Proposed Project Improvements
➢ Add 3rd NB through lane from 30th Street to 32nd Street
➢ Add 3rd SB through lane from Via Lido to 32nd Street
➢ Add bike lanes on both sides on Newport Blvd. from Via Lido to 32nd Street
➢ Relocate
Newport Blvd.
on-
street
parking between 30th Street &
Via Lido
into new
public
parking
lot
at NW
corner of Newport Blvd
& 32nd
Street
➢ New landscaped medians on Newport Blvd from 30th Street to Via Lido
➢ Increase left turn storage at traffic signals
➢ Closure of left turn movement to and from 31St Street
PUBLIC PARKING
Relocation of 27 on- street parking spots to a new public parking lot at NW
corner of Newport Blvd and 32nd Street
Three existing public parking lots at 30t" Street with 76 spaces
Existing angled on- street public parking on 32nd Street with 51 spaces
4 Private parking lots on Newport Blvd between 32nd Street & Short Street
Mitigated Negative Declaration (MND)
Mitigation Monitoring & Reporting Program (MMRP)
➢ MND prepared by Chambers Group, Inc.
➢ No significant environmental impacts
➢ Mitigation measures required related to Cultural Resources,
Geology /Soils, Hazards /Hazardous Materials, and Noise.
➢ Public comment periods: 6/26/14 - 7/8/14 and 8/29/14 — 10/2/14
➢ Seven comment letters received and responses prepared
➢ All impacts less than significant, no significant
new information to warrant recirculation
➢ Adoption of the MND and MMRP recommended
Mitigation Measures
➢ Qualified Archaeologist or Paleontologist monitoring
➢ Incorporate the recommendations of the geotechnical
investigation
➢ Dewatering and shoring recommendations
➢ Engineering monitoring
➢ Hazardous materials testing for demolition materials and soils
including all appropriate cleanup (if necessary)
➢ Maintain typical construction hours and
install a 6 -foot high noise wall at abutting residence
PROJECT SCHEDULE
• Complete Environmental Documentation — Oct. 2014
• Coastal Permitting — Nov. 2014 to Sept. 2015
• Complete Final Design — Oct. 2015 (Dependent on Coastal
Development Permit)
• Award Construction Contract — Dec. 2015
• Construction —Jan. 2015 to Sept. 2016
QUESTIONS &COMMENTS
��FpRr'%
Public Works Department
A Well- Engineered Machine
Protecting and Providing Quality
Public Improvements and Services
PROJECT COST
Right -of -Way
Acquisition
$3,451,587 $0 $3,048,413 $6,500,000
Construction Capital $0 $2,706,000 $1,194,000 $3,900,000
Total
$3,451,587 $2,878,000 $4,467,413 $10,797,000
General
Fund
Measure M
Grant
Environmental,
Preliminary and Final
$0
$172,000
$225,000
$397,000
Design
Right -of -Way
Acquisition
$3,451,587 $0 $3,048,413 $6,500,000
Construction Capital $0 $2,706,000 $1,194,000 $3,900,000
Total
$3,451,587 $2,878,000 $4,467,413 $10,797,000
TRAFFIC CIRCULATION
Lengthened
Left turn' s1
J�j storage 7 �7��
po ket
Permitted U-
turn I
gr a
a y
st
C
RECONFIGURE ALLEY ACCESS
➢ Close existing alley access from 32nd Street
➢ Access alley from Marcus Avenue or Finley Avenue
➢ Marcus Ave from alley access to 32nd Street will be converted to 2 -way traffic
4i
0
1'�
Right -of -Way Acquisitions
204 MARCUS AVE
R/W = 6,748 S= - - -- °.
T� ! 3201 NEWPOR- BLVD
8,684 6F� -
_�' 3305 NEWPORT
N R /W = 48 ,,F
TCE = 237 SF I
tPJ (P) TCE
/i (E) R/W
1
R/W J _ _ _ _ _ - -
_' e
Z 33) NEWPORT BLVD °
p R/W = 10,782 SF,
V)
I --I i
I I
Former Wachovia Bank
Wachovia Bank Parking Lot
Retail Strip Center
Former City Hall
Gateway Park
* Voluntary Acquisition. Not required to complete project
3531 NEWPORT BLVD -
_ R/W - 1,224 SF
_ -- Wi 5/W- o
ari
R/W
Y ac F
Lido Pacific, LLC
Lido Pacific, LLC
Terra Cotta Realty Fund, LLC
City of Newport Beach
City of Newport Beach
Full Acquisition
Full Acquisition
Partial Acquisition
Partial Dedication
Partial Dedication
Right -of -Way Acquisition
3201 Newport Boulevard & 3204 Marcus Avenue
CLOSURE OF 31ST STREET
➢ U -turn at 30th Street will be permitted
➢ Left turn /U -turn pocket at 30th Street will be lengthened