HomeMy WebLinkAbout10 - C-3296 - Main Beach Sewer Force Main ReplacementTO: FROM: SUBJECT: Mayor and Members of the City Council Public Works Department qft6lbl MAIN BEACH SEWER FORCE MAIN REPLACEMENT - AWARD OF CONTRACT NO. 3296 September 11, 2001 CITY COUNCIL AGENDA ITEM NO. 7 COUNCIL AGENDA PLO. jo RECOMMENDATIONS: 1. Approve the plans and specifications. 2. Award Contract No. 3296 to GCI Construction, Inc. for the Total Bid Price of Three Hundred Twenty Eight Thousand Six Hundred Ninety Dollars ($328,690) and authorize the Mayor and the City Clerk to execute the contract. 3. Establish an amount of $30,000 to cover the cost of unforeseen work. DISCUSSION: At 2:30 P.M. on August 29, 2001, the City Clerk opened and read the following bids for this project: BIDDER - SCHEDULE A BASE BID BASE BID PLUS ADDITIVE ITEMS Low GCI Construction, Inc. $282,990 $328,690 2 AD General Engineering 411,510 569,010 3 Williams Supply Co. 417,600 456,100 Corrected Bid Amount BIDDER - SCHEDULE B BASE BID BASE BID PLUS ADDITIVE ITEMS Low GCI Construction, Inc. $340,845 $367,645 2 Williams Supply Co. 497,950 522,950 3 AD General Engineering 541,950 615,950 The low total bid amount is 10 percent below the Engineer's Estimate of $362,500. The low bidder, GCI Construction, Inc., possesses a general "A" contractor's license as required by the project specifications. GCI Construction, Inc. has satisfactorily completed similar projects for the City and is currently working on three other projects for the City. Subject: Main Beach Sewer Force Main Replacement — Award of Contract No. 3296 September 11, 2001 Page: 2 PROJECT DESCRIPTION: This project calls for the replacement of 355 feet of 1952 sewer force main that extends from the Main Beach Sewer Pump Station in Breakers Drive up the slope between two houses to Ocean Boulevard and then up Marguerite Avenue to the first alley. Instead of replacing the line in the same location up a steep slope between two houses, an alternate alignment in Breakers Drive, up the ramp serving Corona del Mar Main Beach and along Jasmine Avenue was chosen. Even though this alignment is almost 4.5 times longer, it was felt that a standard installation in the street would not be significantly more expensive and that the new line would be more accessible in the future for maintenance. Also included in the project is the replacement of the existing 4 -inch cast iron water main within Breakers Drive with a new 8 -inch water main. This line was installed in 1938 and relined in 1980. Existing water services and fire hydrants are to be replaced. The new water line provides increased fire flow protection to Breakers Drive and the project is recommended in the soon to be completed water master plan. THE REBIDDING PROCESS This project is a re -bid from December 2000. On January 9, 2001, the City Council rejected bids because the cost of the project was higher than anticipated and exceeded available funding in last year's CIP authorization. In an effort to establish the most economic alternative, staff added the option of replacing the sewer main in its existing location within the slope to Marguerite Avenue. Both options were bid during this current bid process. Schedule A was the original project, which consisted of a new force main along Breakers Drive. Schedule B considered the option between the houses and up the slope to Marguerite. The attached bid summary shows the bid results of the two options. All three bidders showed that going up the slope would be significantly more costly than constructing the new longer force main in Breakers Drive. Additionally, staff reconsidered the Breakers Drive repaving options for the waterline installation to see if some cost savings could be obtained. Breakers Drive is gated and not open to the public and is maintained by the Breakers Drive Association. The staff has worked with the Association to obtain a cost sharing agreement to repave the entire street. The Breakers Drive Homeowners Association will fund half of the repaving efforts or $13,400. Upon project award, staff will invoice the association for their share. With the redesign of the pavement and the commitment by the residents for cost sharing, the City saved approximately $40,000 in cost compared to the bids received last December. Subject: Main Beach Sewer Force Main Replacement — Award of Contract No. 3296 September 11, 2001 Page: 3 There are sufficient funds available in the following account for the work: Account Number Account Description 7531- C5600532 Main Beach Sewer Force Main Replacement. 7501- C5500074 Water Main Master Plan Improvement Program Total Respectfully submitted )RKS DEPARTMENT Badum, Director By: ! W Mi hael . Cori, P.E. Utilities Engineer Attachment: Project Location Map Bid Summary Amount $180,800.00 177,890.00 $358,690.00 06 z --miQoS—a!!!K Ji Q \ — ow LU W z� U W �w LU W � / Z — 0U � ^ LU LU w w a" ° W O 3 uj C/) Z f G Wa LL „F P W a; W I— / al 111 \1 O� �p • i U CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT TITLE Main Beach Sewer Farce Main Replacement and Brooke. Drive Water Main BID LOCATION: City Clerk's Office - City HOII CONTRACT NO.: 3296 DATE: 29-AU9 -01 TIME: 2:30p.m. ENGINEER'S ESTIMATE: 6362.SW.0D BY: SR CHECKED: MSS DATE: 08/2912001 PROJECT MANAGER: Mike ar,aco4 C \viers \Paw \sraretl \conead199\ \Bid Summary- Main MOch xis Page I En ineefs Estimate GCI. INC. WILLIAMS SUPPLY CO. AD GENERAL ENGR. ITEM DESCRIPTION OUANTIT UNIT AMOUNT UNIT AMOUNT UNIT AMOUNT UNIT AMOUNT SCHEDULE "A' A -1 Mobll¢ation I LS 10.000.00 10.000.00 38.500.00 38.50.00 15.000.00 15.000.00 8.000.00 8.000.00 A -2 Traffic Control I IS 5.00.0 5.00.0 2.20.0 2.20.0 15.00.0 15.00.0 8.00.0 8.000 Piper Burst Existing flinch Cast Iran Water Main and Install New 6-Inch H.D.P.E.. SDR. 17. Sewer Farce Main and Fittings in A3 Breakers Drive 890 U 1000 89.00.0 41.0 36,490,0 95.0 84.550.0 97.0 86.3300 Install New 6-inch H.D.P.E.. SDR-17 Sewer Farce Moln and Fittings in Breakers Drve. Ramp. Across ocean Boulevard. and in A4 Jasmine Avenue 750 IF 50.0 37.50.0 39.0 29.250.0 95.0 71,250.0 90.0 67.500.0 A -5 Connection to Existing Sewer Manhole I EA 2.00000 2,00000 1.700,00 1,700.00 1,000.00 LOW 00 1,00000 1.000.0 Install New Minch PVC C -90. Class 150 A-8 Water Main in Breakers Drive 1.030 LF 40.0 41.20.0 38.0 39.655.0 95.0 97.850.0 880 90.640.0 Remove Existing and Install New I -inch Water Service. Including Connection to Existing Pressure Reducing Valve. Meter A -7 Box. and Cover 23 EA 900.0 20.70.0 6150 14.145.0 6500 14.950.0 1.380.0 31.740.00 Install New Fire Hydrant ASsemblY and A-B Connect to New 8 -inch Wafer Main 2 EA 3.00.0 6.00.0 2.30.0 4.60.0 3.00.0 6.00.0 5.40.0 10.800.0 A -9 Connect to 64nch Existing Water Main I EA 2.000.00 2.000.00 1.500.00 1,500.00 3,50.00 3.50.00 4.000.00 4,000.00 install 6 -Inch Gate Valve. Including Valve A -10 Box Ono Cover and Appurtenances 3 EA 1.00.0 3.00.0 900,0 2,70.0 1.0)0 00 SLOW 00, 2.50.0 7.5m 00 Remove and Resurface A.C. Pavement within Trench Boundaries along Breakers A-11 Drive and Jasmine Avenue 9.00 U 4.30 38.70.0 4.60 41,40,0 3.75 33.750.0 4.0 36.000.0 Remove and Resurface P.C.C. Pavement wilhing Trench Boundaries along Jostrine A -12 Avenue and Ocean Boulevard 1.500 sF 7.50 11.250.00 7.50 11,250.00 6.50 9.750.00 6,00 9.000,00 Remove and Install Full Depth A.C. Pavement In A.C. /P.C.C. Pavement A -13 Within Trench Bauntlaries along Ramp 4,000 sF 6.00 24.000.00 630 25.200.00 650 26.000.00 400 16000.00 Pressure Test. Disinfect, and Flush Water A -14 iMoin I IS 2.000.00 2.000.00 1.400.00 1.400.00 4.0)0,001 4.00000 4.00000 4.000.00 Remove Existing and Install New Discharge Piping in Existing Sewer Pump Station to Valve Vault, Including Trench Resurfacing and Abandoning Existing Force Main and Associated A -15 APPUnenances 1 Ls 7,501 7,500 9.50.00 9.50.0 7.000.0 TWCGO 12.000 12.00.00 Construct Sewer Force Main Bypass Volvo A.16 Vault 1 is 10.00000 10.000.00 18.000.00 18.000,00 15.000.00 15.0000.00 10.00000 10.000.00 Excavation Safety Measures Including Adequate Sheeting. Sharing and Bracing or Equivalent Methods for the Protection of Ute and Limb. Mich Shall CamPly to A -17 Applicable Safety Orders I IS 10.0000 10.000.0 5500 00 5.50,0 10.00,0 10.00.0 9.000.0 9,000.0 Total Price for Bid Items A l -A17 319,850.00 282,990,00 417,600.00 411,510.00 ENGINEER'S GILLESPIE WILIAMS SUPPLY CO. AD GENERAL ENGR. Additive Bid Items QUANTITY UNIT AMOUNT UNIT AMOUNT UNIT AMOUNT UNIT AMOUNT Install Asphalt Concrete Overlay Along 1D Breakers Drive 24,000 SF 1 24.000.0 IN 24.0)0 00 1 24.000.0 3.25 78.00000 Grinding Existing Asphalt Concrete Ib Pavement Along Breakers Drive. 2.000 sF 1 2.000.0 1040 2,&70.0 0.5 LOW 00 1.50 3.000 Install Asphalt Concrete Overlay Along Half -Width of the Ramp and Portion of 20 Jasmine Avenue 10.50 sF 1 10.50.0 1.0 10.50.0 1 10.50.0 500 52.50.00 Grinding of Existing Asphalt Concrete Pavement Along the Half -Width of the 2b Ramp and Portion of Jasmine Avenue 6.000 sF 1 6.000,00 1.40 8.400.00 0.5 3.00000 4.00 24.000.00 Price for Additive Bid llama la. lb, 2a. 2b 42,500.00 45,700.00 38.500.00 157.500.00 Total Price for Bid Items Schedule "A° 362.350.00 1 328,690.00 1 458,100.00 569,010.00 C \viers \Paw \sraretl \conead199\ \Bid Summary- Main MOch xis Page I CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT TITLE Main Beach Sewer Farce Main Replacement and Breakers Drive Water Main BID LOCATION: City Clerk's Office - City Hall CONTRACT Ni dp4 DATE: 29AUg -01 TIME: 2:30P.m. ENGINEER'S ESTIMATE: 7M2.500.00 BY: SR CHECKED: wis DATE: 08/29/2001 PRadECT MANAGER: Mike anuoo4 Engineer's Estimate GCI. INC. WILLIAMS SUPPLY AD GENERAL ENGR. ITEM DESCRIPTION QUANTITY UNIT AMOUNT UNIT AMOUNT UNIT AMOUNT UNIT AMOUNT SCHEDULE'S' B -1 Mobilization 1 IS 10.000.00 10.000.00 42.600.00 42.600.00 15.000.00 15.000.00 20.000.00 20.000.00 B -2 Traffic Control 1 IS 3.000.00 3.000.00 1.700.00 1.700.00 15.01 15.000.00 10.000.00 10.000.00 Install New 6inch Cedo -LOk Yelomine. SDR -17 Sewer Farce Main and Fittings In Easement Between Lots. Across Ocean B -3 Boulevard and in Mar uerite Avenue 350 U 250.00 87.500.00 20200 70.700.00 40000 140.00100 250.00 87.501 B4 lConnection to Existing Sewer Manhole 1 EA 2000.00 2000.00 600.00 600.00 2.00100 2.00000 8.5DO.001 8.500.00 Remove Existing Woad Stairs to Second B -5 Lending and Rebuild with New Materials I 15 7.500.00 7.500.00 17.800.00 17.800.00 20,000,001 20.000.00 25.000.00 25.000.00 Remove Existing Concrete Retaining Wall and Rebuild with New Materials Including Placement of Sail Cement In Trench B -6 Bounaorles I is 10.000.00 10.000.00 7.300.00 7.300.00 25.000.00 25.00000 25.170100 25.0)0.00 Remove. As Required. Existing Woad Property Fence and Rebuild with New B -7 Mafenali 1 IS 5.000.00 5.01 2300.00 230000 10.000.00 10.000.00 5.000.00 5.17170.00 Remove and Rebuild Existing Concrete B -8 Walkway, Block Fence and Wood Gate I IS 5.000.00 5.000,00 6.100.00 8.100.00 211000.00 20.000.00 15.000.00 15.000.00 Remove Existing Shower and Replace B -9 with New Materials I LS 2500.00 2.500.00 .1.500.00 1.500.00 2.500.00 2.500.00 10.000.00 10.000.00 Remove, As Required. Existing Landscaping and Irrigation System. Replant with New Materials and Reinstall B -10 Irrigation System I IS 5.000.00 5.000.00 8.600.00 8.600.00 10.000.00 10.000.00 40.000.00 40.000.00 Remove and Replace Existing A.C. B -11 Driveway within Trench Boundaries I LS 2000.00 2.000.00 4.01 4.000.00 3.500.00 3.50100 7.500.00 7.500.00 Remove and Replace Existing Concrete B -12 Sidewalk and Curb and Gutter 1 t5 3.01 3.000 00 4.000,00 4,000 00 1.501 1.500.00 10.000.00 10.01 Within Trench Boundaries along Marguerite Avenue and @ Intersection of Marguerite Avenue and Ocean B -13 Boulevard 5.700 SF 7.00 4275000 3.00 17.100.00 5.50 31.350.00 12.00 68.400.00 Install New 8 -inch PVC 0-900. Class 150 B -IA Water Main in Breakers OdW 1.030 V 40.00 41.200.00 38.50 39.655.00 95.00 97.850.00 75,00 77.250.00 Remove Existing Ono Install New Llnch Water Service. Including Connection to Existing Pressure Reducing Valve, Meter B -15 Fax. and Cover 23 EA 90000 20,700.00 620.00 14.26000 650.00 14.950.00 1.500.00 34.500.00 Install New Fire Hydrant Assembly and B -16 Connect to New 8 -Inch Water Main 2 EA 3,000,10 6.000.00 Z.30 AWDDD 3.000.00 6,00D.00 4.000.00 8.000.00 Ei Connect to 6 -inch Existing Water Main I EA 2.000.00 ZOW,00 I.50D.00 1.50,00 3.503.00 3.500.00 3,500 00 3.500.00 Install 6 -inch Gore Valve. Including Valve B -18 Box and Cover and Apnurtenances 3 EA LWOW 3.000.00 91000 2.730.00 1.000 00. 3.000.00 1.200.00 3.600.00 Remove and Resurface A.C. Pavement within Trench Boundaries along Breakers B -19 Drive BAD) N 4.30 36.120.00 6,50 54.600.00 4.50 37.800.00 300 25.200.00 Pressure lest. Disinfect. and Flush Water B -20 Main I LS 2.000.00 2.0W.W 2.000.00 2,000.00 3.00000 3.000.00 5.DO0.W 5.WOW Remove Existing and Install Now Discharge Piping in Existing Sewer Pump Station 10 Valve Vault, including Trench ReSuIIOO!ng and Abandoning Edsring Force Main and Associated 8.21 Appurtenances I Ui 7.500.00 7.500.00 9.500.D01 9.500,00 10.000.00 10.000.1)(01 15.000.00 15.OW.W Construct Sewer Force Main Bypass Valve 8-22 Vault I LS 10AW.W 10.000.00 17.BW.W 17.800.00 6.000.00 6.000.00 10.000.00 10.000.00 B -23 Protect Existing Utilities in Place 1 IS 4,ODO,DO 4.000.00 2AW.00 2.400.00 10.000.00 10.000.00 3.ODO.W 3.000.W Excavation Safety Measures!nc!uding Adequate Sheeting. Shoring and Bracing or Equivolent Methods ter the Protection of UB and Limb. Which Shall Comply to B -24 Applicable Safely Ordors 1 LS 10.000.00 10.000.00 5.500.00 5.50,00 10.000,00 10.000.00 25.000.00 25.W0.00 Tolol Price for Bid Items 01 -B24 327.770.00 340,845.00 497,950.00 541.950.00 ecl. INC. WILLIAMS SUPPLY CO. AD GENERAL ENGR. ENGINEER'S Additive Bid Items QUANTITY UNIT AMOUNT UNIT AMOUNT UNIT AMOUNT UNIT I AMOUNT Install Asphalt CODarete OVerIaY Along to Breakers Drive 24.000 kF 1.00 24,000.00 1.00 24.000.00 1 D 24.000.00 3.00 72000.00 Grinding Existing ASPnal1 Concrete 1b Pavement Along Breakers Drive. 2.;700 SF 1.00 2000.00 1.40 2. BOB ,00 0.50 1.000.00 LW 2.000,00 Iuser¢I Pow lif4 %ifili Allgill)VIAW9 AIMW 0INUllaeoch.xls 26000.00 26,800.00 25,000.00 Q.00 353.770.00 367,645.00 522950.00 6t 5,950.00 Total Price for Bid Items Schedule "W