HomeMy WebLinkAbout05 - C-3157 - Dahlia Avenue Street End-Fernleaf Avenue Slope RepairApril 10, 2001 CITY COUNCIL AGENDA ITEM NO. s TO: Mayor and Members of the City Council FROM: Public Works Department SUBJECT: DAHLIA AVENUE STREET END /FERNLEAF AVENUE SLOPE REPAIR, CONTRACT NO 3157 — ACCEPTANCE AND COMPLETION RECOMMENDATIONS: 1. Accept the work. 2. Authorize the City Clerk to file a Notice of Completion. 3. Authorize the City Clerk to release the Labor and Materials bond 35 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code. 4. Release the Faithful Performance Bond 1 year after Council acceptance. DISCUSSION: On April 25, 2000, the City Council authorized the award of the Dahlia Avenue Street End /Fernleaf Avenue Slope Repair contract to Metro Builders & Engineers of Newport Beach, California. The contract provided for: • Grading and flattening of the slope above the Fernleaf Avenue roadway (ramp) • Installation of a tan colored sandblasted retaining wall with caisson piles along the top of the slope • Installation of a short masonry block debris wall along the bottom of the slope • Installation of drainage provisions • Installation of a temporary above - ground irrigation system • Planting of shrubs, ground cover, and trees The contract has now been completed to the satisfaction of the Public Works Department. A summary of the contract cost is as follows: Original bid amount: $457,612.00 Actual amount of bid items constructed: 464,387.00 Total amount of change orders: 66,135.77 Final contract cost: $530,522.70 SUBJECT: DAHLIA AVENUE STREET END /FERNELAF AVENUE SLOPE REPAIR, CONTRACT NO 3157— ACCEPTANCE AND COMPLETION April 10, 2001 Page 2 The increase in the amount of actual bid items constructed over the original bid amount resulted from the need for additional 18 -inch storm drain and concrete drainage Swale exceeding the bid item quantities. The final overall construction cost including change orders was 15.9 percent over the original bid amount. Five change orders totaling $66,135.70 were issued to complete the project. They were as follows: 1. A change order in the amount of $1,368.08 provided for removal of an abandoned waterline. 2. A change order in the amount of $1,197.66 provided for a substitute split -face CMU wall block. 3. A change order in the amount of $2,287.50 provided for the demolition and removal of an interfering concrete caisson. 4. A change order in the amount of $36,592.21 provided for pavement replacement, wall foundation drainage fabric, curb replacement, CMU wall at catch basin, splash wall, fee payment to Southern California Edison, and miscellaneous items. 5. A change order in the amount of $24,690.25 provided for additional length of steel piles due to variation in the depth of bedrock and additional grading, backfill, and compaction due to a revised location of the wall at the west end of the site to protect residential property. Funds for the project were expended in the following accounts: Description Dahlia Avenue Street End Slope Repair Miscellaneous Slope Repairs Account No. Amount 7013- C5100023 $497,522.70 7014- C5100508 33,000.00 Total $530,522.70 The original scheduled completion date was September 22, 2000. Due to the extensive additional work required for change orders numbers 4 and 5, the completion date was extended to February 23, 2001. All work was completed by the revised completion date. Respectfully submi d, PUBLIC WORKS DEPARTMENT Don Webb, Director By: - CZ� 4r R. Gunther, P.E. Construction Engineer