REPORT TO THE MAYOR AND CITY COUNCIL
PROJECT. Extended StayAmerica
4881 Birch Street
January 11, 2000
Iq
Marc Myers
(949) 644 -3210
PURPOSE OF
APPLICATION: Request for a General Plan Amendment, PC Amendment, Use Permit and a
Traffic Study to allow the construction of a 164 room extended stay hotel.
The General Plan Amendment will increase the square footage entitlement
permitted on the site, the PC Amendment involves text modifications to the
development standards including, but not limited to: designating Parcel 1 of
Retail and Service Site 1 for hotel use, increasing the square footage
entitlement to accommodate the construction of the new building, and
establishing a 60 foot height limit for the new hotel site. A Use Permit is
required for the establishment of a hotel.
ACTION: Conduct public hearing; and:
• Adopt Resolution 2000 -_, approving General Plan Amendment
No. 99 -2(A); and
• Introduce Ordinance No. 1000 -_, an amendment to the Koll
Center Planned Community (Amendment No. 897), and approve the
designation of hotel use for Parcel I of KCN Retail and Service Site
1, establish the permitted gross floor area for KCN Retail and
Service Site I at 110,000 square feet, establish the permitted height
for the site at 60 feet, and pass to second reading on January 25,
2000; and
Sustain the action of the Planning Commission and approve the supporting
documentation related to the Amendment, subject to the Findings,
Conditions, and Mitigation Measures as modified by the Planning
Commission:
• The acceptance of a Negative Declaration
• Use Permit No. 3665
• A Traffic Generation Study
Planning Commission Recommendation
At its meeting of December 9, 1999, the Planning Commission voted (all ayes) to recommend
approval of the applications related to the construction of a 164 room extended stay hotel. To
ensure that the site landscaping is installed as proposed, Condition No. 1, which requires the final
development to be in substantial conformance with the approved plans, was modified by the
Planning Commission to include the proposed landscape plan in the substantial conformance
compliance requirement. The revised condition of approval is included in the excerpt Planning
Commission's meeting minutes attached for the Council's review. A copy of the staff report
prepared for the Planning Commission is also attached.
Submitted by: Prepared by:
SHARON Z. WOOD MARC W. MYERS
Assistant City Manager Associate Planner
Attachments: Staff Report to the Planning Commission
Resolution
Ordinance
Excerpt of December 9, 1999 Planning Commission Meeting Minutes
Planning Commission Resolutions
Exhibit "A"
Mitigated Negative Declaration
Mitigation Monitoring Program
Traffic Generation Study
Letter from Langdon Wilson Architecture Planning Interior regarding Koll Center Newport Design
Review
Site Plan, Floor Plan, Landscape Plan and Elevations
I
Page 2
0 RESOLUTION NO. 2000-
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF NEWPORT BEACH APPROVING GENERAL PLAN
AMENDMENT NO. 99 -2(A) TO THE LAND USE ELEMENT
OF THE NEWPORT BEACH GENERAL PLAN TO
INCREASE THE SQUARE FOOTAGE ENTITLEMENT
ALLOWED ON PARCEL 1 OF RETAIL AND SERVICE
SITE 1 OF THE KOLL CENTER PLANNED COMMUNITY
BY 17,890 SQUARE FEET. [General Plan Amendment No. 99-
2(A)l
WHEREAS, as part of the development and implementation of the Newport
Beach General Plan the Land Use Element has been prepared; and
WHEREAS, the Land Use Element of the General Plan sets forth objectives,
supporting policies and limitations for development in the City of Newport Beach; and
WHEREAS, it has been determined that the proposed development is consistent
with General Plan Policy B, since the proposed increase in development will not result in
. significant changes to the long range traffic service levels since the proposed hotel development
generates fewer daily and peak hour trips; and
WHEREAS, it has been determined that the proposed development is consistent
with General Plan Policy C, since adequate on -site parking is provided for the proposed use since
the project is providing more than two times the number required by code; and
WHEREAS, it has been determined that the proposed development is consistent
with General Plan Policy D, since the location of the new structure will not adversely affect
public views nor will it impact environmentally sensitive habitat since it is located in an
urbanized area; and
WHEREAS, it has been determined that the proposed development is consistent
with General Plan Policy F, because the project conforms to all development standards including
landscape requirements, setbacks, lot coverage, and parking, and is consistent with the
requirements of the Koll Center Planned Community; and
WHEREAS, it has been determined that the proposed development is consistent
with General Plan Policy L, since a hotel will improve the prosperity of Koll Center and the
Page 3
entire airport area by increasing recreational and business visitor accommodations which support
the uses in the area; and
WHEREAS, on December 9, 1999, the Planning Commission of the City of
Newport Beach conducted a public hearing regarding General Plan Amendment 99 -2 (A) at
which time this amendment to the Land Use Element was discussed and determined to be
consistent with the goals of the Newport Beach General Plan; and therefore, recommended for
approval to the City Council; and
WHEREAS, pursuant to the California Environmental Quality Act, an Initial
Study has been prepared for the project. Based upon information contained in the Initial Study, it
has been determined that, if proposed mitigation measures are incorporated, the project would
not have a significant effect on the environment. A Negative Declaration has been prepared and
accepted by the City of Newport Beach in connection with the applications noted.
WHEREAS, on January 11, 2000, the City Council of the City of Newport Beach
conducted a public hearing regarding a 17,890 square foot increase in development rights on
Parcel 1 of Retail and Service Site 1 in the Koll Center Newport Planned Community, at which
time Amendment No. 897 was discussed and determined to be consistent with the goals and
policies of the Newport Beach General Plan.
NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of
Newport Beach does hereby amend the Land Use Element, Statistical Area L4 (KCN RS 1), and
the Estimated Growth for Statistical Area 1-4 Table of the General Plan to read as follows:
Page 4
0
• Airport Area (Statistical Area L4)
1 -9. KCN Retail and Service Site I This site is designated for Retail and Service Commercial
and is allocated 102,110 120,000 sq. ft. which includes 164 hotel rooms.
BE IT FURTHER RESOLVED that the development authorized by this
action is allocated to 4881 Birch Street, Newport Beach.
Page 5
ESTIMATED GROWTH FOR STATISTICAL AREA L4
Residential (in du's)
Commercial (in sq. ft.)
Existing
Gen. Plan
Projected
Existing
Gen. Plan
Projected
I /1/87
Projection
Growth
1 /I /87
Projection
Growth
I -I.KCN OS A
-0-
-0-
-0-
874,346
874,346
-0-
1-2.KCN OS B
-0-
-0-
-0-
1,060,898
1,060,898
-0-
1-3.KCN OS C
-0-
-0-
-0-
734,641
734,641
-0-
1-4.KCN OS D
-0-
-0-
-0-
250,176
250,176
-0-
1-5.KCN OS E
-0-
-0-
-0-
27,150
32,500
5,350
1 -6.KCN OS F
-0-
-0-
-0-
31,816
34,300
2,484
1 -7.KCN OS G
-0-
-0-
-0-
81,372
81,372
-0-
1-8.KCN OS I
-0-
-0-
-0-
377,520
442,775
65,255
1 -9.KCN RS 1
-0-
-0-
-0-
52,086
120,000
17,890
1- 10.Court House
-0-
-0-
-0-
69,256
90,000
20,744
2 -INP BLK A
-0-
-0-
-0-
349,000
380,362
31,362
2- 2.NPBLKB
-0-
-0-
-0-
10,150
11,950
1,800
2 -3.NP BLK C
-0-
-0-
-0-
211,487
457,880
246,393
2 -4.NP BLK D
-0-
-0-
-0-
274,300
288,264
13,964
2 -5.NP BLK E
-0-
-0-
-0-
834,762
860,884
26,122
2 -6.NP BLK F
-0-
-0-
-0-
192,675
201,180
8,505
2 -7.NP BLK G & H
-0-
-0-
-0-
255,001
295,952
40,951
2 -8.NP BLK I
-0-
-0-
-0-
99,538
378,713
279,175
2 -9.NP BLK J
-0-
-0-
-0-
190,500
228,530
38,030
3. Campus Drive
-0-
-0-
-0-
885,202
1,261,727
376,525
TOTAL
-0-
-0-
-0-
6,861,876
8,086,450
1,224,574
Population
-0-
-0-
-0-
revised 12/9/99
BE IT FURTHER RESOLVED that the development authorized by this
action is allocated to 4881 Birch Street, Newport Beach.
Page 5
ADOPTED this 11 `s day of January, 2000, by the following vote, to wit: 0
AYES, COUNCIL MEMBERS
NOES, COUNCIL MEMBERS
ABSENT, COUNCIL MEMBERS
am
ATTEST:
City Clerk
Page 6
r1
LJ
0 ORDINANCE NO. 2000-
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY
OF NEWPORT BEACH APPROVING AMENDMENT NO. 897
TO THE KOLL CENTER PLANNED COMMUNITY
DISTRICT TO DESIGNATE PARCEL 1 OF KCN RETAIL
AND SERVICE SITE 1 FOR HOTEL USE, ESTABLISH THE
PERMITTED GROSS FLOOR AREA FOR KCN RETAIL
AND SERVICE SITE 1 AT 120,000 SQUARE FEET, AND
ESTABLISH THE PERMITTED HEIGHT FOR THE SITE AT
60 FEET.
(PLANNING COMMISSION AMENDMENT NO. 897)
WHEREAS, on December 9, 1999, Planning Commission of the City of Newport Beach
held a public hearing regarding this amendment, and recommended approval to the City Council;
and
WHEREAS, the public was duly noticed of the public hearings; and
WHEREAS, the City of Newport Beach has determined that the proposed project will not
have a significant effect on the environment upon implementation of the mitigation measures set
. forth in the Negative Declaration prepared for the project pursuant to the California Environmental
Quality Act (CEQA) and the State CEQA Guidelines; and
WHEREAS, on January 11, 2000, the City Council of the City of Newport Beach
held a public hearing regarding this amendment at which time amendments to the Koll Center
Newport Planned Community District Regulations were discussed and determined to be in
conformance with the "Retail and Service Commercial" designation of the Newport Beach General
Plan, and the City Council finds that the proposed amendment does not alter the character of the
subject property or the Koll Center Newport Planned Community District as a whole; and the
proposed amendment to increase the allowable gross floor area for Parcel 1 of Retail and Service
Site 1 by 17,890 square feet is consistent with the General Plan; and
WHEREAS, the City Council finds that the proposed amendment to the Koll Center
Planned Community District Regulations is consistent with the General Plan; and
WHEREAS, the Newport Beach Municipal Code provides specific procedures for the
implementation of Planned Community zoning for properties within the City of Newport Beach;
. and
Page 7
WHEREAS, the proposed amendment to the land use limitations of the Koll Center •
Planned Community District, to designate Parcel 1 of KCN Retail and Service Site 1 for hotel use,
increase the permitted amount of development, and establish the permitted height limit for the site
at 60 feet, will apply only to the property at 4881 Birch Street and not to any other site in Koll
Center, and
WHEREAS, the proposed amendments to the development regulations of the Koll
Center Planned Community District, specifically related to Parcel 1 of KCN Retail and Service
Site 1 only and not to any other site in Koll Center.
THE CITY COUNCIL OF THE CITY OF NEWPORT BEACH DOES HEREBY ORDAIN
AS FOLLOWS:
SECTION 1: Approve Amendment No. 897 to designate Parcel 1 of KCN Retail and
Service Site 1 of the Koll Center Newport Planned Community for hotel use, increase the
permitted amount of development by 17,890 square feet, and establish the permitted height limit for
the site at 60 feet." •
SECTION 2: The Mayor shall sign and the City Clerk shall attest to the passage of this
Ordinance. This Ordinance shall be published once in the official newspaper of the City, and the
same shall become effective thirty (30) days after the date of its adoption.
This Ordinance was introduced at a regular meeting of the City Council of the City of Newport
Beach held on January 11, 2000, and adopted on the 25th day of January, 2000, by the following
vote, to wit:
AYES, COUNCIL MEMBERS
NOES, COUNCIL MEMBERS
ABSENT, COUNCIL MEMBERS
MA
Em
ATTEST:
City Clerk
0
Page 9
City of Newport Beach
Planning Commission Minutes
December 9, 1999
erosion. The retaining wall will reclaim approximately 29 feet of rear yard
surface area which previously was slope.
Chairperson Selich stated that this application has generated a lot of
opposition letters received by the Commission and also, it has not been
reviewed by the architectural committee of the Homeowners' Association. He
proposed that the Commission ask the applicant if he would be willing to
continue this item. This will allow him time to go back to the association and
neighbors for review, and then bring the application back to the Commission.
Commissioner Kranzley stated that he is uncomfortable hearing this application
prior to the review by the Homeowner's Association. He noted his concern with
the negative correspondence received this past week and encouraged the
applicant to ask for a continuance on this matter.
Commissionioners Ashley and Fuller noted the some sentiments.
Public comment was opened.
Ray DeSalle, landscape architect of Peter Brandow Associates, on belhaf of
Mrs. Dolin stated that the applicant wants to be a good neighbor and would
welcome working with the architectural committee of the association. At
Commission advice, he asked for a continuance to January 6, 2000.
Chairperson Selich suggested the continuance of thirty days within which the
applicant would be able to work with the neighbors and the Homeowner's
Association.
Public comment was closed.
Motion was made by Commissioner Kranzley to continue this item to January
6, 2000.
Ayes: Fuller, Ashley, Selich, Kranzley
Noes: None
Absent: Tucker, Gifford
Abstain
SUBJECT:
0
None
Extended StayAmerica
4881 Birch Street
• Accept the Negative Declaration as adequate for
approval of the project; and
• Adopt Resolution recommending approval of
General Plan Amendment No. 99 -2(A); and
3
.
IT<I71i
DPI F7
Item No. 3
GPA 99 -2A
Use Permit No. 3665
and Acceptance of a
Negative Declaration
City of Newport Beach
Planning Commission Minutes
December 9, 1999
• Adopt Resolution recommending approval of
Planned Community Amendment No. 897; and
• Use Permit No. 3665
• A Trip Generation Study
Request for a General Plan Amendment, PC Amendment, Use Permit and a
Traffic Study to allow the construction of a 164 room extended stay hotel. The
General Plan Amendment will increase the square footage entitlement
permitted on the site, the PC Amendment involves text modifications to the
development standards including, but not limited to: designating Parcel 1 of
Retail and Service Site 1 for hotel use, increasing the square footage
entitlement to accommodate the construction of the new building, and
establishing a 60 foot height limit for the new hotel site. A Use Permit is required
for the establishment of a hotel.
Commissioner Kranzley asked about a trip generation reduction and how it is
reflected in the model.
Ms. Temple answered that if the General Plan Amendment is approved, the
database will be altered to reflect the new use and the old use will be taken
out.
Commissioner Kranzley then asked about the required parking spaces (164).
Does this take into consideration the parking for the employees? Staff
answered that it is all- inclusive. The actual requirement for hotel parking is one
space for each two rooms, however, based on this type of use, that a more
appropriate requirement would be one per room. The applicant is actually
providing greater than that.
Commissioner Fuller, referencing page 24 of the Checklist Explanations, asked
about the surface parking stalls that are provided. It indicates 173, which is not
consistent with the plans that indicate 185 parking stalls. Which one is correct?
Mr. Myers answered that initially the project was proposed for a few less rooms.
The applicant was providing for 173 parking spaces, which is in excess of our
parking requirement. Since the time of the original proposal, a few more rooms
have been added and the applicant is adding more parking (185), as there is
more available space on site..
Commissioner Fuller asked about the architectural style, finish and color of the
building matching the existing development. Staff answered that the
development will be consistent to the surrounding style of the area. The
applicant has brought renderings as exhibits.
INDEX
Approved
0
Is
Chairperson Selich asked about the trip generation rate that was used on this
kind of a hotel. 0
W
City of Newport Beach
Planning Commission Minutes
December 9, 1999
Commissioner Kranzley, referring to hand - written page 94, read that, 'based
upon the average trip generation rate of the two sites, the typical Extended
Stay America facility would generate 4.62 trip -ends per day per occupied room
with 0.29 vehicles per hour per occupied room during the AM peak hour and
0.37 vehicles per hour per occupied room during the PM peak hour."
Tony Brine, Traffic Engineer, explained that when the trip generation study was
prepared, the consultant did a review of the existing Extended Stay America
facilities in three locations. These generation rates were based upon the
numbers (actual counts) of the existing facilities. This is a different type of hotel
use than the regular uses which is why a trip generation study was done as
opposed to using a regular ITE rate.
Public comment was opened.
Lance Potter, Extended Stay America of 100 West Monroe Street, Chicago,
Illinois. He stated that he handles the real estate acquisition for the Extended
Stay America corporation. He explained that the company:
• started in 1995;
• now is a national chain of 360 hotels;
• the hotels are owned and operated by Extended Stay America, which is
based in Fort Lauderdale, Florida;
• the first hotel in Southern California opened about two and one half years
ago and there are now 14 locations with two more under construction;
• the hotels are unique as each guest room contains:
a full kitchen with a refrigerator, twin burner stove, microwave,
coffeemaker and kitchen sink
• hotel does not offer meeting rooms, restaurant or lounge;
• designed for guests needing to stay in an area one to four weeks;
• the company sees a real opportunity in Newport Beach as there are no
hotels that offer kitchens in the guest rooms (with the exception of one) and
there is a need for this type of service in the area; and
• the project is comprised of 164 rooms.
Commissioner Kranzley asked about the average length of stay. He was
answered that the average among the other Southern California Extended
Stay America hotels was 16 nights.
Commissioner Fuller asked about the number of employees in this proposed
hotel. He was answered there will be a maximum of 8 with maid service and
laundry facilities on site.
Mike Gallen, Senior Construction Manager of Extended Stay America
referencing exhibits, explained:
• maximized the available parking spaces
• maximized the landscaping on site
• four floors with first floor lobby, guest laundry facilities with vending
INDEX
City of Newport Beach
Planning Commission Minutes
December 9, 1999
INDEX
0
machines and a house laundry on site
• no restaurant or convention facilities that would increase the parking and
traffic
• trip generation rates were based on approximately 90% occupancy
Commissioner Kranzley asked staff if a hotel restaurant or anything else were to
come on this site, the applicant would have to come back to the Planning
Commission? He was answered that any change to the use permit would
require the applicant to come back for an amendment, as they would not be
in substantial conformance with the use permit. This would hold true with any
new owner of the project.
Chairperson Selich asked for and received an explanation of the landscape
plan.
Mr. Potter explained that he has gone through a design review with the Koll
Center Newport for both architectural and landscape designs. A copy of the
preliminary approval from Koll Center Newport is part of the staff report. The
original landscape plan did not have all of the trees required, so we added a
few more trees based on that requirement. The plan includes all of the trees
that are within the Koll Center plan. Most of the trees are 24" boxes and a
good size. We anticipate keeping the landscape buffer that is along Birch and
Von Karmen. One of the conditions was to add a sidewalk along Birch and in
doing that we will either bring it along the street or meander it through and
have to relocate a few of the trees that are already there. The landscape
along the parking structure will be maintained as the existing buffer towards the
north.
Public comment was closed.
Commissioner Kranzley noted that there is generally some type of condition
with regards to landscaping. There does not seem to be one with this report.
Mr. Myers answered that staff is of the opinion that the Koll Center Plan
Community landscape requirements are adequate in this case. These
standards of the Planned Community the applicant will need to adhere to.
However, if the Planning Commission desires, a condition can be added. DRAFT
Commissioner Kranzley stated that he would prefer that, even if it is the site plan
approved by Koll Center.
Motion was made by Commissioner Kranzley to amend condition number one
and include, landscape plan, and accept the Negative Declaration as
adequate for approval of the project; and adopt Resolution 1510
recommending approval of General Plan Amendment No. 99 -2A and adopt
Resolution 1511, recommending approval of Planned Community Amendment
No. 897 and approve Use Permit No. 3665 and accept a Trip Generation Study
N
. City of Newport Beach
Planning Commission Minutes
December 9, 1999
INDEX
with the findings and conditions in Exhibit A.
Ayes: Fuller, Ashley, Selich, Kranzley
Noes: None
Absent: Tucker, Gifford
Abstain: None
EXHIBIT "A"
FINDINGS, MITIGATION MEASURES AND CONDITIONS OF APPROVAL
Mitigated Negative Declaration
General Plan Amendment No. 98 -1(C),
Planned Community Amendment No. 897,
and
Use Permit No. 3640
A. Mitigated Negative Declaration:
Findings:
1. An Initial Study and Mitigated Negative Declaration have been
• prepared in compliance with the Environmental Quality Act
(CEQA), the State CEQA Guidelines, and City Council Policy K -3.
2. On the basis of the analysis set forth in the Initial Study and
Mitigated Negative Declaration, including the mitigation
measures listed, the proposed project does not have the
potential to significantly degrade the quality of the
environment.
3. There are no long -term environmental goals that would be
compromised by the project.
4. No cumulative impacts are anticipated in connection with this
or other projects.
5. There are no known substantial adverse affects on human
beings that would be caused by the proposed project.
6. The contents of the environmental document have been
considered in the various decisions on this project. RAFT
Mitigation Measures:
1. During construction activities, the applicant shall ensure that
• the following measures are complied with to reduce short -term
(construction) air quality impacts associated with the project:
7
13
City of Newport Beach
Planning Commission Minutes
December 9, 1999
INDEX
0
a) controlling fugitive dust by regular watering, or other dust
palliative measures to meet South Coast Air Quality
Management District (SCAQMD) Rule 403 (Fugitive Dust); b)
maintaining equipment engines in proper tune; and c)
phasing and scheduling construction activities to minimize
project - related emissions.
2. During construction activities, the applicant shall ensure that
the project will comply with SCAQMD Rule 402 (Nuisance), to
reduce odors from construction activities.
3. During construction activities, the project will comply with the
erosion and siltation control measures of the City's grading
ordinance and all applicable local and State building codes
and seismic design guidelines, including the City Excavation
and Grading Code (NBMC Section 15.10).
4. The project shall conform to the requirements of the National
Pollution Discharge Elimination System (NPDES) and shall be
subject to the approval of the Public Works Department to
determine compliance. .
5. The project will comply with the provisions of the City of
Newport Beach General Plan Noise Element and the
Municipal Code pertaining to noise restrictions. During
construction activities, the hours of construction and
excavation work are allowed from 7:00 a.m. to 6:30 p.m. on
weekdays, 8:00 a.m. to 6:00 p.m. on Saturdays, and not at any
time on Sundays and holidays.
6. Prior to the start of construction activities (e.g. demolition of
existing building), a construction traffic control plan shall be
prepared which includes the haul route, truck hauling
operations, construction traffic flagmen, and construction
warning /directional signage.
7. Prior to the commencement of construction activities, the
project applicant shall coordinate with utility and service
organizations regarding any construction activities to ensure
existing facilities are protected and any necessary expansion
or relocation of facilities are planned and scheduled in
consultation with the appropriate public agencies. V AFT
B. General Plan Amendment No. 99 -2(A): Adopt Resolution
No. (Attached) recommending to the City Council the
adoption of General Plan Amendment No. 99 -2(A).
I �
• City of Newport Beach
Planning Commission Minutes
December 9, 1999
INDEX
C. Amendment No. 897: Adopt Resolution No. (Attached),
recommending to the City Council adoption of Amendment No. 897.
D. Use Permit No. 3640:
Findings:
1. The Land Use Element of the General Plan designates the site for
"Retail and Service Commercial" uses and a hotel is a permitted
use within this designation.
2. The proposed development will not have any significant
environmental impact, based on information presented and
incorporated into the negative declaration.
3. Based upon the information contained in the Initial Study,
comments received, and all related documents, there is no
• substantial evidence that the project, as conditioned, could
have a significant effect on the environment; therefore a
Negative Declaration has been prepared. The Negative
Declaration adequately addresses the potential environmental
impacts of the project, and satisfies all the requirements of
CEQA, and is therefore approved. The Negative Declaration
was considered prior to approval of the project.
4. An Initial Study has been conducted, and considering the
record as a whole there is no evidence before this agency that
the proposed project will have the potential for an adverse
effect on wildlife resources or the habitat upon which wildlife
depends. On the basis of the evidence in the record, this
agency finds that the presumption of adverse effect contained
in Section 753.5(d) of Title 14 of the California Code of
Regulations (CCR) has been rebutted. Therefore, the proposed
project qualifies for a De Minimis Impact Fee Exemption
pursuant to Section 753.5(c) of Title 14, CCR.
5. The design of the proposed improvements will not conflict with
any easements acquired by the public at large for access
through or use of property within the proposed development.
E
6. A trip generation study has been prepared which analyzes the
expected trip generation for the proposed hotel, and verifies
that the proposed project generates fewer trips than the
existing use, and has been reviewed and approved by the City
9
4
J
City of Newport Beach
Planning Commission Minutes
December 9, 1999
Traffic Engineer.
Approval of Use Permit No. 3665 will not, under the
circumstances of the case be detrimental to the health, safety,
peace, morals, comfort and general welfare of persons residing
or working in the neighborhood or be detrimental or injurious to
property or improvements in the neighborhood or the general
welfare of the City and is consistent with the legislative intent of
Title 20 of this Code for the following reasons:
• The hotel use is compatible with the surrounding
professional office and general commercial uses in the
area since hotel uses are typically allowed in
commercial districts as a support use.
• The hotel operation is compatible with the character of
the neighborhood since the surrounding buildings are
mid and high -rise structures consisting of office uses.
• Adequate on -site parking is available for the proposed
use.
• There are no significant aesthetic impacts.
• The hotel use will not result in adverse traffic impacts.
• Adequate provision for vehicular traffic circulation is
being made for the hotel facility.
• The proposal includes no physical improvements which
Will conflict with any easements acquired by the public
of large for access through or use of property within the
proposed development.
Conditions:
1. The development shall be in substantial conformance with the
approved site plan, floor plans, landscape plan and elevations,
except as noted below.
2. The approval of Use Permit No. 3665 is subject to final City
Council approval of GPA 99 -2 (A) and Amendment No. 897.
3. The project shall provide 185 parking spaces on site.
4. All employees shall park on -site.
5. All trash areas shall be screened from adjoining properties and
public streets.
6. The access rights to Von Korman Avenue and Birch Street have
been dedicated to the city except at existing driveways per
10
INDEX
,
•
is
•
Iii,
City of Newport Beach
Planning Commission Minutes
December 9, 1999 INDEX
Parcel Map 76/45. No additional driveways are permitted on
the Von Korman Avenue or Birch Street frontages.
7. Prior to issuance of any grading or building permits for the site,
the applicant shall demonstrate to the satisfaction of the
Public Works Department and the Planning Department that
adequate sewer facilities will be available for the project.
Such demonstration shall include verification from the Orange
County Sanitation District and the City's Utilities Department.
8. The project shall be designed to eliminate light and glare onto
adjacent properties or uses, including minimizing the number
of light sources. The plans shall be prepared and signed by a
licensed Electrical Engineer acceptable to the City. Prior to
the issuance of any building permit the applicant shall provide
to the Planning Department, in conjunction with the lighting
system plan, lighting fixture product types and technical
specifications, including photometric information, to
determine the extent of light spillage or glare which can be
anticipated. This information shall be made a part of the
• building set of plans for issuance of the building permit. Prior to
issuance of the certificate of occupancy or final of building
permits, the applicant shall schedule an evening inspection by
the Code Enforcement Division to confirm control of light and
glare specified by this condition of approval.
Standard Requirements
1. The project is subject to all applicable City ordinances,
policies, and standards, unless specifically waived or modified
by the conditions of approval.
2. The proposed hotel facility and related parking shall conform to
the requirements of the Uniform Building Code, including State
Disabled Access requirements, unless otherwise approved by
the Building Department.
3. All mechanical equipment shall be screened from view of
adjacent properties and adjacent public streets within the limits
authorized by this use permit, and shall be sound attenuated in
accordance with Chapter 10.26 of the Newport Beach DRAFT
Municipal Code, Community Noise Control.
4. All improvements shall be constructed as required by Ordinance
and the Public Works Department.
11
City of Newport Beach
Planning Commission Minutes
December 9, 1999
5. Arrangements shall be made with the Public Works
Department in order to guarantee satisfactory completion of
any required public improvements, if it is desired to obtain a
grading or building permit prior to completion of the public
improvements.
6. Section 19.20.030(f) of the Subdivision Ordinance is waived
and grades of more than 7% shall be permitted as approved
by the Public Works Department.
7. The final design of the on -site parking, vehicular circulation and
pedestrian circulation systems shall be subject to the approval
of the City Traffic Engineer.
8. Intersections of private drives and adjacent streets shall be
designed to provide sight distance for a speed of 40 miles per
hour. Slopes, landscape, walls, signs and other obstructions shall
be considered in the sight distance requirements. Landscaping
within the sight line shall not exceed twenty -four inches in
height.
9. Sidewalk shall be constructed along the Von Korman Avenue
street frontage. The sidewalk shall be eight (8) feet wide to
match other sidewalk along Von Korman Avenue. All work shall
be completed under an encroachment permit issued by the
Public Works Department.
10. Street, drainage and utility improvements shall be shown on
standard improvement plans prepared by a licensed civil
engineer.
H. A drainage study shall be prepared by the applicant and
approved by the Public Works Department, along with a master
plan of water, sewer, and storm drain facilities for the on -site
improvements prior to the issuance of any grading or building
permits. Any modifications or extensions to the existing storm
drain, water, and sewer systems shown to be required by the
study shall be the responsibility of the developer.
12. Public Works Department plan check and inspection fees shall
be paid.
13. Any Edison transformer serving the site shall be located outside
the sight distance planes as described in City Standard 110 -L.
14. Disruption caused by construction work along roadways and
by movement of construction vehicles shall be minimized by
12
•
INDEX
IK
. City of Newport Beach
Planning Commission Minutes
December 9, 1999
proper use of traffic control equipment and flagmen. Traffic
control and transportation of equipment and materials shall
be conducted in accordance with state and local
requirements. A traffic control plan shall be reviewed and
approved by the Public Works Department.
15. Public easements and utilities crossing the site shall be shown
on the grading and building site plans.
16. Overhead utilities serving the site shall be undergrounded to the
nearest appropriate pole in accordance with Section 19.24.140
of the Municipal Code unless it is determined by the City
Engineer that such undergrounding is unreasonable or
impractical.
17. A fire protection system acceptable to the Fire Department
shall be installed by the developer and tested by the Fire
Department prior to storage of any combustible materials or
start of any structural framing.
. 18. The parking spaces shall be marked with approved traffic
markers or painted white lines not less than 4 inches wide.
19. The Planning Commission may add to or modify conditions of
approval to this Use Permit or recommend to the City Council
the revocation of this Use Permit, upon a determination that the
operation which is the subject of this Use Permit, causes injury, or
is detrimental to the health, safety, peace, morals, comfort, or
general welfare of the community.
20. This Use Permit shall expire unless exercised within 24 months
from the date of approval as specified in Section 20.91.050A of
the Newport Beach Municipal Code.
SUBJECT:.— 900 Sea Lane (Tim McSunas, applicant)
1995 Shores Partners, L.P.
•.• Tentative Tract Map No. 15829
• `Modification Permit No. 5002
• Acceptance of a Negative Declaration
Request to subdivide an existing lot containing 7.5`acres,of land into a single
parcel of land in conjunction with the development of a`'90.unit attached
and detached residential condominium project on property located. in the
MFR (Multi - Family Residential) District. Also included is a request for. a
13
INDEX
x [:'j';
Item No. 4
TTM No. 15829
Modification No. 5002
Acceptance of a
Negative Declaration
Continued to
01/06/2000
I�
RESOLUTION NO. _
A RESOLUTION OF THE PLANNING COMMISSION OF
THE CITY OF NEWPORT BEACH RECOMMENDING TO
THE CITY COUNCIL APPROVAL OF AN AMENDMENT
TO THE LAND USE ELEMENT OF THE NEWPORT
BEACH GENERAL -PLAN TO INCREASE THE SQUARE
FOOTAGE ENTITLEMENT ALLOWED IN RETAIL AND
SERVICE SITE 1 PARCEL 1 OF THE KOLL CENTER
PLANNED COMMUNITY BY 17,890 SQUARE FEET.
[General Plan Amendment No. 99 -2(A)]
WHEREAS, as part of the development and implementation of the Newport
Beach General Plan the Land Use Element has been prepared; and
WHEREAS, it has been determined that the proposed development is consistent
with General Plan Policy B, since the proposed increase in office development will not result in
significant changes to the long range traffic service levels since proposed hotel development
generates fewer daily and peak hour trips; and
WHEREAS, it has been determined that the proposed development is consistent
with General Plan Policy C, since adequate on -site parking is provided for the proposed use since
the project is providing more than two times the number required by code; and
WHEREAS, it has been determined that the proposed development is consistent
with General Plan Policy D, since the location of the new structure will not adversely affect
public views nor will it impact environmentally sensitive habitat since it is located in an
urbanized area; and
WHEREAS, it has been determined that the proposed development is consistent
with General Plan Policy F, because the project conforms to all development standards including
landscape requirements, setbacks, lot coverage, and parking, and is consistent with the
requirements of the Koll Center Planned Community; and
WHEREAS, it has been determined that the proposed development is consistent
with General Plan Policy L, since a hotel will improve the prosperity of Koll Center and the
entire airport area by increasing recreational and business visitor accommodations which support
the uses in the area; and
GPA 99 -2(A)
Amendment No. 897
Use Permit No. 3665
�)
Page 15
WHEREAS, on December 9, 1999, the Planning Commission of the City of
Newport Beach conducted a public hearing regarding General Plan Amendment 99 -2 (A) at
which time this amendment to the Land Use Element was discussed and determined to be
consistent with the goals of the Newport Beach General Plan; and
WHEREAS, pursuant to the California Environmental Quality Act, an Initial
Study has been prepared for the project. Based upon information contained in the Initial Study,
it has been determined that, if proposed mitigation measures are incorporated, the project would
not have a significant effect on the environment. A Negative Declaration has been prepared and
accepted by the City of Newport Beach in connection with the applications.
NOW, THEREFORE, BE IT RESOLVED, that the Planning Commission of
the City of Newport Beach does hereby recommend that the City Council of the City of Newport
Beach amend the Land Use Element, Statistical Area L4 (KCN RS 1), and the Estimated Growth
for Statistical Area L4 Table of the General Plan to read as follows:
L_1
GPA 99 -2(A)
Amendment No. 897
Use Permit No. 3665
Page 16 a 1
Airport Area (Statistical Area L4)
1 -9. KCN Retail and Service Site 1 This site is designated for Retail and Service Commercial
and is allocated 102,110 120,000 sq. ft. which includes 164 hotel rooms.
BE IT FURTHER RESOLVED that the development authorized by this
action is allocated to 4881 Birch Street, Newport Beach.
GPA 99 -2(A)
Amendment No. 897
Use Permit No. 3665
Page 17
0
E
I`1
ESTIMATED GROWTH FOR STATISTICAL AREA L4
Residential (in du's)
Commercial
(in sq.
ft.)
Existing
Gen. Plan
Projected
Existing
Gen. Plan
Projected
1/1/87
Projection
Growth
1/1/87
Projection
Growth
I -1.KCN OS A
-0-
-0-
-0-
874,346
874,346
-0-
1-2.KCN OS B
-0-
-0-
-0-
1,060,898
1,060,898
-0-
1-3.KCN OS C
-0-
-0-
-0-
734,641
734,641
-0-
1-4.KCN OS D
-0-
-0-
-0-
250,176
250,176
-0-
1-5.KCN OS E
-0-
-0-
-0-
27,150
32,500
5,350
1 -6.KCN OS F
-0-
-0-
-0-
31,816
34,300
2,484
1 -7.KCN OS G
-0-
-0-
-0-
81,372
81,372
-0-
1-8.KCN OS 1
-0-
-0-
-0-
377,520
442,775
65,255
1 -9.KCN RS 1
-0-
-0-
-0-
52,086
120,000
17,890
1- 10.Court House
-0-
-0-
-0-
69,256
90,000
20,744
2 -1NP BLK A
-0-
-0-
-0-
349,000
380,362
31,362
2- 2.NPBLK B
-0-
-0-
-0-
10,150
11,950
1,800
2 -3.NP BLK C
-0-
-0-
-0-
211,487
457,880
246,393
2 -4.NP BLK D
-0-
-0-
-0-
274,300
288,264
13,964
2 -5.NP BLK E
-0-
-0-
-0-
834,762
860,884
26,122
2 -6.NP BLK F
-0-
-0-
-0-
192,675
201,180
8,505
2 -7.NP BLK G & H
-0-
-0-
-0-
255,001
295,952
40,951
2 -8.NP BLK 1
-0-
-0-
-0-
99,538
378,713
279,175
2 -9.NP BLK 1
-0-
-0-
-0-
190,500
228,530
38,030
3. Campus Drive
-0-
-0-
-0-
885,202
1,261,727
376,525
TOTAL
-0-
-0-
-0-
6,861,876
8,086,450
1,224,574
Population
-0-
-0-
-0-
revised 12/9/99
BE IT FURTHER RESOLVED that the development authorized by this
action is allocated to 4881 Birch Street, Newport Beach.
GPA 99 -2(A)
Amendment No. 897
Use Permit No. 3665
Page 17
0
E
I`1
• ADOPTED this 9 "' day of December, 1999, by the following vote, to wit:
M
CJ
XA
•
Edward Selich, Chairman
Richard Fuller, Secretary
AYES
NOES
GPA 99 -2(A)
Amendment No. 897
Use Permit No. 3665 %
Page 18 D
RESOLUTION NO.
A RESOLUTION OF THE PLANNING COMMISSION OF
THE CITY OF NEWPORT BEACH RECOMMENDING TO
THE CITY COUNCIL APPROVAL OF AN AMENDMENT TO
THE KOLL CENTER PLANNED COMMUNITY DISTRICT
TO DESIGNATE PARCEL 1 OF KCN RETAIL AND
SERVICE SITE 1 FOR HOTEL USE, ESTABLISH THE
PERMITTED GROSS FLOOR AREA FOR KCN RETAIL
AND SERVICE SITE i AT 120,000 SQUARE FEET,
ESTABLISH THE PERMITTED HEIGHT FOR THE SITE AT
60 FEET.
(PLANNING COMMISSION AMENDMENT NO. 897)
WHEREAS, as part of the development and implementation of the Newport Beach
General Plan the Land Use Element has been prepared; and
WHEREAS, Section 20.51.045 of the Newport Beach Municipal Code provides
that amendments to establish or amend a Planned Community Development Plan must be approved
by a Resolution of the Planning Commission setting forth full particulars of the amendment; and
WHEREAS, the Planning Commission is of the opinion that the proposed .
amendment to the Koll Center Planned Community District Regulations is consistent with the
General Plan; and
WHEREAS, the Planning Commission conducted a public hearing on December 9,
1999, at which time this amendment to amend the Koll Center Planned Community District
Regulations was discussed and determined to be in conformance with the "Retail and Service
Commercial' designation of the Newport Beach General Plan, since the proposed amendment does
not alter the character of the subject property or the Koll Center Planned Community District as a
whole; and
WHEREAS, the Newport Beach Municipal Code provides specific procedures for
the implementation of Planned Community zoning for properties within the City of Newport
Beach; and
WHEREAS, the City of Newport Beach has determined that the proposed project
will not have a significant effect on the environment upon implementation of the mitigation
L�
GPA 99 -2(A)
Amendment No. 897
Use Permit No. 3665
Page 19 1
m
measures set forth in the Negative Declaration prepared for the project pursuant to the California
Environmental Quality Act (CEQA) and the State CEQA Guidelines; and
WHEREAS, the proposed amendment to the land use limitations of the Koll
Center Planned Community District, to designate Parcel 1 of KCN Retail and Service Site 1 for
hotel use, increase the permitted amount of development, and establish the permitted height limit
for the site at 60 feet, will apply only to the property at 4881 Birch Street and not to any other site
in Koll Center, and
WHEREAS, the proposed amendments to the development regulations of the
Koll Center Planned Community District, specifically related to Parcel 1 of KCN Retail and
Service Site 1 only and not to any other site in Koll Center.
NOW, THEREFORE, BE IT RESOLVED that the Planning Commission of the
City of Newport Beach does hereby recommend that the City Council approve Amendment No.
897 to designate Parcel 1 of KCN Retail and Service Site 1 for hotel use, increase the permitted
amount of development by 17,890 square feet, and establish the permitted height limit for the site at
60 feet, will apply only to the property at 4881 Birch Street and not to any other site in Kell Center,
• and
IM
m
ADOPTED this 9th day of December, 1999, by the following vote, to wit:
Edward Selich, Chairman
Richard Fuller, Secretary
AYES
NOES
ABSENT
GPA 99 -2(A)
Amendment No. 897
Use Permit No. 3665
Page 20 5
A.
EXHIBIT "A"
FINDINGS, MITIGATION MEASURES AND CONDITIONS OF APPROVAL FOR
Mitigated Negative Declaration
General Plan Amendment No. 98 -1(C),
Planned Community Amendment No. 897,
and
Use Permit No. 3640
Mitigated Negative Declaration:
Findings:
An Initial Study and Mitigated Negative Declaration have been prepared in
compliance with the Environmental Quality Act (CEQA), the State CEQA
Guidelines, and City Council Policy K -3.
2. On the basis of the analysis set forth in the Initial Study and Mitigated Negative
Declaration, including the mitigation measures listed, the proposed project does not
have the potential to significantly degrade the quality of the environment.
3. There are no long -term environmental goals that would be compromised by the
project.
4. No cumulative impacts are anticipated in connection with this or other projects. •
5. There are no known substantial adverse affects on human beings that would be
caused by the proposed project.
6. The contents of the environmental document have been considered in the various
decisions on this project.
Mitigation Measures:
During construction activities, the applicant shall ensure that the following
measures are complied with to reduce short-term (construction) air quality
impacts associated with the project: a) controlling fugitive dust by regular
watering, or other dust palliative measures to meet South Coast Air Quality
Management District (SCAQMD) Rule 403 (Fugitive Dust); b) maintaining
equipment engines in proper tune; and c) phasing and scheduling construction
activities to minimize project - related emissions.
2. During construction activities, the applicant shall ensure that the project will
comply with SCAQMD Rule 402 (Nuisance), to reduce odors from construction
activities. •
CPA 99 -2(A)
Amendment No. 897
Use Permit No. 3665
Page 9
3. During construction activities, the project will comply with the erosion and
. siltation control measures of the City's grading ordinance and all applicable local
and State building codes and seismic design guidelines, including the City
Excavation and Grading Code (NBMC Section 15.10).
4. The project shall conform to the requirements of the National Pollution Discharge
Elimination System (NPDES) and shall be subject to the approval of the Public
Works Department to determine compliance.
5. The project will comply with the provisions of the City of Newport Beach General
Plan Noise Element and the Municipal Code pertaining to noise restrictions.
During construction activities, the hours of construction and excavation work are
allowed from 7:00 a.m. to 6:30 p.m. on weekdays, 8:00 a.m. to 6:00 p.m. on
Saturdays, and not at any time on Sundays and holidays.
6. Prior to the start of construction activities (e.g. demolition of existing building), a
construction traffic control plan shall be prepared which includes the haul route,
truck hauling operations, construction traffic flagmen, and construction
warning /directional signage.
7. Prior to the commencement of construction activities, the project applicant shall
coordinate with utility and service organizations regarding any construction
. activities to ensure existing facilities are protected and any necessary expansion or
relocation of facilities are planned and scheduled in consultation with the
appropriate public agencies.
B. General Plan Amendment No. 99 -2(A): Adopt Resolution No. (Attached)
recommending to the City Council the adoption of General Plan Amendment No. 99 -2(A).
C. Amendment No. 897: Adopt Resolution No. (Attached), recommending to the City
Council adoption of Amendment No. 897.
D. Use Permit No. 3640:
Findings:
1. The Land Use Element of the General Plan designate the site for "Retail and Service
Commercial" uses and a hotel is a permitted use within this designation.
2. The proposed development will not have any significant environmental impact,
based on information presented and incorporated into the negative declaration.
GPA 99 -2(A)
Amendment No. 897
Use Permit No. 3665
Page 10
3. Based upon the information contained in the Initial Study, comments received, and
all related documents, there is no substantial evidence that the project, as .
conditioned, could have a significant effect on the environment; therefore a
Negative Declaration has been prepared. The Negative Declaration adequately
addresses the potential environmental impacts of the project, and satisfies all the
requirements of CEQA, and is therefore approved. The Negative Declaration was
considered prior to approval of the project.
4. An Initial Study has been conducted, and considering the record as a whole there is
no evidence before this agency that the proposed project will have the potential for
an adverse effect on wildlife resources or the habitat upon which wildlife depends.
On the basis of the evidence in the record, this agency finds that the presumption of
adverse effect contained in Section 753.5(d) of Title 14 of the California Code of
Regulations (CCR) has been rebutted. Therefore, the proposed project qualifies for a
De Minimis Impact Fee Exemption pursuant to Section 753.5(c) of Title 14, CCR.
5. The design of the proposed improvements will not conflict with any easements
acquired by the public at large for access through or use of property within the
proposed development.
6. A trip generation study has been prepared which analyzes the expected trip
generation for the proposed hotel, and verifies that the proposed project generates
fewer trips than the existing use, and has been reviewed and approved by the City
Traffic Engineer.
7. Approval of Use Permit No. 3665 will not, under the circumstances of the case be
detrimental to the health, safety, peace, morals, comfort and general welfare of
persons residing or working in the neighborhood or be detrimental or injurious to
property or improvements in the neighborhood or the general welfare of the City and
is consistent with the legislative intent of Title 20 of this Code for the following
reasons:
• The hotel use is compatible with the surrounding professional office and
general commercial uses in the area since hotel uses are typically allowed in
commercial districts as a support use.
It The hotel operation is compatible with the character of the neighborhood
since the surrounding buildings are mid and high -rise structures consisting
of office uses.
• Adequate on -site parking is available for the proposed use.
• There are no significant aesthetic impacts.
• The hotel use will not result in adverse traffic impacts.
• Adequate provision for vehicular traffic circulation is being made for the
hotel facility.
GPA 99 -2(A)
Amendment No. 897
Use Permit No. 3665
Page 11
r/
• The proposal includes no physical improvements which will conflict with
any easements acquired by the public at large for access through or use of
property within the proposed development.
Conditions:
1. The development shall be in substantial conformance with the approved site plan,
floor plans and elevations, except as noted below.
2. The approval of Use Permit No. 3665 is subject to final City Council approval of
GPA 99 -2 (A) and Amendment No. 897.
3. The project shall provide 185 parking spaces on site.
4. All employees shall park on -site.
5. All trash areas shall be screened from adjoining properties and public streets.
6. The access rights to Von Karman Avenue and Birch Street have been dedicated to
the city except at existing driveways per Parcel Map 76/45. No additional
driveways are permitted on the Von Karman Avenue or Birch Street frontages.
. 7. Prior to issuance of any grading or building permits for the site, the applicant shall
demonstrate to the satisfaction of the Public Works Department and the Planning
Department that adequate sewer facilities will be available for the project. Such
demonstration shall include verification from the Orange County Sanitation
District and the City's Utilities Department.
0
8. The project shall be designed to eliminate light and glare onto adjacent properties
or uses, including minimizing the number of light sources. The plans shall be
prepared and signed by a licensed Electrical Engineer acceptable to the City. Prior
to the issuance of any building permit the applicant shall provide to the Planning
Department, in conjunction with the lighting system plan, lighting fixture product
types and technical specifications, including photometric information, to
determine the extent of light spillage or glare which can be anticipated. This
information shall be made a part of the building set of plans for issuance of the
building permit. Prior to issuance of the certificate of occupancy or final of
building permits, the applicant shall schedule an evening inspection by the Code
Enforcement Division to confirm control of light and glare specified by this
condition of approval.
GPA 99 -2(A)
Amendment No. 897
Use Permit No. 3665
Page 12
�iy.,
Standard Requirements:
1. The project is subject to all applicable City ordinances, policies, and standards,
unless specifically waived or modified by the conditions of approval.
2. The proposed hotel facility and related parking shall conform to the requirements of
the Uniform Building Code, including State Disabled Access requirements, unless
otherwise approved by the Building Department.
3. All mechanical equipment shall be screened from view of adjacent properties and
adjacent public streets within the limits authorized by this use permit, and shall be
sound attenuated in accordance with Chapter 10.26 of the Newport Beach
Municipal Code, Community Noise Control.
4. All improvements shall be constructed as required by Ordinance and the Public
Works Department.
5. Arrangements shall be made with the Public Works Department in order to
guarantee satisfactory completion of any required public improvements, if it is
desired to obtain a grading or building permit prior to completion of the public
improvements.
6. Section 19.20.030(f) of the Subdivision Ordinance is waived and grades of more .
than 7% shall be permitted as approved by the Public Works Department.
7. The final design of the on -site parking, vehicular circulation and pedestrian
circulation systems shall be subject to the approval of the City Traffic Engineer.
8. Intersections of private drives and adjacent streets shall be designed to provide sight
distance for a speed of 40 miles per hour. Slopes, landscape, walls, signs and other
obstructions shall be considered in the sight distance requirements. Landscaping
within the sight line shall not exceed twenty -four inches in height.
9. Sidewalk shall be constructed along the Von Karman Avenue street frontage. The
sidewalk shall be eight (8) feet wide to match other sidewalk along Von Karman
Avenue. All work shall be completed under an encroachment permit issued by the
Public Works Department.
10. Street, drainage and utility improvements shall be shown on standard improvement
plans prepared by a licensed civil engineer.
11. A drainage study shall be prepared by the applicant and approved by the Public
Works Department, along with a master plan of water, sewer, and storm drain
facilities for the on -site improvements prior to the issuance of any grading or
building permits. Any modifications or extensions to the existing storm drain,
CPA 99 -2(A)
Amendment No. 897
Use Permit No. 3665
Page 13 y
water, and sewer systems shown to be required by the study shall be the
responsibility of the developer.
12. Public Works Department plan check and inspection fees shall be paid.
13. Any Edison transformer serving the site shall be located outside the sight distance
planes as described in City Standard 110 -L.
14. Disruption caused by construction work along roadways and by movement of
construction vehicles shall be minimized by proper use of traffic control
equipment and flagmen. Traffic control and transportation of equipment and
materials shall be conducted in accordance with state and local requirements. A
traffic control plan shall be reviewed and approved by the Public Works
Department.
15. Public easements and utilities crossing the site shall be shown on the grading and
building site plans.
16. Overhead utilities serving the site shall be undergrounded to the nearest appropriate
pole in accordance with Section 19.24.140 of the Municipal Code unless it is
determined by the City Engineer that such undergrounding is unreasonable or
impractical.
i17. A fire protection system acceptable to the Fire Department shall be installed by
the developer and tested by the Fire Department prior to storage of any
combustible materials or start of any structural framing.
0
18. The parking spaces shall be marked with approved traffic markers or painted white
lines not less than 4 inches wide.
19. The Planning Commission may add to or modify conditions of approval to this Use
Permit or recommend to the City Council the revocation of this Use Permit, upon a
determination that the operation which is the subject of this Use Permit, causes
injury, or is detrimental to the health, safety, peace, morals, comfort, or general
welfare of the community.
20. This Use Permit shall expire unless exercised within 24 months from the date of
approval as specified in Section 20.91.050A of the Newport Beach Municipal Code.
GPA 99 -2(A)
Amendment No. 997
Use Permit No. 3665
Page 14 J
CITY OF NEWPORT BEACH
F I L E 3300 Newport Department POSTED
D
port Boulevard - P.O. Box 1768
Newport Beach, CA 92658 -8915 NOV 0 3 1999
NOV 0 3 1999 (949)644.3200
GARY L. GR Clerk Recorder ARY L. G V E, C�erk Recorde(
,'�r�9'r€ _.. NEGATIVE DECLARATIOl V %DEPUTY
To:
❑Office of Planning and Research
1400 Tenth Street, Room 121
Sacramento, CA 95814
County Clerk, County of Orange
Public Services Division
P.O. Box 238
Santa Ana, CA 92702
Public review period:
From: City of Newport Beach
Planning Department
3300 Newport Boulevard - P.O. Box 1768
Newport Beach, CA 92658.8915
(Orange County)
Date received for filing at OPR/County Clerk:
November 3, 1999 to November 23, 1999
Name of Project: Extended Sta America
Project Description: The application is a request to permit the approval of a General Plan Amendment, Planned
Community Amendment, Use Permit and a Traffic Study. The project involves the construction of a
four -story, 69,956 square feet, 164 -room hotel facility on 2.65 acres at 4881 Birch Street in the Koll
Center Newport area. The project site is currently developed with approximately 22,000 square feet
of building utilized as a multi- tenant food court (Plaza de Cafes). The project will involve the
demolition of the existing building to allow for the construction of the proposed hotel and associated
parking.
Finding: Pursuant to the provisions of City Council K -3 pertaining to procedures and guidelines to implement the California
Environmental Quality Act, the Environmental Affairs Committee has evaluated the proposed project and determined that the proposed
project would not have a significant effect on the environment.
A copy of the Initial Study containing the analysis supporting this finding is Q attached ❑ on file at the Planning Department.
The Initial Study may include mitigation measures that would eliminate or reduce potential environmental impacts. This document will be
considered by the decision - makers) prior to final action on the proposed project. If a public hearing will be held to consider this project, a
notice of the time and location is attached.
Additional plans, studies and/or exhibits relating to the proposed project may be available for public review. If you would like to
examine these materials, you are invited to contact the undersigned.
If you wish to appeal the appropriateness or adequacy of this document, your comments should be submitted in writing prior to the
close of the public review period. Your comments should specifically identify what environmental impacts you believe would result from
the project, why they are significant, and what changes or mitigation measures you believe should be adopted to eliminate or reduce these
impacts. There is no fee for this appeal. If a public hearing will be held, you are also invited to attend and testify as to the appropriateness
of this document.
If you have any questions or would like further information, please contact the undersigned at (949) 644 -3200.
November 3,1999
Marc Myers ociate Planner Date:
0
0
F: \USERS\Pt.M SHARED\ IPlmcoml Pemding \FxwndedSrayAmericaV4EGDEC -form ;"
CITY OF NEWPORT BEACH
NOTICE OF PUBLIC HEARING
and
NOTICE OF INTENT TO ADOPT A MITIGATED NEGATIVE DECLARATION
Notice is hereby given that the Planning Commission of the City of Newport Beach will hold a public
hearing on the application of Extended StavAmerica Hotel for a General Plan Amendment. Planned
Communitv Amendment. Use Permit and Traffic Study on property located at 4881 Birch Street,
Newport Beach, California 92660.
PROPOSAL: The application is a request to permit the approval of a General Plan Amendment. Planned
Community Amendment, Use Permit and a Traffic Study. The proiect involves the construction of a
four - storv. 69.956 square feet. 164 -room hotel facility with 173 parkine spaces on 2.65 acres at 4881
Birch Street in the Koll Center Newport area. The proiect site is currently developed with approximately
22.000 square feet of building utilized as a multi- tenant food court (Plaza de Cafes). The project will
involve the demolition of the existing building to allow for the construction of the proposed hotel and
associated parking.
NOTICE IS HEREBY FURTHER GIVEN that an Initial Study/Mitigated Negative Declaration has been
prepared by the City of Newport Beach in connection with the application noted above. The Initial
study/Mitigated Negative Declaration states that, the subject development as proposed and with
implementation of recommended mitigation measures will not result in a significant effect on the
environment. It is the present intention of the City to accept the Initial Study and Mitigated Negative
Declaration and supporting documents. This is not to be construed as either approval or denial by the City of
the subject application. The City encourages members of the general public to review and comment on this
documentation. The Initial Study and Mitigated Negative Declaration review 20 -day public review period is
November 3. 1999 to November 23. 1999. Copies of the Initial Study and Mitigated Negative Declaration
and supporting documents are available for public review and inspection at the Planning Department, City of
Newport Beach, 3300 Newport Boulevard, Newport Beach, California 92659 -1768, (949) 644 -3210.
Notice is hereby further given that said public heating will be held on the 9th day of December 1999, at the
hour of 7:00 p.m. in the Council Chambers of the Newport Beach City Hall, 3300 Newport Boulevard,
Newport Beach, California, at which time and place any and all persons interested may appear and be heard
thereon. If you challenge this project in court, you may be limited to raising only those issues you or
someone else raised at the public heating described in this notice or in written correspondence delivered to
the City at, or prior to, the public hearing. For information call (949) 644 -3200.
Richard Fuller, Secretary, Planning Commission, City of Newport Beach
NOTE- The expense of this notice is paid from a filing fee collected from the applil;ant.
CITY OF NEWPORT BEACH
ENVIRONMENTAL CHECKLIST FORM
Project Title: Extended StayAmerica Hotel
2. Lead Agency Name and Address: City of Newport Beach
Planning Department
3300 Newport Boulevard,
Newport Beach, CA 92658 -8915
3. Contact Person and Phone Number: Marc Myers, Associate Planner, Planning Department
(949) 644 -3210
4. Project Location: The site is located at 4881 Birch Street near the intersection of Von
Karman and Birch Street in the City of Newport Beach.
5. Project Sponsor's Name and Address: Extended StayAmerica, 2525 Cherry Avenue, #310,
Signal Hill, CA 90806.
6. General Plan Designation: Retail and Service Commercial .
7. Zoning: PC — Koll Center Newport Planned Community
8. Description of Project: (Describe the whole action involved, including but not limited to later
phases of the project, and any secondary, support, or off -site features necessary for its
implementation. Attach additional sheets if necessary.)
The application is a request to permit the approval of a General Plan Amendment, Planned
Community Amendment, Use Permit and a Traffic Study. The project involves the
construction of a four - story, 69,956 square feet, 164 -room hotel facility and 173 parking
spaces on 2.65 acres at 4881 Birch Street in the Koll Center Newport area. The project site is
currently developed with approximately 22,000 square feet of building utilized as a multi -
tenant food court (Plaza de Cafes). The project will involve the demolition of the existing
building to allow for the construction of the proposed hotel and associated parking.
9. Surrounding Land Uses and Setting: (Briefly describe the project's surroundings.)
Current
Development:
The proposed site is currently developed with an existing 22,000
square foot building that is the Plaza de Cafes food court.
To the north:
Professional office building, fast -food restaurant (Carl's Jr)
To the east:
Professional office buildings
To the south:
Professional office buildings, hotel (Sutton Place
To the west:
Parking Structure, Professional Office buildings
CHECKLIST
Page 1
10. Other public agencies whose approval is required (e.g., permits, financing approval, or
participation agreement.) n /a.
ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED:
The environmental factors checked below would,be potentially affected by this project, involving at least
one impact that is a "Potentially Significant Impact" as indicated by the checklist on the following pages.
❑ Land Use Planning
❑ Population & Housing
❑ Geological Problems
❑ Water
❑ Air Quality
❑ Transportation/
Circulation
❑ Biological Resources
❑ Energy & Mineral
Resources
❑ Hazards
❑ Noise
❑ Mandatory Findings of
Significance
DETERMINATION (To be completed by the Lead Agency.)
On the basis of this initial evaluation:
❑ Public Services
❑ Utilities & Service
Systems
❑ Aesthetics
❑ Cultural Resources
❑ Recreation
I find that the proposed project COULD NOT have a significant effect on the
environment, and a NEGATIVE DECLARATION will be prepared. ❑
I find that although the proposed project could have a significant effect on the
environment, there will not be a significant effect in this case because revisions
in the project have been made by or agreed to by the project proponent.
A MITIGATED NEGATIVE DECLARATION will be prepared. El
I find that the proposed project MAY have a significant effect on the
environment, and ENVIRONMENTAL IMPACT REPORT is required. ❑
I find that the proposed project MAY have a significant effect(s) on the
environment, but at least one effect 1) has been adequately analyzed in an
• earlier document pursuant to applicable legal standards, and 2) has been
addressed by mitigation measures based on the earlier analysis as
described on attached sheets, if the effect is a "potentially significant impact" 96
..J
CHECKLIST
Page 2
BN6-F'W6 1WD GcF . 11):949 -644 -3229
N'0V 02'9'9 16:31 tJo.003 F.02
I find that the proposed project MAY have a significant effect(s) on the
environment, but at least one effect 1) has been adequately analyzed in an •
earlier document pursuant to applicable legal standards, and 2) has been
addressed by mitigation measures based on the earlier analysis as
described on attached sheets, if the effect is a "potentially significant impact"
or "potentially significant unless mitigated." An ENVIRONMENTAL IMPACT
REPORT is required, but it must analyze only the effects that remain
to be addressed. O
1 find that although the proposed project could have a significant effect
on the environment, there WILL NOT be a sign icant effect in this case because
all Potentially significant effects (a) have been analyzed adequately in an earlier
EIR or NEGATIVE DECLARATION pursuant to applicable standards and
(b) have been avoided or mitigated pursuant to that earlier M, including
revisions or mitigation measures that are imposed upon the proposed project,
nothing further is required. ❑
Submitted by: Marc Myer ssociate Planner Date:
Planning Department
Prepared by: Hodge & Associates Date:
Cheryle L. Bodge
r_NuseKSwIN�Afl AMA I PC) RMNANEG- DEd.OXF.Lis7.l)OC
0
CFECYJAST
Page 3
s
•
•
CITY OF NEWPORT BEACH
ENVIRONMENTAL CHECKLIST
Q
I. AESTHETICS.
Would the project:
a) Have a substantial adverse effect
on a scenic vista?
b) Substantially damage scenic
resources, including, but not limited
to, trees, rock outcroppings, and
historic buildings within a state
scenic highway?
C) Substantially degrade the existing
visual character or quality of the site
and its surroundings?
C) Create a new source of substantial
light or glare which would adversely
affect day or nighttime views in the
area?
II. AGRICULTURE RESOURCES.
Would the project:
a) Convert Prime Farmland, Unique
Farmland, or Farmland of Statewide
Importance (Farmland), as shown
on the maps prepared pursuant to
the Farmland Mapping and
Monitoring Program of the California
Resources Agency, to non-
agricultural use?
b) Conflict with existing zoning for
agricultural use, or a Williamson Act
contract?
C) Involve other changes in the
existing environment which, due to
their location or nature, could result
in conversion of Farmland, to non-
agricultural use?
III. AIR QUALITY.
Would the project:
a) Conflict with or obstruct
implementation of the applicable air
quality plan?
Potentially
Potentially
Less than
No
Significant
Significant
Significant
Impact
Impact
Unless
Impact
Mitigation
Incorporated
❑ ❑ ❑ Q
❑ ❑ ❑ Q
❑
❑
❑
Q
❑
❑
❑
Q
❑ ❑ ❑ Q
CHECKLIST
Page 4
21
b) Violate any air quality standard or
contribute to an existing or
projected air quality violation?
C) Result in a cumulatively
considerable net increase of any
criteria pollutant for which the
project region is non - attainment
under an applicable federal or state
ambient air quality standard
(including releasing emissions
which exceed quantitative
thresholds for ozone precursors)?
d) Expose sensitive receptors to
substantial pollutant
concentrations?
e) Create objectionable odors affecting
a substantial number of people?
IV. BIOLOGICAL RESOURCES.
Would the project:
a) Have a substantial adverse effect,
either directly or through habitat
modifications, on any species
identified as a candidate, sensitive, or
special status species in local or
regional plans, policies, or regulations
or by the California Department of
Fish and Game or U.S. Fish and
Wildlife Service?
b) Have a substantial adverse effect on
any riparian habitat or other sensitive
natural community identified in local
or regional plans, policies,
regulations or by the California
Department of Fish and Game or
U.S. Fish and Wildlife Service?
C) Have a substantial adverse effect on
federally protected wetlands as
defined by Section 404 of the Clean
Water Act (including, but not limited
to, marsh, vernal pool, coastal, etc.)
through direct removal, filling,
hydrological interruption, or other
means?
rotemiany
Significant
Impact
El
0
0
0
u
All
rutenuany
Significant
Unless
Mitigation
Incorporated
El
El
EN
0
u
0
Lessthan No
Significant Impact .
Impact
Q ❑
❑ 0
❑
Q
o
❑
El
J
n
FLA
0
CHECKLIST
Page 5
J
0
0
0
d) Interfere substantially with the
movement of any native resident or
migratory fish or wildlife species or
with established native resident or
migratory wildlife corridors, or
impeded the use of native wildlife
nursery sites?
e) Conflict with any local policies or
ordinances protecting biological
resources, such as a tree
preservation policy or ordinance?
f) Conflict with the provisions of an
adopted Habitat Conservation Plan,
Natural Community Conservation
Plan, or other approved local,
regional, or state habitat
conservation plan?
V. CULTURAL RESOURCES. Would
the project:
a) Cause a substantial adverse
change in the significance of a
historical resource as defined in
§15064.5?
b) Cause a substantial adverse
change in the significance of an
archaeological resource pursuant to
§15064.5?
C) Directly or indirectly destroy a
unique paleontological resource or
site or unique geologic feature?
d) Disturb any human remains,
including those interred outside of
formal cemeteries?
VI. GEOLOGY AND SOILS.
Would the project:
a) Expose people or structures to
potential substantial adverse effects,
including the risk of loss, injury, or
death involving:
Potentially
Potentially
Less than No
Significant
Significant
Significant Impact
Impact
Unless
Impact
Mitigation
Incorporated
❑ ❑ ❑ Q
❑ ❑ ❑ Q
❑ ❑ 1 ❑ Q
❑ ❑ ❑ Q
❑ ❑ Q ❑
CHECKLIST
Page 6
❑
❑
❑
Q
❑ ❑ Q ❑
CHECKLIST
Page 6
0
0
r 1
�J
CHECKLIST
Page 7
Potentially
Potentially
Less than
No
Significant
Significant
Significant
Impact
Impact
Unless
Impact
Mitigation
Incorporated
i) Rupture of a known earthquake
❑
❑
❑
Q
fault, as delineated on the most
recent Alquist - Priolo
Earthquake Fault Zoning Map
issued by the State Geologist
for the area or based on other
substantial evidence of a
known fault? Refer to Division
of Mines and Geology Special
Publication 42.
ii) Strong seismic ground
❑
❑
Q
❑
shaking?
iii) Seismic - related ground failure,
❑
❑
❑
Q
including liquefaction?
iv) Landslides?
❑
❑
❑
Q
b)
Result in substantial soil erosion or
❑
❑
Q
❑
the loss of topsoil?
C)
Be located on a geologic unit or soil
❑
❑
❑
Q
that is unstable, or that would
become unstable as a result of the
project and potentially result in on-
or off -site landslide, lateral
spreading, subsidence, liquefaction
or collapse?
d)
Be located on expansive soil, as
❑
❑
❑
Q
defined in Table 18- 1 -B of the
Uniform Building Code (1994),
creating substantial risks to life or
property?
e)
Have soils incapable of adequately
❑
❑
❑
Q
supporting the use septic tanks or
alternative waste water disposal
systems where sewers are not
available for the disposal of waste
water?
VII.
HAZARDS AND HAZARDOUS
MATERIALS.
Would the project:
a)
Create a significant hazard to the
❑
❑
❑
Q
public or the environment through
routine transport, use, or disposal of
hazardous materials?
0
0
r 1
�J
CHECKLIST
Page 7
9
10
CHECKLIST
Page 8
�I
Potentially
Potentially
Less than
No
Significant
Significant
Significant
Impact
Impact
Unless
Impact
Mitigation
Incorporated
b)
Create a significant hazard to the
❑
❑
❑
public or the environment through
reasonably foreseeable upset and
accident conditions involving the
release of hazardous materials into
the environment?
C)
Emit hazardous emissions or
❑
❑
❑
✓❑
handle hazardous or acutely
hazardous materials, substances, or
waste within one - quarter mile of an
existing or proposed school?
d)
Be located on a site which is
❑
❑
❑
Q
included on a list of hazardous
materials sites which complied
pursuant to Government Code
Section 65962.5 and, as a result,
would it create a significant hazard
to the public or the environment?
e)
For a project within an airport land
❑
❑
❑
use plan or, where such a plan has
not been adopted, within two miles
of a public airport or public use
airport, would the project result in a
safety hazard for people residing or
working in the project area?
f)
For a project within the vicinity of a
❑
❑
❑
Q
private airstrip, would the project
result in a safety hazard for people
residing or working in the project
area?
g)
Impair implementation of or
❑
❑
❑
0
physically interfere with an adopted
emergency response plan or
emergency evacuation plan?
h)
Expose people or structures to a
❑
❑
❑
[Jj
significant risk of loss, injury or
death involving wildland fires,
including where wildlands are
adjacent to urbanized areas or
where residences are intermixed
with wildlands?
CHECKLIST
Page 8
�I
VIII. HYDROLOGY AND WATER
QUALITY.
Would the project:
a) Violate any water quality standards
or waste discharge requirements?
b) Substantially deplete groundwater
supplies or interfere substantially
with groundwater recharge such
that there would be a net deficit in
aquifer volume or a lowering of the
local groundwater table level (e.g.,
the production rate of pre- existing
nearby wells would drop to a level
which would not support existing
land uses or planned uses for which
permits have been granted)?
C) Substantially alter the existing
drainage pattern of the site or area,
including through the alteration of
the course of a stream or river, in a
manner which would result in
substantial erosion or siltation on- or
off -site?
d) Substantially alter the existing
drainage pattern of the site or area,
including through the alteration of a
course of a stream or river, or
substantially increase the rate or
amount of surface runoff in a
manner which would result in
flooding on or off -site?
e) Create or contribute runoff water
which would exceed the capacity of
existing or planned stormwater
drainage systems or provide
substantial additional sources of
polluted runoff?
f) Otherwise substantially degrade
water quality?
g) Place housing within a 100 -year
flood hazard area as mapped on a
federal Flood Hazard Boundary or
Flood Insurance Rate Map or other
flood hazard delineation map?
Potentially
Significant
Impact
C
C
C
0
0
0
Potentially
Significant
Unless
Mitigation
Incorporated
Al
J
Al
Less man NO
Significant Impact
Impact
❑
Q
❑
D
FFAI
0
N
❑
o
❑
Q
CHECKLIST
Page 9
4, ----
0
0
0
h) Place within a 100 -year flood hazard
area structures which would impede
or redirect flood flows?
i) Expose people or structures to a
significant risk of loss, injury or
death involving flooding, including
flooding as a result of the failure of
a levee or dam?
j) Inundation by seiche, tsunami, or
mudflow?
IX. LAND USE AND PLANNING.
Would the proposal:
a) Physically divide an established
community?
b) Conflict with any applicable land use
plan, policy, or regulation of an
agency with jurisdiction over the
project(including, but not limited to
the general plan, specific plan, local
coastal program, or zoning
ordinance) adopted for the purpose
of avoiding or mitigating an
environmental effect?
C) Conflict with any applicable habitat
conservation plan or natural
community conservation plan?
X. MINERAL RESOURCES.
Would the project:
a) Result in the loss of availability of a
known mineral resource that would
be of value to the region and the
residents of the state?
b) Result in the loss of availability of a
locally- important mineral resource
recovery site delineated on a local
general plan, specific plan, or other
land use plan?
C) Displace substantial numbers of
people, necessitating the
construction of replacement housing
elsewhere?
Potentially
Potentially
Less than No
Significant
Significant
Significant Impact
Impact
Unless
Impact
❑
Mitigation
❑
Incorporated
❑
❑
❑ 0
❑ ❑ ❑ 0
❑
❑
❑
D
❑
❑
❑
❑ ❑ ❑
❑ ❑ ❑ 0
❑ ❑ ❑ 2
❑ ❑ ❑ 2
CHECKLIST
Page 10
XI. NOISE.
Would the project result in:
a) Exposure of persons to or
generation of noise levels in excess
of standards established in the local
general plan or noise ordinance, or
applicable standards of other
agencies?
b) Exposure of persons to or
generation of excessive
groundborne vibration or
groundborne noise levels?
C) A substantial permanent increase in
ambient noise levels in the project
vicinity above levels existing without
the project?
d) A substantial temporary or periodic
increase in ambient noise levels in
the project vicinity above levels
existing without the project?
e) For a project located within an
airport land use land use plan or,
where such a plan has not been
adopted, within two miles of a public
airport or public use airport, would
the project expose people residing
or working in the project area to
excessive noise levels?
f) For a project within the vicinity of a
private airstrip, would the project
expose people residing or working
in the project area to excessive
noise levels?
XII. POPULATION AND HOUSING.
Would the project:
a) Induce substantial population
growth in an area, either directly (for
example, by proposing new homes
and businesses) or indirectly (for
example, through extension of
roads or other infrastructure)?
voiennany
Significant
Impact
0
u
0
u
U
0
0
vacennaay
Significant
Unless
Mitigation
Incorporated
0
LE
FE
LE
LE
El
EN
Less than
Significant
Impact
No
Impact
A
Q
❑
❑
Q
Q ❑ •
Q ❑
El
9
F
CHECKLIST
Page 11
4q
•
0
b) Displace substantial numbers of
existing housing, necessitating the
construction of replacement housing
elsewhere?
C) Displace substantial numbers of
people, necessitating the
construction of replacement housing
elsewhere?
XIII. PUBLIC SERVICES Would the
project:
a) Would the project result in
substantial adverse physical
impacts associated with the
provision of new or physically
altered government facilities, need
for new or physically altered
government facilities, the
construction of which could cause
significant environmental impacts, in
order to maintain acceptable service
ratios, response times or other
performance objectives for any of
the public services:
Fire protection?
Police protection?
Schools?
Other public facilities?
XIV. RECREATION
a) Would the project increase the use
of existing neighborhood and
regional parks or other recreational
facilities such that substantial
physical deterioration of the facility
would occur or be accelerated?
b) Does the project include
recreational facilities or require the
construction of or expansion of
recreational facilities which might
have an adverse physical effect on
the environment? opportunities?
Potentially
Potentially
Less than No
Significant
Significant
Significant Impact
Impact
Unless
Impact
Mitigation
Incorporated
❑ ❑ ❑ 0
❑ ❑ 0 ❑
❑ ❑ ❑ 0
❑ ❑ ❑ 0
CHECKLIST
Page 12
XV. TRANSPORTATION/TRAFFIC Would
XVI. UTILITIES & SERVICE SYSTEMS
Would the project:
a) Exceed wastewater treatment
requirements of the applicable
Regional Water Quality Control
Board?
Potentially
the project:
a)
Cause an increase in traffic which is
Significant
substantial in relation to the existing
Impact
traffic load and capacity of the street
Impact
system (i.e., result in a substantial
Mitigation
increase in either the number of
vehicle trips, the volume to capacity
ratio on roads, or congestion at
intersections)?
b)
Exceed either individually or
cumulatively, a level of service
standard established by the county
congestion management agency for
designated roads or highways?
C)
Result in a change in air traffic
patterns, including either an
increase in traffic levels or a change
in location that results in substantial
safety risks?
d)
Substantially increase hazards due
to a design feature (e.g., sharp
curves or dangerous intersections)
or incompatible uses (e.g., farm
equipment)?
e)
Result in inadequate emergency
access?
f)
Result in inadequate parking
capacity?
g)
Conflict with adopted policies, plans,
or programs supporting alternative
transportation (e.g., bus turnouts,
bicycle racks)?
XVI. UTILITIES & SERVICE SYSTEMS
Would the project:
a) Exceed wastewater treatment
requirements of the applicable
Regional Water Quality Control
Board?
Potentially
Potentially
Less than
Significant
Significant
Significant
Impact
Unless
Impact
Mitigation
Incorporated
u
❑
0
C
0
LE
C
FE
M
0
No
Impact
❑
o
❑
o
❑
D
❑
o
❑
D
❑
D
❑ D
I�
�J
r1
LJ
CHECKLIST
Page 13
1 -16
U
b) Require or result in the construction
of new water or wastewater
treatment facilities or expansion of
existing facilities, the construction of
which could cause significant
environmental effects?
C) Require or result in the construction
of new storm water drainage
facilities or expansion of existing
facilities, the construction of which
could cause significant
environmental effects?
d) Have sufficient water supplies
available to serve the project from
existing entitlements and resources,
or are new or expanded
entitlements needed?
e) Result in a determination by the
wastewater treatment provider,
which serves or may serve the
project that it has adequate capacity
to serve the project's projected
demand in addition to the provider's
existing commitments?
f) Be served by a landfill with sufficient
permitted capacity to accommodate
the project's solid waste disposal
needs?
g) Comply with federal, state, and local
statutes and regulation related to
solid waste?
XVII. MANDATORY FINDINGS OF
SIGNIFICANCE.
A) Does the project have the potential
to degrade the quality of the
environment, substantially reduce
the habitat of a fish or wildlife
species, cause a fish or wildlife
population to drop below self -
sustaining levels, threaten to
eliminate a plant or animal
community, reduce the number or
restrict the range of a rare or
endangered plant or animal or
eliminate important examples of the
major period of California history or
prehistory?.
Potentially
Potentially
Less than No
Significant
Significant
Significant Impact
Impact
Unless
Impact
Mitigation
Incorporated
❑
❑
0 ❑
❑ ❑ 21 ❑
❑ ❑ Q ❑
❑ ❑ 10 ❑
❑ ❑ ❑ 2
❑ ❑ ❑ Q
❑ ❑ ❑ 21
CHECKLIST
Page 14
0. 1
b) Does the project have impacts that
are individually limited, but
cumulatively considerable?
( "Cumulatively considerable" means
that the incremental effects of a
project are considerable when
viewed in connection with the
effects of past projects, the effects
of other current projects, and the
effects of probable future projects.)
C) Does the project have
environmental effects which will
cause substantial adverse effects
on human beings, either directly or
indirectly?
XVII. EARLIER ANALYSES.
Potentially Potentially
Significant Significant
Impact Unless
Mitigation
Incorporated
C
u
0
Lessthan No
Significant Impact
Impact
u
Al
N
Earlier analyses may be used where, pursuant to the tiering, program EIR, or other CEQA process, one o•
more effects have been adequately analyzed in an earlier EIR or negative declaration. Section
15063(c)(3)(D). In this case a discussion should identify the following on attached sheets:
a) Earlier analyses used. Identify earlier analyses and state where they are available for review.
b) Impacts adequately addressed. Identify which effects from the above checklist were within the scope of and
adequately analyzed in an earlier document pursuant to applicable legal standards, and state whether such
effects were addressed by mitigation measures based on the earlier analysis.
c) Mitigation measures. For effects that are "Less than Significant with Mitigation Incorporated," describe the
mitigation measures, which were incorporated or refined from the earlier document and the extent to which
they address site - specific conditions for the project.
F:\USERSTLN\SHARED\IFORMS\NEG-DEOOOCKLIST.DOC
CHECKLIST
Page 15
L� yy
L�
SOURCE LIST
The following enumerated documents are available at the offices of the City of Newport Beach, Planning
Department, 3300 Newport Boulevard, Newport Beach, California 92660.
1. Final Program EIR — City of Newport Beach General Plan
2. General Plan, including all its elements, City of Newport Beach.
3. Title 20, Zoning Code of the Newport Beach Municipal Code.
4. City Excavation and Grading Code, Newport Beach Municipal Code.
5. Chapter 10.28, Community Noise Ordinance of the Newport Beach Municipal Code.
6. South Coast Air Quality Management District, Air Quality Management Plan 1997.
7. South Coast Air Quality Management District, Air Quality Management Plan EIR, 1997.
8. Extended StayAmerira Trip Generation Study, Newport Beach, California. Prepared by RKJK &
Associates, Inc. August 26, 1999.
9. Phase 1 Environmental Site Assessment Proposed Extended StayAmerical Hotel 4881 Birch Street,
Newport Beach, California. Prepared by Krazan & Associates, Inc. July 29, 1999.
10. Addendum letter dated September 8, 1999 to Phase 1 Environmental Site Assessment Proposed
Extended StayAmerical Hotel 4881 Birch Street, Newport Beach, California. Prepared by Krazan &
Associates, Inc. July 29, 1999.
CHECKLIST
Page 16
CITY OF NEWPORT BEACH
ENVIRONMENTAL ANALYSIS CHECKLIST EXPLANATIONS
Extended StayAmerica Hotel
4881 Birch Street, Newport Beach
Project Description
ANALYSIS
The application is a request to permit the approval of a General Plan Amendment,
Planned Community Amendment, Use Permit and a Traffic Study. The project
involves the construction of a four - story, 69,956 square feet, 164 -room hotel
facility with 173 parking spaces on 2.65 acres at 4881 Birch Street in the Koll
Center Newport area. The project site is currently developed with approximately
22,000 square feet of building utilized as a multi- tenant food court (Plaza de
Cafes). The project will involve the demolition of the existing building to allow
for the construction of the proposed hotel and associated parking. The regional
location of the site is depicted on Exhibit 1 and the project vicinity on Exhibit 2.
The project plans are presented in Appendix A of this document.
The following discussion provides explanations for the conclusions contained in the
Environmental Checklist regarding the proposed project's environmental Impacts.
I. AESTHETICS
a) Have a substantial adverse effect on a scenic vista? (No Impact)
The project site is located at 4881 Birch Street near Von Karman Avenue in the Koll
Center Newport area. The property is currently developed with a 22,000 square foot
building that is utilized as a food court. Surrounding properties are also developed
with multi -story professional office buildings, hotel and parking structures. The
proposed hotel project is not located in an area that contains a scenic vista.
Therefore, the project will not have a substantial adverse effect on a scenic vista.
b) Substantially damage scenic resources, including but not limited to,
trees, rock outcroppings, and historic buildings within a state scenic
highway? (No Impact)
See response to Section I (a) above. The project will not have a significant impact
to any scenic resources such as trees, rock outcroppings, or historic buildings. The
ra
0
0
LOS ANGELES r
COUNTY
Garden Grove
Riversid e e
F ie
ORANGE
reeway
TUSTIN
SANTA ANA
COSTA
Coo MESA
Hy
NEWPORT
BEACH
P A C I F I C
0 C E A N
MAP NOT TO SCALE
PROJECT
LOCATION
0
HODGE & ASSOCIATES
SAN BERNARDINO
COUNTY
LAKE
OREST
•
bib
l
sad MISSION
\ VIEJO
LAGUNA
NIGUEL
POINT
r SAN JUAN
CAPISTRANO
RIVERSIDE
COUNTY
ORANGE
COUNTY
SAN DIEGO
COUNTY
e
Regional Location Map
EXHIBIT 1
I
r As
!11
'. \ 73 .
. project site does contain existing landscaping including trees, however, most of the
existing landscaping will be preserved for the new hotel.
c) Substantially degrade the existing visual character or quality of the site
and its surroundings? (No Impact)
The project site is located in a developed area that includes multi -story buildings for
office, hotel and parking structures. The proposed hotel will consist of a 4 -story
building and provide 164 - rooms. The associated hotel parking will be
accommodated on -site and will provide 173 parking spaces (at grade /surface). The
proposed hotel is approximately 61' -11" in height (including architectural
elements). The height and bulk of the new building is sufficient that it will be
visible from many locations within and around the Koll Center Newport area. The
immediate vicinity of the project site includes a number of multi -story buildings.
Due to the highly developed nature of the subject property and surrounding
business properties, including a nearby high rise hotel, and adjacent multiple story
parking structure, the aesthetic impacts associated with the proposed hotel is not
considered a significant impact.
The building architecture will be compatible with surrounding uses and will include
building materials such as stone veneer and a slate concrete tile roof. The proposed
hotel design and architectural treatment will be subject to comply with the City of
Newport Beach requirements and the Koll Center Newport Planned Community
Association. Therefore, the project will not degrade the existing visual character or
quality of the site nor its surroundings.
d) Create a new source of substantial light or glare which would adversely
affect day or nighttime views in the area? (No Impact)
The project site is located in an area that is already developed and urbanized. The
proposed hotel will replace an existing one -story building that is approximately
22,000 square feet. The hotel is proposed to be a 4 -story, 164 -room facility.
Although, the new hotel building will be greater in height than the existing use the
project will not adversely affect day or nighttime views in the area. The proposed
use is compatible with the surrounding area that consists of professional office
buildings, support retail and service uses, and hotels. The proposed project will
introduce additional lighting associated with the operation of the hotel (hotel
rooms, security lighting, landscape lighting, etc.). The lighting will be visible,
however, due to the urbanized developed nature of the immediate vicinity,
potential impacts of light and glare are not considered significant. Parking lot
lighting similar to the existing site lighting will be utilized for the proposed
. project.
CHECKUST EXPLANATIONS J
Page 2
E
II. Agriculture Resources
a) Convert Prime Farmland, Unique Farmland, or Farmland of
Statewide Importance (Farmland), as shown on the maps prepared
pursuant to the Farmland Mapping and Monitoring Program of the
California Resources Agency, to non - agricultural use? (No Impact)
The project is located in a developed urbanized area of the City. The project site
is already developed with an existing building. The site is not utilized for
farmland uses and/or agriculture resources and has not been since at least 1938.
Therefore, the proposed project will not have any impacts on agriculture
resources.
b) Conflict with existing zoning for agricultural use, or a Williamson Act
contract? (No Impact) is
See response to Section H (a) above. The project does not conflict with the
existing zoning for the site. The property is not zoned for agricultural uses nor is
subject to a Williamson Act contract.
C) Involve other changes in the existing environment which, due to their
location or nature, could result in conversion of Farmland, to non-
agricultural use? (No Impact)
The proposed hotel project will not have any impact on farmland or agricultural
uses. The site is located in a developed area that does not contain farmland or
agricultural uses. Therefore, the project will not have any impact that could result
in the conversion of property to non - agricultural use.
III. Air Quality
a) Conflict with or obstruct implementation of the applicable air quality
plan? (No Impact)
The project site is located in the South Coast Air Basin (SCAB). The South Coast
Air Quality Management District ( SCAQMD) sets and enforces regulations for •
stationary sources in the basin. The California Air Resources Board (CARB) is
responsible for controlling motor vehicle emissions. The SCAQMD in
CHECKUSTEXPLANAnONS 1
Page 3
,cii
• coordination with the Southern California Association of Governments (SCAG)
has developed the Air Quality Management Plan (AQMP) for the air basin. The
AQMP goals include the implementation of technological and innovative changes
that provide for achieving clean air goals while maintaining a healthy economy.
The AQMP also addresses state and federal planning requirements and programs.
Regional and local air quality has been previously addressed in the Final Program
EIR for the City of Newport Beach General Plan.
The 1997 Air Quality Management Plan (AQMP) which was developed by the
SCAQMD in coordination with the Southern California Association of
Governments (SCAG) includes a comprehensive analysis of future emission
forecasts which reflect demographic and economic growth forecasts provided by
the Southern California Association of Governments (SCAG). The build -out of
the City of Newport Beach (including the subject project area) is included in these
forecasts. The 1997 AQMP` provide an extensive analysis of potential impacts,
including the cumulative impacts of basin -wide growth and development.
The Land Use Element of the City's General Plan identifies that the project site is
located within the Koll Center Newport Planned Community. The Land Use
Element further describes the property as located in the Retail and Service Site 1
(KCN RS 1) of the Koll Center. The proposed hotel is approximately 69,956
square feet in size and will replace the existing 22,000 square foot building (Plaza
de Cafes). The Retail and Service designation allows for such land uses as hotels.
A traffic study prepared for the project by RKJK & Associates concluded that the
proposed hotel will generate fewer daily vehicle trips than the existing Plaza de
Cafes International Food Court. Therefore, the project will not result in any air
quality impacts such as those associated with vehicle emissions beyond that of the
existing site use (Plaza de Cafes). Also, the projected growth in the area
(cumulative) has already been included in forecasts that are incorporated into the
1997 AQMP. The project will not result in any new significant impacts that are
significantly greater than that previously evaluated in regards to air quality.
b) Violate any air quality standard or contribute to an existing or
projected air quality violation? (Less Than Significant Impact)
Potential air quality impacts to surrounding businesses from project construction
activities will be minimized through mitigation measures, including short-term
impacts to air quality from air pollutants being emitted by construction equipment
and dust generated during site preparation. The project will require limited
grading since the site has been previously developed with an existing building.
The existing 22,000 square foot building will be demolished so that the proposed
. hotel can be accommodated on the site. The demolition activities will result in
short-term air quality impacts (e.g. dust), however, with implementation of
recommended mitigation measures this impact is considered less than significant.
CHECKLIST EXPLANATIONS J
Page 4
The small amount of project - related emissions will have no impact on regional •
particulate levels. Where construction operations are near existing businesses, the
dust generated by such activities is considered a local nuisance as opposed to an
actual health hazard. If water or other soil stabilizers are used to control dust as
required by SCAQMD Rule 403, the emissions can be reduced by 50 percent.
The following mitigation measures are recommended to reduce short-term
construction related air quality impacts to a level of less than significant.
Mitigation Measure No. I During construction activities, the applicant shall
ensure that the following measures are complied with to reduce short -tenn
(construction) air quality impacts associated with the project: a) controlling
fugitive dust by regular watering, or other dust palliative measures to meet South
Coast Air Quality Management District (SCAQMD) Rule 403 (Fugitive Dust); b)
maintaining equipment engines in proper tune; and c) phasing and scheduling
construction activities to minimize project - related emissions.
Mitigation Measure No. 2 During construction activities, the applicant shall
ensure that the project will comply with SCAQMD Rule 402 (Nuisance), to reduce
odors from construction activities
c) Result in a cumulatively considerable net increase of any criteria .
pollutant for which the project region is non - attainment under an
applicable federal or state ambient air quality standard (including
releasing emissions which exceed quantitative thresholds for ozone
precursors)? (No Impact)
See response to Section III (a) above. The project is located in the South Coast
Air Basin that is a designated non - attainment area. However, the proposed hotel
does not represent significant growth beyond that already previously evaluated
and forecasted for air quality cumulative impacts of basin -wide growth and
development. Therefore, the project will not result in any significant impacts
cumulatively to air quality.
d) Expose sensitive receptors to substantial pollutant concentrations?
(No Impact)
The project is not located in area that would expose sensitive receptors (e.g.
elementary schools etc.) to substantial pollutant concentrations. The site is
located in an area already developed with professional office buildings,
retail /service uses, and hotels. Therefore, it is not anticipated that the project will
result in any significant impacts to sensitive receptors.
CHECKLIST EXPLANATIONS
Page 5
i'
0
e) Create objectionable odors affecting a substantial number of people?
(Less Than Significant Impact)
The proposed hotel will not include a restaurant. However, each guestroom of the
hotel will contain a kitchen for private use. Therefore, impacts to surrounding
business properties from hotel operations (including an incremental increase in
emissions and odors associated with private food preparation) will be minimal.
Therefore, these effects are not considered significant. Additional potential long-
term air quality impacts associated with the proposed project include those
associated with vehicular emissions. A traffic study has been prepared for the
project and is discussed in Section XV (Transportation/Traffic). The traffic study
identified that the project is estimated to generate 1,163 daily vehicle trips. The
findings of the traffic study concluded that the proposed project will not result in
significant impacts to transportation /traffic. Therefore, the project will not create
objectionable odors affecting a substantial number of people.
IV. Biological Resources
a) Have a substantial adverse effect, either directly or through habitat
modifications, on any species identified as a candidate, sensitive, or
special status species in local or regional plans, policies, or regulations
or by the California Department of Fish and Game or U.S. Fish and
Wildlife Service? (No Impact)
The project site is currently developed with an existing 1 -story building and
associated parking lot. The site is also located in a area which is developed with
urban uses such as office buildings, retail and service uses, and hotels. The project
site will not directly or indirectly have any impacts on sensitive biological resources.
b) Have a substantial adverse effect on any riparian habitat or other
sensitive natural community identified in local or regional plans,
policies, and regulations or by the California Department of Fish and
Game or U.S. Fish and Wildlife Service? (No Impact)
See response to Section IV (a) above. The site does not contain any riparian
habitat or sensitive natural community.
c) Have a substantial adverse effect on federally protected wetlands as
defined by Section 404 of the Clean Water Act (including, but not
• limited to, marsh, vernal pool, coastal, etc.) through direct removal,
filling, hydrological interruption, or other means? (No Impact)
CHECKLIST EXPLANATIONS
Page 6
V
See response to Section IV (a) above. The site does not contain any wetlands. •
Therefore, the project will not result in any impacts to wetlands.
d) Interfere substantially with the movement of any native resident or
migratory fish or wildlife species or with established native resident or
migratory wildlife corridors, or impede the use of native wildlife
nursery sites? (No Impact)
See response to Section IV (a) above. The site does not contain any migratory
fish or wildlife species. Therefore, the project will not have any impacts to such
species.
e) Conflict with any local policies or ordinance protecting biological
resources, such as a tree preservation policy or ordinance? (No Impact)
See response to Section IV (a) above. The site does not contain any vegetation
(including trees) that is protected by City policy or ordinance. Therefore, the
project will not conflict with any policies or ordinance pertaining to biological
resources.
f) Conflict with the provisions of an adopted Habitat Conservation Plan,
Natural Community Conservation Plan, or other approved local,
regional, or state habitat conservation plan? (No Impact)
See response to Section IV (a) and (e) above. The site does not contain any
biological resources that would be subject to a conservation plan.
Cultural Resources
a) Cause a substantial adverse change in the significance of a historical
resource as defined in Section 15064.5? (No Impact)
The project site is currently developed with an existing I -story building and
associated parking lot. The site is also located in an area that is developed with
urban uses such as office buildings, retail and service uses, and hotels. The project
site will not directly or indirectly have any impacts on cultural (including historical)
resources.
b) Cause a substantial adverse change in the significance of an
archeological resource pursuant to Section 15064.5? (No Impact) •
CHECKLIST EXPLANATIONS J
Page 7
See response to Section V (a) above. The project site is already developed. The
proposed project includes replacing an existing 1 -story building with a 164 -room,
4 -story hotel. The hotel parking will be provided around the building at grade
level. Due to the existing site conditions, the project will require minimal site
preparation (e.g. grading). Therefore, it is not anticipated that the project will
have any impacts on archeological resources.
C) Directly or indirectly destroy a unique paleontological resource or site
or unique geologic feature? (No Impact)
See response to Section V (a) and (b) above. It is not anticipated that the project
will result in any direct or indirect impacts to unique paleontological resources or
geologic features due to the existing site conditions and will not excavate or grade
extensively (already developed with an existing structure and paved parking lot).
d) Disturb any human remains, including those interred outside formal
cemeteries? (No Impact)
See response to Section V (a) and (b) above. It is not anticipated that the project
• will result in any impact since the site is already developed and located in an
urbanized area of the City.
VI. Geology & Soils
a) Expose people or structures to potential substantial adverse effects,
including the risk of loss, injury, or death involving-
0
rupture of a known earthquake fault, as delineated on the most
recent Alquist - Priolo Earthquake Fault Zoning Map issued by
the State Geologist for the area or based on other substantial
evidence of a known fault? (Less Than Significant Impact)
The Final EIR/GPA 82 -2 (page 37 -41) includes a complete discussion of existing
conditions, impacts and City policy and requirements pertaining to geology and
soils. The topography of the site is relatively flat. The site is not located in an area
of unique geologic or physical features. There are no evident faults on the site. The
closest known active or potentially active fault is the Newport- Inglewood Fault
(approximately four miles from the project site). The Whittier - Elsinore Fault is
located over 30 miles northeast of the site. The Whittier - Elsinore Fault is included
with a Special Studies Zone by the State of California. The site is not located
within Alquist -Priolo special fault zone. The site is expected to be subject to
• moderate to severe ground shaking from a regional seismic event within the
project life of the proposed building.
CHECKLIST EXPLANATIONS J
Page 8
i!'
The property was originally graded in conjunction with the development of the
existing one -story food court building. The site topography is flat and minimal
site preparation (e.g. grading) will be needed in conjunction with the project. The
existing building will be demolished so that the proposed hotel can be
accommodated on the site. It is anticipated that the project will require exporting
building debris associated with the demolition activity. The debris will be
exported to a Southern California site acceptable to the permit agencies.
Compliance with the City Excavation and Grading Code (NBMC Sec. 15.10.140)
will reduce any potential impacts to an insignificant level. No cumulative impacts
associated with geological conditions are anticipated as a result of the proposed
hotel project.
Mitigation Measure No. 3 During construction activities, the project will
comply with the erosion and siltation control Measures of the City's grading
ordinance and all applicable local and State building codes and seismic design
guidelines, including the City Excavation and Grading Code (NBMC Section
15.10).
ii) Strong seismic ground shaking? (Less Than Significant Impact)
See response to Section VI (a)(i) above. The Newport- Inglewood Fault is believed
to be capable of producing an earthquake of 7.5 magnitude. The Whittier - Elsinore
Fault is estimated to potentially produce an earthquake of 7.0 magnitude. Primary
hazards of an earthquake include groundshaking, ground displacement and
subsidence. In the event of a regional seismic event, the site would experience
moderate to severe ground shaking. A mitigation measure is presented in Section
VI(a)(i) requiring compliance with applicable local and State building codes and
seismic design guidelines. Therefore, with implementation of the recommended
mitigation measure, potential impacts will be reduced to an insignificant level.
iii) Seismic - related ground failure, including liquefaction? (No
Impact)
See response to Section VI (a)(i) above. Ground failure, liquefaction, seiching and
dam failure are secondary seismic hazards which may result from an earthquake.
The potential for liquefaction is associated with the soil types and shallow
groundwater. The Phase 1 Environmental Site Assessment prepared by Krazan
and Associates, Inc. identified that the approximate depth to groundwater is 29 feet
below the surface. It is not anticipated that there will be any significant impacts
associated with ground failure or liquefaction. A mitigation measure is presented in .
Section VI(a)(i) requiring compliance with applicable local and State seismic design
guidelines and building codes. Therefore, with implementation of the
CHECKLIST EXPLANATIONS I C
Page 9
recommended mitigation measure, potential impacts will be reduced to an
insignificant level.
iv) Landslides? (No Impact)
Landslides and erosion hazard potential is typically associated with hillside areas.
The project site is located in a developed area of the City and the topography of the
site is very flat. The project will not result in any significant impacts associated with
landslides.
b) Result in substantial soil erosion or the loss of topsoil? (No Impact)
See response to Section VI(a)(i). The project will require minimal site
preparation (e.g. grading) and therefore, no significant impacts are anticipated as
a result of soil erosion or the loss of topsoil.
C) Be located on a geologic unit or soil that is unstable, or that would
become unstable as a result of the project and potentially result in on or
off -site landslide, lateral spreading, subsidence, liquefaction or
collapse? (No Impact)
The project site is located in a developed area of the City and the topography of the
site is very flat. A mitigation measure is presented in Section VI(a)(i) that requires
compliance with applicable building codes and seismic design guidelines.
Therefore, with implementation of the recommended mitigation measure, potential
impacts will be reduced to an insignificant level.
d) Be located on expansive soil, as defined in Table 18 -1 -B of the Uniform
Building Code (1994), creating substantial risks to life or property? (No
Impact)
The project is not located on expansive soil as defined per the Uniform Building
Code. However, a mitigation measure is presented in Section VI(a)(i) that requires
compliance with applicable building codes and seismic design guidelines.
e) Have soils incapable of adequately supporting the use of septic tanks or
alternative waste water disposal systems where sewers are not available
for the disposal of waste water? (No Impact)
CHECKLIST EXPLANATIONS
Page 10
VII.
The project site is currently developed with an existing one -story building. The
site will not be utilizing septic tanks or alternative waste water disposal systems.
The site can be served by an existing sewer system. Therefore, the project will not
result in any significant impacts associated with septic tanks or alternative waste
water disposal systems.
Hazards and Hazardous Materials
a) Create a significant hazard to the public or the environment through
routine transport, use, or disposal of hazardous materials? (No Impact)
The proposed project does not involve the transport, use, or disposal of any
hazardous materials. Additionally, Krazan and Associates, Inc. have prepared a
Phase I Environmental Site Assessment for the project site. The assessment
concluded that there are no environmental conditions, including hazardous
substances (including soils, surface waters, and groundwater) in connection with the
project site.
b) Create a significant hazard to the public or the environment through
reasonably foreseeable upset and accident conditions involving the
release of hazardous materials into the environment? (No Impact)
See response to VII (a) above. The project consists of the development of a 164 -
room hotel building and associated parking lot. The site is already developed with
an existing 1 -story building that is proposed for demolition so that the hotel can be
accommodated on the site. The project itself does not pose as a significant hazard to
the public or the environment.
C) Emit hazardous emissions or handle hazardous or acutely hazardous
materials, substances, or waste within one - quarter mile of an existing or
proposed school? (No Impact)
See response to VII (a) above. Additionally, the site is not located within one-
quarter mile of an existing or proposed school.
d) Be located on a site which is included on a list of hazardous materials
sites which complied pursuant to Government Code Section 65962.5
and, as a result, would it create a significant hazard to the public or the
environment? (No Impact) 0
CHECKLIST EXPLANATIONS
Page 11
• See response to VII (a) above. Additionally, the site is not on a list of hazardous
materials sites.
e) For a project within an airport land use plan or, where such a plan has
not been adopted, within two miles of a public airport or public use
airport, would the project result in a safety hazard for people residing
or working in the project area? (No Impact)
The project site is located within a half mile of a public airport. The John Wayne
Airport is in close proximity to the proposed hotel site. However, the project does
not pose a safety hazard for hotel guests or employees working in the project area.
The proposed project is compatible with surrounding uses. The immediate project
area is developed with multi -story office buildings, hotels, and retail /service uses.
f) For a project within the vicinity of a private airstrip, would the project
result in a safety hazard for people residing or working in the project
area? (No Impact)
See response to VII (a) above. Additionally, the site is not located within the
vicinity of a private airstrip.
g) Impair implementation of or physically interfere with an adopted
emergency response plan or emergency evacuation plan? (No Impact)
The proposed hotel project is located in an urbanized area of the City. The project
itself will not result in any impacts to an adopted emergency response plan or
emergency evacuation plan.
h) Expose people or structures to a significant risk of loss, injury or death
involving wildland fires, including where wildlands are adjacent to
urbanized areas or where residences are intermixed with wildlands?
(No Impact)
The proposed hotel project is located in an urbanized area of the City. The project
itself (or location) will not be a significant risk involving wildland fires.
VIII. Hydrology & Water Quality
a) Violate any water quality standards or waste discharge requirements?
(No Impact)
The project site is located within the Santa Ana River Basin. The site is under the
jurisdiction of the Santa Ana Regional Water Quality Control Board (RWQCB)
CHECKLIST EXPLANATIONS
Page 12
for issues related to water quality. Each of the nine California RWQCBs is •
responsible for adopting and implementing water quality control plans for each
basin's water bodies, regulating waste discharges from both point and nonpoint
sources, and monitoring permit compliance within its designated basin. There is
a Drainage Area Management Plan (DAMP) which is implemented by the Cities
(including Newport Beach), County of Orange, and Orange County Flood
Control District. The DAMP was prepared in compliance with specific
requirements of the National Pollutant Discharge Elimination System (NPDES)
storm water program. The DAMP includes a wide range of Best Management
Practices (BMPs) and control techniques to further reduce the amount of
pollutants entering the storm drain system.
The City of Newport Beach has for many years been already performing many of
the procedures that protect the quality of stormwater runoff, such as: site
construction erosion and sediment control programs, sweeping streets, managing
solid waste, recycling programs, storm drain and catch basin maintenance,
enforcing prohibitions on illegal discharges, controlling spills, supervising
industrial waste discharges through permitting, and enforcing ordinances
prohibiting certain discharges. Additionally, Krazan and Associates, Inc. have
prepared a Phase I Environmental Site Assessment for the project site. The
assessment concluded that there are no environmental conditions, including
hazardous substances (including soils, surface waters, and groundwater) in
connection with the project site.
The proposed project would not substantially increase water runoff. The site is
already developed with an existing building and is located in an urbanized area of
the City. The project is located outside of all flood hazard areas; therefore, no
significant impacts are anticipated. Subject to the incorporation of City standard
conditions of approval and/or mitigation measures, no cumulative impacts
associated with hydrologic conditions are anticipated as a result of the project. To
ensure that storm runoff will not significantly impact the existing drainage system,
mitigation measures in compliance with said City regulations will reduce any
potential impacts to an insignificant level.
Mitigation Measure No. 4 The project shall conform to the requirements of the
National Pollution Discharge Elimination System (NPDES) and shall be subject to
the approval of the Public Works Department to determine compliance.
b) Substantially deplete groundwater supplies or interfere substantially
with groundwater recharge such that there would be a net deficit in
aquifer volume or a lowering of the local groundwater table level (e.g.,
the production rate of pre - existing nearby wells would drop to a level
which would not support existing land uses or planned uses for which
permits have been granted)? (No Impact)
CHECKLIST EXPLANATIONS U I
Page 13
i
See Response to Section VIII(a) above. The proposed site is located in a
developed area of the City and the site contains an existing one -story building.
The Phase 1 Environmental Site Assessment prepared by Krazan and Associates,
Inc. identified that the approximate depth to groundwater is 29 feet below the
surface. The project site topography is flat and will require minimal site preparation
(e.g. grading/excavation). Therefore, it is not anticipated that the project will have
any significant impact on groundwater.
c) Substantially alter existing drainage pattern of the site or area,
including through the alteration of the course of a stream or river, in
a manner which would result in substantial erosion or siltation on- or
off -site? (Less Than Significant Impact)
See response to Section VIII (a) above. The project will result in a change to the
drainage pattern of the site, however, this change is not considered significant.
The site is currently developed with a 22,000 square foot one -story building
utilized as a food court. The building will be demolished so that the proposed 4-
story hotel can be constructed on the site. The first floor of the hotel building is
approximately 17,489 square feet. The hotel building (17,489 square feet of first
floor ground area) site coverage is slightly less than that of the existing one -story
building (22,000 square feet). Therefore, the actual building foundation is not
different from the existing building. The hotel will also provide surface parking
surrounding the building. Other than a slight decrease in building foundation
coverage, the drainage pattern will not be substantially altered. Additionally,
there are no nearby streams or rivers which would be impacted as a result of the
project. Therefore, the project will not result in any significant impacts that would
alter the existing drainage pattern of the site or area.
d) Substantially alter the existing drainage pattern of the site or area,
including through the alteration of a course of a stream or river, or
substantially increase the rate or amount of surface runoff in a
manner which would result in flooding on or off - site? (No Impact)
See response to Section VIII (c) above.
e) Create or contribute runoff water which would exceed the capacity of
existing or planned stormwater drainage systems or provide
substantial additional sources of polluted runoff? (No Impact)
See response to Section VIII (a)(c) above.
f) Otherwise substantially degrade water quality? (No Impact)
See response to Section VIII (a)(c) above.
CHECKLIST EXPLANATIONS
Page 14
g) Place housing within a 100 -year flood hazard area as mapped on a
federal Flood Hazard Boundary or Flood Insurance Rate Map or
other flood hazard delineation map? (No Impact)
See response to Section VIII (a)(c) above. Also, the project is not located within a
100 -year flood hazard area.
h) Place within a 100 -year flood hazard area structures which would
impede or redirect flood flows? (No Impact)
See response to Section VIII (a)(c) and (g) above.
i) Expose people or structures to a significant risk of loss, injury or
death involving flooding, including flooding as a result of the failure
of a levee or dam? (No Impact)
See response to Section VIII (a)(c) and (g) above. Also, the project site is not
located near a levee or dam.
j) Inundation by seiche, tsunami, or mudflow? (No Impact)
See response to Section VIII (a)(c) above.
IX. Land Use and Planning
a) Physically divide an established community? (No Impact)
The project site is located at the northwest corner of Birch Street and Von Karman
Avenue. Although the project will require the demolition of the existing building
(Plaza de Cafes International Food Court), the project will not physically divide
an established community. The proposed project will be developed within a
separate parcel located on the northwest corner of Birch Street and Von Kalman
Avenue. The development of the project will not require subdivision of property
or physically divide adjacent properties. Therefore, the project will not result in
significant impacts to an established community.
b) Conflict with any applicable land use plan, policy, or regulation of an
agency with jurisdiction over the project ( including, but not limited
to the general plan, specific plan, local coastal program, or zoning
ordinance) adopted for the purpose of avoiding or mitigating an
environmental effect? (Less Than Significant Impact)
•
CHECKLIST EXPLANATIONS b"
Page 15
The application is a request to permit the approval of a General Plan Amendment,
Planned Community Amendment, Use Permit and a Traffic Study. The project
involves the construction of a four - story, 69,956 square feet, 164 -room hotel
facility on 2.65 acres at 4881 Birch Street in the Koll Center Newport area. The
project site is currently developed with approximately 22,000 square feet of
building utilized as a multi - tenant food court (Plaza de Cafes). The project will
involve the demolition of the existing building to allow for the construction of the
proposed hotel and associated parking. The Land Use Element of the City's
General Plan identifies that the project site is located within the Koll Center
Newport Planned Community. The Land Use Element further describes the
property as located in the Retail and Service Site 1 (KCN RS 1) of the Koll
Center. The Retail and Service designation allows for such land uses as hotels.
The KCN RS 1 area is allocated 102,110 square feet of uses. The General Plan
Amendment and Planned Community Amendment will allow for the designation
of 164 -hotel rooms allocated to the KCN RS 1. The proposed hotel is compatible
with surrounding land uses that include professional office buildings, hotel,
retail /service and the nearby John Wayne Airport. Therefore, the proposed
project will not conflict with any applicable land use plan, policy, or regulation.
C) Conflict with any applicable habitat conservation plan or natural
community conservation plan? (No Impact)
See response to IX (a)(b) above. Also, the project is not subject to any applicable
habitat conservation plan or natural community conservation plan.
X. Mineral Resources
a) Result in the loss of availability of a known mineral resource that
would be of value to the region and the residents of the state? (No
Impact)
The area surrounding the project is fully developed. The project consists of a
proposed hotel which will replace an existing 22,000 square foot, one -story
building. The use of natural resources will not be significantly affected by this
project. No significant increase in the use of energy or natural resources is
anticipated.
b) Result in the loss of availability of a locally- important mineral
resource recovery site delineated on a local general plan, specific plan,
. or other land use plan? (No Impact)
CHECKLIST EXPLANATIONS �n I
Page 16
See response to Section X (a) above. The proposed project will not result in any •
significant impacts to a locally- important mineral resource.
C) Displace substantial numbers of people, necessitating the construction
of replacement housing elsewhere? (No Impact)
See response to Section X(a) above. The project area is developed with professional
office buildings, hotel, and retail /service uses. The site is not zoned for residential
uses. The project will not displace people, necessitating the construction of
replacement housing.
XI. Noise
a) Exposure of persons to or generation of noise levels in excess of
standards established in the local general plan or noise ordinance, or
applicable standards of other agencies? (Less Than Significant
Impact)
The area surrounding the project site is fully developed. The project consists of a
proposed hotel which will replace an existing 22,000 square foot, one -story
building. Future on -site noise impacts will not significantly differ from those
which now exist. RKJK & Associates, Inc have prepared a traffic study
evaluating the proposed project. The existing building (Plaza de Cafes food
court) generates approximately 1,434 trip -ends per day. The proposed hotel
would generate 898 trip -ends per day. Therefore, noise levels associated with
project related traffic are anticipated to be less than that associated with the
existing building. The project will result in short-term construction related noise
impacts, however, with the incorporation of City standard conditions of approval
and/or mitigation measures, these short-term noise impacts will be less than
significant. A mitigation measures is presented in Section XI (d) below for
potential construction noise impacts.
b) Exposure of persons to or generation of excessive groundborne
vibration or groundborne noise levels? (Less Than Significant
Impact)
Surrounding businesses in the immediate vicinity (e.g. adjacent office building,
Carl's Jr fast -food restaurant) may experience some groundborne vibration and
noise associated with the demolition of the existing building and construction
activities for the proposed hotel. A mitigation measure is presented in Section XI
(d) below which will reduce construction related temporary impacts to a level of
less than significant. •
CHECKLIST EXPLANATIONS
Page 17
0
c) A substantial permanent increase in ambient noise levels in the
project vicinity above levels existing without the project? (No Impact)
See response to XI (a) above. The traffic study prepared by RKJK & Associates
concluded that the proposed hotel project will generate fewer daily vehicle trips
than the existing Plaza de Cafes International Food Court. Future on -site noise
impacts will not significantly differ from those, which now exist. Therefore, the
project will not result in a substantial permanent increase in ambient noise levels
in the project vicinity as a result of the hotel project.
d) A substantial temporary or periodic increase in ambient noise levels
in the project vicinity above levels existing without the project? (Less
Than Significant Impact)
Construction noise represents a short-term impact on ambient noise levels. Noise
generated by construction equipment, including trucks, graders, bulldozers,
concrete mixers and portable generators can reach high noise levels. However,
intervening structures (e.g., adjacent multi -level parking structure) will act as
noise barriers to reduce levels. Noise levels will be further mitigated by limiting
the hours of construction through provisions contained in the City Noise Control
Regulations (NBMC Chapter 10.28).
Mitigation Measure No. 5 The project will comply with the provisions of the
City of Newport Beach General Plan Noise Element and the Municipal Code
pertaining to noise restrictions. During construction activities, the hours of
construction and excavation work are allowed front 7:00 a.m. to 6:30 p.m. oil
weekdays, 8:00 a.m. to 6:00 p.m. on Saturdays, and not at any time on Sundays
and holidays.
e) For a project located within an airport land use plan or, where such a
plan has not been adopted, within two miles of a public airport or
public use airport, would the project expose people residing or
working in the project area to excessive noise levels? (Less Than
Significant Impact)
The project site is located within a half mile of the John Wayne Airport.
However, the proposed hotel project is consistent with the land use designation
for the site and surrounding area. The project will be required to comply with
Uniform Building Code regulations and the City's design requirements and noise
control measures. Mitigation measures are presented in Section XI (d) above.
Therefore, it is anticipated that any potential noise impacts will be reduced to less
than significant.
Vol
CHECKLIST EXPLANATIONS
Page 18
f) For a project within the vicinity of a private airstrip, would the
project expose people residing or working in the project area to
excessive noise levels? (No Impact)
The project site is not located within the vicinity of a private airstrip. Therefore,
there are no project impacts associated with a private airstrip.
XII. Population and Housing
a) Induce substantial population growth in an area, either directly (for
example, by proposing new homes and businesses) or indirectly (for
example, through extension of roads or other infrastructure)? (No
Impact)
The proposed project consists of replacing an existing 22,000 square foot building
(food - court) with a 164 -room, four -story hotel. The hotel use is projected to have
3 to 5 full time employees and 5 to 10 part time employees. However, no direct
population increase would result from the project or the employees.
While the proposed project will include employees, which could generate a
potential demand for housing, this increase is not considered significant due to the
minimal employment needs of the hotel. Therefore, the project will not result in
any impacts associated with substantial population growth.
b) Displace substantial numbers of existing housing, necessitating the
construction of replacement housing elsewhere? (No Impact)
The project area is developed with professional office buildings, hotel, and
retail /service uses. The site or immediate project area is not zoned for residential
uses. The project will not displace any existing housing.
C) Displace substantial numbers of people, necessitating the construction
of replace housing elsewhere? (No Impact)
The project area is developed with professional office buildings, hotel, and
retail/service uses. The site is not zoned for residential uses. The project will not
displace people, necessitating the construction of replacement housing.
XIII. Public Services
a) Would the project result in substantial adverse physical impacts
associated with the provision of new or physically altered government
facilities, need for new or physically altered government facilities, the
CHECKLIST EXPLANATIONS
Page 19
construction of which could cause significant environmental impacts, in
order to maintain acceptable service ratios, response times or other
performance objectives for any of the public services:
Utilities and service systems are already servicing the existing office building at
4881 Birch Street. A survey was conducted to assess any possible changes on
demand for existing community services and public utility providers currently
serving the site. Each appropriate agency was given a project description
(overview), regional location map, vicinity map, a preliminary plot plan of the
proposed addition, and a Service Availability /Capacity Information Request
questionnaire designed to determine any possible impacts on services. The survey
and responses from these service providers are on file with the City of Newport
Beach, Planning Department. The agencies contacted and which provide services
to the site are:
Fire Protection
City of Newport Beach Fire & Marine Department
Law Enforcement
City of Newport Beach Police Department
Natural Gas
The Gas Company
Electricity
Southern California Edison Company
Telecommunications
Pacific Bell
Water/Wastewater
City of Newport Beach Utilities Department
Irvine Ranch Water District
Solid Waste
Waste Management of Orange County
Transit System
Orange County Transportation Authority
Fire protection? (Less Than Significant Impact)
The City of Newport Beach Fire and Marine Department are currently providing
fire protection and emergency response services for the existing building at 4881
Birch Street. The City of Newport Beach Fire and Marine Department will
continue to provide fire protection and emergency response services to the site if
developed with the proposed hotel. The closest emergency response facility to the
site is Station #3 located on Santa Barbara Drive. Five other facilities are also
available for emergency response service. Response times to the site are
dependent on various factors. Emergency calls receive the quickest response
times with alarm calls and non - emergency calls having longer response times
respectively. The availability of personnel and extenuating circumstances may
further affect response times.
The proposed hotel may potentially increase the number of calls for service to the
location; however, it is anticipated that the project will not require any new
facilities or staff. Current emergency equipment and facilities at the project site
must be evaluated to ensure that the current facilities are adequate and serviceable
for the hotel. Items that need to be evaluated include, but are not limited to, the
CHECKLIST EXPLANATIONS
Page 20
v
following: firefighter communication equipment, fire pump, and on site water
supply.
All fire protection must be designed as an integral part of the construction process
with all improvements and/or modernization of equipment systems or devices
identified and agreed upon by the City of Newport Beach Fire and Marine
Department prior to any construction approval.
Police protection? (Less Than Significant Impact)
The City of Newport Beach Police Department is currently providing Law
enforcement services to the site. The City of Newport Beach Police Department
will continue to provide law enforcement services to the site once the construction
is complete. The City's police facility is located at 870 Santa Barbara Drive.
Response times to the site are dependent on various factors. Emergency calls
receive the quickest response times with alarm calls and non - emergency calls
having longer response times respectively. The availability of personnel and
extenuating circumstances may further affect response times. It is anticipated that
the hotel project may increase the number of calls for service to the location;
however, no new facilities or staff will be required.
Schools? (No Impact) 0
The proposed project consists of a proposed 164 -room hotel project. The hotel will
require minimal staffing of employees (3 to 5 full time employees and 5 to 10 part-
time). Although, there is the potential that employees who are not currently residing
in the City will move closer to their place of employment, this increase in
population is considered minimal and insignificant. Therefore, it is not anticipated
that there will be any significant impacts to schools in relation to the proposed hotel
project.
Other public facilities? (No Impact)
The project site is developed and has been since 1980. Surrounding properties are
also developed. There are sufficient public or governmental services that serve
the area and the project would not create significant additional demand for these
services.
XIV. Recreation
a) Would the project increase the use of existing neighborhood and
regional parks or other recreational facilities such that substantial
physical deterioration of the facility would occur or be accelerated? (No
Impact)
CHECKLIST EXPLANATIONS
Page 21
The proposed 164 -room Extended StayAmerica Hotel is designed for business
travelers in need of lodging for a week or more. It is not anticipated that the
proposed hotel use will generate a significant increase in the use of existing
recreational facilities since the hotel is primarily for business travelers who will be
visiting the area for a short period of time.
b) Does the project include recreational facilities or require the
construction of or expansion of recreational facilities which might have
an adverse physical effect on the environment? Opportunities? (No
Impact)
The proposed hotel is designed for business travelers who will be visiting for a
short period of time. Therefore, the hotel will not include ancillary uses such as a
recreation facility (pool, athletic gym etc.). Due to nature of the project, a hotel
for business travelers, the demand for additional neighborhood or regional parks
is not anticipated. Therefore, the proposed project will not result in any impacts
associated with the construction of or expansion of recreational facilities.
XV. Transportation/Traffic
a) Cause an increase in traffic which is substantial in relation to the
existing traffic load and capacity of the street system (i.e., result. in a
substantial increase in either the number of vehicle trips, the volume
to capacity ratio on roads, or congestion at intersections)? (No
Impact)
A traffic analysis has been prepared for the proposed project by RKJK &
Associates, Inc. The traffic report includes an analysis of existing traffic conditions
and future conditions with and without development of the proposed hotel.
Site access will remain the same as that which currently exists. Access to the site
is provided off of Birch Street and Von Karman Avenue. The existing site has
two access points (driveways) one from Birch Street and one from Von Karman
Avenue. Also, there is an existing pedestrian sidewalk area provided adjacent to
the frontage of the site. The proposed hotel will provide approximately 173
surface parking stalls.
The traffic study evaluated the projected trip generation for the proposed hotel and
compared the generation to the existing food -court building (Plaza de Cafes). The
traffic study also conducted and evaluated traffic counts and trip generation rates
for three existing Extended StayAmerica Hotels located in Southern California
(Long Beach, Ontario, and Torrance), The traffic study concluded that the
proposed hotel will generate significantly fewer vehicle trips than the existing
facility (Plaza de Cafes). The existing facility generates approximately 1,434 trip -
ends per day with 102 vehicles during the AM peak hour and 120 vehicles per
7J
CHECKLIST EXPLANATIONS
Page 22
hour during the PM peak hour. The proposed hotel will generate approximately
898 trip -ends per day with 61 vehicles per hour during the AM peak hour and 69
vehicles per hour during the PM peak hour. The trip -ends generated by the
proposed hotel are less than that of a typical hotel because there are not ancillary
functions such as conference rooms, ballroom facilities, and restaurant.
The traffic study concluded that the project will not result in any significant
impacts to transportation/traffic and that the project will generate fewer vehicle
trip -ends than that generated by the existing building (Plaza de Cafes food court).
The project will have short-term impacts associated with construction activities.
The site is currently developed with a 22,000 square foot building. The existing
building will be demolished so that the new hotel can be accommodated on the
site. Building debris and site demolition materials will be transported off -site. A
mitigation measure is recommended that requiring a traffic control plan for the
exportation of the site debris and project construction activities. The area
surrounding the project site is fully developed with office, hotel and support retail
uses. Therefore, a traffic control plan is recommended to ensure implementation
of proper construction related signage, construction traffic flagmen, and truck
hauling operations to reduce potential short-term traffic impacts.
Mitigation Measure No. 6 Prior to the start of construction activities (e.g.
demolition of existing building), a construction traffic control plait shall be
prepared which includes the haul route, truck hauling operations, construction
trqffic flagmen, and construction wanting /directional signage.
b) Exceed either individually or cumulatively, a level of service standard
established by the county congestion management agency for
designated roads or highways? (No Impact)
See response to Section XV (a) above.
C) Result in a change in air traffic patterns, including either an increase
in traffic levels or a change in location that results in substantial
safety risks? (No Impact)
See response to Section XV (a) above.
d) Substantially increase hazards due to a design feature (e.g. sharp
curves or dangerous intersections) or incompatible uses (e.g., farm
equipment)? (No Impact)
See response to Section XV (a) above. Also, the project does not propose any •
design features relative to curves, intersections, or incompatible uses.
94
CHECKLIST EXPLANATIONS
Page 23 .l
e) Result in inadequate emergency access? (No Impact)
See response to Section XV (a) above. Also, the existing driveway on Birch
Street and the existing driveway on Von Kalman Avenue will provide access to
the site. Also, the parking lot will surround the entire hotel building and
therefore, will provide additional emergency access to the site.
f) Result in adequate parking capacity? (No Impact)
The proposed hotel will provide approximately 173 surface parking stalls for the
164 -room hotel. The parking will be adequate to serve the hotel operations.
g) Conflict with adopted policies, plans, or programs supporting
alternative transportation (e.g., bus turnouts, bicycle racks)? (No
Impact)
The Orange County Transportation Authority (OCTA) provides public
transportation services to and around the site. The OCTA currently provides
local bus service in the vicinity of the project site along MacArthur Boulevard and
Birch Street. The OCTA bus route 61 operates along MacArthur Boulevard.
Service consists of 30 one -way trips daily. Bus routes 71 and 76 operate along
Birch Street. These routes operate 57 one -way daily trips. OCTA's long range
plan calls for a 49% expansion of bus service (in Orange County) by year 2015.
The project is not expected to negatively impact any current facility, service or
service expansion plans for the project area and/or site. Therefore, the proposed
hotel will not conflict with adopted policies, plans, or programs supporting
altemative transportation.
XVI. Utilities and Service Systems
a) Exceed wastewater treatment requirements of the applicable Regional
Water Quality Control Board? (Less Than Significant Impact)
The proposed 164 -room hotel facility will replace an existing 22,000 square foot
building. It is not anticipated that the project will exceed wastewater treatment
requirements. Additionally, a mitigation measure to further reduce potential
impacts to water quality has been presented in Section VIII(a) requiring
compliance with the NPDES requirements.
b) Require or result in the construction of new water or wastewater
treatment facilities or expansion of existing facilities, the construction
of which could cause significant environmental effects? (Less Than
Significant Impact)
CHECKLIST EXPLANATIONS
Page 24 �i
The City of Newport Beach Utilities Department currently provides wastewater
services to the site. It is anticipated that there is adequate capacity to serve the
proposed office building. The Irvine Ranch Water District (IRWD) provides
water service to the site. The points of connection for all applicable water and
sewer lines will need to be identified and agreed to by the City of Newport Beach
Utilities Department prior to any construction approval. The IRWD has indicated
(letter dated October 25, 1999) that there is sufficient capacity to serve the
proposed project. The IRWD also serves recycled (reclaimed) water and has a
dual distribution system installed in Von Karman Avenue. Recycled water is used
for non - potable uses such as landscape. Also, buildings that are dual plumbed can
provide recycled water for use in toilets and urinals. The IRWD encourages that
the developer consider this option as part of the design of the hotel.
The project will not result in the significant alteration or expansion of existing
utility and service systems since the site is already developed and being served by
the utility providers. However, to ensure that there are no adverse impacts
associated with the proposed hotel, a mitigation measure is presented which
requires coordination with utility and service organizations prior to the
commencement of construction.
Mitigation Measure No. 7 Prior to the commencement of construction
activities, the project applicant shall coordinate with utility and service
organizations regarding any construction activities to ensure existing facilities
are protected and any necessary expansion or relocation of facilities are planned
and scheduled in consultation with the appropriate public agencies.
C) Require or result in the construction of new storm water drainage
facilities or expansion of existing facilities, the construction of which
could cause significant environmental effects? (Less Than Significant
Impact)
See response to Section XVI (b) above.
d) Have sufficient water supplies available to serve the project from
existing entitlements and resources, or are new or expanded
entitlements needed? (Less Than Significant Impact)
See response to Section XVI (b) above.
Ll
e) Result in a determination by the wastewater treatment provider,
which serves or may serve the project that it has adequate capacity to
serve the project's projected demand in addition to the provider's
existing commitments? (Less Than Significant Impact)
CHECKLIST EXPLANATIONS
Page 25 ri
0 See response to Section XVI (b) above.
f) Be served by a landfill with sufficient permitted capacity to
accommodate the project's solid waste disposal needs? (No Impact)
See response to Section XVI (c) above. The site is currently being provided solid
waste services by Waste Management of Orange County. Waste Management of
Orange County will continue to provide solid waste disposal services to the
proposed hotel building once the project is complete. Further, there are no
expected negative impacts from the hotel, and no new facilities or staff are
anticipated.
g) Comply with federal, state, and local statutes and regulation related to
solid waste? (No Impact)
See response to Section XVI (b) above.
CHECKLIST EXPLANATIONS
Page 26
11
XVII. Mandatory Findings of Significance
A) Does the project have the potential to degrade the quality of the environment,
substantially reduce the habitat of a fish or wildlife species, cause a fish or
wildlife species, cause a fish or wildlife population to drop below self - sustaining
levels, threaten to eliminate a plant or animal community, reduce the number
or restrict the range of a rare or endangered plant or animal or eliminate
important examples of the major periods of California history or prehistory?
On the basis of the foregoing analysis, the proposed project does not have the
potential to significantly degrade the quality of the environment. The project site is
located in a developed urbanized area of the City. The site and adjacent properties
do not contain any significant environmental resources, including plants or wildlife.
B) Does the project has the potential to achieve short -term environmental goals to
the disadvantage of long -term environmental goals?
0
There are no long -term environmental goals that would be compromised by the
project. Additionally, the environmental analysis of the proposed project concluded
that the project would not result in any significantly greater impacts than that of the
existing site development. The project does not have the potential to achieve short-
term goals to the disadvantage of long -term goals. .
C) Does the project have possible environmental effects which are individually
limited, but cumulatively considerable?
No cumulative impacts are anticipated in connection with this or other projects. The
project is consistent with the type of land uses developed in the area. The project
will not result in environmental effects which are cumulatively considerable based
on evaluation of projected growth and planned projects for the project area known
as of the date of this analysis.
D) Does the project have environmental effects which will cause substantial
adverse effects on human beings, either directly or indirectly?
That there are no known substantial adverse effects on human beings that would be
caused by the proposed project. The proposed hotel project is consistent with the
land uses in the project area and the environmental evaluation has concluded that no
adverse significant environmental impacts will result from the project.
r� 1}
CHECKLIST EXPLANATIONS
Page 27 r
Appendix A
Project Plans
0
11
`i
CHECKLIST EXPLANATIONS
Page 28
!'! I �iE�c jli '• as - _ �� 't
jj ii pQ� i q �O x
U-0 zv gl! ° Aldi6fi
o �6
Z wY�V gyp
m
L U
1 N o
110 C)
N Q N W
I— 0 o cn Y o (�
�V WMOCN U u�
H �,� �, w ea, M m
N = ro x O .0 X
_ 00
2 V > °LL �0LL oC
U Q cc U �V M w W •
w Q Zu co co
®�►-- "'NroCN 00 L7�'o z0
00 0 � CN �° V y Q) c� Z
W W c m ui N
d C C W
® z a o a
w °'
z Z X
LLJ w
LU
...
�)D
C1
la Pit all §{ ye`Q ° E i F
aS7e:k1y PF (� fFin Qi1SSSIe9:.�ua Al 41S . t 8 It's i
-'q� 8 41 ta.IS fYi' ', r @ 6 °@ 'C Y .SPI1 P S I..f11.11 °:iFIP R4: a
a :6' o,�YVf1t @ ;1 11Q €`tF 3E1'9(•4'1 {Qe Q °� 1'' 1 113 IQile4.:1:..::Y ii! tIQQi • I
Evt: QIQ: $' 1 1 + Ei @QQ r 1 ,, p u. ! a `Q A @sl u.......... d i.......... i
-pb 4� ;.Y•`y' .,s. sa,FnQ',(ES °1.16! ab4A1 r!IQ i �Sitaa '
'ePQe.'f Ir a 4n a v, F m'1 .PrAQ1s 1 + P
91 1 {d IFF Qnl i 1 11
E
QI F 11� tivtjalQr 4 En 'q Sn e1e .@ 1 .. i:9�� Qr4 71pgp a {14
€n § @'Q 4 {3'Q QeQIF��'i3p9Y ° @ @° lit.
' E ? faaFiQ4liini lia4ioli@::i�liu�
d 1 q Pr.1e4•ii C'.ISp`s1�.Yk1Yi,.la..a p:aPB 3..�E1 14g °d
16QaE�
1 -dr r 1 5 1 S 6
Q�EAr€ a @� @.;¢e9aQt1 e'pi9i5@ 9e .@ p� 14 t IE ill
i av 9 x�A II 'b 1 3 .! 3.11 it y .9 1 r5y 1 s. 4 rl I i Bd 1, 1•iM1•� a QaP411 @PQfN„ +
sa is it A'1It['91 6'�$�IrteSl? >I { °f, IFP•S�� ��e�Cep9t41.�1p•e' ;P 1 � !�� + rsq�Q � i.� 7JiQN1i4iQiii @nP iPJ4�9SSuQ
AS 5 B1Q 1 °,.fig :1�.lrzlilFe
it
so
`9AeS 1 3145@e'9S1 ie1 q S p11]
rS f93 ��l¢I�Q:wa� i6QS9isQ. Svitlze 3i�g9Et €Ia��QY ?g�ige`3A!rl!?I�Q e?I�.� a Q�Si_
pp �t pp 9 tt
1 R Ar/ F1F 5� P •9 p @' 13 �If €q + R 1 E i S i \ .� —'. 55 Y
gk3di' §i:4v€ F� i QB �: 3' �0 gl f �r d I�� g�dpl
q SS €€
list M. Ap ' €tl Etl Ig 6: a�� 865 ; I �e �1 1'aa!
FI 4: M VI Is A +E � i ei �1 it e � 1$a : y' ° it @ q- it
3' '
�ra�E�t, tlgaRe�s 91 {I, g� itl a� �!� s�g9 Asa
��diEgQZ
I 41 155 i r 'S � E
It �° @a11�b 96a1.�.ilt H Q 1 �•E
1YP.
�i� yK�
I '' 1 1 I 1• I
E l
a
;1•5a all +l r a tl
Cali. 6ebfs a
sq y P 1l
If
I If
It fr,
Ing
� —ems
YI p 1�
u
s� Q
K'
E'
aaeae xn.".
1 l l
.�..
s
ho
r
1
Mme.,,,....
—
' #lei {.
aaeae xn.".
1 l l
j.jl :,6al;eenl0. a
wF U
i`!ltolMiigiU $ a9
�jrlta,;lpitjiitjp!! tq! ,4091
�litt,ifaP1 =fa,iana<i,jij :Yltl
''
� m:
...wnJAelL..x....x.enaq.dlk
z
jt�0:i 6jaE�'at !ota�+! a'�Cl
`
ijt ,i•.tS$,:aii,l9sajugla!lt:::a
F� !!
a'1 T
Q ?. 6alrj!
!!n
ri9 F 5 V
±B
I
it- io
i 17� I
i,l i I
I I
I
0
a
. aaaa.ae.z I,.
a p�ISla
B
R€
t. ��AlS4
II � r:p
aCtj`��tte E
a
a'1 T
Q ?. 6alrj!
tF
lE.t:ttai9
a. �''�•
�
-X
l���i
iJj7��
F 4
4q•
it
IRE t
�
9
99
yy
ItI
ggi;9 gag�i!!
�31pgZt
-
qjl P:P
4
p(
n
I? 7..
�
�
_
��, '•
{t
F! a • "•�� � fi3l��y �
t�.�
! _
gyy
Fd 9'iE� R
�- A
I I�
l�F�r
I
, q
I'I
±B
I
it- io
i 17� I
i,l i I
I I
I
0
a
. aaaa.ae.z I,.
•
0
e
li�t$IVe�1
P000m
9 ae aeeeep �ee� 1+ g l.l!!
a�i 7i 9
9�83r1¢3li i4�4 {p 4:;:;4a
a l 9
a9' �a478! � apti� al4 � @a
6�
i
4�
7
I; I
w.
I
I=
lY I1=
�O
I
I I iI I
I I
I II �
1
I I
i
I
I 1
I I
I I
I u
J_1
133tl1S HDtll9 � I �
I �
E
Q
U
cz
wa
Qo
LL
<u
U-) U
W
LU m
Q O
�-a
W Z
ax
1 63
of
M -W-
L
It
'T
1:1
e
f
jl
(
71
le
z
w
z�
7
Y
O
I
3
d
r
z
�µ
QAM
of
M -W-
L
It
'T
1:1
e
f
jl
(
71
le
z
w
z�
7
Y
O
I
3
d
r
z
�µ
L
It
'T
1:1
e
f
jl
(
71
le
z
w
z�
7
Y
O
I
3
d
r
z
�µ
F- IL
0
0
ID
oij
Q.
O
IY
Z
0
O
CK
n.
Q.
6 6 6 6 6
ib
J.
9
J
v
J
O
p.
p
p
O
O
[ m
(oo�S ?I;i,tfAM
�o a
Q �N: d
�"��
p'. -'} �..1 ,� � {'„ L Off•
�j
I i
-
-I
- -r
-T
__
- .Z.�z
EB
B
€
M
1
�p
F
-cd-
1 -
€®
J
®€B
€B
€B
€B
j
I I
I I I I I
I I
1 I I
I I I I
�j
� tili i t i i u n ht a t+! t!?t i;i
! P
} f h ! d ilts
t Sa it i I hit !slit kiln
0
I S
t�
r
z
E v1
� tili i t i i u n ht a t+! t!?t i;i
! P
} f h ! d ilts
t Sa it i I hit !slit kiln
0
I S
MITIGATION MONITORING AND REPORTING PROGRAM
City of Newport Beach
Extended StayAmerica Hotel
I. OVERVIEW
This mitigation monitoring program was prepared in compliance with Public Resources Code
Section 21081.6 (AB 3180 of 1988). It describes the requirements and procedures to be
followed by the applicant and the City to ensure that all mitigation measures adopted as part of
this project will be carried out. Attachment 1 summarizes the mitigation measures,
implementing actions, and verification procedures for this project.
H. MITIGATION MONITORING PROCEDURES
Mitigation measures can be implemented in three ways: (1) through project design, which is
verified by plan check and inspection; (2) through compliance with various codes, ordinances,
policies, standards, and conditions of approval which are satisfied prior to or during construction
and verified by plan check and /or inspection; and (3) through monitoring and reporting after
construction is completed. Compliance monitoring procedures for these three types of mitigation
measures are summarized below.
• A. Mitigation measures implemented through project design:
Upon project approval, a copy of the approved project design will be placed in the official
project file. As part of the review process for all subsequent discretionary or ministerial permits,
the file will be checked to verify that the requested permit is in conformance with the approved
project design. Field inspections will verify that construction conforms to approved plans.
B. Mitigation measures implemented through compliance with codes, ordinances, policies,
standards, or conditions of approval:
Upon project approval, a copy of the approved project description and conditions of approval
will be placed in the official project file. As part of the review process for all subsequent
discretionary or ministerial permits, the file will be checked to verify that the requested permit is
in compliance with all applicable codes, ordinances, policies, standards and conditions of
approval. Field inspections will verify that construction conforms to applicable standards and
conditions.
C. Mitigation measures implemented through post- construction monitoring:
If any mitigation measures require verification and reporting after construction is completed, the
City will maintain a log of these mitigation monitoring and reporting requirements, and will
review completed monitoring reports. Upon submittal, the City will approve the report, request
additional information, or pursue enforcement remedies in the event of noncompliance. Final
monitoring reports will be placed in the official file.
'.O
j\
a�
2)
§f
z?
?]
§�
I*
1]
�
gA
/
(�
>
�
(
[
ZZ
a�
@$
3
/ }
/
CL.
±
±
3
%
r
(\
{ k
�/
-
k}@
)b
±
±\
±(
2
r;
-
�
\(
\(
\(
»:2k«a§
$
3
|43
In
�
(�
§w
eo§
\§
\ &4
\
\)�\(
/j
\K
,
:Z--
�\
[
\
\�)
\/\
�2$&
'>�%»§
\«
% \\
»u»
( ƒ
/ \
\af£;
` « -�
:
t%
to
«
:tea
r�¥
~24
44�
% 2:§
3 ~E
�-
\\
/»�g
asyt�;
]�
d \]
I*
1]
�
gA
/
0
0
•�
u
u R
O
C
v
c
0
0
0
0
'-
.�
C
y
y
D y
o y
c c
0
0
v
v
e
e
zz v
a v
4
C
0
o
C
O
o
cc
E
U Q
U o
U n
U a
s s
s
to
g o
pQ U s
U
y
b
•Zy
` .sue
to
CU
O
t3
O y
Z
'o
o
st
•°�°
o s
3
qj o
o
.o
Q
y
o
o
t3
cs
4
o m
°
o
U
Q
Z2
4
o
.Lj
e
.st
O
st
y
d
p •"
sU.
��
4
O U s
V
l
w;
O
O s
n"
cc s
n
o�
oa
-
.
o
U o
st
u t3
am+
n
s R
o C
°
U
Q
t3
to
-r
O
U s
O
Co
N
i�
t3
N
N +�'.
Y
CO
O
N
•�
o
st
t3
3
zt
t3
t3
ti
qj
° A
4
o
' °
:t
s cs Z
s y
o K
•� o
o
CEO
'� s
m
r
4
o
0 4
cs
z
a
b
h
C1
EXTENDED STAY AMERICA (ESA)
TRIP GENERATION STUDY
Newport Beach, California
KiK--
0
0
y
Mr. Mike Gallen
EXTENDED STAY AMERICA, INC.
2525 Cherry Avenue, #310
Signal Hill, CA 90806 -2037
Subject: Extended Stay America (ESA) Trip Generation Analysis, Newport
Beach
Dear Mr. Gallen:
The firm of RKJK & ASSOCIATES, INC. (RKJK) is pleased to submit this trip generation
study for your proposed Extended Stay America (ESA) Business Hotel to be located in
the City of Newport Beach. The project is located at the northwest corner of Von
Karman and Birch Street in the City of Newport Beach. The project would consist of a
160 unit Extended Stay America Business Hotel, which would replace the existing
. 22,000 square foot Plaza de Cafe high turnover restaurant.
The location of the project is shown in the attached Exhibit A. The site plan for the
proposed project is shown in Exhibit B. RKJK has prepared a trip generation analysis
for various Extended Stay Americas in Southern California. The Extended Stay
America (ESA) Business Hotel Trip Generation Study prepared by RKJK &
ASSOCIATES, INC. dated April 9, 1998 is included in Appendix "A ". This study
documents the traffic counts and trip generation rates for three Extended Stay America
facilities located in Southern California. These facilities generate fewer trips than typical
business hotels for a variety of reasons.
The purpose of this study is to document the expected trip generation for the proposed
Newport Beach Extended Stay America (ESA) Business Hotel and compare the trip
generation to the existing high turnover restaurant (Plaza de Cafe). Based upon the
study, the proposed project would generate significantly fewer trips than the existing
facility.
FINDINGS
1. The existing facility (Plaza de Cafe) consists of a mixture of various types of
restaurants. The primary trips occur during the morning and noon hours and a
substantial amount of business is "walk -in" traffic. Based upon discussions with the
City of Newport Beach traffic engineering staff, it was decided to utilize the ITE Trip
Code 832 (high turnover sit -down restaurant) for purposes of estimating the trip
generation for the existing facility. As a result of the large number of "walk-in" trips,
TRANSPORTATION PL. >"ING • US • TRAFFIC /ACOUSTICAL ENGINEERING
1601 Dove street. Suite 290 • 'Newport Beach, CA 92000 • Phone: 19491 474-0809 • Fax: t949i 474 -090'
X�
Mr. Mike Gallen
EXTENDED STAY AMERICA, INC.
August 26, 1999
Page 2
the overall trip generation is reduced by a factor of 50% in order to account for the
large number of visitors who walk to the site. The existing facility generates
approximately 1,434 trip -ends per day.
2. RKJK has conducted a review of trip generation for Extended Stay America (ESA)
Business Hotels. The report included in Appendix "A" documents the traffic counts
and calculated trip generation rates for Extended Stay America (ESA) facilities in
Long Beach, Ontario and Torrance. The Long Beach facility generated significantly
fewer trips than Ontario and Torrance facilities. Therefore, as per discussions with
the City of Newport Beach staff, the average of the Ontario and Torrance facilities
has been utilized for this trip generation study.
3. The proposed Extended Stay America (ESA) Business Hotel would generate 898
trip -ends per day with 61 vehicles per hour during the AM peak hour and 69 vehicles
per hour during the PM peak hour.
4. Trip generation from the ITE Trip Code 312 (Business Hotel) has also been
calculated. Based upon this use, 1,163 trip -ends per day with 92 vehicles per hour
during the AM peak hour and 99 vehicles per hour during the PM peak hour would
be generated. However, it should be noted that the people who utilize Extended
Stay America (ESA) Business Hotels typically make fewer trips than a normal
business hotel because there are no ancillary functions (i.e. conference rooms, etc.).
Therefore, fewer outside and visitor trips are made for this use. For this trip
generation study, it is appropriate to use the actual trip generation studies for
Extended Stay America (ESA) to compare the potential trip generation for the
proposed use to the existing facility.
5. The proposed project would generate fewer daily and peak hour trips than the
existing high turnover restaurant.
TRIP GENERATION ANALYSIS
RKJK has completed a trip generation analysis for the proposed Extended Stay
America Business Hotel. A survey of several other existing Extended Stay Americas
(ESA) has been completed in the attached report titled Extended Stay America (ESA)
Business Hotel Trip Generation Study dated April 9, 1998 included in Appendix "A ". A
summary of the trip generation rates during the AM /PM peak hour and daily traffic is
included in Table 1. It should be noted that the trip generation for the Long Beach site
was significantly less than the Ontario and Torrance sites. Therefore, the Ontario and
Torrance sites have been utilized for purposes of calculating appropriate trip generation
rates for Extended Stay America's Newport Beach facility. Table 1 also includes the
•
average trip generation rates for just the Ontario and Torrance facilities. •
\'/
Mr. Mike Gallen
EXTENDED STAY AMERICA, INC.
August 26, 1999
. Page 3
Trip generation rates for typical business hotel (ITE Trip Code 312) and high turnover
restaurant (ITE Trip Code 832) are included in Table 2. As previously noted, the
Extended Stay America facility would generate fewer trips than a typical business hotel
since they do not offer any conference or other facilities that would draw additional
traffic. Therefore, the trip generation rates from the previous Extended Stay America
(ESA) studies are more appropriate for calculating the projected trips for the Newport
Beach facility.
The trip generation for the proposed Extended Stay America is based upon the
measured trip rates and the ITE trip rates are included in Table 3. Also included in
Table 3 is an estimate of the trip generation for the high turnover restaurant (Plaza de
Cafe), including a reduction in trips to account for the extensive amount of walk -in traffic
which currently occurs. As shown in Table 3, the proposed Extended Stay America
would generate 898 trip -ends per day, with 61 vehicles per hour during the AM peak
hour and 69 vehicles per hour during the PM peak hour. The net trip generation for the
high turnover restaurant would be 1,434 trip -ends per day with 102 vehicles during the
AM peak hour and 120 vehicles per hour during the PM peak hour. The current
operation of the Plaza de Cafe does not generate a significant amount of PM peak hour
trips. However, based upon its designated use, it could generate the number of trips
shown in Table 3.
A comparison of the projected Extended Stay America (ESA) trip generation for the
existing high turnover restaurant (Plaza de Caf6) with the reduction to account for a
"walk -in" traffic is included in Table 4. As shown in Table 4, the proposed project would
generate 536 fewer daily trips with 39 less vehicles per hour during the AM peak hour
and 51 vehicles per hour less during the PM peak hour.
CONCLUSIONS
RKJK has completed a trip generation study for the proposed Newport Beach Extended
Stay America Business Hotel. The proposed project would include 160 rooms and
would replace an existing 22,000 square foot high turnover restaurant (Plaza de Cafd).
The proposed project would generate fewer trips than the existing high turnover
restaurant use currently on this site.
n�
Mr. Mike Gallen
EXTENDED STAY AMERICA, INC.
August 26, 1999
Page 4 .
RKJK appreciates this opportunity to work with EXTENDED STAY AMERICA, INC. on
this project. If you have any questions regarding this, please call me at (949) 474 -0809.
Sincerely,
RKJKI& ASSOCIATES, INC. oQPOFE�
y Q`
Robert Kahn, P.E. ¢ '0 0"
Principal EXP 17131h31
RK:nam /10117 TRAFk�G \P
JN:0778 -99 -01 OFM
0
rI
L
0
0
EXHIBIT A
LOCATION MAP
I
.0k
X"
EXHIBIT B
SITE PLAN
0
1/0
1♦
v
r
m
0
0
UIC-L-
�,
-.1
/1�1
94,
I
.0k
X"
EXHIBIT B
SITE PLAN
0
1/0
1♦
v
r
m
0
0
UIC-L-
�,
L1
TABLE 1
EXTENDED STAY AMERICA
AVERAGE TUESDAY THROUGH THURSDAY TRIP GENERATION RATES'
LONG BEACH, ONTARIO AND TORRANCE
SITE
UNITS
AM
PM
DAILY
IN
OUT
I IN
OUT
11-ong Beach
I RM
0.081
0.061
0.131
0.12
2.64
Ontario
I RMI
0.181
0.181
0.161
0.191
5.13
Torrance
I RMI
0.131
0.261
0.291
0.211
6.09
Average
1
1 0.131
0.17
—0.191
0.17
4.62
ONTARIO AND TORRANCE ONLY
SITE
UNITS
AM
PM
DAILY
IN I OUT
IN
I OUT 4
Ontario
RM
–0.181 0.181
0.161
0.19
5.13
Torrance
RMI
0.131 0.261
0.291
0.211
6.09
Avera a
1 0.161 0.221
0.231
0.20
5.61
' RM =Room
c:VcktableMkk10117tb
�i
JN:0778 -99 -01
TABLE 2
ITE TRIP GENERATION RATES
USE
UNITS'
AM
PM
DAILY
I IN
I OUT
I IN
OUT
Business Hotel
RM
0.341
0.241
0.371
0.25
7.27
High Turnover
Restaurant'
TSF
4.82
4.45
6.52
4.34
158.37
' RM =Room
TSF = Thousand Square Feet
2 ITE Trip Code 812
3 ITE Trip Code 832
c: \kktables \kk10117tb
JN:0778 -99.01
0
0
0
TABLE 3
TRIP GENERATION
' RMS = Rooms
TSF = thousand square feet
c: \kkW blesUck10117tb
JN:0778.99 -01
AM
I PM
USE
QUANTITY1
DAILY
IN
I OUT
I IN
I OUT
Extended Stay
160 RMS
26
35
37
32
898
America
ITE Business
160 RMS
54
38
59
40
1,163
Hotel
High Turnover
Restaurant
(Plaza de Cafe)
• Total Trips
22.0 TSF
106
98
143
95
2,867
• Net Trips (Less
22.0 TSF
53
49
72
48
1,434
"Walk -In" Traffic)
' RMS = Rooms
TSF = thousand square feet
c: \kkW blesUck10117tb
JN:0778.99 -01
TABLE 4
TRIP GENERATION COMPARISON
c:Utktab1es \kk10117tb
JN:0778 -99 -01
0
0
'b
AM
PM
USE
QUANTITY
IN
OUT
IN
OUT
DAILY
Extended Stay
160 Rooms
26
35
37
32
898
America
High Turnover
22.0 TSF
53
49
72
48
1.434
Restaurant
(Plaza de Cafe)
less "walk -in"
traffic
DIFFERENCE 1
-27
-14
-35
-16
-536
c:Utktab1es \kk10117tb
JN:0778 -99 -01
0
0
'b
0
APPENDIX A
EXTENDED STAY AMERICA (ESA)
BUSINESS HOTEL TRIP GENERATION STUDY
0
E
163
K
ROBERT KAHN • 10HN K9IN& ASSOCIATES INC.
April 9, 1998
Mr. Rick Bizar
EXTENDED STAY AMERICA, INC.
2525 Cherry Avenue, #310
Signal Hill, CA 90806 -2037
Subject: Extended Stay America (ESA) Business Hotel Trip Generation Study
Dear Mr. Bizar:
RKJK has completed an additional trip generation study for the Extended Stay America
(ESA) Business Hotels. In our February 16, 1998 report an analysis of the existing
Extended Stay America (ESA) Business Hotel located in the City of Long Beach (4101
Willow Street) was completed. The trip generation for that study was documented
in RKJK's February 16, 1998 report. There has been a request to expand the
database to include two additional hotels. As a result of that, RKJK has obtained 24-
hour traffic counts at two additional Extended Stay America (ESA) Business Hotels.
These hotels were located at Extended Stay #911 (3990 E. Inland Empire Boulevard)
in the City of Ontario, and Extended Stay #356 (3525 Torrance Boulevard) in the City
of Torrance.
Twenty -four hour traffic counts were obtained at each of the two additional Extended
Stay America sites. The Ontario Extended Stay America consisted of 127 rooms with
a 94% occupancy. The Torrance site included 122 units with 98% occupancy.
Traffic counts were obtained Tuesday, March 31, 1998 through Sunday, April 5,
1998. Monday counts were not available due to adverse weather conditions. Both
the Torrance and Ontario site had two driveways serving each of the hotel facilities.
A summary of the original Long Beach site traffic counts and trip generation rates is
included in Table 1. A summary of the Ontario facility traffic counts and trip
generation rates are included in Table 2. A summary of the Torrance site traffic
counts and trip generation rates are included in Table 3. The detailed traffic count
worksheets for each of these facilities is included in Appendix "A ".
A comparison of the trip generation rates for the three Extended Stay America Hotel
facilities is included in Table 4. As can be seen by Table 4, both the Torrance and
Ontario facility generated more traffic than the Long Beach facility. Therefore, there
could be variations in traffic generation, dependent on location and other adjoining
uses for these facilities. For purposes of trip generation rate calculations, the Institute
•
40
•
,b 1
TRANSPURTATIU` III. \vmVG CIS • rRAFF IC:'A('(WI;TI( "AI F"IGINEFRING
1_(,nl n.nr \r n•,•I. tium• "nl Noy. p��rl Rr•.i� h. f\ rr. (.I.O Phnnr�, I -lay :- a -gflU`I nr
Fax: I'lar J'J•q)_ r
•Mr. Rick Bizar
EXTENDED STAY AMERICA, INC.
April 9, 1998
Page 2
of Transportation Engineers (ITE) typically uses mid -week conditions from Tuesday
through Thursday to determine trip generation rates. These counts are more typical
of what can be expected from any particular land use.
For purposes of determining the appropriate trip generation rate for Extended Stay
America Business Hotels, RKJK has combined the trip generation rates for each of the
three facilities for both the AM /PM peak hour and daily conditions. Trip generation
has been determined for typical Tuesday through Thursday conditions, since this is
what is utilized by the ITE in their determination of trip generation rates. A summary
of the average rates are shown in Table 5. For purposes of trip generation for a
typical Extended Stay America facility, the average rates shown in Table 5 would be
most appropriate for this type of land use. Based upon the average trip generation
rate of the two sites, the typical Extended Stay America facility would generate 4.62
trip -ends per day per occupied room with 0.29 vehicles per hour per occupied room
•during the AM peak hour and 0.37 vehicles per hour per occupied room during the PNI
peak hour.
RKJK has completed the trip generation study for three Extended Stay American
facilities, the site located in Long Beach, Ontario and the City of Torrance. Each of
the facilities was occupied over 90% during the study period. Based upon our review,
it is recommended that the average rates included in Table 5 be utilized for purposes
of trip generation and traffic impact fee assessment. If you have any questions
regarding this or need further review, please give me a call at (714) 474 -0809.
Sincerely,
RKJK & ASSOCIA
0, fir—
Robert Kahn, P. ¢ NO 0655
Principal EXP 12/31/01
RK: kgd /8023
JN:0778 -98 -04
Attachments
0
165
TABLE 1 •
EXTENDED STAY AMERICA LONG BEACH
TRIP GENERATION STUDY
Number of Units:
134
Percent Occupied:
98%
Occupied Units:
131
RK:nam/7781
JN:0778 -98 -02
April 9, 1998
C
)6(,
TRAFFIC COUNTS
AM
PM
DAILY
DAY
IN
OUT
I TOTAL
IN
OUT
TOTAL
IN
OUT
I TOTAL
Saturday
9
6
15
8
14
221
137
152
289
Sunday
4
7
11
12
20
321
133
168
301
Monday
7
8
15
12
22
34
155
157
312
Tuesday
10
7
17
10
16
26
153
155
308
Wednesday
10
9
19
12
15
27
165
175
340
Thursday
12
8
20
30
16
46
212
176
388
11'riday
11
5
16
15
12
27
196
148
344
RK:nam/7781
JN:0778 -98 -02
April 9, 1998
C
)6(,
TRIP GENERATION RATES
AM
PM
DAILY
DAY
IN OUT
TOTAL
IN
OUT I
TOTAL
IN
I OUT
I TOTAL
IThursday
1 0.0921 0.0611
0.1531
0.229
0.1221
0.351
1.618
1.344
2.962
Des: Thurs.
0.081 0.061
0.142
0.132
0.120
0.252
1.349
1.288
2.636
lWeekday
1 0.0761 0.0561
0.1331
0.1zil
0.1241
0.2441
1.3451
1.2381
2.583
Weekend
1 0.0501 0.0501
0.0991
0.0761
0.1301
0.2061
1.0311
1.221
2.252
RK:nam/7781
JN:0778 -98 -02
April 9, 1998
C
)6(,
0
4
Number of Units:
127
Percent Occupied:
94%
Occupied Units:
120
TABLE 2
EXTENDED STAY AMERICA ONTARIO
TRIP GENERATION STUDY
DAY
TRAFFIC COUNTS
AM
PM
DAILY
IN
OUT
I TOTAL
IN
I OUT I
TOTAL
IN
OUT
TOTAL
Saturday
30
26
56
24
18
42
377
340
717
Sunday
17
26
43
16
31
47
362
384
746
Monday
NIA
NIA
N/A
NIA
N/A
N/A
N/A
NIA
N/
Tuesday
20
19
39
19
25
44
315
298
613
Wednesday
30
25
55
15
24
39
304
314
618
Thursday
14
19
33
22
20
42
321
294
615
Friday
36
25
61
27
36
63
374
373
747
N/A = Not Available
RK:nam /8023
0 pri0778 -98 -04
l 9, 1998
10
TRIP GENERATION RATES
AM
PM
DAILY
DAY
IN
OUT
I TOTAL
I IN
OUT
I TOTAL
IN
OUT
I TOTAL
ursda
0.117
0.158
0.275
0.183
0.167
0.350
2.675
2.450
5.125
es -Thurs.
I
0.178
0.175
0.353
0.156
0.192
0.347
2.611
2.517
5.128
eekda
0.2081
0.183
0.3921
0.1731
0.2191
0.392
2.7381
2.6651
5.402
Weekend
1 0.1961
0.217
0.4131
0.1671
0.2041
0.371
3.0791
3.017
1.096
N/A = Not Available
RK:nam /8023
0 pri0778 -98 -04
l 9, 1998
10
TABLE 3 •
EXTENDED STAY AMERICA TORRANCE
TRIP GENERATION STUDY
Number of Units: 122
Percent Occupied: 98%
Occupied Units: 119
N/A = Not Available
RK:nam /8023
JN:0778 -98 -04
April 9, 1998
16K
TRAFFIC COUNTS
DAY
AM
PM I
DAILY
IN
OUT
I TOTAL
IN
OUT
I TOTAL
IN
OUT
I TOTAL
Saturday
24
11
35
13
31
44
349
343
692
Sunday
20
17
37
8
21
29
266
264
530
Monday
N/A
N/A
N/A
N/A
N/A
WA
N/A
N/A
N/
Tuesday
12
24
36
26
29
55
352
357
709
Wednesday
14
25
39
38
20
58
385
372
757
Thursday
19
43
62
39
25
64
353
356
709
Frida
34
28
62
26
24
50
422
425
847
N/A = Not Available
RK:nam /8023
JN:0778 -98 -04
April 9, 1998
16K
TRIP GENERATION RATES
AM
PM
DAILY
DAY
IN
OUT
I TOTAL
IN
OUT
I TOTAL
IN I OUT
I TOTAL
Fhursda
0.160
0.361
0.521
0.328
0.210
0.538
2.966 2.992
5.958
Tues: Thurs.
1 0.1261
0.2581
0.3841
0.2891
0.207
0.4961
3.0531
3.039
6.092
Weekday
1 0.1661
0.2521
0.4181
0.2711
0.206
0.4771
3.1761
3.172
6.349
Weekend
1 0.1851
0.1181
0.3031
0.0881
0.218F-0.3071
2.5841 2.550
5.134
N/A = Not Available
RK:nam /8023
JN:0778 -98 -04
April 9, 1998
16K
0 TABLE 4
EXTENDED STAY AMERICA
TRIP GENERATION STUDY SUMMARY
LONG BEACH
DAY
TRIP GENERATION RATES
AM
PM
DAILY
IN
OUT
I TOTAL
IN
OUT
TOTAL
IN
OUT
I TOTAL
IThursday
0.0921
0.0611
0.1531
0.2291
0.122
0.3511
1.6181
1.3441
2.962
Tues: Thurs.
0.0811
0.0611
0.1421
0.1321
0.1201
0.2521
1.3491
1.2881
2.636
lWeekday
1 0.0761
0.0561
0.133E
0.1211
0.1241
0.2441
1.3451
1.2381
2.583
Weekend
1 0.0501
0.0501
0.0991
0.0761
0.1301
0.2061
1.0311
1.2211
2.252
ji
ONTARIO
TORRANCE
TRIP GENERATION RATES
DAY
AM
PM
DAILY
IN
OUT
I TOTAL
IN
OUT
I TOTAL
IN I OUT
I TOTAL
Thursda
0.117
0.158
0.275
0.183
0.167
0.350
2.675 2.450
5.125
Tues: Thurs.
0.1781
0.1751
0.3531
0.1561
0.1921
0.3471
2.6111
2.5171
5.128
lWeekday
1 0.2081
0.1831
0.3921
0.1731
0.2191
0.3921
2.7381
2.6651
5.402
eekend
1 0.1961
0.2171
0.4131
0.1671
0.2041
0.3711
3.0791 3.0171
6.096
TORRANCE
RK:nam18023
JN:0778 -98 -02
April 9, 1998
r
10
TRIP GENERATION RATES
DAY
AM
PM
DAILY
IN
I OUT
TOTAL
IN
OUT
TOTAL
IN
OUT
I TOTAL
Thursday
0.1601
0.3611
0.5211
0.3281
0.2101
0.5381
2.9661
2.9921
5.958
Tues.-Thurs.
0.1261
0.2581
0.3841
0.2891
0.2071
0.4961
3.0531
3.0391
6.092
Weekday
0.1661
0.2521
0.4181
0.2711
0.2061
0.4771
3.1761
3.1721
6.349
Weekend
1 0.1851
0.1181
0.3031
0.0881
0.2181
0.3071
2.584
2.550
5.134
RK:nam18023
JN:0778 -98 -02
April 9, 1998
r
10
TABLES
EXTENDED STAY AMERICA
AVERAGE TUESDAY THROUGH THURSDAY TRIP GENERATION RATES'
RKnam/8023
JN:0778 -98 -02
April 9, 1998
0
lb
AM
I PM
I DAILY
IN
I OUT
I TOTAL
I IN
OUT
I TOTAL
I IN
OUT
DAILY
ILong Beach
0.0811
0.0611
0.1421
0.1321
0.1201
0.2521
1.3491
1.288
2.636
Ontario
1 0.1781
0.1751
0.3531
0.1561
0.1921
0.3471
2.611
2.517
5.128
Torrance
0.126
0.258
0.384
0.289
0.207
0.496
3.053
3.039
6.092
[Average
1 0.1281
0.1651
0.2931
0.1921
0.1731
0.3651
2.3381
2.281
4.619
RKnam/8023
JN:0778 -98 -02
April 9, 1998
0
lb
0
APPENDIX A
TRAFFIC COUNTS
0
1
Received Apr -08 -98 04:28pm from CCITT G3 4 RKJK page 2
BIER -09 -98 05:34 PM P -02
8:008:15
L=tlon:Exiended Stay _2
6
8:008:15
Ontario
2
Volumes for Wed 411/98
2
8
02070026
4
3
AM Period
IN
7
OUT
1
2
PM Period
IN
6
OUT
2 9
0 7 16
9:009:15
12:00.12:15
0
9:009:15
0
2
9:15.9:30
12:00.12:15
0
9:15.9:30
1
1
9:309:45
2
12:15.12:30
0
1
0
9:45 -10:00
6 16
12:15.12:30
1
1 5
2
10:0010:15
5
3
12;30.12:45
0
2
1
5
5
12:30.11:45
1
1
3
1
1
10:30.10:45
12:45.1:00
1
1
0
1
2
12:45 -1:00
0
2
2
8
10
1:00-1:15
2
0
1:00.1:15
1
7
1:15.1:30
0
1
1:15.1:30
2
4
1:301:45
0
0
1:30.1:45
0
4
1:45.2:00
2
4
1
2
6
1:45 -2:00
1
4
1
16
20
2:00.2:15
3
0
2:00.2:15
4
3
2:15 -2:30
0
0
2:1$-2:30
1
9
2:30.2:45
3
1
2:30.2:45
2
3
2:453:00
2
8
2
3
11
2:45.3:00
3
10
4
19
29
3:003:15
4
0
3:0(13:15
3
2
3:15.3:30
0
1
3:15 -3:30
1
3
3:30 -3:45
2
0
3:30.3:45
2
1
3:45 -4:00
0
6
0
1
7
3:45.4:00
2
8
4
10
] 8
4:003:15
0
1
4:00.4:15
1
2
4:15.4:30
3
0
4:15.430
4
1
4:304:45
1
2
4:304:45
2
3
4:45.5:00
2
6
0
3
9
4:45.5:00
7
14
2
8
22
5:005:15
3
0
5:005:15
5
6
5:15 -5:30
4
1
5:15.5:30
3
2
5:305:45
3
5
5:305:45
2
5
5:45 -6:00
6
16
0
6
22
5:45.6:00
4
14
6
19
33
6:00.6:15
4
4
6:006:15
2
6
6:15 -6:30
6
6
6:15.6:30
6
5
6:306:45
7
3
6:30 -6:45
2
3
6:45 -7:00
6
23
5
I8
41
6:45 -7:00
5
15
6
20
35
7:007:15
7
7
7:007•.15
1
2
7:15 -7:30
8
6
7:15.7:30
2
1
7:301:45
6
5
7:307:45
4
4
7:45.8:00
5
26
6
24
50
1:45.8:00
3
10
1
8
18
8:008:15
3
6
8:008:15
2
2
8:15.8:30
2
8
8:15.8:30
4
3
8:308:45
7
7
8:308:45
1
2
8:4S -9:00
5 17
6
27 44 8:45.9.00
2 9
0 7 16
9:009:15
3
4
9:009:15
1
2
9:15.9:30
5
5
9:15.9:30
2
1
9:309:45
2
6
9:309:45
1
2
9:45 -10:00
6 16
6
21 37 9:45 -10:00
1 5
2 7 12
10:0010:15
5
3
10:0010:15
2
2
10:15 -10:30
5
5
10:15.10:30
1
1
10:3010:45
1
1
10:30.10:45
1
1
10:45.11:00
1 12
1
10 22 10:45 -11:00
1 $
1 5 10
11:00 -11:15
5
1
11:0011:15
1
2
11:15.11:30
1
1
11:15 -11:30
1
0
11:3011:43
1
1
11:30 -11:45
1
1
11:45 -12:00
5
12 2
5 17 11.45 -12:00
1
4 0
Taal Volumex
147
121
268
100
130
Daily Totals
247
251
3 7
230
496
1)3
Received Apr -08 -98 04:28pm
1
from CCITT G3 - RKJK
page 3
QPR. -09 -98 05:34 PM
0
1:15.1:30
P.03
0
LacationIxtended Stav 1
Ontario
Volumes for Wed 1!1198
02070063
AM Pchod IN
Old r
PM Period IN
OUT
12:00.12:15 0
0
12:00 -12:15 0
1
•
12:15 -12.30 0
0
12:15.12:30 1
0
12:30-12.45 0
l
12:30.12:45 0
2
12:45 -1:00 0 0
0 1
1 12:45 -1:00 0 1
1 4 5
1:00.1:15
1
0
1:00 -1:15
1
0
1:15.1:30
0
0
1:15.1:30
0
1
1:30-1:45
0
1
1:30.1:45
0
1
1:45 -2:00
0 1
0 1
2 1:45.2:00
1 2
0 2 4
2:00 -2:15
0
0
2:00 -2:15
2
0
2:15.2:30
0
0
2:15 -2:30
2
2
2:30.2:45
0
0
2:30 -145
0
3
2:45 -100
0 0
l 1
1 2:45 -3:00
1 5
0 5 10
3:00.3:15
0
0
3:00.3:15
0
0
3:15.3:30
0
0
3:15.3:30
0
2
3:30.3:45
2
0
3:30.3:45
0
1
3:45.4:00
0
2 0
0 2 3:45 -4:00
1 1
0 3 4
4:00.4:15
0
0
4:00.4:15
0
0
4:154:30
0
2
4:15.4:30
3
1
4:30 -4:45
0
1
4:30.4:45
0
0
4:45.5:00
0
0
0
3
3
4:45 -5:00
4
7
0
1
8
5:00.5:15
0
0
5:00.5:15
1
2
5:15.5:30
1
0
.5:15 -5:30
0
3
5:30.5:45
2
0
5:30.5:45
0
0
5:45.6:00
0
3
0
0
3
3:45 -6:00
0
1
0
5
6
6:00.6:15
0
2
6:00 -6: 15
1
1
6:15.6:30
1
0
6:15 -6:30
0
2
6:30.6:45
0
1
6:30.6:45
0
0
6:45 -7:00
0
1
1
4
S
6:45 -7:00
0
1
0
3
4
7:00.1:15
1
1
7:00.7:15
1
0
7:15 -1:30
0
0
7:15.7:30
2
1
7:30.7:45
2
0
7:30.7:45
6
5
7:45 -8:00
1
4
0
1
5
7:45 -8:00
1
10
4
10
20
8:00.8:15
0
0
8:00 -8:1.5
0
0
8:13.8,30
0
2
8:15.8:30
1
2
8:30.8:45
1
I
8:30.8:45
5
1
8:45 -9:00
0
1
0
3
4
8:45.9:00
1
7
3
6
13
9:00.9:15
1
0
9:00 -9:15
0
0
9:15.9:30
2
0
9:15 -9:30
0
2
9:30.0:45
0
0
9:30 -9:45
0
0
9:45.10:00
0
3
0
0
3
9:45.10:00
1
1
1
3
4
10:00-10:15
0
1
10:00-10:15
0
0
10:15.10:30
0
0
10:15.10:30
0
0
10:30.10:45
1
1
10:30-10:45
0
0
10:45 -11:00
0
1
0
2
3
10:45.11:00
0
0
0
0
0
11:00-11:15
0
2
11:00-11:15
1
0
11:15.11:30
0
1
11:15.11:30
1
2
11:30-11:43
1
0
11:30-11:45
0
0
11:45.12:00
1
2
0
3
5
11:45.12:00
1
3
0
2
5
-row volumes 18 19 37 39 44
Daily Totals 57 63
is
fl`
tieceive0 Apr -08 -98 04:28pm
P..PR -09 -99 03535 PM
from CCITT G3 RKJK
page 4
P.04
Location:Estendad Stay i
4
13
Ontario
3
Volumes for Tue 3/31/98
5:45.6;00
4
02070025
4
AM Period
IN
OUT
8
PM Period
TN
6:00 -6:15
OUT
3
12:00.12:15
0
is6:00.6:15
6:15 -6:30
0
1
12:00.12.15
0
0:15.6;30
3
1
12:15.12:30
0
6:30.6:45
0
2
12:15.12:30
1
6:30 -6:45
2
0
12:30.12:45
0
6:45.7:00
1
17
7
12:3042:45
2
6:45 -7:00
6
7
3
12:45 -1:00
1
1
0
1
2
12:45.1:00
6
9
1
12
21
1:00.1:15
2
7:15 -7:30
2
5
1:00.1:15
5
7:15.7:30
2
1
1:15.1:30
0
1:30 -7:45
1
7
1:15 -I:30
2
1:30 -7:45
2
2
1:30.1:45
0
7:45 -8:00
0
14
2
1:30.1:45
7
7:45 -8:00
6
8
2
1:45.2:00
3
3
0
3
6
1:45.2:00
7
21
6
16
37
2:00.2:15
2
8:15.8:30
1
6
2:004:15
6
8:15.8.30
2
3
2:15.2:30
0
8:30 -8:45
1
4
.21552:30
2
8:30 -8:45
4
7
2:30 -2:45
0
4:45.9:00
0
11
3
2:30.2:35
3
8:43.9:00
3
17
2
2:45.3:00
0
2
1
3
5
2:45.3:00
5
16
2
11
27
3:00.3:15
0
9:15 -9:30
0
4
3:00.3:15
2
9:15.9;30
4
3
3:15.3:30
0
9:30.9:45
2
6
3:15-3:30
4
9:30 -9:45
3
6
3:30.3:45
1
9:45 -10:00
l
17
3
3:30.3:41
2
9:45 -10:00
2
it
4
3:45 -4:00
2
3
0
3
6
3:454:00
.4
12
4
13
25
4:00 -4:15
0
10:15 -10:30
I
4
4:00.4:15
2
10:15 -10:30
3
2
4:15.4:30
0
10.30.10:45
0
2
4:15 -4:30
5
10:30.10:35
8
0
4:30 -4:45
1
10:45.11:00
1
14
5
4:304:45
2
10:45 -11:00
4
12
2
4:45.1:00
2
3
1
3
6
4A5 -S:00
6
15
2
17
32
5:00.5:15
2
11:15.11.30
0
2
5:00.5:15
3
11:73 -11.30
3
5
5:15.5:30
S
11:30.11:45
2
1
5:1S -5:30
4
11:30.11:45
6
1
5:30.5:45
2
41:45 -12:00
1
11
2
5:30 -5:45
2
11:45.12:00
2
8
1
5:45 -6:00
4
13
0
3
16
5:45.6;00
4
13
4
IS
28
2
8
6:00 -6:15
3
3
is6:00.6:15
6:15 -6:30
6
1
0:15.6;30
2
1
6:30.6:45
2
2
6:30 -6:45
0
0
6:45.7:00
7
17
7
l8
35
6:45 -7:00
2
7
3
7
14
1:00 -7:15
5
2
7:00.7.15
4
2
7:15 -7:30
1
5
7:15.7:30
3
1
1:30 -7:45
2
7
1:30 -7:45
0
2
7:45 -8:00
6
14
2
16
30
7:45 -8:00
1
8
2
7
15
8:00.8:15
1
4
8:00 -8:15
8
7
8:15.8:30
3
6
8:15.8.30
3
3
8:30 -8:45
2
4
8:30 -8:45
2
7
4:45.9:00
5
11
3
17
28
8:43.9:00
4
17
2
19
36
9:00.9:15
4
2
9:00.9:15
2
4
9:15 -9:30
6
4
9:15.9;30
3
3
9:30.9:45
1
6
9:30 -9:45
4
6
9:45 -10:00
6
17
3
IS
32
9:45 -10:00
2
it
4
17
28
10:00.10:15
2
2
10:00.10:15
5
3
10:15 -10:30
5
4
10:15 -10:30
2
2
10.30.10:45
5
2
10:30.10:35
3
0
10:45.11:00
2
14
5
13
27
10:45 -11:00
2
12
2
7
19
11:00.11:15
3
3
11:00.11:15
1
1
11:15.11.30
2
2
11:73 -11.30
2
5
11:30.11:45
4
1
11:30.11:45
3
1
41:45 -12:00
2
11
2
S
19
11:45.12:00
2
8
1
8
16
0 Total Volumes
Daily Totals
103
149 149
258 252
jt�
Received Apr -08 -98 04:28pm from CCITT G3 RKJK page 5
q ?R -09 -90 05:36 PM P.05
Location:Extended Stay 1
_ _
Ontario
Volumes for Tue 3/31/98
02070063
AM Period
IN
OUT
PM Period
JN
OLT
12:00 -12:15
0
0
12:00.12:15
0
1
12:15.12:30
0
1
12:15 -12:30
0
1
.
12:30.12:45
0
0
12:30.12:45
0
0
12:45.1:00
0
0
0
1
1
12:45.1:00
0
0
2
4
4
1:00.1:15
0
0
1:00.1:15
1
1
1:15 -1:30
0
1
1:15.1:30
1
0
1:30.1:45
1
0
1:30.1:45
0
0
1:45 -2:00
0
1
0
1
2
1:45.2:00
0
2
1
2
4
2:00.115
0
0
2:00-2:15
1
0
2:15.2:30
0
1
2:15.2:30
0
0
2:30.2:45
0
0
2:30.2:45
0
0
2:45.3:00
0
0
0
1
1
2:45 -3:00
1
2
2
2
4
3:00.3:15
0
0
3:00.3:15
0
1
3:15.3:30
0
0
3:15.3:30
0
0
3:30.3:45
0
1
3:30.3:45
1
0
3:45.4:00
0
0
0
1
1
145 -4:00
1
2
0
1
3
4:00.4:15
0
0
4:ON4:IS
1
0
4:15.4:30
1
0
4:15.4:30
0
4
4:30.4.45
2
1
4:30.4:45
1
3
4:45 -5:00
0
3
0
1
4
4:45 -5:00
2
4
1
8
12
5:00.5:15
0
0
5:00.5:15
0
0
3:13 -3:30
1
0
5:15 -5:30
3
0
5:30.5:45
0
0
5:30 -5:45
3
0
5:45.6:00
1
2
0
0
2
5:45 -6:00
2
8
0
0
8
6:00 -6:15
2
0
6:00 -6:15
0
0
6:15 -6:30
0
1
6:15 -6:30
0
0
610 -6:45
0
0
6:30 -6:45
2
1
6:45.7:00
0
2
0
1
3
6:4S -7:00
1
3
0
1
4
7:00.7:15
1
0
7:00.7:15
4
0
7:15.7:30
2
1
7:15.7:30
0
1
7:30.7:45
2
0
7:30.7:45
0
2
7:45 -8:00
1
6
2
3
9
7:45.8:00
0
4
1
4
B
8:00.8:15
0
1
8:0MAS
0
0
8:15 -8:30
0
0
8:15.8:30
0
0
8:30.8:45
1
0
8:30.8:45
2
0
8:45 -9:00
1
2
0
1
3
845.9:00
1
3
0
0
3
9:00.9:15
0
1
9:00 -9:15
1
1
9:15 -9:30
0
1
9:15.9:30
2
0
9:30.9:45
1
0
9:30.9:45
0
0
9:45 -10:00
0
1
0
2
3
9:45 -10:00
0
3
0
1
4
10:00.10:15
0
0
10:00.10:15
0
0
10:15 -10:30
0
1
10:15 -10:30
1
2
10:30.10:45
1
2
10:30.10:45
2
1
10:43 -11:00
2
3
1
4
7
10:45.11:00
0
3
0
3
6
11:00.11:15
0
1
ILOO.11:13
0
0
11:15 -11:30
1
3
11:15.11:30
0
0
11:30.11:45
0
0
11:30.11:45
0
0
11:45 -12:00
2
3
0
4
7
11:45.12:00
0
0
0
0
0
Taal Volumes
23
20
43
34
26
60
.
Daily Totals
57
46
103
fib
Received Apr -08 -98
R
04:28pm
from
CCITT G3 - RKJK
page 6
P.06
,,, -09 -93 05:36
PM
Location:Eztended Stay
I
Ontario
Volumes for Thur4 /2/98
02070062
i AM Period
IN
OUT
PMpenod
IN
OUT
i� 12:00 - 12:.15
0
0
12:00 -12:15
0
1
1 12:15 -12:30
0
0
12:15.12:30
1
0
1130.12:45
0
1
12:30.12:45
2
4
12:45.1:00
0
0
0
1
1
12:45 -1:00
0
3
1
6
9
3 1:00.1:15
0
0
1:00.1:13
1
2
1:15 -L30
1
1
1:15 -L'30
0
0
1:30.1:45
0
0
1:30.1:45
0
3
' 1:45 -2:00
0
1
2
3
4
1:45 -2:00
2
3
0
5
8
2:00.2:15
0
1
2:00.2:15
1
0
2:15 -2:30
A
0
2:15 -130
2
2
2:30 -2:45
0
0
2:30 -2:45
0
1
2:45.3:00
1
1
1
2
3
2:45 -3:00
1
4
0
3
7
3:00 -3:15
0
0
3:00 -3:15
2
0
3:15 -3:30
0
0
3:15.300
0
2
3:30 -3:45
2
0
3:30 -3:45
1
0
3:45400
1
3
1
1
4
3:45 -4:00
1
3
0
2
7
4:00 -4:15
0
2
4:00.4:15
0
4
4:15-3:30
0
0
4:15 -4:30
3
2
4:30 -4:45
1
0
4:30 -4:45
2
3
4:45.5:00
2
3
0
2
5'.
4:45 -5:00
4
9
0
9
18
5:00.5:15
3
1
5:00.5:15
2
0
5:15 -5:30
0
0
5:15.5:30
1
2
5:30.5:45
0
0
5:30.5:45
0
1
5:45.6:00
2
5
0
1
6'
-3:45 -6:00
3
6
0
3
9
6:00 -6:15
1
1
6:00.6:15
2
0
6:15 -6:30
2
0
6:15.6:30
0
2
6:30.6:45
0
3
6:30.6:45
1
4
6:45.7:00
0
3
2
6
9
6AS -7:00
2
5
2
8
13
7:00.7:15
0
1
7;00.7:15
3
0
7:15 -7:30
1
0
7:15.7:30
2
0
7:30.1:45
2
2
1:30 -7:45
4
3
7;45.8:00
3
6
1
A
10
7:45.8:00
0
9
2
5
14
8:00 -8115
0
0
8:00.8:15
1
1
8:15.8:30
2
2
8:15 -6:30
2
0
8:30.8:45
1
1
810.8:45
0
0
8:45 -9:00
2
5
0
3
8
8:15 -9:00
1
-4
2
3
7
9:00.9:15
1
0
9:00.9:15
2
4
9:15.9:30
0
2
9:15.9:30
0
3
9:30.9:45
1
1
9:30.9:45
1
2
9:45 -10:00
2
4
0
3
7
9:45.10:00
D
3
1
10
13
10:00.10:15
3
0
10:00 -10:15
1
0
10:15 -10:30
0
2
10:15.1030
2
0
10:30.10:45
2
1
10:30 -10:45
0
1
10:43.11:00
4
9
0
3
12
10:45 -11:00
1
4
0
1
S
11:00.11:15
0
3
11:00.11:15
0
0
11:15 -11:30
1
1
11:15 -11:30
0
2
11:30.11:45
2
1
11:30 -11:45
1
1
11:45.12:00
1
4
0
6
w
11 ;45 -12:00
0
1
0
3
4
•Total Volumes
44
35
79
56
58
114
Daily Tot:ds
I00
93
793
�i1
Received Apr -08 -98 04:28pm
from
CCITT G3 � RKJK
page 1
PPR- 09 -'3e
05:ss
PM
P.01
Loomion:Eztended Stay 1
Ontario
Volumes for Fri 4,13/98
02070046
AM Period
1N
OLT
FM Period
IN
OUT
12:00.12.15
0
1
12:00 -12:15
0
0
12:15.12:30
0
0
12:15.12:30
1
2
12:30 -12:45
0
0
12:30.12:45
2
0
12:45.1:00
1
1
2
3
4
12:451:00
0
3
1
3
6
1:00-1:15
2
1
1:00.1:15
0
0
1:15.1:30
0
0
L15.1:30
2
1
1:30-1:45
0
0
1:30-1:45
3
0
1AS -2:00
0
2
2
3
5
1:45 -2:00
0
5
3
4
9
2:00.2:15
0
1
2:00.2:15
0
2
2:15.2:30
1
0
215 -2:30
0
1
2:30-2:45
2
0
2:30-2:45
6
0
2:45.3:00
0
3
1
2
S
2:45.3:00
1
7
2
5
12
3:00.3:15
0
2
3:00.3:35
2
1
3:15 -3:30
0
0
3:15.3:30
0
0
3:30-3:45
0
0
3:30-3:45
0
0
3:45 -4:00
0
0
3
5
5
3:45 -4:00
0
2
0
1
3
4:00.4:15
0
0
4:00.4:15
0
2
4:15 -4:30
1
0
4:15 -4:30
2
1
4:30-4:45
2
2
4:30-4:45
1
0
4:45 -5:00
0
3
1
3
.6
4:45 -5:00
0
3
0
3
6
5:00 -5.15
0
0
5:00-5:15
1
2
5:15.5:30
0
0
5:15 -5:30
0
4
5:30-5:45
1
0
5:30-5:45
1
1
5:45.6:00
2
3
2
2
5
5;45 -6:00
2
4
2
9
13
6:00.6:15
2
1
6:00415
0
0
6:15 -6.30
3
0
6:15.6:30
0
l
6:30-6.45
4
0
6:30-6:45
0
2
6:45-7-00
0
9
0
1
10
6:45.7:00
0
0
0
3
3
7:00.7:15
0
1
7:00.7:15
1
3
7:15 -7:30
0
2
7:15.7:30
2
2
7:30-7:45
2
0
7:30-1:45
2
4
7:45.8:00
3
5
0
3
3
7:45.8:00
3
8
2
11
19
8:00.8:15
0
3
8:00 -8:15
4
0
8:15 -8:30
0
1
8:15.8:30
0
3
8:30.8:45
0
0
8:30 -8:45
0
2
6:45 -9:00
0
0
0
4
4
8:45.9:00
0
4
0
5
9
9:00.9:15
1
2
9:00 -9:15
0
0
9:15.9:30
2
1
9 :15.90
1
2
9:30-9:45
0
0
9:30.9:43
2
1
9:45 -10:00
0
3
0
3
6
9:45.10:00
1
4
0
3
7
10:0040:15
0
2
10:00.10:15
2
0
10:15 -10:30
1
1
10:15 -10:30
0
0
10:30.10:45
2
0
10:30-10:45
0
0
10:45 -11:00
0
3
0
3
6
10:45.11:00
1
3
2
2
S
11:00.11:15
2
3
11:00.11:15
2
1
11:15.11:30
1
2
11:15.11:30
0
0
11:30-11:45
1
0
11:30 -11:45
1
0
11:45.12:00
0
4
1
6
10
11:45 -12:00
0
3
0
1
4
Taal Volumes
36
38
74
46
50
`M
Daily Totals
32
98
170
Received Apr -08 -98 03:48pm from CCITT G3 - RKJK page 2
APR -09 -99 04754 PM P -02
L=Wion:Exte» dcd Stay 2
5
Ontario
Volumes for Still 4/3198
6:00.6:15
1
02070057
0
AM Period
IN
6:15 -6:30
OLT
S
PM Perlod
M
6 :15 -6:30
OUT
2
12:00 -12:15
12:15 -12:30
0
1
6:30.6:45
2
2
6
12:00.12:15
12:13 -12:30
3
1
6:30 -6:45
3
0
3
12:30.11:45
2
6:45.7:00
0
14
7
12 :30 -12:45
2
6 :45.1:00
2
15
4
12:45.1:00
0
3
2
6
9
12:43.1:00
3
9
1
6
15
1:00 -1:15
0
7:15.7:30
1
6
1:00 -1:15
4
7:15 -1;30
2
6
1:15.1:30
2
7:30.7:45
0
6
105 -1:30
1
7:30.1:45
1
3
1:30 -1:45
3
7:45.8:00
0
I1
5
1:30.1:45
1
7 ;45.8:00
0
13
6
1:45.2:00
0
5
2
3
8
1:45 -2:00
7
13
2
5
18
2 ;00.2:15
0
8:15.8:30
1
6
2:00.2:15
5
8:1.5.8:30
1
1
2:15.2:30
2
00.8:45
0
4
2:.15 -1-30
3
830.8:45
0
6
2:30.2:45
1
8:45 -9:00
2
L
5
2:30 -2:45
3
8:45 -9:00
1
11
1
2:45 -3:00
4
7
3
6
13
2:45.100
5
16
2
4
20
3:00.3:13
3
9:13 -9:30
2
3
3:00.3:15
1
9:15.9:30
0
3
3:15.3:30
0
9:30.9:45
2
5
3:13.3:30
7
9:30 -9:45
3
2
3:30.3:45
0
945.10:00
4
11
7
130.3:45
5
9:45.10:00
5
20
1
3:45.4:00
2
5
3
It
.16
3:45.4:00
3
16
1
9
15
4:004:15
3
10:15. 10:30
2
5
/ 4:00.4:15
3
10;15.10:30
8
0
4:15.4:30
0
10:30 -10:45
0
4
4:15.4:30
1
10:30 -10:45
1
3
4:30.4:45
0
10:45 -11:00
0
17
6
- 4:30.4:45
5
10:45.11:00
10
15
2
4AS -5:00
2
5
2
4
9
4:43.5:00
6
15
6
25
40
5:00.5:15
4
11:15.11:30
3
4
5:00.5:15
3
IJ:15 -J 00
7
2
5:15.5:30
3
11:30.11:45
2
3
5:15 -5:30
6
11:30.11:45
8
3
5:30.5:45
2
11 ;45 -12:00
4
11
4
j 5:30.5:45
1
11:45.12:00
1
3
2
5:45.6:011
4
13
5
14
-27
5:45.6:00
5
15
2
18
33
6:00.6:15
5
3
6:00.6:15
1
0
6:15 -6:30
3
S
6 :15 -6:30
3
2
6:30.6:45
2
6
6:30 -6:45
6
3
6:45.7:00
4
14
7
23
35
6 :45.1:00
5
15
4
9
24
7 :00 -7:15
2
4
7:00.7:15
4
5
7:15.7:30
3
6
7:15 -1;30
1
6
7:30.7:45
2
6
7:30.1:45
3
3
7:45.8:00
4
I1
5
21
32
7 ;45.8:00
5
13
6
20
33
8:00.8:15
2
7
8:00.8 :15
1
1
8:15.8:30
3
6
8:1.5.8:30
5
1
00.8:45
4
4
830.8:45
1
6
8:45 -9:00
3
L
5
12
34
8:45 -9:00
4
11
1
9
20
9:00 -9:15
2
6
9:00.9:15
6
4
9:13 -9:30
4
3
9:15.9:30
7
3
9:30.9:45
5
5
9:30 -9:45
5
2
945.10:00
6
11
7
21
32
9:45.10:00
2
20
1
10
30
10:00- 10;15
7
6
10:00 -10:15
4
2
10:15. 10:30
5
5
10;15.10:30
3
0
10:30 -10:45
3
4
10:30 -10:45
5
3
10:45 -11:00
2
17
6
21
38
10:45.11:00
3
15
2
7
22
11:00.11:15
4
3
11:00 -11.15
1
4
11:15.11:30
1
4
IJ:15 -J 00
0
2
11:30.11:45
2
3
11:30.11:45
1
3
11 ;45 -12:00
4
11
4
14
25
11:45.12:00
1
3
2
II
14
IZoW Vollnncs
120
164
284
161
133
294
Daily Totals
2$1
297
57$
r
�j i
Received Apr -08 -98 03:48pm from CCITT G3 , RKJK page 3
;PR -09 -99 04_55 PM P.03
L4oatiollIxlended Stay I
Ontario
Volunles for San 4/5/91
02070030
AM Period
IN
OUT
PM Period
IN
our
12:00.12:15
0
0
12:00 -11:15
0
2
12:15.12:30
0
0
12:15 -12:30
1
2
12:30.12:45
0
0
12:30 -12:45
0
0
12:45 -1:00
.0
0
0
0
0
12:45.1:00
0
1
0
4
5
1:00.1:15
0
1
1:00 -1:15
0
2
1:15 -1:30
0
0
1:15.1:30
0
1
1:30 -1:45
0
0
1:30 -1:45
0
0
1:45.2:00
0
0
0
1
1
1:45 -2:00
0
D
2
S
5
2:00.2:15
1
0
2:00.2:15
1
4
2:15 -1-30
0
1
2:15.2:30
0
1
2:30 -2:45
0
0
2:30 -2:45
0
3
2;45.3:00
0
1
0
1
2
2:45 -3:00
0
1
2
10
11
3:013-3:15
0
2
3:00 -3:15
1
0
3:13 -3:30
1
1
3:15.3:30
2
0
3:303:45
2
0
3:30 -3:45
0
2
3:45.4:00
0
3
0
3
.6
3:45.4:00
0
3
1
3
.6
4:00.4:15
0
1
; 4:00 -4:15
0
0
4:15 -4:30
0
0
4:15.4:30
1
0
4:30 -4:43
1
0
4:30 -4:45
0
4
4:45 -5:00
2
3
3
4
7
4,45-5:00
0
1
2
6
7
5:00 -5:15
0
0
5:00.5:15
0
3
5:15.5:30
0
1
5:13.5.30
1
2
3:30.5:45
1
1
5:30 -5:45
0
0
5:456:00
.1
2
.0
3
5
5:45 -6:00
0
1
4
9
10
6:00.6:15
1
0
6:00 -6:15
2
2
6:15.6:30
2
0
6:15.6.30
1
0
6:30.6:45
1
1
6:30 -6:45
2
0
6:45.7:00
2
6
0
1
7
6:45.7.00
.0
5
5
7
12
7:00.7:15
3
1
7:00 -7:15
4
4
7:15 -7:30
0
1
7:15.7:30
3
3
7:30.7:45
2
0
7:30 -7:45
2
2
7:45 -8:00
1
6
2
5
11
7:45 -8:00
1
10
1
10
20
8:00.8:15
0
1
8:00.8:15
2
0
8:15.8:30
0
0
8:15.8:30
1
0
8:30 -845
1
2
8:30 -8:45
2
0
8:45 -9:00
2
3
1
4
7
8:45.9:00
0
5
0
0
5
9:00.9:15
0
0
9:00 -9:15
2
3
9:15 -9:30
0
0
9:15.9.30
1
2
9:30.9:45
1
0
9:30 -9:45
2
0
9:45 -10:00
0
1
2
2
3
9:4-1-10:00
1
6
0
5
11
10:00.10:15
1
1
10:00 -10:15
0
0
10:15.10.30
2
0
10:15.10:30
0
1
10:30 -10:45
1
0
10:30 -10:45
2
0
10:45.11:00
2
6
0
.1
7
10:4541:00
.1
3
0
1
4
11:00.11:15
4
0
11:00.11:15
0
0
11:15 -11:30
2
0
11:15.11:30
1
0
11:30.11:45
2
1
11:30.11:45
2
1
11:45.12:00
3
11
0
1
12
11:45.12:00
0
3
0
I
4
Total
42
68
39
61
Totals
Deily 7'aalx
AI
87
1G8
0
1�`l
, VcI n,, , c I , i I", 'II I , W I)AIA Kaye 4
APR -09 -98 04:55 PM
P -04
Lom ion:Uxlended Stay 2
6
Ontario
Volumes for Sat 4/4/98
6:00 -6:15
4
02070029
2
AM Period
IN
6:15.6!30
OUT
1
PM Period
IN
6:15 -6:30
OLIT
7
12:00.12:15
0
6:30 -6:45
0
4
12:00 -12:15
1
6:30 -6:45
2
2
12:15 -12:30
1
6:45 -7:00
1
27
2
12:15 -12:30
2
6:45 -7:00
3
15
4
12:30.12:45
0
7:00 -7:15
0
7
12:30 -12:45
4
7:00 -7:15
4
2
12:45 -1:00
0
1
1
2
3
12:45-1:00
3
10
2
11
21
1:00 -1:15
0
1:30.745
0
5
1:00.1:15
2
7:30 -7:45
1
6
1:15.1:30
0
7:45 -8:00
0
20
5
1:15 -1:30
1
7:15 -8:00
2
11
6
1:30.1:45
2
8:00.8:15
0
6
1:30.1:45
3
8:00.8:15
2
7
1:45 -2:00
3
5
2
2
7
1:45 -2:00
2
8
1
6
14
2:00 -2:15
0
8:30.8:45
1
2
2:00-2:15
6
8 :30.8:45
4
6
2:15.2:30
0
8:45.9:00
2
12
3
2:15 -.2:30
5
8:45.9:00
4
15
2
2:30.245
0
9:00 -9:15
0
2
2:30.2:45
2
9:00.9:15
3
2
2:45 -3:00
2
2
3
6
8
2:45 -3:00
l
14
2
13
27
3:00.3:15
4
9:30.9:45
2
2
3:00.3:15
4
9:30 -9:45
6
3
3:15.130
2
9:45 -10:00
0
17
4
3:15 -3:30
2
9:45 -10:00
2
17
2
3:30.3:45
0
10:00.1015
2
2
3:30.3:45
0
10:00 -10:15
1
7
3:45 -4:00
0
6
1
5
11
3:45.4:00
2
8
5
14
22
4:00.4:15
0
10:30.10:45
0
2
4:00 -4:15
7
10:30.10:45
2
1
4:15.4:30
1
10:45 -11:00
0
Il
4
4:15.9:30
I
10:45 -11:00
1
7
1
4:30.4:45
2
11:00-11:15
1
2
- 4:30.4:45
2
11:00.11:15
6
0
4:45 -5:00
3
6
2
1
9
4:41 -5:00
8
18
2
11
29
5:00 -5:15
4
11:30 -11:45
0
2
5:00.5:15
5
11:30-11:4S
1
2
5.15.5:30
2
11:45.12:00
2
9
2
5:15 -5:30
9
11:45 -12:00
2
b
0
5:30.5:45
3
TOM VOInn$9
1
105
5:30.5:45
2
6
143
5:45.6:00
4
13
4
7
20
145 -6:00
3
19
3
12
31
6:00.6:15
6
2
6:00 -6:15
4
2
6:15.6!30
7
1
6:15 -6:30
2
7
6:30 -6:45
8
4
6:30 -6:45
6
2
6:45 -7:00
6
27
2
9
36
6:45 -7:00
3
15
4
1S
30
7:00 -7:15
2
7
7:00 -7:15
2
2
7:15.7:30
7
6
7:15.7:30
3
S
1:30.745
$
5
7:30 -7:45
2
6
7:45 -8:00
6
20
5
23
43
7:15 -8:00
4
11
6
19
30
8:00.8:15
2
6
8:00.8:15
2
7
8:15 -8:30
3
5
8:15.8:30
5
2
8:30.8:45
4
2
8 :30.8:45
6
6
8:45.9:00
3
12
3
16
Z8
8:45.9:00
2
15
2
17
32
9:00 -9:15
5
2
9:00.9:15
4
2
9:15.9:30
1
4
9:15.9:30
2
4
9:30.9:45
6
2
9:30 -9:45
6
3
9:45 -10:00
5
17
4
12
29
9:45 -10:00
5
17
2
11
28
10:00.1015
2
2
10:00 -10:15
2
7
10:15 -10:30
4
3
10:15 -10:30
2
2
10:30.10:45
2
2
10:30.10:45
1
1
10:45 -11:00
3
Il
4
11
22
10:45 -11:00
2
7
1
11
18
11:00-11:15
1
2
11:00.11:15
2
0
11;15 - 11:30
2
3
11:15 -11:30
1
1
11:30 -11:45
3
2
11:30-11:4S
2
2
11:45.12:00
3
9
2
9
18
11:45 -12:00
1
b
0
3
9
TOM VOInn$9
129
105
234
148
143
291
Daily Totals
277
248
F 523
Received Apr -08 -98 03:48pm
from
CCITT G3 - RKJK
page 5
,,PP.-09 -99
04[56
PM
P.05
L=a iomExtended Stay I
Ontario
Volumes for Sal 4/4/98
02070031
AMPeriml
TN
OUT
PMPerlod
IN
OLJr
12:00.12:15
0
0
12:00 -12:15
0
2
12:15.12:30
0
0
12:15.12:30
1
1
42:30 -12:45
0
0
12:30.12:45
2
0
12:43.1:00
A
0
1
1
1
12:451:00
0
3
2
3
8
1:00.1:15
0
0
1:00.1:15
0
3
1:15.1:30
0
0
1:15 -1:30
0
0
1:30.1:43
0
0
1:3061:45
1
2
1:45.2:00
1
1
0
0
1
1:45.2:00
2
3
1
6
9
2:00.2:15
2
1
2:00.2:13
0
0
2:15.2:30
0
0
2:15 -2:30
0
0
2:30.2:45
0
0
2:30.2:45
0
2
2:45.3:00
0
2
1
2
4
2:45.3:00
0
0
1
3
3
$:00-3:1S
1
0
3:00 -3:15
1
0
3:15.3:30
2
2
3:35.3:30
0
0
3:30.3:45
0
0
3:30.3:45
0
0
3:45.4:00
0
3
0
2
5
3:45.4:00
0
.1
2
2
3
4:00.4:15
0
1
4:00.4:15
0
1
4!15.4-30
0
0
4:15.4:30
1
0
4:30.4,45
0
0
4:30.4:45
2
2
4:45.5:00
0
.0
1
2
2
4:45.5:00
A
3
3
6
9
5:0065:15
0
2
3:00.5:15
2
2
5:15.5:30
3
0
3:15.3:30
0
0
5:30.5:45
2
1
5:30.5:45
1
2
5:45 -6:00
3
.6
0
3
9
5:45.6:00
2
5
2
6
11
6:00.6:15
2
0
6:00.6:15
3
4
6:15 -6:30
0
1
6:134:30
2
2
6:30.6:45
2
0
6:30-445
0
3
6:45 -7:00
3
7
0
1
.8
6:45 -7:00
2
7
2
11
18
7:00.7:15
4
2
7:00 -7:15
3
1
7:15.7:30
0
3
7:13 -1:30
4
0
7:30.7:45
2
0
7:30.7:45
2
0
7:45 -8:00
4
10
.0
3
13
7:43 -8:00
3
12
2
3
15
8:00-8:15
2
0
8:00.8:15
2
3
8:15 -8:30
0
0
8:15 -8:30
4
2
8:30-8:45
0
1
8:30-8:45
1
1
8:45 -9:00
1
3
1
2
S
8:45.9:00
2
.9
1
7
16
9:00-9:15
2
0
9:00.9:15
1
3
9:15 -910
.2
2
9:15 -9:30
2
2
9:30445
0
1
9:30-9:45
0
0
9:45 -10:00
1
S
0
3
8
9:45 -10:00
1
.4
0
5
9
10:00.10.15
2
1
10:00-10:15
2
0
10:13.10:30
0
0
10:13 -10.30
1
2
10:30-10:45
2
5
10:30-20:45
0
1
10:43.11.00
.1
5
2
8
13
10:45.11:00
1
.4
0
3
7
11:00-11:15
0
1
1100 -11:15
1
0
11:15 -11:30
1
3
11:13- 11:3.0
2
0
U :30.11:45
0
2
11:30-11:45
1
1
11:45 -12:00
1
2
1
.7
9
11:45 -12:00
1
5
0
1
6
Total Volumes
44
34
78
56
58
114
Daily Totals
100
Sit
192
P
Received Apr -08 -98 03:48pm
[4PP. -09 -96 04:57 PM
from CCITT G3 4 RKJK
page
P.06
Looation:Hxtended Stay 1
1 3
Ontario
Volwites for Fri 4/3/98
2 10
02070028
AM Period
1N
OVr
4:004:15
PM Period
ilr
01.7
0
-12:15
0
0
2
12:00.12:15
4
3
,4304:45
•12:00
12:15 -12:30
1
0
1 4
12:15.12:30
1
3
3 16 37
12:30.1145
0
0
5:00.5:15
12:30.12:45
2
2
2
12:45.1:00
0
1 0
0
1 12:45 -1:00
0 7
1
9 16
1:00.1:15
0
0
5 14
1:00 -1:15
2
4
4 27 SO
1:15.1:30
1
1
6:006:15
1:15 -1:30
1
1
2
1:301:45
2
2
1:30.1:45
2
1
7
1:45.100
0
3 1
•4
7 1:45.200
S ]0
2
8 18
2:00 -2:15
0
0
2
2:002:15
3
5
6
2:15 -2:30
0
0
2:15.2:30
1
4
5
2:302:45
1
4
6
130.2:45
1
2
37
2:45.3:00
2
3 2
6
9 2:45 -3:00
2 7
3
14 21
3:003:15
0
3
3:003:15
1
2
4
3:15.310
0
0
2
3:15 -3:30
3
2
3:30.3:45
2
2
3
3:303:45
4
3
1
•
3:45 -4:00
1 3
1
b 9 3:454:00
2 10
5 12 22
4:00.4:15
3
2
4:004:15
2
4
4:15.4:30
0
4
4:15 -4 „30
5
2
4;304:4$
0
3
,4304:45
8
7
4:45.5:00
1 4
2
11 15 4:45.5;00
•6 21
3 16 37
5:005:15
3
1
5:00.5:15
4
8
5:15.5:30
2
0
5:15 -530
5
7
5:30 -5:45
4
0
5:305:45
7
8
5;45 -6:00
5 14
2
3 17 3:45 -6:00
7 23
4 27 SO
6:006.15
6
3
6:006:15
1
1
6:15 -6:30
6:306:45
6:15 -6:30
6:30.6:45
6:45.7:00 3 18 2 16 34 6:45 -7:00 4 17 6 12 29
7:00.7:15 7 3 7:007:15 1 1
7:15.7:30 8 2 7:15 -7:30 3 5
7:307:45
7:307:45
7:45.8:00
7
31
•8
22
53
7:45 -8:00
A
JO
5
15
25
8:008:15
4
3
8:009:15
5
3
8:13.8:30
6
2
9:33-3:30
6
5
810 -BA5
6
7
8:308:45
6
6
8:45 -9:00
5
21
7
19
40
8:45.9:00
4
21
2
16
37
9:009: t 5
2
4
9:009. l5
3
7
9:15 -9:30
4
8
9:15 -9.30
2
2
9:309:45
6
3
9:309:45
4
5
9:45 -10:00
6
18
4
19
37
9:45 -10:00
3
12
2
16
28
10:0010:15
3
6
10:00 -10:15
2
4
10:15 -10:30
2
3
10:15 -L0:30
1
3
10:3010:43
1
1
10:3010:45
2
2
10:45-1121,
A
10
2
12
22
10.45 -11:00
1
6
1
10
16
11:00-11:15
5
4
11:0011:15
1
0
11:15.11:30
6
2
11:1.5 -11:30
2
1
11:3011:45
5
3
11:3011:45
1
1
11:45.12:00
1
17
1
10
27
11:45.12:00
1
5
0
2
7
0 Total Volumes 143 128 271 149 157 306
Daily Totals 292 285 577
n�
Received Apr -08 -98 04:28pm from CCITT G3 , RKJK page 7
APR - 139 -98 05:37 PM P.07
Location:Extcnded Stay 2
Ontario
Volumes for Thur 4/2!98
02070027
AM Period
LN
OLT
PM Period
IN
OUT
12:00. 12:15
0
0
1100 -12:15
1
1
12:15.12:30
1
0
12:15.12:30
1
2
•
12:30.12:45
0
0
12:30 -12:45
2
1
12:45.1:00
0
1
0
0
1
12:45 -1:00
3
7
2
6
13
1:00.1:15
0
0
1:00 -1:15
4
2
1:15.1:30
0
0
1:15 -1:30
4
1
1:30.1:45
0
0
1:30.1:45
2
2
1:45.2:00
1
1
0
0
1
1:45.2:00
2
12
3
8
20
2:00.2:15
0
1
2:00.2:15
3
1
2:15 -2:30
0
0
2:15.2:30
2
1
2:30.2:45
2
0
2:30-2:45
1
1
2:45 -3:00
1
3
1
2
5
2:45 -3:00
2
8
1
5
13
3:00.3:15
0
0
3:00.3:15
3
6
3:15 -3:30
0
0
3:15 -3:30
4
3
3:30-3:45
1
0
3:30-3:45
2
2
3:45 -4:00
2
3
2
2
5
3:454:00
5
14
4
IS
29
4:00.4:15
0
1
4:00 -4:15
4
3
4:15 -4:30
0
0
4:15 -4;30
2
2
4:30-4:45
2
0
4:30-4:45
5
4
4:45.5:00
3
5
1
2
7
4:45 -5:00
2
13
2
11
24
5:00-5:15
4
0
5:00 -5:15
1
3
5:15.5:30
2
2
3:15.5:30
3
2
5:30.5:45
3
0
5:30-5:45
2
5
5:45.6:00
4
13
3
5
18
5:45.6:00
5
11
9
19
30
6:00.6:15
0
2
6:00.6:15
4
6
•
6:15.6:30
0
4
6:15 -6:30
1
5
6:30-6:45
2
2
6:30.6:45
3
1
6:45.7:00
1
3
3
11
14
6:45.7:00
1
9
5
17
26
7:00.7:15
1
5
7:00 -7:15
6
1
7:15.730
1
2
7:15.7:30
1
2
7:30-7:45
2
6
7:30 -7:45
2
4
7:45 -8,M0
4
S
2
IS
23
7:45 -8:00
5
14
3
10
24
S:00 -8:15
2
3
8:00 -8:15
4
1
8:15.8:30
1
2
8:15.8:30
2
1
8:30-8:45
2
3
8:30 -8:45
4
3
8:45.9:00
3
8
2
10
18
8:45 -9:00
4
14
1
6
20
9:00.9:15
2
1
9:00 -9:15
2
4
9:15.9:30
3
2
9:13 -9:30
3
2
9:30 -9;45
2
3
9:30.9.45
5
3
9:45 -10:00
5
12
2
8
20
9:45 -10:00
l
11
2
11
22
10:00-10:15
6
4
10:00 - 10:15
2
4
10:15.10:30
6
2
10:15 -10:30
4
2
10:30-10:45
2
3
10:30.10:45
1
1
10:45.11:00
5
19
2
11
30
10:45 -11:00
2
9
5
12
21
11:00-11:15
6
3
11:00-11:15
2
1
11:15.11:30
3
2
11:15 -11:30
1
1
11:30-11:45
6
5
11:30-11:45
2
1
11:45.12:00
2
17
2
12
29
11:45.12:00
1
6
0
3
9
Total Volumes
93
78
171
128
123
251
Daily Totals
221
201
422
IJ `�
l
0
TORRANCE ESA COUNTS
E
Received Apr -08 -98 01:59pm
PPR -09 -99 03`04 PM
from CCITT G3 - RKJK
page 1
P.01
Location:Eztended Stay
E. Dwy
Torrance
Volutnes for 7ue.3/31/98
02070018
AM Period
IN
OUT
PMPeriod
IN
OUT
12:00.12:15
0
1
12:00 -12:15
1
1
12:15 -12.30
0
0
12:15.12:30
2
2
12:30-1145
1
2
12:30.12:45
3
2
12:45 -i:00
0
1
1
4
5
12:45.1:00
4
10
1
6
16
I:00-1:15
0
0
1:00.1:15
4
0
115 -1:30
1
1
1:15.1:30
3
0
1:30-1.45
2
0
1:30-1:45
2
0
1:45.2:00
0
3
2
3
6
1:45 -2:00
0
9
3
3
12
2:002:15
a
0
2:00.2:15
2
4
2:15 -21:30
0
0
2.13-2:30
4
2
2:30-2.45
0
1
2:30-2:45
3
0
2:45.100
1
1
0
1
2
2:45 -3:00
2
11
3
9
20
3:00-3:15
2
0
3:00.3:15
1
4
3:15.3:30
0
1
3:1S -3:30
2
3
3:30-3:45
0
0
3:30-3:45
3
2
3:45.4:00
3
5
0
1
6
3:45 -4:00
2
8
9
IB
26
4:00-4:15
2
0
4:00.4:15
3
4
4:15.4:30
0
0
4:15 -4:30
4
2
4:30.4:45
2
1
4:30.4:45
2
3
4AS -5:00
1
5
0
l
6
4:45.5:00
5
14
6
15
29
5:00.5:15
2
2
5:00.5:15
2
5
5:15.5:30
0
0
5:15.5:30
6
7
5:30-5:45
1
0
5:30-5:45
7
6
5:45.6:00
0
3
1
3
6
5:45 -6:00
4
19
4
22
41
6:00.6:15
0
0
6:00-6:15
2
2
6:15.6:30
1
0
6:15 -6:30
3
3
6:30-6:45
2
1
6:30-6:45
2
5
6:45 -7:00
3
6
2
3
9
6:45 -7:00
0
7
7
17
24
` 7:00 -7:15
0
0
7:00.7:15
0
6
7:15.7:30
0
0
7:15 -7:30
1
5
7:30-7:45
1
2
7:30-7:45
2
4
7:45.8:00
2
3
4
6
9
7:45 -8:00
3
6
2
17
23
8:00.8:15
4
3
8:00 -8:15
4
0
8:15 -8:30
2
2
8:15 -8:30
2
3
8:30.8:45
0
1
8:30-8:45
3
3
8:45.9:00
0
6
0
6
12
8:45 -9.00
3
12
2
8
20
9:00-9:15
3
0
9:00.9:15
4
4
9:15.9:30
5
2
9:15 -9:30
2
2
9:30-9:45
4
2
9:30-9:45
1
3
9:45.10:00
2
34
2
6
20
9:45 -10:00
2
9
4
13
22
10:00-10:15
5
6
10:00.10:15
4
2
10:15.10:30
2
4
10:15 -10:30
2
0
10:30-10:45
7
2
10:3040:45
1
3
10:45.11:00
2
16
3
1S
31
10:45 -11:00
4
11
2
7
18
11:00-11:15
3
2
11:00 -11:15
2
1
11:15.11:30
2
4
11:15.11:30
1
0
11:30-11:45
2
3
11:30-11:45
1
0
11_45.12:00
2
9
2
11
20
11:45 -12:00
3
7
2
3
_10
72
Daily Totals
123 138
193 198
•
J-�
Received Apr -08 -98 01:54pm
APR -09 -9e 03:00 PM
AM Period
•12:00-12:15
12:15 -12:30
12:30-12:45
W.
0 1
1 0
0 1
1:001:]5 l 0
I:15.1:30 2 0
1:30-1:45 0 0
1:45.2:00 0 3 0
(9
from CCITT G3 4 RKJK page 2
P.02
e Volumes for Tue.3 /31198 020700
PM Period IN OUT
12:00.12:15 0 2
12:15.12:30 2 1
12:30.12:45 1 3
3 12:45.1:00 4 7 2 8
1:00.1:15 3 1 -
1:15.1:30 1 2
1:30-1:45 1 4
1:45.2:00 0 3 3 10
2:00.2:15
3
1
2:00.2:15
1
2
2:15 -2:30
2
0•
2:15 -2:30
2
1
2:30.2:43
4
0
2:30-2:45
1
0
2:45.3:00
0
9
0
1
10
2:45 -3:00
2
6
0
3
9
3:00.3:15
0
0
3:00 -3:15
1
1
3:15.3:30
2
0
3:15.3:30
0
4
3:30-3:45
1
0
3:30-3:45
8
2
3:45 -4:00
3
6
1
1
7
3:45.4:00
6
15
3
10
25
4:00 -4:15
0
0
4:00.4:15
5
6
4:15 -4:30
2
0
4:15.4:30
2
4
4:30-4:45
1
2
4:30-4:45
0
S
4:4$.5:00
2
$
1
3
8
`' 4:45.5:00
0
7
3
18
25
5:00-5:15
1
0
5:004:15
1
3
3:15.5:30
2
0
5:15 -5:30
3
1
5:30.5:45
3
0
5:30.5:45
2
2
5:45 -6:00
4
10
3
3
13
5:45.6:00
1
7
1
7
14
• 6:00.6:15
2
1
6:00 -6:15
3
3
6:15.6:30
0
0
6:15.6:30
2
1
6:30 -6:45
0
0
6:30-6:45
1
4
6:45.7:00
0
2
2
3
5
6:45 -7:00
3
9
1
9
l8
7:00 -7:15
4
5
7:00.7:15
2
2
7:15 -7:30
3
6
7:15 -7:30
0
1
7:30-7:45
2
3
7:30-7:45
2
0
7:45.8:00
0
9
4
is
27
7:45.8:00
4
8
0
3
11
9:00.9:15
2
2
8:00-8:15
5
1
8:15.8:30
1
0
8:15 -8:30
1
2
8:30-8:4$
3
0
8:30-8:45
2
4
8:45 -9:00
1
7
3
5
12
8:45.9:00
1
9
2
9
18
9:00.9:15
2
5
9:009:15
0
3
9:15 -9:30
0
7
9:15 -9:30
0
2
9:30.9:45
1
1
9:309:45
1
1
9:45.10:00
2
S
1
14
19
9:45.10:00
2
3
2
8
11
10:0010:15
3
2
10:00-10:15
4
3
10:15 -1030
2
1
10:15 -10:30
1
0
10:3010:45
0
1
10:30-10:45
0
2
10:45.11:00
2
7
2
6
13
10:45 -11:00
1
6
1
6
12
11:0011: I S
3
1
11:0011:15
0
0
11:15 -11:30
2
3
11:15 -11:30
2
4
11:30.11:45
1
2
11:30-11:45
1
1
11:45.12:00
1
7
1
7
14
11:45.12:00
1
4
0
5
9
ToW Volum
Daily Totals
86 96 182
157 159 316
Heceivea Apr -06 -98 b1:54pm
PPR -09 -9e
02789 PM
Laalion:Extended Stay w. Dwy
t AM Period
IN
2 12:00.12:15
t
12:15.12:30
1
12:30 -12:45
0
i
{ 12:45.1:00
0 2
1:00 -1:15
1
1:15 -1:30
0
t 1:30.1:45
0
1:45 -2:00
2 3
2:00.2:15
0
1 11 17
0 2:00.2:15
trom CCITT G3 v HKJK page 1
P -01
0 12:00.12:15
2
1
1 12:15.12:30
1
4
0 12:30.12:45
5
2
0 1 3 12:45.1:00
3 11
0 7 18
0 1:00.1:15
2
6
0 1:15.1:30
3
1
0 1:30 -1:45
1
3
0 0 3 1:45 -2:00
0 6
1 11 17
0 2:00.2:15
0
4
2.15.2:30
0
0
2:1$.2:30
2
1
2:30-2:45
1
1
2:30 -2:45
0
1
2:45.3:00
0
1
1
2
3
2:45.3:00
0
2
2
8
10
3:00.3:15
0
0
3:00.3:15
0
1
3:15.3:30
0
0
3:15.3:30
0
0
3:30-3:4S
0
0
3:30-3:45
1
1
3:45.4:00
1
1
1
1
2
3:45 -4:00
1
2
4
6
8
4:00.4:15
0
0
4:004:15
1
5
4:15 -4:30
0
1
4:15 -4:30
0
3
4:301:45
0
0
4:30-4:45
4
1
4:45.5:00
0
0
0
1
I
4:45 -5:00
1
6
0
9
15
5:00.5:15
0
1
5:00-515
1
2
5:15.5:30
0
0
5:15 -5:30
4
1
3:30-5:45
2
2
/5:30-5:45
3
1
5:45.6:00
0
2
0
3
5
'5:45.6:00
2
10
2
6
16
6:00.6:15
1
0
6:00.6:15
3
1
6:15 -6:30
0
2
6:15 -6:30
3
0
6:30.6:45
0
3
6:30-6:45
3
2
6:45.7:00
0
1
3
8
9
6:45 -7:00
1
10
1
4
14
7:007:15
1
3
7:00.7:15
1
3
7:15.7:30
1
4
7:15 -7:30
1
l
7:30-7:45
4
1
7:30-7:45
3
1
7:45.8:00
1
7
3
11
18
7:45 -8:00
3
8
0
S
13
8:00.8:15
2
3
8:00 -8:15
0
1
8:15.8:30
1
5
8:15 -8:30
4
1
8:30.8:45
5
1
8:30-8:45
0
0
8:45.9:00
2
10
5
14
24
8:45 -9:00
0
4
1
3
7
9:00.9:15
0
3
9:00 -9:15
1
0
9:15 -9:30
2
2
9:15.9:30
0
0
9:30-9:45
1
0
9:30-9:45
2
1
9:45 -10:00
1
4
3
8
12
945.10.00
0
3
0
1
4
10:00.1o:15
2
2
10:00-10:15
3
0
10:15 -10:30
1
1
10:15.10:30
0
0
10:30-10:45
3
0
10:30-10:45
0
2
10:45.11:00
1
7
2
5
12
10:45 -11:00
1
4
1
3
7
11:00-11:15
2
2
11:00.11:15
2
- �-
- 0
11:15.11:30
1
3
11:15 -11:30
1
1
11:30-11:45
2
0
11:3041:45
2
0
11:45.12:00
1
6
1
6
12
11:45.12:00
1
6
3
4
10
Total Volumes
44
60
104
72
67
-
_
139
Daily Totals
116
127
243
r�
LJ
'fib
Received Apr -08 -98 01:59pm
from
CCITT G3 4 RKJK
page 2
APR -09 -9e
03:03
PM
P.02
1.aeation:Extendod Stay W.
PM
Torrance
Volumes for Wed411198
02070016
AM Period
TN
OLT
PM Period
IN
OUT
12:00.12:15
0
0
12:00 -12:15
0
2
12:15.12:30
0
0
12715.12:30
0
3
12:30-12:45
0
1
12:30.12:45
0
2
12:45.1:00
0
0
0
1
1
12:45 -1:00
0
0
0
7
7
1:00.1:15
0
0
1:00.1.15
0
2
1:15.1:30
0
0
1:15.1:30
1
3
1:30.1:45
0
0
1:30-1:45
2
1
1:45 -2:00
1
1
1
1
2
1:45.2:00
2
5
1
7
12
2:00.2:15
0
0
2:00.2:15
1
5
2:15 -2:30
0
0
2:15.2.30
3
1
2:30.2:45
0
0
2:30.2:45
0
1
2:45.3:00
0
0
0
0
0
2:45 -3:00
3
7
.0
7
14
3:00.3:15
1
0
3:043:15
0
0
3:15 -3:30
0
0
3:15.3:30
2
7
3:34145
0
1
3:343:45
0
0
3:45 -4:00
2
3
0
1
4
3:45 -4:00
1
3
4
11
14
4:044:15
0
0
4:044:15
3
1
4:15 -4:30
0
0
4:15.4:30
1
3
4:344:45
1
2
4:30.4:45
1
3
4:45.5:00
2
3
1
3
6
4:45.5:00
0
5
1
8
13
5:045:15
0
0
5:045:15
4
0
515.5:30
0.
0
5:15 -5:30
1
0
5:30.5:45
0
0
5:345:45
7
3
5:45.6:00
1
1
1
1
2
5:45 -6:00
3
15
0
3
18
6:046:15
2
0
'6:00-6:15
2
2
6:15.6:30
0
0
6:15 -6:30
2
4
6:346:45
2
9
6:346:45
2
1
6:45.7:00
1
5
2
2
7
6:45.7:00
2
8
5
12
20
7:047:15
2
1
7:047:15
7
1
7:15 -7:30
1
3
7:15 -7:30
0
2
7:347:45
2
2
7:347:45
0
2
7:45.8:00
0
5
0
6
11
7:45 -8:00
1
8
2
7
15
8:048:15
2
2
8:00 -8:15
2
0
8:15.8:30
3
2
8:15.8:30
3
0
8:348:45
4
4
8:30.8:45
2
2
8:45.9:00
2
11
2
10
21
8:45.9:00
2
9
1
3
12
9:049:15
0
4
9:040:15
4
1
9:15 -9:30
2
3
9:15.9:30
1
1
9:349:45
3
2
9:349.45
1
0
9:45.10:00
4
9
0
9
18
9:45.10:00
0
6
0
2
8
10:0410:15
2
3
10:0410:15
3
0
10:15.10:30
3
2
10:15.10:30
1
0
10:30.10:45
2
1
10:3410:45
1
1
10:45.11:00
4
13
5
11
22
10:45 -11:00
1
6
0
1
7
11:0411:15
2
4
11:0411:15
0
0
11:15.11:30
3
3
11:15.11:30
0
0
11:3411:45
2
2
11:34I1:45
0
0
i1:45•t2:)0
2
9
3
12
21
11:45 -12:00
2
2
0
0
2
Towt Volumes
58
57
115
74
68
142
Daily Totals
132
125
257
1A
Receivea Apr -06
-96 01:59pm
from
GCIII G3 �
HKJK
page 3
PPR- 199 -98
03706
PM
P.03
LocaLlonIxtended Stay w.
D"
Torrance
Volumes for Thur 4/2198
02070001
AM Period
1N
OUT
PM Period
Al
OLM
12:00 -12:15
0
0
12:00.12:15
2
0
12:15.12:30
3
1
12:15.12:30
4
1
12:30.12:45
1
2
12:3012:45
1
1
114S -1:00
2
6
0
3
9
12:45.1:00
0
7
2
4
11
1:00 -1:15
0
0
1:00.1:15
0
0
1:15 -1:30
0
0
1:15 -1:30
1
0
1:301:45
0
0
1:30.1:45
1
0
1:45.2:00
2
2
0
0
2
1:45 -2:00
2
4
1
1
S
2:00.2:15
0
0
2:002:15
2
1
115 -2:30
0
0
2:15 -2:30
1
6
2:30.2.45
0
0
2:302:45
2
1
2:45.3:00
0
0
0
0
0
2AS -3:00
1
6
7
15
21
3:003:15
0
2
3:003:15
0
1
3:15 -3:30
0
0
3:15 -3:30
1
2
3:303:45
D
0
3:303:45
2
0
3:45.4:00
0
0
0
2
2
3AS -4:00
1
4
0
3
7
4:004:15
0
0
4:004:15
3
1
4:15.430
0
0
4:15 -4:30
1
2
430.4:45
0
0
4:304:45
4
1
4:45 -5:00
0
0
0
0
0
4;45 -5:00
2
10
0
4
14
5:005:15
0
1
5:005:15
3
3
5:15.5:30
0
1
5:15 -5:30
3
0
5:305:45
0
0
5:30-SAS
1
0
5:45.6:00
0
0
1
3
3
3:43.6:00
4
11
2
5
16
6:006:15
1
2
6:006:15
0
1
6:15.6:30
4
4
6:15.6:30
4
2
.
6:306:45
0
2
6:306:45
4
0
6:45.7:00
0
5
1
9
14
6:45 -7:00
0
8
2
5
13
7:00.7:15
5
4
7:007:15
l
1
7:15 -7:30
2
S
7:15 -7;30
0
1
7:307:45
2
9
7:30.7:45
0
1
7:45 -8:00
1
10
S
23
33
7:454:00
7
8
3
6
14
8:008:15
1
5
8:008:15
6
0
8:15.8:30
0
1
8:15.8:10
5
0
8:308:45
3
1
8:308:45
3
0
BAS -9:00
2
6
2
9
15
8:45 -9:00
3
17
1
1
18
9:009:15
1
0
9 :009:15
4
0
9:)S-O,.30
1
8
9:15 -9:30
3
0
9:304.45
0
2
9:309:45
0
0
9:45 -10:00
1
3
2
12
15
9:45.10:00
1
8
0
0
8
10:0010:1 S
0
4
10:0010:15
0
0
10:15.10:30
3
2
10:15 -10:30
0
0
10:3010:45
3
2
10:3010:45
1
1
10.45.11:00
1
7
6
14
21
10:45 -11:00
0
1
0
1
2
11:00.11:15
2
1
11:0011:15
1
1
11:15.11:30
5
S
11:15.11:30
1
0
11:3011:45
0
1
11:30 -11:45
0
0
11:45.1100
2
9
1
8
17
11:45.12:00
1
3
0
1
4
Total Volumes
48
83
131
87
46
133
DaityTotals
135
129
1 264
r�
Received Apr -08 -98 01:59pm from CCITT G3 4 RKJK page 4
APR -09 -90 033:06 PM P.04
Torrance
131
AM Period
IN
OUT
PMPcriod
1N
OUT
Is12:00.12:15
0
0
12100.12:15
4
5
12:15.12:30
3
1
12:15.12:30
1
3
12:30 -12:45
0
0
12:30 -12:45
5
6
12:45.1:00
2
S
0
1
6
12:45.1:00
5
15
2
16
31
1:00.1:15
4
0
1:00 -1:15
1
1
1:15.1:30
0
0
1:15.1:30
1
5
1:30.1:45
1
2
1:30.1:45
2
3
1:45-2:00
0
5
0
2
7
1:45,2:00
0
4
2
11
15
2:00.2:15
0
0
2:00.2:15
7
2
2:15 -2:30
0
0
2:15 -2:30
8
2
2:30 -2:45
0
0
2:30.2:45
8
6
2:45.3:00
0
0
0
0
0
2:45.3:00
9
12
2
12
44
3:00.3:15
0
0
3:00.3:15
2
2
3:15.3:30
0
0
3:35.3:30
1
0
3:30.3:45
0
0
3:30.3:45
2
4
3:45.4:00
I
1
0
0
1
3:45.4:00
6
11
16
22
33
4:00.4:15
1
2
4:00.4:15
7
4
4:15.4:30
0
0
4:35 -4:30
4
1
4:30.4:45
3
1
4:30.4:45
2
5
4:45.5:00
0
4
0
3
7
:4:45.5:00
5
18
1
11
29
S:00.5:15
1
2
5:00.5:15
7
4
515.5:30
4
2
.5:15.5:30
8
5
5:30.5:45
0
0
5:303:45
6
3
5 ;45.6:00
0
S
0
4
9
5:45.6:00
7
28
8
20
48
6:0066:15
0
1
6:00.6:15
1
S
6:15 -6:30
0
2
6:15.6:30
0
1
6:30.6:45
2
2
6:30.6:45
5
S
6:45 -7:00
0
2
1
6
8
6:45 -7:00
1
.7
4
15
22
7:00.7:15
S
3
7:00.7:15
3
1
7:15 -7:30
4
4
7:15.130
8
2
7:30.7:45
0
4
7:30.7.45
2
4
7:45 -8:00
0
9
9
20
29
7:45 -8:00
1
14
4
11
2S
8:00 -8:15
2
4
8:00.8:15
1
4
8:154:30
0
2
8:15.8:30
1
2
8:30.8:45
1
4
8:30.8:45
2
2
8:45 -9:00
3
6
0
10
16
8:45.9:00
.6
10
4
12
22
9:00.9:15
3
5
9:00.9:15
1
1
9:15.9:30
3
4
9:15 -9:30
3
2
9:30 -9:4$
1
6
9:30.9:45
2
4
9:45.10:00
1
8
1
16
24
9:45.10:00
1
7
2
9
16
10:00.10:15
1
3
10:00.10:15
0
4
10:15.10:30
2
1
10:15 -10:30
7
2
10:30.10:45
1
2
10:30.10:45
1
2
30:45.11:00
2
6
1
7
13
10:45 -11:00
1
9
0
8
17
11:00 -11:15
'11
11:00.1 T I S
2
1
11:15 -11:30
1
1
11:15 -11:30
0
1
11:30.11:43
4
5
11:30 -11:45
2
1
11 :45.12:00
ToW Volume:
1
59
7
1
77
8
15
135
11:45-12:00
1
160
5
0
150
3
8
310
IaailyToWs
218
227
445
131
Received Apr -08 -98 01:591)m
6PR -09 -99 03:07 PM
from CCITT G3 4 RKJK page 5
P.05
L40ation:Extended Stav E.
Dwy
Torrance
Volumes for Wed.4 /1198
02070015
AM Pcnod
N
OUT
PM Period
IN
011l
12:00.12:15
0
0
12:0012:15
1
7
12;15.12:30
1
0
12:15 -12:30
2
3
12:30.12:45
2
0
12:30.12:45
1
2
12:45 -1:00
0
3
1
1
4
12:45 -1:00
0
4
0
12
16
1:001:15
0
0
1:001:15
9
6
1:15.1:30
0
0
1:15 -1:30
8
3
1;301:45
0
0
1:30.1:45
1
8
1:45 -2:00
1
1
0
0
1
1:45.2:00
3
21
4
21
42
2:00-2:1$
0
0
2:002:15
3
1
2:15 -2:30
0
1
2:15 -2:30
1
3
2:302:45
0
0
2:302:45
6
2
2:45.3:00
0
0
0
1
1
2:45.3:00
3
13
3
9
22
3:00.3:15
1
2
3:003:15
3
1
3:15.3:30
2
1
3:15.3:30
7
5
3:303:43
0
0
3:303:45
3
5
3:45.4:00
0
3
3
6
9
3:45.4:00
5
20
2
13
33
4:00 -4:15
0
4
4:004:15
4
4
4:15.4:30
0
2
4:15.4:30
4
4
4:304:45
0
1
4:304:45
7
3
4:45 -5:00
2
2
0
7
9
4:45 -5:00
6
21
2
13
34
5:005:15
0
0
S:00.5:15
8
6
5:15.5:30
1
0
5:15 -5:30
1
2
5:30-SAS
2
3
5:305:45
7
6
$:45.6:00
6:00-6:13
3
2
6
5
7
8
14
'..5:43.6:00
6:006:15
7
7
23
3
4
17
40
6:15430
0
6
6:15.6:30
3
1
6:306:45
2
5
6:30.6:45
4
B
6:45.7:00
3
7
4
22
29
6:45.1:00
1
15
4
17
32
'7:00-7:15
4
2
7:007:15
0
5
7:15.7:30
5
0
7:15.7:30
0
0
7:307:45
3
3
7:307:43
1
3
7:45.8:00
0
12
3
8
20
7:45.8:00
9
10
4
12
22
8:008:15
0
3
8:008:15
2
4
8:15 -8:30
0
5
8:15 -8:30
9
2
8:308:45
2
4
8108:45
7
5
8:45.9:00
1
3
3
15
IS
8:4S -9:00
7
25
2
13
38
9:009:15
4
2
9:00.9:15
5
2
9:15.9:30
3
0
9:15 -9:30
0
1
9:309:45
4
3
9 :309:45
1
1
9:45 -10:00
2
13
2
7
20
9:45.10:00
5
11
4
8
19
10:0010:15
3
4
10:0010:15
1
0
10:15 -10:30
5
2
10:15.10:30
S
2
10.3010:45
4
3
10:3010:45
0
4
10:45.11:00
3
13
5
14
29
10:45.11:00
1
7
2
8
15
11:0011:15
2
3
11:0011:15
3
2
11:15.11:30
0
4
11:15.11:30
2
1
11:3011:45
2
2
11:3011:45
2
1
11:45.12:00
2
6
0
9
15
11:45.12:00
5
12
2
6
18
Total Volumes
71
98
169
182
149
331
Daily Totals
253
241
500
)3,�,
Received Apr -08 -98 01:59pm
,rPR -09 -90 03:07 PM
from CCITT G3 4 RKJK
page 6
P -06
LocatiowExtcnded Stay
E. Dwy
0
Torrance
2
Volumes for Fri. 4/3/99
5:15 -5:30
2
02070014
i 5:15.5:30
AM Period
V4
5:30.5:45
our
3
15:30-5:45
PM Period
IN
5:45.6:00
our
2 1 6
8 5:45 -6:00
12:00-12:15
0
6:00.6:15
2
2
6:00 -6:15
12:00.12:15
0
6:13 -6:30
6
3
6:15.6:30
12:15.12:30
3
7:15.7:30
5
2
12:15.12:30
4
7:15 -7:30
5
2
12:30 -12:45
0
7:30.7:45
0
7
12:30-12:45
3
7:30-7:45
5
4
12:45.1;00
3
6
0
7
13
12:45 -1:00
5
12
5
21
33
1:00 -1:15
0
8:00.8:1 S
0
4
1:00.1:15
4
8:00 -8:15
4
3
1:15 -1:30
0
8:15.8:30
0
7
1:15 -1:30
3
8:13.8:30
6
4
1:30.1:45
0
8:30.8.45
0
3
1:30-1:45
2
8:30-8:45
3
2
1:45.2:00
0
0
2
2
2
1:45 -1,00
4
13
4
17
30
2:00.2:15
2
9:00.9:15
0
0
2:00-2:15
2
9:00.9:15
2
3
2:15.2:30
0
9:15 -9.30
0
2
2:15.2:30
4
9:15.9:30
3
5
2:30-2:45
0
9:30.9:45
0
S
2:30-2:45
5
9:30-9:45
5
4
2:45.3:00
0
2
0
0
2
2:45.3:00
6
17
6
16
33
3:00.3:15
0
10:00.10:15
0
5
3:00.3:15
7
10.210:13
7
2
3:15.3:30
0
10:15.10:30
0
6
3:15.3:30
5
10:15 -10:30
8
1
3:30.3:45
0
10:30-10 :45
0
2
3:30.3:45
3
10:30-10:45
10
0
3:45.4:00
2
2
0
0
2
3:454:00
2
17
7
32
49
4:00.4:15
3
11:00611:15
4
1
/'4:W4:13
0
11:00.11:15
6
0
4:13.4:30
2
11:15 -11:30
0
4
4:15 -4:30
2
11 :15 -11:30
4
2
4:30.4:45
3
11:30.11:45
2
10
4:30.4:45
4
11:30-11:4S
5
1
4:45 -5:00
2
10
1
7
17
'4:45 -5;00
6
12
3
IS
30
5:00.5:15
0
0
3:00.5:15
2
2
5:15 -5:30
2
2
i 5:15.5:30
4
7
5:30.5:45
0
3
15:30-5:45
6
5
5:45.6:00
0
2 1 6
8 5:45 -6:00
4 16
4 18 34
6:00.6:15
0
2
6:00 -6:15
5
2
6:13 -6:30
0
3
6:15.6:30
2
6
630.6:45
4
5
6:30 -6:45
3
4
6:45.7:00
3
7
3
13
20
6:45 -7:00
6
16
5
17
33
7:00.7:15
9
6
7:00.7:15
4
3
7:15.7:30
2
2
7:15 -7:30
3
2
7:30.7:45
5
7
7:30-7:45
2
4
7:45.8:00
11
27
2
17
44
7 :45 -8:00
7
16
2
11
27
8:00.8:1 S
5
4
8:00 -8:15
S
3
8:15.8:30
9
7
8:13.8:30
4
4
8:30.8.45
4
3
8:30-8:45
3
2
8:45.9:00
3
21
2
16
31
8:45.9:00
1
13
5
14
27
9:00.9:15
9
0
9:00.9:15
4
3
9:15 -9.30
6
2
9:15.9:30
2
5
9:30.9:45
3
S
9:30-9:45
3
4
9:45.10:00
4
22
5
12
34
9:45 -10 :00
2
11
3
15
26
10:00.10:15
3
5
10.210:13
4
2
10:15.10:30
7
6
10:15 -10:30
4
1
10:30-10 :45
1
2
10:30-10:45
5
0
10:45-11:02
Z
IS
1
14
32
10:45 -11:00
3
16
0
3
19
11:00611:15
4
1
11:00.11:15
2
0
11:15 -11:30
8
4
11 :15 -11:30
0
2
11:30.11:45
6
10
11:30-11:4S
0
1
11:43 -12:00
9
27
4
19
46
11:45.12:00
1
3
0
3
6
Total Volumes
Daily Totals
306 298
133
Received Apr -08 -98 01:59pm from CCITT G3 -+ RKJK page 7
91PP -09 -98 03:08 PM P.07
iocation:Pxtended Stay E.
Dwy
Torrance
Volumes for Sat.4 /4/98
02070017
AM Period
IN
OUT
P-M Period
LN
OLT
12:00 -12:15
0
0
12:00 -12:15
0
2
12:15.12:30
0
2
MIS-12:30
1
2
.
12:30.12.45
1
1
12:30.12:45
2
2
12:45 -1:00
0
1
2
5
6
12:45 -1:00
0
3
2
8
Il
1:00.1:15
0
1
1:00 -1:15
0
7
1:15.1:30
0
0
1:15.1:30
3
6
1:30 -1:45
0
0
1:30.1:45
4
4
1:45 -2:00
0
0
0
.1
.1
1:45.2:00
2
9
2
19
28
2:00.2:15
0
1
2:00-2:15
3
0
2:15.2:30
1
0
.2:15.2:30
2
0
2:30.2;45
0
0
2:30.2:45
4
3
2:45.3:00
0
1
0
1
2
1,45.3:00
5
14
5
8
22
3:00 -3:15
0
0
3:00.3:15
3
2
3:15.3:30
1
0
3.:15 -3:30
2
4
3:30 -3:45
0
1
3:30 -3:45
1
2
3:45.4:00
0
1
2
3
4
3:45.4:00
0
6
3
11
17
4:00 -4:15
2
0
4:00 -4:15
1
5
4:15 -4:30
1
0
4:15.4:30
0
2
4:30.4:45
0
1
4:30.4:45
8
7
4:45.5:00
0
3
2
3
6-
4:45 -5:110
1
10
6
20
30
5:00 -5:15
0
0
5:00 -5:15
5
6
5:15.5:30
1
0
5:15 -5:30
3
2
5:30 -5:45
2
1
5:30 -5:45
2
7
5:45 -6:00
0
3
2
3
6
.5:45 -6:00
4
14
2
17
31
6:006:15
2
0
6:00 -6:15
2
8
6:15.6:30
4
0
6:15.6:30
4
5
6:306:45
0
0
6:30-6:45
2
3
6:45.7:00
0
6
1
1
7
6:45 -7:00
0
8
6
22
30
.-'7:00 -7.15
1
0
7:00.7:15
0
4
7:15.1:30
2
0
7:15.1:30
3
2
7:307:45
5
0
7:307:45
5
3
7:45.8:00
3
11
3
3
14
7:45.8:00
4
12
2
11
23
8:008:15
7
2
8:008:15
7
2
6:15 -8:30
4
1
8:15.8:30
2
4
8:308:45
6
0
8:30.8:45
0
2
8:45.9:00
5
22
0
3
25
8:45 -9:00
0
9
3
II
20
9:00.9:15
7
0
9:009:15
1
4
9:15.9:30
3
2
9:15 -9:30
4
2
9:30.9:41
2
4
9:36.9:45
2
5
9:45 -10:00
4
16
4
10
26
9:45 -10:00
3
10
2
13
23
10:00. 10.15
7
2
10:0010:15
5
3
10:15.10:30
2
5
10:15 -10:30
6
4
10:30 -10:43
9
6
10:30 -10:45
7
2
10:45.11:00
8
26
2
15
41
10.45 -11:00
2
20
4
13
33
11:0011:15
2
3
11:0011:15
2
0
11:15.11:30
4
7
1115 -11:30
1
1
11:3011:45
3
8
11:3011:45
2
1
11:45 -12:00
2
11
9
27
38
11:45.12:00
4
9
0
2
11
Total Volumes
101
75
176
124
135
279
Daily Totals
225
230
455
/34
ytt-
Received Apr -08 -98 01:59pm from CCITT G3 4 RKJK
RVR -09 -99 03:39 PM
page 8
P. e6
Localion:Extcnded Stay W. Dwy
2
0
Torfanee
0
Volunies for Sat 414/98
6:006:15
2
02070003
0
AM Period
IN
`6:13.6:30
OUr
1
0
PM Period
IN
6:15 -6:30
OUT
3
1
12:00.12:15
0
6 :306:4S
1
41
1
12:00.12 :35
2
6:30.6:45
1
2
12:15 -12130
0
6:4S -7:00
1
3
0
12:15.12:30
0
6:45 -7:00
5
8
0
12:30.12:45
0
7:007:15
0
1
12:3012:45
1
7:007:15
1
3
12:45.1:00
0
0
0
2
2
12:45.1:00
2
5
2
9
14
1:00-1:15
0
7:307:45
1
2
1:001:15
0
7:307:45
3
4
1:15.1:30
0
7:45.8:00
0
3
2
1:15 -1:30
2
7:43.8:00
2
8
2
1:301:45
0
8:008:15
0
1
1:301:45
3
8:008:15
3
0
1:45.100
3
3
0
1
4
1:45 -2:00
0
5
0
8
13
2:002:15
0
8:308:45
0
1
2:002:15
0
8:308:45
2
2
2:15.2:30
0
8:45 -9:00
0
2
2
2:13.2:30
2
8:45.9:00
1
7
1
2:302:45
0
9:009:15
0
1
2:302:45
1
9:009:15
4
0
2:45.3:00
0
0
0
0
0
2:45 -3:00
0
3
2
9
12
3:003.15
0
9:309:45
0
6
3:00.3:15
0
4.309:45
3
1
3:15.3:30
1
9:45 -10:00
1
10
3
3:13.3:30
1
9:45 -10:00
2
10
0
3:303:45
1
10:0010:1 S
0
1
3:303:45
2
10:0010:15
0
2
3:43.4:00
0
2
0
1
3
3:45.4:00
0
3
1
6
9
4;004:15
0
10:3010:45
1
1
4:004:15
0
10:3010:45
2
0
4:15.4:30
0
10:45.11:00
0
14
1
4:15.4:30
0
10:43.11:00
4
9
0
4:304:45
1
0
4:304:45
2
3
4:45.5:00
0
1
0
1
2
4:4$.5:00
1
3
2
11
14
5:00':15
0
0
5:005:15
3
0
5:15.5:30
1
0
/ 5:15.5:30
2
1
5:305:43
1
0
5;305:45
0
2
S:45.6:00
0
2
0
0
2
5:45 -6:00
1
6
0
3
9
6:006:15
2
0
0
0
1
6:006:15
2
1
0
1
0
`6:13.6:30
0
1
0
2
1
6:15 -6:30
1
3
1
1 4
0
6 :306:4S
1
41
1
71
72
6:30.6:45
2
2
124
113
6:4S -7:00
0
3
0
1
4
6:45 -7:00
3
8
0
3
11
7:007:15
0
1
7:007:15
4
3
7:15 -7:30
1
1
7:15 -7:30
2
2
7:307:45
0
2
7:307:45
0
4
7:45.8:00
2
3
2
6
9
7:43.8:00
2
8
2
11
19
8:008:15
0
1
8:008:15
1
0
8:15.8:30
0
4
8:13 -8:30
3
1
8:308:45
2
1
8:308:45
2
2
8:45 -9:00
0
2
2
8
10
8:45.9:00
1
7
1
4
11
9:009:15
6
1
9:009:15
4
0
9:15 -9:30
1
1
9:15.930
3
2
9:309:45
1
6
4.309:45
2
1
9:45 -10:00
2
10
3
11
21
9:45 -10:00
1
10
0
3
13
10:0010:1 S
3
1
10:0010:15
2
2
10:15 -10:30
4
2
10:15 -10:30
4
1
10:3010:45
2
1
10:3010:45
1
0
10:45.11:00
5
14
1
5
19
10:43.11:00
2
9
0
3
12
11:0011:15
2
0
11:0011:15
0
1
11:15.11:30
3
1
11:15 -11:30
1
0
11:3011:45
2
1
11:3011:43
2
1
11:45 -12:00
6 13
3
5 18 11:43 -12:00
1 4
0
Taal Volumes
53
41
94
71
72
Daily Totals
124
113
125
Receivea Apr -08
-98
01:59pm
from
GCIII G3 � KKJK
page 9
PPR -09 -98
03:09
PM
P.09
Lueatiolt:Extended Stay
W. Dwy
Torrance
Volumes for Sun. 4/5/98
02070020
AM Period
IN
OUT
PM Period
1N
OUT
12:00.11:15
12:15.12:30
0
0
0
1
12:00 -12:15
12:15.12:30
0
1
0
2
12:30.12:45
0
0
12:3042:45
0
0
12:45.1:00
1
1
0
1
2
12:45 -1:00
0
1
2
4
5
1:00.1:15
0
0
1:00.1:15
2
1
1:15.1:30
0
0
1:15.1:30
0
0
1:30.1:45
0
1
1:30.1:45
0
2
1:45.2:00
0
0
0
1
1
1:45.2:00
3
5
1
4
9
2:00.2:15
0
0
2:00.2:15
2
0
2:15 -2:30
1
0
2:15 -2:30
1
2
2:30.2:45
0
0
2:30.2:45
0
4
2:45.3:00
0
1
0
0
1
2:45 -3:00
0
3
2
8
11
3:00 -3:15
0
0
3:00 -3:85
1
3
3:15 -3:30
0
0
3:15.3:30
2
5
3:30.3:45
0
0
3:30.3:45
0
4
3:45 -4:00
2
2
0
0
2
3:45 -4:00
0
3
2
14
17
4:00.4:15
1
0
4:00 -4:15
1
0
4:15 -4:30
0
0
4:154:30
2
2
4:30.4:45
0
0
4:30.4:45
3
3
4:45.5:00
0
1
0
0
1
4:45 -5:00
0
6
2
7
13
5:00.5:15
1
0
5:00.5:15
2
1
5:15 -5:30
0
1
S:15 -5:30
0
0
5:303:45
0
0
5:30.S :45
1
0
5:45 -6:00
0
1
0
1
2
5:45 -6:00
l
4
2
3
7
6:00.6:15
2
0
6;00.6;15
0
1
6:15 -6:30
1
0
6:15 -6:30
1
2
6:30.6:45
0
0
6:30.6:45
2
4
6:45 -7:00
0
3
2
2
5
6:45.7:00
4
7
1
B
15
7:00.7:15
1
0
7:00.7:15
0
2
7:15.7:30
2
3
7:15 -7:30
2
0
7:30.7:45
0
1
7:30.7:45
1
0
7:45.8:00
2_
5
2
6
If
7 :45-8:00 _
0
3
4
6
9
8:00.8:13
3
0
8:00.8:15
2
2
8:15 -8:30
4
0
8:15.8:30
0
1
8:30.8:45
2
2
8:30.8:45
0
0
8:45 -9:00
3
12
4
6
18
8:45.9:00
1
3
0
3
6
9:00 -9:15
2
2
9:00.9:15
0
1
9:15 -9:30
0
3
9:15430
2
2
9:30.9:45
1
2
9:30.9:45
l
3
9:45 -10.00
2
5
0
7
12
9:45.10:00
2
5
0
6
11
10:00 -10:15
3
0
10:00.10:15
0
0
10:15.10:30
2
4
10:15 -10:30
1
2
10:3000:45
4
2
10:30.10:45
2
1
10:45.11:00
2
11
1
7
18
10:45.11:00
1
4
0
3
7
11:00.11:15
5
0
11:00.11:15
2
0
11:15.11:30
1
0
11;15.11:30
1
1
11:30 -11:45
2
2
11:30 -11:45
1
1
11:45.12:00
1
9
1
3
12
1145 -12:00
1
S
0
2
7
Tate! Volumes
51
34
85
49
68
117
Daily Totals
100
101
202
•
1,29
Received Apr -08 -98 01:59pm
1 2
from
CCITT G3 -+ RKJK
2 11
4 14 25
4;00.4:15
page 10
,. ?R -09 -98 03710
PM
0
2
4:154:30
0
0
P.10
0
3
4:30.4:45
0
Localion:Extended Stay B.
D"
Torrance
Volumes for Sun. 415198
4:45.5:00
02070021
1
AM Period IN
.2 2
OUT
PM Period
IN
OUT
S:005:15
4
12:00.12:15 0
5:15.5:30
0
12:00 -12:15
1
0
0
5:30.5:45
72:15 -12:30 0
2
1
12:15.12:30
2
0
3 14
.1
12:30 -12:45 0
2 14
0
1230-12:45
0
2
3
15 3
12:45.1:00 0
0
0 1
1 12:45.1:00
0 3
4
6
9
1:00.1:15 0
11:0011:15
1
1:00.1:15
3
2
I
3
1:I5.1:30 0
11:15 - 11:30
0
1:1S -1:30
2
3
3
2
1:30.1:45 0
11:3011:45
0
1:30 -1:45
4
4
0
6 0
1:45.2:00 1
1
0 1
2 1:43.2:00
2 11
1
10
21
2:00.2:15 2
0
2:00 -2:15
0
2
2:15.2:30 0
1
2:15.2:30
0
3
2:30.2:45 0
0
2:30.2:45
2
5
2:45.3:00 0
2
0 1
3 2:45 -3:00
4 6
4
14
20
3:00.115 1
0
3:00.3:15
3
2
MS -3:30 0
0
.3:15.3:30
2
3
3:30 -3:45 0
0
3:30 -3:45
4
5
3:45.4:00
1 2
0
0 2 3:454:00
2 11
4 14 25
4;00.4:15
2
0
4:00.4:15
0
2
4:154:30
0
0
4:15 -4:30
0
3
4:30.4:45
0
0
4:30.4:45
0
S
4:45.5:00
3 3
1
1 6 4:45.5:00
.2 2
4 14 16
5:00 -5:15
2
0
S:005:15
4
2
5:15.5:30
4
0
5 :15 4:30
5
0
5:30.5:45
5
2
5:30.5:45
3
2
5:4$,6:00
3 14
.1
3 17 3 :454:00
2 14
3 7 21
6:00.6:15
6
0
6:0D -6:15
2
2
6:13.6:30
5
0
6;15 -6:30
4
4
6:30.6:45
4
0
6:30.6.45
2
2
6:45.7:00
2 1.7
0
0 17 6:45.7:00
1 .9
0 8 17
7:007:15
1
2
7:00.1:15
0
2
7:15 -7:30
2
J
7:13,730
2
3
7:307:45
5
0
7:307:45
1
4
7:43.8:00
1 9
0
3 12 7:45 -8:00
0 3
2 11 14
8:008:15
3
2
8:00.8:15
1
4
8:15 -8:30 1 4 8;25 -8:30 2 3
8:30.8:45 4 2 8:308:45 2 4
9:009:15
2
2
9:00.9:15
2
s
9:15 -910
3
1
9:15.9:30
0
2
9:309:45
4
0
9:309:45
2
1
9:45 -10:00
2
11 0
3 14
9:43 -10:00
.1 5
2
8 13
10:0010:15
3
2
10:00.10:15
1
2
10:15 -10:30
4
4
10:15.10:30
2
0
10:3010.45
S
2
10:3010:45
0
1
10:45 -11:00
3
15 3
11 26
19:45.11:00
1 4
4
7 31
11:00.11:15
2
4
11:0011:15
0
2
1 1:15.11:30
I
3
11:15 - 11:30
1
3
1I:30-11:45
3
2
11:3011:45
1
1
11:4542:00
0
6 0
9 15
11:45.110D
0 2
0
6 1
•Total Volumes
90
44
134
76
ll8
194
Daily Totals
166
162
321
I t/6
12/02:1999 04:09 669 -1759 DDS :SPLP PAGE 02
OCT 2 �9a9
LANGDON
WILSON
ARCHITECTURE
P L A N N I N G
I N T E R 1 0 R S
Partners October 19, 1999
J. Faeick Alen, AIA
AsaJ NI Khan
Mr. Kevin M. Clarke
Michael Schroeder, AIA project Director
Polygon Development, LP
200 East Baker Street, Suite 100
Costa Mesa, California 92626
Reference: KCN Design Review
Extended Stay America
4881 Birch Street
Dear Kevin:
Via Facsimile and Mail: (714) SS7 -7696
Based on Koll Center Newport's (KCN) authorization, Langdon Wilson is providing
the following KCN CC &R Design Review response to the proposed Extended Stay
America project. The design development level drawings submitted for review were
prepared by mcg architecture and consist of sheets T.1 and A.1 through A.5, dated
August 9, 1999.
This design development submission is conditionally approved and is subject to the
following requirements:
Offices
1. Submit a preliminary (design development level) landscape plan for design
review. Of concern is the limited distance between the parking lot and the
Los Angeles
building and the ability to soften and filter the view of the building from the
(213) 2%1186
adjacent streets and properties; and to maintain the established 'office in a park'
Orange County
character of KCN. In addition to the limited landscape area around the building,
(9491833 -9193
the parkways and landscape setback should be considered for supplemental or
new landscape treatment. The preliminary landscape submittal should include
Phoenix
species and size of proposed planting material.
(6021252 -2555
2. Proposed screening of the satellite dish, transformer and trash enclosure should
16800 Von Karmen Ave..
be indicated on the preliminary landscape plan.
Suite 200
3. Three monument signs are proposed. The corner monument sign exceeds the 4'
lmina, CA 92612 -1517
permitted height limit contained in the KCN Planned Community Development
(949)633.9193
Standards (P.C. Text). The height of this sign shall be reduced to 4' in height. The
PAX (949) 833.3098
other two signs comply with the P.C. Text requirements.
J. Patrick Allen, AIA , !
Architect ��I
12/02/1999 04:09
ANGDON
ILSON
ARCHITECTURE
P L A N N I N r
I N T E R 1 0 R S
E
E
669 -1.'59
Mr. Kevin .M. Clarke
Project Director
Polygon Development, LP
DDS :BPLP
PAGE 03
October 19, 1999
Page 2
4. The proposed new Von Karman driveway is conditionally acceptable to Koll
Center Newport. The concern is the potential for City imposed conditions that
would restrict left turn movements to and from existing driveways, such as
extending the raised median. If such conditions are imposed Koll Center
Newport reserves the right to riot approve the proposed curb cut if it so chooses.
5. The proposed elevations indicate three proposed wall signs. Only two are
permitted by the P.C. Text and only two locations are approved by KCN.
6. To complete the design development phase design review, the following
submittals should be made:
a) Preliminary landscape plans;
b) Preliminary exterior signage indicating size, location, materials, color and
letter style; and
c) Exterior material, finishes and colors.
If there are any questions or clarification required regarding the conditions of design
development phase approval, please call me at (949) 833 -9193.
Sincerely, I'//
u
J. Patrick Allen, AIA
Senior Partner
cc via facsimile: flay Werta - C.B. Richard Ellis - (310) 563 -8670
Tim Strader - KCN c/o Starpointe Ventures - (949) 719 -6366
Buffi Hendrix - C.B. Richard Ellis - (949) 833 -2476
WC\CAD D1172421674 {I arke.doc
J4,;L
If-
i �rF,`x'POgr
� m
in
v - s
CITY OF NEWPORT BEACH
COMMUNITY and ECONOMIC DEVELOPMENT
PLANNING DEPARTMENT
3300 NEWPORT BOULEVARD
NEWPORT BEACH, CA 92658
(949) 644 -3200: FAX (949) 644 -3250
Hearing Date:
Agenda Item No.:
Staff Person:
Period:
December 9, 1999
3
Marc Myers
(949) 644 -3210
14 days
REPORT TO THE PLANNING COMMISSION (' ` —a-t) uU
PROJECT. — ExtondedStayAmerica
4881 Birch Street
PURPOSE OF
APPLICATION: Request for a General Plan Amendment, PC Amendment, Use Permit and a
Traffic Study to allow the construction of a 164 room extended stay hotel.
The General Plan Amendment will increase the square footage entitlement
permitted on the site, the PC Amendment involves text modifications to the
development standards including, but not limited to: designating Parcel l of
Retail and Service Site I for hotel use, increasing the square footage
entitlement to accommodate the construction of the new building, and
establishing a 60 foot height limit for the new hotel site. A Use Permit is
required for the establishment of a hotel.
ACTION: Recommend to the City Council approval of the project and:
• Accept the Negative Declaration as adequate for approval of the
project; and
• Adopt Resolution 99 -_, recommending approval of General Plan
Amendment No. 99 -2(A); and
• Adopt Resolution 99 recommending approval of Planned
Community Amendment No. 897; and
Approve:
• Use Permit No. 3665
• A Trip Generation Study
With findings and conditions in Exhibit "A ".
LEGAL
DESCRIPTION: Parcel 2 of Parcel Map Book 76, Page 45 and Parcel 1 of
Parcel Map Book 129, Page 5
ZONE: PC (Koll Center Planned Community)
OWNER: PB Von Karman L.P. and Burnett Polygon, Costa Mesa
and Honolulu
Points and Authority
• Conformance with the General Plan
The Land Use Element of the General Plan designates the site for 'Retail Service
Commercial" uses. A hotel use is permitted within this designation. The Land Use
Element currently allows 52,740 square feet of floor area for retail and office uses on Parcel
1, and a total of 102,110 square feet in Retail and Service Site 1 of Koll Center Newport
Planned Community. The proposed project requires an amendment to the Land Use
Element tc- mcreas2 the entitlement in Retail and Service Site 1 by 17,216 square feet with
164 hotel rooms.
• Environmental Compliance (California Environmental Quality Act)
In accordance with the California Environmental Quality Act (CEQA), the State CEQA
Guidelines and City Council Policy K -3, an Initial Study has been prepared for the project.
Based upon the information contained in the Initial Study, it has been determined that if
proposed mitigation measures are incorporated, the project will not have a significant effect
on the environment. A Mitigated Negative Declaration has, therefore, been prepared for the
project, and a copy of it is attached for the Planning Commission's review. It is the present
intention of the City to accept the Negative Declaration and supporting documents. The
Negative Declaration is not to be construed as either approval or denial by the City of the
subject applications. The City encourages members of the general public to review and
comment on this documentation. Copies of the Negative Declaration and supporting
documents are also available for public review and inspection at the Planning Department.
• Amendment procedures and requirements are set forth in Chapter 20.94 of the Municipal
Code.
• Use Permit procedures and requirements are set forth in Chapter 20.91 of the Municipal
Code.
• Traffic Study requirements are set forth in Chapter 15.40 of the Municipal Code.
GPA 99 -2(A)
Amendment No. 897
Use Permit No, 3665
Page 2
VICINITY MAP
1
, (rj
1 r..
r1, ,
GPA 99 -2 (
Subiect Property and Surrounding Land Uses
Current
The subject site is currently developed with a
Development:
food court.
To the north:
Beyond the parking structure on the adjacent
buildings and related off - street parking-
To the east:
Across Von Kalman Avenue are additional p
off - street parking-
To the south:
Across Birch Street are additional profession
arkin .
To the west:
Are business and professional office buildings
Analysis
The proposal involves the construction of an extended stay hotel project on the 2.7 acre site located
at 4881 Birch Street currently occupied by the Plaza de Caf6 food court. The proposed extended
stay hotel will consist of approximately 69,956 square feet of development including the residential
areas, common areas, service areas, and a mechanical storage room. The hotel will provide 164
rooms in a single, four -story building. The parking for the hotel is provided on -site within the
surface level parking areas surrounding the hotel building.
General Plan Amendment
The Land Use Element of the General Plan is a long range planning document setting forth the
City's policies for the use of land. The objective of the Land Use Element is to provide for an
orderly balance of residential and commercial uses with an emphasis on preserving the quality of
life found in the City.
The project is located in Statistical Area L4, Koll Center Newport Retail and Service Site 1 of the
Land Use Element, which does not provide for further growth at this time beyond the retail and
office uses which exist on -site. However, amendments to the General Plan may be approved with
the finding that the amendment is consistent with the intent and policies of the General Plan. The
General Plan policies applicable to this proposal are discussed below.
General Plan Policy B allows for some modest growth provided that traffic does not exceed the
level of service desired by the City. Based on the Institute of Transportation Engineers (ITE) Trip
Rates for the existing use versus the proposed use, the City Traffic Engineer determined that the
proposed hotel would reduce the site's traffic generation. However, to substantiate this finding and
to assess consistency with this policy, a Trip Generation Study was conducted. This analysis
verified the proposed hotel development would result in fewer daily and peak hour trips, and would
not result in significant changes to long range traffic service levels. The City Traffic Engineer has
reviewed the study and concurs with its findings. Therefore, approval of this amendment would be
consistent with policy B.
General Plan Policy C in the Land Use Element allows for commercial, recreation or destination
visitor serving facilities when traffic congestion and parking shortages are controlled. The
proposed hotel is a commercial extended stay hotel seeking to provide support service for the
professional and business offices that surround the use. Based on the Trip Generation Study and
the number of parking spaces provided on -site for the proposed use, the hotel use will resTilt in
fewer trips, and adequate on site parking is available for the proposed use since the project is
providing more than two times the number required by code. Therefore, the amendment to increase
the entitlement permitted on this site is consistent with General Plan policy C.
General Plan Policy D requires that the siting of new buildings and structures shall be controlled
and regulated to preserve, to the extent practical, public views and unique natural resources. While
the City remains committed to protect private property rights, it is also committed to regulate the
placement of buildings in areas adjacent to valuable natural resources and environmentally sensitive
habitats.
GPA 99 -2(A)
Amendment No. 897
Use Permit No. 3665
Page 4
,
The proposed location of the hotel building is in Retail and Service Site 1 of Koll Center Planned
Community, which contains a mixture of administrative and financial commercial uses and general
retail commercaal uses. The existing building which will be demolished is a two story commercial
building occupied by a number of restaurant uses in a food court setting. The proposed hotel
building will maintain an overall height of approximately 60 feet which is comparable to, and lower
than, many of the existing office buildings in the surrounding area. The hotel will consist of a
single, four -story residential building and related surface level parking. The height and bulk of the
new building is such that it will be visible from many locations within and around the Koll Center
area, and will be .visible :i•om Von Kalman Avenue, Birch Street and possibly Campus Drive.
However, the proposed architectural style, finish and color of the hotel building is compatible with
the adjacent buildings, and therefore, are in keeping with the general character of the area.
Additionally, the location of the new building will not adversely affect natural resources nor will it
impact environmentally sensitive habitat since the subject site and the surrounding area is currently
fully developed. The proposed amendment, therefore, meets the intent of General Plan Policy D.
General Plan Policy F provides for the City to develop and maintain suitable and adequate
standards for landscaping, sign control, site and building design, parking and other development
standards to insure that commercial projects are aesthetically pleasing and compatible with
surrounding land uses. As previously stated, the proposed amendment will provide for a
commercial extended stay hotel. The nature of the proposed hotel is such that it serves business
people who have a need to stay in town for periods of time which are longer than a typical hotel
stay, but shorter than a typical apartment lease. The architectural style, finish and color of the
building will be similar to the existing development and, therefore, aesthetically pleasing and
compatible with surrounding land uses. In addition, the exterior appearance of the proposed
building, including site landscaping and signage is consistent with the appearance of the existing
buildings in the immediate vicinity. It is the opinion of staff that the development standards
contained in the Kell Center Newport Planned Community District Regulations provide suitable
and adequate development standards for the site. Therefore, the amendment meets the intent of
General Plan Policy F.
General Plan Policy L provides for the City to promote the prosperity of its commercial districts
through the adoption of appropriate development regulations, so that those districts reflect and
compliment the high quality of its residential areas. It is the opinion of staff that an extended stay
hotel will improve the prosperity of Koll Center and the overall airport area by providing
accommodations for corporate travelers to the area. Also, an extended stay hotel is a use supportive
of corporate business office uses. Additionally, the modified development regulations maintain the
character of the district and reflect the intent of the Koll Center Planned Community GuideTines,
therefore, the amendment meets the intent of General Plan Policy L.
Due to the possibility of inaccurate square footage numbers documented over time in the General
Plan Land Use Element, staff has included a slight adjustment (674 square feet) in the amount of
entitlement to accommodate potential modest adjustments in the hotel building, should the need
arise.
GPA 99 -3(A)
Amendment No. 897
Use Permit No. 3665
Page 5
Planned Community Text Amendments
The Koll Center Planned Community Text is intended to implement the policies and development
limitations of the General Plan. Should the Planning Commission determine that the General Plan
Amendment is appropriate in this case, the PC text amendment related to the increased entitlement
would be the implementation of the policies of the General Plan. The PC text amendment also
includes revisions to the development standards which apply to the site. These are discussed below.
The hotel building is proposed on a site currently designated for retail and office use only. To
accommodate the proposed hotel use, this site must be changed to a designation consistent with the
proposed use. The applicant is proposing to modify the PC text development standards to
accommodate the construction of the proposed hotel building. A hotel use is permitted within the
retail and service designation of the General Plan. However, the PC text does not currently allow
hotel uses on this site. The PC land use designation of the site will be changed from retail and
office to hotel, since, in the Koll Center Planned Community, hotel sites are specifically designated
by the text regulations.
An additional modification to the PC text development standards is an increase in the height limit
requirements. The proposed height limit for the hotel site is 60 feet, while the current height limit
established for this site by the PC text is 35 feet. However, most of the other sites within the
Planned Community have a greater height limit, and the existing office buildings surrounding the
site are all in excess of 35 feet. Therefore, staff does not believe that any undesirable or abrupt
scale relationships would be created by approval of the request. The proposed office building
complies with all other site regulations.
Use Permit
Hotel development in the Koll Center Planned Community requires the approval of a Use Permit.
Approval of this use permit will allow the construction of an extended stay hotel. The hotel will
consist of 164 rooms. All of the rooms in the hotel are I- bedroom and l- bathroom, and include a
fully equipped kitchenette, and small dining area. Unlike typical hotels, this hotel does not provide
ancillary uses such as a restaurant, clubhouse, meeting rooms, lounge area, exercise room, or
pool/spa facilities. However, it does provide laundry facilities on site.
Parking ,
The proposed surface level parking lot will provide the parking for the proposed building. The
Municipal Code requires 1 parking space for each two guest rooms. With a total of 164
guestrooms, 82 parking spaces are required. However, since the hotel caters to corporate users
from out of town with longer stays and lower turnover, staff is of the opinion that the demand on
parking may be higher in this case since a rental car is typically utilized for the duration of the stay,
and is parked at the hotel. Due to these characteristics, utilization of the parking requirement of one
space per room for motel may be more appropriate in this case. If so applied, 164 parking spaces
would be required. Since, the project is providing 185 parking spaces on site at a ratio greater than
GPA 99.2U1
Ainendment No. 897
Use Permit No, 3665
Page 6
I space per each room, staff is of the opinion that number of parking spaces provided on site is
adequate for the hotel use. A condition of approval has been included which reflects this
requirement.
Vehicular Access and On -Site Circulation:
The proposed on -site circulation for the hotel is illustrated on the Parking Site Plan. The surface
level parking area surrou:ls the building. The ingress/egress to the parking area is provided via
two existing curb cuts, one from Birch Street and the other from Von Karman Avenue. The access
drive from Von Karman Avenue is provided in the form of a 28 foot wide reciprocal access
easement. The easement is recorded and provides pedestrian and vehicular ingress and egress to the
subject property and the adjacent site. The site plan calls for a 26 foot wide drive aisle which
extends around the building throughout the entire surface level parking area. The City Traffic
Engineer has reviewed the plans and, because there are two existing access points to the site, and
the drive aisles meet the City's standards, access and circulation for the site are considered adequate
and no problems are anticipated.
Recommendations
The adoption and amendment of the General Plan is considered a legislative act on the part of the
City, and State Planning Law does not set forth any required findings for either approval or denial
of a General Plan Amendment. Zoning actions are required to be consistent with the General Plan.
Staff is of the opinion that the proposed location of the hotel and the proposed conditions under
which it would be operated or maintained could be found consistent with General Plan policies and
the purpose of the district in which the site is located because adverse traffic impacts are not
anticipated in association with the project, the visitor accommodation will not create traffic or
parking problems, the project will not affect public views or unique natural resources, and the hotel
will add to the prosperity of Koll Center Planned Community. The approval of the amendment to
the General Plan's Land Use Element for the proposed hotel is, therefore, consistent with the City's
land use policies.
Section 20.91.035 of the Newport Beach Municipal Code provides that in order to grant any use
permit, the Planning Commission shall find that the establishment, maintenance or operation of the
use or building applied for will not, under the circumstances of the particular case, be detrimental to
the health, safety, peace, morals, comfort, and general welfare of persons residing or workingih the
neighborhood of such proposed use or be detrimental or injurious to property and improvements in
the neighborhood or the general welfare of the City.
In this particular case, based upon the analysis contained in this report, staff is of the opinion that
the findings for approval of the use permit can be made for the proposed extended stay hotel facility
since the parking demand can be adequately served by the parking provided on -site. Additionally,
issues related to access and site circulation have been reviewed by the Traffic Engineer and are
considered adequate. Because of the site's location in a regional office center, and the fact that the
hotel does not include ancillary uses such as a clubhouse or restaurant, there is little potential for
GPA 99 -2(A)
Amendment No. 897
Use Permit No. 3665
Page 7
problems associated with the hotel operation. Additionally, due to the highly developed character
of the surrounding land uses, which include a combination of low rise support structures and
several other multi -story high rise buildings, the development will not impact the character of the
existing development. In addition, staff also believes that the provisions of the Koll Center Planned
Community District Regulations adequately address site requirements and provide for uniform
landscape treatment on site and throughout the center.
It can also be found that the project meets the requirements of the Traffic Phasing Ordinance
because the proposed exr ^itded stay hotel project will generate fewer trips than the existing food
court use currently occupying the site. Based on the information contained in the Trip Generation
Study and the City's Traffic Phasing Ordinance, a traffic study is not required because the proposed
project does not result in an increase of greater than 300 trips to the site.
Should the Planning Commission wish to approve the subject project, the actions and findings and
conditions of approval set forth in the attached Exhibit "A" are suggested.
Staff cannot reasonably conceive of findings for denial since the proposed hotel use in this
particular case conforms to Title 20 of the Municipal Code and all other requirements of the Koll
Center Planned Community District Regulations and does not appear to have any detrimental effect
on the surrounding neighborhood. However, should information be presented at the public hearing
which would warrant the denial of this application, the Planning Commission may wish to take
such action.
Submitted by:
PATRICIA L. TEMPLE
Planning Director
ni �J
Prepared by:
MARC W. MYERS
Associate Planner
Attachments: Exhibit "A"
Mitigated Negative Declaration
Mitigation Monitoring Program
Traffic Generation Study
Letter from Koll Center Community Association
Site Plan, Floor Plan and Elevations
F:\USERSTLMSHAREM I PLANCOMM 999\ 12- 09\ExtemdcdStay1GPA99- 2(A)tpt
GPA 99 -2(A)
Amendment No. 897
Use Permit No. 3665
Page 8