Loading...
HomeMy WebLinkAbout10 - Balboa Village Project Update & Psomas AgreementApril 24, 2001 COUNCIL AGENDA ITEM NO. 10 TO: Mayor and Members of the City Council FROM: Public Works Department SUBJECT: BALBOA VILLAGE PROJECT UPDATE AND APPROVAL OF AMENDMENT NO. 5 TO PSOMAS AGREEMENT RECOMMENDATIONS: 1. Receive and file project update report. 2. Approve Amendment No. 5 in the amount of $107,905 to the original Agreement with Psomas. The amendment provides for a fee increase to cover work beyond the original scope. The Amendment also provides for a time extension to the Agreement. PROJECT HISTORY At the February 22, 2000, City Council meeting, Staff was directed to solicit proposals for professional services to design pedestrian and streetscape improvements for the Balboa Village area. The Balboa Village project includes hardscape, landscape, and streetlight improvements for the Balboa Pier parking lot, pier plaza, Washington Street, Palm Street, Main Street, Bay Avenue, Balboa Boulevard, Ocean Front, and Peninsula Park. On May 23, 2000, Council authorized the City to execute an Agreement with Psomas to provide pre- design, design, and construction services for the Balboa Village Improvement Project for a fee of $493,131. The original scope of work includes: Designing pedestrian and streetscape improvements Preparing an odor assessment at Washington Street and Bay Avenue Designing water, sewer, streetlight, and storm drain improvements There are several projects associated with the Balboa Village Project underway concurrently including: • Forming an Underground Utilities Assessment District • Re- designing the Washington Street and Balboa Pier restrooms • Designing the landmark tower at the corner of Balboa Boulevard and Palm Avenue SUBJECT: Balboa Village Project Update and Approval of Amendment No. 5 to Psomas Agreement April 24, 2001 Page 2 Several studies associated with the project have been commissioned and completed: • A human health risk assessment for the methane and hydrogen sulfide emissions at Washington Street and Bay Avenue • A Negative Declaration for the project • A biological assessment for the new storm drain outfall at the north end of Washington Street • An analysis of the Ficus trees on Main Street with a complementary study by Staff on tree maintenance costs PROJECT PHASING The Village Project will be constructed in three phases: Phase 1 — FY 2001 -2002 Construction of the Balboa Pier Parking Lot improvements, Pier Plaza improvements, Main Street connection to the A Street Parking Lot, Balboa Boulevard improvements, and storm drain facilities in Washington Street. Phase 2 — FY 2002 -2003 In general, construction of the Balboa Village streetscape improvements from Ocean Front to Balboa Boulevard. Phase 3 — FY 2003 -2004 In general, construction of the Balboa Village streetscape improvements from Balboa Boulevard to Edgewater Avenue. In the next few years, three important projects are planning construction within the Village area: the Balboa Theatre renovation, the Balboa Inn expansion, and the Orange County Sanitation District sewer pump station at Balboa Boulevard and A Street. The Village project phasing will be modified in the areas of these projects to facilitate construction and protect the Village improvements. PROJECT STATUS The City received a third submittal of drawings and specifications from Psomas on March 23`x. The documents were reviewed and returned to Psomas on April 19th. Factoring in the new tasks, the construction drawings are approximately eighty percent complete. Psomas is revising the drawings for resubmittal on May 18th. Comments were received from the California Coastal Commission and the City prepared and submitted a response to the Coastal Commission on April 5, 2001. Staff selected a concrete material called Lithocrete for use on this project. Staff is coordinating with a local supplier to prepare samples with the proposed materials, patterns, and colors for the sidewalks and roadways. Staff has begun the process to pre - qualify Lithocrete contractors. SUBJECT: Balboa Village Project Update and Approval of Amendment No. 5 to Psomas Agreement April 24, 2001 Page 3 The cost estimate for the project is being analyzed. It appears the total cost for the project is higher than the project budget. This can be attributed to the suggested additional enhancements. Unit costs are being reviewed by Staff to keep the project within the budget. The Army Corps of Engineers and the California Regional Water Quality Control Board are processing permit applications for the Village project. Staff is preparing a Request for Proposal for Construction Management services for the project. CONTRACT AMENDMENT NO. 5 Construction documents for the Balboa Village Project are being prepared by Psomas. The original contract amount with Psomas was $493,136. Amendments totaling $121,981 (24.7 percent of the original contract amount) have been previously approved for new planning and design tasks assigned to Psomas. Tasks covered by the previous amendments included: • Design development for streetscapes, Peninsula Park, pier plaza, and the landmark tower • Design of landscape area for the pier plaza and Peninsula Park, • Street tree research • Planning options for parking on Bay Avenue • Design options for Balboa Boulevard • Design modifications for underground utilities Amendment No. 5 for $107,905 has been reviewed by Staff for new design tasks and revisions. The added tasks to be provided are: 1. Design revisions for the storm drain in Washington Street 2. Planning and design for the storm drain outfall into Newport Harbor 3. Design for a new storm drain tide gate and vault 4. New design and design revisions for parking, hardscape, trees, landscape, traffic, and utilities improvements throughout the Village 5. Supplemental survey 6. Revisions to drawings to accommodate new construction phasing 7. Project planning and coordination 8. Contingency ($10,000) SUBJECT: Balboa Village Project Update and Approval of Amendment No. 5 to Psomas Agreement April 24, 2001 Page 4 PROJECT SCHEDULE Staff anticipates signing the construction drawings by July 16, 2001, and awarding the contract on September 11, 2001. Construction is anticipated to begin by October 1, 2001. Amendment No. 5 extends the term of the contract to December 31, 2001. Funds are available for Amendment No. 5 in the following accounts: Description Balboa Pier Parking Parking Management Implementation Respectfully submitted, F / PUBLIC WORKS DEPARTMENT Don Webb, Director �B; Robert Stein, Project Manager Account No. Amount 7022- C5100376 $ 77,070 7022- C5200414 30,835 Total $107,905 Attachment: Amendment No. 5 to Psomas Professional Services Agreement BALBOA VILLAGE IMPROVEMENT PLAN AMENDMENT NO. 5 TO PROFESSIONAL SERVICES AGREEMENT WITH PSOMAS THIS AMENDMENT NO. 5 TO PROFESSIONAL SERVICES AGREEMENT, entered into this day of , 2001, by and between the CITY OF NEWPORT BEACH, a municipal corporation, (hereinafter referred to as "CITY ") and Psomas, whose address is 3187 Red Hill Avenue, Suite 250, Costa Mesa, California, 92626, (hereinafter referred to as "Consultant'), is made with reference to the following: RECITALS: A. On May 23, 2000, CITY and CONSULTANT entered into a Professional Services Agreement, hereinafter referred to as "AGREEMENT ", for final design and construction support services for the Balboa Village Improvement Project, hereinafter referred to as 'PROJECT'. B. CITY and CONSULTANT have entered into four separate AMENDMENTS of the AGREEMENT, the latest dated December 20, 2000, C. CITY desires to enter into this AMENDMENT NO. 5 to reflect additional services not included in the AGREEMENT or prior AMENDMENTS and to extend the term of the AGREEMENT to December 31, 2002, D. CITY desires to compensate CONSULTANT for additional professional services needed for PROJECT. E. CITY and CONSULTANT mutually desire to amend AGREEMENT, hereinafter referred to as "AMENDMENT NO. 5 ", as provided here below. NOW, THEREFORE, the parties hereto agree as follows: 1. CONSULTANT shall be compensated for services performed pursuant to this AMENDMENT NO. 5 according to "Exhibit A" dated April 11, 2001 attached hereto. 2. Total additional compensation to CONSULTANT for services performed pursuant to this AMENDMENT NO. 5 shall not exceed one hundred seven thousand, nine hundred five AND 00/100 dollars ($107,905.00). 3. The term of the AGREEMENT shall be extended to December 31, 2002. 4. Except as expressly modified herein, all other provisions, terms, and covenants set forth in AGREEMENT shall remain unchanged and shall be in full force and effect. IN WITNESS WHEREOF, the parties hereto have executed this AMENDMENT NO. 5 on the date first above written. CITY OF NEWPORT BEACH, A municipal corporation MN APPROVED AS TO FORM: Garold B. Adams, Mayor City of Newport Beach By: City Attorney ATTEST: LaVonne Harkless City Clerk Psomas AN fAusers \pbvAshared \balboa village\agreements \psomas \amendment 5 041101.doc P S O M A S BALBOA VILLAGE IMPROVEMENT PLAN AMENDMENT NO.5 - EXHIBIT A April 11, 2001 With PSOMAS 3187 Red Hill Avenue, Suite 250 Costa Mesa, CA 92626 As requested by the City, Psomas has been asked to perform new design and planning tasks for the Balboa Village Improvement Project including: • Design Revisions for the storm drain in Washington Street, • Design for a new storm drain tide gate and vault, • New design and design revisions for hardscape, landscape, and utilities improvements throughout the Village, and • Revisions to drawings to accommodate new construction phasing. The tasks are detailed below. Task 1 Redesign Storm Drain Line A in Washington Street (Task 1 Request $9,423) The proposed storm drain will be revised at the request of SCE to avoid some its facilities that will be very costly to relocate. Additionally, the City has decided to included in this project a new storm drain outfall across Edgewater into Newport Harbor. Psomas shall: a) Determine a new alignment to eliminate interference's between SCE facilities, b) Coordinate with the City and Ron Yeo for storm drain line alignment within the restroom plaza area, c) Coordinate with SCE for relocation of its facilities, d) Extend the system into Newport Bay including design of a new bulkhead penetration and pipe anchors, and removal of the existing facilities, e) Revise alignment as required by new tide gate (Task 2 below). f) Coordinate research for interfering utilities in Edgewater, g) Coordinate with the City and property owners for other interference's in Edgewater, h) Re- connect two existing catch basin in Washington St. to the new system, and i) Revise the specification for trenching, demolition, access and other requirement. MA2NEW060300\Adm1n \Change Order\010412 Amemdment 5 Exhibit A 0411011.doc P S O M A S j) Coordinate with the City and Nuvis to relocate proposed trees on Washington St. between Balboa Boulevard and Bay Avenue. including coordination with Nuvis for the final location of trees on Washington Street north of Bay Avenue including the landscape area. This task also includes coordination with SCE regarding pipeline alignment and profile. Task 2 Tide Gate Planning and Design (Task 2 Request $12,684) Psomas shall perform site studies and coordinate with the City to locate the vault for the new tide -gate valve within the landscape area on the north end of Washington Street. The site plan will show the odor vent mast, tide gate vault and control pedestal, backf low valve, fire department connection, post indicator valve and connections to the two catch basins. The vault shall be located so that it does not impede pedestrian movements in Washington Street and Edgewater. Structural calculations shall be performed and details prepared for the new construction. A new electrical circuit for the tide gate shall be designed. Task 3 Planning Coordination Meetings (Task 3 Request: $3,465) At the request of the City, Nuvis attended seven coordination meetings to discuss options for the landscaping, landmark tower, hardscape materials and pavement pattern. A contingency of 18 hours for future meetings is included in this task. Task 4 Hardscape, Landscape and Utility Design and Revision. (Task 4 Request: $38,303) As requested by the City, Psomas shall perform the following new or revised design tasks. Modify the curb line on Balboa Boulevard near Edison vault. (Subtask request: $1,700) a. Provide a wall detail and horizontal control for the seat wall between the Pier Plaza and Peninsula Park. (Subtask request: $1,253) b. Prepare details to modify an existing french drain in the Pier Parking Lot based on information provided by the City. (Subtask request: $950) c. Prepare full improvements for the alley (plan and profile) linking Bay Avenue and Balboa Blvd between Washington St and Main St. (Subtask request: $3,482) d. Redesign the proposed water line in Washington Street to eliminate interference's between existing SCE facilities and proposed water improvements. (Subtask request: $2,000) e. Delete the proposed sanitary sewer replacement in Bay Avenue East from the plans. (Subtask request: $701) f. Prepare a salvage plan for the existing palm trees in the Balboa Pier Parking Lot. (Subtask request: $1,200) g. Shift the two parallel parking stall in front of the Pharmacy on Balboa Blvd. (Subtask request: $1,897) MA2NEW060300\Admin \Change Order\010412 Amemdment 5 Exhibit A 0411011.do P S O M A S h. Revise landscape and hardscape design to accommodate changed parking on Balboa Blvd in front of pharmacy, driveway at Palm St, modified utility locations at restroom, planter at north end of Washington St to accommodate gas emission, relocate tree wells and planting areas between Adams and Palm on Balboa Blvd. (Subtask request: $3,100) i. Add trees to the Balboa Pier Parking Lot. The original design included removal of all trees within the interior of the Pier Parking Lot. Based on Council and community comments, trees will be installed within the parking lot interior in a geometric pattern that will not interfere with the new parking layout. The demolition and improvement plans, as well as the hardscape, planting and irrigation designs shall be revised to accommodate the change. (Subtask request: $3,336) j. Reduce tree well sizes on Balboa Blvd. and adjust paving patterns and hardscape plans to accommodate these changes. (Subtask request: $7,764) k. Design decorative elements for the meandering wall and conical pilasters along the Oceanfront boardwalk. Design to include footings and wall cap. Also, at the direction of the City, revise Pier Plaza geometry and decorative pilasters. (Subtask request: $3,375) I. Provide concept to provide trellises and vines for the area on Washington Street north of Bay Avenue. Provide a planting concept for the landscape area at the north end of Washington Street in order to accommodate the odor vent `mast'. (Subtask request: $2,000) m. Modify the loop detector in Balboa Blvd. at Main Street due to changes in the street geometry. (Subtask request: $1,650) n. Redesign the intersection between Main Street and Bay Avenue to construct Main Street north of Balboa Boulevard in Phase 2 rather than in Phase 3. The existing design is based upon a different phasing sequence. Because the finish elevations of the existing and proposed improvements are not identical at the new match line, the design shall be modified and a transition detail shall be created. (Subtask request: $1,200) o. Revise Balboa Boulevard improvements between Alley 220 (East of Main Street) and A Street to construct this section in Phase 2 rather than Phase 1. The design of the project is somewhat dependent on how the project is phased. The City has indicated that some elements of the project initially planned in Phase 1 may be moved to later phases. This will require some adjustment to the street details at the interface between phases, changes in the traffic control plans, street light design and circuitry, and irrigation drawings. (Subtask request: $2,695) Task 5 Additional Field Survey (Task 5 Request: $1,550) Additional survey is required beyond the right -of -way on Palm Street in order to design a driveway and two alley access - points to ADA standards. MA2NEW060300\Admin \Change order\010412 Amemdment 5 Exhibit A 0411011.doc P S O M A S Task 6 Optional Task: Change the Main Street Tree Wells (Task 6 Allocation: $20,000) If requested, Psomas shall attend meetings to discuss the changing tree wells from 3'x3' to 4'x6'. This change may include adjusting tree locations on Main Street, revising the demolition plan, revising stationing, relocating street furniture, relocating street lights, revising streetscape patterns, providing specifications for tree grates, and revising the cost estimate. Prior to proceeding on this task, Psomas will obtain written authorization from the City. Task 7 Contingency (Task 7 Request: $10,000) Because of the complexity of the project, it would be prudent to assume that the City will want to make additional changes based on review by city staff and community comments. Psomas suggests that a design contingency be included with this change order. This contingency would not be used unless authorized by the City. Task 8 Project Planning and Coordination (Task 8 Request: $10,480) The original Psomas budget for Project Management addressed the coordination anticipated for the original scope of work. The design elements of the Balboa Village evolved over the course of the project in response to discussions and meetings by the Psomas team with City staff, the City Council, representatives of various businesses in the village, and other City consultants. Because the scope of the project changed as the improvement plans were being developed, substantial coordination efforts and costs have resulted. Initiating project changes involves researching design options, considering alternative design concepts, discussing and evaluating design suggestions by city staff, documenting the process, and distributing information to the city, consultants and other interested parties. These preparation efforts are not covered within specific design tasks. Additional costs have also resulted from ascertaining the impact of the proposed changes on the construction drawings and coordinating the added work with Psomas' subconsultants, City staff and other City consultants. In addition, there has been a significant effort by Psomas' Project Manager to prepare change orders in response to the City's requests for additional items of work. Psomas has developed cost estimates to provide additional requested services. This task involves developing a conceptual design, making site visits, calling sub - consultant or vendors for research, confirming assumptions and design parameters with city staff, developing labor hours, reproduction costs and M:\2NEW060300Wdmin \Change Order\010412 Amemdment 5 Exhibit A 0411011.doc P S O M A S other costs, and listing assumptions. The City has implemented about half of the options that they have requested Psomas to develop. Finally, the project planning that is running concurrently with the design has stretched out the design schedule which does impact the project budget by adding meetings and coordination time. This requested task budget would this period through the end of June Task 9 Reproduction: (Task 9 Request: $2,000) This task will provide a supplement to the reimbursables budget to accommodate the extra plan sets and documents that have been produced to support the ongoing design effort as well as the anticipated revisions to complete the construction documents. Total Fee Request for Amendment 5: $107,905 MA21NEW060300Wdmin \Change Order\010412 Amemdment 5 Exhibit A 0411011.doc