Loading...
HomeMy WebLinkAbout15 - C-3270 - Bonita Canyon Sports Park - West Park Open Space Irrigation & LandscapingAugust 14, 2001 CITY COUNCIL AGENDA ITEM NO. 15 TO: Mayor and Members of the City Council FROM: Public Works Department SUBJECT: BONITA CANYON SPORTS PARK - WEST PARK OPEN SPACE IRRIGATION AND LANDSCAPING, CONTRACT NO. 3270 RECOMMENDATIONS: Approve Change Order No. 23 to Castello, Inc., in the amount of $336,603.70 to add irrigation and landscaping to the West Park Open Space area of the Bonita Canyon Sports Park and authorize the Public Works Director to execute Change Order No. 23. 2. Authorize an additional $95,000 to increase the construction contingency to 2% of the construction cost to provide for the cost of unforeseen work. PROJECT BACKGROUND AND UPDATE: On May 9, 2000, the City Council awarded the $6,276,000 Bonita Canyon Sports Park Improvements contract to Castello, Inc., of Escondido, California. The park has three distinct use areas - East Park, Mid Park, and West Park. See attached color site plans. The contract included the following basic park components: (a) Three 200 -foot youth baseball fields (b) One multi - purpose baseball /soccer field (c) Mid Park - three mid -youth soccer fields (d) West Park youth soccer fields (e) East Park restroom and equipment storage facilities (e) East Park on the site parking for 240 vehicles (f) West Park on site parking for 115 vehicles (f) East Tot Lot (g) Green open spaces with earth berms, pedestrian walking trails, and lights (h) Picnic areas In addition to the above described park components, several alternative bid items were considered in the contract documents. These items were: 1. West Park Open Space (area south of soccer fields) along MacArthur Boulevard to the Manning Park (approximately 2000 feet) 2. West Park Tot Lot* 3. West Park tennis courts 4. West Park basketball courts 5. Mid Park restroom facility* 6. Five decorative park signs *(Bold indicates Council Approved Alternative Bid Item) SUBJECT:: BONITA CANYON SPORTS PARK - WEST PARK OPEN SPACE IRRIGATION AND LANDSCAPING, CONTRACT NO. 3270 August 14, 2001 Page 2 The total project cost for the base bid, plus the six alternate bid items, exceeded available funding sources in May 2000. Council approved constructing the base project with the addition of bid Alternate No. 2 (West Tot Lot) and bid Alternate No. 5 (Mid Park restroom facility). The West Park tennis and basketball courts were recently funded under the new FY2001/02 CIP Program and added to the contract under Change Order No. 17. The Contractor agreed to construct these improvements for the original bid price. Staff did not recommend funding the five decorative signs because of the $50,000 cost. The General Services Staff will build traditional park signs for about $10,000. Currently, the Bonita Canyon Sports Park is about 80 percent complete. The improvements are scheduled for completion in late October with five months of plant establishment and maintenance following. The first uses of the park are scheduled for late Spring 2002. To date, 21 change orders have been processed. Staff from Public Works, General Services, Community Services, and EPT have worked to monitor the project and maintain a "minimal" change order balance on this contract. Value engineering throughout the construction process has resulted in several substantial cost savings and has offset unforeseen cost increases. Attached is a summary of the change orders to date. WEST PARK OPEN SPACE DISCUSSION: The City Council approved $400,000 in funding for the West Park Open Space in the FY 2001/02 CIP budget. In addition, there is $50,000 in funds available for planting trees along MacArthur Boulevard. The additive bid from Castello for the West Park Open Space was originally $245,000. However, during the early part of construction, Castello's landscape subcontractor requested to be removed from the project. According to Castello, Haro's Landscape of San Diego had underbid the project and was over extended. Castello requested that Haro be substituted by Flintridge Landscaping of Costa Mesa, which the City approved. An additional cost of $130,000 was realized by Castello in switching landscape companies. Haro's original bid was $1,850,000 and Flintridge's quote was $1,980,000. Because the City did not contract the West Park Open Space at the time of award, Castello has no legal obligation to honor their original bid price of $245,000. This is unlike the tennis and basketball courts where Castello did agree to build those facilities for their year old bid prices. They made this possible by constructing the courts with their own crews instead of subcontractors. Staff has spent months negotiating with Castello and Flintridge for the West Park Open Space in anticipation of the funding being approved by City Council. After extensive discussion and review of different options, a cost of $336,603.70 for the West Park Open Space has been reached with Castello and their subcontractor. Staff believes this price is fair in comparison to the other bids received in May 2000 which averaged $349,000. SUBJECT:: BONITA CANYON SPORTS PARK - WEST PARK OPEN SPACE IRRIGATION AND LANDSCAPING, CONTRACT NO. 3270 August 14, 2001 Page 3 The following items justify approval of the West Park Open Space as a change order to the originally approved construction contract with Castello versus re- bidding the work as a separate project: • The completion of the West Park Open Space could be completed shortly after the completion of rest of the Bonita Canyon Sports Park. Re- bidding the work as a separate contract could add as much as six months to the project schedule. • The reduced schedule for the West Park Open Space change order will minimize community disruption by allowing one contractor to continuously proceed to complete the work without the gaps that would occur from mobilizing a new contractor. The ongoing concerns of the adjacent residents regarding dust and aesthetics would be mitigated sooner by an expedient completion of the landscaping. • City staff has thoroughly reviewed the proposed change order costs and have found them to be fair and consistent with market prices for similar work. There is no guarantee that re- bidding the work as a separate project will produce lower costs. In fact, higher costs may be encountered in the current bidding market. The original engineers estimate for the West Park Open Space was $500,000. Completion of West Park Open Space as a change order will avoid the additional costs to re -bid the work as a separate project. Those costs include additional administration costs and costs to revise the plans, specifications, and contract documents estimated at $25,000. There would also be added costs, approximately $25,000, for erosion control since the planting would not be established sufficiently by the rainy season. If the change order is approved, the Contractor would need only 30 more working days to complete the West Park Open Space. By their current schedule, the West Park could be complete as early as mid - November at which time the five -month period of plant establishment and contractor maintenance would begin. PROJECT FUNDING AND RECOMMENDATION: The following funding sources are available to complete the Bonita Canyon Sports Park including the addition of the tennis and basketball courts and West Park Open Space: Account Number Account Description Amount 7441- C4120434 Bonita Canyon Sports Park $6,170,000 7532- C5600100 Bonita Canyon Sports Park Sewer 100,000 7021- C4120375 Freeway Reservation Park 48,000 7021- C4120616 Bonita Canyon Sports Park — Tennis and 120,000 Basketball Courts 7432- C5100657 Bonita Canyon Sports Park - West Park $400,000 Open Space Irrigation and Landscaping 7015- C5100599 Landscaping — MacArthur Boulevard 50.000 Total: $6,888,000 Bold indicates May 2000 Council approved funding. Remaining funding is from FY 2001102 CIP. When the project was awarded on May 14, 2000, $42,000 (0.6% of the construction cost) was established to cover the cost of unforeseen work. To date, staff has approved $47,178.24 in SUBJECT:: BONITA CANYON SPORTS PARK - WEST PARK OPEN SPACE IRRIGATION AND LANDSCAPING, CONTRACT NO. 3270 August14,2001 Page 4 change orders, not including the tennis and basketball courts. Typically, construction projects carry a contingency of approximately 10 %. With the addition of the West Park Open Space and ongoing construction activities additional change orders may be realized for unforeseen conditions. Staff recommends increasing the allowance by $95,000 for a total of $137,000 which would represent a 2% construction contingency. With the addition of this West Park Change order, the contract cost would be as follows: Original contracted work (including additive bid Items Nos. 2 and 5) $6,276,000.00 Approved construction contingency 42,000.00 Addition of tennis and basketball courts (approved) 113,000.00 Anticipated change orders for unforeseen work to completion 95,000.00 Addition of West Park Open Space 336.603.70 Total $6,862,603.70 Staff recommends the approval of the West Park Open Space as a change order to the originally approved construction contract with Castello and authorize the Director of Public Works to execute the change order. Approval of additional funding for the West Park Open Space, tennis and basketball courts, and the MacArthur Boulevard landscaping, will be adequate to complete the overall Bonita Canyon Sports Park, including the West Park Open Space. Respectfully sub it ed, B WORKS DEPARTMENT Stephen G. Badum, Director By: MiqKael J. mac ri, P.E. Utilities Engine r Attachments: Change Order Summary Project Color Site Maps Bonita Canyon Sports Park — Change Order Summary Change Order No. 1 — Mid Park Wet Soils Placing Geotextile Fabric 8XT per Field Meeting on 7/10/2000 $16,243.00 Fill Test Holes $ 1,850.00 Extra Excavation @ Canyon Drains @ East Park $ 30,085.00 Grading "Credit" at Mid Park ($14,079.00) Subtotal CCO1 $ 34,099.00 Negotiated CCO1 (Approved /Signed) $ 32.000.00 Change Order No. 2. - Request for Time Extension from Soils Issue (30 days) $ 0.00 Change Order No. 3 - Modifications to Sewer Mains for Pacific Bell Pothole at Pacific Bell $ 824.00 Add for Realignment of Sewer Line on Ford Road $ 7,940.35 Additional Depth of Sewer $ 5,834.40 Delete Sewer Cleanout/PVC ($3,300.00) Total to Date: $ 11.298.75 Change Order No. 4 - Modification of Storm Drain Pipe Material ($9,996.00) Change Order No. 5 - Modification to Sidewalk Base Material ($43,504.45) Change Order No. 6 - Structural Changes at Dissipater Structure $1,700.16 Change Order No. 7 - Interfering Utilities (ACP Water Main) $5,500.00 Change Order No. 8 - Reduction to Street Patching Efforts ($3,856.00) Changer Order No. 9 — Additional Cost for Sewer Main (partial paid by Pacific Bell) $ 10,208.00 Slurry Backfill for Sewer 8/4/2000 $ 3,086.60 Hard Rock Excavation 8/7 & 8/8 $ 4,767.40 Remove Excess Rock 8/9/2000 $ 2,816.00 Remove Excess Rock 8/10 & 8/11 $ 5,637.55 Slurry Backfll for Sewer 8!712000 $ 4,202.00 Sewer Pothole /Delay on Ford Road $ 3,000.00 Total CC09 $ 23.5n9.55 Change Order No. 10 — City Requested Change to Berms Along MacArthur Blvd. $6,108.00 Change Order No. 11 — Value Engineering Changes to Irrigation System ( $101,870.00 ) Change Order No. 12 — Changes for Electrical Connections Penetrate Edison Vaults $3,300.00 Credit for DG Pads vs. Concrete Pads ($408.00) Total CCO12 $ 2.892.00 Change Order No. 13 - Electrical7relephone Services to Site $60,458.95 Change Order No. 14 — Powder Coat Cable Fencing and Stabilize Outlet Structure $7,311.30 Change Order No. 15 — Modification to Irrigation Control Valves $7,169.30 Change Order No. 16 —Additional S.D. Junction Structure and Modification to Bleachers Additional Storm Drain Junction Structure Requested by City $ 4,162.40 Modification to Bleachers to Conform to New Building Codes $ 10,208.00 Total CCO 16 $ 14.370.40 Change Order No. 17 — Addition of Tennis and Basketball Courts Change Order No. 18 — Misc. Electrical Conduit, Irrigation Sleeves and Building Hangers Change Order No. 19 — Modify Fence Footing and Additional Drainage Lines Change Order No. 20 — Modification to irrigation meter facilities and fencing credit Change Order No. 21 — Repairs to MacArthur Slope from Rain Damage, Additional Roof Flashing and City Requested Tiling of Drinking Fountains Change Order No. 22 — Changes to Soil Amendments and Selected Trees (Pending) Change Order No. 23 —West Park Open Space Irrigation and Landscaping (Pending) Total Change Orders (Approved and Pending) F: \Users \PBW\Shared \COUNCIL \FY01- 02Wugust -14 \West Park Change Order Summary.doc $113,000.00 $ 10,717.24 $ 9,765.04 $ 6,462.00 $ $7,142.00 $3,927.00 $336,603.70 Jti. �I C i� ;,'.. y, I JV L 1•` Y „ `Y W� �'4 V \` Y V i' a 4 1 � � v`.. 4. c