Loading...
HomeMy WebLinkAboutM2014-0021HARBOR RESOURCES DIVISION 829 Harbor Island Drive Newport Beach, CA 92660 (949) 644-3044 / Fax (949) 723-0589 HARBOR PERMIT/APPROVAL IN CONCEPT HARBOR PERMIT/APPROVAL IN CONCEPT BY THE CITY OF NEWPORT BEACH as required for permit application to the South Coast Regional Commission pursuant to California Administrative Code, Sections 13210 and 13211. General Description of Proposed Development: Remove existing floating dock system -dock, gangway,pier, approach and pile. Replace with new docks stem -dock, gangway,pier, approach and pile. Address number must be stenciled on at least 1 bayward facing pile. Pier conditions must be signed by applicant prior to tinal approval. IProaerty Address: 641 Via Lido Soud Legal Description: Harbor Permit Number: 172-641 Plan Check Number: 0778-2014 Applicant: Jim Declusin Applicant's Mailing Address: 2027 Placentia Ave., Costa Mesa, CA 92627 Phone Number: 949-631-3121 Swift Slip have reviewed the plans for the foregoing development including: 1. The general site plan, including any roads and public access to the shoreline. 2. The grading plan, if any. 3. The general uses and intensity of use proposed for each part of the area covered in the application. Page 1 of 2 And find They comply with the current adopted Newport Beach General Plan, Municipal Code, Title 17 and any applicable specific or precise plans or, ❑ That a variance of exception has been approved and final. A copy of any variance, exception, conditional use permit or other issued permit is attached together with all conditions of approval and all approved plans including approved tentative tract maps. On the basis of this finding, these plans are approved in concept and said approval has been written upon said plans, signed and dated. Should Newport Beach adopt an ordinance deleting, amending or adding to the Municipal Code or other regulations in any manner that would affect the use of the property or the design of a project located thereon, this Approval In Concept shall become null and void as of the effective date of this said ordinance. In accordance with the California Environmental Quality Act or 1970, and state and local guidelines adopted thereunder, this development: Has been determined to be ministerial or categorically exempt. ❑ Has received a final Exemption Declaration or final Negative Declaration (copy attached). ❑ Has received a Final Environmental Impact Report (copy attached). All discretionary approvals legally required of Newport Beach prior to issuance of a harbor permit and a building permit have been given and are final. The development is not subject to rejection in principal by Newport Beach unless a substantial change is proposed. This concept approval in no way excuses the applicant from complying with all applicable policies, ordinances, codes and regulations of Newport Beach. See attached Special Conditions. Lisa Walters, Harbor April 30, 2014 Attachments: Worksheet for Building Permit Application Drawing Pier Conditions Page 2 of 2 And find ,, They comply with the current adopted Newport Beach General Plan, Municipal Code, Title 17 and any applicable specific or precise plans or, ❑ That a variance of exception has been approved and final. A copy of any variance, exception, conditional use permit or other issued permit is attached together with all conditions of approval and all approved plans including approved tentative tract maps. On the basis of this finding, these plans are approved in concept and said approval has been written upon said plans, signed and dated. Should Newport Beach adopt an ordinance deleting, amending or adding to the Municipal Code or other regulations in any manner that would affect the use of the property or the design of a project located thereon, this Approval In Concept shall become null and void as of the effective date of this said ordinance. In accordance with the California Environmental Quality Act or 1970, and state and local guidelines adopted thereunder, this development: Has been determined to be ministerial or categorically exempt. ❑ Has received a final Exemption Declaration or final Negative Declaration (copy attached). ❑ Has received a Final Environmental Impact Report (copy attached). All discretionary approvals legally required of Newport Beach prior to issuance of a harbor permit and a building permit have been given and are final. The development is not subject to rejection in principal by Newport Beach unless a substantial change is proposed. This concept approval in no way excuses the applicant from complying with all applicable policies, ordinances, codes and regulations of Newport Beach. See attached Special Conditions. Lisa Walters, Harbor April 30, 2014 Attachments: Worksheet for Building Permit Application Drawing Pier Conditions Page 2 of 2 Print Form Worksheet for Combo Building & Solar PerMr.icatio ���W°° e r Comm'I r Residential City of Newport Beach - Building Division NOTE: PLAN CHECK FEES DUE AT TIME OF SUBqMW Ar h In A Im^ M. � �C,IFpRN rBuilding r Grading rDrainage r Elec r Mech r Plum Cu Yd CutY / Project Address (Not mailing address) r Flood r Fire r Liq r;'I A Suite No [641 VIA LIDO SOLID �— Description of Work Use F—ConstType F_ Remove existing floating dock system - floating dock. gang )ach. platform. and Replace # Storiesr #Units (if Res) pile. with new floating P p docks stem - floating dock, gangway, pier, approach, and pile. 9 Y 9 9 Y, p pP p� Valuation $ 59,000 Material/Labor New/Add SF Remodel SF Garage/New/Add OWNER'S NAME Last Declusin First Jim or Maria ' Owner's Address",3 Owner's E-mail Address ,: 70368 Calico Road Jacquelyn.chung@sbcglobal.net ,' d a City Rancho Mirage State CA Zip 92270 Telephone 1949.63105121 APPLICANT'S NAME Last Chung First Pacquelyn Applicant's Address Applicant's E-mail Address FOR SWIFT SLIP DOCK AND PIER BUILDERS, INC. iJacquelyn.chung@sbcglobal.net City State F Zip F Telephone ARCHITECT/DESIGNER'S NAME Last First Lic. No. �— ArchitecVDesigner's Address F Architect/Designees E-mail Address F_ City State Zip I Telephone ENGINEER'S NAME Last First Lic. No. Engineer's Address Engineer's E-mail Address City State �� Zip F Telephone CONTRACTOR'S NAME/COMPANY Swift Slip Dock and Pier Builders, Inc. Lic. No. 797052 Class Contractor's Address Contractor's E-mail Address 2027 Placentia Avenue iJacquelyn.chung@sbcglobal.net City Costa Mesa State CA Zip 92627 Telephone 949.631.3121 SETBACKS REAR SETBACKS FRONT PERMIT NO. SETBACKS LEFT SETBACKS RIGHT PLAN CHECK NO. USE ZONE DEVELOPMENT NO PLAN CHECK FEES $ I CITY OF NEWPORT BEACH CITY OF NEWPORT BENCH PPER PLNLENP(W BRY PRClr4rC MM" an. a NM JEM it AT -PA Ear JEM I SOUND IN FEET RM DENOTE mt LOWER LOW WRTER. a) 2 E c)_ T -i co CD I a All a NM JEM it AT -PA Ear JEM I SOUND IN FEET RM DENOTE mt LOWER LOW WRTER. 20-17 Placentia Avenue. Costai. Mesa- in Dock and Pier Builders, Inc. Contractor's License 797052 A www.swiftshpdocks.com 2027 Placentia Avenue - Costa Mesa, CA 92627 Telephone (949) 631-3121- Fax (949) 631-3122 Jim and Maria Declusin Re: 641 Via Lido Soud Newport Beach, Ca 92663 Cell Jim (503) 887-188o Maria: (949) 610-6803 Phone: (76o) 992-9537 Email: mariasantas(@aol.com Estimate Remove and replace floating dock, gangway, pier and pilings. Floating Dock 1) 4 x 8 framing with 5 x 7 angle clips. 2) Superfloats filled with Styrofoam (20" freeboard). 3) 2 x 6 diagonals for shear strength. 4) 21/2" diameter steel torsion tube built into dock for longterm stability. 5) 3 —18" square prestressed concrete guide pile. 6) Surge blocks with steel frames built below deck for cleaner look. 7) 1 x 6 Azek Premium decking attached with stainless steel screws. 8) 3 x 12 facia (upgrade) with white rubstrip and corners. 9) 10 —14" through bolted cleats. Gangway 1) 3'X 26' dimensions. 2) 3 — 2 x 12 stringers. 3) Heavy duty hinge and axle wheel combination. 4) 1 x 6 decking to match dock. 5) 1" half rounds for traction. 6) 3 x 4 posts 7) Milled handrails 8) 5 —1/4" stainless steel cables. Pier 1) 2 —14" thick prestressed concrete "T" pile. 2) 2 x 10 joists. 3) 1 x 6 decking to match dock. 4) Railings to match gangway. #13285rev 11/21/13 DIVE WORKS PO Box 21238 Long Beach, CA 90801 Swift Slips 2027 Placentia Avenue Costa Mesa, CA 92627 (949) 759-0773 641 Via Lido Soud Newport Beach Preliminary Survey March 14, 2014 Subject: Eelgrass (Zostera marina) Preliminary Survey and Caulerpa taxifolia Survey 641 Via Lido Soud, Newport Beach Eelgrass was not observed at proposed project site. No Caulerpa Taxifolia was observed in subject area noted above. This Preliminary Eelgrass Survey is the result of studying this property to determine the presence of eelgrass. This report as required in accordance with the Southern California Eelgrass Mitigation Policy (SCEMP) since eelgrass is widely distributed throughout Southern California Coastal and Harbor Regions. This policy has been set in place to protect marine habitats and sea grass beds that play a role in the life cycle chain for marine life to reproduce. This survey assists development projects by contractors like you to conduct activities in conjunction with BMP's concerning impact and management for promoting Eelgrass and controlling the spread of Caulerpa. Responsible developments by contractors like you help protect these sensitive marine ecosystems, which in turn, protects our ocean resources. Thank you. If you have any questions please feel free to contact us. Respectfully, DiveWork@gmail.com (949) 759-0773 Preliminary Survey Page 1 of 11 f, WO DIVE WORKS PO Box 21238 Long Beach, CA 90801 (949) 759-0773 641 Via Lido Soud Newport Beach RESIDENT Jim & Maria Declusin 641 Via Lido Soud Newport Beach, CA Preliminary Survey March 14, 2014 Swift Slips Dock & Platform Builders, Inc. Costa Mesa, California Eelgrass Survey Preliminary Report Prepared March 19, 2014 by Dive Works Robert Wiegand Survey assistance by Sean Donovan Preliminary Survey Page 2 of 11 DIVE WORKS PO Box 21238 Long Beach, CA 90801 (949) 759-0773 641NVia Lido Soud ewport Beach Preliminary Survey March 14, 2014 CONTENTS List of Tables 3 List of Figures 3 Current Situation 4 Eelgrass Impacts 4 Survey Method 4 Survey Findings 4 Discussion 4 Caulerpa Survey Form 7 Eelgrass Survey Form g List of Tables Table 1. Tides and Currents .....................................................................................................................5 List of Figures Figure 1. Site Location .....................................................................................................................5 Figure 2. Dive Transects, Existing, and Proposed .................................................................................................................................6 Preliminary Survey Page 3 of 11 Current Situation DIVE WORKS PO Box 21238 Long Beach, CA 90801 (949) 759-0773 641 Via Lido Soud Newport Beach Preliminary Survey March 14, 2014 Resident (Jim & Maria Declusin) at 641 Via Lido Soud, Newport Beach, Ca, see Figure 1, has proposed to replace existing dock, gangway, platform, and pile. Proposed new dock would be a smaller dock footprint and gangway system and no platform. See Figure 2. The new dock system would be composed of Douglas fir. Eelgrass was not observed in construction site; see Figure 2 & Eelgrass Survey Report. Caulerpa was not observed in any areas surveyed; see Caulerpa Survey Report. Eelgrass Impacts No eelgrass in survey area. See Figure 2. Survey Method Survey conducted March 19, 2014 beginning at 1115 hr, at N Lat +33. 609940", W Long -117. 915694 ". Day was overcast, air temperature 68° F. Water was 62° F. Depth ranged from sea wall at 0' to approximately 12' at end of existing dock, visibility was 4 ft. See Table 1. Survey area delineated spanning 30' ft wide paralleling sea wall to 80' ft out from sea wall past end of proposed dock to cover entire area to ensure >75% coverage of bay floor. Survey conducted by diver's 3' ft apart. Lanes ran parallel with sea wall scanning approximately 4 ft on either side. See Figure 2. Survey Findings Dimensions of proposed dock are shown in Figure 2. Eelgrass at this proposed project site was not observed. See Eelgrass Survey Report for detailed findings and observations. Sea life observed were mussels on bottom in sediment (sand and dirt). Discussion No eelgrass was observed in project area. Proposed project shows an approach 4 feet long to a platform that is 10 feet wide by 14 feet long with 2 -14" T piles replacing 5-14" existing piles. Proposed gangway shows Tx 26' from platform to dock slip. Proposed dock slip would be "L" shape at the head walk and 61 feet long by 4 feet wide at end of dock slip (See Figure 3). Existing approach/platform with 5-14" piles are to be removed along with gangway and dock slip. Dock slip dimensions would change reducing overall foot print from existing of 660 sqft to proposed of 788 sqft. Existing "L" shape (at head walk) dock slip dimensions are 54 feet by 6 feet (See Figure 2). Mussels on dock floats, piles and bottom exist. No eelgrass is present in survey area. Impact to navigational waters will not change. Best management practices are recommended in replacement of piles and installation of proposed dock system. Preliminary Survey Page 4 of 11 1ve ` o l�WG SER�1C. DIVE WORKS PO Box 21238 Long Beach, CA 90801 Table 1: Tides and Currents (949) 759-0773 641 Via Lido Soud Newport Beach Preliminary Survey March 14, 2014 NEWPORT BAY ENTRANCE, CORONA DEL MAR, CA Stationld: 9410580 Daily Tide Prediction in Feet 5.50 Time Zone: LSTILDT .. J 5.80 Datum: MLLW = 4.50 0 +' 4.60 Elate Flay Time Hgt as > 3.56 43/19 Wed 05:31 AM 0.26 L 3.66 � 03119 Wed 11:36 AM 4.03 H � 2,56 03/19 Wed 05:13 PM 0.96:L y 2.66 03/19 Wed 11:36 PM 5.1 H 0 w 1.56 03/20 Thu 06:18 AM 0.33 L: 0 1'00 = 6.56 03/20 Thu 12:24 PM 3.56 H' 6 66 03/20 Thu 05:42 PM 1.36 L 03/19 03/19 63/19 63/19 63/20 63120 03/20 03/26 63/21 12an ban 12pn 6pn 12an 6an 12pn 6pn 12an Date/Tine (LST/LDT) Figure 1. Site Location Preliminary Survey Page 5 of 11 Q� -e woes fir' s DIVE WORKS (949) 759-0773 641 Via Lido Soud Po Box 21238 Newport Beach o Long Beach, CA 90801 Preliminary Survey March 14, 2014 VWG SEB�1G Figure 2. Existing dock slip Dive Transects �ti �ioi Ufk 5a� Transects Lat } Long -i Grid Square = 5 sgft Xj Depth Survey Area Preliminary Survey Page 6 of 11 -J� WoR�C SGS DIVE WORKS (949) 759-0773 641 Via Lido Soud po sox 21238 Newport Beach Long Beach, CA 90801 Preliminary Survey March 14, 2014 G seR� I>>yMG SFONJ DIVE WORKS (949) 759-0773 641 Via Lido Soud PO Box 21238 Newport Beach Long Beach, CA 90801 Preliminary Survey March 14, 2014 Caulerpa Survey Reporting Form This form is required to be submitted for any surveys conducted for the invasive exotic algae, (Caulerpa) which is required to be conducted under federal and/or state permits and authorizations issued by the U.S. Army Corps of Engineers, Coastal Commission, and/or Regional Water Quality Boards (Regions 8 & 9). The form has been designed to assist to identify and control any potential impacts of the authorized actions on the spread of Calupera. Surveys required to be conducted for this species are subject to modification through publication of revisions to the Calupera survey policy. It is incumbent upon the authorized permittee to ensure that survey work is following the latest protocols. For further information on these protocols, contact: Robert Hoffman, National Marine Fisheries Service, 562-980-4043, or William Paznokas, California Department of Fish & Game, 858-467-4218. This survey is valid for (60) sixty days from March to August and valid for (90) ninety days from August to October. For information regarding this survey please contact Robert Wiegand, Dive Works Diving Service at 949-759-0773. Required Information Site Name: 641 Via Lido Soud Newport Beach, CA Survey Contact: Robert Wiegand (949) 759-0773 DiveWork@Gmail.com Permit Reference: (ACOE Permit No., CCC Permit No.) Hydrographic System: Newport Harbor (bay, estuary, lagoon, or harbor) Specific Location: N Lat +33. 609940", W Long -117. 915694 " (UTM, Lat./Long., datum, accuracy level, attach electronic survey area map if possible) Was Caulerpa Detected: Yes, Caulerpa was found at this site and Has been contacted on date. xxxx No, Caulerpa was not found at this site Description of Permitted Work: Remove existing dock, gangway, platform, 5 piles and replace with a (describe briefly the work to be different configuration dock, gangway, install 2 piles. conducted at the site under the permits identified above) Preliminary Survey Page 8 of 11 DIVE WORKS PO Box 21238 Long Beach, CA 90801 (949) 759-0773 641 Via Lido Soud Newport Beach Preliminary Survey March 14, 2014 Caulerpa Survey Reporting Form (Cont.) Description of Site: (describe the Depth range: 0' to 12' Bottom is sediment and sand. physical and biological conditions within the survey area at the time of the survey and provide insight into variability, if known. Please provide units for all numerical information). Substrate type: Sediment, sand Temperature: 680 Air 620 Water Salinity: Dominant flora: Dominant fauna: Mussels Exotic species encountered - None Caulerpa Other site description notes: Description of survey Effort: Survey date and time period: Survey conducted using (please describe the surveys SCUBA. conducted including type of survey DATE: March 19, 2014 (SCUBA, remote video, etc.) and survey methods employed, date of TIME : 1115 AM work, and survey density (estimated percentage of the bottom actually viewed). Describe any limitations encountered during the survey efforts. Horizontal visibility in water: 4' Survey type and methods: SCUBA Survey Personnel: Robert Wie and, Sean Donovan Survey density: Survey limitations: None Other Information: (use this space to provide any additional information or references to attached materials such as maps, reports, etc. Caulerpa Survey Reporting Form (version 1.2, 10/31/04) Preliminary Survey Page 9 of 11 ti1 F, WORD G sER��� DIVE WORKS (949) 759-0773 429-0 Shoreline Village Drive Long Beach, CA 90802 641 Via Lido Soud Newport Beach Preliminary Survey March 19, 2014 Eelgrass Survey Reporting Form This form is required to be submitted for any surveys conducted for Eelgrass which is required to be conducted under federal and/or state permits and authorizations issued by the U.S. Army Corps of Engineers and the Coastal Commission and required for review by Marine Bureau and Planning Department. The form has been designed to assist in identifying eelgrass while ensuring that the required information is consistently documented. Surveys required to be conducted for this species are subject to modification through publication of revisions to the Eelgrass survey policy. It is incumbent upon the authorized permittee to ensure that survey work is following the latest protocols. For further information on these protocols, contact: Robert Hoffman, National Marine Fisheries Service, 562-980-4043, or William Paznokas, California Department of Fish & Game, 858-467-4218. This survey is valid for (60) sixty days from March to August and valid for (90) ninety days from August to October. For information regarding this survey please contact Robert Wiegand, Dive Works Diving Service at 949-759-0773. Required Information Site Name: 641 Via Lido Soud Newport Beach, CA Survey contact: Robert Wiegand (949) 759-0773 DiveWork@Gmaii.com Permit Reference: (ACOE Permit No., CCC Permit No.) HyRd.ographic System: Newport Bay (bay, estuary, lagoon, or harbor) Specific Location: N Lat +33. 609940", W Long -117. 915694 " (UTM, Lat./Long., datum, accuracy level, attach electronic survey area map if possible) Was Eelgrass Detected: Eelgrass within 15' of project / disposal Eelgrass within 15'-30' of project / disp xxxx No eelgrass in project / disposal site Description of Permitted Work: Remove existing dock, gangway, platform, 5 piles and replace (describe briefly the work to be with a different configuration dock, gangway, install 2 piles. conducted at the site under the permits identified above) Preliminary Survey Page 10 of 11 DIVE WORKS (949) 759-0773 429-0 Shoreline Village Drive Long Beach, CA 90802 641 Via Lido Soud Newport Beach Preliminary Survey March 19, 2014 Eelgrass Survey Reporting Form (Cont.) Description of Site: (describe the Depth range: 0' to 12' Bottom is sediment and sand physical and biological conditions within the survey area at the time of the survey and provide insight into variability, if known. Please provide units for all numerical information). Substrate type: Sediment, sand Temperature: 680 Air 620 Water Salinity: Dominant flora: Dominant fauna: Mussels Exotic species encountered none Other site description notes: Description of Survey Effort: Survey date and time period: Survey conducted using SCUBA (please describe the surveys conducted including type of survey DATE: March 19, 2014 (SCUBA, remote video, etc.) and survey methods employed, date of TIME :1115 AM work, and survey density (estimated percentage of the bottom actually viewed). Describe any limitations encountered during the survey efforts. Horizontal visibility in water: 4' Survey type and methods: SCUBA Survey Personnel: Robert Wie and, Sean Donovan Survey density: Survey limitations: None Other Information: (use this space to provide any additional information or references to attached materials such as maps, reports, etc. Eelgrass Survey Reporting Form (April 2009) Preliminary Survey Page 11 of 11 HARBOR RESOURCES DIVISION 829 Harbor Island Drive Newport Beach, CA 92660 (949) 644-3034 / Fax (949) 723-0589 Special Conditions April 30, 2014 641 Via Lido Soud With reference to the plans currently under consideration at the above referenced address to reconfigure or modify the dock system or bulkhead, the following conditions will now be in effect: 1. The project proponent is aware of the Harbor Permit Policies (Council Policy H-1) and Title 17 of the City of Newport Beach Municipal Code. The project proponent understands that the above referenced structure(s) is under the purview of these Policies and Codes. 2. Any future work on the above mentioned structure(s) requires permits with the City of Newport Beach and any other applicable agencies. Painting and work considered to be cosmetic in nature does not require a permit. 3. The conditions set forth in this document pertain to the proposed dock system and/or bulkhead under consideration. Any future modifications or alterations to the dock system and/or bulkhead may require new conditions which may override or change these conditions. These conditions supersede all past conditions associated with this property. 4. Only marine oriented uses are allowed on the pier, pier platform, gangway and float. Patio furniture, plants etc ... are not permitted. 5. In accordance with Municipal Code 10.08.030 A. the project proponent shall obtain the proper permits for equipment and materials storage. "Except as otherwise provided in this section, no person shall use any public street, sidewalk, alley or parkway or other public property for the purpose of storing or displaying any equipment, materials or merchandise, or any other commercial purpose. B. Public streets, sidewalks, alleys, or parkways may be used for the purpose of selling, storing, or displaying any equipment, material, merchandise or for other commercial purposes in the following cases: ... For the temporary storage of construction equipment or material provided a permit is issued pursuant to Chapter 12.62 of this Code and the storage is consistent with provisions of the Uniform Building Code." 6. The project shall be implemented in conformance with the Local Coastal Program - Coastal Land Use Plan. Page 1 of 2 7. In accordance with Municipal Code 10.28.040 the following noise regulations apply: "A. Weekdays and Saturdays. No person shall, while engaged in construction, remodeling, digging, grading, demolition, painting, plastering or any other related building activity, operate any tool, equipment or machine in a manner which produces loud noise that disturbs, or could disturb, a person of normal sensitivity who works or resides in the vicinity, on any weekday except between the hours of seven a.m. and six -thirty p.m., nor on any Saturday except between the hours of eight a.m. and six p.m. B. Sundays and Holidays. No person shall, while engaged in construction, remodeling, digging, grading, demolition, painting, plastering or any other related building activity, operate any tool, equipment or machine in a manner which produces loud noise that disturbs, or could disturb, a person of normal sensitivity who works or resides in the vicinity, on any Sunday or any federal holiday." 8. Your side property lines extend in the water along their same bearing. Vessels shall not encroach upon the neighbor's property on either side. 9. Vessels may not extend beyond the end of the fingers by more than the width of its beam except as otherwise noted in the Municipal Code. 10. The maximum beam of a vessel that is permitted to side -tie to the westernmost side of the float is 16'. 11. The maximum beam of a vessel that is permitted to side -tie to the easternmost side of the float is 9 '. Lisa Walters, Harbor Resources Date Applicant Signature Print Name Date Joint Pier Applicant Signature (if applicable) Print Name Date Page 2 of 2 HARBOR RESOURCES DIVISION 829 Harbor Island Drive Newport Beach, CA 92660 (949) 644-3034 / Fax (949) 723-0589 Special Conditions April 30, 2014 641 Via Lido Soud With reference to the plans currently under consideration at the above referenced address to reconfigure or modify the dock system or bulkhead, the following conditions will now be in effect: 1. The project proponent is aware of the Harbor Permit Policies (Council Policy H-1) and Title 17 of the City of Newport Beach Municipal Code. The project proponent understands that the above referenced structure(s) is under the purview of these Policies and Codes. 2. Any future work on the above mentioned structure(s) requires permits with the City of Newport Beach and any other applicable agencies. Painting and work considered to be cosmetic in nature does not require a permit. 3. The conditions set forth in this document pertain to the proposed dock system and/or bulkhead under consideration. Any future modifications or alterations to the dock system and/or bulkhead may require new conditions which may override or change these conditions. These conditions supersede all past conditions associated with this property. 4. Only marine oriented uses are allowed on the pier, pier platform, gangway and float. Patio furniture, plants etc ... are not permitted. 5. In accordance with Municipal Code 10.08.030 A. the project proponent shall obtain the proper permits for equipment and materials storage. "Except as otherwise provided in this section, no person shall use any public street, sidewalk, alley or parkway or other public property for the purpose of storing or displaying any equipment, materials or merchandise, or any other commercial purpose. B. Public streets, sidewalks, alleys, or parkways may be used for the purpose of selling, storing, or displaying any equipment, material, merchandise or for other commercial purposes in the following cases: ... For the temporary storage of construction equipment or material provided a permit is issued pursuant to Chapter 12.62 of this Code and the storage is consistent with provisions of the Uniform Building Code." 6. The project shall be implemented in conformance with the Local Coastal Program - Coastal Land Use Plan. Page 1 of 2 G 7. In accordance with Municipal Code 10.28.040 the following noise regulations apply: "A. Weekdays and Saturdays. No person shall, while engaged in construction, remodeling, digging, grading, demolition, painting, plastering or any other related building activity, operate any tool, equipment or machine in a manner which produces loud noise that disturbs, or could disturb, a person of normal sensitivity who works or resides in the vicinity, on any weekday except between the hours of seven a.m. and six -thirty p.m., nor on any Saturday except between the hours of eight a.m. and six p.m. B. Sundays and Holidays. No person shall, while engaged in construction, remodeling, digging, grading, demolition, painting, plastering or any other related building activity, operate any tool, equipment or machine in a manner which produces loud noise that disturbs, or could disturb, a person of normal sensitivity who works or resides in the vicinity, on any Sunday or any federal holiday." 8. Your side property lines extend in the water along their same bearing. Vessels shall not encroach upon the neighbor's property on either side. 9. Vessels may not extend beyond the end of the fingers by more than the width of its beam except as otherwise noted in the Municipal Code. 10. The maximum beam of a vessel that is permitted to side -tie to the westernmost side of the float is 16'. 11. The maximum beam of a vessel that is permitted to side -tie to the easternmost side of the float is 9 Lisa Walters, Harbor Resources Date Applicant Signature Print Name Date Joint Pier Applicant Signature (if applicable) Print Name Date Page 2 of 2 STATE OF CALIFORNIA - NATURAL RESOURCES AGENCY CALIFORNIA COASTAL COMMISSION South Coast District Office 200 Oceangate, 10th Floor Long Beach, California 90802-4416 PH (562) 590-5071 FAX (562) 590-5084 EDMUND G. BROWN, JR., GOVERNOR Coy I V C o S oo. c� October 13, 2014 Permit No. 5-14-0741 NOTICE OF ADMINISTRATIVE PERMIT EFFECTIVENESS Please be advised that the Administrative Permit with the above permit number which was sent to you on September 22, 2014 and was reported to the Commission on October 9, 2014 is now fully effective. Development of your project is subject to compliance with all terms and conditions specified in the Administrative Permit. Should you have any questions please contact our office. CHARLES LESTER Executive 7'ector . I _- Coastal Program Analyst 2017 Placentia Avenue; Costa:. Mesa, Californ-ia 92°627 n HARB OR PERMIT TRANSFER APPLICATION 829 harbor Island Drive Newport Beach, CA 92660 949-644-3044 **Date of Applicaton:��Permit Number: V" a'(UL4I **Property Address: (-'A cA 1-k L �L _ **Buyer's Names: C1 Yl( c6ii Billing Address: 70 -314 CDO C. R40 Telephone No,: W • q 90295 -� Buyer's Signatures: **Seller's Names:�kl _ \Ji 0! Lj C) Seller's Signatures: � I Joint Owner Signature: L _� **Escrow Company: Mariners Escrow Corp.. Phone#949-1,Q46c)40 **AddressO��D njewport Center Drive #200, Newport Beach, CA 92660 **Escrow Number: 44(L0'i�-Tn **Fax #: 949-729-0190 Closing Date (Estimate): 4 - aC� - I -2t> *;STARRED ITEMS---------------------- MUST BE COMPLETE TO------------- BEGIN THE PROCESS. Inspection Date: - Reinspection Date: Fee Paid: 4>Gn$ C k No: 5� Application Complete: Harbor Resources Sig re/Date Special Conditions: This permit is revocable by the City Council In accordance with Title 17 of the Newport Beach Municipal Code. HA -RB OR PERMIT TRANSFER APPLICATION 829 Harbor Island Drive Newport Beach, CA 92660 949-6443044 **Date ofAppllcaton:��Permit Number: I12-t.o41 **Property Address: ' CL— UJA« Sd CA **Buyer's Names: Billing Address: Telephone No.: Buyer's Signatures: **Seller's Nam( Seller's Signature Joint: Owner Signature: **Escrow Company: Mariners Escrow Corp. Phone#949-(,oAtg +� **AddressIV4D Newport Center Drive 11200, Newport Beach, CA 92660 **Escrow Number: **Fax #: 949-729-0190 Closing Date (Estimate): aS *STARRED ITEMS-MUSTBE COMPLETE TO BEGIN THE PROCESS, Inspection Date: jI i,-�S _ Reinspection Date: -3 hro Fee Paid: heck No: Application Complete: Harbor Resources Signature/Date Special Conditions: This permit is revocable by the City Council In accordance with Title 17 of the Newport Beach Municipal Code. MARINERS ESCROW 270 NEWPORT CENTER DRIVE, SUITE 200 / NEWPORT BEACH / CA / 92660 / USA T 949.640.6040 F 949.721.8157 www.marinersescrow.com Harbor Pen -nits Date: April 24, 2013 829 Harbor Island Drive Escrow No.: 44608 -DJ Newport Beach, CA 92660 Your Re: 641 Via Lido Soud Attn: Lisa Re: 641 Via Lido Soud, Newport Beach, CA 92663 In connection with the above referenced escrow, we enclose the following: Signed Application by both parties to complete the transfer. If you have any questions or need anything fiu-ther, please do not hesitate to call. Sincerely, 's Escrow Corporation Deborah Johnson Escrow Officer NP CITY OF NEWPORT BEACH 829 Harbor Island Drive, Newport Beach, CA 92659 949-644-3044/Fax 949-723-0589 March 20, 2013 a O Mariners Escrow- O Fax# 949.729.0190 Re: 641 Via Lido Soud Escrow#44608-DJ Dear Mariners Escrow, The City of Newport Beach has inspected the above pier and found it to meet City standards. Once we receive the application signed by both the buyer and seller the pier will be transferred. Thanks for your help and if you require further assistance in this matter please call 949.644.3044. Sincerely, haw Waw Lisa Walters INSPECTION FORM Harbor Resources Department Date: Inspection Requested By: Inspector: Pier Address: a e;Pierransfer GFI Present Anti -Siphon / Backflow Present . Other Comments Eelgrass Ye Need None Needed_ Date Time FJ Eelgrass Within 15' of Project F] Eelgrass Within 15'- 30' of Project ❑ No. Eelgrass in Project Area Pump Out Pier Location Yes No Operational Recommended Action Encroachmenet Address of Complaining Party Boat Description CF Number Location on Dock Comments / Observations Other Request Reinspection Yes Nem 511-0 1 Ll_�� Map Output Page 1 of 1 http : //www6. c ity . newp ort -beach. c a. us/servlet/com. e sri. e srimap. E srimap? S erviceName=n... 03/06/2013 March 14, 2013 Mariners Escrow Fax# 949.729.0190 Re: Pier Permit #172-641 641 Via Lido Soud Escrow # 44605 -DJ CITY OF NEWPORT BEACH 829 Harbor island Drive, Newport Beach, CA 92659 949-644-3044/Fax 949-723-0589 Dear Mariners Escrow, The above dock was inspected by the City of Newport Beach at the property mentioned above. We cannot transfer the pier permit until the following deficiencies have been corrected and the property has been re -inspected: 1. It needs a new testable Backflow Prevention Device installed (please see diagram). The Newport Beach City Municipal Code 17.60.030 states: CA. Prior to the transfer of an annual pier permit, all harbor structures shall be inspected for compliance with the City's minimum plumbing, electrical and structural requirements, and the conditions of the existing permit. All structural deficiencies must be corrected prior to the transfer of the permit. A fee will be charged for this inspection, established by Resolution of the City Council. Please call 949-644-3044 to request a reinspection. Once the property has passed reinspection and we have the signed application, the pier will be transferred. Sincerely, 2b Waetm Lisa Walters Harbor Resources Division STATE OF CALIFORNIA - NATURAL RESOURCES AGENCY ARNOLD SCHWARZENEGGER, Governor CALIFORNIA COASTAL COMMISSION South Coast Area Office 200 Oceangate, Suite 1000 m Long Beach, CA 90802-4302 July 9, 2010 (562)590-5071 Mr. Chris Miller City of Newport Beach/Division of Harbor Resources 829 Harbor Island Drive Newport Beach, CA 92660 Subject: Condition Compliance — Coastal Development Permit 5-06-117 & Conformance with Consistency Certification CC -031-06 - DOCK CONSTRUCTION Dear Mr. Miller: Commission staff have received information submitted as evidence of compliance with Coastal Development Permit 5-06-117, and/or as evidence of conformance with Consistency Certifications CC -031- 06 for the following sites in the City of Newport Beach: Applicant Site Address Existing Pier, Proposed Proposed Existing Proposed Additional Description Pier Platform, Float Gangway Piles Piles and Dock Dimensions and Pier Dimensions Single finger Single finger Eelgrass survey 6/4/2010 5 to 8 foot 5 to 8 foot (expires 10/2/2010); Caulerpa wide by 66' wide by 66' 641 Via Lido long floating long floating Use Use survey 6/4/2010 (expires Cheng, Jennifer Soud dock dock existing 1 existing 9/2/2010 Commission staff have reviewed the information submitted and determined that the above referenced dock construction_ projects conform with the submittal requirements established under Consistency Certification CC -031-06 the Special Conditions of Coastal Development Permit 5-06-117. Please note that the eelgrass and Caulerpa taxifolia surveys completed are only valid for a limited time period and that additional surveys must be completed and submitted to Commission staff for review if the proposed dock projects listed above do not commence prior to expiration of the initial survey. In addition, please note that this authorization shall expire on October 23, 2011 and that all authorized work must be completed prior to that date. Finally, please note there are ongoing obligations relative to water quality protection established in the authorization which must be implemented for the entire life of the approved development. Please be advised that only the projects described in the materials submitted for the sites listed above have been found to conform with Consistency Certification CC -031-06 and/or conform with the terms and conditions of Coastal Development Permit 5-06-117. Any change in the projects may cause them to lose their status as consistent with CC -031-06 and/or CDP 5-06-117. This certification is based on information provided by the City of Newport Beach. If, at a later date, this information is found to be incorrect or incomplete, this letter will become invalid, and any development occurring at that time must cease until a new determination regarding conformance with CC -031-06 and/or CDP 5-06-117, is obtained. If you have any questions, please contact me at (562) 590-5071 or Mr. Mark Delaplaine at (415) 904- 5200. Sincerely, V Karl Schwing Supervisor, Regulation & Planning, Orange County Area Cc: Mr. Mark Delaplaine, California Coastal Commission Mr. Dan Swenson, U.S. Army Corps of Engineers DEPARTMENT OF THE ARMY LOS ANGELES DISTRICT, CORPS OF ENGINEERS P.O. BOX 532711 LOS ANGELES, CALIFORNIA 90053-2325 July 1, 2010 REPLY TO ATTENTION OF: Office of the Chief Regulatory Division Lisa Walters 829 Harbor Island Drive Newport Beach, California 92660 Dear Ms. Walters: This is in reply to your application (File No. SPL-2010-00613-RJV) dated June 17, 2010 for a Department of the Army Permit to discharge fill material into waters of the U.S., in association with the Jennifer Cheng boat dock replacement project. The proposed work would take place seaward of 641 Via Lido Soud in Newport Bay within the City of Newport Beach, Orange County, California. Based on the information you have provided, the Corps of Engineers has determined that your proposed activity complies with the terms and conditions of Regional General Permit (RGP) No. 54- Maintenance Dredging, Beach Nourishment, and Dock Maintenance. As long as you comply with the general permit conditions of RGP No. 54 an individual permit is not required. Specifically, you are authorized to conduct the following regulated activities: 1. Remove and replace the existing floating dock located at 641 Via Lida Soud, Newport Beach, California. 2. Install anew dock in the same configuration and size as the existing dock. 3. Install a new dock composed of a Douglas fir treated frame, composite decking, and galvanized steel hardware. -2 - Furthermore, you must comply with the following non -discretionary Special Conditions: 1. Provide Coastal Zone Management Act (CZMA) certification prior to initiating work in waters of the U.S. 2. The permitted activity shall not interfere with the right of the public to free navigation on all navigable waters of the United States as defined by 33 C.F.R. Part 329. 3. No other modifications or work shall occur to the structure perrnitted herein. 4. The Permittee shall discharge only clean construction materials suitable for use in the oceanic environment. The Permittee shall ensure no debris, soil, silt, sand, sawdust, rubbish, cement or concrete washings thereof, oil or petroleum products, from construction shall be allowed to enter into or placed where it may be washed by rainfall or runoff into waters of the United States. Upon completion of the project authorized herein, any and all excess material or debris shall be completely removed from the work area and disposed of in an appropriate upland site. 5. The Permittee shall notify the Corps Regulatory Division of the date of commencement of operations not less than 14 calendar days prior to commencing work, and shall notify the Corps of the date of completion of operations within 30 days of project completion. A general permit does not grant any property rights or exclusive privileges. Also, it does not authorize any injury to the property or rights of others or authorize interference with any existing or proposed Federal project. Furthermore, it does not obviate the need to obtain other Federal, State, or local authorizations required by law. Thank you for participating in our regulatory program. If you have any questions, please contact R.J. Van Sant at 213-452-3418 or via e-mail at Richard.J. Vansant@usace.army.mil. -3 - Please be advised that you can now comment on your experience with Regulatory Division by accessing the Corps web -based customer survey form at: htW://12er2.nwl2.usace.army.mil/survey.html. Sincerely, James E. Mace Senior Project Manager South Coast Branch Regulatory Division Enclosure: Project map Project diagram 6/03/201V THU iO: i6 Y Ax svAil't Silp VJ001/002 -.'n++t».'..e,•,ir+.-.:mea.au.�.axaurw...asw;::w�.hea=+e:i[ _ ' =, - -rub - 4}}-}z.4' ••.• �K - • piVu�t q:� op0 pf�r•! W N J8:'.Ja'� k VJCiAl!TY SKETCH wo�r�>rx , 4 IyWo6iRT IS.A CAL iiMIQ 4 T 1tTYy l.. { as _- ._Tt� ,h„gca+wuy..eo�s O -O §•w oil' W o N 3flp om �ly ei Fvrrs�ar r"lr�sS DIV caLo Lo l U) CI OF NEWPORT BEACH Q� -jw w c 1 11-000. -zsL No C7 �12 2, a) w wwa Z, AIV fi 0 c A L P ; d P - i� � � lits, P+N�Erap•pra tine.. iwiv k�.es �-�i.3�,c.-cs�A`��t�� .�..�.•��-ra�� `�.� �'-��src'.���w "i��o ��i �1 � �3 � P � ! �s. `' ..._ _ .. vljUU1/UUi f� .,.,.. �...w..-_....c,.... - ..,,_w-.;.. w�o-]w -:aw.. ..Ls.. -s. �....a.-r,..,,,,i�...,::tta:uxruaswwsmu..a = - �—.+•�.. - VIO 3p I All VJCJ IV I TY SKETCH o ky au ardMMIA x. ���.... {(J p /}�►, �c ~n�a.y+ atrrt�e s�,ap Xisa�psr4ljr ,�d+ �lvfi`4i�cf"z '' vies j on 40Wep- ow Q fl.O 41 cxa�� ��fg6lrgherd tss r�.l�rx � oIRE ,. N DIV m 4 ,kd^1 7U co OF NEWPORT BEACH 4.100: ` JS fV Lu w _ f ' ' _ Cp 32 OF kvd2eleP-Al DIN Nbocv 5 V5 e,, �...._.. ,...._.. .._.�..._ . � sus Paov 4�N� June 17, 2010 California Coastal Commission Attn: Karl Schwing 200 Oceangate, STE 1000 Long Beach, CA 90802-4416 Army Corps of Engineers Attn: Corice Farrar 915 Wilshire Blvd. Los Angeles, CA 90017 CITY OF NEWPORT BEACH Santa Ana Regional Water Quality Control Board Attn: Adam Fischer 3737 Main Street, STE 500 Riverside, CA 92501-3348 HARBOR RESOURCES RE: Regional General Permit No. 54 — Dock Construction Application Submittals Enclosed is the recent monthly batch of dock construction applications for your approval, per the California Coastal Commission Permit 5-06-117 & Federal Consistency Certification CC -031-06, the Army Corps of Engineers Permit No. 54 (File No. 200501233 -DPS) and the Regional Water Quality Control Board General Certification Permit. All of these applications have been checked for accuracy and completeness as evidenced by the attached Dock Construction Application City Checklist. Thank you for your time in reviewing these applications. Please do not hesitate to call if you have any questions. Cheng- 641 Via Lido Soud Sincerely, .Lisa Wafters Harbor Resources Technician (949) 644-3044 829 Harbor Island Drive, Newport Beach, CA 92660 PH: (949) 644-3034 FX: (949) 723-0589 *Website: www.newport-beach.ca.us/HBR/ HARBOR RESOURCES DIVISION 829 Harbor Island Drive Newport Beach, CA 92660 (949) 644-3044 Fax (949) 723-0589 www.newport-beach.ca.us/hbr DOCK CONSTRUCTION APPLICATION Applicant Name: Project Site Address: E/ 0 T4 1� LM CITY CHECKLIST Applicant address, phone number +cam 1-3 Agent name, address, phone number (if applicable) Project site address Assessor's parcel number Project site latitude and longitude Description of proposed work (project must not deviate from the Standard Drawings) Type of construction material used (concrete, wood, steel etc... ): Scaled drawings (plan view and cross sectional view) ® Site address ® Location within the Harbor ® Location and dimensions of existing dock structure Location and dimensions of proposed dock structure ® Location and dimensions of existing dock structures on adjacent properties Location of Bulkhead, Pierhead and Project Lines Photo(s) of project area at low tide (including 30' buffer area) 829 Harbor Island Drive, Newport Beach, CA 92660 PH: (949) 644-3044 FX: (949) 723-0589 *Website: www.newport-beach.ca.us/HBR/ Dock Construction Application City Checklist Page 2 Eelgrass Survey ® Survey for presence of eelgrass within 30' of the entire project area ❑ Yes K No Eelgrass within 15' of entire project area. Project not permitted. ❑ If any eelgrass is located greater than 15' from the project area, then no further monitoring required. ® Caulerpa Survey ® Survey for Caulerpa within 30' of the project area Project is over (check one box): X City Tidelands ❑ County Tidelands (State Lands Commission Dredge Lease Approval) ❑ If applicable, check one box: ❑ The Irvine Company owner's approved area ❑ Bay Island owner's approved area ❑ Dover Shores owner's approved area ❑ Linda Isle owner's approved area �1 Completed Worksheet for Building /Fire Permit Application and proof of payment of Building Department fees Check for $60 made payable to Santa Ana Regional Water Quality Control Board Signed application AIC -City approved Approval in Concept HARBOR RESOURCES DIVISION 829 Harbor Island Drive Newport Beach, CA 92660 (949) 644-3044 / Fax (949) 723-0589 HARBOR PERMIT/APPROVAL IN CONCEPT HARBOR PERMIT/APPROVAL IN CONCEPT BY THE CITY OF NEWPORT BEACH as required for permit application to the South Coast Regional Commission pursuant to California Administrative Code, Sections 13210 and 13211. General Description of Proposed Development: Remove and replace existing dock structure. Install new floating dock same size and shape as existing. Use existing pile in place. Address number must be stenciled on at least 1 bayward facing pile. Pier conditions must be signed by applicant prior to final approval. Property Address: 641 Via Lido Soud Legal Description: Harbor Permit Number: 172-641 Plan Check Number: 1009-2010 Applicant: Jennifer Cheng Applicant's Mailing Address: 641 Via Lido Soud, Newport Beach, CA 92625 Phone Number: (949) 631-3121 I have reviewed the plans for the foregoing development including: 1. The general site plan, including any roads and public access to the shoreline. 2. The grading plan, if any. 3. The general uses and intensity of use proposed for each part of the area covered in the application. page 1 of 2 And find X They comply with the current adopted Newport Beach General Plan, Municipal Code, Title 17 and any applicable specific or precise plans or, ❑ That a variance of exception has been approved and final. A copy of any variance, exception, conditional use permit or other issued permit is attached together with all conditions of approval and all approved plans including approved tentative tract maps. On the basis of this finding, these plans are approved in concept and said approval has been written upon said plans, signed and dated. Should Newport Beach adopt an ordinance deleting, amending or adding to the Municipal Code or other regulations in any manner that would affect the use of the property or the design of a project located thereon, this Approval In Concept shall become null and void as of the effective date of this said ordinance. In accordance with the California Environmental Quality Act or 1970, and state and local guidelines adopted thereunder, this development: X Has been determined to be ministerial or categorically exempt. ❑ Has received a final Exemption Declaration or final Negative Declaration (copy attached). ❑ Has received a Final Environmental Impact Report (copy attached). All discretionary approvals legally required of Newport Beach prior to issuance of a harbor permit and a building permit have been given and are final. The development is not subject to rejection in principal by Newport Beach unless a substantial change is proposed. This concept approval in no way excuses the applicant from complying with all applicable policies, ordinances, codes and regulations of Newport Beach. See attached Special Conditions. Lisa Walters, Harbor Resources June 22, 2010 Attachments: Worksheet for Building Permit Application Drawing Pier Conditions Page 2 of 2 HARBOR RESOURCES DIVISION 829 Harbor Island Drive v.12-14-06 Newport Beach, CA 92660 (949) 718-1844 Fax (949) 723-0589 www.newport-beach.ca.us/hbr DOCK CONSTRUCTION APPLICATION Regional General Permit 54 CDP 5-06-117 & CC -031-06 Corps File No. 200501233 -DPS Water Board Consistency Permit Valid Until October 23, 2009 This Permit applies to residential dock construction projects only and includes pier, gangway, float and pile repair /replacement. Bulkhead work is not permitted under this Permit. Applicant Name, Address, Phone Number: �i,4/l ip g c k eAID tido Se vd G4 9 Z- 440 Agent Name, Address, Phone Number (if applicable): ©2� P14-f"ON Ove CO s4A- nl ts4 cel- 9'T � 6 '--7 Project Site Address: Assessor's Parcel Number: KI ViA Udo Sav Project Site: Longitude: - 1 1711( ( Latitude: 33.610 q Description of Proposed Work (Project Must Not Deviate from the City's Standard Drawings): F40A-01? l /tri D 0 CA -5 Steif i t Y�41. Regional General Permit 54 Dock Construction Application Page 2 Type of Construction Material Used (concrete, wood, steel including any chemical treatment etc...): I be 641 f'd s Please submit the following on a separate page. Use the check boxes to ensure a complete application is filed. Incomplete applications will not be processed. Scaled drawings of the project (plan view and cross sectional view) i_K- Site address FV' Location within the Harbor Location and physical dimensions of existing dock structure (float, pier, gangway, pile and bulkhead) F/ Location and physical dimensions ofproposed dock structure (float, pier, gangway, pile and bulkhead) F/ Location and physical dimensions of existing dock structures on adjacent properties F/ Location of Bulkhead, Pierhead and Project Lines F- Photo(s) of entire project area at low tide (including 30' buffer area), with emphasis on eelgrass VEelgrass Survey - Completed by a Certified Eelgrass Diver A. Survey for the presence of eelgrass within 30' of the entire project area B. If eelgrass is within 15' of project area, then the project will not be permitted. (An Individual Permit must be sought.) C. Any eelgrass must be located greater than 15' from project area • No further eelgrass monitoring is required Caulerpa Survey - Completed by a Certified Caulerpa Diver A. Survey for Caulerpa within 30' of the project area Project is over (check one box): (��City Tidelands F County Tidelands (State Lands Commission Dredge Lease Approval) F If applicable, check one box: The Irvine Company owner's approved area f� F Bay Island owner's approved area Dover Shores owner's approved area Linda Isle owner's approved area Regional General Permit 54 Dock Construction Application Page 3 Completed Worksheet for Building/Fire Permit Application and proof of payment of Building Department fees Check for $60 made payable to Santa Ana Regional Water Quality Control Board I, M�— (Applicant / Agent), hereby certify that the information on this application is accurate and complete. I also certify that I have read the California Coastal Commission Permit 5-06-117 & Federal Consistency Certification CC -031-06, the Army Corps of Engineers Regional General Permit 54 (File No. 200501233 -DPS) and the California Regional Water Quality Control Board General Certification for Regional General Permit No. 54 for construction in Newport Harbor and that I will comply with all of the conditions in those permits. I also certify that by acceptance of this Permit, the applicant acknowledges and agrees that the site may be subject to hazards from waves and erosion. I will further hold the City of Newport Beach harmless from and indemnify the City against any claim for damages arising out of the exercise of these permits. In addition, I shall reimburse the City of Newport Beach for all attorney's fees and other costs expended by them in defending any claim, lawsuit, or judgment arising out of the activities of the applicant carried on under the authority of such Permit. I understand that any work authorized must be completed by October 23, 2009, after which a new authorization is required. Per the RGP Permit, all dock construction applications will be processed by the various agencies through monthly batch submittals sent to them by Harbor Resources. Therefore, all dock construction applications must be submitted to and received by Harbor Resources by the I" Monday of every month. Applications submitted prior to this deadline are encouraged and appreciated. Applicant and / 5-P Date Worksheet for Building Combo Permit Anplication Po City of Newport Beach - Building Depart r*ARBOR RESOURCES Please print 3 copies F— Grading r7lDrainage f— Elec r-. MQP,9JxWPORT BE 1. Project Address (Not mailing address) -neCK Appropriate IJOX Tor Applicant 3. Owner's Name Last ............ A First .................................. . .. ......... ..................................... .................. Owner's Address Owner's E-mail Address . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ----------- .............. A W.0 .................... ------ Zip Telephone City State __�7 F C -- .. .. ..... ... ........ ............ .............. ........... .... . ........ .............. ........................ I I .............. ............................. ........................................ [7 4. Architect/Designer's Name Architect/Designer's Address City I Last First ......................................... ............................ Lic. No. itect/Designer's E-mail Address ..... . ........ State zipTelephone . .. . . ............. ........ ............................ .............................. Lic. No. F7 6. Contractor's Name Last FirstF_ lass ............................................................................................. . .. ..... k.p ..................... Contractor's Address Contractor's E-mail Address Z [—,� PiQC ..........o Z. ....... . .. ... ............................ [ ........................ ........................ .... . . ........ ... .... .......... .... . ....... ...................... ........ .............................. City ...... ............. .......... State Zip Telephone ....u..........................UN .SV .._1 OFFICE USE ONLY ENERGY P/C FEE $ GRADING P/C FEE $ PERMIT NO. PLAN CHECK NO. % f -D /,`0 Rev IIIRI07 ELEC/MECH/PLUM P/C PLAN CHECK FEE $ /A __ d --------------- - -- .. .... . ... .. . ...... .1 ................................. Tenant Name(if Applicable) . ... .. . .......................................... .................. .. . .. .... .............. .... # Units (if Residential) 2. Description of Work Use 1)2- [_ 1� r-1044'ttl N&lc` 1-1'/(a 612 : ............ I ............ - ...................................... Exist House SF .............................. ............................................................ Demo House SF .. ..... ........... ........ .................................. ................................ Add/Reconstruct House SIF ...... ........... Valuation $ . ............... ..................... . Exist Gar SF F77 Demo Garage SF F777 Add/Reconstruct Garage SF ........................... .............. # Stories F7 .................................................. New 17 Add Alter [—.Demo TOTAL HOUSE SF ............. . Cu Yd Cut F77 TOTAL GARAGE SIF ....... ........... Cu Yd Fill .... F77 -neCK Appropriate IJOX Tor Applicant 3. Owner's Name Last ............ A First .................................. . .. ......... ..................................... .................. Owner's Address Owner's E-mail Address . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ----------- .............. A W.0 .................... ------ Zip Telephone City State __�7 F C -- .. .. ..... ... ........ ............ .............. ........... .... . ........ .............. ........................ I I .............. ............................. ........................................ [7 4. Architect/Designer's Name Architect/Designer's Address City I Last First ......................................... ............................ Lic. No. itect/Designer's E-mail Address ..... . ........ State zipTelephone . .. . . ............. ........ ............................ .............................. Lic. No. F7 6. Contractor's Name Last FirstF_ lass ............................................................................................. . .. ..... k.p ..................... Contractor's Address Contractor's E-mail Address Z [—,� PiQC ..........o Z. ....... . .. ... ............................ [ ........................ ........................ .... . . ........ ... .... .......... .... . ....... ...................... ........ .............................. City ...... ............. .......... State Zip Telephone ....u..........................UN .SV .._1 OFFICE USE ONLY ENERGY P/C FEE $ GRADING P/C FEE $ PERMIT NO. PLAN CHECK NO. % f -D /,`0 Rev IIIRI07 ELEC/MECH/PLUM P/C PLAN CHECK FEE $ /A __ Printing: Layout Page Page 1 of 1 http://www6.city.newport-beach.ca.us/nbmap/layout.aspx 5/25/2010 5/25/2010 Printing: Layout Page % ,I k5l A 2a newport-beach.ca.us/.../layout.aspx 1/1 2726 Shelter Nsland Dr. San Diego rfK S mac . 3 ' mss 8 0 1 236-0013 s (800) 225-9730 t„F,0 07 June 2010 To: Mr. Brady Helm Swift Slips 2027 Placentia Avenue Costa Mesa, CA 92627 Re: Preliminary Eelgrass _.- r_ Residence,641 Via Lido Newport Dear Mr. Brady Helm, Attached is the preliminary Eelgrass (Zostera marina) survey as well as a Caulerpa Survey Reporting Form for the dock replacement project at the Cheng residence, 641 Via Lido Soud. No Caulerpa was observed, and no eelgrass was present in the general vicinity of the project area. As you know, this preliminary report was required in accordance with the Southern California Eelgrass Mitigation Policy (SCEMP) since eelgrass is widely distributed throughout the Newport Bay. This policy protects an important marine habitat, seagrass beds, which provide habitat and food for adult and juvenile marinelife such as halibut, lobster, seabirds and even endangered sea turtles. Responsible development by homeowners and contractors like you help to protect these sensitive marine ecosystems here in southern California, contributing to the greater challenge of protecting our ocean resources. We appreciate the opportunity to work with you. If you have any questions, please do not hesitate to contact us at any of the numbers below. Sincerely, t, Kira Withy -Allen & Richard Mann WSSI Environmental Consulting & Monitoring 2726 Shelter Island Dr. San Diego, CA 92106 kirawithyallen@wssica.com; mann@wssica.com (800) 236-0013 Office Swift Slip Dock & Pier Builders, Inc. Costa Mesa, California Preliminary Eelgrass Survey 07 June 2010 Report Prepared By Kira Withy -Allen Survey Conducted By Kira Withy -Allen and Molly Colvin �°c, '�, Y'.`s�k `✓"� � a ��� `^�,%. Asa'`?/� Results No eelgrass (Zostera marina) nor Caulerpa sp. was observed in the surveyed area. The depth ranged from shoreline to 9 ft throughout the surveyed area. Water temperature was 68° F (20°C). Depth adjustments based on local tide information: s.0 4.0 3.0 e e t 2.0 i.0 0.0 2:34 AIM 3.5'I 9:35 AM 0.9 << spay rri, jinn 4, 2010 j Day > > 4:45 PM 4,0 11,05 PU! 23 Discussion The absence of eelgrass was not unexpected, given the poor light penetration in the vicinity of the area. No impact to eelgrass is expected with the replacement of the existing dock. WS �Q r-� � > a. l§ ..O d rSan Diego CA 92106 fir" ^ ( 8 P0) 236-0013 - (8 0 0) (fax) . Site Photos 2726 WS Shelter Island Dr. San Diego CA 92106 S 1 (800) 236-0013 - (800) 225-9730 (fax) 2726 Shelter Island Dr. WS S 1 San Diego CA 92106 (800) 236-0013 - (800) 225-9730 (fax) Current and Proposed Dock Layout 06/01/2018 13:56 9496313122 ,I r SWIFTSL2PDpCKPIER PAGE 04105 Caulerpa Survey Reporting Form This form is required to be submitted for any surveys conducted for the invasive exotic alga Caulerpa taxifolia that are required to be conducted under federal or state permits and authorizations issued by the U.S. Army Corps of Engineers or Regional Water Quality Control Boards (Regions 8 & 9). The form has been designed to assist in controlling the costs of reporting while ensuring that the required information necessary to identify and control any potential impacts of the authorized actions on the spread of Caulerpa. Surveys required to be conducted for this species are subject to modification through publication of revisions to the Caulerpa survey policy. It is incumbent upon the authorized permittee to ensure that survey work is following the latest protocols. For further information on these protocols, please contact: Robert Hoffman, National Marine Fisheries Service (NOAA Fisheries), (562) 980-4043, or William Paznokas, California Department of Fish & Game, (858) 467-4218). Report Date: 07 June 2010 Name of bay, estuary, lagoon, or harbor: Newport Bay Specific Location Name: (address or common 641 Via Lido Soud, Newport Beach, CA reference) Site Coordinates: (UTM, Lat./Long., datum, N 33.610261 Lat accuracy level, and an W 117. 915594 Long electronic survey area map or hard copy of the map must be included) Survey Contact: (name, hone, e-mail) Kira Withy -Allen, 619-246-1597 Personnel- Conducting Survey (if other than Kira Withy -Allen & Molly Colvin, above): (name, phone, kirawithyallen@wssica.com e-mail Permit Reference: pending (ACOE Permit No., RW CB Order or Cert. No.) Is this the first or second First survey survey for thisproject? Was Caulerpa Detected?: (if Caulerpa is found, please Yes, Caulerpa was found at this site and immediately contact NOAA Fisheries or CDFG personnel identified above) has been contacted on date. XXX No, Caulerpa was not found at this site. 6 Description of Permitted Work: A new dock will replace the existing dock. No (describe briefly the work to changes will be made to the original dock be conducted at the site layout (please see proposed dock layout in under the permits identified above) attached eelgrass report.) Description of Site: range:1-q feet -Depth Substrate e: silty sand & mud (describe the physical and biological conditions within the Temperature: 68 deg F survey area at the time of the survey and provide insight into variability, if known. Please Salinity: Dominant flora: none provide units for all numerical information). Dominant fauna: Perch Exotic species encountered none (including any other Caulerpa species): Other site description notes: none Description of Survey • Efforttime • Survey date and 04 June 2010 12:00 PM Horizontal visibilityin water: 3 feet (please describe the surveys conducted including type of Survey type and methods: Two divers conducting belt survey (SCUBA, remote video, etc.) and survey methods employed, date of transects on SCUBA work, and survey density (estimated percentage of the bottom actually viewed). Survey personnel: Kira Withy-Allen & Molly Colvin Describe any limitations encountered during the survey efforts. Survey density: none found Survey limitations: none Other Information: Please see attached eelgrass report for further (use this space to provide additional information or information. references to attached maps, reports, etc.) Caulerpa Survey Reporting Form (version 1.2, 10/31/04) _..... . _ m«>w. .. . . ^ W.+"4" + r 2 , \v\� a■q# .. .� ���42� � ���/�\�-�� 2� The Dock Co., Inc. Vr`e ?re a licensed qua` ty dOck- sOrvsce company stablished 1979 All perk guaranteed. €cense nA=506714 nice F. Fenton VICE PRESIDENT 7 843.6798 1e835 Algonquin, I Sulte 416 ® Huntington Bea; h: CA 92649 rv. ADDRESS. _ - Cy f 4- TELEPHONE NO. FETE HECK NO. DATE Arlo �7® ROVED BY: DATE APPLICATION IS HEREBY MADE FOR A. HARBOR PERMIT TO. D R AT THE ABOVE LOCATION IN ACCORDANCE WITH THE CITY OF NEWPORT BEACH PERMITK C J�POLICIES AND THE ATTACHED DRAWING VCIL. EllBY / bO%/U� COMPANY .IC WORKS Moo''DATED OW._ DATE :CTION GAL CONDITIONS: M� becA eo roc a, 'V r OA i Cl r Y oF` /VEmwaer dexcH r 4,,,g aroch a +r(a 0orb Or 0/ N - V Q9 [s w w "41-0r O?" B_+` o K TQ B �tCOA PI 1 �: /.4615 Q�9 C% 1I II li � COteNw i� 0 U 7[t 7 wisr �srrr Cwsr Vil C I ill I TY S K F T C W ,r I A �1,00 .SOUSE N�;wPoRr 8.iy CALIFORNIA y! / � ferry A—WILACSw Soundings are er/0ressed /n f'ee's' and ddnofe dep th s below IL-7eor7 LO wer Low Wafer. /vlox/s m C 7- AIR 907 ro'"ge of fideopprox/rno�e/y !D ��ef Hor6or 4r 7cs ore eafohh'shed in �h:S • 5 e C Ar on of Newporf Say: 13 C l 00 _ 1'p.S'L I 1-::,L 141V CX �XISTlNFr �( ,eyLE � /l-�dl fsIE2 P< o PIDSE c � I �QoPosE.� YlnuiN4 0,., G 3iY9cv F I Rk CoNY`FGe,,F-O j36s.!( I , , s 1 g F }' M."c- Exlsrl11 1 i5'6Ai.F,yb LIN _ I (i(1 A-LLq-eE t- �7`�.,vn+�6�,1! Gel�F,✓G PL / c,4.v is G o r 13 B c,e, 7-,ZA cr q o 6N[ v,*Cc©la Sassy r*F_ boc4a 'Co --Ne 17� --6 �( �F W Pn Q CITY OF NEWPORT BEACH V = P.O. BOX 1768, NEWPORT BEACH, CA 92658-8915 IFOFLC�`r December 8, 1988 Newport Center Escrow 2430 West Coast Highway Newport Beach,CA 92663 Sirs: The City of Newport Beach has received an application to transfer Pier Permit 0172-641-1 for the property located at 641 via Lido Soud, Newport Beach. The structure was inspected on December 8, 1988, at which time it was determined that it conforms to the City Standards. Upon receipt of the $260.00 transfer fee and the completed and signed transfer forms, this pier permit will be transferred as requested. Sincerely, Tony Melum Tidelands Administrator 3300 Newport Boulevard, Newport Beach --.:�_ zaa d'*.< i.: _ _ a _' _ ._ IS' _._ �F •_s +Pi d __- - i - � - � �± �.�[. F��`��h'21a E !��JS-_ �_ _. ss+ s-esa� a. �... xd,+leCc s...x ..� �:w��u..�. _-..tT✓.�..c... � . - .e uv_.wc - .....c+eu.+_�..�._--.....,... t.d.-..d ..� _..�_s_. � ,.....s.r � ,. � - ..i/1 .� .�...... - r � ' STATUS SHEET \�. ► HARBOR PERMITS cl e),'I TRANSFER to LOCATION <D �`� �� I c,. () .j �— ._i a"�.__ PERMIT;kq Sel ler Buyer� Date Application Rec'v: Date Fee Rec'v: Oral Request for Inspection Escrow Co.yV �4��4(• l.ri'�� �.: +� I✓'DatF1-- ' ®i Escrow Officer �� _ Escrow _ _Date Inspection Made Date Deficiency Letter Sent (if applicable) Date Deficiency Corrected (if applicable) __— Date Orange County Notified (if applicable). Date Transfer Completed 1. Location: 2. 3. Electrical:-6� 4. Strut tural :_ REMAIlKS: f I J Inspector's Initials O� SEW Ppb ` - 1� CITY OF NEWPORT BEACH U = P.O. BOX 1768, NEWPORT BEACH, CA 92658-8915 FRN December 5, 1988 Bill Feeney Waterfront Homes 2435 West Coast Highway Newport Beach, CA 92663 Dear Sirs: The City of Newport Beach Marine Department has received a request to transfer pier permit #0172-641 for the property located at 641 Via Lido Soud, Newport Beach, CA. The facility was inspected on November 28, 1988. We cannot transfer the pier permit until the folowing deficiency(ies) has/have been corrected and WE HAVE BEEN NOTIFIED OF THE CORRECTION: 1. A City approved anti -syphon device is required at the water connection to the pier and float. 2. Electricity should be in conduit. The City Harbor Permit Policies state: 10.D. "At the time of transfer, all harbor structures shall be inspected for compliance with the City's minimum plumbing, electrical and structural requiremenmts, and the conditions of the existing permit. All structural deficiencies must be corrected prior to transfer of the permit." A permit for plumbing or electrical work must be obtained from the Building Department of the City. PLEASE ADVISE THIS DEPARTMENT WHEN THE ABOVE DEFICIENCIES HAVE BEEN CORRECTED. When we have been notified, the structure will again be inspected and when the requirements have been met the pier permit will be transferred. You can telephone 714-644-3044 to request a reinspection of the structure. If you have questions, please call this number, Since-,ely, Tony,:, �um.,-..,Tidelands Administrator 3300 Newport Boulevard, Newport Beach