HomeMy WebLinkAbout05 - C-3198 - Bayside Drive Storm Drain Improvement ProjectCJ
December 13, 1999
CITY COUNCIL AGENDA
ITEM NO. 5
TO: Mayor and Members of the City Council
FROM: Public Works Department
SUBJECT: APPROVAL OF NEGATIVE DECLARATION FOR BAYSIDE DRIVE STORM
DRAIN IMPROVEMENT PROJECT — CONTRACT NO. 3198
RECOMMENDATION:
Approve the Negative Declaration for the Bayside Drive Storm Drain Improvements.
DISCUSSION:
The City's Capital Improvement Program includes the Storm Drain Improvements Program. This
program consists of the following:
• Install approximately 160 feet of 18 -inch reinforced concrete storm drainpipe in Bayside Drive
from 2307 Bayside Drive to County Road.
• Install 5 catch basins with grates and a junction structure within the project limits on Bayside
Drive to intercept and direct future stormwater into the new storm drain system.
• Connect these improvements to an existing 24 -inch reinforced concrete pipe located in a
drainage easement within the private property at 2323 Bayside Drive.
• • Construct a new bulkhead opening next to the County Road street end for stormwater
discharge.
A Draft Initial Study (D.I.S.) for this project was prepared by staff pursuant to the California
Environmental Quality Act. The D.I.S. was filed with the Governor's Office of Planning and
Research, a State Clearinghouse, for review by various State agencies. The review period started
on November 8, 1999, and concluded on December 9, 1999. Some of the State agencies that
received the D.I.S. for review included the California Coastal Commission, the Department of
Conservation, the Department of Fish and Game, the Department of Parks and Recreation, the
Regional Water Quality Control Board, the Resources Agency, and the State Lands Commission.
The D.I.S. determined that the project would not have a significant effect on the environment. A
Coastal Development Permit is required for the work. City Council approval of the Negative
Declaration is required before the Coastal Development Permit application can be processed.
Staff recommends approval of the project's Negative Declaration.
Respectfull s d,
PU�ORKS DEPARTMENT
Don Webb, ctor
By:
Fong rs6, P.E.
. Associate Civil Engineer
Attachment: Negative Declaration
F: \Users \PBW\Shared\ COUNCIL \Fy99 -00 \December -13 \County Rd.doc
CITY OF NEWPORT BEACH
3300 Newport Boulevard - P.O. Box 1768
Newport Beach, CA 92658 -8915
(949) 644 -3311
NEGATIVE DECLARATION
To:
From: City of Newport Beach
Public Works Department
Office of Planning and Research
3300 Newport Boulevard - P.O. Box 1768
XX 1400 Tenth Street, Room 121
E
Newport Beach, CA 92658 -8915
Sacramento, CA 95814
(Orange County)
County Clerk, County of Orange
XX Public Services Division
P.O. Box 238
Date received for filing at OPR/County Clerk:
Santa Ana, CA 92702
Public review period: November 8, 1999 to December 9, 1999
Name of Project: Bayside Drive Storm Drain Improvement Project
Project Location: Bayside Drive from 2307 Bayside Drive to County Road
Project Description: This drainage project provides for the installation of approximately 160 feet of 18-
inch reinforced concrete pipe, a reinforced concrete junction structure, and five (5)
differently sized catch basins with grates and the connection of these improvements
to an existing 24 " reinforced concrete pipe for drainage through a new bulkhead
opening next to the County Road street end.
Finding: Pursuant to the provisions of City Council K -3 pertaining to procedures and guidelines to implement the
California Environmental Quality Act, the Environmental Affairs Committee has evaluated the proposed project and determined
that the proposed project with the proposed mitigation measures implemented would not have a significant effect on the
environment.
A copy of the Initial Study containing the analysis supporting this finding is attached. This document will be
considered by the decision - maker(s) prior to final action on the proposed project. A.public hearing will be held to consider this
project. The time and location of the public meeting is attached.
If you wish to appeal the appropriateness or adequacy of this document, your comments should be submitted in writing
prior to the close of the public review period. Your comments should specifically identify what environmental impacts you
believe would result from the project, why they are significant, and what changes or mitigation measures you believe should be
adopted to eliminate or reduce these impacts. There is no fee for this appeal- You are also invited to attend the public meeting
and to testify as to the appropriateness of this document.
If you have any questions or would like further information, please contact the undersigned at (949) 644 -3311.
Date It I2-I q9
William Patapo , C� ngineer
City of Newport Bea h, ublic Works Department
•
•
s
•
0
CITY OF NEWPORT BEACH
NOTICE OF COMPLETION
and Environmental Document Form
To:
State Clearinghouse
From: City Of Newport Beach
1400 Tenth St., Rm. 121
Public Works Department
Sacramento, CA 95814
3300 Newport Boulevard
Newport Beach, CA 92663
(Tel. No.: 916/445 -0613)
(Orange County)
Contact Person: Mr. Fong Tse, P.E.
SCH #
Tel No.: (949) 644 -3311
Project
Location: Bgvside Drive
Cross Streets From 2307 Bayside Drive to County Road
Total Acres 0.1
A.P.No.Not Applicable Section Not Applicable Twp. Not Applicable Range Not Applicable Base Not Applicable
Within 2 Miles: State Hwy #. 1 — PCH
Waterways: Newport Harbor
Airports: None Railways: None
Schools:Harbor View Elementary
Present
Land Use/Zoning/General Plan Use: R -1. R -2. and R -3 Residential
Project
Description, Installation of 160 feet of 18 -inch reinforced concrete gi a reinforced concrete 'unction structur
five (5)
differently sized catch basins with erates, and the
connection of these improvements to an existing reinforced
concrete pipe for drainage through a new bulkhead opening
next to the County Road street end.
Document Type
CEQA:
NEPA OTHER
❑
NOP ❑ Supplement/Subsequent
❑ NOT ❑ Joint Document
❑
Early Cons ❑ EIR (Prior SCE No.)
❑ EA ❑ Final Document
®
Neg Dec
O Draft EIS ❑ Other
❑
Drafl/EIR ❑ Other
❑ FONSI
Local Action Type
❑
General Plan Update Cl Specific Plan
Cl
Rezone Cl Annexation
❑
General Plan Amendment Cl Master Plan
Cl
Prezone Cl Redevelopment
❑
General Plan Element ❑ Planned Unit Dev.
Cl
Use Permit ® Coastal Permit
❑
Community Plan Cl Site Plan
Cl
Land Division (Sub- Cl Other:
division Parcel Map,
Tract map, ect.)
Development Type
❑
Residential: Units Acres
❑ Water Facilities: Type MGD
❑
office: Sq.O. Acres Employees_
❑ Transportation: Type
❑
Commercial:Sq.tt Acres Employees_
❑ Mining: Mineral
❑
Industrial: Sq.ft. Acres Employees—
13 Power. Type Watts
❑
Educational:
❑ Waste Treatmimt: Type
❑
Recreational
❑ Hazardous Waste: Type
® Other. Storm drain improvements
Project Issues Discussed in Document
❑
Aesthetic/Visual ❑ Flood Plain/Flooding
❑
Schools(Universitics Cl Water Quality
❑
Agricultural Land ❑ Forest land/Fire hazard
❑
Septic Systems ❑ Water Supply /Groundwater
❑
Air Quality ❑ Geologic /Seismic
❑
Sewer Capacity ❑ Welland/Riparian
❑
Archeologic/Historic ❑ Minerals
❑
Wildlife ❑ Soil Erosion/Compaction/Oading
❑
Coastal Zone ❑ Noise
❑
Solid Waste ❑ Growth Inducing
❑
Drainage/Absoption ❑ Population/Housing/Balance
❑
Toxic/Hazardous ❑ Land Use
❑
Economic/Jobs ❑ Public Service/Facilities
❑
Traf c/Circuladon ❑ Cumulative Effects
❑
Fiscal ❑ Recreation/Parks
Cl
Vegetation ® Other: None Applicable
CITY OF NEWPORT BEACH
NOTICE OF INTENT
TO ADOPT A
NEGATIVE DECLARATION
NOTICE IS HEREBY GIVEN that the City of Newport Beach has prepared an Initial Study/
Mitigated Negative Declaration pursuant to the California Environmental Quality Act for the
proposed project described below. The Initial Study has determined that the project, with the
proposed mitigation measures implemented, will not have a significant effect on the
environment. The City therefore intends to adopt a Negative Declaration.
Project Name: Bayside Drive Storm Drain Improvement Project.
Proiect Location: Bayside Drive from 2307 Bayside Drive to County Road.
Project Proponent: City of Newport Beach
3300 Newport Boulevard
Newport Beach, CA 92663
Public Review Period: November 8, 1999 through December 9, 1999
Project Description:
The project provides for the installation of approximately 160 feet of 18 -inch reinforced concrete
pipe, a reinforced concrete junction structure, and five (5) differently sized catch basins with
grates and the connection of these improvements to an existing 24" reinforced concrete pipe for
drainage through a new bulkead opening next to the County Road street end.
These drainage improvements are needed to decrease the potential of flooding nearby homes and
the Bayside Drive roadway during heavy rain storms.
Opportunity for Public Review:
Interested persons are invited to review the Negative Declaration, including studies and/or
exhibits relating to the proposed project, and submit comments. These documents and all
comments received will be considered by the Newport
on the proposed project. A copy of the Negative
available for review at the following location:
Newport Beach City Hall
Public Works Department
3300 Newport Boulevard
Newport Beach, CA 92663
Beach City Council prior to final action
Declaration, and related documents are
r]
11
n
U
If you wish to appeal the appropriateness or the adequacy of the Negative Declaration, your
comments should be submitted in writing prior to the close of public review period stated above.
Your comments should specifically identify what environmental impacts you believe would
result from the project, why they are significant, and what changes you believe should be
adopted to eliminate or reduce the impacts.
The City Council is scheduled to consider approval of the project and the Negative Declaration
at a public meeting on Monday, December 13, 1999 at 7:00 PM in the Newport Beach Council
Chambers, 3300 Newport Boulevard, Newport Beach, California.
If you have any questions or would like further information, please contact Mr. Fong Tse of the
City of Newport Beach Public Works Department at (949) 644 -3311.
Date of Publication: November 8, 1999
0
CITY OF NEWPORT BEACH
ENVIRONMENTAL CHECKLIST FORM
0
1. Project Title: Bayside Drive Storm Drain Improvement Project
2. Lead Agency Name and Address: City of Newport Beach
Public Works Department
3300 Newport Boulevard,
Newport Beach, CA 92658 -8915
(949) 644 -3311 (fax: 949- 644 -3308)
3. Contact Person and Phone Number: Mr. Fong Tse, (949) 644 -3311
4. Project Location: Bayside Drive from 2307 Bayside Drive to County Road
5. Project Sponsor's Name and Address: City of Newport Beach, Public Works Department
3300 Newport Boulevard
Newport Beach, CA 92663
6. General Plan Designation: Residential 0
7. Zoning: R -1, R -2, and R -3
8. Description of Project: (Describe the whole action involved, including but not limited to later
phases of the project, and any secondary, support, or off-site features necessary for its
implementation. Attach additional sheets -if necessary.)
The project provides for the installation of approximately 160 feet of 18 -inch reinforced
concrete pipe, a reinforced concrete junction structure, and five (5) differently sized catch
basins with grates and the connection of these improvements to an existing 24" reinforced
concrete pipe for drainage through a new bulkhead opening next to the County Road street
end.
These drainage improvements are needed to decrease the potential of flooding nearby
homes and the Bayside Drive roadway during heavy rainstorms.
0
CRECKUST
Page 1
0
f, J
9. Surrounding Land Uses and Setting: (Briefly describe the project's surroundings.)
Current
Development: Fully improved 2 -lane roadway and drainage easement.
To the north: R -1 land use with fully developed residential lots (with homes)
To the east: R -1 land use with fully developed residential lots (with homes)
To the south: R -2 and R -3 land use with fully developed residential lots (with
homes)
To the west: R -1 with fully developed residential lots (with homes) and Newport
Harbor
10. Other public agencies whose approval is required (e.g., permits, financing approval, or
participation agreement.)
California State Coastal Commission — Coastal Development Permit
Regional Water Quality Control Board — Discharge Permit/Waiver
ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED:
The environmental factors checked below would be potentially affected by this project, involving at
least one impact that is a "Potentially Significant Impact" as indicated by the checklist on the following
pages.
❑ Land Use Planning
❑ Population & Housing
❑ Biological Resources
❑ Mineral Resources
❑ Aesthetics
❑ Cultural Resources
❑ Geology and Soils
❑
Hazards/Hazardous Materials
❑
Agricultural Resources
❑ Hydrology and Water Quality
❑
Noise
❑
Recreation
❑ Air Quality
❑ Transportation/Circulation
❑ Public Services
❑ Utilities & Service Systems ❑ Mandatory Findings of
Significance
CHECK UST
Page 2
DETERMINATION (To be completed by the Lead Agency.)
On the basis of this initial evaluation:
I find that the proposed project COULD NOT have a significant effect on the
environment, and a NEGATIVE DECLARATION will be prepared. 0
I find that although the proposed project could have a significant effect on the
environment, there will not be a significant effect in this case because revisions
in the project have been made by or agreed to by the project proponent. A
MITIGATED NEGATIVE DECLARATION will be prepared. ❑
I find that the proposed project MAY have a significant effect on the
environment, and ENVIRONMENTAL IMPACT REPORT is required. ❑
I find that the proposed project MAY have a "potentially significant
impact" or "potentially significant unless mitigated" impact on the
environment, but at least one effect 1) has been adequately analyzed
in an earlier document pursuant to applicable legal standards, and 2) has
been addressed by mitigation measures based on the earlier analysis as
described on attached sheets. An ENVIRONMENTAL IMPACT
REPORT is required, but it must analyze only the effects that remain
to be addressed. ❑
I find that although the proposed project could have a significant effect on
the environment, because all potentially significant effects (a) have been
analyzed adequately in an earlier EIR or NEGATIVE DECLARATION
pursuant to applicable standards, and (b) have been avoided or mitigated
pursuant to that earlier EIR or NEGATIVE DECLARATION,
including revisions or mitigation measures that are imposed upon the
proposed project, nothing further is required. ❑
2
Signature Date
William Patapoffff, P.E.
Printed Name
0
CHECKLIST
Page 3
C�
is
0
•
0
Issues
Potentially
Significant
Less Than
significant
with
Less Than
significant
No
Impact
budgadon
Impact
Impact'
Incorporated
1. AESTHETICS — Would the project:
a) Have a substantial adverse effect on a scenic vista?
X
b) Substantially damage scenic resources, including, but not limited
to, trees, rock outcroppings, and historic buildings within a state
X
scenic hi hwa ?
c) Substantially degrade the existing visual character or quality of
the site and its surroundings?
X
d) Create a new source of substantial light or glare which would
X
adversely affect day or nighttime views in the area?
2. AGRICULTURE RESOURCES — In determining
whether impacts to agricultural resources are significant
environmental effects, lead agencies may refer to the
California Agricultural Land Evaluation and Site
Assessment Model (1997) prepared by the California Dept.
of Conservation as an optional model to use in assessing
impacts on agriculture and farmland. Would the project:
a) Convert Prime Farmland, Unique Farmland, or Farmland of
Statewide Importance (Farmland), as shown on the maps pre-
X
pared pursuant to the Farmland Mapping and Monitoring Pro-
gram of the California Resources Agency, to non - agricultural
use?
b) Conflict with existing zoning for agricultural use, or a William-
X
son Act contract?
c) Involve other changes in the existing environment which, due to
X
their location or nature, could result in conversion of Farmland,
to non -a 'cultural use?
3. AIR QUALITY — Where applicable, the significance
criteria established by the applicable air quality
management or air pollution control district may be relied
upon to make the following determinations. Would the
project:
a) Conflict with or obstruct implementation of the applicable air
quality plan?
X
b) Violate any air quality standard or contribute substantially to an
existing or projected air quality violation?
X
c) Result in a cumulatively considerable net increase of any criteria
pollutant for which the project region is non - attainment trader an
applicable federal or state ambient air quality standard
X
(including releasing emissions which exceed quantitative
thresholds for ozone precursors)?
d) Expose sensitive receptors to substantial pollutant concentra-
tions?
X
Checklist
Page 4
Checklist
Page 5
•
E
0
Lea. Than
Issues
Potentially
Significant
Significant
with
I.eaa Th..
significant
No
Impact
Mitigation
Impact
Impact
Incorporated
e) Create objectionable odors affecting a substantial number of
X
people?
4. BIOLOGICAL RESOURCES — Would the project:
a) Have a substantial adverse effect, either directly or through habi-
tat modifications, on any species identified as a candidate, sensi-
X
tive, or special status species in local or regional plans, policies,
or regulations, or by the California Department of Fish and
Game or U.S. Fish and Wildlife Service?
b) Have a substantial adverse effect on any riparian habitat or other
sensitive natural community identified in local or regional plans,
policies, regulations or by the California Department of Fish and
X
Game or U.S. Fish and Wildlife Service?
c) Have a substantial adverse effect on federally protected wetlands
as defined by Section 404 of the Clean Water Act (including,
X
but not limited to, marsh, vernal pool, coastal, etc.) through
direct removal, filling, hydrological interruption, or other
means?
d) Interfere substantially with the movement of any native resident
or migratory fish or wildlife species or with established native
X
resident or migratory wildlife corridors, or impede the use of
native wildlife nursery sites?
e) Conflict with any local policies or ordinances protecting biologi-
X
cal resources, such as a tree preservation policy or ordinance?
f) Conflict with the provisions of an adopted Habitat Conservation
Plan, Natural Community Conservation Plan, or other approved
X
local regional, or state habitat conservation Ian?
5. CULTURAL RESOURCES — Would the project:
a) Cause a substantial adverse change in the significance of an
X
historical resource as defined in § 15064.5?
b) Cause a substantial adverse change in the significance of an
X
archaeological resource pursuant to §15064.5?
c) Directly or indirectly destroy a unique paleontological resource
X
or site or unique geologic feature?
d) Disturb any human remains, including those interred outside of
X
formal cemeteries?
6. GEOLOGY AND SOILS — Would the project:
a) Expose people or structures to potential substantial adverse ef-
fects including the risk of loss injury, or death involving:
1) Rupture of a known earthquake fault, as delineated on the most
recent Alquist -Priolo Earthquake Fault Zoning Map issued by
X
the State Geologist for the area or based on other substantial
evidence of a known fault? Refer to Division of Mines and Ge-
ology Special Publication 42.
Checklist
Page 5
•
E
0
0
•
CJ
Issues
Potentially
significant
Leas Thao
significant
Will,
Less ThaVP.Cl
SlgnlficmImpact
Mitigation
Impact
IocorporateA
2) Strong seismic ground shaking?
X
3) Seismic - related ground failure, including liquefaction?
X
4) Landslides?
X
b) Result in substantial soil erosion or the loss of topsoil?
X
C) Be located on a geologic unit or soil that is unstable, or that
would become unstable as a result of the project, and potentially
result in on- or off -site landslide, lateral spreading, subsidence,
X
liquefaction or collapse?
d) Be located on expansive soil, as defined in Table 18 -1 -B of the
Uniform Building Code (1994), creating substantial risks to life
X
or property?
e) Have soils incapable of adequately supporting the use of septic
tanks or alternative waste water disposal systems where sewers
X
are not available for the disposal of waste water?
7. HAZARDS AND HAZARDOUS MATERIALS —
Would the project:
a) Create a significant hazard to the public or the environment
through the routine transport, use, or disposal of hazardous
X
materials?
b) Create a significant hazard to the public or the environment
through reasonable foreseeable upset and accident conditions
X
involving the release of hazardous materials into the environ-
ment?
c) Emit hazardous emissions or handle hazardous or acutely ham
ardous materials, substances, or waste within one - quarter mile
X
of an existln or Rroposed school?
d) Be located on a site which is included on a list of hazardous
materials sites compiled pursuant to Government Code Section
65962.5 and, as a result, would it create a significant hazard to
X
the public or the environment?
e) For a project located within an airport land use plan or, where
such a plan has not been adopted, within two miles of a public
airport or public use airport, would the project result in a safety
X
hazard for people residing or working in the project area?
f) For a project within the vicinity of a private airstrip, would the
project result in a safety hazard for people residing or working
X
in the project area?
X
g) Impair implementation of or physically interfere with an adopted
emergency response plan or emergency evacuation plan?
Checklist
Page 6
Checklist
Page 7
0
Less Thao
ISSUeS
Po"-dJI
SlgolfWlth
Signlfeant
Leas Than
Sigaficant
No
ImpMidgadon
Impact
Impact
p
'
ocorparated
h) Expose people or structures to a significant risk of loss, injury or
death involving wildland fires, including where wildlands are
adjacent to urbanized areas or where residences are intermixed
X
with wildlands?
8. HYDROLOGY AND WATER QUALITY — Would the
project:
a) Violate any water quality standards or waste discharge require -
X
ments?
b) Substantially deplete groundwater supplies or interfere substan-
tially with groundwater recharge such that there would be a net
deficit in aquifer volume or a lowering of the local groundwater
X
level (e.g., the production rate of pre - existing nearby wells
would drop to a level which would not support existing land
uses or planned uses for which permits have been ranted?
c) Substantially alter the existing drainage pattern of the site or
area, including through the alteration of the course of a stream
X
or river, in a manner which would result in substantial erosion or
siltation on- or off -site?
d) Substantially alter the existing drainage pattern of the site or
area, including through the alteration of the course of a stream
or river, or substantially increase the rate or amount of surface
X
runoff in a manner which would result in flooding on- or off -
site?
e) Create or contribute runoff water which would exceed the capac-
ity of existing or planned storrawater drainage systems or pro-
X
vide substantial additional sources of polluted runoff?
f) Otherwise substantially degrade water quality?
X
g) Place housing within a 100 -year flood hazard area as mapped on
a federal Flood Hazard Boundary or Flood Insurance Rate Map
or other flood hazard delineation map?
X
h) Place within a 100 -year flood hazard area structures which
would impede or redirect flood flows?
X
i) Expose people or structures to a significant risk of loss, injury or
death, involving flooding, including flooding as a result of the
X
failure of a levee or dam?
j) Inundation by seiche, tsunami, or mudflow?
X
9. LAND USE AND PLANNING -- Would the project:
a) Physically divide an established community?
X
b) Conflict with applicable land use plan, policy, or regulation of an
agency with jurisdiction over the project (including, but not lim-
ited to the general plan, specific plan, local coastal program, or
zoning ordinance) adopted for the purpose of avoiding or miti-
gating an environmental effect?
Checklist
Page 7
0
Checklist
Page 8
Leas Than
Issues
Potentially
significant
Significant
With
Lea, Than
Significant
No
Impact
Mitigation
Impact
Impact
Incorporated
c) Conflict with any applicable habitat conservation plan or natural
X
community conservation plan?
10. MINERAL RESOURCES — Would the project:
a) Result in the loss of availability of a known mineral resource that
X
would be of value to the region and the residents of the state?
b) Result in the loss of availability of a locally- important mineral
resource recovery site delineated on a local general plan,
X
specific plan or other land use plan?
11. NOISE — Would the project result in:
a) Exposure of persons to or generation of noise levels in excess of
standards established in the local general plan or noise ordi-
X
nance or applicable standards of other agencies?
b) Exposure of persons to or generation of excessive groundbore
X
vibration or groundbome noise levels?
c) A substantial permanent increase in ambient noise levels in the
X
project vicinity above levels existing without the project?
d) A substantial temporary or periodic increase in ambient noise
levels in the project vicinity above levels existing without the
X
Project?
e) For a project located within an airport land use plan or, where
such a plan has not been adopted, within two miles of a public
X
airport or public use airport, would the project expose people
residing or working in the project area to excessive noise levels?
0 For a project within the vicinity of a private airstrip, would the
project expose people residing or working in the project area to
Xr
excessive noise levels?
12. POPULATION AND HOUSING -- Would the project:
a) Induce substantial population growth in an area, either directly
(for example, by proposing new homes and businesses) or indi-
rectly (for example, through extension of roads or other iufra-
structure)?
b) Displace substantial numbers of existing housing, necessitating
the construction of replacement housing elsewhere?
X
c) Displace substantial numbers of people, necessitating the con-
struction of replacement housing elsewhere?
X
13. PUBLIC SERVICES —
a) Would the project result in substantial adverse physical impacts
associated with the provision of new or physically altered gov-
emmental facilities, need for new or physically altered govern-
mental facilities, the construction of which could cause signifi-
X
cant environmental impacts, in order to maintain acceptable ser-
vice ratios, response times or other performance objectives for
any of the public services:
Checklist
Page 8
Checklist
Page 9
,I
0
Less Than
Potentially
Significant
L. Than
No
Issues
Significant
With
Significant
Impact
Impact
Mitigation
Impact
Incorporated
X
l Fire protection?
2) Police protection?
X
3) Schools?
X
4) Parks?
X
S) Other public facilities?
X
14. RECREATION --
a) Would the project increase the use of existing neighborhood and
regional parks or other recreational facilities such that
substantial physical deterioration of the facility would occur or
X
be accelerated?
b) Does the project include recreational facilities or require the
construction or expansion of recreational facilities which might
X
have an adverse physical effect on the environment?
15. TRANSPORTATION /CIRCUL.ATION — Would the
project:
a) Cause an increase in traffic which is substantial in relation to the
existing traffic load and capacity of the street system (i.e., result
X
in a substantial increase in either the number of vehicle trips, the
volume to capacity ratio on roads, or congestion at intersec-
tions)?
b) Exceed, either individually or cumulatively, a level of service
standard established by the county congestion management
agency for designated roads or highways?
X
c) Result in a change in au traffic patterns, including either an in-
crease in traffic levels or a change in location that results in sub-
stantial safety risks?
X
d) Substantially increase hazards due to a design feature (e.g., sharp
curves or dangerous intersections) or incompatible uses (e.g.,
farm equipment)?
X
e) Result in inadequate emergency access?
X
f) Result in inadequate parking capacity?
X
g) Conflict with adopted policies, plans, or programs supporting
alternative transportation (e.g., bus turnouts, bicycle racks)?
X
16. UTILITIES AND SERVICE SYSTEMS — Would the
project:
a) Exceed wastewater treatment requirements of the applicable
Regional Water Quality Control Board?
X
b) Require or result in the construction of new water or wastewater
treatment facilities or expansion of existing facilities, the con-
struction of which could cause significant environmental
effects?
Checklist
Page 9
,I
0
0
IS. EARLIER ANALYSES.
Earlier analyses may be used where, pursuant to the tiering, program EIR, or other CEQA process,
one or more effects have been adequately analyzed in an earlier EIR or negative declaration. Section
15063(c)(3)(1)). In this case a discussion should identify the following on attached sheets:
a) Earlier analyses used. Identify earlier analyses and state where they are available for review.
b) Impacts adequately addressed. Identify which effects from the above checklist were within the scope
of and adequately analyzed in an earlier document pursuant to applicable legal standards, and state
whether such effects were addressed by mitigation measures based on the earlier analysis.
c) Mitigation measures. For effects that are "Less than Significant with Mitigation Incorporated,"
describe the mitigation measures which were incorporated or refined from the earlier document and
the extent to which they address site - specific conditions for the project.
0
Checklist
Page 10
Las Than
Issues
pak.thtuy
Significant
Significant
With
Leas Than
Significant
No
Impact
Mitigation
Impact
Impact
Incorporated
c) Require or result in the construction of new storm water drainage
facilities or expansion of existing facilities, the construction of
X
which could cause significant environmental effects?
d) Have sufficient water supplies available to serve the project from
existing entitlements and resources, or are new or expanded
entitlements needed?
X
e) Result in a determination by the wastewater treatment provider
which serves or may serve the project that it has adequate capac-
ity to serve the project's projected demand in addition to the
X
provider's existing commitments?
f) Be served by a landfill with sufficient permitted capacity to ac-
commodate the project's solid waste disposal needs?
X
g) Comply with federal, state, and local statutes and regulations
related to solid waste?
X
17. MANDATORY FINDINGS OF SIGNIFICANCE —
a) Does the project have the potential to degrade the quality of the
environment, substantially reduce the habitat of a fish or wildlife
species, cause a fish or wildlife population to drop below self-
X
sustaining levels, threaten to eliminate a plant or animal commu-
nity, reduce the number or restrict the range of a rare or endan-
gered plant or animal or eliminate important examples of the
major periods of California history or prehistory?
b) Does the project have impacts that are individually limited, but
cumulatively considerable? ( "Cumulatively considerable"
means that the incremental effects of a project are considerable
X
when viewed in connection with the effects of past projects, the
effects of other current projects, and the effects of probable
future projects)?
c) Does the project have environmental effects which will cause
substantial adverse effects on human beings, either directly or
X
indirectly?
IS. EARLIER ANALYSES.
Earlier analyses may be used where, pursuant to the tiering, program EIR, or other CEQA process,
one or more effects have been adequately analyzed in an earlier EIR or negative declaration. Section
15063(c)(3)(1)). In this case a discussion should identify the following on attached sheets:
a) Earlier analyses used. Identify earlier analyses and state where they are available for review.
b) Impacts adequately addressed. Identify which effects from the above checklist were within the scope
of and adequately analyzed in an earlier document pursuant to applicable legal standards, and state
whether such effects were addressed by mitigation measures based on the earlier analysis.
c) Mitigation measures. For effects that are "Less than Significant with Mitigation Incorporated,"
describe the mitigation measures which were incorporated or refined from the earlier document and
the extent to which they address site - specific conditions for the project.
0
Checklist
Page 10
CITY OF NEWPORT BEACH
ENVIRONMENTAL ANALYSIS CHECKLIST EXPLANATIONS
Bayside Drive Storm Drain Improvement Project
Project Description
This project provides for the installation of approximately 160 feet of 18 -inch
reinforced concrete pipe, a reinforced concrete junction structure, and five (5)
differently sized catch basins with grates and the connection of these improvements
to an existing 24" reinforced concrete pipe for drainage through a new bulkhead
opening next to the County Road street end.
These drainage improvements are needed to decrease the potential of flooding
nearby homes and the Bayside Drive roadway during heavy rainstorms.
ANALYSIS
The following provides the explanations and supporting analyses for the impact
categories and questions contained in the previous Checklist, and identifies
mitigation measures where applicable.
I. AESTHETICS .
Would the project
a) Have a substantial adverse effect on a scenic vista?
No Impact. This at -grade and below ground improvement project is located
within a fully developed residential section of the City. Except for a view of
Newport Harbor at the end of County Road, there are no other scenic
resources within proximity of the project.
The project consists of the construction of at -grade and underground
drainage improvements and will not interfere with the existing view of
Newport Harbor. No mitigation measures are necessary.
b) Substantially damage scenic resources, including, but not limited to, trees,
rock outcroppings, and historic buildings within a state scenic highway?
No Impact. The project is not located within a state scenic highway. No
mitigation measures are necessary.
c) Substantially degrade the existing visual character or quality of the site
and its surroundings?
CHECKLIST EXPLANATIONS
PAGE I
IV
No Impact. The project consists of the construction of at -grade and
underground drainage improvements and will not affect the existing visual
character nor the quality of the site nor its surroundings. No mitigation
measures are necessary.
d) Create a new source of substantial light or glare which would adversely
affect day or nighttime views in the area?
No Impact. The project does not include any lighting work. The existing
street lighting arrangement within the project limits will remain as -is. The
project will not adversely impact the day or night time views in the area. No
mitigation measures are necessary.
2. AGRICULTURE RESOURCES
Would the project :
a) Convert Prime Farmland, Unique Farmland, or Farmland of Statewide
Importance (Farmland), as shown on the maps prepared pursuant to the
Farmland Mapping and Monitoring Program of the California Resources
Agency, to non - agricultural use?
No Impact. No agricultural activities occur within the project vicinity. No
mitigation measures are necessary.
b) Conflict with existing zoning for agricultural use, or a Williamson Act
contract?
No Impact. The project site is not zoned for agricultural use and there are no
Williamson Act contracts within the project vicinity. No mitigation
measures are necessary.
c) Involve other changes in the existing environment which, due to their
location or nature, could result in conversion of Farmland, to non-
agricultural use?
No Impacts. The project does not involve any work that could result in the
conversion of farmland. No mitigation measures are necessary.
3. AIR QUALITY
Would the project:
a) Conflict with or obstruct implementation of the applicable air quality
plan?
Less Than Significant Impact. The project would result in emissions during
CHECKLIST EXPLANATIONS
Page 2
11
construction (e.g. dust and construction equipment exhaust). No emissions
would be generated after construction is completed. It is anticipated that
construction equipment will be limited to a backhoelloader, a dump truck, a
flatbed truck, a concrete mixer, and other portable equipment during various
phases of the work. A street sweeper will be at the project site throughout
the work duration. This combination of equipment is estimated to generate
substantially less than the significance thresholds identified in the South
Coast Air Quality Management District's 1993 CEQA Air Quality
Handbook, Table A9 -8E. Consequently, the project would not conflict with
or obstruct implementation of the air quality plan. Standard contract
specifications require all construction equipment to be maintained in proper
working order, which would minimize emissions. No additional mitigation
is necessary.
b) violate any air quality standard or contribute substantially to an existing
or projected air quality violation?
Less Than Significant Impact. See Section 3.a above.
c) Result in a cumulatively considerable net increase of any criteria pollutant
for which the project region is non- attainment under an applicable federal
or state ambient air quality standard (including releasing emissions which
exceed quantitative thresholds for ozone precursors)?
Less Than Significant Impact. See Section 3.a above.
d) Expose sensitive receptors to substantial pollutant concentrations?
Less Than Significant Impact. See Section 3.a above.
e) Create objectionable odors affecting a substantial number of people?
Less Than Significant Impact. Diesel- powered equipment used for
construction could cause odors and emissions that may be offensive to
sensitive receptors. However, the construction work is located in an area
with constant sea breezes and the odors should not cause any problems for
the nearby residents. Consequently, the project would not generate
objectionable odors during the work. The completed improvements will not
generate any odors. The issue of odor generation is expected to be less than
significant. No mitigation measures are necessary.
4. BIOLOGICAL RESOURCES
Would the project.
a) Have a substantial adverse effect, either directly or through habitat
modifications, on any species identified as a candidate, sensitive, or
CHECKLIST EXPLANATIONS
Page 3
special status species in local or regional plans, policies, or regulations, or
by the California Department of Fish and Game or U.S. Fish and Wildlife
Service?
Less Than Significant Impact. Although urban runoff contains contaminants
such as oil, heavy metals, pesticides, etc., the construction of the new storm
drain and outlet would not have a substantial effect on water quality in
Newport Harbor. The runoff that will be discharged by the proposed
drainage improvements currently flows into the harbor through other
existing storm drain discharge locations in the area. No mitigation measures
are necessary.
b) Have a substantial adverse effect on any riparian habitat or other sensitive
natural community identified in local or regional plans, policies,
regulations or by the California Department of Fish and Game or U.S.
Fish and Wildlife Service?
Less Than Significant hnpact. See Section 4.a above.
c) Have a substantial adverse effect on federally protected wetlands as
defined by Section 404 of the Clean Water Act (including, but not limited
to, marsh, vernal pool, coastal, etc.) through direct removal, fdling,
hydrological interruption, or other means?
Less Than Significant Impact. See Section 4.a above.
d) Interfere substantially with the movement of any native resident or
migratory fish or wildlife species or with established native resident or
migratory wildlife corridors, or impede the use of native wildlife nursery
sites?
Less Than Significant hnpact. See Section 4.a above.
e) Conflict with any local policies or ordinances protecting biological
resources, such as a tree preservation policy or ordinance?
Less Than Significant Impact. See Section 4.a above.
,n Conflict with the provisions of an adopted Habitat Conservation Plan,
Natural Community Conservation Plan, or other approved local, regional,
or state habitat conservation plan?
No impac. The project site is not included in any Habitat Conservation
Plan nor NCCP area. No mitigation measures are necessary.
CHECKLIST EXPLANATIONS
Page 4
5. CULTURAL RESOURCES .
Would the project:
a) Cause a substantial adverse change in the significance of an historical
resource as defined in §15064.5?
No Impact. There are no historic resources at the project site. No mitigation
measures are necessary.
b) Cause a substantial adverse change in the significance of an
archaeological resource pursuant to §15064.5?
No Impact. There are no archaeological resources at the project site. No
mitigation measures are necessary.
C) Directly or indirectly destroy a unique paleontological resource or site or
unique geologic feature?
No Impact. There are no paleontological resources at the project site. No
mitigation measures are necessary.
d) Disturb any human remains, including those interred outside of formal
cemeteries?
No Impact. There are no known human remains at the project site. No
mitigation measures are necessary.
6. GEOLOGYAND SOILS
Would the project:
a) Expose people or structures to potential substantial adverse effects,
including the risk of loss, injury, or death involving.
I) Rupture of a known earthquake fault, as delineated on the most
recent Alquist- Priolo Earthquake Fault Zoning Map issued by the
State Geologist for the area or based on other substantial evidence
of a known fault? Refer to Division of Mines and Geology Special
Publication 42.
No Impact. There are no known earthquake faults or Alquist -Priolo
zones within the project vicinity. No mitigation measures are
necessary.
CHECKLIST EXPLANATIONS
Page 5
iI
•
2) Strong seismic ground shaking?
No Impact. Although there are no known earthquake faults within
the project vicinity, the area is subject to strong seismic ground
shaking, as is the case with all of Southern California. Since the
proposed improvements are intended for the conveyance of surface
runoff, seismic ground shaking will not pose serious hazards to the
public. No mitigation measures are necessary.
3) Seismic - related ground failure, including liquefaction?
No Impact. See Section 5.a.2 above.
4) Landslides?
No Impact. The project location is nearly flat and no significant risk
of landslide is present. No mitigation measures are necessary.
b) Result in substantial soil erosion or the loss oftopsoil?
No Impact. The project area is completely urbanized and is located entirely
within existing street right -of -way and a drainage easement. No soil erosion
or loss of topsoil would occur during or after the construction operations.
. No mitigation measures are necessary.
c) Be located on a geologic unit or soil that is unstable, or that. would become
unstable as a result of theproject, and potentially result in on- or off-site
landslide, lateral spreading, subsidence, liquefaction or collapse?
No hnpact. The project involves the shallow installation of drainage pipes,
catch basins, and a junction structure within a flat portion of the Bayside
Drive right -of -way and a drainage easement. The potential of landslide,
liquefaction, or other hazards that could be caused by this project is minimal.
No mitigation measures are necessary.
d) Be located on expansive soil, as defined in Table 18-1-B of the Uniform
Building Code (1994), creating substantial risks to life or properly?
No hnpact. Expansive soils are generally high in clay content. The native
soil material as observed through the private work at 2323 Bayside Drive,
which is located immediately adjacent to the proposed City project site, did
not exhibit clayey characteristics. No mitigation measures are necessary.
e) Have soils incapable of adequately supporting the use of septic tanks or
alternative waste water disposal systems where sewers are not available for
the disposal of waste water?
CHECKLIST EXPLANATIONS
Page 6
No Impact. The project does not involve the use of septic tanks. All
wastewater is presently conveyed off -site via connections to the sanitary
sewer system. No mitigation measures are necessary.
7. HAZARDS AND HAZARDOUS MATERIALS
Would the project:
a) Create a significant hazard to the public or the environment through the
routine transport, use, or disposal of hazardous materials?
No Impact. No use, transport, or disposal of hazardous material is proposed
for this project. No mitigation measures are necessary.
b) Create a significant hazard to the public or the environment through
reasonable foreseeable upset and accident conditions involving the release
ofhazardous materials into the environment?
Less Than Significant Impact. Gasoline- and diesel powered equipment
would be used during construction. The standard construction contract
provisions require the contractor to follow the site maintenance and cleanup
procedures described in the Standard Specifications for Public Works
Construction. No additional mitigation measures are necessary.
c) Emit hazardous emissions or handle hazardous or acutely hazardous
materials, substances, or waste within one - quarter mile of an existing or
proposed school?
No Impact. The project would not involve the handling or transport of
acutely hazardous materials and would not result in hazardous emissions.
The existing school facility closest to the project location is more than one-
quarter mile away and no new school facility is proposed within the project
vicinity. No mitigation measures are necessary.
d) Be located on a site which is included on a list of hazardous materials sites
compiled pursuant to Government Code Section 65962.5 and, as a result,
would it create a significant hazard to the public or the environment?
No Impact. The project is not located on a listed hazardous materials site.
No mitigation measures are necessary.
e) For a project located within an airport land use plan or, where such a
plan has not been adopted, within two miles of a public airport or public
use airport, would the project result in a safety hazard for people residing
or working in the project area?
CHECKLIST EXPLANATIONS
Page 7
.T
u
•
0
No !=act. The project is not located within an existing or future airport
land use plan area nor within two miles of an airport. No mitigation
measures are necessary.
,i For a project within the vicinity of a private airstrip, would the project
result in a safety hazard for people residing or working in the project
area?
No Impact. The project is not located within the vicinity of a private
airstrip. No mitigation measures are necessary.
g) Impair implementation of or physically interfere with an adopted
emergency response plan or emergency evacuation plan?
Less Than SiMiificant With Mitigation Incorporated. The project will not
have any permanent effects on an emergency response or emergency
evacuation plan. Due to temporary lane closure during construction,
emergency evacuation routes could be affected. The following mitigation
measure would reduce this impact to a level that is less than significant.
Mitigation Measure 7 -1. Traffic Control Plan Prior to project
advertisement for bids, the project specifications shall be prepared to
• contain traffic control requirements that the contractor must adhere
to during the work. Such traffic control shall include provisions for
continuous traffic access through the construction site by emergency
equipment and personnel and the temporary installation of approved
warning devices alerting the public of the construction work and lane
closure.
Prior to the start of construction, the contractor shall provide the City
with a traffic control plan that has incorporated all of the project
requirements. No work shall begin without a City approved traffic
control plan.
h) Expose people or structures to a significant risk of loss, injury or death
involving wildland fires, including where wildlands are adjacent to
urbanized areas or where residences are intermixed with wildlands?
No impact The project is located in a fully developed urban residential area
with no wildland interface. No mitigation measures are necessary.
& HYDROLOGYAIVD WATER QUALITY
Would the project:
. a) Kolate any water quality standards or waste discharge requirements?
CHECKLIST EXPLANATIONS
Page 8
Less Than Significant Impact. The project provides for the discharge of
runoff into Newport Harbor. Such discharge would contain urban pollutants
such as pesticides and oil. However, since the runoff to be conveyed by the
proposed drainage improvements is currently entering the harbor at other
discharge locations, no change in the type nor quantity of runoff into the
harbor is expected. All construction activities will be subject to the National
Pollutant Discharge Elimination System (NPDES) Best Management
Practices, which require measures be taken to minimize runoff of
contaminants and siltation. No additional mitigation measures are
necessary.
b) Substantially deplete groundwater supplies or interfere substantially with
groundwater recharge such that there would be a net deficit in aquifer
volume or a lowering of the local groundwater level (eg., the production
rate ofpre - existing nearby wells would drop to a level which would not
support existing laid uses or planned uses for which permits have been
granted?
No Impact. The project would not have any effect on groundwater supplies
nor recharge. No mitigation measures are necessary.
c) Substantially alter the existing drainage pattern of the site or area,
including through the alteration of the course of a stream or river, in a
manner which would result in substantial erosion or siltation on- or off
site?
Less Than Significant Impact. The proposed improvements will intercept
and divert future rainstorm runoff on Bayside Drive so as to decrease the
potential of flooding nearby homes. The drainage pattern for the general
area, however, will remain unchanged and no erosion nor siltation will result
from the improvements. No mitigation measures are necessary.
d) Substantially alter the existing drainage pattern of the site or area,
including through the alteration of the course of a stream or river, or
substantially increase the rate or amount of surface runoff in a manner
which would result in flooding on- or off-site?
Less Than Significant Impact. The proposed improvements will intercept
and divert future rainstorm runoff on Bayside Drive so as to decrease the
potential of flooding nearby homes. The drainage pattern for the general area
will remain unchanged. No mitigation measures are necessary.
e) Create or contribute runoff water which would exceed the capacity of
existing or planned stormwater drainage systems or provide substantial
additional sources ofpolluted runofJ? .
No Impact The project would not create any urban runoff. No mitigation
measures are necessary.
CHECKLIST EXPLANATIONS
Page 9
9t
Otherwise substantially degrade water quality?
No Impact. Since the project only changes the point of discharge for the
existing urban runoff, the water quality in the area will not change. No
mitigation measures are necessary.
g) Place housing within a 100 year flood hazard area as mapped on a federal
Flood Hazard Boundary or Flood Insurance Rate Map or other flood
hazard delineation map?
No Impact. No housing is proposed for this project. No mitigation
measures are necessary.
! :) Place within a 100 year flood hazard area structures which would impede
or redirect flood flows?
No Impact. Except for the construction of drainage improvements that will
redirect urban runoff and decrease the potential of flooding nearby homes
during heavy rainstorms, no other structures are proposed for this project.
No mitigation measures are necessary.
i) Expose people or structures to a significant risk of loss, injury or death,
involving flooding, including flooding as a result of the failure of a levee
or dam?
No Impact. The proposed improvements will direct future urban runoff
away from the nearby homes and residents. No mitigation measures are
necessary.
j) Inundation by seiche, tsunami, or mudflow?
No Impact. The project site, typical of the California coastline, is located in
a low -lying area that could be inundated in the event of seiche or tsunami.
The proposed improvements would have no effect on these conditions. No
mitigation measures are necessary.
9. LAND USE AND PLANNING
Would the project:
a) Physically divide an established community?
No !=act. The project is located in a fully developed residential area of the
City. The project would not physically divide the already established
community. No mitigation measures are necessary.
CHECKLIST EXPLANATIONS
Page 10
b) Conflict with applicable land use plan, policy, or regulation of an agency
with jurisdiction over the project (including, but not limited to the general
plan, specific plan, local coastal program, or zoning ordinance) adopted
for the purpose of avoiding or mitigating an environmental effect?
No Impact. The project would not conflict with the existing General Plan
land use designation or zoning. No mitigation measures are necessary.
c) Conflict with any applicable habitat conservation plan or natural
community conservation plan?
No Impact. The project would not conflict with habitat or natural
community conservation plan. No mitigation measures are necessary.
10. MINERAL RESOURCES
Would the project.
a) Result in the loss of availability of a known mineral resource that would
be of value to the region and the residents of the state?
No Impact. The project is located in a fully developed residential area of the
City and no mineral sources would be affected. No mitigation measures are
necessary.
b) Result in the loss of availability of a locally - important mineral resource
recovery site delineated on a local general plan, specific plan or other land
use plan?
No Impact. There are no locally important mineral resource recovery areas
located within the project limits. No mitigation measures are necessary.
11. NOISE
Would the project result in:
a) Exposure of persons to or generation of noise levels in excess of standards
established in the local general plan or noise ordinance, or applicable
standards of other agencies?
Less Than Significant Impact. The project would not result in any long-
term noise increase. As with all public works projects, a short-term noise
increase around the project site would occur during construction. All
construction equipment will comply with the noise limits imposed by the
Standard Specifications for Public Works Construction and by the Newport A&
Beach Municipal Code. No additional mitigation measures are necessary.
CHECKLIST EXPLANATIONS
Page I I
ou
b) Exposure of persons to or generation of excessive groundborne vibration
or groundborne noise levels?
Less Than Significant Impact. The project could generate a moderate
amount of ground vibration during the storm drain trench work. Such
vibration is typical of public works projects. Since the amount of trench
work is minimal, the ground vibration that could result from the work
should not last more than a few day. No additional mitigation measures are
necessary.
c) A substantial permanent increase in ambient noise levels in the project
vicinity above levels existing without the project?
No Impact. The project could not generate a permanent increase in ambient
noise levels in the area. No mitigation measures are necessary.
d) A substantial temporary or periodic increase in ambient noise levels in the
project vicinity above levels existing without the project?
Less Than Significant Impact. The project could generate a moderate and
temporary noise increase during construction. Such noise increase is typical
of public works projects. All construction equipment will comply with the
noise limits imposed by the Standard Specifications for Public Works
Construction and by the Newport Beach Municipal Code. No additional
mitigation measures are necessary.
e) For a project located within an airport land use plan or, where such a
plan has not been adopted, within two miles of a public airport or public
use airport, would the project expose people residing or working in the
project area to excessive noise levels?
No act. The project is not located within an airport land use plan nor
within two miles of a public airport. No mitigation measures are necessary.
j) For a project within the vicinity of a private airstrip, would the project
expose people residing or working in the project area to excessive noise
levels?
No Impac. There are no private airstrips within the project vicinity. No
mitigation measures are necessary.
12. POPULMONAND HOUSING
Would the project.
a) Induce substantial population growth in an area, either directly (for
example, by proposing new homes and businesses) or indirectly (for
example, through extension of roads or other infrastructure)?
CHECKLIST EXPLANATIONS
Page 12
II
No Impact The project is located in a fully developed area of the City and
is proposed for drainage improvements. No increase in population growth
could result from this project. No mitigation measures are necessary.
b) Displace substantial numbers of existing housing, necessitating the
construction of replacement housing elsewhere?
No Impact The project is located in a fully developed area of the City and
is proposed for drainage improvements. No decrease of existing housing
could result from this project. No mitigation measures are necessary.
c) Displace substantial numbers of people, necessitating the construction of
replacement housing elsewhere?
No Impact. The project is located in a fully developed area of the City and
is proposed for drainage improvements. No displacement of existing
residents could result from this project. No mitigation measures are
necessary.
13. PUBLIC SER VICES
a) Would the project result in substantial adverse physical impacts associated
with the provision of new or physically altered governmental facilities, need for
new or physically altered governmental facilities, the construction of which could
cause significant environmental impacts, in order to maintain acceptable service
ratios, response times or other performance objectives for any of the public
services:
1) Fire protection?
No Impact. The project would not adversely impact fire protection
in the area. No mitigation measures are necessary.
2) Police protection?
No Impact. The project would not adversely impact police
protection in the area. No mitigation measures are necessary.
3) Schools?
No Impact. The project would not affect student generation or
school operations. No mitigation measures are necessary.
4) Parks?
No Impact. The project would not affect parks or recreation. No
mitigation measures are necessary.
CHECKLIST EXPLANATIONS
Page 13
S) Other public facilities?
No Impact. The project would not affect any other public facilities.
No mitigation measures are necessary.
14. RECREATION
a) Would the project increase the use of existing neighborhood and regional
parks or other recreational facilities such that substantial physical
deterioration of the facility would occur or be accelerated?
No Impact. The project would not increase the use of existing neighborhood
or regional parks or other recreational facilities. No mitigation measures are
necessary.
b) Does the project include recreational facilities or require the construction
or expansion of recreational facilities which might have an adverse
physical effect on the environment?
No Impact. The project would not increase the use of parks or other
recreational facilities. No mitigation measures are necessary.
• 15. TRANSPORTATION /CIRCULATION
Would the project.
a) Cause an increase in traffic which is substantial in relation to the existing
traffic load and capacity of the street system (La, result in a substantial
increase in either the number of vehicle trips, the volume to capacity ratio
on roads, or congestion at intersections)?
Less Than Significant Impact. Typical of all construction work, a short -term
increase in traffic in the general area immediately adjacent to the work site is
expected to occur during construction. The traffic increase will not be
significant.
b) Exceed, either individually or cumulatively, a level of service standard
established by the county congestion management agency for designated
roads or highways?
No Impact. Except for the temporary traffic delays during construction, the
improvements will not change the existing level of service in the area. No
mitigation measures are necessary.
c) Result in a change in air traffic patterns, including either an increase in
trafflc levels or a change in location that results in substantial safety
risks?
CHECKLIST EXPLANATIONS
Page 14
No Impact. The project will not change the current air traffic patterns in the
area. No mitigation measures are necessary.
d) Substantially increase hazards due to a design feature (eg., sharp curves
or dangerous intersections) or incompatible uses (eg., farm equipment)?
No impact. The proposed improvements will not change the geometries of
the existing roadway. No mitigation measures are necessary.
e) Result in inadequate emergency access?
Less Than Significant Impact. The project will not have any
permanent effects on emergency access. Due to temporary lane
closure during construction, emergency access routes could be
affected. However, prior to project advertisement for bids, the
project specifications shall be prepared to contain traffic control
requirements that the contractor must adhere to during the work.
Such traffic control shall include provisions for continuous traffic
access through the construction site by emergency equipment and
personnel and the temporary installation of approved warning
devices alerting the public of the construction work and lane closure.
Prior to the start of construction, the contractor shall provide the City .
with a traffic control plan that has incorporated all of the project
requirements. No work shall begin without a City approved traffic
control plan. The City emergency response personnel will be
notified of the construction work and temporary lane closure prior to
and during the work.
P Result in inadequate parking capacity?
No Impact. The project will not change the existing parking capacity in the
area. No mitigation measures are necessary.
P) Conflict with adopted policies, plans, or programs supporting alternative
transportation (eg., bus turnouts, bicycle racks)?
No Impact. The project will not conflict with adopted policies, plans, or
programs supporting alternative transportation. No mitigation measures are
necessary.
16. UTILITIES AND SERVICE SYSTEMS
Would the project:
a) Exceed wastewater treatment requirements of the applicable Regional
Water Quality Control Board? is
CHECKLIST EXPLANATIONS
Page 15
. No Impact. The project would have no effect on wastewater flows or
treatment requirements. No mitigation measures are necessary.
b) Require or result in the construction of new water or wastewater treatment
facilities or expansion of existing facilities, the construction of which
could cause significant environmental effects?
No lmRaact. The project would have no effect on wastewater flows or
treatment requirements. No mitigation measures are necessary.
c) Require or result in the construction of new storm water drainage
facilities or expansion of existing facilities, the construction of which
could cause significant environmental effects?
Less Than Significant Impact. Although the project proposed the
construction of new drainage provisions, the completed work is an isolated
stand -alone system that would not cause the construction of additional new
or expanded drainage facilities. No mitigation measures are necessary.
d) Have sufficient water supplies available to serve the project from existing
entitlements and resources, or are new or expanded entitlements needed?
• No Impact. The project would not affect water supply or demands. No
mitigation measures are necessary.
e) Result in a determination by the wastewater treatment provider which
serves or may serve the project that it has adequate capacity to serve the
project's projected demand in addition to the provider's existing
commitments?
No Impact. The project would have no effect on wastewater flows or
treatment requirements. No mitigation measures are necessary.
Be served by a landfill with sufficient permitted capacity to accommodate
the project's solid waste disposal needs?
Less Than Significant Impact. The project construction may result in the
generation of excess earth material that would need to be transported off site.
This would not be considered a significant impact due to its temporary
nature and limited quantity. Removed native material that could not be
reused on the project will be diposed of at a landfill. Removed asphalt
material will be recycled by the contractor. No mitigation measures are
necessary.
. g) Comply with federal, state, and local statutes and regulations related to
solid waste?
CHECKLIST EXPLANATIONS
Page 16
No Impact The project specifications require the contractor to dispose of
construction waste in accordance with the applicable statutes and
regulations. No mitigation measures are necessary.
1Z MANDATORY FINDINGS OF SIGNIFICANCE
a) Does the project have the potential to degrade the quality of the
environment, substantially reduce the habitat of a fish or wildlife species,
cause a fish or wildlife population to drop below self-sustaining levels,
threaten to eliminate a plant or animal community, reduce the number or
restrict the range of a rare or endangered plant or animal or eliminate
important examples of the major periods of California history or
prehistory?
Less Than Significant Impact. The project has the potential to degrade the
quality of the environment, but the measures recommended would reduce
these potential impacts to a level that is less than significant.
b) Does the project have impacts that are individually limited, but
cumulatively considerable? ( "Cumulatively considerable" means that the
incremental effects of a project are considerable when viewed in
connection with the effects of past projects, the effects of other current
projects, and the effects of probable future projects) ? •
No Impact The project does not have any impact that is individually
limited, but cumulatively considerable. No mitigation measures are
necessary.
c) Does the project have environmental effects which will cause substantial
adverse effects on human beings, either directly or indirectly?
No Impact. The project does not have any environmental effects that could cause
substantial adverse effects on human beings. No mitigation measures are
necessary.
REFERENCES
• Building News Publications, Standard Specifications for Public Works Construction,
1997 Edition.
• City of Newport Beach, Newport Beach Municipal Code.
• South Coast Air Quality Management District, CEOA Air Quality Handbook, 1993.
REPORT PREPARATION PERSONNEL
Lead Agency:
City of Newport Beach Don Webb, P.E. Public Works Director •
Bill Patapoff, P.E. City Engineer
Fong Tse, P.E. Associate Civil Engineer
CHECKLIST EXPLANATIONS
Page 17
0
Appendix A
Project Vicinity Map and Location Map
0
0
®
PROJECT LATION MAP) pAC/F�C
VICINITY MAP
NOT TO SCALE
4Q' p�
5
CITY
O F
tp
IRVINE
UPPER UNIVU91 qG
14PORT� —, r L
BAY U.C.I.
OF
IEWPI
BEAU
BAY
o0,�
FORD
BAYSIDE DRIVE STORM DRAIN IMPROVEMENT
(FROM 2307 BAYSIDE DRIVE TO COUNTY ROAD)
CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT
1�
U m
m
N A
ADAMS AVE. p
10-
pRANGE
z C
CITY OF
COLLEGE
0O C
COSTA o
o
Y M
MESA s
s
o
zo
m
= V
VICTORIA
ST.
LL S
19TH S
ST.
CL
PROJECT LATION MAP) pAC/F�C
VICINITY MAP
NOT TO SCALE
4Q' p�
5
CITY
O F
tp
IRVINE
UPPER UNIVU91 qG
14PORT� —, r L
BAY U.C.I.
OF
IEWPI
BEAU
BAY
o0,�
FORD
BAYSIDE DRIVE STORM DRAIN IMPROVEMENT
(FROM 2307 BAYSIDE DRIVE TO COUNTY ROAD)
CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT
1�
PLO
P� OD
O GF
CP�PO ��`Tl
P
,0 9
n P
�P
tom^ 0�'G
NEWPORT
gp�(SIDE �'e
HARBORNn
Q
P
�J
0
A A
INaP ��GF
LOCATION MAP
NOT TO SCAM �cP
S -- PROJECT LOCATIONa
BAYSIDE DRIVE STORM DRAIN IMPROVEMENT
(FROM 2307 BAYSIDE DRIVE TO COUNTY ROAD)
CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT