Loading...
HomeMy WebLinkAbout08 - C-3155 Balboa Peninsula Gateway ParkAugust 23, 1999 CITY COUNCIL AGENDA ITEM NO. 8 TO: Mayor and Members of the City Council FROM: Public Works Department SUBJECT: BALBOA PENINSULA GATEWAY PARK, LIDO GATEWAY PARK, AND SOUND WALL LANDSCAPE IMPROVEMENTS — AWARD OF CONTRACT NO. 3155 RECOMMENDATIONS: 1. Approve the Plans and Specifications 2. Reject the bids of Green Giant Landscape, Inc., and JDC, Inc., as being non- responsive. 3. Award Contract No. 3155 to Golden Bear Arborists, Inc., for the Total Bid Amount of $310,494.05, and authorize the Mayor and the City Clerk to execute the contract. 4. Approve a budget amendment to appropriate a new revenue contribution of $78,886.00 to Account No. 7251- C5100372. 5. Establish an amount of $20,000 to cover the cost of testing and unforeseen work. DISCUSSION: At 11:00 A.M on August 11, 1999, the City Clerk opened and read the following bids for this project: TOTAL BID CORRECTED TOTAL BIDDER AMOUNT BID AMOUNT Low Green Giant Landscape, Inc. $289,034.25 Non - responsive 2 Golden BearArborists, Inc. $310,709.30 $310,494.05 3 R. Fox Construction, Inc. $326,499.40 $327,536.35 4 JDC, Inc. $352,775.00 Non - responsive 5 4 -Con Engineering, Inc. $409,988.50 $386,588.50 The apparent low bidder, Green Giant Landscape, Inc., and another bidder, JDC Inc., did not insert Page PR -2 (Rev.) into their proposals as required by an addendum (copy attached) nor did they submit bids based upon the revised bid quantities that were included in the addendum. As a consequence, their bids are incorrectly computed and totaled, and are recommended to be rejected as being non - responsive. The City Attorney concurs in this matter. The other three bidders did insert Page PR -2 (Rev.) into their proposals. The correctly - submitted low total bidder, Golden Bear Arborists, Inc., is 13% above the revised SUBJECT: Balboa Peninsula Gateway Park, Lido Gateway Park, and Sound Wall landscape Improvements — Award of Contract No. 3124 August 23, 1999 Page: 2 Engineer's Estimate of $275,000. Golden Bear Arborists, Inc. possesses a General Engineering Contractor "A" License as required by the project specifications, and has recently satisfactorily performed contract work for the City. The Gateway Park improvements provide for "passive" use of the two sites. They are intended to be landscaped "gateways" onto the Peninsula and Lido Isle. The conceptual plans were approved by the City Council on September 22, 1997. The improvements will be built on two parcels of vacant land adjacent to the intersection of Newport Boulevard and Short Street/Via Lido. In addition to the park improvements, the sound wall along Newport Boulevard between Short Street and the bridge will be landscaped. The conceptual plans are attached. The improvements include removing unsuitable soil and replacing it with imported topsoil; constructing stuccoed concrete block "donor" walls and retaining walls; installing subdrains, irrigation, and lighting systems; planting trees, shrubs, and ground cover; installing signage and decorative City seals; providing a 90 -day plant maintenance and establishment period; and guaranteeing plant materials, depending on size, for 90 days or one year after completing the maintenance and plant establishment period. The Lido Gateway Park improvements were previously bid on June 9, 1998 and on July 15, 1998. The City Council rejected the bids on both occasions because 1) only two bids were received each time, 2) the low bids were above the Engineer's Estimate, and 3) insufficient funds were available to award the contract and have enough remaining to landscape the Balboa Peninsula Gateway site. The City Council also directed Staff to consider ways to reduce the park improvement costs, to rebid the park improvements in a combined contract, and to meet with donor groups to examine ways to raise additional revenues. The plans have been modified to eliminate some walls; reduce site grading, signage, and sizes of some plant materials; and eliminate decorative fiber optic lighting. The bids received reflect these changes and are reasonable based on the prepared estimates. Balboa Peninsula Gateway Park will be constructed on a 1/3 -acre former service station site that has been owned by the City since May of 1997. An Orange County Sanitation District (OCSD) sewage pump station project is nearing completion on the site. The final items of OCSD's work will not interfere with the park construction. OCSD is contributing $78,886 to the City for the easement to construct and maintain the new pump station and related sewer mains on the site. Lido Gateway Park will be constructed on a 1/6 -acre former service station site that is currently owned by the State. On November 27, 1995, the City executed a Purchase and Sale Agreement and deposited $1450 with the State as a 10% down payment towards its purchase. A Right of Entry from the State will allow the City to construct park improvements on the parcel, until the Director's Deed transfers ownership of the land to the City. SUBJECT: Balboa Peninsula Gateway Park, Lido Gateway Park, and Sound Wall landscape Improvements — Award of Contract No. 3124 August 23,1999 Page: 3 • Funding for the parks will come from the currently budgeted Park -In Lieu account and from the OCSD funds that need to be appropriated to the Contributions account. The funding breaks down as follows: Park -in -lieu Account No. 7021- C5100372 $ 251,608.05 OCSD Contribution Account No. 7251- C5100372 $ 78,886.00 Total $ 330,494.05 A budget amendment is needed to appropriate new revenue of $78,886.00 to a new contributions Account No. 7251- C5100372. The "Gateway to Newport's Balboa Peninsula Citizens Committee" raised over $205,000 from approximately 170 individuals to fund the purchase of the park property and the construction of the parks. In recognition of their donations, engraved "donor blocks" will be placed atop short walls that will be built along the perimeters of the sites. The City will purchase, engrave, furnish, and map the locations of donor blocks atop the walls for the contractor's use. During the planning process a number of groups were involved, (including the Park and Open Space Committee; the Park, Beaches, & Recreation Commission; the Harbors, Beaches and Parks Committee and the Balboa Peninsula Beautification Committee), in developing the landscape plans for the sites. Materials, lettering, coloring, and motif have been coordinated with the beautification that is proposed to be installed elsewhere on the Peninsula. The Coastal Commission granted approval for the park construction as a component of the Coastal Development Permit for OCSD's pump station. A .mitigated negative declaration has been certified under the provisions of the California Environmental Quality Act for these past improvements. Work is to be completed within 45 consecutive working days or by November 19, 1999, whichever occurs first. Liquidated damages are $250 per calendar day. 4Re ectfully submitted, PUBLIC WORKS DEPARTMENT Richard M. Edmonston, Acting Director 4-47a�ji U114 • . D. Project Engineer . Attachment: EXHIBIT - Conceptual Plans- Addendum No. 1 Bid Summary f: Wsersl pbwl sharedkoounciMy99- o0\august- 23\gateway parks o3155.doc Page 1 of 2 CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT ADDENDUM NO. 1 Balboa Peninsula Gateway Park, Lido Gateway Park, and Sound Wall Landscape Improvements CONTRACT N 155 7a, DATE: August 6, 1999 BY: Public Works Director • TO: ALL PLANHOLDERS 1. NOTICE INVITING BIDS Change Engineers Estimate to $275,000. 2. PROPOSAL Insert and submit bids using attached Page PR -2 (Rev.) 3. SPECIAL PROVISIONS Revise INTRODUCTION as follows: (4) the Standard Specifications for Public Works Construction (1997 Edition, including supplements); 4. STANDARD SPECIFICATIONS Replace Section 3 -3.2.3 as follows: • Page 2 of 2 3 -3.2.3 Markup. • (a) Work by Contractor. The following percentages shall be added to the Contractor's costs and shall constitute the markup for all overhead and profits: 1) Labor ............. ............................... 20 2) Materials ........ ............................... 15 3) Equipment Rental ........................... 15 4) Other Items and Expenditures ........... 15 To the sum of the costs and markups provided for in this subsection, 1 percent shall be added for compensation for bonding. (b) Work by Subcontractor. When all or any part of the extra work is performed by a Subcontractor, the markup established in 3- 3.2.3(a) shall be applied to the Subcontractor's actual cost of such work. A markup of 10 percent on the first $5,000 of the subcontracted portion of the extra work and a markup of 5 percent on work added in excess of $5000 of the subcontracted portion of the extra work may be added by the Contractor. This Section only applies to work in excess of the estimated quantities shown in the Proposal." PLANS . Sheet 1-3: Note concerning HYDRAULIC - POINT OF CONNECTION should refer to a proposed 2" (not 1 ") water meter that will be furnished and set by City. Sheet 1-4: Reduced Pressure Backflow Preventer listed in IRRIGATION LEGEND is not existing, but will be furnished and installed by Contractor as specified in IRRIGATION LEGEND shown on Sheet L3. 0 Bidders must sign this Addendum No. 1 and attach it to the bid proposal. No bid will be considered unless this signed Addendum No.1 is attached in full. I have carefully examined this Addendum and have included full payment in my Proposal. Bidder's Name (Please Print) Date Authorized Signature & Title f: \usersVpbw�shared%contrects\fy 99-O ftateway parks, balboa & lido c-3155 addendum.doc QUANTITY ITEM DESCRIPTION AND UNIT UNIT 4. 128 L.F. 6" PCC Curb @ Dollars and Cents Per Linear Foot 5. 169 L.F. 10' -10" or 12' -10" Wall w/ Cap @ Dollars and Cents Per Linear Foot 6. 534 F 3' -4" Wall w/ Cap 158 L.F. @ Dollars and Cents Per Linear Foot 7. 240 1 I= 22" Wall w/ Donor Block Cap 368 L.F. @ Dollars and Cents Per Linear Foot 8. Lump Sum Signage & City Logo @ Dollars and Cents Per Lump Sum 9. Lump Sum 3" Atrium Drain System, Complete @ Dollars and Cents Per Lump Sum Page PR -2 (Rev.) TOTAL W fAusers\pbw\shared\contractsUy 99- 00\gateway parks. balboa & lido �3155\proposal c 3155.doc W C_J E LI 0 z 0 3 e a tQ z � S a � g �! J rte._ —... P—I, s . _z -�V t ; k 4 / § \ 4 }{§ � \ \f ; )}\ ! \! \ \ > } \ / \ f \ } ) ! ) { } $ !& ft \ I 2 f \ / / « m \ / § \ \ ) 0 9 E .� � � \ \ � \ I 2 f \ / / « m \ / § \ \ ) 0 9 E rl r° WI a d Z = W CO W �a 00 LU LL 3 O U F J U CO a E i re Lii l< 0 c 0 E a V m L9 N R E r� m g 0 0 0 0 0 0 o g g o o in o 0 0 0 0 0 0 S 0 u vi S �o 0 0 o g of lc g o 0 o ui vi v ri to S d S g o 0 0 o 0 0 o 0 0 pp 0 m 88 N N m O m m 8 O E b T m O O O O fp N N .y b N S N tl1 ul V O c p Op m .yM IO .yq O dW O uml Nq .rvi N N O M m O� w T p R M Nq N .y N O NW N NW �O Nq I� N O N q ( N� llf rvW v W �O rvH tlf w 00 am t+1 W q V' fR N 1R .�i fR fR q aR W a fR 00 q• W S 000000 S O S 0 0 0 S W q H q W M O M 9 9 9 V Z N Vl N O ll1 q W O O N g S l0 M M t!1 rl N ll1 � d, 0 q W N! tiW �` N M M q q• q• aR aR q 11 — N -rd O 8 8 O S O O O O O O O O O O O O O O O O O O O O O O m O O O g O O 0 O O S S 8 0 O 0 0 0 0 0 0 0 0 0 0 IM /I u g o o 8 S Sm S rM a�mo 0 l 80 ' 80 0 0 H O M o m N O O� ll1 N IR O O m O 0 M IRW le Ni C6 IF MH NH �qN CO O q•N V R M N.Ni N W q .N-i q NN.N -i M W Nq Nq N �a q VF q v1 q v1 v1 q N q w w N M b q N 0 0 0 0 0 Sm� S S 0 0 0 0 S S S S O o Q i S I S S S O S S 0 0 0 0 0 U O O O O O O O O R NM N M M N O O O O O O {{...... O ( N S S W S Q v T M W OH N S w T S S a' n S S 0 0 pX LL i-i Z O q aR ODD N p M M N ww m 0 garw C +aq w qar -1 W- C c N N M N! N! q W q q S 0 In S S vf000 N 0 0 0 0000000008f8888888f88f8 0 0 0 0 0 0 0 In m V1 ti~ O N m V Q R m T c'1 tl1 aD 00pp O IO to m of of O� O p S O Ill pp Y O N M Vf m 0 M N of O N p O O N N Y pp O O O Ilf S p V' N 0 0 Z N m M O N -Z N G Z N .y m N N N m N m N N N M M MM � N r4 -Z 6 V Pq M y -Z r,: rvW MO 6 � 's C4 � N � � N TO V q W W W q .- "CX a M a m S O LI? O N S N Cl! O h O N O 0 O 0 O 0 S S S S S S O of m S S N S S S S y Z o of ri v r�i ri o ui vi vi .-i o q 0 o vi o M* vi q m o 0 MW o S q In °o O vi O 0 h 0 0 0 p o v o 3 $ N q aR N M q 1R N m N 1R m R m N g N rl O T � O O �% N q• q• aR q q• q N o; � S SO S S S Sp S S S SO S S S S S S S S S O O Op O T O O O O O O Pi b p S p W p N p S p n p V S p R S O ti ON n S N S S S S S S b S p 0 O N N L m O N O m O N N O N M O N VS M tS 1 O g 0 � M ' � M M M N O .y d' -i N m� N N � � � � ~q w Q aR q• N q fR aR q w N o 0 0 0 0 0 8in $ S g S V $.-i $ m Sof $ g oof 8 o °o o0 o0 oo0 In b N m n of o p°o p W W Z O q N .y .1 V N N! tl1 N M q' q M S q Q O V1 M O Ilf O N N V1 M Ilf W M M M 1R q W q rl rl I;/»�f J (A IA J J J J (V/�1 J Iv/�f J j> V j> V VI QQ W QQ W QQ W Qd W QQ W QQ W N }} V Iu(�f J VI Qd W QQ W Qd W QQ W Qd W QQ W QQ W Qd W QQ W Qq W («/�. Z � ti N O N �O lmll m � rl rl N N O Ip of O N N „My Ifl .y .y rl U d a v m $ c 0 0 Z �v M c I� O V E u 3 V f L Ur W O w L L W 0 O W 9 m 0 li y (j 0 v b 3 o t= M E o a E r v c '° E m N 'Ma� o` m= E o m b U) i 6 6 6^ m m bp f IO V to (+1 N t%1 M VOI H In .rvi M N F- (L/1 N L1' t V m d m V all W W f ti N M Y tl1 IO N m O� O .y N M d' h IO N m� N N N M N N N N N N M M M f`M'1 c 0 E a V m L9 N R E r� m City of Newpo/ t Beach NO. BA- 005 BUDGET AMENDMENT l 1999 -00 AMOUNT: $78,886.00 �FECT ON BUDGETARY FUND BALANCE: • rr-qv-i Increase Revenue Estimates Increase in Budgetary Fund Balance Increase Budget Appropriations AND Decrease in Budgetary Fund Balance Transfer Budget Appropriations X No effect on Budgetary Fund Balance SOURCE: from existing budget appropriations X from additional estimated revenues from undesignated fund balance EXPLANATION: This budget amendment is requested to provide for the following: To increase revenue estimates by a contribution from Orange County Sanitation District and appropriate the funds to improve Balboa Peninsula Gateway Park, Lido Gateway Park and Sound Wall Landscaping. There are no prior budget amendments. ACCOUNTING ENTRY: BUDGETARY FUND BALANCE Fund Account Description 010 3605 Fund Balance Control REVENUE APPROPRIATIONS (3601) Fund /Division Account 250 4858 EXPENDITURE APPROPRIATIONS (3603) Description Refunds & Rebates - From Government Description Division Number 7251 Contribution Account Number C2100372 Balboa Peninsula Gateway Park Division Number Account Number Division Number Account Number Signed: Signed: Signed: 4 �.�C/O� Approval: Finance Director Administrative Approval: City Manager City Council Approval: City Clerk Amount Debit Credit $78,886.00 $78,886.00 Automatic System Entry. F -/6 -25r Date AM I Date