HomeMy WebLinkAbout15 - C-3360 Jamboree Road Water Main ReplacementDecember 12, 2000
CITY COUNCIL AGENDA
ITEM NO. 15
TO: Mayor and Members of the City Council
FROM: Public Works Department
SUBJECT: JAMBOREE ROAD ZONE III WATER MAIN REPLACEMENT,
CAMELBACK STREET TO UNIVERSITY DRIVE - AWARD OF
CONTRACT NO. 3360
RECOMMENDATIONS:
Approve the plans and specifications.
2. Accept the withdrawal of the low bid from Universal Pipeline Inc., because of a
mathematical error.
3. Award Contract No. 3360 to the second low bidder, A.D. General Engineering,
with a bid of $267,311.00, and authorize the Mayor and the City Clerk to execute
the contract.
4. Establish an amount of $25,000.00 to cover the cost of unforeseen work.
DISCUSSION:
At 2:00 p.m. on November 29, 2000, the City Clerk opened and read the following bids
for this project:
TOTAL BID AMOUNT
$210,561.07 '
$267,311.00
$269,777.00
$298,679.62
$311,840.00
$322,169.00
$322,670.00 "
$326,389.00
$327,178.00
$337,641.00
$355,536.00
$358,677.00
$368,180.00
$405,616.94
$542,359.00
' Corrected Bid Amount is $210,561.41
Corrected Bid Amount is $323,120.00
BIDDER
Low
Universal Pipeline, Inc.
2
A.D. General Engineering
3
Atlas- Allied, Inc.
4
Tomovich & Associates
5
Vasilj, Inc.
6
Cody Engineering
7
Majich Brothers
8
Colich & Sons, L.P.
9
Pipeline Equipment Rental
10
GCI, Inc.
11
Doty Brothers
12
W.A. Rasic Construction Company
13
Williams Supply Company, Inc.
14
R & L Sewer
15
Steve Casada Construction
TOTAL BID AMOUNT
$210,561.07 '
$267,311.00
$269,777.00
$298,679.62
$311,840.00
$322,169.00
$322,670.00 "
$326,389.00
$327,178.00
$337,641.00
$355,536.00
$358,677.00
$368,180.00
$405,616.94
$542,359.00
' Corrected Bid Amount is $210,561.41
Corrected Bid Amount is $323,120.00
Subject: JAMBOREE ROAD ZONE III WATER MAIN REPLACEMENT, CAMELBACK STREET TO UNIVERSITY DRIVE -
AWARD OF CONTRACT NO. 3360
December 12, 2000
Page: 2
The low bidder made a mathematical error in bid item No. 3, installation of the 16 -inch
P.V.C. pipe. The contractor showed a unit value of $35.74 per linear foot but it should
have been a unit value of $53.74 per linear foot. The contractor requests his bid be
withdrawn. (See attached letter).
The second low bid amount is 23 percent below the Engineer's Estimate of
$343,000.00. The second low bidder, A.D. General Engineering Inc., possesses a
General Engineering Contractor's "A" license as required by the project specifications.
A.D. General Engineering has satisfactorily completed similar projects for other
agencies.
This project calls for the replacement of 1500 feet of deteriorating 16 -inch cement
mortar and coated (CMCL) steel water main that was installed in 1975. The project
replacement pipe will be 16 -inch PVC pipe. The project location is the easterly bike
lane on Jamboree Road between Camelback Street and University Drive. There have
been six excavations south of Camelback Street along the easterly side of Jamboree
Road to repair joint failures. The line has been shut down since last spring when it was
determined several joints between Camelback Street and University Drive showed signs
of failure.
In addition to the work on Jamboree Road, this project will replace two 16 -inch valves
and one 12 -inch valve located at the intersection University Drive and La Vida. These
valves leaked when used to shut down the main on Jamboree Road and the University
Drive main located just east of La Vida.
There are sufficient funds available in the Water Transmission Main Replacement
Capital Improvement Account No. 7501- C5500386 for the required $292,311.00 project.
The project should take approximately two months to complete and during most of that
time the bike and curb lanes will be closed to allow for the construction.
RespeeffoRy sybm e ,
PUBLIC WORKS DEPARTMENT
Don Webb, Director
By:
Mic ael J. Sinacori, P.E.
Utilities Engineer
Attachment: Project Location Map
Bid Summary
Letter from Universal Pipeline, Inc. dated November 30, 2000
TITLE: Jamboree Zone III Water Mein Replacement Project
CONTRACT NO.: 3360
ENGINEER'S ESTIMATE: 4343,000A0
PROJECT MANAGER: Mike simcorl
CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT
BID LOCATION: City Clerk's Office City Hall
DATE: 29 -Nov 00 TIME 2:00p.m.
BY: MJS CHECKED: DATE: It 6'D
b \users \pbw \shared \contract \99 \ \28id Summary Jamboree Zone III Page 1
ENGINEER'S
ESTIMATE
Universal Pi eline Inc.
R.D. General
En ineerin
Atlas
Allied Inc.
ITEM
DESCRIPTION
QUANTITY
UNIT
AMOUNT
UNIT
AMOUNT
UNIT
AMOUNT
UNIT
AMOUNT
1
Mobilization
1
LS
25,000.001
25,000.001
10.000.001
10,000.00
101000.00
10,000.00
91000.00
9,000.00
Road and Intersecting Streets, and for
Work at the Intersection of University
2
Drive and La Vida
1
LS
10,000.00
10,000.00
2,500.00
2,500.00
9,000.00
9,000.00
6,000.00
6,000.00
Furnish and Install New 16 Inch PVCC905
97, DR 14 Water Main, Including Asphalt
Removal, Excavation, Thrust Blocks,
3
Backfill, and Compaction
1.487
LF
85.00
126,395.00
35.74
53,145.38
74.00
110,038.00
56.00
83,272.00
Remove and Dispose of Existing 16 Inch
Steel CML & C Water Main Including
4 jAcclitional
Backfill and Compaction
1,487
LF
15.00
22,305.00
8.05
11,970.35
19.00
28,253.00
15.00
22,305.00
urnis an Install m ange ipe om
5
Restraints as Show on Drawings
25
EA
125.00
3,125.00
1,017.79
25,444.75
400.00
10,000.00
860.00
21,500.00
Valve, Including Thrust Block, Valve Box
6
and Cover
5
EA
5,000.00
25,000.00
3,991.74
19,958.70
4,000.00
20,000.00
3,200.00
16,000.00
Including Thrust Block, Valve Box and
7
Cover
1
EA
3,000.00
3,000.00
3,002.75
3,002.75
2,000.00
2,000.00
2,700.00
2,700.00
Remove Existing and Provide and Install
New Fire Hydrant Assembly Including
8
Valve, lateral, and Sidewalk Restoration
1
EA
6,000.00
6,000.00
6,119.90
6 119.90
5,200.00
5,200.00
5,800.00
5,800.00
Excavate Existing Connection at the
Intersection of Jamboree Road and
Camelback Street. Remove Interfering
Portions of Existing Pipe and Re- Connect
per Connection Detail W , Backfill and
9
Compaction
1
LS
10,000.00
10,000.00
5,518.23
5,518.23
3,700.00
3,700.00
6,900.00
6,900.00
Excavate Existing Connection at the
Intersection of University Drive and
Jamboree Road. Remove Existing Fittings
and Valves and Interfering Portions of
Existing Pipe, Install new Fittings and Re
Connect per Connection Detail 'B', Backfill
10
Compaction.
1
LS
15,000.00
15,000.00
9,645.29
9,645.29
3,900.00
3,900.00
17,500.00
17,500.00
Intersection of University Drive and La
Vida. Remove Existing Fittings Valves and
Interfering Portions of Existing Pipe,
Install New Fittings, and Re Connect per
Connection Detail "C, Backfill and
11
Compaction.
1
LS
15.000.001
15,000.00
6,443.72
6,443.721
4,000.00
4,000.00
10.500.001
10,500.00
Asphalt Pavement per Drawings Including
Street Reconstruction and Striping where
12
necessary.
15,200
SF
2.50
38,000.00
3.31
50,312.00
2.60
39,520.00
4.00
60,800.00
Jamboree Road Water Main and Piping in
University Drive to the La Vida PRV
13
Station
1
LS
5,000.00
5,000.00
2,650.34
2,650.34
3,700.00
3,700.00
3,500.00
3,500.00
Excvation and Safely Mesures, including
adequate sheeting, shoring and bracing or
equivalent methods for the protection of
14
life and limb.
1
LS
8,000.00
8,000.00
3,191 %00
3,850.00
18,000.00
18,000.00
4,000.00
4,000.00
Total Bid Price for Items 1.14
EE
311,825.00
LOW
1 210,561.41
1 2ND
267,311.00
3RD
269 777.00
Coiredted�fruro ]O- 1'OS'a
b \users \pbw \shared \contract \99 \ \28id Summary Jamboree Zone III Page 1
TITLE: Jamboree zone III Water Malu Replacement Project
CONTRACT NO.: 33W
ENGINEER'S ESTIMATE: $343,000.00
PROJECT MANAGER: Mike sinacori
CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT
BID LOCATION: City Clerk's Office - City Hall
DATE: 29 Nov 00 TIME: 2:00 p.m.
BY: MJS CHECKED: DATE:
f: \uses \pbw\shared \contract \99 \ \2Bid Summary Jamboree Zone III Page 2
Tomovich
& Associates
Vasil' Inc.
Cod E
mg
Ma'ich
Bros. , Inc.
ITEM
DESCRIPTION
QUANTITY
UNIT I
AMOUNT
UNIT
AMOUNT
UNIT I
AMOUNT
UNIT
AMOUNT
1
Mobilization
1
LS
25,000.001
25,000.00
10,000.00
10,000.00
17,500.00
17,500.00
20,000.00
20000.00
Road and Intersecting Streets, and for
Work at the Intersection of University
2
Drive and La Vida
1
LS
5,000.00
51000.00
91000.00
9,000.00
4,500.00
4,500.00
15,000.00
15,000.00
Furnish and Install New 16 Inch PVCC905
97, DR -14 Water Main, Including Asphalt
Removal, Excavation, Thrust Blocks,
3
Backfill, and Compaction
1,487
LF
92.10
136,952.70
110.00
163,570.00
100.00
148,700.00
90.00
133,830.00
Remove and Dispose of Existing 16-Inch
Steel CML & C Water Main Including
4 lAdditional
Backfill and Compaction
1,487
LF
47.16
70,126.92
10.00
14,870.00
12.00
17,844.00
20.00
29,740.00
Furnish and Install Uni Flange Pipe Joint
5
Restraints as Show on Drawings
25
EA
200.00
5,000.00
100.00
2.500.00
1,000.00
25,000.00
850.00
21,250.00
Valve, Including Thrust Block, Valve Box
6
and Cover
5
EA
1,000.00
5,000.00
3,000.00
15,000.00
3,365.00
16,825.00
3,000.00
15,000.00
7
Including Thrust Block, Valve Box and
Cover
1
EA
800.00
800.00
2,800.00
2,800.00
2,000.00
2,000.00
2,400.00
2,400.00
Remove Existing and Provide and Install
New Fire Hydrant Assembly Including
8
Valve, lateral, and Sidewalk Restoration
1
EA
6,000.00
6,000.00
3,500.00
3,500.00
4,275.00
4,275.00
5,000.00
5,000.00
Excavate Existing Connection at the
Intersection of Jamboree Road and
Camelback Street. Remove Interfering
Portions of Existing Pipe and Re Connect
per Connection Detail 'A, Backfill and
9
lComPaction
1
LS
1 5,000.00
5,000.00
3,000.00
3,000.00
4,775.00
4,775.00
6,000.00
6,000.00
Excavate Existing Connection at the
Intersection of University Drive and
Jamboree Road. Remove Existing Fittings
and Valves and Interfering Portions of
Existing Pipe, Install new Fittings and Re
Connect per Connection Detail 'El', Backfill
10
and Compaction.
1
LS
5,000.00
5,000.00
12,000.00
12,000.00
5,000.001
5,000.00
8,offo.offl
8,000.00
Excavate Existing Connection at the
Intersection of University Drive and La
Vida. Remove Existing Fittings Valves and
Interfering Portions of Existing Pipe,
Install New Fittings, and Re Connect per
Connection Detail -C, Backfill and
11
Compaction.
1
LS
5,000.001
5,000.00
15,000.001
15,000.00
4,775.00
4,775.00
6,000.00
6,000.00
Asphalt Pavement per Drawings Including
Street Reconstruction and Striping where
12
necessary.
15,200
SF
1.50
22,800.00
3.00
45,600.00
4.00
60,800.00
3.25
49,400.00
Jamboree Road Water Main and Piping in
University Drive to the La Vida PRV
13
Station
1
LS
2,000.00
2,000.00
5,000.00
5,000.00
3,250.00
3,250.00
4,000.00
4,000.00
Excvation and Safely Mesures,including
adequate sheeting, shoring and bracing or
equivalent methods for the protection of
14
life and limb.
1
LS
5,000.00
5,000.00
10,000.00
10,000.00
6,925.00
6,925.00
7,500.00
7,500.00
Total Bid Price for Items 1 -14
4TH 1 298,679.62 5TH 311,840.00 6TH 322169.00
7TH
1 323,120.00
Corrected from 22670.00
f: \uses \pbw\shared \contract \99 \ \2Bid Summary Jamboree Zone III Page 2
TITLE: Jamboree Zone 111 Water Main Replacement Project
CONTRACT NO.: 3M
ENGINEER'S ESTIMATE: $343,000.00
PROJECT MANAGER: Mike Sinacad
CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT
BID LOCATION: City Clerk's Office - City Hall
DATE: 29 Nov 00 TIME: 2:OOp.m.
BY: MJS CHECKED: DATE:
t.\ uses \pbw\stWed \contract \99 \ \20d Summary � Jamboree Zone III Page 3
Colich &Sons, L.P.
Pipeline E ui menl Rental
GCI
Doty Brothers
ITEM
DESCRIPTION
OUANTITY
UNIT
I AMOUNT
UNIT
AMOUNT
UNIT
I AMOUNT
UNIT I
AMOUNT
1
Mobilization
1
LS
35,627.001
35,627.00
15,000.00
15,000.00
35,000.00
35,000.00
26,209.00
26,209.00
Road and Intersecting Streets, and for
Work at the Intersection of University
2
Drive and La Vida
1
LS
8,777.00
8,777.00
8,000.00
8,000.00
7,000.00
7,000.00
19,815.00
19,815.00
Furnish and Install New 16-Inch PVCC905
97, DR 14 Water Main, Including Asphalt
Removal, Excavation, Thrust Blocks,
3
Backfill, and Compaction
1,487
LF
74.00
110,038.00
124.00
184,388.00
75.00
111,525.00
57.00
84,759.00
Remove and Dispose of Existing 16 Inch
Steel CML & C Water Main Including
4
Additional Backfill and Compaction
1,487
LF
5.00
7,435.00
10.00
14,870.00
4&001
71,376.00
51ml
75,837.00
Furnish ancrinstall um-Flange espe Joint
5
Restraints as Show on Drawings
25
1 EA
1 415.00
10,375.00
400.00
10,000.00
400.00
10,000.00
75100
18,825.00
Valve, Including Thrust Block. Valve Boa
6
and Cover
5
EA
3,286.00
16,430.00
3,200.00
16,000.00
3,000.00
15,000.00
3,082.00
15,410.00
Including Thrust Block, Valve Boa and
7
Cover
1
EA
1,885.00
1,885.00
1,800.00
1,800.00
2,000.00
2,000.00
2,378.00
2,378.00
Remove Existing and Provide and Install
New Fire Hydrant Assembly Including
8
Valve, lateral, and Sidewalk Restoration
1
EA
8,044.00
8,044.00
4,200.00
4,200.00
4500.00
4,500.00
7,055.00
7,055.00
Excavate Existing Connection at the
Intersection of Jamboree Road and
Camelback Street. Remove Interfering
Portions of Existing Pipe and Re-Connect
per Connection Detail W , Backfill and
9
lCompaction
1
I LS
8,446.00
8,46.00
700.00
700.00
6,000.001
6,000.00
5.170.001
5,170.00
Excavate Existing Connection at the
Intersection of University Drive and
Jamboree Road. Remove Existing Fittings
and Valves and Interfering Portions of
Existing Pipe, Install new Fittings and Re.
Connect per Connection Detail •B•, Backfill
10
and Compaction.
1
LS
15,295.00
15,295.00
1,400.001
1,400.00
9,000.00
9,000.00
7,840.00
7,840.00
Intersection of University Drive and La
Vida. Remove Existing Fittings Valves and
Interfering Portions of Existing Pipe,
Install New Fittings, and Re Conned per
Connection Detail'C•, Backfill and
11
Compaction.
1
LS
14,971.00
14,971.00
3,500.00
3,500.00
5,000.00
5,000.00
6,090.00
6,090.00
Jamboree Road Water Main and Piping in
University Drive to the La Vida PRV
#REF!
Station
1
LS
3,053.00
3,053.00
5,600.00
5,600.00
2,000.00
2,000.00
6,536.00
6,536.00
Excvalion and Safety Mesures, including
adequate sheeting, shoring and bracing or
equivalent methods for the protection of
#REF!
life and limb.
1
LS
5,45100
5,453.00
7,000.00
7,000.00
3,000.00
3,000.00
13,340.00
13,340.00
Total Bid Price for Items 1.14
8TH
245,829.00
9TH
272,458.00
10TH
281,401.00
11TH
289,264.00
t.\ uses \pbw\stWed \contract \99 \ \20d Summary � Jamboree Zone III Page 3
TITLE: Jamboree Zone III Water Main Replacement Project
CONTRACT NO.: 3360
ENGINEER'S ESTIMATE: $343,1000.00
PROJECT MANAGER: Mike Sinacod
CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT
BID LOCATION: City Clerk's Office City Hall
DATE: 29-Nov 00 TIME: 2:00 p.m.
BY: MJS CHECKED: DATE:
t\ users \pbw \shared \contract \99 \ \2Bid Summary - Jamboree Zone III Page 4
W.A. Rasic
Construction
Williams
upply Co. Inc.
R & L Sewer Inc.
Steve Casada
Construction
ITEM
DESCRIPTION
QUANTITY
UNIT
I AMOUNT
UNIT
I AMOUNT
UNIT
AMOUNT
UNIT
I AMOUNT
1
Mobilization
1
LS
15,000.001
15,000.00
10,000.00
10,000.00
30,620.44
30,620.44
10,000.00
10,000.00
Road and Intersecting Streets, and for
Work at the Intersection of University
2
Ddve and La Vida
1
LS
10,000.00
10,000.00
10,000.00
10,000.00
10,000.00
10,000.00
5,000.00
5,000.00
Furnish and Install New 16-Inch PVCC905
97, DR-14 Water Main, Including Asphalt
Removal, Excavation, Thrust Blocks,
3
Backfill, and Compaction
1 487
LF
141.00
209,667.00
125.00
185,875.00
11100
168,031.00
146.00
217,102.00
Remove and Dispose of Existing 16 Inch
Steel CML & C Water Main Including
4
lAdditional Backfill and Compaction
1,487
LF
30.00
44,610.00
15.001
22,305.00
IT751
26,394.25
111.00
165,057.00
Furnish and Install Uni Flange Pipe Joint
5
Restraints as Show on Drawings
25
EA
700.00
17,500.00
200.00
5,000.00
920.00
23,000.00
700.00
17,500.00
Valve, Including Thrust Block, Valve Box
6
and Cover
5
EA
2,700.00
13,500.00
6,000.00
30,000.00
3,600.00
18,000.00
3,000.00
15,000.00
Including Thrust Block, Valve Box and
7
Cover
1
EA
1,500.00
1,500.00
4,000.00
4,000.00
2,240.00
2,240.00
2,400.00
2,400.00
Remove Existing and Provide and Install
New Fire Hydrant Assembly Including
8
Valve, lateral, and Sidewalk Restoration
1
EA
4,000.00
4,000.00
6,000.00
6,000.00
3,600.00
3,600.00
8,200.00
8,200.00
Excavate Existing Connection at the
Intersection of Jamboree Road and
Camelback Street. Remove Interfering
Portions of Existing Pipe and Re Connect
per Connection Detail *A' , Backfill and
9
Compaction
1
LS
2,000.00
2,000.00
10,000.00
10,000.00
2,000.00
2,000.00
15,000.00
15,000.00
Excavate Existing Connection at the
Intersection of University Drive and
Jamboree Road, Remove Existing Fittings
and Valves and Interfering Portions of
Existing Pipe, Install new Fittings and Re.
Connect per Connection Detail "B", Backfill
10
and Compaction.
1
LS
2,000.00
2,000.00
15,000.00
15,000.00
4,000.00
4,000.00
18,000.00
18,000.00
Excavate Existing Connection at the
Intersection of University Drive and La
Vida. Remove Existing Fittings Valves and
Interfering Portions of Existing Pipe,
Install New Fittings, and Re-Connect per
Connection Detail 'C, Backfill and
11
Compaction.
1
LS
2,500.001
2,500.00
20,000.001
20,000.00
5,500.001
5,500.00
16,00().oOl
16,000.00
Asphalt Pavement per Drawings Including
Street Reconstruction and Striping where
12
necessary.
15,200
SF
2.00
30,400.00
2.50
38,000.00
6.30
95,760.00
3.00
45,600.00
Jamboree Road Water Main and Piping In
University Drive to the La Vida PRV
13
Station
1
LS
3,500.00
3,500.00
6,000.00
6,000.00
5,000.00
5,000.00
5,000.00
5,000.00
Eacvatlon and Safety Mesures, including
adequate sheeting, shoring and bracing or
equivalent methods for the protection of
14
life and limb.
1
I LS
2,500.00
2,500.00
6,000.00
6,000.00
11,471.25
11,471.25
2,500.00
2,500.00
Total Bid Price for Items 1.14
12TH
358,677.00
13TH
368 180.00
14TH
405 616.94
15TH
542,359.00
t\ users \pbw \shared \contract \99 \ \2Bid Summary - Jamboree Zone III Page 4
Dec 04 00 02:30P universal Pipeline Inc. 949 - 766 -1012 P•2
%'Jer-
llniversal Pipeline, lnc. 0 iVo;;� —,
November 30, 2000
Mr. Michael Sinacori
Project Manager
City of Newport Beach
3300 Newport Blvd
Newport Beach CA, 92658
RE: Mathematical Error on Jamboree Road Bid
Dear Mr. Sinacori
Uc. A 719997AB
Universal Pipeline Inc., respectfully request to have our bid discarded due to a
Mathematical Error in bid item #3. We will not be able to complete the project for our bid
amount.
If you have any questions please feel free to call me at (909) 461 -9318.
Sincerely,
�v
Mark G. Wilson
President
MGW:jlw
29835 Rose Blossom Drive • Murrieta . CA 92563
Phone (949) 678 -0218 a e-mail: unpipeline @aol.com s