HomeMy WebLinkAbout08 - C-3453 - West Newport Sewer Main ReplacementJune 25, 2002 CITY COUNCIL AGENDA ITEM NO. 8 TO: Mayor and Members of the City Council FROM: Public Works Department SUBJECT: WEST NEWPORT SEWER MAIN REPLACEMENT, CONTRACT NO. 3453 — COMPLETION AND ACCEPTANCE RECOMMENDATIONS: 1. Accept the work. 2. Authorize the City Clerk to file a Notice of Completion. 3. Authorize the City Clerk to release the Labor and Materials bond 35 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code. 4. Release the Faithful Performance Bond 1 year after Council acceptance. 5. Approve Amendment No. 1 to the Professional Services Agreement with Engineering Resources for additional as- needed construction support services from $28,163 to $43,208 and authorize the Public Works Director to execute the Amendment. DISCUSSION: On September 25, 2002, the City Council authorized the award of the West Newport Sewer Main Replacement contract to A.D. General Engineering of Burbank, California. The contract provided for the emergency replacement of approximately 300 feet of sewer that had collapsed within West Coast Highway near Cappy's Restaurant. The Contractor had significant difficulty installing the sewer line because of depth and groundwater conditions. As a result, portions of the sewer lines needed to be re- constructed at the Contactor's expense. Despite the reconstruction effort, three of the sewer line joints had infiltration from the groundwater. These portions will be lined - at the Contractors expense, as part of the recently awarded sewer lining project. Other than the completion of the sewer lining project, this contract has been completed to the satisfaction of the Public Works Department. A summary of the contract cost is as follows: Original bid amount: $114,540.00 Actual amount of bid items constructed: 114,723.00 Total amount of change orders: 1,971.91 Final contract cost: $116,694.91 SUBJECT: West Newport Sewer Main Replacement, Contract No. 3453 - Completion And Acceptance June 25, 2002 Page 2 Two change orders were executed for the project. The first change order totaling $23,933.91 compensated the contractor for excess groundwater conditions and slurry backfill and additional paving requested by the City Staff. The Contractor was also charged for overtime inspection per the contract, which was shown as a deduction on the first change order. The second and third change orders totaled a deduction of ($21,962) for repayment by the contractor for damages to landscaping, inspection cost for the re- construction effort, and compensation to the City for the required lining of the Coast Highway portion of the new sewer main. Net change orders were $1,971.91, or 1.72 percent over the original contract amount. Funds for the project were expended in the following account: Description Account No. Amount Sewer Main Master Plan Improvement 7531- C5600292 $ 116,694.91 Because of the emergency nature of this work, Engineering Resources was contracted to perform design survey as well as construction inspection and support services. Due to the problems involved with this contract, the inspection effort exceeded the original approved contract amount. Attached is Amendment No. 1 to Engineering Resources' Professional Services Agreement for additional construction support efforts. Approximately half of the inspection costs are paid for by the contractor through the deductive change order described above. A total of $24,847 is needed to accomodate Amendment No. 1. Funds are available from the contingency balance of this project in Account No. 7531- C5600292 in the amount of $12,845.09 and an additional $12,001.91 is available in Account No. 7533 - 05600339. Pursuant to Council Policy this Amendment to the original Professional Services Agreement requires approval by the City Council. Respectfully submitted, By: DEPARTMENT G. Badum, Director J. SinacoYl, P.E. I Civil Engineer AMENDMENT NO. 1 TO PROFESSIONAL SERVICES AGREEMENT FOR AS- NEEDED ENGINEERING AND CONSTRUCTION SUPPORT SERVICES THIS AMENDMENT NO. 1 TO PROFESSIONAL SERVICES AGREEMENT, entered into this _ day of June 2002, by and between the CITY OF NEWPORT BEACH, a municipal corporation, (hereinafter referred to as "CITY ") and Engineering Resources of Southern California, Inc., whose address is 3550 E. Florida Avenue, Suite B, Hemet, CA 92544, (hereinafter referred to as "Consultant'), is made with reference to the following: RECITALS: A. On , September 24, 2001, CITY and CONSULTANT entered into a Professional Services Agreement, hereinafter referred to as "AGREEMENT ", for As- Needed Engineering Construction and Support Services for a not -to- exceed fee $20,000. B. On November 19, 2001, the CITY increased the not -to- exceed compensation to from $20,000 to $28,163 for additional inspections services. C. CITY desires to enter into this AMENDMENT NO. 1 to further increase compensation from $28,163 to $43,208. D. CITY and CONSULTANT mutually desire to amend AGREEMENT, hereinafter referred to as "AMENDMENT NO. 1 as provided here below. NOW, THEREFORE, the parties hereto agree as follows: 1. Except as expressly modified herein, all other provisions, terms, and covenants set forth in AGREEMENT shall remain unchanged and shall be in full force and effect. IN WITNESS WHEREOF, the parties hereto have executed this AMENDMENT NO. 1 on the date first above written. APPROVED AS'TO FORM: By: Robin Clauson Assistant City Attorney CITY OF NEWPORT BEACH, A municipal corporation L-YA Stephen G. Badum, Public Works Director City of Newport Beach ENGINEERING RESOURCES, INC. F :IUSERS1PBVASharedWgreements%Fy 01 -02\Engineedng Resources Amendment 1.doc