HomeMy WebLinkAbout12 - C-3176 - Balboa Boulevard ReconstructionOctober 24, 2000 CITY COUNCIL AGENDA ITEM NO. 12 TO: Mayor and Members of the City Council FROM: Public Works Department SUBJECT: BALBOA BOULEVARD RECONSTRUCTION MAIN TO "G" STREET, CONTRACT NO. 3176 - COMPLETION AND ACCEPTANCE RECOMMENDATIONS: 1. Accept the work. 2. Authorize the City Clerk to file a Notice of Completion. 3. Authorize the City Clerk to release the Labor and Materials bond 35 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code. 4. Release the Faithful Performance Bond six months after Council acceptance. DISCUSSION: On May 24, 1999, the City Council authorized the award of the Balboa Boulevard Reconstruction, Main to "G" Street contract to Los Angeles Engineering, Inc., of Rosemead, California. The contract provided for the re- paving of Balboa Boulevard from Main Street to G Street. The contract also included the removal and replacement of deteriorated sidewalk, curb access ramps, driveways, cross gutters, curb & gutter, landscape planters and streetscape improvements using interlocking pavers at the intersection of Balboa Boulevard and Main Street. The contract has now been completed to the satisfaction of the Public Works Department. A summary of the contract cost is as follows: Original bid amount: $574,564.10 Actual amount of bid items constructed: 610,895.58 Total amount of change orders: 76,067.92 Final contract cost: $686,963.50 The increase in the amount of actual bid items constructed over the original bid amount resulted from the additional cold milling of existing concrete roadway found under the asphalt roadway. The final overall construction cost, including change orders, was 19.6 percent over the original bid amount. All change orders exceeding the 10 percent original bid cost had City Manager approval. A total of nine monetary change orders were issued to complete the project. They were as follows: A change order in the amount of $700.00 provided for the replacement of a brick driveway at 1134 Balboa Boulevard. SUBJECT: Balboa Boulevard Reconstruction, Main to "G" Street, Contract No. 3176 - Completion And Acceptance October 24, 2000 Page 2 2. A change order in the amount of $6,856.62 provided for removal and disposal of the existing median at Balboa Boulevard and G Street. 3. A change order in the amount of $6,856.62 provided for removal and disposal of the existing median at Balboa Boulevard and G Street. 4. A change order in the amount of $5,200.80 provided for the relocation/and or lowering of six streetlights. 5. A change order in the amount of $11,145.60 provided for the removal and reconstruction of additional sidewalk. 6. A change order in the amount of $9,663.00 provided for the replacement of curb access ramps and temporary driveway access due to grade differentials. 7. A change order in the amount of $23,399.54 provided for the purchase, replacement and adjustments of water meter boxes and sewer cleanouts. 8. A change order in the amount of $7,821.96 provided for the removal and reconstruction of additional roadway. 9. A change order in the amount of $8,576.65 provided for the removal of buried streetlight bases, backfill planter areas and other miscellaneous items. Funds for the project were budgeted in the following accounts: Description Account No. Amount Gas Tax Balboa Boulevard 7181- C5100390 $416,610.00 General Fund Streets 7013- C5100020 138,789.40 CDBG Fund 7161- C5100390 100,000.00 Measure M Turnback 7281- C5100390 31,564.10 Total $686,963.50 The scheduled completion date was November 19, 1999. Due to inclement weather and extra work, time extensions were granted until December 17, 1999. All work was completed by that date with the exception of punch -list items. One item on the list was the settlement of some brick pavers at the intersection of Balboa Boulevard and Main Street. Staff elected to have the contractor not do any remedial work until the settlement stopped. The remedial work now has been completed. Res tfMtted, s I PUBLIC WORKS DEPARTMENT Don Webb, Director Lois Thompson Administrative Coordinator Attachment: Project Location Map