Loading...
HomeMy WebLinkAbout15 - C-3360 Jamboree Road Water Main ReplacementDecember 12, 2000 CITY COUNCIL AGENDA ITEM NO. 15 TO: Mayor and Members of the City Council FROM: Public Works Department SUBJECT: JAMBOREE ROAD ZONE III WATER MAIN REPLACEMENT, CAMELBACK STREET TO UNIVERSITY DRIVE - AWARD OF CONTRACT NO. 3360 RECOMMENDATIONS: Approve the plans and specifications. 2. Accept the withdrawal of the low bid from Universal Pipeline Inc., because of a mathematical error. 3. Award Contract No. 3360 to the second low bidder, A.D. General Engineering, with a bid of $267,311.00, and authorize the Mayor and the City Clerk to execute the contract. 4. Establish an amount of $25,000.00 to cover the cost of unforeseen work. DISCUSSION: At 2:00 p.m. on November 29, 2000, the City Clerk opened and read the following bids for this project: TOTAL BID AMOUNT $210,561.07 ' $267,311.00 $269,777.00 $298,679.62 $311,840.00 $322,169.00 $322,670.00 " $326,389.00 $327,178.00 $337,641.00 $355,536.00 $358,677.00 $368,180.00 $405,616.94 $542,359.00 ' Corrected Bid Amount is $210,561.41 Corrected Bid Amount is $323,120.00 BIDDER Low Universal Pipeline, Inc. 2 A.D. General Engineering 3 Atlas- Allied, Inc. 4 Tomovich & Associates 5 Vasilj, Inc. 6 Cody Engineering 7 Majich Brothers 8 Colich & Sons, L.P. 9 Pipeline Equipment Rental 10 GCI, Inc. 11 Doty Brothers 12 W.A. Rasic Construction Company 13 Williams Supply Company, Inc. 14 R & L Sewer 15 Steve Casada Construction TOTAL BID AMOUNT $210,561.07 ' $267,311.00 $269,777.00 $298,679.62 $311,840.00 $322,169.00 $322,670.00 " $326,389.00 $327,178.00 $337,641.00 $355,536.00 $358,677.00 $368,180.00 $405,616.94 $542,359.00 ' Corrected Bid Amount is $210,561.41 Corrected Bid Amount is $323,120.00 Subject: JAMBOREE ROAD ZONE III WATER MAIN REPLACEMENT, CAMELBACK STREET TO UNIVERSITY DRIVE - AWARD OF CONTRACT NO. 3360 December 12, 2000 Page: 2 The low bidder made a mathematical error in bid item No. 3, installation of the 16 -inch P.V.C. pipe. The contractor showed a unit value of $35.74 per linear foot but it should have been a unit value of $53.74 per linear foot. The contractor requests his bid be withdrawn. (See attached letter). The second low bid amount is 23 percent below the Engineer's Estimate of $343,000.00. The second low bidder, A.D. General Engineering Inc., possesses a General Engineering Contractor's "A" license as required by the project specifications. A.D. General Engineering has satisfactorily completed similar projects for other agencies. This project calls for the replacement of 1500 feet of deteriorating 16 -inch cement mortar and coated (CMCL) steel water main that was installed in 1975. The project replacement pipe will be 16 -inch PVC pipe. The project location is the easterly bike lane on Jamboree Road between Camelback Street and University Drive. There have been six excavations south of Camelback Street along the easterly side of Jamboree Road to repair joint failures. The line has been shut down since last spring when it was determined several joints between Camelback Street and University Drive showed signs of failure. In addition to the work on Jamboree Road, this project will replace two 16 -inch valves and one 12 -inch valve located at the intersection University Drive and La Vida. These valves leaked when used to shut down the main on Jamboree Road and the University Drive main located just east of La Vida. There are sufficient funds available in the Water Transmission Main Replacement Capital Improvement Account No. 7501- C5500386 for the required $292,311.00 project. The project should take approximately two months to complete and during most of that time the bike and curb lanes will be closed to allow for the construction. RespeeffoRy sybm e , PUBLIC WORKS DEPARTMENT Don Webb, Director By: Mic ael J. Sinacori, P.E. Utilities Engineer Attachment: Project Location Map Bid Summary Letter from Universal Pipeline, Inc. dated November 30, 2000 TITLE: Jamboree Zone III Water Mein Replacement Project CONTRACT NO.: 3360 ENGINEER'S ESTIMATE: 4343,000A0 PROJECT MANAGER: Mike simcorl CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT BID LOCATION: City Clerk's Office City Hall DATE: 29 -Nov 00 TIME 2:00p.m. BY: MJS CHECKED: DATE: It 6'D b \users \pbw \shared \contract \99 \ \28id Summary Jamboree Zone III Page 1 ENGINEER'S ESTIMATE Universal Pi eline Inc. R.D. General En ineerin Atlas Allied Inc. ITEM DESCRIPTION QUANTITY UNIT AMOUNT UNIT AMOUNT UNIT AMOUNT UNIT AMOUNT 1 Mobilization 1 LS 25,000.001 25,000.001 10.000.001 10,000.00 101000.00 10,000.00 91000.00 9,000.00 Road and Intersecting Streets, and for Work at the Intersection of University 2 Drive and La Vida 1 LS 10,000.00 10,000.00 2,500.00 2,500.00 9,000.00 9,000.00 6,000.00 6,000.00 Furnish and Install New 16 Inch PVCC905 97, DR 14 Water Main, Including Asphalt Removal, Excavation, Thrust Blocks, 3 Backfill, and Compaction 1.487 LF 85.00 126,395.00 35.74 53,145.38 74.00 110,038.00 56.00 83,272.00 Remove and Dispose of Existing 16 Inch Steel CML & C Water Main Including 4 jAcclitional Backfill and Compaction 1,487 LF 15.00 22,305.00 8.05 11,970.35 19.00 28,253.00 15.00 22,305.00 urnis an Install m ange ipe om 5 Restraints as Show on Drawings 25 EA 125.00 3,125.00 1,017.79 25,444.75 400.00 10,000.00 860.00 21,500.00 Valve, Including Thrust Block, Valve Box 6 and Cover 5 EA 5,000.00 25,000.00 3,991.74 19,958.70 4,000.00 20,000.00 3,200.00 16,000.00 Including Thrust Block, Valve Box and 7 Cover 1 EA 3,000.00 3,000.00 3,002.75 3,002.75 2,000.00 2,000.00 2,700.00 2,700.00 Remove Existing and Provide and Install New Fire Hydrant Assembly Including 8 Valve, lateral, and Sidewalk Restoration 1 EA 6,000.00 6,000.00 6,119.90 6 119.90 5,200.00 5,200.00 5,800.00 5,800.00 Excavate Existing Connection at the Intersection of Jamboree Road and Camelback Street. Remove Interfering Portions of Existing Pipe and Re- Connect per Connection Detail W , Backfill and 9 Compaction 1 LS 10,000.00 10,000.00 5,518.23 5,518.23 3,700.00 3,700.00 6,900.00 6,900.00 Excavate Existing Connection at the Intersection of University Drive and Jamboree Road. Remove Existing Fittings and Valves and Interfering Portions of Existing Pipe, Install new Fittings and Re Connect per Connection Detail 'B', Backfill 10 Compaction. 1 LS 15,000.00 15,000.00 9,645.29 9,645.29 3,900.00 3,900.00 17,500.00 17,500.00 Intersection of University Drive and La Vida. Remove Existing Fittings Valves and Interfering Portions of Existing Pipe, Install New Fittings, and Re Connect per Connection Detail "C, Backfill and 11 Compaction. 1 LS 15.000.001 15,000.00 6,443.72 6,443.721 4,000.00 4,000.00 10.500.001 10,500.00 Asphalt Pavement per Drawings Including Street Reconstruction and Striping where 12 necessary. 15,200 SF 2.50 38,000.00 3.31 50,312.00 2.60 39,520.00 4.00 60,800.00 Jamboree Road Water Main and Piping in University Drive to the La Vida PRV 13 Station 1 LS 5,000.00 5,000.00 2,650.34 2,650.34 3,700.00 3,700.00 3,500.00 3,500.00 Excvation and Safely Mesures, including adequate sheeting, shoring and bracing or equivalent methods for the protection of 14 life and limb. 1 LS 8,000.00 8,000.00 3,191 %00 3,850.00 18,000.00 18,000.00 4,000.00 4,000.00 Total Bid Price for Items 1.14 EE 311,825.00 LOW 1 210,561.41 1 2ND 267,311.00 3RD 269 777.00 Coiredted�fruro ]O- 1'OS'a b \users \pbw \shared \contract \99 \ \28id Summary Jamboree Zone III Page 1 TITLE: Jamboree zone III Water Malu Replacement Project CONTRACT NO.: 33W ENGINEER'S ESTIMATE: $343,000.00 PROJECT MANAGER: Mike sinacori CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT BID LOCATION: City Clerk's Office - City Hall DATE: 29 Nov 00 TIME: 2:00 p.m. BY: MJS CHECKED: DATE: f: \uses \pbw\shared \contract \99 \ \2Bid Summary Jamboree Zone III Page 2 Tomovich & Associates Vasil' Inc. Cod E mg Ma'ich Bros. , Inc. ITEM DESCRIPTION QUANTITY UNIT I AMOUNT UNIT AMOUNT UNIT I AMOUNT UNIT AMOUNT 1 Mobilization 1 LS 25,000.001 25,000.00 10,000.00 10,000.00 17,500.00 17,500.00 20,000.00 20000.00 Road and Intersecting Streets, and for Work at the Intersection of University 2 Drive and La Vida 1 LS 5,000.00 51000.00 91000.00 9,000.00 4,500.00 4,500.00 15,000.00 15,000.00 Furnish and Install New 16 Inch PVCC905 97, DR -14 Water Main, Including Asphalt Removal, Excavation, Thrust Blocks, 3 Backfill, and Compaction 1,487 LF 92.10 136,952.70 110.00 163,570.00 100.00 148,700.00 90.00 133,830.00 Remove and Dispose of Existing 16-Inch Steel CML & C Water Main Including 4 lAdditional Backfill and Compaction 1,487 LF 47.16 70,126.92 10.00 14,870.00 12.00 17,844.00 20.00 29,740.00 Furnish and Install Uni Flange Pipe Joint 5 Restraints as Show on Drawings 25 EA 200.00 5,000.00 100.00 2.500.00 1,000.00 25,000.00 850.00 21,250.00 Valve, Including Thrust Block, Valve Box 6 and Cover 5 EA 1,000.00 5,000.00 3,000.00 15,000.00 3,365.00 16,825.00 3,000.00 15,000.00 7 Including Thrust Block, Valve Box and Cover 1 EA 800.00 800.00 2,800.00 2,800.00 2,000.00 2,000.00 2,400.00 2,400.00 Remove Existing and Provide and Install New Fire Hydrant Assembly Including 8 Valve, lateral, and Sidewalk Restoration 1 EA 6,000.00 6,000.00 3,500.00 3,500.00 4,275.00 4,275.00 5,000.00 5,000.00 Excavate Existing Connection at the Intersection of Jamboree Road and Camelback Street. Remove Interfering Portions of Existing Pipe and Re Connect per Connection Detail 'A, Backfill and 9 lComPaction 1 LS 1 5,000.00 5,000.00 3,000.00 3,000.00 4,775.00 4,775.00 6,000.00 6,000.00 Excavate Existing Connection at the Intersection of University Drive and Jamboree Road. Remove Existing Fittings and Valves and Interfering Portions of Existing Pipe, Install new Fittings and Re Connect per Connection Detail 'El', Backfill 10 and Compaction. 1 LS 5,000.00 5,000.00 12,000.00 12,000.00 5,000.001 5,000.00 8,offo.offl 8,000.00 Excavate Existing Connection at the Intersection of University Drive and La Vida. Remove Existing Fittings Valves and Interfering Portions of Existing Pipe, Install New Fittings, and Re Connect per Connection Detail -C, Backfill and 11 Compaction. 1 LS 5,000.001 5,000.00 15,000.001 15,000.00 4,775.00 4,775.00 6,000.00 6,000.00 Asphalt Pavement per Drawings Including Street Reconstruction and Striping where 12 necessary. 15,200 SF 1.50 22,800.00 3.00 45,600.00 4.00 60,800.00 3.25 49,400.00 Jamboree Road Water Main and Piping in University Drive to the La Vida PRV 13 Station 1 LS 2,000.00 2,000.00 5,000.00 5,000.00 3,250.00 3,250.00 4,000.00 4,000.00 Excvation and Safely Mesures,including adequate sheeting, shoring and bracing or equivalent methods for the protection of 14 life and limb. 1 LS 5,000.00 5,000.00 10,000.00 10,000.00 6,925.00 6,925.00 7,500.00 7,500.00 Total Bid Price for Items 1 -14 4TH 1 298,679.62 5TH 311,840.00 6TH 322169.00 7TH 1 323,120.00 Corrected from 22670.00 f: \uses \pbw\shared \contract \99 \ \2Bid Summary Jamboree Zone III Page 2 TITLE: Jamboree Zone 111 Water Main Replacement Project CONTRACT NO.: 3M ENGINEER'S ESTIMATE: $343,000.00 PROJECT MANAGER: Mike Sinacad CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT BID LOCATION: City Clerk's Office - City Hall DATE: 29 Nov 00 TIME: 2:OOp.m. BY: MJS CHECKED: DATE: t.\ uses \pbw\stWed \contract \99 \ \20d Summary � Jamboree Zone III Page 3 Colich &Sons, L.P. Pipeline E ui menl Rental GCI Doty Brothers ITEM DESCRIPTION OUANTITY UNIT I AMOUNT UNIT AMOUNT UNIT I AMOUNT UNIT I AMOUNT 1 Mobilization 1 LS 35,627.001 35,627.00 15,000.00 15,000.00 35,000.00 35,000.00 26,209.00 26,209.00 Road and Intersecting Streets, and for Work at the Intersection of University 2 Drive and La Vida 1 LS 8,777.00 8,777.00 8,000.00 8,000.00 7,000.00 7,000.00 19,815.00 19,815.00 Furnish and Install New 16-Inch PVCC905 97, DR 14 Water Main, Including Asphalt Removal, Excavation, Thrust Blocks, 3 Backfill, and Compaction 1,487 LF 74.00 110,038.00 124.00 184,388.00 75.00 111,525.00 57.00 84,759.00 Remove and Dispose of Existing 16 Inch Steel CML & C Water Main Including 4 Additional Backfill and Compaction 1,487 LF 5.00 7,435.00 10.00 14,870.00 4&001 71,376.00 51ml 75,837.00 Furnish ancrinstall um-Flange espe Joint 5 Restraints as Show on Drawings 25 1 EA 1 415.00 10,375.00 400.00 10,000.00 400.00 10,000.00 75100 18,825.00 Valve, Including Thrust Block. Valve Boa 6 and Cover 5 EA 3,286.00 16,430.00 3,200.00 16,000.00 3,000.00 15,000.00 3,082.00 15,410.00 Including Thrust Block, Valve Boa and 7 Cover 1 EA 1,885.00 1,885.00 1,800.00 1,800.00 2,000.00 2,000.00 2,378.00 2,378.00 Remove Existing and Provide and Install New Fire Hydrant Assembly Including 8 Valve, lateral, and Sidewalk Restoration 1 EA 8,044.00 8,044.00 4,200.00 4,200.00 4500.00 4,500.00 7,055.00 7,055.00 Excavate Existing Connection at the Intersection of Jamboree Road and Camelback Street. Remove Interfering Portions of Existing Pipe and Re-Connect per Connection Detail W , Backfill and 9 lCompaction 1 I LS 8,446.00 8,46.00 700.00 700.00 6,000.001 6,000.00 5.170.001 5,170.00 Excavate Existing Connection at the Intersection of University Drive and Jamboree Road. Remove Existing Fittings and Valves and Interfering Portions of Existing Pipe, Install new Fittings and Re. Connect per Connection Detail •B•, Backfill 10 and Compaction. 1 LS 15,295.00 15,295.00 1,400.001 1,400.00 9,000.00 9,000.00 7,840.00 7,840.00 Intersection of University Drive and La Vida. Remove Existing Fittings Valves and Interfering Portions of Existing Pipe, Install New Fittings, and Re Conned per Connection Detail'C•, Backfill and 11 Compaction. 1 LS 14,971.00 14,971.00 3,500.00 3,500.00 5,000.00 5,000.00 6,090.00 6,090.00 Jamboree Road Water Main and Piping in University Drive to the La Vida PRV #REF! Station 1 LS 3,053.00 3,053.00 5,600.00 5,600.00 2,000.00 2,000.00 6,536.00 6,536.00 Excvalion and Safety Mesures, including adequate sheeting, shoring and bracing or equivalent methods for the protection of #REF! life and limb. 1 LS 5,45100 5,453.00 7,000.00 7,000.00 3,000.00 3,000.00 13,340.00 13,340.00 Total Bid Price for Items 1.14 8TH 245,829.00 9TH 272,458.00 10TH 281,401.00 11TH 289,264.00 t.\ uses \pbw\stWed \contract \99 \ \20d Summary � Jamboree Zone III Page 3 TITLE: Jamboree Zone III Water Main Replacement Project CONTRACT NO.: 3360 ENGINEER'S ESTIMATE: $343,1000.00 PROJECT MANAGER: Mike Sinacod CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT BID LOCATION: City Clerk's Office City Hall DATE: 29-Nov 00 TIME: 2:00 p.m. BY: MJS CHECKED: DATE: t\ users \pbw \shared \contract \99 \ \2Bid Summary - Jamboree Zone III Page 4 W.A. Rasic Construction Williams upply Co. Inc. R & L Sewer Inc. Steve Casada Construction ITEM DESCRIPTION QUANTITY UNIT I AMOUNT UNIT I AMOUNT UNIT AMOUNT UNIT I AMOUNT 1 Mobilization 1 LS 15,000.001 15,000.00 10,000.00 10,000.00 30,620.44 30,620.44 10,000.00 10,000.00 Road and Intersecting Streets, and for Work at the Intersection of University 2 Ddve and La Vida 1 LS 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 5,000.00 5,000.00 Furnish and Install New 16-Inch PVCC905 97, DR-14 Water Main, Including Asphalt Removal, Excavation, Thrust Blocks, 3 Backfill, and Compaction 1 487 LF 141.00 209,667.00 125.00 185,875.00 11100 168,031.00 146.00 217,102.00 Remove and Dispose of Existing 16 Inch Steel CML & C Water Main Including 4 lAdditional Backfill and Compaction 1,487 LF 30.00 44,610.00 15.001 22,305.00 IT751 26,394.25 111.00 165,057.00 Furnish and Install Uni Flange Pipe Joint 5 Restraints as Show on Drawings 25 EA 700.00 17,500.00 200.00 5,000.00 920.00 23,000.00 700.00 17,500.00 Valve, Including Thrust Block, Valve Box 6 and Cover 5 EA 2,700.00 13,500.00 6,000.00 30,000.00 3,600.00 18,000.00 3,000.00 15,000.00 Including Thrust Block, Valve Box and 7 Cover 1 EA 1,500.00 1,500.00 4,000.00 4,000.00 2,240.00 2,240.00 2,400.00 2,400.00 Remove Existing and Provide and Install New Fire Hydrant Assembly Including 8 Valve, lateral, and Sidewalk Restoration 1 EA 4,000.00 4,000.00 6,000.00 6,000.00 3,600.00 3,600.00 8,200.00 8,200.00 Excavate Existing Connection at the Intersection of Jamboree Road and Camelback Street. Remove Interfering Portions of Existing Pipe and Re Connect per Connection Detail *A' , Backfill and 9 Compaction 1 LS 2,000.00 2,000.00 10,000.00 10,000.00 2,000.00 2,000.00 15,000.00 15,000.00 Excavate Existing Connection at the Intersection of University Drive and Jamboree Road, Remove Existing Fittings and Valves and Interfering Portions of Existing Pipe, Install new Fittings and Re. Connect per Connection Detail "B", Backfill 10 and Compaction. 1 LS 2,000.00 2,000.00 15,000.00 15,000.00 4,000.00 4,000.00 18,000.00 18,000.00 Excavate Existing Connection at the Intersection of University Drive and La Vida. Remove Existing Fittings Valves and Interfering Portions of Existing Pipe, Install New Fittings, and Re-Connect per Connection Detail 'C, Backfill and 11 Compaction. 1 LS 2,500.001 2,500.00 20,000.001 20,000.00 5,500.001 5,500.00 16,00().oOl 16,000.00 Asphalt Pavement per Drawings Including Street Reconstruction and Striping where 12 necessary. 15,200 SF 2.00 30,400.00 2.50 38,000.00 6.30 95,760.00 3.00 45,600.00 Jamboree Road Water Main and Piping In University Drive to the La Vida PRV 13 Station 1 LS 3,500.00 3,500.00 6,000.00 6,000.00 5,000.00 5,000.00 5,000.00 5,000.00 Eacvatlon and Safety Mesures, including adequate sheeting, shoring and bracing or equivalent methods for the protection of 14 life and limb. 1 I LS 2,500.00 2,500.00 6,000.00 6,000.00 11,471.25 11,471.25 2,500.00 2,500.00 Total Bid Price for Items 1.14 12TH 358,677.00 13TH 368 180.00 14TH 405 616.94 15TH 542,359.00 t\ users \pbw \shared \contract \99 \ \2Bid Summary - Jamboree Zone III Page 4 Dec 04 00 02:30P universal Pipeline Inc. 949 - 766 -1012 P•2 %'Jer- llniversal Pipeline, lnc. 0 iVo;;� —, November 30, 2000 Mr. Michael Sinacori Project Manager City of Newport Beach 3300 Newport Blvd Newport Beach CA, 92658 RE: Mathematical Error on Jamboree Road Bid Dear Mr. Sinacori Uc. A 719997AB Universal Pipeline Inc., respectfully request to have our bid discarded due to a Mathematical Error in bid item #3. We will not be able to complete the project for our bid amount. If you have any questions please feel free to call me at (909) 461 -9318. Sincerely, �v Mark G. Wilson President MGW:jlw 29835 Rose Blossom Drive • Murrieta . CA 92563 Phone (949) 678 -0218 a e-mail: unpipeline @aol.com s