Loading...
HomeMy WebLinkAbout07 - C-3296 Main Beach Sewer Force Main ReplacementSeptember 11, 2001 CITY COUNCIL AGENDA ITEM NO. 7 TO: Mayor and Members of the City Council FROM: Public Works Department SUBJECT: MAIN BEACH SEWER FORCE MAIN REPLACEMENT - AWARD OF CONTRACT NO. 3296 RECOMMENDATIONS: 1. Approve the plans and specifications. 2. Award Contract No. 3296 to GCI Construction, Inc. for the Total Bid Price of Three Hundred Twenty Eight Thousand Six Hundred Ninety Dollars ($328,690) and authorize the Mayor and the City Clerk to execute the contract. 3. Establish an amount of $30,000 to cover the cost of unforeseen work. DISCUSSION: At 2:30 P.M. on August 29, 2001, the City Clerk opened and read the following bids for this project: BIDDER - SCHEDULE A BASE BID BASE BID PLUS ADDITIVE ITEMS Low GCI Construction, Inc. $282,990 $328,690 2 AD General Engineering 411,510 569,010 3 Williams Supply Co. 417,600 456,100 " Corrected Bid Amount BIDDER - SCHEDULE B BASE BID BASE BID PLUS ADDITIVE ITEMS Low GCI Construction, Inc. $340,845 $367,645 2 Williams Supply Co. 497,950 522,950 3 AD General Engineering 541,950 615,950 The low total bid amount is 10 percent below the Engineer's Estimate of $362,500. The low bidder, GCI Construction, Inc., possesses a general "A" contractor's license as required by the project specifications. GCI Construction, Inc. has satisfactorily completed similar projects for the City and is currently working on three other projects for the City. Subject: Main Beach Sewer Force Main Replacement — Award of Contract No. 3296 September 11, 2001 Page: 2 PROJECT DESCRIPTION: This project calls for the replacement of 355 feet of 1952 sewer force main that extends from the Main Beach Sewer Pump Station in Breakers Drive up the slope between two houses to Ocean Boulevard and then up Marguerite Avenue to the first alley. Instead of replacing the line in the same location up a steep slope between two houses, an alternate alignment in Breakers Drive, up the ramp serving Corona del Mar Main Beach and along Jasmine Avenue was chosen. Even though this alignment is almost 4.5 times longer, it was felt that a standard installation in the street would not be significantly more expensive and that the new line would be more accessible in the future for maintenance. Also included in the project is the replacement of the existing 4 -inch cast iron water main within Breakers Drive with a new 8 -inch water main. This line was installed in 1938 and relined in 1980. Existing water services and fire hydrants are to be replaced. The new water line provides increased fire flow protection to Breakers Drive and the project is recommended in the soon to be completed water master plan. THE REBIDDING PROCESS This project is a re -bid from December 2000. On January 9, 2001, the City Council rejected bids because the cost of the project was higher than anticipated and exceeded available funding in last year's CIP authorization. In an effort to establish the most economic alternative, staff added the option of replacing the sewer main in its existing location within the slope to Marguerite Avenue. Both options were bid during this current bid process. Schedule A was the original project, which consisted of a new force main along Breakers Drive. Schedule B considered the option between the houses and up the slope to Marguerite. The attached bid summary shows the bid results of the two options. All three bidders showed that going up the slope would be significantly more costly than constructing the new longer force main in Breakers Drive. Additionally, staff reconsidered the Breakers Drive repaving options for the waterline installation to see if some cost savings could be obtained. Breakers Drive is gated and not open to the public and is maintained by the Breakers Drive Association. The staff has worked with the Association to obtain a cost sharing agreement to repave the entire street. The Breakers Drive Homeowners Association will fund half of the repaving efforts or $13,400. Upon project award, staff will invoice the association for their share. With the redesign of the pavement and the commitment by the residents for cost sharing, the City saved approximately $40,000 in cost compared to the bids received last December. Subject: Main Beach Sewer Force Main Replacement — Award of Contract No. 3296 September 11, 2001 Page: 3 There are sufficient funds available in the following account for the work: Account Number Account Description 7531- C5600532 Main Beach Sewer Force Main Replacement. 7501- C5500074 Water Main Master Plan Improvement Program Total: Respectfully submitted,. PUBLIC,W,ORKS DEPARTMENT Badum, Director I By:�� Mi hael . Cori, P.E. Utilities Engineer Attachment: Project Location Map Bid Summary Amount $180,800.00 177,890.00 $358,690.00 CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT TITLE Main Beach Sewer Force Main Replacement and Bel Drive Water Main BID WCATION: City Clerk's Office - City Hall CONTRACT NO.: 3396 DATE: 29 -Aug -01 TIME: 2:30 p.m. ENGINEER'S ESTIMATE: $363400.00 BY: SR CHECKED: HJS DATE: 08/2912001 PROJECT MANAGER: Mike Slnacoil C\ uiea \Pbw \stgred \c0niraot\99\\Bitl Sul - Main BeachAS Page 1 Engineers Estimate GCI. INC. WILLIAMS SUPPLY CO. AD GENERAL ENGR. ITEM DESCRIPTION QUANTITY UNIT AMOUNT UNIT AMOUNT UNIT AMOUNT UNIT AMOUNT SCHEDDLE'A' A -1 IMO011ization 7 lS 10,000.00 10.000.00 38.500,001 38.500.00 15.000 ,00 15,000.00 8.000.00 8.00000 A -2 Traffic Central I 10 5.000.00 5,000.00 2.200,00 2.200.00 15,000,00 15.000.00 8.000.00 8.000.00 Piper Burst Existing 44nch Cast Iran Water Main and Install New 64nch H.D.P.E.. SDR- 17. Sewer Farce Main antl fittings In �u` A -3 Breakers Drive 890 100.00 89.000.00 41.00 36,490.00 95.00 84.55.00 97.00 86,330.00 Install New 6 -inch H. D.P.E.. SDR -17 Sewer Farce Main and Fittings in Breakers Drive. Ramp. Across ocean Boulevard. antl In A -4 Jasmine Avenue 750 ITT 50.00 37.50000 39.00 29.250.00 95.00 71.250.00 90.00 67.50000 A -5 Connection to Existing Sewer Manhole I EA 2.0DOD01 2.000.00 1,700.00 1,700.00 1.000.00 1,000,00 I.OD0.001 11000.00 Install New 8 -inch PVC C -900. Class 150 A -6 Water Main In Breakers Drive 1.030 LF 40.00 41.200.00 38.50 39.655,00 95.00 97.85000 88.00 90.640.00 Remove Existing and Install New I -inch Water Service. Including Connector, to Existing Pressure Reducing Valve. Meter A -7 Boll and Cover 23 EA 900.00 20.700.00 61500 14,14500 650.00 14.950.00 1.380.00 31.740,00 Install New Fire Hydrant Assembly and A -B Canned to New 84nch Water Main 2 EA 3.000.00 6.000.00 2.30000 4,600.00 3.000.00 6.000.00 5.400.00 10.800.00 A -9 Connect to 64nch Existing Water Main I EA 2.000.00 2.000.00 1.50000 1.500.00 3.500.00 3,500.00 4.000.00 4.000.00 Install 6 -inch Gate Valve. Including Valve A -10 Box and Cover and Appurtenances 3 EA 1.000 ,00 3.000.00 900.00 2.700.00 1.000.00 3.000.00 2.500.00 7.50000 Remove and Resurface A.C. Pavement Within Trench Boundaries along Breakers A -11 Drive and Jasmine Avenue 9.000 V 430 38.700.00 4.60 41.400.00 3,75 33.750.00 4.00 36,000,00 Remove and Resurface P.C.C. Pavement withing Trench Boundaries along Jasmine A -12 Avenue and Ocean Boulevard 1,500 SF 7.50 11,250.00 7.50 11.250.00 6.50 9.750.00 6.00 9.000.00 Remove and Install Full Depth A.C. Pavement In A.C. /P.C.C. Pavement A -13 Within Trench Boundaries along Ramp 4.000 SF 6.00 24.000.00 6.30 25200.00 6.50 26.00000 4.00 16,000.00 Pressure Test. Disinfect, and Flush Water A -14 Main I LS 2.000.00 2.0)0.00 1.40000 1,400,001 4,ODO.001 4.00000 4,000.00 4.000.00 Remove Existing and Install New Discharge Piping In Existing Sewer Pump Station to Valve Vault. Including Trench Resurfacing and Abandoning Existing Farce Main and Associated A -15 Appurtenances. I LS 7.500.00 7.500.00 9.500.00 9.500.00 7.000.00 7.000.00 12,00000 12.00000 Construct Sewer Farce Main Bypass Valve A -16 Vault I LS 10,000.00 10,000.00 18.000.00 18.000.00 15.000.00 15.000.00 10,000.00 1 o Excavation Safety Measures Including Adequate Sheeting. Sharing and Bracing or Equivalent Methods for the Protection of to and Limb. Which Shall Comply to A -17 Applicable Safety Orders I LS 10.00000 10.000.00 5.500.00 5.50.00 10.000.00 10.000.00 9.000.00 9.000.00 Total Price for Bid Items Al -AT 7 319.850.00 282.990.00 417,600.00 411,510.00 ENGINEER'S GILLESPIE WILIAMS SUPPLY CO. AD GENERAL ENGR. Additive Bid items OUANTI UNIT AMOUNT UNIT AMOUNT UNIT AMOUNT UNIT AMOUNT Install Asphalt Cancrete Overlay Along la Breakers Drive 24.000 SF 1 24.000.00 1.00 24.000.00 1 24.000.00 3.25 78.000 ,00 Grinding Existing Asphalt Concrete lb Pavement Along Breakers Drive. 2.000 SF 1 2.000.00 1.40 2.800.00 0.5 1.000.00 1.50 3.00000 Install Asphalt Concrete Overlay Nang Half -Wil of the Ramp and Pardon of 20 Jasmine Avenue 10,500 SF 1 10.500.00 1.00 10.500.00 1 10.500.00 5.00 52.500.00 Grinding of Existing Asphalt Concrete Pavement Along the Half -Width of the 21b Ramp and Portion of Jasmine Avenue 6,000 SF 1 6,000.00 1.40 8.400.00 0.5 3.000.00 4.00 24.00000 9raaror ACailive Bleh9m$Ia.IE,3a.]D 42.500.00 45.700.00 38.500.00 157,500.00 Total Price for Bid Items Schedule "A" 362.350.00 328,690.00 456.100.00 569.010.00 C\ uiea \Pbw \stgred \c0niraot\99\\Bitl Sul - Main BeachAS Page 1 CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT TITLE Main Beach Sewer Force Maln Replacement and Breakers Drive Water Main BID LOCATION: City Clerk's Office -City H011 CONTRACT NO.: ]296 DATE: 29 -Aug -01 TIME: 2:30p.m. ENGINEER'S ESTIMATE: $M2.50100 BY: SR CHECKED: ws DATE: OB/29/2001 PROJECT MANAGER: Mike unacorl ex�. �alno.. 1$ i�Rr�Q6�k9s41UCBt @i���6rlarPrtk /1Eeacn xi: Total Price for Bid Items Schedule "B" Install Asphalt Concrete Overlay Along 1 1a Breakers Drive 24.000 LF 1.00 24.000.00 1.00 1 24.00000 1.00 24.000.00 3.00 1 ]2.000.00 Grinding Existing Asphalt Concrete Ib Pavement Along Breakers Drive. I 2.000 SF 100 1 2.000.00 1.40 1 2.800.00 0.50 1 1.00000 1.00 2000.00 ex�. �alno.. 1$ i�Rr�Q6�k9s41UCBt @i���6rlarPrtk /1Eeacn xi: Total Price for Bid Items Schedule "B"