HomeMy WebLinkAbout09 - C-3313 - Newport Heights Street ImprovementsMarch 27, 2001 CITY COUNCIL AGENDA ITEM NO. 9 TO: Mayor and Members of the City Council FROM: Public Works Department SUBJECT: NEWPORT HEIGHTS STREET IMPROVEMENTS, CONTRACT NO. 3313 — ACCEPTANCE AND COMPLETION RECOMMENDATIONS: 1. Accept the work. 2. Authorize the City Clerk to file a Notice of Completion. 3. Authorize the City Clerk to release the Labor and Materials bond 35 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code. 4. Release the Faithful Performance Bond 1 year after Council acceptance. DISCUSSION: On June 27, 2000, the City Council authorized the award of the Newport Heights Street Improvements contract to Nobest, Inc., of Westminster, California. The contract provided for rehabilitation of existing asphalt concrete pavement by constructing an asphalt concrete overlay, and in some areas, complete removal and replacement of the roadway. In addition, curb and gutter, driveway approaches, and concrete street replacement were constructed. The improved Newport Heights streets were Santa Ana Avenue, Catalina Drive, Holmwood Drive, and Beacon Street. The contract has now been completed to the satisfaction of the Public Works Department. A summary of the contract cost is as follows: Original bid amount: $449,955.00 Actual amount of bid items constructed: 490,374.22 Total amount of change orders: 29,584.34 Final contract cost: $519.958.56 The increase in the amount of actual bid items constructed over the original bid amount resulted from the need for over - excavation of unacceptable subgrade materials and for additional areas of asphalt paving. The final overall construction cost including change orders was 15.6 percent over the original bid amount. SUBJECT: NEWPORT HEIGHTS STREET IMPROVEMENTS, CONTRACT NO 3313 — ACCEPTANCE AND COMPLETION March 27, 2001 Page 2 A total of two change orders totaling $29,584.34 were issued to complete the project. They were as follows: A change order in the amount of $11,246.00 provided for removal of Type B curb and construction of 496 feet of Type A curb and gutter. 2. A change order in the amount of $18,338.34 provided for removal and reconstruction of cross gutters, rebuilding brick pavers and wall, and additional curb and gutter. Funds for the project were budgeted in the following accounts: Description OCCTFP Measure M Tumback Sidewalk, Curb & Gutter Replacement Dover Drive Overlay Account No. Amount 7281- C5100536 $393,649.00 7013- C5100020 98,306.00 7181- C5100537 28,003.56 Total $519,958.56 The original scheduled completion date was October 16, 2000. Due to substantial additions to areas for over excavation, street paving, and corrective work required of the contractor, the completion date was extended to February 13, 2001. All work was completed by the revised completion date. Respectfully submitte , PUBLIC WORKS DEPARTMENT Don Webb, Director By: . '2" C r'Lec/ R. Gunther, P.E. Construction Engineer