HomeMy WebLinkAbout15 - Emergency Power Supply of City Hall, Zone IIAugust 23,1999 Item No. 15 • TO: Mayor and Members of the City Council FROM: Timothy Riley, Fire and Marine Chief Donna Boston, Emergency Services Coordinator SUBJECT: Emergency Power Supply for City Hall, Zone II RECOMMENDATION Authorize the acquisition and installation of an emergency power supply for City Hall through a sole- source bid, deeming the project of urgent necessity for the preservation of life, health, and property, with the project not to exceed $90,000. In order to pursue this project with a sole- source bid, this Agenda Item must be approved with a minimum of 5 votes, according to Section 1110 of the City Charter. DISCUSSION At the June 14, 1999 City Council meeting, the acquisition of an emergency power supply for City Hall was approved as a checklist item on the 1999 -2000 Budget. The request for emergency power evolved from the City Emergency Preparedness Committee (EPC). The EPC views the issue of emergency power as an important component required for the City's emergency organization based on both life safety priorities, as well as the continuity of government. In order to complete the acquisition and installation of the emergency power system, by the Year 2000, the City must alleviate the time spent in preparing bid documents, plans and specifications, for a normal public works bid process. Due to the nature of the project, the lead time necessary to acquire the power supply, and the time required for installation, the remaining twenty weeks in the year approaches the minimum required to complete this project. As an alternative to the design, bid, and build approach, the Public Works staff met with Duthie Power Services, who have provided the Utilities Division with Generators in their preparation for the year 2000. Duthie Power will essentially provide design /build services, whereby plans will be prepared by Duthie and submitted to the Building Department for approval. At the same time the Building Department is reviewing the plans, the generator manufacturing will be taking place. Duthie Power has provided the City with a price quotation, coming in approximately $15,000 under the budget set at $105,800. In addition to the Utilities Division, the City employs Duthie Power Services to service the Fire & Marine Department generators, E and has used the company in the past to purchase generators. Upon exploration, it has been found that Duthie Power Services has regularly quoted among the low or middle bids for our City, as well as for other agencies, such as the Costa Mesa Sanitation District. Duthie Power Services can provide the power supply with the specifications we require prior to the end of the year, if the Council chooses to approach the project in the manner described above. Though Duthie will not guarantee delivery, their current generator manufacturing is taking 16 weeks for delivery Since the City Emergency organization depends on the continuous function of telecommunications, MIS, GIS, and other resources located at City Hall, these components are necessary for effective response to emergencies. Failure of these systems within City Hall could result in a situation costing emergency responders time, information, communications, and resources. These factors will impact the City's response to any type of emergency and could worsen the negative effects of an emergency situation. In addition, by providing emergency power to these two buildings, the public will have access to Fire Administration, Public Works and Building Departments and the City Attorney's Office during long -term power outages. 1] D TIE POWER SERVICES 2335 E. Cherry Industrial Circle Long Beach, CA 908054416 TO: City of Newport Beach ATTN:Michael Sinacori PH: 949.644.3342 FAX: 949.644.3318 Dear Michael, Phone (562) 790.1772 FAX (562) 790 -8230 8 -9 -99 In reply to your request we are pleased to offer the following estimate of labor & material as outlined below. Scope: 1. Provide and install a 250KW Generac diesel generator with the following options. (See Attached). 2. Provide and install a 1200A Generac Automatic Transfer Switch. 3. Demo existing shed and (1) block wa1L Leave wall between generator and Edison transformer. 4. Sawcutt asphalt and pour new pad for generator. 5. Provide and install (7) crash posts. 6. Haul away debris. 7. Provide and install conduit and wiring for a complete and workable installation. S. Startup and test. Generator: with 343 gallon tank (20.9 hours of runtime @ full load): $44,716.00 with 733 gallon tank (44.7 hours of runtime @ full load): $46,317.00 with 1138 gallon tank (69.4 hours of runtime @ full load): $47,548.00 Labor and Material $35,323.00 (Sales tax included) All work quoted is to be performed during normal working hours. Monday — Friday / 6:30 A.M. — 3:30 PM Quote valid for 30 days. All work quoted subject to approval by local Building & Safety Dept. Any requirements not covered within the scope of this proposal may cause an increase to the costs. . Permits and plan check fees not included (714) 778 -0275 Lic 9708125 Engineering drawings not included. (Estimated @ $1,000.00). Thank you for this opportunity to furnish this proposal for your consideration. Should have any questions, please do not hesitate to contact me. Terms: 20% deposit due with order. 80% net 15 days upon completion. Sincerely, Duthie Power Services Mike Spagnoli Construction Manager Bill Thomas Sales Engineer 0 0 • f� DUTHIE POWER SERWCis 2335 E Cherry Industrial Circle Long Beach, CA 90805-441, 6 TO: City of Newport Beach ATTN:Michael Sinacori PH: 949.644.3342 FAX: 949.644.3318 Phora (562) 790.1772 (714) 778-0275 FAX (562) 790 -8230 ' lac #708125 8 -9 -99 Dear Michael, Please note I have included along with the quotation information for the Generac Generator & Automatic Transfer Switch (ATS). Included are installation sheets, data sheets, cut sheets on the optional equipment. If fiuther information is requested, please do not hesitate to contact me. Following is a list of Cities we have sold equipment to as well as installation. If additional information ( names, equipment information, etc.) we will gladly furnish at your request. City of El Segundo City of Torrance City of Newport Beach (Fire & Marine) City of Rolling Hills Estates City of Downey City of Compton Miscellaneous Hospitals, Convalescent Homes, etc. I have included the cost comparison of a comparable Onan Generator and ATS: $48,965.00 (includes 340 gal. Tank) (larger tanks available at add'L cost) Duthie Power Services does not guarantee installation timeframe or equipment availability. Since we are not the manufacturer, it is iimpossible to account for all the variables which must be taken into account when a complex item such as these are manufactured. I have included the manufacturers shipping timetables. Please note the generator identified (12 liter) is presently 12 —16 weeks out. As'aresult, it will not be possible to "GUARANTEE" the i nstallatidn by Christmas, however please be assured we at Duthie Power Services are committed to providing the very best service to our customers since generator services ( Sales, Installations, Service and Rentals) are the only services we perform. . Thank you for this opportunity to furnish this proposal for your consideration. Should have any questions, please do not hesitate to contact me. Sincerely, Duthie Power Services Mike Spagnoli Bill Thomas Construction Manager Sales Engineer