Loading...
HomeMy WebLinkAbout09 - C-3373 - Balboa Boulevard Design ImprovementsSeptember 26, 2000 CITY COUNCIL AGENDA ITEM NO. 9 TO: Mayor and Members of the City Council FROM: Public Works Department SUBJECT: DESIGN OF IMPROVEMENTS ON BALBOA BOULEVARD FROM 12TH STREET TO MEDINA WAY AND ON NEWPORT / BALBOA BOULEVARD FROM 26TH STREET TO 16TH STREET, CONTRACT NO. 3373 - APPROVAL OF PROFESSIONAL SERVICES AGREEMENT RECOMMENDATION: Approve a Professional Services Agreement with KFM Engineering Inc., of Foothill Ranch, California, for professional engineering services for a contract price of $231,580. DISCUSSION As part of the City's adopted FY 00 -01 Capital Improvement Program, staff invited five engineering firms to submit their proposals to provide engineering design services for the following two Arterial Highway Rehabilitation Program (AHRP) projects on the Peninsula: • Balboa Boulevard from 12th Street to Medina Way • Newport/Balboa Boulevard from 26th Street to 16th Street These projects are funded for construction in FY 01 -02 ($2,530,000) and FY 02 -03 ($2,120,000) respectively, through the federal AHRP and City Gas Tax Funds. The scope of the professional services will include survey, utility investigation and coordination, pavement studies, hydrology and hydraulic studies to design the drainage systems, striping plans, traffic control plans, street design, specifications, cost estimates, and federal processing of the contract documents through Caltrans. The project between 26th and 16th Streets will need to be coordinated with the underground utility district in the same area. Four firms responded to the City's request for proposals: • Berryman & Henigar • Huitt- Zollars • KFM Engineering • Van Dell SUBJECT: DESIGN OF IMPROVEMENTS ON BALBOA BOULEVARD FROM 12TH STREET TO MEDINA WAY AND ON NEWPORT / BALBOA BOULEVARD FROM 26TH STREET TO 16TH STREET, CONTRACT NO. 3373 - APPROVAL OF PROFESSIONAL SERVICES AGREEMENT September 26, 2000 Page 2 Staff independently reviewed the firms' qualifications, past experience on similar projects, and availability, and ranked KFM Engineering, Inc., (KFM) the highest. Upon selection, staff negotiated with KFM to provide the necessary scope of services for a fee of $231,580. KFM has completed engineering services competently and professionally on similar projects for our City and other local agencies in Southern California. Funds for this project are available in the following accounts: Account Name Balboa Boulevard, 12th Street to Medina Way Balboa /Newport Boulevard, 26th to 16th Street Respectfully submitted, (Z—) ) PUBLIC WORKS DEPARTMENT Don Webb, Director By: Bill Patapoff City Engineer Attachments: Project Location Map Professional Services Agreement Exhibit "A" Scope of Services Exhibit "B" Schedule of Hourly Billing Rates Account Number Amount 7181- C5100582 $115,520 7181- C5100593 $116,060 TOTAL $231,580 V NEWPORT & BALBOA BOULEVARDS 26TH STREET TO 16TH STREET NOT TO SCALE aksoA BLVD PAC#t ocew BALBOA BLVD. RECONSTRUCTION 'PORT 12TH STREET TO MEDINA WAY BOA At VD. 4r PAQft FRONT NOT TO SCALE PROFESSIONAL SERVICES AGREEMENT FOR NEWPORT BOULEVARD FROM 26'" STREET TO 16' STREET AND BALBOA BOULEVARD FROM 12' STREET TO MEDINA WAY THIS AGREEMENT, entered into this day of 2000, by and between CITY OF NEWPORT BEACH , a Municipal Corporation (hereinafter referred to as "City "), and KFM Engineering, Inc., whose address is 26632 Towne Centre Drive, Suite 240, Foothill Ranch, California, 92610, (hereinafter referred to as "Consultant'), is made with reference to the following: RECITALS A. City is a I file ;cipal Corporation duly organized and validly existing under the laws of the State of California with the power to carry on its business as it is now being conducted under the statutes of the State of California and the Charter of City. B. City is planning to implement improvements to Newport Boulevard and Balboa Boulevard hereinafter referred to PROJECT. C. City desires to engage Consultant to provide professional engineering services for roadway rehabilitation and drainage system improvements on two Arterial Highway Rehabilitation Projects (AHRP): (1) Newport and Balboa Boulevards from 26`h Street to 16'" Street and (2) Balboa Boulevard from 12`" Street to Medina Way upon the terms and conditions contained in -1- this Agreement. D. The principal member for the Consultant for the purpose of this Project is Rick Kreuzer, P.E., President. E. City has solicited and received a proposal from Consultant, has reviewed the previous experience and evaluated the expertise of Consultant and desires to contract with Consultant under the terms of conditions provided in this Agreement. NOW, THEREFORE, it is mutually agreed by and between the undersigned parties as follows: 1. TERM The term of this Agreement shall commence on the 26th day of September 2000, and shall terminate on the 30th day of September 2003, unless terminated earlier as set forth herein. 2. SERVICES TO BE PERFORMED Consultant shall diligently perform all the duties set forth in the scope of services, attached hereto as two Exhibit "A's" and incorporated herein by reference. 3. COMPENSATION TO CONSULTANT City shall pay Consultant for the services in accordance with the provisions of this Section and the scheduled billing rates set forth in Exhibit 'B" attached hereto and incorporated herein by reference. No rate changes shall be made during the term of this Agreement without prior written approval of City. Consultant's compensation for all work performed in accordance with this Agreement shall not exceed the total contract price of two hundred thirty one thousand five hundred eighty dollars ($231,580). The segment on -2- Balboa Boulevard from 12th Street to Medina Way is $115,520 and the segment on Newport Boulevard from 26th Street to 16th Street is $116,060. 3.1 Consultant shall maintain accounting records of its billings which includes the name of the employee, type of work performed, times and dates of all work which is billed on an hourly basis and all approved incidental expenses including reproductions, computer printing, postage and mileage. 3.2 Consultant shall submit monthly invoices to City payable by City within thirty (30) days of receipt of invoice subject to the approval of City. 3.3 Consultant shall not receive any compensation for extra work without prior written authorization of City. Any authorized compensation shall be paid in accordance with the schedule of the billing rates as set forth in Exhibit 'B ". 3.4 City shall reimburse Consultant only for those costs or expenses which have been specifically approved in this Agreement, or specifically approved in advance by City. Such cost shall be limited and shall include nothing more than the following costs incurred by Consultant: A. The actual costs of subconsultants for performance of any of the services which Consultant agrees to render pursuant to this Agreement which have been approved in advance by City and awarded in accordance with the terms and conditions of this Agreement. B. Approved computer data processing and reproduction charges. C. Actual costs and /or other costs and /or payments specifically authorized in advance in writing and incurred by Consultant in the performance of this Agreement. -3- 4. STANDARD OF CARE 4.1 All of the services shall be performed by Consultant or under Consultant's supervision. Consultant represents that it possesses the professional and technical personnel required to perform the services required by this Agreement and that it will perform all services in a manner commensurate with the community professional standards. All services shall be performed by qualified and experienced personnel who are not employed by City nor have any contractual relationship with City. Consultant represents and warrants to City that it has or shall obtain all licenses, permits, qualifications and approvals required of its profession. Consultant further represents and warrants that it shall keep in effect all such licenses, permits and other approvals during the term of this Agreement. 4.2 Consultant shall not be responsible for delay, nor shall Consultant be responsible for damages or be in default or deemed to be in default by reason of strikes, lockouts, accidents, or acts of God, or the failure of City to furnish timely information or to approve or disapprove Consultant's work promptly, or delay or faulty performance by City, contractors, or governmental agencies, or any other delays beyond Consultant's control or without Consultant's fault. 5. INDEPENDENT PARTIES City retains Consultant on an independent contractor basis and Consultant is not an employee of City. The manner and means of conducting the work are under the control of Consultant, except to the extent they are limited by statute, rule or regulation and the expressed terms of this Agreement. Nothing in this Agreement shall be deemed to constitute Consultant or any of Consultant's employees or agents to be the agents or 0 employees of City. Consultant shall have the responsibility for and control over the details in means of performing the work provided that Consultant is in compliance with the terms of this Agreement. Anything in this Agreement which may appear to give City the right to direct Consultant as to the details of the performance of the services or to exercise a measure of control over Consultant shall mean that Consultant shall follow the desires of City only in the results of the services. 6. COOPERATION Consultant agrees to work closely and cooperate fully with City's designated Project Administrator, and any other agencies which may have jurisdiction or interest in the work to be performed. City agrees to cooperate with Consultant on Project. 7. PROJECT MANAGER Consultant shall assign PrJect' to -a project Manager, who shall coordinate all phases of Project. This Project Manager shall be available to City at all reasonable times during term of Project. Consultant has designated Rick Kreuzer, P.E. to be its Project Manager. Consultant shall not bill any personnel to Project other than those personnel identified in Exhibit 'B ", whether or not considered to be key personnel, without City's prior written approval by name and specific hourly billing rate. Consultant shall not remove or reassign any personnel designated in this Section or assign any new or replacement person to Project without the prior written consent of City. City's approval shall not be unreasonably withheld with respect to removal or assignment of non -key personnel. Consultant, at the sole discretion of City, shall remove from Project any of its personnel assigned to the performance of services upon written request of City. Consultant warrants it will continuously furnish the necessary personnel to complete -5- Project on a timely basis as contemplated by this Agreement. 8. TIME OF PERFORMANCE Time is of the essence in the performance of the services under this Agreement and the services shall be performed by Consultant in accordance with the schedule specified below. The failure by Consultant to strictly adhere to the schedule may result in termination of this Agreement by City, and the assessment of damages against Consultant for delay. Notwithstanding the foregoing, Consultant shall not be responsible for delays which are due to causes beyond Consultant's reasonable control. However, in the case of any such delay in the services to be provided for Project, each party hereby agrees to provide notice to the other party so that all delays can be addressed. 8.1 Consultant shall submit all requests for extensions of time for performance in writing to the Project Adminisiraioi not later than ten (10) calendar days after the start - .. -... of the condition, which purportedly causes a delay, and not later than the date upon which performance is due. The Project Administrator shall review all such requests and may grant reasonable time extensions for unforeseeable delays, which are beyond Consultant's control. 8.2 For all time periods not specifically set forth herein, Consultant shall respond in the most expedient and appropriate manner under the circumstances, by either telephone, fax, hand delivery or mail. 9. CITY POLICY Consultant will discuss and review all matters relating to policy and project direction with the Project Administrator in advance of all critical decision points in order to ensure that the Project proceeds in a manner consistent with City goals and policies. M 10. CONFORMANCE TO APPLICABLE REQUIREMENT All work prepared by Consultant shall conform to applicable city, county, state and federal law, regulations and permit requirements and be subject to approval of the Project Administrator and City Council. 11. PROGRESS Consultant is responsible to keep the Project Administrator and /or his/her duly authorized designee informed on a regular basis regarding the status and progress of the work, activities performed and planned, and any meetings that have been scheduled or are desired. 12. HOLD HARMLESS Consultant shall indemnify, defend, save and hold harmless City, its City Council, boards and commissions,--officers and employees from and against any and all loss, damages, liability, claims, allegations of liability, suits, costs and expenses for damages of any nature whatsoever, including, but not limited to, bodily injury, death, personal injury, property damages, or any other claims arising from any and all negligent acts or omissions of Consultant, its employees, agents or subcontractors in the performance of services or work conducted or performed pursuant to this Agreement, excepting only the active negligence or willful misconduct of City, its officers or employees, and shall include attorneys' fees and all other costs incurred in defending any such claim. Nothing in this indemnity shall be construed as authorizing, any award of attorneys' fees in any action on or to enforce the terms of this Agreement. 13. INSURANCE Without limiting consultant's indemnification of City, and prior to commencement of -7- work, Consultant shall obtain and provide and maintain at its own expense during the term of this Agreement policy or policies of liability insurance of the type and amounts described below and satisfactory to City. Certification of all required policies shall be signed by a person authorized by that insurer to bind coverage on its behalf and must be filed with City prior to exercising any right or performing any work pursuant to this Agreement. Except workers compensation and errors and omissions, all insurance policies shall add City, its elected officials, officers, agents, representatives and employees as additional insured for all liability arising from Consultant's services as described herein. All insurance policies shall be issued by an insurance company certified to do business in the State of California, with original endorsements, with Best's A- VII or better carriers, uniess otherwise approved by City Risk Manager. — A. Worker's compensation insurance covering all employees and principals of Consultant, per the laws of the State of California. B. Commercial general liability insurance covering third party liability risks, including without limitation, contractual liability, in a minimum amount of $1 million combined single limit per occurrence for bodily injury, personal injury and property damage. If commercial general liability insurance or other form with a general aggregate is used, either the general aggregate shall apply separately to this Project, or the general aggregate limit shall be twice the occurrence limit. C. Commercial auto liability and property insurance covering any owned and rented vehicles of Consultant in a minimum amount of $1 million combined single limit per accident for bodily injury and property damage. D. Professional errors and omissions insurance which covers the services to be performed in connection with this Agreement in the minimum amount of one million Dollars ($1,000,000). Said policy or policies shall be endorsed to state that coverage shall not be canceled by either party, except after thirty (30) days' prior notice has been given in writing to City. Consultant shall give City prompt and timely notice of claim made or suit instituted arising out of Consultant's operation hereunder. Consultant shall also procure and maintain, at its own cost and expense, any additional kinds of insurance, which in its own judgment may be necessary for its proper protection and prosecution of the work. Consultant agrees that in the event of loss due to any of the perils for which it has __ agreed to provide comprehensive general and automotive" liaiinity "ihsurahUe;" that Consultant shall look solely to its insurance for recovery. Consultant hereby grants to City, on behalf of any insurer providing comprehensive general and automotive liability insurance to either Consultant or City with respect to the services of Consultant herein, a waiver of any right of subrogation which any such insurer of said Consultant may acquire against City by virtue of the payment of any loss under such insurance. 14. PROHIBITION AGAINST TRANSFERS Consultant shall not assign, sublease, hypothecate or transfer this Agreement or any of the services to be performed under this Agreement, directly or indirectly, by operation of law or otherwise without prior written consent of City. Any attempt to do so without consent of City shall be null and void. The sale, assignment, transfer or other disposition of any of the issued and 0 outstanding capital stock of Consultant, or of the interest of any general partner or joint venturer or syndicate member or co- tenant if Consultant is a partnership or joint- venture or syndicate or co- tenancy, which shall result in changing the control of Consultant, shall be construed as an assignment of this Agreement. Control means fifty percent (50 %) or more of the voting power, or twenty -five percent (250) or more of the assets of the corporation, partnership or joint-venture. 15. OWNERSHIP OF DOCUMENTS Each and every report, draft, work product, map, record and other document reproduced, prepared or caused to be prepared by Consultant pursuant to or in connection with this Agreement shall be the exclusive property of City. Documents, including drawings and specifications, prepared by Consultant pursuant to this Agreement are not intended or represented -to hp- %litable.for reuse by City or others on any other project. Any use of completed documents for other projects and any use of incomplete documents without specific written authorization from Consultant will be at City's sole risk and without liability to Consultant. Further, any and all liability arising out of changes made to Consultant's deliverables under this Agreement by City or persons other than Consultant is waived as against Consultant and City assumes full responsibility for such changes unless City has given Consultant prior notice and has received from Consultant written consent for such changes. Consultant shall, at such time and in such forms as City may require, furnish reports concerning the status of services required under this Agreement. 16. CONFIDENTIALITY The information, which results from the services in this Agreement, is to be kept -10- confidential unless the release of information is authorized by City. 17. CITY'S RESPONSIBILITIES In order to assist Consultant in the execution of his responsibilities under this Agreement, City agrees to provide the following: A. City will provide access to and upon request of Consultant, provide one copy of all existing record information on file at City and will provide all such materials in a timely manner so as not to cause delays in Consultant's work schedule. B. Provide blueprinting, copying and other services through City's reproduction company for each of the required submittals. Consultant will be required to coordinate the required submittals with City's reproduction company. All other reproduction- Wli oe -the responsibility of Consultant and as defined above. 18. ADMINISTRATION This Agreement will be administered by the Public Works Department. Bill Patapoff, City Engineer shall be considered the Project Administrator and shall have the authority to act for City under this Agreement. The Project Administrator or his/her authorized representative shall represent City in all matters pertaining to the services to be rendered pursuant to this Agreement. 19. RECORDS Consultant shall keep records and invoices in connection with the work to be performed under this Agreement. Consultant shall maintain complete and accurate records with respect to the costs incurred under this Agreement. All such records shall be -11- clearly identifiable. Consultant shall allow a representative of City during normal business hours to examine, audit and make transcripts or copies of such records. Consultant shall allow inspection of all work, data, documents, proceedings and activities related to the Agreement for a period of three (3) years from the date of final payment under this Agreement. 20. WITHHOLDINGS City may withhold payment of any disputed sums until satisfaction of the dispute with respect to such payment. Such withholding shall not be deemed to constitute a failure to pay according to the terms of this Agreement. Consultant shall not discontinue work for a period of thirty (30) days from the date of withholding as a result of such withholding. Consultant shall have an immediate right to appeal to the City Manager or his designee with icsNect to such disputed sums. Consultant shall be entitled to receive interest on any withheld sums at the rate of seven percent (7 %) per annum from the date of withholding of any amounts found to have been improperly withheld. 21. ERRORS AND OMISSIONS In the event of errors or omissions that are due to the negligence or professional inexperience of Consultant which result in expense to City greater than would have resulted if there were not errors or omissions in the work accomplished by Consultant, the additional design, construction and/or a restoration expense shall be bome by Consultant. Nothing in this paragraph is intended to limit City's rights under any other sections of this Agreement. 22. CITY'S RIGHT TO EMPLOY OTHER CONSULTANTS City reserves the right to employ other consultants in connection with Project. -12- 23. CONFLICTS OF INTEREST A. Consultant or its employees may be subject to the provisions of the California Political Reform Act of 1974 (the "Act "), which (1) requires such persons to disclose financial interest that may foreseeably be materially affected by the work performed under this Agreement, and (2) prohibits such persons from making, or participating in making, decisions that will foreseeably financially affect such interest. B. If subject to the Act, Consultant shall conform to all requirements of the Act. Failure to do so constitutes a material breach and is grounds for termination of this Agreement by City. Consultant shall indemnify and hold harmless City for any and all claims for damages resulting from Consultant's violation of iris Section. 24. SUBCONSULTANT AND ASSIGNMENT Except as specifically authorized under this Agreement, the services included in this Agreement shall not be assigned, transferred, contracted or subcontracted without prior written approval of City. 25. NOTICES All notices, demands, requests or approvals to be given under this Agreement shall be given in writing and conclusively shall be deemed served when delivered personally or on the third business day after the deposit thereof in the United States mail, postage prepaid, first class mail, addressed as hereinafter provided. -13- All notices, demands, requests or approvals from Consultant to City shall be addressed to City at: Bill Patapoff, City Engineer City of Newport Beach 3300 Newport Boulevard P. O. Box 1768 Newport Beach, CA, 92658 -8915 (949) 644 -3311 Fax (949) 644 -3318 All notices, demands, requests or approvals from City to Consultant shall be addressed to Consultant at: Attention: Rick Kreuzer, P.E. President KFM Engineereing, Inc. 26632 Towne Centre Drive, Suite 240 Foothill Ranch, CA 92610 (949) 580 -3838 Fax (949) 580 -3837 26. TERMINATION In the event either part hereto fails or refuses to perform any of the provisions hereof at the time and in the manner required hereunder, that party shall be deemed in default in the performance of this Agreement. If such default is not cured within a period of two (2) days, or if more than two (2) days are reasonably required to cure the default and the defaulting party fails to give adequate assurance of due performance within two (2) days after receipt by defaulting party from the other party of written notice of default, specifying the nature of such default and the steps necessary to cure such default, the nondefaulting party may terminate the Agreement forthwith by giving to the defaulting party written notice thereof. -14- 26.1 City shall have the option, at its sole discretion and without cause, of terminating this Agreement by giving seven (7) days' prior written notice to Consultant as provided herein. Upon termination of this Agreement, City shall pay to Consultant that portion of compensation specified in this Agreement that is earned and unpaid prior to the effective date of termination. 27. COMPLIANCES Consultant shall comply with all laws, state or federal and all ordinances, rules and regulations enacted or issued by City. 28. WAIVER A waiver by either party of any breach, of any term, covenant or condition contained herein shall not be deemed to be a waiver of any subsequent breach of the same or any other term, covenant or condition -cori'iained herein whether of the same or a different character. 29. INTEGRATED CONTRACT This Agreement represents the full and complete understanding of every kind or nature whatsoever between the parties hereto, and all preliminary negotiations and agreements of whatsoever kind or nature are merged herein. No verbal agreement or implied covenant shall be held to vary the provisions hereon. Any modification of this Agreement will be effective only by written execution signed by both City and Consultant. 30. OPINION OF COST Any opinion of the construction cost prepared by Consultant represents his /her judgment as a design professional and is supplied for the general guidance of City. Since Consultant has no control over the cost of labor and material, or over competitive bidding -15- or market conditions, Consultant does not guarantee the accuracy of such opinions as compared to contractor bids or actual cost to City. 31. COMPUTER DELIVERABLES CADD data delivered to City shall include the professional stamp of the engineer in responsible charge of the work. City agrees that Consultant shall not be liable for claims, liabilities or losses arising out of, or connected with (a) the modification or misuse by City, or anyone authorized by City, of CADD data; (b) the decline of accuracy or readability of CADD data due to inappropriate storage conditions or duration; or (c) any use by City, or anyone authorized by City, of CADD data for additions to this Project, for the completion of this Project by others, or for any other project, excepting only such use as is authorized, in writing, by Consultant. By acceptance of CADD data, City agrees to indemnify Consultant for damages—=d liability -resulting from the modification or misuse of such CADD data. All drawings shall be transmitted to the City in Auto Cad version 14 in ".dwg" file format. All written documents shall be transmitted to the City in Microsoft Word 97 and Microsoft Excel 97 and be consistent with Microsoft Office 97. 32. PATENT INDEMNITY Consultant shall indemnify City, its agents, officers, representatives and employees against liability, including costs, for infringement of any United States' letters patent, trademark, or copyright infringement, including costs, contained in Consultant's drawings and specifications provided under this Agreement. -16- IN WITNESS WHEREOF, the parties have caused this Agreement to be executed on the day and year first written above. APPROVED AS TO FORM: Robin Clauson Assistant City Attorney ATTEST: By: LaVonne Hai kiess City Clerk CITY OF NEWPORT BEACH A Municipal Corporation By: Mayor City of Newport Beach CONSULTANT Bv: Rick Kreuzer, P.E. President f\users\pbvAshared\agreements \fy 00 -01 \kfm- Balboa & medina way ahrp.doc -17- KFM E NG IN EER ING, INC. AUG 2 n EXIA t�AT °A " tlU August 28, 2000 Mr. Bill Patapoff, P.E. City of Newport Beach Public Works Department 3300 Newport Boulevard Newport Beach, CA 92658 RE: Revised Proposal for Professional Engineering Services for Newport / Balboa Boulevard from 26`h Street to 16`h Street. Dear Mr. Patapoff: KFM appreciates the opportunity to submit this proposal. We believe we are very well qualified for the subject project, having completed numerous roadway rehabilitation projects under the AHRP program over the last three years. Our proposal is formatted as follows: - - Section 1.0 Section 2.0 Section 3.0 Section 4.0 Section 5.0 Project Overview Scope of Work Manhour Allocation Schedule Qualifications Per the request of the RFP, we have enclosed our proposed fee in a separate sealed envelope. Once again we appreciate the opportunity to be of further service to the City of Newport Beach. If you have any questions regarding this proposal, please do not hesitate to give me a call. Res Ily submitted: Rick Kreuzer, P.E. President 26632 Towne Centre Drive • Suite 240 • Foothill Ranch • California • 92610 Ph: 949.580.3838 Fax: 949.580 3837 1.0 PROJECT OVERVIEW The City of Newport Beach has solicited proposals for the design of improvements to Newport Boulevard from 26th to 21St Street and to Balboa Boulevard from 21St to 16th Street. The improvements will include the rehabilitation / reconstruction of the roadway and the construction of drainage systems. Parkway improvements in the form of new curb and gutter, sidewalk, and access ramps will be implemented, as warranted. In preparation of this proposal, KFM has: • Collected all as -built drawings for the project • Conducted a thorough field review of the project and developed a comprehensive photo log to document existing site conditions. • Collected and reviewed City drainage atlas sheets for the project area. • Obtained and reviewed the Pavement Report for Newport Boulevard from 19th Street to 26u' Street, prepared by OCPFRD. • Discussed the project with City staff. • Discussed the project with Steve Marvin of Labelle Marvin. We believe these research efforts have given us a good understanding of the project requirements and the key issues, as summarized below, which we believe will need to be addressed for successful completion of the project. KEYISSUES INNOVATIVE REHABILITATION STRATEGIES Innovative, cost effective solutions to improve the condition of the Newport and Balboa Boulevard roadway sections will be our primary focus. As stated, the County of Orange has completed a Pavement Report for the section of the project between 19`" and 26`" street. This report calls for a combination of removals and grinding followed by A.C. deeplift sections (for those areas removed) and a final 0.15 Asphalt Rubber Hot Mix (ARHM) cap. A 0.15' Tire Modified Asphalt Concrete (TMAC) is also proposed as an alternative to the 0.15' ARHM cap. KFM will be utilizing the services of Labelle Marvin (LM) for the preparation of a Pavement Report for the remaining section of the project along Balboa Boulevard from 19th to 16th Street. Additionally, LM will be reviewing the County data and recommendations for the 26th to 19th segment and proposing additional strategies for consideration. . In order to arrive at a preferred rehabilitation strategy, two primary design elements need to be considered. These elements are discussed on the following page. ❖ Vertical Considerations — Many times the rehabilitation strategy which appears to be the most cost effective solution at the onset does not result in the best long term solution. As an example, a roadway which is in fair to poor condition may require a thicker overlay on the order of 3 to 4 inches. While this approach may result in the best unit price rehabilitation strategy, it may also result in much steeper roadway crossfalls and /or an irregular roadway cross slope condition, neither of which results in a road with good rideability. This is particularly important when you have a project which, like the project at hand, consists of fairly irregular cross fall conditions and defined edge conditions (curb and gutter both sides). This example serves to point out the critical interrelationship between pavement improvement strategies and the vertical design component of a project. In other words, a perfectly applicable solution, from a pavement improvement perspective, may not be feasible if the vertical design criteria for the project cannot be satisfied. KFM and Labelle Marvin understand this critical interrelationship, having completed an excess of 20 roadway rehabilitation projects together over the last 5 years. We will work very closely on this project to develop the very best strategy for improvement of Newport / Balboa Boulevard. A specific concern with respect to the vertical design of the roadway will be the drainage conditions at the east end of the project between 18th and 16th Street. As evidenced in the photograph below, there are four inlets which are in the center of the eastbound travelway. During the design process, it will be imperative to reconstruct the crossfall of the roadway in these areas to get the runoff to flow to the sides of the street and keep the travelway as dry as possible. Once again, KFM will work closely with Labelle Marvin to "many" this vertical design issue to the proposed pavement improvement strategies. ❖ Budget — Another important tool to obtaining the best improvement strategies for a project is knowing the construction budget for a project. This "sets the bar' for us and gives us a target number to improve upon. In summary, we cannot emphasize enough that the development of innovative and cost effective improvement strategies are very much a collaborative effort between the engineer and pavement specialists. KFM and Labelle Marvin bring this close working relationship as well as a wealth of roadway rehabilitation design experience to the subject project. DRAINAGE Currently, the project area is drained by a network of inlets and pipes which outfall to the Bay at five locations, summarized as follows: • 30 inch CMP in 26th Street • 15 inch RCP in 21st Street • 24 inch PVC in 19th Street • 12 inch ACP in 1 8t Street • 18 inch CAP in 15th Street. Although outside the project limits, this outfall pipe drains the project via a 12 inch CMP in Balboa Boulevard from 19th Street to the east. Improvement to the drainage system will be a critical component of the project. Improper roadway drainage is one of the leading contributors to the degradation of a roadway surface. It will be KFM's charge to improve the drainage situation in the project area. This will be accomplished by upgrading existing underground and/ or constructing new underground systems, including new inlets to get the surface run -off out of the travelway and to its outfall to the Bay as efficiently as possible. KFM will accomplish this by completing a comprehensive Hydrology and Hydraulic study which will determine the needed improvements. The scope of work for this study is described in detail in Section 2.0 of this proposal. CROSS SECTIONING As evidenced by the preceding discussion, the vertical design component of this project is a very key consideration. In Newport and Balboa Boulevards, we have roadways which are relatively irregular with respect to crossfalls. Based upon our field review, we believe it is imperative to obtain existing cross sections at a tighter than normal interval. We are proposing to cross section the entire project at 25 foot intervals. Moreover, KFM will also obtain grid elevations at all intersections to insure that the project drains properly and that all ponding areas are .eliminated. The attainment of complete and thorough survey information regarding the existing vertical condition of the roadway will be critical to the development of a plan package that will not result in "field fitting" during construction. PROJECT ADMINISTRATION This project is partly funded with AHRP funds. The AHRP program is subject to Federal guidelines which are administered by Caltrans District 12. KFM Engineering is currently processing 6 projects through this program. We understand the plan format requirements and administrative aspects which are required for Federal projects. Further, we enjoy a very good working relationship with the Caltrans Local Programs Administrator for the City of Newport Beach, Mr. Talib Aziz. Mr. Aziz can attest to KFM's knowledge regarding the AHRP and Federal funding process as a whole. UTILITY COORDINATION Utility coordination is a very important aspect of any project. KFM employs a very comprehensive and detailed approach to coordinating with utility agencies. PROJECT MANAGEMENT No project is successful without effective project management. KFM engineering was founded on the philosophy of providing hands -on, experienced, proactive project management on all projects. This project will be no exception. Our proposed Project Manager, Rick Kreuzer, has 17 years of design and project management experience. He will not only be involved with project management and oversight, but will also be involved in day to day design of the project. We strongly encourage the City of Newport Beach to contact any of our client references cited herein regarding Mr. Kreuzer's and the balance of KFM Teams' performance on past projects. 2.0 SCOPE OF WORK Task 1— Data Collection KFM shall collect and review all record information including, but not necessarily limited to, the following: • As -built drawings' • Utility record drawings • Right -of -way record maps • Assessors parcel maps' • Benchmark information • Centerline intersection ties • Drainage Index Maps' • County Materials Report " ' denotes information already gathered by KFM in preparation of this proposal. Task 2 — Field Survey Field survey work shall consist of the following subtasks: ♦ Horizontal/Vertical Tie in centerline monumentation and run bench loop. ♦ Aerial Control Set aerial targets and tie -in to horizontal / vertical control. ♦ Cross Sections Survey cross sections will be taken at 25 foot intervals for the entire project stretch. Elevations shall be obtained at centerline, lane lines, grade breaks, lip of gutter, flowline, top of curb and at existing right -of -way. ♦ Monumentation Locate existing centerline monumentation and reset with temporary points, as required. ♦ Surface Topography Locations /elevations will be picked up for all existing site features (manholes, valves, pedestals, signs, etc.) within the proposed right -of -way. This information will supplement the aerial base sheets. ♦ Subsurface Information Sewer manholes and storm drain inlets, catch basins and manholes will be dipped to obtain accurate invert elevations. This as -built information will be critical to avoiding utility conflicts during construction. Task 3 — Aerial Topographic Mapping Aerial topographic mapping will be completed at 1 " =20' scale for the subject project. Mapping will extend to a minimum of 20 feet beyond the roadway right -of -way. Contours will be depicted. at 1 foot intervals. All surface features such as manholes, valves, vaults and the like will be depicted. Task 4 — Base Mapping Aerial mapping will be downloaded into KFM's CADD system. Utilizing information obtained under Tasks 1 through 3, KFM will plot all property lines, street right -of -way lines, and underground utility lines. Task 5 — Field Reviews The value of conducting thorough Feld reviews on a project cannot be underestimated. KFM believes very strongly in walking our projects in the field throughout the base mapping and design stages of a project to insure all design issues are considered. This task will be particularly important on the subject project due to the variety of conditions which exist within the project limits. Thorough field reviews will be conducted by the KFM project team throughout the duration of the project. Task 6 — Utility Investigation and Coordination Utility coordination will be ongoing throughout the duration of this project and will consist of the following tasks: ♦ Obtain plans showing location and size of all utility lines and appurtenances within the project area. ♦ Plot utility lines on Base Map (Task 4). ♦ Cross check plotted locations above with field review information to insure that existing lines are shown in the proper location. Request potholing from utility companies, as warranted. ♦ Upon finalizing the proposed roadway improvements, determine where potential utility conflicts exist and where utility modifications are warranted. ♦ Coordinate with affected utility companies regarding conflicts, relocations and improvements. Two (2) full sets of plans will be submitted for comment to each utility agency concurrent with all KFM submittals to the City for plan check. All correspondence with utility companies will be sent via certified mail. Task 7— Pavement Deflection Study Labelle Marvin will complete a Pavement Deflection Study for the section of Balboa Boulevard between 1gt" Street and 16`" Street to determine the required roadway improvement alternatives. This task will involve the following: • Non - destructive pavement deflection data shall be gathered from each traveled lane such that three sensor readings are recorded at each test location at select intervals. Labelle Marvin, Inc., shall provide Road Rater, operator, recorder and traffic control as necessary, to protect the traveling public and work force. During deflection testing operations, notes of visual pavement conditions and /or distress, cross streets, presence or absence of curb and gutter, and other such observations shall be logged. Field data collected shall be returned to the Labelle Marvin office for processing through their computer. This processing shall produce a typed tabulation of all data and field notes thereon, which locate the intersections of cross streets, pertinent landmarks, field conditions, etc. The tabulation shall include the reading of three Road Rater sensors, as well as the conversion of Road Rater Sensor Number One to an equivalent Traveling Deflectometer unit. • An engineering review of test data to isolate or separate limits of similar deflection response for statistical summary of data (providing the 80th percentile deflection) shall be made. • Prior to field sampling operations, Underground Service Alert will be notified, all test locations marked, and a meeting held, if requested, with concerned utilities to relocate test sites as necessary. • Coring and boring of the in -site roadway materials shall be performed at a total of 12 locations to determine pavement thicknesses and to obtain subgrade materials for further analysis. These corings will be taken to a depth of 3 to 4 feet. All sample locations will be backfilled and patched. Labelle Marvin shall provide traffic control during sampling operations. • The in -place moisture content of the subgrade soil samples removed at each location shall be determined. Individual or composite samples of subgrade material which typify the materials encountered shall be selected and subjected to R -Value testing for replacement section design. • Using the traffic indices provided by the City and existing pavement thickness information determined during current or previous coring operations, the 80th percentile deflection response shall then be compared to known pavement models. This comparison shall produce overlay requirements for a select design period in accordance with Caltrans Test Method Number 356, and a service life reading (Nominal Service Life) for the roadways studied. A Registered Civil Engineer shall supervise all operations, review all completed data and incorporate results of deflection testing and pavement conditions. Engineered recommendations for alternate methods of pavement rehabilitation based upon deflections and materials analysis shall be provided. Task 8 — Hydrology and Hydraulic Study The specific methodology KFM Engineering will implement to complete the hydrology and hydraulic report for the subject project will consist of a series of steps, summarized as follows: Step 1 Collect all existing as -built drawings, index maps, and hydrology /hydraulic reports on file for the project area. Step 2 Conduct a thorough Feld review to verify drainage boundaries, identify overland flow direction and to verify existing pick -up points, including both on -site (within public R/W) and off -site (private property) catchment points (i.e., inlets, catch basins). Step 3 Prepare a hydrology map for the existing drainage system. Hydrology calculations will be prepared for a 10 and 25 year storm event using AES -RATOC software. 10 and 25 year flows will be shown at all major confluence locations as well as the outfalls to the Bay. Step 4 Complete hydraulic calculations for the existing storm drain system for the 10 and 25 year flows. Calculations will be computed using WSPG software. This step will serve to verify the existing drainage system deficiencies. Step 5 Prepare preliminary layout of proposed drainage system improvements, including proposed catch basin locations. Step 6 Prepare a hydrology map for the Proposed drainage system identified under Step 5. Complete hydrology calculations (10/25 year) including catch basin /inlet hydrology. Step 7 Complete mainline and catch basin hydraulic calculations to determine if the proposed system improvements satisfy the City's street flooded width criteria. Step 8 Modify the proposed system improvements, as required, and complete steps 5 through 7, until the hydraulic criteria are satisfied. The result of Task 8 will be a Hydrology and Hydraulics Report which will be formatted as follows: 1.0 INTRODUCTION 2.0 STUDY OBJECTIVE 3.0 METHODOLOGY 4.0 EXISTING CONDITIONS 5.0 SYSTEM DEFICIENCIES 6.0 PROPOSED IMPROVEMENTS Appendix A - Existing System Hydrology Map and Calculations Appendix B - Existing System Hydraulic Calculations Appendix C - Proposed System Hydrology Map and Calculations Appendix D - Proposed System Mainline Hydraulic Calculations Appendix E - Proposed System Catch Basin Sizing and Street Flooded Width Calculations This document will be processed along with the Final PS &E for City approval. Task 9 — Develop Improvement Strategy The objective of this task is to formulate the improvement strategy for the project prior to proceeding with final design. The improvement alternatives, along with the corresponding construction estimates, will be presented to City staff for the purpose of identifying the preferred strategy for implementation. Based upon the alternatives identified in the Labelle Marvin report (Task 7) and the Hydrology and Hydraulic Study (Task 8), in conjunction with our thorough field reviews, KFM will present a series (probably on the order of three options) of alternatives for treatment of the roadway and storm drain system. With respect to roadway rehabilitation, these alternatives will consider options such as traditional overlay; ARHM overlay; pulverize in- place /cement streettsurface overlay; use of geotextile fabrics and grids; SAMI; TMAC; and various combinations thereof. Cost estimates will be developed to accompany each option presented to the City along with our recommendation for the "optimum" treatment with due consideration given to the budgeting elements of the project. The drainage improvement scenarios will consist of various rerouting /upsizing of existing pipes (if necessary) and new storm drain line connections. Task 10— Geotechnical Boring Logs for Storm Drain Alignment Based upon the final proposed storm drain alignment, KFM shall utilize the services of Constant and Dickey (CDI) to perform geotechnical borings. These borings will be drilled to a depth of 10 feet. A log of borings will be developed to classify the subsurface materials encountered and to identify the depth of groundwater. This information will be included in the project specifications for the contractors use in prepartion of the project bid. These borings will be no further apart than 500 feet. We have assumed that 5 borings will_bg_ _ taken for this project. Task 11— Final PS &E Based upon the approved strategy resulting from Task 9, KFM will complete the construction bid documents in the form of finals plans, specifications and estimates (PS &E). We envision the following plan set: Description • Title Sheet .... ............................... • Typical Sections .......................... • Details # Sheets .................... ..............................1 ..................................... ............................... • Roadway Plan & Profile ........... ............................... • Storm Drain Plan & Profile ....... ............................... • Lateral Profiles ........................ ............................... • Striping Plans .......................... ............................... • Traffic Control .......................... ............................... • Cross Sections ........................ ............................... TOTAL .......................... 50 Sheets Roadway plan and profile sheets will be prepared at 1 " =20' horizontal and 1 " =2' vertical scale. The plans will depict all proposed roadway improvements, including the necessary removal /replacement of existing curb and gutter to correct existing drainage deficiencies. Replacement of traffic loops and inclusion of all required ADA improvements and new sidewalk (if desired by City) will be depicted on these drawings. Also any required median modifications will be included. Profiles will be shown for centerline /crown line, and north and south lips of gutters. Any grade breaks within the roadway cross section will also be addressed. Storm drain plan and profile will be prepared at V =20' horizontal and 1 ° =2' vertical scale. Lateral profiles will be depicted on a separate sheet. Striping plans will be completed at 1 " =20' scale in double plan format. Traffic control plans will be prepared at 1 " =20' in double plan format for the `mixed master' area only. Traffic control plans for all other areas of the project will be the contractors responsibility. Cross sections will be prepared at 25 foot intervals at a scale of 1" =10' horizontal and 1" =1' vertical. All existing and proposed elevations and street crossfalls will be shown. All plans will be prepared using AutoCAD 14. Specifications will be prepared in conformance with City of Newport Beach format. Quantities and cost estimates shall be completed for the project and submitted with the plans along with all project submittals. Cost estimates will be segmented to conform with the funding programs for the project. Task 12 — Project Coordination and Meetings KFM shall provide all necessary coordination activities and attend all project related meetings for _-the duration of the project. No additional compensation will be requested by.. KFM, regardless of the number of meetings. Task 13 — Federal Processing and Compliance This project is partially funded under the Arterial Highway Rehabilitation Program (AHRP), a program which is Federally funded and administered by OCTA with technical oversight responsibilities resting with Caltrans Local Programs staff. KFM shall complete the project PS &E in conformance with the guidelines for Federally funded projects contained in the Caltrans Local Programs Manual and the "Reengineering" circular dated July 1, 1995. Items of work under this task include: • Conducting field reviews with Caltrans, as required. • Certifying PS &E compliance. • Conducting any required meetings with Caltrans to assure Federal and State compliance. • Obtaining all necessary permits required for the project. • Obtaining FNM -76 approval for the project. In order to award a contract for construction of the project, the City must receive FNM -76 approval from Caltrans. This FNM -76 approval is obtained by submitting the bid documents and supporting forms to the Caltrans local representative which are then reviewed and subsequently approved, at which time the project can be advertised for construction bids. All necessary work required to obtain this approval is included in our scope of work. KFM has completed the design and obtained FNM -76 approval for 14 AHRP projects for various Orange County municipalities in the last 3 years. Task 14 — Bidding and Construction Support This task shall include provision of bid addenda and /or plan clarifications, as well as attendance at the project preconstruction meeting and other pertinent meetings. KFM shall also be available to City staff during the construction period to answer questions and provide clarification to plan and specification issues, as needed. Task 15 — As -Built Drawings Upon completion of construction, KFM shall complete as -built drawings for the project. One hard copy set of plans (mylar), along with digital files will be delivered to the City upon completion. Task 16 — Reimbursables KFM shall provide all reimbursables (mileage, printing, plotting, etc.) for the duration of the project, excluding bid set reproduction which will be the responsibility of the City of Newport Beach. 3.0 MANHOUR ALLOCATION Exhibit A below summarizes the manhours, by task, estimated to complete the scope of work outlined in Section 2.0 of this proposal. CITY OF NEWPORT BEACH NEWPORTBALBOA BLVD. fsom 26th to 164h MANHOUR ALLOCATION EXHIBIT A TASK KIM STAFF TOTAL KFM ANHOUR.S SUBS. TOTAL PM PE D VE 1. DATA COLLECTION 2 2 4 4 2. FIELD SURVEY - HoriwntaWMical Control 1 8 9 9 -Aerial Control 2 6 8 8 -Cross Sections & Grids 2 40 42 42 - Monumematiau 1 8 9 9 - Surface Toporaphy 1 241 25 25 - Subsaface Information 1 12 13 13 3, AERIAL TOPOGRAPHIC MAPPING 1 1 30 31 4. BASE MAPPING 4 8 24 36 36 5. FMLD REVIEWS 8 12 20 20 6. unLrfY INVESTIGATION AND COORDINAT ION 2 8 6 16 16 7. PAVEMENT DEFLECTION STUDY 4 4 110 114 8. HYDROLOGY & HYDRAULIC STUDY 24 40 24 88 88 9. DEVELOP IMPROVEMENT STRATEGY 16 24 12 52 52 10. STORM DRAIN GEOTECHNICAL BORINGS 4 4 36 40 11, FINAL P S & E -Title Shwt 1 1 2 4 7 7 - Typical Sections (1) 4 16 12 1 32 32 - Details(2) 4 24 1 24 51 52 - Rmdmy Plan & Profile 7) 56 64 112 252 252 - Storm Dmin Plan & Profile 28 56 48 132 132 - Lateml Profiles 1 4 12 12 28 28 - Striping Plans 4 2 12 12 26 26 -Tmffic Control Plans 4 4 16 32 52 52 -Cross Sections 23 23 46 80 149 149 - Specifications 16 12 28 28 -Cost Estimate 4 12 16 16 12. PROJECT COORDINATION & MEETINGS 16 12 28 28 13. FEDERAL PROCESSING & COMPLIANCE 4 16 12 32 32 14. BmDING & CONSTRUCTION SUPPORT 4 8 6 18 18 15. AS -BUILT DRAWINGS 2 4 8 14 14 16. REIeBURSABLES NIA TOTAL MANHOURS 245 426 428 98 1197 176 1373 4.0 SCHEDULE The project schedule is depicted graphically on Exhibit B on the following page. This schedule has been developed based upon an assumed start date of September 5, 2000 and an assumed agency review duration of five days each for the 50% and final reviews and a review duration of 10 days for the 100% design review. Significant project milestones are summarized as follows: /Notice to Proceed ........................ ............................... September 26, 2000 Submit PS &E for 50% Design Review ......................... December 12, 2000 Submit PS &E for 100% Design Review .. .........................January 16, 2001 Submit PS &E for Final Review ....... ............................... February 13, 2001 PS &E Approved; Project Complete ............................... February 27, 2001 S w p w m ...., �. d M V pp t y C () t� m x W a - . 0 N �- w j' V O O v .. N O h n n tj O rq O O U) 0� V 0 tn O� N 0 0 0 0� m 0 to N N 44 0 ago a o W x c 3 ° rn OaN 7 ro > > v (1) > m oC ;04 + C4 W c v m N m i ir c > UZW 0 cn .r 'y o V _ c E <D 5 n v '2 o 25 _ O 3 °\0 3 Q c 3 y o> o o >'n�aoces o� o n Lo � >°� w ° >LL> LLj c a> > o CL °' Z m E o o[ a o o�C a o o [ a °d <D U U) E° o a '= N= v a) v o m m a� ° a) E c E c .N E c . C 0_> a> c -0 N� Q CD _0 N z LLQm a 20 E(o Q IL v) Q m U) QlLd 5.0 QUALIFICATIONS KFM Engineering, Inc. has assembled a Project Team which is knowledgeable and experienced in all aspects of the subject project. The Project Team structure is illustrated on Exhibit C on the following page. Personal resumes of the key team members identified are enclosed at the end of this proposal section. The Project Manager for the project will be Mr. Rick Kreuzer, P.E. Mr. Kreuzer is a Registered Civil Engineer in California with 17 years of civil engineering experience, including three years with the Orange County Environmental Management Agency as a construction inspector, one year as a Project Engineer for a major Orange County contractor and the last eleven years as a consultant. As the Project Manager, Mr. Kreuzer will have overall technical responsibility for the project and will be the client's primary contact. He will also have "hands -on" involvement in the day to day design of the project. His experience is well suited to this project, as summarized below: 17+ years as a consultant with an emphasis in public works design. • Numerous storm drain, roadway widening, and reconstruction /rehabilitation projects completed for various cities in Orange County over the past seventeen years. • Extensive experience coordinating with utility companies. • 3 years with OCEMA as field inspector on public works projects. He has a strong understanding of the construction elements to be considered on a project of this type. Recent street improvement projects similar in nature to the subject project which Mr. Kreuzer has managed include: PROJECT CLIENT CONSTRUCTION COST Artesia Boulevard Buena Park $1,200,000 Fairview Road Costa Mesa $3,400,000 Yorba Linda Boulevard Placentia $1,200,000 Tustin Street Orange $1,100,000 Ortega Highway San Juan Capistrano $200,000 Del Obispo Road San Juan Capistrano $300,000 Katella Avenue Anaheim $18,000,000 MacArthur Boulevard Newport Beach $700,000 San Miguel Road Newport Beach $200,000 Taft Avenue Orange $1,500,000 Wit mW ja 6 2 IL m a 0 V h h a !f PROJECT CLIENT CONSTRUCTION COST Main Street Orange $850,000 Imperial Highway La Habra $30,000,000 Lincoln Avenue Anaheim $800,000 Lake Forest Drive OCPFRD $3,000,000 Beach Boulevard Huntington Beach $1,100,000 Avenido Pico San Clemente $400,000 Marguerite Parkway Mission Viejo $700,000 Annual Resurfacing Program 94 -95 Dana Point $500,000 Annual Resurfacing Program 94 -95 Dana Point $600,000 Annual Resurfacing Program 94 -95 San Juan Capistrano $600,000 Mr. Kreuzer will be assisted by Jeff Lund. His main area of expertise is in the design of street widening and rehabilitation projects. Mr. Lund served as the Project Engineer for the vast majority of the projects listed above. Mr. Lund's experience includes 8 years as a Design /Project Engineer. Prior to that, Mr. Lund served 5 years as a project inspector for the City of Santa Barbara where he was responsible for Gtu'-inspection /oversight of all City roadway and storm drain improvement projects. Ed Miller, P.E. will be responsible for the design of the traffic elements of the project, including the development of striping and traffic control plans. Mr. Miller has 16 years of experience in transportation /traffic design. He also has extensive experience processing Federally funded projects through Caltrans. The field surveying for the project will be under the direction of Ted Krull, L. S. Mr. Krull serves as KFM's survey party chief. He is a Registered Land Surveyor in the State of California with over 22 years of professional experience. Arrowhead Mapping of San Bernardino will supply the aerial mapping for the project. They have worked extensively with KFM over the last 5 years. Steve Marvin, P.E. of Labelle -Marvin will oversee the pavement deflection study work on the project. Mr. Marvin is widely recognized as the leading authority regarding pavement analysis and engineering. Labelle -Marvin has worked on numerous projects with KFM in the past, including most of the projects mentioned herein. Brian Constant, P.E. of Constant and Dickey (CDI) will oversee the drilling and development of boring logs for the proposed storm drain alignment. CDI is currently working on multiple projects as a subconsultant to KFM. CIT Y OF NEWPORT BEACH NEWPORTIBALBOA BLVD. (mm 26th to 16th FEE SCHEDULE EXHIBIT A TASK KFM STAFF TOTAL XFM HOURS LUMP sum i TOTAL (5115) (S85) P ($70) D (5170) 1. DATA COLLECTION 2 2 4 $400 2. FIELDSURVEY - Horizontalfvcrical COMM 1 8 9 $L475 -Aerial ConfM 2 6 8 1 $1,250 - Cross Sections & Grids 2 40 42 $7,030 - Monomentation 1 8 9 $1475 - Surfacer 1 24 25 54,195 - Subsurface lnformation 1 12 13 52,155 3. AERIAL TOPOGRAPHIC MAPPING 1 1 $3,150 53,265 4. BASE MAPPING 4 8 24 36 52,820 5. FIELD REVIEWS S 12 20 51,940 6. UTILITY DWESTIGATION AND COORDINATION 2 8 6 16 51,330 7. PAVEMENT DEFLECTION STUDY 4 4 $10,300 $10,760 8. HYDROLOGY & HYDRAULIC STUDY 24 40 24 88 $7,840 9. DEVELOP IMPROVEMENT STRATEGY 16 24 12 52 $4,720 10. STORM DRAIN GEOTECHNICAL BORINGS 4 4 $2,500 $2,960 11, FINAL S & E -TRle Sheet 1 1 2 4 7 $565 -T teal Section 1 4 16 12 32 $2,660 - Demiis 2 4 24 24 52 $4,180 -Rwdu y Plan & Profile 7 84 112 252 $21,420 - Storm Dmin Plan & Pmfde (7 56 48 132 $11,340 - Lateral Profiles 1 12 12 28 $2,320 -Stri in Plans 4) 12 12 16 $2,090 - Traffic Control Plan 4) E23 16 32 52 54,060 -Cross Section 23 46 80 149 $12,155 -S ifimtions 12 18 $2,860 -Cast Estimate 12 16 $1,480 12. PROJECT COORDINATION &MEETINGS 12 18 $2,860 13. FEDERAL PROCESSING & COMPLIANCE 12 32 $2,660 14. BIDDING & CONSTRUCTION SUPPORT 6 18 $1,560 15. AS -BULT DRAWINGS 8 14 $1,130 16. REIdBURSABLES $2,000 52,000 TOTAL MANHOURS TOTAL COSTS 245 $28,175 426 $36,210 428 $32,100 98 $16,660 1197 $17,950 5128,955 LESS IM /a ........................... $11,896 TOTALFEE.... ........... ...... $116,860 EXHIBIT B KFM ENGINEERING, INC. SCHEDULE OF HOURLY BILLING RATES Rates Effective through December 31, 2000 OFFICE PERSONNEL: Typists, Word Processors ........................ ..............................$ 30.00 /Hr. Technician ............................................... ..............................$ 45.00 /Hr. Design Engineers / CADD Operators ...... ............................... $ 70.00 /Hr. Project Engineers ..................................... ..............................$ 85.00 /Hr. Project Managers .................................... ............................... $ 115.00/Hr. FIELD PERSONNEL: Two -Man Survey Party, including Truck and Equipment ............... ............................... $ 135.00/Hr. Three -Man Survey Party, i =_!uding T=-% z; d Equipment ............... ............................... $ 170.00 11-11r. SUPPORT & MISCELLANEOUS COSTS: C.A.D.D. Work Station/ Plotter ................. ............................... $ 25.00 /Hr. Computer time ........................................ ............................... $ 16.00 /Hr. Telefax..................................................... ..............................$ 2.00 /Pg. Electronic Distance Measuring Equipment (E.D.M.) ............... $ 55.00 /Day Survey Trucks ......................................... ............................... $ 0.50/Mile Other Vehicles ........................................ ............................... $ 0.30 /Mile Outside services and consultants are billed at direct costs plus 15 %. Blueprints, reproduction, messenger service, subsistence, travel and other expenses are billed at direct cost plus 10 %. Terms are net 30 days with 1 Y:% per month interest charges. The above schedule is for straight time hours. KFM LNG] NEER ING. INC F— Kia 1 k-V VPC,, August 28, 2000 Mr. Bill Patapoff, P.E. City of Newport Beach Public Works Department 3300 Newport Boulevard Newport Beach, CA 92658 RE: Revised Proposal for Professional Engineering Services for Balboa Boulevard Improvements from 12th Street to Medina Way. Dear Mr. Patapoff: KFM appreciates the opportunity to submit this proposal. We believe we are very well qualified for the subject project, having completed numerous roadway rehabilitation projects under the AHRP program over the last three years. Our proposal is formatted as follows: SECTION 1.0 ............PROJECT OVERVIEW - SECTION 2.0 ............SCOPE OF WORK SECTION 3.0 ............MANHOUR ALLOCATION SECTION 4.0 ............SCHEDULE SECTION 5.0 ............QUALIFICATIONS Per the requirements of the RFP, we have enclosed our proposed fee in a separate sealed envelope. Once again, we appreciate the opportunity to be of further service to the City of Newport Beach. If you have any questions regarding this proposal or require additional information, please do not hesitate to give me a call. Respectfully submitted: Rick Kreuzer, P.E. President 26632 Towne Centre Drive • Suite 240 • Foothill Ranch • California • 92610 Ph: 949.580.3838 Fax: 949.580.3837 1.0 PROJECT OVERVIEW The City of Newport Beach has solicited proposals for the design of improvements to Balboa Boulevard from 12th Street to Medina Way. The improvements will include the rehabilitation /reconstruction of the roadway and the construction of drainage systems. Parkway improvements in the form of new curb and gutter, sidewalk, and access ramps will be implemented, as warranted. In preparation of this proposal, KFM has: • Collected all as -built drawings for the project. • Conducted a thorough field review of the project and developed a comprehensive photo log to document existing site conditions. • Collected and reviewed City drainage atlas sheets for the project area. • Discussed the project with City staff. • Discussed the project with Steve Marvin of Labelle Marvin. We believe these research efforts have given us a good understanding of the project requirements and the key issues, as summarized below, which we believe will need to be addressed for successful completion of the project. KEY ISSUES INNOVATIVE REHABILITATION STRATEGIES Innovative, cost effective solutions to improve the condition of the Balboa Boulevard roadway section will be our primary focus. KFM will be utilizing the services of Labelle Marvin (LM) for the preparation of a Pavement Report for the project. In order to arrive at a preferred rehabilitation strategy, two primary design elements need to be considered, summarized as follows: ❖ Vertical Considerations — Many times the rehabilitation strategy which appears to be the most cost effective solution at the onset does not result in the best long term solution. As an example, a roadway which is in fair to poor condition may require a thicker overlay on the order of 3 to 4 inches. While this approach may result in the best unit price rehabilitation strategy, it may also result in much steeper roadway crossfalls and /or an irregular roadway cross slope condition, neither of which results in a road with good rideability. This is particularly important when you have a project which, like the project at hand, consists of fairly irregular cross fall conditions and defined edge conditions (curb and gutter both sides and raised medians in the center). This example serves to point out the critical interrelationship between pavement improvement strategies and the vertical design component of a project. In other words, a perfectly applicable solution, from a pavement improvement perspective, may not be feasible if the vertical design criteria for the project cannot be satisfied. KFM and Labelle Marvin understand this, critical interrelationship, having completed an excess of 20 roadway rehabilitation projects together over the last 5 years. We will work very closely on this project to develop the very best strategy for improvement of Balboa Boulevard. A specific concern with respect to the vertical design of the roadway is that a large portion of the subject project area drains to the raised median area in the center of the road where it is picked up by inlets in the median. This condition is depicted in the photographs below: 0 During the design process, KFM will investigate the potential for reconfiguring the crossfall of the roadway to drain entirely (or primarily) toward the sides where there is more room available to accommodate flooding in the street and to relieve flooding in the #1 lanes adjacent to the median. Once again, KFM will work closely with Labelle Marvin to "marry" this vertical design issue to the proposed pavement improvement strategies. Budget — Another important tool to obtaining the best improvement strategies for a project is knowing the construction budget for a project. This "sets the bar" for us and gives us a target number to improve upon. In summary, we cannot emphasize enough that the development of innovative and cost effective improvement strategies are very much a collaborative effort between the engineer and pavement specialists. KFM and Labelle Marvin bring this close working relationship as well as a wealth of roadway rehabilitation design experience to the subject project. DRAINAGE Currently, the project area is drained by a network of inlets and pipes which outfall to the Bay at two locations, summarized as follows: 12 inch CAP in 11th Street 18 inch CAP in 10th Street Improvement to the drainage system will be a critical component of the project. Improper roadway drainage is one of the leading contributors to the degradation of a roadway surface. It will be KFM's charge to improve the drainage situation in the project area. This will be accomplished by upgrading existing underground and/ or constructing new underground systems, including new inlets to get the surface run -off out of the travelway and to its outfall to the Bay as efficiently as possible. KFM will accomplish this by completing a comprehensive Hydrology and Hydraulic study which will determine the needed improvements. The scope of work for this study is described in detail in Section 2.0 of this proposal. CROSS SECTIONING As evidenced by the preceding discussion, the vertical design component of this project is a very key consideration. Balboa Boulevard is a roadway which has a relatively irregular crossfall condition. Based upon our field review, we believe it is imperative to obtain existing cross sections at a tighter than normal interval. We are proposing to cross section the entire project at 25 foot intervals. Moreover, KFM will also obtain grid elevations at all intersections to insure that the project drains properly and that all ponding areas are eliminated. The attainment of complete and thorough survey information regarding the existing vertical condition of the roadway will be critical to the development of a plan package that will not result in "field fitting" during construction. PROJECT ADMINISTRATION This project is partly funded with AHRP funds. The AHRP program is subject to Federal guidelines which are administered by Caltrans District 12. KFM Engineering is currently processing 6 projects through this program. administrative aspects which are required for working relationship with the Caltrans Local Beach, Mr. Talib Aziz. Mr. Aziz can attes t Federal funding process as a whole. UTILITY COORDINATION We understand the plan format requirements and Federal projects. Further, we enjoy a very good Programs Administrator for the City of Newport to KFM's knowledge regarding the AHRP and Utility coordination is a very important aspect of any project. KFM employs a very comprehensive and detailed approach to coordinating with utility agencies. PROJECT MANAGEMENT No project is successful without effective project management. KFM engineering was founded on the philosophy of providing hands -on, experienced, proactive project management on all projects. This project will be no exception. Our proposed Project Manager, Rick Kreuzer, has 17 years of design and project management experience. He will not only be involved with project management and oversight, but will also be involved in day to day design of the project. We strongly encourage the City of Newport Beach to contact any of our client references cited herein regarding Mr. Kreuzer's and the balance of KFM Teams' performance on past projects. 2.0 SCOPE OF WORK Task 1— Data Collection KFM shall collect and review all record information including, but not necessarily limited to, the following: • As -built drawings * • Utility record drawings • Right -of -way record maps • Assessors parcel maps • Benchmark information • Centerline intersection ties • Drainage Index Maps * * denotes information already gathered by KFM in preparation of this proposal. Task 2 — Field Survey Field survey work shall consist of the following subtasks: ♦ HorizontalNertical Tie in centerline monumentation and run bench loop. ♦ Aerial Control Set aerial targets and tie -in to horizontal / vertical control. ♦ Cross Sections Survey cross sections will be taken at 25 foot intervals for the entire project stretch. Elevations shall be obtained at centerline, lane lines, grade breaks, lip of gutter, flowline, top of curb and at existing right -of -way. ♦ Monumentation Locate existing centerline monumentation and reset with temporary points, as required. ♦ Surface Topography Locations /elevations will be picked up for all existing site features (manholes, valves, pedestals, signs, etc.) within the proposed right -of -way. This information will supplement the aerial base sheets. ♦ Subsurface Information Sewer manholes and storm drain inlets, catch basins and manholes will be dipped to obtain accurate invert elevations. This as -built information will be critical to avoiding utility conflicts during construction. Task 3 — Aerial Topographic Mapping Aerial topographic mapping will be completed at 1 " =20' scale for the subject project. Mapping will extend to a minimum of 20 feet beyond the roadway right -of -way. Contours will be depicted at 1 foot intervals. All surface features such as manholes, valves, vaults and the like will be depicted. Task 4 — Base Mapping Aerial mapping will be downloaded into KFM's CADD system. Utilizing information obtained under Tasks 1 through 3, KFM will plot all property lines, street right -of -way lines, and underground utility lines. Task 5 — Field Reviews The value of conducting thorough field reviews on a project cannot be underestimated. KFM believes very strongly in walking our projects in the field throughout the base mapping and design stages of a project to insure all design issues are considered. This task will be particularly important on the subject project due to the variety of conditions which exist within the project limits. Thorough field reviews will be conducted by the KFM project team throughout the duration of the project. Task 6 — Utility Investigation and Coordination Utility coordination will be ongoing throughout the duration of this project and will consist of the following tasks: ♦ Obtain plans showing location and size of all utility lines and appurtenances within the project area. ♦ Plot utility lines on Base Map (Task 4). ♦ Cross check plotted locations above with field review information to insure that existing lines are shown in the proper location. Request potholing from utility companies, as warranted. ♦ Upon finalizing the proposed roadway improvements, determine where potential utility conflicts exist and where utility modifications are warranted. ♦ Coordinate with affected utility companies regarding conflicts, relocations and improvements. Two (2) full sets of plans will be submitted for comment to each utility agency concurrent with all KFM submittals to the City for plan check. All correspondence with utility companies will be sent via certified mail. Task 7 — Pavement Deflection Study Labelle Marvin will complete a Pavement Deflection Study for the section of Balboa Boulevard between 12`h Street and Median Way to determine the required roadway improvement alternatives. This task will involve the following: • Non - destructive pavement deflection data shall be gathered from each traveled lane such that three sensor readings are recorded at each test location at select intervals. Labelle Marvin, Inc., shall provide Road Rater, operator, recorder and traffic control as necessary, to protect the traveling public and work force. During deflection testing operations, notes of visual pavement conditions and /or. distress, cross streets, presence or absence of curb and gutter, and other such observations shall be logged. Field data collected shall be returned to the Labelle Marvin office for processing through their computer. This processing shall produce a typed tabulation of all data and field notes thereon, which locate the intersections of cross streets, pertinent landmarks, field conditions, etc. The tabulation shall include the reading of three Road Rater sensors, as well as the conversion of Road Rater Sensor Number One to an equivalent Traveling Deflectometer unit. • An engineering review of test data to isolate or separate limits of similar deflection response for statistical summary of data (providing the 80th percentile deflection) shall be made. • Prior to field sampling operations, Underground Service Alert will be notified, all test locations marked, and a meeting held, if requested, with concerned utilities to relocate test sites as necessary. • Coring and boring of the in -site roadway materials shall be performed at a total of 12 locations to determine pavement thicknesses and to obtain subgrade materials for further analysis. These corings will be taken to a depth of 30 feet.All sample locations will be backfilled and patched. Labelle Marvin shall provide traffic control during sampling operations. • The in -place moisture content of the subgrade soil samples removed at each location shall be determined. Individual or composite samples of subgrade material which typify the materials encountered shall be selected and subjected to R -Value testing for replacement section design. • Using the traffic indices provided by the City and existing pavement thickness information determined during current or previous coring operations, the 80th percentile deflection response shall then be compared to known pavement models. This comparison shall produce overlay requirements for a select design period in accordance with Caltrans Test Method Number 356, and a service life reading (Nominal Service Life) for the roadways studied. A Registered Civil Engineer shall supervise all operations, review all completed data and incorporate results of deflection testing and pavement conditions. Engineered recommendations for alternate methods of pavement rehabilitation based upon deflections and materials analysis shall be provided. Task 8 — Hydrology and Hydraulic Study The specific methodology KFM Engineering will implement to complete the hydrology and hydraulic report for the subject project will consist of a series of steps, summarized as follows: Step 1 Collect all existing as -built drawings, index maps, and hydrology /hydraulic reports on file for the project area. Step 2 Conduct a thorough field review to verify drainage boundaries, identify overland flow direction and to verify existing pick -up points, including both on -site (within public RAN) and off -site (private property) catchment points (i.e., inlets, catch basins). Step 3 Prepare a hydrology map for the existing drainage system. Hydrology calculations will be prepared for a 10 and 25 year storm event using AES -RATOC software. 10 and 25 year flows will be shown at all major confluence locations as well as the outfalls to the Bay. Step 4 Complete hydraulic calculations for the existing storm drain system for the 10 and 25 year flows. Calculations will be computed using WSPG software. This step will serve to verify the existing drainage system deficiencies. Step 5 Prepare preliminary layout of proposed drainage system improvements, including proposed catch basin locations. Step 6 Prepare a hydrology map for the proposed drainage system identified under Step 5. Complete hydrology calculations (10/25 year) including catch basintinlet hydrology. Step 7 Complete mainline and catch basin hydraulic calculations to determine if the proposed system improvements satisfy the City's street flooded width criteria. Step 8 Modify the proposed system improvements, as required, and complete steps 5 through 7, until the hydraulic criteria are satisfied. The result of Task 8 will be a Hydrology and Hydraulics Report which will be formatted as follows: 1.0 INTRODUCTION 2.0 STUDY OBJECTIVE 3.0 METHODOLOGY 4.0 EXISTING CONDITIONS 5.0 SYSTEM DEFICIENCIES 6.0 PROPOSEDIMPROVEMENTS Appendix A - Existing System Hydrology Map and Calculations Appendix B - Existing System Hydraulic Calculations Appendix C - Proposed System Hydrology Map and Calculations Appendix D - Proposed System Mainline Hydraulic Calculations Appendix E - Proposed System Catch Basin Sizing and Street Flooded Width Calculations This document will be processed along with the Final PS &E for City approval. Task 9 — Develop Improvement Strategy The objective of this task is to formulate the improvement strategy for the project prior to proceeding with final design. The improvement alternatives, along with the corresponding construction estimates, will be presented to City staff for the purpose of identifying the preferred strategy for implementation. Based upon the alternatives identified in the Labelle Marvin report (Task 7) and the Hydrology. and Hydraulic Study (Task 8), in conjunction with our thorough field reviews, KFM will present a series (probably on the order of three options) of alternatives for treatment of the roadway and storm drain system. With respect to roadway rehabilitation, these alternatives will consider options such as traditional overlay; ARHM overlay; pulverize in- place /cement streettsurface overlay; use of geotextile fabrics and grids; SAMI; TMAC; and various combinations thereof. Cost estimates will be developed to accompany each option presented to the City along with our recommendation for the "optimum" treatment with due consideration given to the budgeting elements of the project. The drainage improvement scenarios will consist of various rerouting /upsizing of existing pipes (if necessary) and new storm drain line connections. Task 10 — Geotechnica/ Boring Logs for Storm Drain Alignment Based upon the final proposed storm drain alignment, KFM shall utilize the services of Constant and Dickey (CDI) to perform geotechnical borings. These borings will be drilled to a depth of 10 feet. A log of borings will be developed to classify the subsurface materials encountered and to identify the depth of groundwater. This information will be included in the project specifications for the contractors use in prepartion of the project bid. These borings will be no further apart than 500 feet. We have assumed that 5 borings will be taken for this project. Task 11— Final PS &E Based upon the approved strategy resulting from Task 9, KFM will complete the construction bid documents in the form of finals plans, specifications and estimates (PS &E). We envision the following plan set: Description • Title Sheet ............................ • Typical Sections ................... • Details ... ............................... • Roadway Plan & Profile........ • Storm Drain Plan & Profile.... • Lateral Profiles ..................... • Striping Plans ....................... • Cross Sections ..................... # Sheets TOTAL .......................... 49 Sheets Roadway plan and profile sheets will be prepared at 1 ° =20' horizontal and V =2' vertical scale. The plans will depict all proposed roadway improvements, including the necessary removal /replacement of existing curb and gutter to correct existing drainage deficiencies. Replacement of traffic loops and inclusion of all required ADA improvements and new sidewalk (if desired by City) will be depicted on these drawings. Profiles will be shown for centerline /crown line, and north and south lips of gutters. Any grade breaks within the roadway cross section will also be addressed. Storm drain plan and profile will be prepared at 1 " =20' horizontal and 1 " =2' vertical scale. Lateral profiles will be depicted on a separate sheet. Striping plans will be completed at V =20' scale in double plan format. Cross sections will be prepared at 25 foot intervals at a scale of 1 " =10' horizontal and 1" =1' vertical. All existing and proposed elevations and street crossfalls will be shown. All plans will be prepared using AutoCAD 14. Specifications will be prepared in conformance with City of Newport Beach format. Quantities and cost estimates shall be completed for the project and submitted with the plans along with all project submittals. Cost estimates will be segmented to conform with the funding programs for the project. Task 12 — Project Coordination and Meetings KFM shall provide all necessary coordination activities and attend all project related meetings for the duration of the project. No additional compensation will be requested by KFM, regardless of the number of meetings. Task 13 — Federal Processing and Compliance This project is partially funded under the Arterial Highway Rehabilitation Program (AHRP), a program which is Federally funded and administered by OCTA with technical oversight responsibilities resting with Caltrans Local Programs staff. KFM shall complete the project PS &E in conformance with the guidelines for Federally funded projects contained in the Caltrans Local Programs Manual and the "Reengineering" circular dated July 1, 1995. Items of work under this task include: • Conducting field reviews with Caltrans, as required. • Certifying PS &E compliance. • Conducting any required meetings with Caltrans to assure Federal and State compliance. • Obtaining all necessary permits required for the project. • Obtaining FNM -76 approval for the project. In order to award a contract for construction of the project, the City must receive FNM -76 approval from Caltrans. This FNM -76 approval is obtained by submitting the bid documents and supporting forms to the Caltrans local representative which are then reviewed and subsequently approved, at which time the project can be advertised for construction bids. All necessary work required to obtain this approval is included in our scope of work. KFM has completed the design and obtained FNM -76 approval for 14 AHRP projects for various Orange County municipalities in the last 3 years. Task 14 — Bidding and Construction Support This task shall include provision of bid addenda and /or plan clarifications, as well as attendance at the project preconstruction meeting and other pertinent meetings. KFM shall also be. available to City staff during the construction period to answer questions and provide clarification to plan and specification issues, as needed. Task 15 — As -Built Drawings Upon completion of construction, KFM shall complete as -built drawings for the project. One hard copy set of plans (mylar), along with digital files will be delivered to the City upon completion. Task 16 — Reimbursables KFM shall provide all reimbursables (mileage, printing, plotting, etc.) for the duration of the project, excluding bid set reproduction which will be the responsibility of the City of Newport Beach. 3.0 MANHOUR ALLOCATION Exhibit A below summarizes the manhours, by task, estimated to complete the scope of work outlined in Section 2.0 of this proposal. CITY OF NEWPORT BEACH BALBOA BLVD. from 12th to Medina MANHOVR ALLOCATION EXHIBIT A TASK KIM STAFF TOTAL KFM ANHOURS SUBS, TOTAL PM PE CARD SURVEY 1. DATA COLLECTION 2 2 4 4 2. FIELD SURVEY - HorizmtalNenical Control 1- 8 9 9 -Aerial Coatml 2 6 8 8 -Cross Sectims &Grids 2 40 42 42 - Monumentatim 1 - S S 9 - Stfaoe Topography 1 24 25 25 - Subsurface Infomtatim 1 12 13 13 3, AERIAL TOPOGRAPHIC MAPPING 1 1 32 33 4. BASE MAPPING 4 8 24 36 36 5. FIELD REVIEWS 8 12 20 20 6. UTILITY INVESTIGATION AND COORDINATION 2 8 6 16 16 7. PAVEMENT DEFLECTION STUDY 4 4 110 114 8. HYDROLOGY & HYDRAULIC STUDY 24 40 24 88 88 9. DEVELOP IMPROVEMENT STRATEGY 16 24 12 52 52 10. STORM DRAIN GEOTECHNICAL BORINGS 4 1 4 36 40 11. FINAL P S & E -Title Sheet 1) 1 2 4 7 7 - Typ ical Sections 1) 4 16 12 32 32 - Details(2) 4 24 24 51 52 - Road"y Plan &Profi1e(9) 60 90 124 174 274 -Storm Drain Plan &Profile 8 28 64 48 140 140 - Lateral Profiles 1 4 12 12 28 28 -Stri ing Plans 4 2 12 12 26 26 -Cross Sections 24 24 48 80 151 152 -S ifications 16 12 28 28 - Cost Estimate 4 12 16 16 12. PROJECT COORDINATION & MEETINGS 16 12 18 28 13. FEDERAL PROCESSING & COMPLIANCE 4 16 12 31 32 14. BIDDING & CONSTRUCTION SUPPORT 4 8 6 '8 18 15. AS -BUILT DRAWINGS 2 4 8 14 14 16. REJMBURSABLF.S N/A TOTAL MANHOURS 246 426 408 98 1178 178 1356 4.0 SCHEDULE The project schedule is depicted graphically on Exhibit 6 on the following page. This schedule has been developed based upon an assumed start date of September 5, 2000 and an assumed agency review duration of five days each for the 50°x6 and final reviews and a review duration of 10 days for the 100% design review. Significant project milestones are summarized as follows: Notice to Proceed ........................ ............................... September 26, 2000 Submit PS &E for 50% Design Review ......................... November 21, 2000 Submit PS &E for 100% Design Review ...................... December 12, 2000 Submit PS &E for Final Review .......... ............................... January 2, 2001 PS &E Approved; Project Complete ........ .........................January 16, 2001 H 3 d L m � ,p U W � a` x 3 w � A A �F z'a� o�N N �r ti V O W N.. 3 m a�i > m a>i 4 O z z z N.. 3 m a�i > m a>i 4 N U o m (D 0 o o m — a d U a) E a) � Q C ' N 0 -o U O • ai > o C cm c W 0 > d N � W °y E. ° ot n N O 2 m o c c 0) o cc d o cc a 2 cc a m U t i v ° m m m o a � V m o 0 W L E cM c iz o ii ¢ m Z) a z o X U) Q LL ¢ m w¢ ii a A ICI OA it W 5.0 QUALIFICATIONS KFM Engineering, Inc. has assembled a Project Team which is knowledgeable and experienced in all aspects of the subject project. The Project Team structure is illustrated on Exhibit C on the following page. Personal resumes of the key team members identified are enclosed at the end of this proposal section. The Project Manager for the project will be Mr. Rick Kreuzer, P.E. Mr. Kreuzer is a Registered Civil Engineer in California with 17 years of civil engineering experience, including three years with the Orange County Environmental Management Agency as a construction inspector, one year as a Project Engineer for a major Orange County contractor and the last eleven years as a consultant. As the Project Manager, Mr. Kreuzer will have overall technical responsibility for the project and will be the client's primary contact. He will also have "hands -on" involvement in the day to day design of the project. His experience is well suited to this project, as summarized below: • 17+ years as a consultant with an emphasis in public works design. • Numerous storm drain, roadway widening, and reconstruction /rehabilitation projects completed or Yarious cities in Orange County over the past seventeen years. • Extensive experience coordinating with utility companies. • 3 years with OCEMA as field inspector on public works projects. He has a strong understanding of the construction elements to be considered on a project of this type. Recent street improvement projects similar in nature to the subject project which Mr. Kreuzer has managed include: PROJECT CLIENT CONSTRUCTION COST Artesia Boulevard Buena Park $1,200,000 Fairview Road Costa Mesa $3,400,000 Yorba Linda Boulevard Placentia $1,200,000 Tustin Street Orange $1,100,000 Ortega Highway San Juan Capistrano $200,000 Del Obispo Road San Juan Capistrano $300,000 Katella Avenue Anaheim $18,000,000 MacArthur Boulevard Newport Beach $700,000 San Miguel Road Newport Beach $200,000 Taft Avenue Orange $1,500,000 a a W m; W •� =0 d ME Ww U A O Q F jod, E" d6 A� Q Z m IL I V tio, 0 d O N CC d — W _ LL �o C7 Z-0 R d AL H L N d v y h Qd yF V a WER d Icz, AL H L N d v y h Qd yF V a PROJECT CLIENT CONSTRUCTION COST Main Street Orange $850,000 Imperial Highway La Habra $30,000,000 Lincoln Avenue Anaheim $800,000 Lake Forest Drive OCPFRD $3,000,000 Beach Boulevard Huntington Beach $1,100,000 Avenido Pico San Clemente $400,000 Marguerite Parkway Mission Viejo $700,000 Annual Resurfacing Program 94 -95 Dana Point $500,000 Annual Resurfacing Program 94 -95 Dana Point $600,000 Annual Resurfacing Program 94 -95 San Juan Capistrano $600,000 Mr. Kreuzer will be assisted by Jeff Lund. His main area of expertise is in the design of street widening and rehabilitation projects. Mr. Lund served as the Project Engineer for the vast majority of the projects listed above. Mr. Lund's experience includes 8 years as a Design /Project Engineer. Prior to that, Mr. Lund served 5 years as a project inspector for the C.ty of Santa Barbara where he was responsible for field inspection /oversight .call City-roadWay and storm drain improvement projects. Ed Miller, P.E. will be responsible for the design of the traffic elements of the project, including the development of striping and traffic control plans. Mr. Miller has 16 years of experience in transportation /traffic design. He also has extensive experience processing Federally funded projects through Caltrans. The field surveying for the project will be under the direction of Ted Krull, L.S. Mr. Krull serves as KFM's survey party chief. He is a Registered Land Surveyor in the State of California with over 22 years of professional experience. Arrowhead Mapping of San Bernardino will supply the aerial mapping for the project. They have worked extensively with KFM over the last 5 years. Steve Marvin, P.E. of Labelle -Marvin will oversee the pavement deflection study work on the project. Mr. Marvin is widely recognized as the leading authority regarding pavement analysis and engineering. Labelle -Marvin has worked on numerous projects with KFM in the past, including most of the projects mentioned herein. Brian Constant, P.E. of Constant and Dickey (CDI) will oversee the drilling and development of boring logs for the proposed storm drain alignment. CDI is currently working on multiple projects as a subconsultant to KFM. CITY OF NEWPORT BEACH BALBOA BLVD. fmm 12th to Medina FEESCHEDULE EXHIBIT A TASK KFM STAFF TOTAL KFM &MNHOURS LUMP sum TOTAL ($115) PM (885) PE (870) CARD (8170) SURV Y 1. DATA COLLECTION 2 2 4 2. FIELD SURVEY -Horiz talNertical Contrd 1 8 9 -Aerial Cmtrol 2 6 8 -Cross Sections & Grids 2 40 42 $ M$3.260$3,375 -Mmum nlatim 1 8 9 - SarfaceT h 1 24 25 - Subsurface Informatim 1 12 13 3. AERIAL TOPOGRAPHIC MAPPING 1 1 4. BASE MAPPING 4 8 24 36 , S. FIELD REVIEWS 8 12 20 81,940 6. UTI TrY INVESTIGATION AND COORDINATION 2 8 6 1 16 1 81,330 7. PAVEMENT DEFLECTION STUDY 4 4 510,875 811,335 8. HYDROLOGY & HYDRAULIC STUDY 24 40 24 88 $7,840 9. DEVELOP IMPROVEMENT STRATEGY 16 24 12 52 $4,720 10. STORM DRAIN GEOTECHNICAL BORINGS 4 4 $2,500 $2,960 11, FINAL S & E -Title Sheet 1 1 2 4 7 $565 - Typical Sectims 1 4 - 16 -2 -- 32 $2,660 - Details(2) 4 24 24 52 $4,180 - Rwdmy Plan & Profile 8 60 90 124 274 $23,230 - Storm Drain Plan & Profile (8) 28 64 48 140 $12,020 - Lateral Piles 1) 4 12 12 28 $2,320 -Stri Plans 4 2 12 12 26 $2.090 - Cross Smtims(24) 24 48 80 152 812,440 -S ificmims 16 12 28 82,860 -Cost Estimate 4 12 16 51,480 12. PROJECT COORDINATION & MEETINGS 16 12 28 82,860 13. FEDERAL PROCESSING & COMPLIANCE 4 16 12 32 $2,660 14 BmDING & CONSTRUCTION SUPPORT 1 8 6 18 $1,560 15. AS -BUILT DRAWINGS 2 4 8 14 $1130 16. REIvIBURSABLES 82,000 $2,0 0 TOTAL MANHOURS TOTAL COSTS 246 828,290 426 536,210 408 830,600 98 816,660 1178 $18,635 $128,355 LESS 10% ........................ $12.836 TOTALFEE._..._._.......... $115,520 EXHIBIT B KFM ENGINEERING, INC. SCHEDULE OF HOURLY BILLING RATES Rates Effective through December 31, 2000 OFFICE PERSONNEL: Typists, Word Processors ........................ ..............................$ 30.00 /Hr. Technician .............................................. ............................... $ 45.00 /Hr. Design Engineers / CADD Operators ....... ..............................$ 70.00 /Hr. Project Engineers ..................................... ..............................$ 85.00 /Hr. Project Managers ..................................... ..............................$ 115.00 /Hr. FIELD PERSONNEL: Two -Man Survey Party, including Truck and Equipment ................ ..............................$ 135.00 /Hr. Three -Man Survey Party, including Truck and Equipment ............... .........::- ..: ................ $ 170.00 /Hr. SUPPORT & MISCELLANEOUS COSTS: C.A.D.D. Work Station/Plotter .................. ..............................$ 25.00 11-1r. Computertime ........................................ ............:.................. $ 16.00 /Hr. Telefax..................................................... ..............................$ 2.00 /Pg. Electronic Distance Measuring Equipment (E.D.M.) ...............$ 55.00 1Day SurveyTrucks .......................................... ..............................$ 0.50 /Mile Other Vehicles ........................................ ............................... $ 0.30 /Mile Outside services and consultants are billed at direct costs plus 15 %. Blueprints, reproduction, messenger service, subsistence, travel and other expenses are billed at direct cost plus 10 %. Terms are net 30 days with 11/2% per month interest charges. The above schedule is for straight time hours.