f) For a project within the vicinity of a
private airstrip, would the project result in a safety
X
hazard for people residing or working in the
project area?
g) Impair implementation of or physically
interfere with an adopted emergency response
X
plan or emergency evacuation plan?
h) Expose people or structures to a
significant risk of loss, injury or death involving
wildland fires, including where wildlands are
X
adjacent to urbanized areas or where residences
are intermixed with wildlands?
VIII. HYDROLOGY AND WATER QUALITY. Would the p roect:
a) Violate any water quality standards or
X
waste discharge re uirements?
b) Substantially deplete groundwater
supplies or interfere substantially with
groundwater recharge, such that there would be a
net deficit in aquifer volume or a lowering of the
local groundwater table level (e.g., the production
X
rate of pre- existing nearby wells would drop to a
level which would not support existing land uses
or planned uses for which permits have been
granted)?
City of Newport Beach
32nd Street/Newport Blvd. Street Rehabilitation and
3e Street/Newport Blvd. Storm Drain improvements
Initial Study/Draft Negative Declaration
Page 12
0
1` 1
0
0
City of Newport Beach
32nd Street/Newport Blvd. Street Rehabilitation and
300' Street/Newport Blvd. Storm Drain Improvements
Initial Study/Draft Negative Declaration
Page 13
Less Than
Potentially
Significant
Less Than
No
Issues
Significant
With
Significant
Impact
Impact
Mitigation
Impact
Incor orated
C) Substantially alter the existing drainage
pattern of the site or area, including through the
alteration of the course of a stream or river, in a
X
manner which would result in substantial erosion
or siltation on- or off -site?
d) Substantially alter the existing drainage
pattern of the site or area, including through the
alteration of the course of a stream or river, or
X
substantially increase the rate or amount of
surface runoff in a manner, which would result in
flooding on- or off -site?
e) Create or contribute runoff water which
would exceed the capacity of existing or planned
X
stormwater drainage systems or provide
substantial additional sources of polluted runoff?
f) Otherwise substantially degrade water
X
quality?
g) Place housing within a 100 -year flood
hazard area as mapped on a federal Flood hazard
X
Boundary of Flood Insurance Rate Map or other
flood hazard delineation map?
h) Place within 100 -year flood hazard area
structures, which would impede or redirect flood
X
flows?
i) Expose people or structures to a
significant risk of loss, injury or death involving
X
flooding, including flooding as a result of the
failure of a levee or dam?
j) Inundation by seiche, tsunami, or
mudflow?
X
IX. LAND USE AND PLANNING. Would the pro et:
a) Physically divide an established
X
community?
b) Conflict with any applicable land use
plan, policy, or regulation of an agency with
jurisdiction over the project (including, but not
limited to the general plan, specific plan, local
X
coastal program, or zoning ordinance) adopted for
the purpose of avoiding or mitigating an
environmental effect?
C) Conflict with any applicable habitat
conservation plan or natural community
X
conservation plan?
X. MINERAL RESOURCES. Would the project:
a) Result in the loss of availability of a
known mineral resource at would be a value to
th
X
there ion and the residents of the state?
City of Newport Beach
32nd Street/Newport Blvd. Street Rehabilitation and
300' Street/Newport Blvd. Storm Drain Improvements
Initial Study/Draft Negative Declaration
Page 13
City of Newport Beach
32 "d Street/Newport Blvd. Street Rehabilitation and
3& Street/Newport Blvd. Storm Drain Improvements
Initial Study/Draft Negative Declaration
Page 14
0
•
Less Than
Potentially
Significant
Less Than
No
Issues
Significant
With
Significant
Impact
Impact
Mitigation
Impact
Incorporated
b) Result in the loss of availability of a
locally important mineral resource recovery site
delineated on a local general plan, specific plan or
X
other land use plan?
XI. NOISE. Would the project result in:
a) Exposure of persons to or generation of
noise levels in excess of standards established in
X
the local general plan or noise ordinance, or
applicable standards of other agencies?
b) Exposure of persons to or generation of
excessive groundborne vibration or groundborne
X
noise levels?
C) A substantial permanent increase in
ambient noise levels in the project vicinity above
X
levels existing without the project?
d) A substantial temporary or periodic
increase in ambient noise levels in the project
X
vicinity above levels existing without the project?
e) For a project located within an airport
land use plan or, where such a plan has not been
adopted, within two miles of a public airport or
X
public use airport, would the project expose
people residing or working in the project area to
excessive noise levels?
f) For a project within the vicinity of a
private airstrip, would the project expose people
residing or working in the project area to
X
excessive noise levels?
X11. POPULATION AND HOUSING. Would the ro ect:
a) Induce substantial population growth in
an area, either directly (for example, by proposing
new homes and businesses) or indirectly (for
X
example, through extension of roads or other
infrastructure)?
b) Displace substantial numbers of existing
housing, necessitating the construction of
X
replacement housin g elsewhere?
C) Displace substantial numbers of people,
necessitating the construction of replacement
X
housing elsewhere?
City of Newport Beach
32 "d Street/Newport Blvd. Street Rehabilitation and
3& Street/Newport Blvd. Storm Drain Improvements
Initial Study/Draft Negative Declaration
Page 14
0
•
0
•
L_J
City of Newport Beach
32nd Street/Newport Blvd. Street Rehabilitation and
30d' Street/Newport Blvd. Storm Drain Improvements
Initial Study/Draft Negative Declaration
Page 15
Less Than
Potentially
Significant
Less Than
No
Issues
Significant
With
Significant
Impact
Impact
Mitigation
Impact
Incor orated
XIII. PUBLIC SERVICES. Would the project result in substantial adverse physical
impacts associated with the provision of new or physically altered governmental
facilities, need for new or physically altered governmental facilities, the construction
of which could cause significant environmental impacts, in order to maintain
acceptable service ratios, response times or other performance objectives for any of
the public services:
a) Fire protection?
X
b) Police protection?
X
C) Schools?
X
d) Parks?
X
e) Other public facilities?
X
XIV. RECREATION.
a) Would the project increase the use of
existing neighborhood and regional parks or other
recreational facilities, such that substantial
X
physical deterioration of the facility would occur
or be accelerated?
b) Does the project include recreational
facilities or require the construction or expansion
of recreational facilities, which might have an
X
adverse physical effect on the environment?
XV. TRANSPORTATION/TRAFFIC. Would the ro'ect:
a) Cause an increase in traffic, which is
substantial in relation to the existing traffic load
and capacity of the street system (i.e., result in a
X
substantial increase in either the number of
vehicle trips, the volume to capacity ratio on
roads or congestion at intersections)?
b) Exceed, either individually or
cumulatively, a level of service standard
X
established by the county congestion management
agency for designated roads or highways?
C) Result in a change in air traffic patterns,
including either an increase in traffic levels or a
X
change in location that results in substantial safety
risks?
d) Substantially increase hazards due to a
design feature (e.g., sharp curves or dangerous
X
intersections) or incompatible uses (e.g., farm
equipment)?
C) Result in inadequate emergency access?
X
f) Result in inadequate parking capacity?
X
City of Newport Beach
32nd Street/Newport Blvd. Street Rehabilitation and
30d' Street/Newport Blvd. Storm Drain Improvements
Initial Study/Draft Negative Declaration
Page 15
City of Newport Beach Initial Study/Draft Negative Declaration
32nd Street/Newport Blvd. Street Rehabilitation and
30" Street/Newport Blvd. Storm Drain Improvements Page 16
Less Than
Issues
Potentially
Significant
Significant
With
Less Than
Significant
No
Impact
Mitigation
Impact
impacl
Incor orated
g) Conflict with adopted policies, plans, or
programs supporting alternative transportation
X
(e.g., bus turnouts, bicycle racks)?
XVI. UTILITIES AND SERVICE SYSTEMS. WotaId the project:
a) Exceed wastewater treatment
requirements of the applicable Regional Water
X
Quality Control Board?
b) Require or result in the construction of
new water or wastewater treatment facilities or
expansion of existing facilities, the construction of
X
which could cause significant environmental
effects?
C) Require or result in the construction of
new storm water drainage facilities or expansion
X
of existing facilities, the construction of which
could cause significant environmental effects?
d) Have sufficient water supplies available
to serve the project from existing entitlements and
X
resources or are new or expanded entitlements
needed?
e) Result in a determination by the
wastewater treatment provider, which serves or
may serve the project that it has adequate capacity
X
to serve the project's projected demand in addition
to the provider's existing commitments?
f) Be served by a landfill with sufficient
permitted capacity to accommodate the project's
X
solid waste disposal needs?
g) Comply with federal, state, and local
statutes and regulations related to solid waste?
X
XVII. MANDATORY FINDINGS OF SIGNIFICANCE.
a) Does the project have the potential to
degrade the quality of the environment,
substantially reduce the habitat of a fish or
wildlife species, cause a fish or wildlife
population to drop below self - sustaining levels,
X
threaten to eliminate a plant or animal community,
reduce the number or restrict the range of a rare or
endangered plant or animal or eliminate important
examples of the major periods of California
history or rehistory?
City of Newport Beach Initial Study/Draft Negative Declaration
32nd Street/Newport Blvd. Street Rehabilitation and
30" Street/Newport Blvd. Storm Drain Improvements Page 16
L-1
0
0
Issues
Potcntially
significant
Impact
Less Than
significant
With
Mitigation
Incorporated
Less Than
significant
Impact
No
Impact
b) Does the project have impacts that are
individually limited, but cumulatively
considerable? ( "Cumulatively considerable"
means that the incremental effects of a project are
considerable when viewed in connection with the
X
effects of past projects, the effects of other current
projects, and the effects of probable future
projects.)
C) Does the project have environmental
effects, which will cause substantial adverse
effects on human beings, either directly or
X
indirectly?
City of Newport Beach
32" Street/Newport Blvd. Street Rehabilitation and
30°i Street/Newport Blvd. Storm Drain Improvements
Initial Study/Draft Negative Declaration
Page 17
ENVIRONMENTAL ANALYSIS
This section provides the explanations and supporting analysis for the impact categories
and questions contained in the previous checklist, and identifies mitigation measures
where applicable. Topics that have no identified impacts, or that have impacts
determined to be less than significant without mitigation, will not be discussed in the
environmental impact report.
L AESTHETICS
Would the project:
a) Have a substantial adverse effect on a scenic vista?
Less Than Significant Impact. The proposed storm drain project would only be visible at
the outlet into Newport Bay, since the piping would be installed below grade. The outlet would
be constructed in the existing seawall with a tide gate. Although Newport Bay is a notable scenic
resource, the outlet would be similar to other outlets that are common around the bay; therefore
no substantial impacts to scenic vistas would result. Furthermore, the outlet would,most likely be
obscured by docks located adjacent to the bulkhead (see Exhibit 3, Site Photos). No mitigation
measures are necessary.
During construction, there would be a temporary visual impact to views. These impacts are not
considered significant due to their brief duration (i.e., approximately two months).
b) Substantially damage scenic resources, including, but not limited to, trees, rock
outcroppings, and historic buildings within a state scenic highway?
Less Than Significant Impact. See La. above. There are no scenic resources other than
Newport Harbor in the immediate vicinity of the project. No mitigation measures are necessary.
c) Substantially degrade the existing visual character or quality of the site and its
surroundings?
Less Than Significant Impact. See discussion under I.a and I.b, above. No mitigation
measures are necessary.
d) Create a new source of substantial light or glare, which would adversely affect day or
nighttime views in the area?
No Impact. The proposed storm drain project would not create any new source of light or
glare. No mitigation measures are necessary.
City of Newport Beach Initial Study/Draft Negative Declaration
32nd Street/Newport Blvd. Street Rehabilitation and
30'" Street/Newport Blvd. Storm Drain Improvements Page 18
E
II. AGRICULTURE RESOURCES
Would the project:
a) Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance
(Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and
Monitoring Program of the California Resources Agency, to non- agricultural use?
No Impact. No agricultural activities occur in the project vicinity. No mitigation
measures are necessary.
b) Conflict with existing zoning for agricultural use, or a Williamson Act contract?
No Imnact. The site is not zoned for agriculture and there are no Williamson Act
contracts in the vicinity. No mitigation measures are necessary.
C) Involve other changes in the existing environment which, due to their location or
nature, could result in conversion of farmland, to non- agricultural use?
No Impact. The project would not involve any changes that could result in the
conversion of farmland. No mitigation measures are necessary.
III. AIR QUALITY
Where available, the significance criteria established by the applicable air quality management
district or air pollution control district may be relied upon to make Ac following
determinations. Would the project:
a) Conflict with or obstruct implementation of the applicable air quality plan?
Less Than Significant Imnact. The project would result in emissions during construction
(e.g., dust, construction equipment exhaust). No emissions would be generated after construction
is completed. It is anticipated that construction equipment will be limited to one backhoe/loader,
one dump truck and one sweeper at the end of each workday. This combination of equipment is
estimated to generate substantially less that the significance thresholds identified in the South
Coast Air Quality Management District's 1993 CEQA Air Quality Handbook, Table A9 -8 -E. -As
a result, the project would not conflict with or obstruct implementation of the air quality plan.
Standard contract specifications require that all construction equipment be maintained in proper
working order, which would minimize emissions. No additional mitigation is necessary.
b) Violate any air quality standard or contribute substantially to an existing or projected
air quality violation?
Less Than Significant Impact. See Section III.a, above.
City of Newport Beach
32nd Street/Newport Blvd. Street Rehabilitation and
3e Street/Newport Blvd. Storm Drain Improvements
Initial Study/Draft Negative Declaration
Page 19
C) Result in a cumulatively considerable net increase of any criteria pollutant for which
the project region is non- attaiument under an applicable federal or state ambient air quality
standard (including releasing emissions which exceed quantitative thresholds for ozone
precursors) ?
Less Than Significant Impact. See Section III.a, above.
d) Expose sensitive receptors to substantial pollutant concentrations?
Less Than Significant Impact. See Section III.a, above.
e) Create objectionable odors affecting a substantial number ofpeople?
Less Than Significant Impact. Diesel- powered equipment used for excavation and
construction could cause odors and emissions that may be offensive to sensitive receptors. There
are some residences immediately adjacent to the storm drain alignment, therefore this
construction activity would occur in close proximity to sensitive receptors. It is estimated that
construction will proceed at an average rate of 100 to 200 feet per day, therefore any given
residence would only be impacted for I or 2 days at most. As a result, the issue of odor
generation is expected to be less than significant.
IV. BIOLOGICAL RESOURCES
Would the project:
a) Have a substantial adverse effect, either directly or through habitat modifications, off
any species identified as a candidate, sensitive, or special status species in local or regional
plans, policies, or regulations, or by the California Department of Fish and Game or U.S. Fish
and Wildlife Service?
Less Than Significant Impact. Although urban runoff contains contaminants (e.g., oil,
heavy metals, pesticides) the construction of a new storm drain and outlet would not have a
substantial effect on water quality in Newport Bay since the same runoff from the project area
currently flows into the bay through the existing storm drain system. No mitigation measures are
necessary.
b) Have a substantial adverse effect on airy riparian habitat or other sensitive natural
community identified in local or regional plans, policies, regulations, or by the California
Department of Fish and Game or U.S. Fish and Wildlife Service?
Less Than Significant Impact. See Section IV.a. above.
C) Have a substantial adverse effect on federally protected wetlands as defined by Section
404 of the Clean Water Act (including, but not limited to, marsh, vernal pool, coastal, etc.)
through direct removal, filling, hydrological interruption, or other means?
Less Than Significant Impact. See Section IV.a. above.
City of Newport Beach Initial Study/Draft Negative Declaration
32 "d Street/Newport Blvd. Street Rehabilitation and
3e Street/Newport Blvd. Storm Drain Improvements Page 20
Ll
•
d) Interfere substantially with the movement of any native resident or migratory fish or
wildlife species or with established native resident or migratory wildlife corridors, or impede
the use of native wildlife nursery sites?
Less Than Significant Impact. See Section Ma. above.
e) Conflict with any local policies or ordinances protecting biological resources, such as a
tree preservation policy or ordinance?
Less Than Significant Impact. See Section IV.a. above.
J) Conflict with the provisions of an adopted Habitat Conservation Plan, Natural
Community Conservation Plan, or other approved local, regional, or state habitat conservation
plan?
No Imvact. The site is not included in any Habitat Conservation Plan or NCCP area. No
mitigation measures are necessary.
V CULTURAL RESOURCES
Would the project:
a) Cause a substantial adverse change in the significance of a historical resource as
defined in §15064.5?
No Imvact. There are no historic resources on the site. No mitigation measures are
necessary.
b) Cause a substantial adverse change in the significance of an archaeological resource
pursuant to § 15064.5?
No Impact. There are no (mown archaeological resources in the vicinity. Balboa
Peninsula is composed primarily of sand and dredged material, therefore there is a very low
probability that archaeological resources are present. No mitigation measures are necessary.
c) Directly or indirectly destroy a unique paleontological resource or site or unique
geologicfeature?
No Impact. There are no known paleontological resources in the vicinity. Balboa
Peninsula is composed primarily of sand and dredged material, therefore there is a very low
probability that paleontological resources are present. No mitigation measures are necessary.
d) Disturb any human remains, including those interred outside offormal cemeteries?
No Impact. Balboa Peninsula is composed primarily of sand and dredged material,
therefore there is a very low probability that any human remains could be present. No mitigation
measures are necessary.
City of Newport Beach
32 "" Street/Newport Blvd. Street Rehabilitation and
30°i Street/Newport Blvd. Storm Drain Improvements
Initial Study/Draft Negative Declaration
Page 21
VI. GEOLOGYA" SOILS
Would the project
a) Expose people or structures to potential substantial adverse effects, including the risk
ofloss, injury, or death involving:
i) Rupture of a known earthquake fault, as delineated on the most recent Alquist-
Priolo Earthquake Fault Zoning Wrap, issued by the State Geologist for the
area or based on other substantial evidence of a known fault? Refer to
Division of Mines and Geology Special Publication 42.
No Imnact. There are no known earthquake faults or Alquist - Priolo zones within
the vicinity of the project. No mitigation is necessary.
ii) Strong seismic ground shaking?
No Impact. Although there are no known earthquake faults in the project
vicinity, the area is subject to strong seismic ground shaking, as is the case with
all of Southern California. This does not present a significant impact, however,
since no serious hazards would result if a break were to occur in the storm drain
as a result of seismic shaking. No mitigation measures are necessary.
iii) Seismic - related ground failure, including liquefaction?
No Impact. See item a)ii, above. .
iv) Landslides?
No Impact. The project area is nearly flat and no significant risk of landslide is
present. No mitigation measures are necessary.
b) Result in substantial soil erosion or the loss of topsoil?
Less Than Significant Impact. The project area is completely urbanized and the project is
located entirely within street rights -of -way, therefore no soil erosion or loss of topsoil would -
occur during construction operations. No mitigation measures are necessary.
C) Be located on a geologic unit or soil that is unstable, or that would become unstable as
a result of the project, and potentially result in on- or off -site landslide, lateral spreading,
subsidence, liquefaction or collapse?
Less Than Significant Impact. The project area is characterized by sandy soils with the
water table at less than 10 feet below the surface. These conditions are conducive to liquefaction
during seismic ground shaking. The project would have no effect on these conditions, and would
not increase geologic hazards in the area. As noted under VI.a.ii, above, these conditions do not
present a significant hazard with respect to the proposed project. No mitigation measures are
necessary.
City of Newport Beach Initial Study/Draft Negative Declaration r
32"" Street/Newport Blvd. Street Rehabilitation and
30" Street/Newport Blvd. Storm Drain Improvements Page 22
d) Be located on expansive soil, as defined in Table 18 -1 -B of the Uniform Building Code
(1994), creating substantial risks to life or property?
. Less Than Significant Impact. Expansive soils are generally high in clay content. Soils
in the project area are typically sandy, and are not expansive. No mitigation measures are
necessary.
e) have soils incapable of adequately supporting the use of septic tanks or alternative
waste water disposal systems where sewers are not available for the disposal of waste water?
No Impact. The project does not involve the use of septic tanks. All wastewater is
presently conveyed off-site via connections to the sanitary sewer system. No mitigation measures
are necessary.
VII. HAZARDS AND HAZARDOUS MATERIALS
Would the project:
a) Create a significant hazard to the public or the environment through the routine
transport, use or disposal of hazardous materials?
No Impact. No use, transport or disposal of hazardous materials is proposed in
connection with the project. No mitigation measures are necessary.
b) Create a significant hazard to the public or the environment through reasonable
foreseeable upset and accident conditions involving the release of hazardous materials into the
environment?
Less Than Significant Impact. During construction, gasoline- and diesel - powered
equipment would be used. In the event of an accident, gasoline or diesel fuel could be spilled.
Standard construction contract provisions would require that the contractor follow site
maintenance and spill cleanup procedures as described in the Standard Specifications for Public
Works Construction (the "Greenbook "). No additional mitigation measures are necessary.
c) Emit hazardous emissions or handle hazardous or acutely hazardous materials,
substances, or waste within one quarter mile of an existing or proposed school?
No Impact. The project would not involve the handling or transport of acutely hazardous
materials and would not result in hazardous emissions. The nearest school (Newport Elementary)
is located at Balboa Boulevard at 13th Street approximately 1 -1/2 miles from the project area. No
mitigation measures are necessary.
d) Be located on a site which is included air a list of hazardous materials sites compiled
pursuant to Government code Section 65962.5 and as a result, would it create a significant
hazard to the public or the environment?
No Impact. The project is not located on a listed hazardous materials site. No mitigation
measures are necessary.
City of Newport Beach Initial Study/Draft Negative Declaration
32°" Street/Newport Blvd. Street Rehabilitation and
3e Street/Newport Blvd. Storm Drain Improvements Page 23
e) For a project located within an airport land use plan or, where such a plait has not
been adopted, within two miles or a public airport or public use airport, would the project
result in a safety hazard for people residing or working in the project area?
No Impact. The storm drain would have no effect on aircraft- related safety.'i No
mitigation measures are necessary.
f) For a project within the vicinity of a private airstrip, would the project result in a safety
hazard for people residing or working in the project area?
No Impact. There are no private airstrips within the project vicinity. No mitigation
measures are necessary.
g) Impair implementation of or physically interfere with an adopted emergency response
plait or emergency evacuation plan?
Less Than SimiScant With Mitigation Incorporated. The proposed storm drain would
have no permanent effect on an emergency response or emergency evacuation plan or procedures.
Emergency evacuation routes could be affected during construction, however, due to temporary
street or lane closures. The following mitigation measure would reduce this impact to a level that
is less than significant.
Mitigation measure
VII -I Traffic Control Plan. Prior to award of a construction contract, a traffic control
plan meeting the approval of the City Traffic Engineer shall be prepared. The
plan shall specify what measures shall be taken to minimize travel disruptions
and safety hazards, including safety ofpedestrians and bicyclists, minimize
inconveniences to residents and businesses, minimize the loss ofparking, and
ensure adequate emergency access at all times. The traffic control plan shall be
incorporated into the contract specifications and shall be enforced by the
construction inspector.
h) Expose people or structures to a significant risk of loss, injury or death involving
wildland fires, including where wildlands are adjacent to urbanized areas or where residences
are intermixed with wildlands?
No Impact. The project site is surrounded by urban development, and no wildland
interface exists. No mitigation measures are necessary.
City of Newport Beach
32nd Street/Newport Blvd. Street Rehabilitation and
30" Street/Newport Blvd. Storm Drain Improvements
Initial Study/Draft Negative Declaration
Page 24
•
9
VIII. HYDROLOGYAND WATER QUALITY
Would the project:
a) Violate any water quality standards or waste discharge requirements?
Less Than Significant Impact. The project would involve the discharge of stormwater
into Newport Harbor, which would be expected to contain urban pollutants such as pesticides and
oil. Since the same runoff from the project area is currently flowing into the harbor, no change in
the type or quantity of pollutant runoff would be anticipated. Grading activities could
temporarily increase the amount of soil erosion and siltation. Construction will be subject to
National Pollutant Discharge Elimination System (NPDES) Best Management Practices, which
require that measures be taken to minimize runoff of contaminants and siltation. No additional
mitigation measures are necessary.
b) Substantially deplete groundwater supplies or interfere substantially with groundwater
recharge, such that there would be a net deficit in aquifer volume or a lowering ofthe local
groundwater table level (e.g., tee production rate of pre- existing nearby wells would drop to a
level which would not support existing land uses or planned uses for which permits have been
granted)?
No Impact. Runoff from the area to be served by the proposed storm drain currently
flows into Newport Harbor. The project would have no effect on groundwater supplies or
recharge.
c) Substantially alter the existing drainage pattern of tie site or area, including through
• the alteration of the course of a stream or river, in a manner which would result in substantial
erosion or siltation on- or off-site?
Less Than Significant Impact. The project would alter the drainage patterns of the area
by diverting runoff from the area east of Newport Boulevard in the vicinity of 301' to 32nd Streets
into the Rhine Channel. This area currently drains into Rivo Alto Channel, west of Newport
Boulevard. Since the area is completely urbanized, no erosion or siltation would result from this
change in drainage pattern. During excavation, earth could be spilled onto adjacent streets
resulting in siltation if preventative measures are not taken. Required compliance with NPDES
Best Management Practices will reduce this construction impact to a level that is less than
significant. No mitigation measures are necessary.
d) Substantially alter the existing drainage patter: of the site or area, including through
the alteration of the course of a stream or river, or substantially increase the rate or amount of
surface runoff in a manner, which would result in flooding onn- or off-site?
Less Than Significant Impact. The project: would have no impact on the rate or amount
of surface runoff. The capacity of the storm drain system would be enhanced to reduce the risk of
flooding. No mitigation measures are necessary.
City of Newport Beach Initial Study/Draft Negative Declaration
32nd Street/Newport Blvd. Street Rehabilitation and
30d' Street/Newport Blvd. Storm Drain Improvements Page 25
e) Create or contribute runoff water which would exceed the capacity of existing or
planned stormwater drainage systeuts or provide substantial additional sources of polluti
runoff?
Less Than SianniScant Impact. The; local drainage pattern would be altered as described
in Section VIII.c, above. No increase in runoff would be caused by the project; the capacity of
the storm drain system would be enhanced;, however, reducing the risk of flooding. No additional
source of polluted runoff would be generated by the project upon completion. During
construction, oil, grease or fuel could be spilled from construction equipment onto the street
resulting in additional contamination. Required compliance with NPDES Best Management
Practices and the Greenbook would reduce this impact to a level that is less than significant. No
additional mitigation measures are necessary.
n Otherwise substantially degrade water quality?
Less Than Significant Impact. The proposed project is not anticipated to generate
unusual or substantial amounts of pollutants. Investigation of issues described under Item VIII.a.
will address water quality concerns. No mitigation measures are necessary.
g) Place housing within a 100 year flood hazard area as »tapped on a federal Flood
Hazard Boundary of Flood Insurance Rate Map or other flood hazard delineation »tap
No Impact. No housing is proposed in connection with the project. No mitigation
measures are necessary.
h) Place within a 100 year flood hazard area structures, which would impede or redirect
flood flows?
No Impact. No structures are proposed that would impede flood flows. The proposed
storm drain would improve the efficiency of the draining system. No mitigation measures are
necessary.
i) Expose people or structures to a significant risk of loss, injury or death involving
flooding, including flooding as a result of the failure of a levee or danr?
No Impact. The project would not expose additional people or structures to flood
hazards. No mitigation measures are necessary.
j) Inundation by seiehe, tsunami, or mudflow?
No Impact. The site is located in a low -lying area that could be inundated in the event of
seiche or tsunami. The project would have no effect on these conditions, however, other than to
improve the efficiency of drainage. No mitigation measures are necessary.
City of Newport Beach
32 "" Street/Newport Blvd. Street Rehabilitation and
30`h Street/Newport Blvd. Storm Drain Improvements
Initial Study/Draft Negative Declaration
Page 26
u
E
IX. LAND USE AND PLANNING
Would the project:
a) Physically divide an established community?
No Imnact. The site is surrounded on all sides by developed land. The project would
have no effect on the established community. No mitigation measures are necessary.
b) Conflict with any applicable land use plan, policy, or regulation of an agency with
jurisdiction over the project (including, but not limited to the general plan, specific plau, local
coastal program, or zoning ordinance) adopted for the purpose of avoiding or mitigating an
environmental effect?
No Impact. The proposed project would not conflict with the existing General Plan land
use designation or zoning. No mitigation measures are necessary.
C) Conflict with any applicable habitat conservation plan or natural community
conservation plan?
No I_mnact. The site is not located within an NCCP or habitat conservation plan. No
mitigation measures are necessary.
X. MINERAL RESOURCES
0 Would the project:
a) Result in the loss of availability of a known mineral resource that would be a value to
the region and the residents of the state?
No Impact. The project area is urbanized and no mineral resources would be affected.
No mitigation measures are necessary.
b) Result in Are loss of availability ofa locally important mineral resource recovery site
delineated on a local general plan, specific plan or other laid use plan?
No Impact. There are no locally important :mineral resource recovery areas located in the
project area. No mitigation measures are necessary.
City of Newport Beach Initial Study/Draft Negative Declaration
32" d Street/Newport Blvd. Street Rehabilitation and
3e Street/Newport Blvd. Storm Drain Improvements Page 27
XI NOISE
Would the project result its:
a) Exposure of persons to or generation of noise levels in excess of standards established
in the local general plan or noise ordinance, or applicable standards of other age I ncies?
Less Than Significant With Mitigation Incoroorated. The storm drain project would not
result in any long -term noise increase. A short -term noise increase during construction would
occur, however. The Newport Beach Municipal Code allows construction only between the
hours of 7:00 a.m. and 6:30 p.m. weekdays, and between 8:00 a.m. and 6:00 p.m. Saturdays
(NBMC Sec. 10.28.040). The following mitigation measures would further reduce potential
noise impacts during construction to a level that is less than significant.
Mitigation Measures
)U-I Construction Noise. The following requirements shall be incorporated into the
project contract specifications and noted on construction plans, and shall be
enforced by the City's construction inspector.
a. Hours of Construction. No construction shall occur except between the
hours of 7:00 a.m. and 6:30 p.m. weekdays unless required to respond to
an emergency situation.
b. Construction Equipment. All construction equipment, either fixed or
mobile, shall be equipped with properly operating and maintained
mufflers. 0
C. Staging Areas. Stockpiling and/or vehicle staging areas shall be located
as far as practicable from dwellings.
b) Exposure ofpersons to orgeneration ofexcessivegroundborne vibration or
groundbore noise levels?
Less Than Significant With Mitigation Incorporated. A short -term increase in
groundbome vibration and noise would be expected to occur during excavation and construction.
Limitations on allowable hours of construction would reduce these impacts. Mitigation measure
XI -1 would reduce this impact to a level that is less than significant.
c) A substantial permanent increase in ambient noise levels in the project vicinity above
levels existing without the project?
No I_m_pact. The project would have no long -term noise impacts. No mitigation is
necessary.
d) A substantial temporary or periodic increase in ambient noise levels in the project
vicinity above levels existing without the project?
Less Than Significant With Mitigation Incorporated. See Section XI.a, above.
City of Newport Beach Initial Study/Draft Negative Declaration
32nd Street/Newport Blvd. Street Rehabilitation and
30d' Street/Newport Blvd. Storm Drain Improvements page 28
e) For a project located within an airport land use plan or, where such a plan has not
been adopted, widen two miles of a public airport or public use airport, would the project
expose people residing or working in the project area to excessive noise levels?
Less Than Significant Impact. The site is located near the flight path from John Wayne
Airport; therefore construction workers would be subject to minor noise impacts due to aircraft
overflight. These impacts are not considered significant, however, since the area is outside the 65
dB CNEL noise contour and their exposure would be temporary. No mitigation measures are
necessary.
j) For a project within the vicinity of a private airstrip, would the project expose people
residing or working in the project area to excessive noise levels?
No Impact. There are no private airstrips within the vicinity of the site. No mitigation
measures are necessary.
XII. POPULATION AND HOUSING
Would cite project.
a) Induce substantial population growth in an area, either directly (for example, by
proposing new homes and businesses) or indirectly (for example, through extension of roads or
other infrastructure)?
No Impact. The project site is fully developed and the proposal consists of the
replacement of an existing storm drain. No increase in development potential would occur as a
result from the project. No mitigation measures are necessary.
b) Displace substantial numbers of existing housing, necessitating the construction of
replacement housing elsewhere?
No Impact. There is no existing housing that would be displaced by the proposed
development No mitigation measures are necessary.
c) Displace substantial numbers of people, necessitating tee construction of replacement
housing elsewhere?
No Impact. No people or existing housing would be displaced by the proposed
development. No mitigation measures are necessary.
City of Newport Beach
32 itd StreettNewport Blvd. Street Rehabilitation and
30'" StreettNewport Blvd. Storm Drain Improvements
Initial Study/Draft Negative Declaration
Page 29
XIIL PUBLICSERVICES
Would the project result in substantial adverse physical impacts associated with the provision
of new or physically altered governmental facilities, need for u e w or physically altered
governmental facilities, the construction o %which could cause significant environmental
impacts, in order to maintain acceptable service ratios, response times or other performance
objectives for any of these public services.
a) Fire protection?
No Impact. The proposed project would have no effect on fire protection. No mitigation
measures are necessary.
b) Police protection?
No Impact. The proposed project would have no effect on police protection. Traffic
control during construction will be provided by the contractor in a manner meeting the approval
of the City Traffic Engineer (see Mitigation Measure No 7 -1 on page 23). No additional
mitigation measures are necessary.
C) Schools?
No Impact. The proposed project would have no effect on student generation or school
operations. No mitigation measures are necessary.
d) Parks?
No Impact. The proposed project would have no effect on parks or recreation. No
mitigation measures are necessary.
e) Otis er public facilities?
No Impact. The proposed project would have no effect on any other public facilities. No
mitigation measures are necessary.
XIV. RECREATION
a) Would the project increase the use of existing neighborhood and regional parks or
other recreational facilities, such that substantial physical deterioration of the facility would
occur or be accelerated?
No Impact. The proposed project would not increase the use of parks or other recreation
facilities. No mitigation measures are necessary.
b) Does the project include recreational facilities or require lite construction or expansion
of recreational facilities, which might have an adverse physical effect on the environment?
No Impact. See Section XIV.a, above.
City of Newport Beach Initial Study/Draft Negative Declaration
32" Street/Newport Blvd. Street Rehabilitation and
3e Street/Newport Blvd. Storm Drain Improvements Page 10
XV. TRANSPORTATIONITRAFFIC
Would the project:
a) Cause an increase in traffic, which is substantial in relation to the existing traffic load
and capacity of the street system (i.e., result in a substantial increase in either the number of
vehicle trips, the volume to capacity ratio on roads, or congestion at intersections)?
Less Than Significant Impact. The project would have no effect on long -term traffic
levels. A short-term increase in traffic from construction equipment and workers would be
expected to occur, however. It is anticipated that 10 -15 workers will be employed on site during
construction, generating approximately 2040 trips per day. In addition, an estimated 32 truck
trips will be required over the duration of project construction (less than one trip per day on
average) to haul excess earth material away from the site. This traffic increase would not be
considered significant. Mitigation Measure VII -I (see page 24) would further reduce this impact
by requiring the preparation of a traffic control plan prior to commencement of the project.
b) Exceed, either individually or cumulatively, a level of service standard established by
the county congestion management agency for designated roads or highways?
Less Than Significant Impact. See Section XV.a, above.
c) Result in a change in air traffic patterns, including either an increase in traffic levels
or a change in location that results in substantial safety risks?
No Impact. The project would have no effect on air traffic patterns. No mitigation
measures are necessary.
d) Substantially increase hazards due to a design feature (eg., sharp curves or dangerous
intersections) or incompatible uses (e.g., farm equipment)?
Less Than Significant With Mitigation Incorporated. The project could disrupt traffic
patterns during construction due to lane closures or traffic diversions. Mitigation Measure VII -1
(see page 24) would reduce this impact to a level that is less than significant.
e) Result in inadequate emergency access?
Less Than Significant With Mitigation Incorporated. See Section XVA, above.
n Result in inadequate parking capacity?
Less Than Significant With Mitigation Incorporated. The project would have no effect
on long -term parking demand or capacity. Demand for additional parking would be created by
construction workers, however. It is estimated that between 10 and 15 workers will be on -site at
any given time, requiring a maximum of IS parking spaces. In addition, some on -street or off -
street parking may be temporarily unavailable during construction. Mitigation Measure VII -I
(see page 24) would reduce this impact to a level that is less than significant.
City of Newport Beach Initial Study/Draft Negative Declaration
32nd Street/Newport Blvd. Street Rehabilitation and
30' Street/Newport Blvd. Storm Drain Improvements Page 31
g) Conflict with adopted policies, plans, or programs supporting alternative transportation
(e.g., bus turnouts, bicycle racks)?
Less Than Significant With Mitigation Incorporated. The project would have no long-
term effect on alternative transportation. Potential disruption of bus travel and bicycle lanes
could occur during construction, however. Mitigation Measure 7 -1 (page 24) would reduce this
impact to a level that is less than significant.
XVI. UTILITIES AND SERVICE SYSTEMS
Would the project:
a) Exceed wastewater treatment requirements of the applicable Regional Water Quality
Control Board?
No Impact. The project would have no effect on wastewater flows or treatment
requirements. No mitigation measures are necessary.
b) Require or result in the construction of new water or wastewater treatment facilities or
expansion of existing facilities, the construction of which could cause significant
environmental effects?
No Impact. The project would have no effect on wastewater flows or treatment
requirements. No mitigation measures are necessary. .
C) Require or result in the construction of new storm water drainage facilities or
expansion of existing facilities, the construction of which could cause significant
environmental effects?
Less Than Significant Impact. The proposed project is the replacement of existing
deteriorated storm drains and the installation of a new storm drain along 30" Street and Newport
Boulevard. No increase in stormwater flows would result, and no new or expanded drainage
facilities beyond those included in this project would be required. No mitigation measures are
necessary.
d) Have sufficient water supplies available to serve tke project from existing entitlements
and resources, or are new or expanded entitlements needed?
No Impac t. The project would have no effect on water supply or demand. No mitigation
measures are necessary.
e) Result in a determination by the wastewater treatment provider, which serves or may
serve the project that it has adequate capacity to serve the project's projected demand in
addition to the provider's existing commitments?
No Impact. See Section XVI.b, above.
City of Newport Beach Initial Study/Draft Negative Declaration
32nd Street/Newport Blvd. Street Rehabilitation and
300' Street/Newport Blvd. Storm Drain Improvements Page 32
0
J) Be served by a landfill with sufficient permitted capacity to accommodate the project's
solid waste disposal needs?
• Less Than Significant Impact. Constructions of the project may result in the generation of
excess earth material that would need to be transported off site. This would not be considered a
significant impact due to its temporary nature and limited volume. Excess fill would most likely
be used at another construction site. Fill that could not be used would be disposed of at a landfill.
Used asphalt would be recycled by the contractor. No mitigation measures are necessary.
g) Comply with federal, state, and local statutes and regulations related to solid waste?
Less Than Significant With Mitigation Incorporated. The project could generate solid
waste during construction. Standard contract specifications requiring the contractor to dispose of
waste in accordance with applicable statutes and regulations would reduce this impact to a level
that is less than significant. No mitigation measures are necessary.
MANDATORYFINDINGS OF SIGNIFICANCE
a) Does the project have tee potential to degrade the quality of the environment,
substantially reduce the habitat of a fnsh or wildlife species, cause a fish or wildlife population
to drop below self - sustaining levels, threaten to eliminate a plant or animal community, reduce
the number or restrict the range of a rare or endangered plant or animal or eliminate
important examples of the major periods of California history or prehistory?
Less Than Significant With Mitigation Incorporated. The project has the potential to
degrade the quality of the environment, but the mitigation measures recommended would reduce
these potential impacts to a level that is less than significant.
b) Does the project have impacts that are individually limited, but cumulatively
considerable? ( "Cumulatively considerable" means that the incremental effects of a project
are considerable when viewed in connection with the effects ofpast projects, the effects of
other current projects, and tine effects of probable future projects.)
Less Than Significant With Mitigation Incorporated. The project would contribute to
short-term cumulative impacts in the areas of air quality, noise and traffic during the two -month
construction period. The project's contribution to these cumulative impacts would be
substantially reduced by the recommended mitigation measures, however, and the incremental
impacts of the project would be so small that they would make only a de minimis contribution to
the cumulative impacts caused by other projects.
c) Does the project have environmental effects, which will cause substantial adverse
effects on human beings, either directy or indirectly?
Less Than Significant With Mitigation Incomorated. The recommended mitigation
measures would substantially reduce the potential impacts of the project to a level that is less than
significant.
City of Newport Beach Initial Study/Draft Negative Declaration
32' Strc"cwport Blvd. Street Rehabilitation and
3e Street/Newport Blvd. Storm Drain Improvements Page 33
Building News Publications, Standard Specifications for Public Works Construction, 1997 (the
"Greenbook ")
City of Newport Beach, Newport Beach Municipal Code.
South Coast Air Quality Management District, CEOA Air Quality Handbook, 19931
REPORT PREPARATION PERSONNEL
Lead Agency:
City of Newport Beach
Don Webb, P.E.
Public Works Director
Bill Patapoff, P.E.
City Engineer
Ed Wimmer, P.E.
Sr. Civil Engineer
Rich Edmonston, P.E.
City Traffic Engineer
Environmental Consultant:
J.H. Douglas & Associates
John H. Douglas, AICP
Principal
City of Newport Beach
Initial Study/Draft Negative Declaration
32°d Street/Newport Blvd. Street Rehabilitation and
30d' Street/Newport Blvd. Storm Drain
Improvements
Page 34