HomeMy WebLinkAbout24 - Park Avenue Bridge Replacement - PowerPoint (Staff)City Council Meeting Adoption of a Mitigated Negative Declaration
November 25, 2014
Project Vicinity
i
V
El
MARWEAVB
i
-LI WA
all k
; - I AIM
v
Existing Park Avenue Bridge
Public Works Department
Community Development Department
Project Background &Benefits
• Vitally important bridge as the only access to /from Little Balboa
Island
• Originally built in 1930 and rehabilitated numerous times
• Full replacement necessary due to advanced deterioration of
structurally critical elements and is functionally obsolete
• Benefits include:
• Improved traffic and pedestrian access and safety
• Improved
columns
boat access under the bridge structure with fewer
• 100% Federally Funded
Public Works Department
New Bridge Structure
• Replaces existing 85 -year old bridge
• Widens both traffic lanes from 10 -ft to 11 -ft
• Widen both sidewalks from 4 -ft to 6 -ft
• Reconstruct ADA- compliant pedestrian ramps
• Pedestrian Stairs at all four corners
• Reduce the number of bridge piles in Grand Canal
• Maintain architectural character of existing bridge
Public Works Department
OP
uG TPo
�ATEND(
A Ir
rorti. �orx or wwaE uoN� f a rua AV E. � � ao
PAR NG
MEP.2 REK9 (DmNG)
Public Works Department
m'4 K
m'4 K
m+1.NR•.s..i•
/iw.
CwU,.96 —C.]V R.O.r i /tl..
®
A.
0� -Y.Ai O•�O.6iR•It.ti tP.
imo rm
•�
PROFREGRADE iKO
>•n
mw Iwn w wm¢ rYVm uwe i..n.m¢ - Im'4
.ul
un I �i�l
ui IRro%n
ELEVATIO
f
B
aP.R.KJ CC
I
I
r
[
1B1I��
I
I
LEGEND
F
PLAJN-
R�ml x
II
I
t P T .M
CRY OF NEWPORT BEACH
PARK AVENUE BWGE MUCEIMIT
PRELIMINARY
ffMER LL PUN
NOT
FOR CONSTRUCTION
�,�
Temporary Bridge at Balboa Avenue
Reasons supporting this as the best construction approach:
• Two -lanes of traffic provided through construction phase;
minimize traffic related impacts
• Unimpeded emergency response access
• Reduces the overall construction time; minimize construction
impacts in environmentally sensitive Grand Canal
• Avoid higher risks associated with staged construction approach
• Confined work area maintaining vehicle /pedestrian access
• Structural viability of 85 -year old bridge through partial
removal
Public Works Department
b
a
71 P-
I► o
LEGEND:
= Balboa Avenue Temp Bridge
Park Avenue Bridge
Park Avenue Bridge Replacement Over Grand Canal Project
PROPOSED CONSTRUCTION ROUTES
47' 10 90' 10• 47•
RAMP
2 -LANE TRUSS BRIDGE
ABUTMENT STEEL PILE SUPPORT
� BOARDWALK
SEAWALL
BEARINGBLOCK
® Balboa Avenue Tem
Public Works Department
CITY OF NEWPORT BEACH
Mitigated Negative Declaration (MND)
CEQA Compliance
• Initial Study /Mitigated Negative Declaration prepared by RBF
consulting
• No significant environmental impacts
• Mitigation measures required related to Aesthetics, Air Quality,
Biological & Cultural Resources, Geology /Soils, Hazards /Hazardous
Materials, & Noise
• IS /MND supported by detailed air quality, noise, historical, hazardous
materials, water quality, hydraulics and traffic technical studies
• All impacts associated with the project were determined to be
mitigated to below a level of significance
Public Works Department
Community Development Department
Mitigated Negative Declaration (MND)
CEQA Compliance
• Public comment period: October 6, 2014 through November 5, 2014
• Six comment letters received (RWQCB, OC Public Works, California
Cultural Resources Preservation Alliance, and adjacent
home /business owners)
• City prepared written Responses to Comments; no comments
affecting or altering conclusions within the IS /MND were raised
Public Works Department
Community Development Department
Project Funding &Schedule
• Highway Bridge Replacement & Replacement Program (Federal
Funds)
• Total Project Funding: $4,414,000
• Schedule:
• Approve Environmental Document — November 2014
• Obtain Coastal Commission Permit Approval —Spring 2015
• Complete Final Design /Bidding — Summer 2015
• Construction — Fall /Winter 2015 to December 2016
Public Works Department
Questions and Comments
;��J� ■IIIIIIII ,
r�rrrrr�rrr�i
MEtµ tNl ON
�ATEW CONLI:Frt W,LLL \
nlErmaW& L A
_ meuLUwn�aaenee �LOwfa r�nLra[.�ia -o�
Edo MV' DS'4
LJ�rANCRE�E
FAPMO -
MUi1
GgIFIFB
HFR2
-I 1 NF/OJI
MRS w
A 4
EE
4.
MOH FFl Kl \
NEWD WALL
Public Works Department
A Well - Engineered Machine
J-
mi