Loading...
HomeMy WebLinkAbout17 - C-3417 - Zone III & IV Pump Station Electrical ImprovementsJune 26, 2001 CITY COUNCIL AGENDA ITEM NO. 17 TO: Mayor and Members of the City Council FROM: Public Works Department SUBJECT: ZONE III AND IV PUMP STATION ELECTRICAL IMPROVEMENTS - AWARD OF CONTRACT NO. 3417 RECOMMENDATIONS: 1. Approve the plans and specifications. 2. Award Contract No. 3417, Zone III and IV Pump Station Electrical Improvements, to Rich Construction for the Total Bid Price of $609,654.00, and authorize the Mayor and the City Clerk to execute the contract. 3. Establish an amount of $50,000.00 to cover the cost of unforeseen work. 4. Approve purchase of four Zone III replacement water booster pumps and motors from Sterling Peerless Pump for a cost of $138,470.70. PROJECT DISCUSSION The Zone III and IV water pump stations are located at the City's Big Canyon Reservoir (BCR) facility in Corona del Mar. The two pump stations boost water into the City's upper water pressure zones from BCR. The Zone III station was used solely as a backup to the Metropolitan Water District until the City reestablished its groundwater supply in 1997 through the Groundwater Development Project. Now the Zone III pump station is used for continuous daily service throughout the year. The station was constructed in the early 1960's. The pumps are worn and responsible for significant energy losses. With the installation of the new Zone III and IV electrical improvements and pumps, the energy savings that will be realized over the next ten years should repay the cost of the project. The project calls for the installation of the new pumps, motors and electrical controls to run both the Zone III and IV pump stations. Variable frequency drives will be installed in the Zone III pump station to provide a more energy efficient system for this pressure zone, which covers one -third of the City. A backup generator is also being installed to provide emergency power to the Zone III pump station. The Zone IV pump station is already equipped with a diesel driven backup pump in case of a power failure. By replacing the pumps and motors and utilizing the new variable frequency drives in the Zone III controls, energy costs can be reduced by twenty -five percent. This equates to a yearly cost savings of approximately $55,000.00. Subject: Zone III and Zone IV Station Improvements — Award of Contract No. 3417 June 26, 2001 Page: 2 ZONE III AND IV PUMP STATION ELECTRICAL IMPROVEMENTS At 2:15 p.m. on June 12, 2001, the City Clerk opened and read the following bids for the Zone III and IV Pump Station Electrical Improvement, C -3417: BIDDER TOTAL BID AMOUNT Low Rich Construction $609,654.00 2 Olsson Construction $698,185.00 3 Tamang Electric $773,898.00 4 Beador Construction $840,000.00 The low total bid amount is 1 percent above the Engineer's Estimate of $600,000.00. The low bidder, Rich Construction, possesses the required Electrical Classification C -10 and General "A" contractor's licenses. Rich Construction has satisfactorily completed the electrical portions of the 16`" Street Reservoir and Pump Station project under the general contractor. They are qualified to complete the requirements for this project. ZONE III REPLACEMENT BOOSTER PUMPS Staff requested bids from three pump manufacturers and four distributors. Since the City went direct to the manufacturers for bids, only one distributor provided a bid (Beylick Drilling). By ordering pumps directly from the manufacturer a significant cost savings can be realized. The following were the bid results to supply four new replacement pumps for the Zone III pump station, not including sales tax. BIDDER TOTAL BID AMOUNT* Low Sterling Peerless Pumps $129,036.00 2 Paco Pumps (Johnson Pump Company) $159,088.00 3 Beylick Drilling (Floway Pumps) $188,686.00 * Does not include sales tax. There are sufficient funds available in the Water Enterprise Fund under Capital Project Account No. 7503- C5500531 for award of Contract No. 3417 and for the purchase of the replacement booster pumps. Respectfully submitted, PUBLIC WORKS DEPARTMENT Don Webb, Director By: Michael J. Sinacori, P.E. Utilities Engineer Attachment: Bid Summary for Zone III and IV Pump Station Electrical Improvements a m O n Q Z Lli N 6 W Y_ F z M Q Q Q U f W w Q W Z W Z n Q N G W Ee f W L Z w Z l 0 u W d n .y Q � JI J .1 . z O L_ N a 3 .00 �a o °1 N V v u U i c w o u Q o aEE a m ` O 6L CL U v E 3 m � 0 3 m F 7 E w .Q �o N 111 �f A r S ll p .. M p W Y Y = W V n S N V .y V Z W 0G V 0 m m 0 U Q Z O y O W O Q m �0w i ILI Q f � W l7 Z W Z in Q f W W Z ^ Ov w a z Z 0 F Q t7 Z 7 H Z 0 f Q Z D 0 f Q !2I O L N a 3 _ A Q p A a Z c ° = v N V v u yn w= = O v E � c W � A `1 Q 6L p ° U vE 'Y'3 m � 3 fl � c k v a z 0 r f f m °o m c N L a E .a w �o N W N �f r S V 41 u c p� W N p Y Y = W V n S V N .y V Z W 0!;j z Z UW p Q g m CO m n. LU 00 3 W Z 0 LL 3 O U F J m U a 2 U W Q Z > O H C O W 6 O Q 4 m a w f a m O n Q Z Lli N 6 W Y_ F z M Q Q Q U f W w Q W Z W Z n Q N G W Ee f W L Z w Z l 0 u W d n .y Q � JI J .1 . z O L_ N a 3 .00 �a o °1 N V v u U i c w o u Q o aEE a m ` O 6L CL U v E 3 m � 0 3 m F 7 E w .Q �o N 111 �f A r S ll p .. M p W Y Y = W V n S N V .y V Z W 0G V 0 m m 0 U Q Z O y O W O Q m �0w i ILI Q f � W l7 Z W Z in Q f W W Z ^ Ov w a z Z 0 F Q t7 Z 7 H Z 0 f Q Z D 0 f Q !2I O L N a 3 _ A Q p A a Z c ° = v N V v u yn w= = O v E � c W � A `1 Q 6L p ° U vE 'Y'3 m � 3 fl � c k v a z 0 r f f m °o m c N L a