Loading...
HomeMy WebLinkAbout13 - C-3566 - Buck Gully Sewer By-Pass Siphon AbandonmentOctober 8, 2002 CITY COUNCIL AGENDA ITEM NO. 13 TO: Mayor and Members of the City Council FROM: Public Works Department SUBJECT: BUCK GULLY SEWER BY- PASS /SIPHON ABANDONMENT - AWARD OF CONTRACT NO. 3566 RECOMMENDATIONS: 1. Approve the plans and specifications. 2. Award Contract No. 3566 to Albert W. Davies for the Total Bid Price of $87,810, and authorize the Mayor and the City Clerk to execute the contract. 3. Establish an amount of $8,700 to cover the cost of unforeseen work. 4. Authorize a Budget Amendment appropriating $96,510 from the unappropriated Wastewater Fund Balance to Account No. 7531- C5600292 DISCUSSION: At 2:00 P.M. on the 30"' of September, the City Clerk opened and read the following bids for this project: BIDDER TOTAL BID AMOUNT Low Albert W. Davies, Inc. $87,810.00 2 GCI, Inc. $114,800.00 3 Caliagua, Inc $177,895.00 4 Paulus Engineering, Inc. $185,065.00 A mandatory pre -bid meeting was held for this project to discuss the difficult terrain at the location and the coordination necessary with the construction of a new house adjacent to the site. Although seven contractors attended the pre -bid meeting only four chose to submit a bid for this project. The low total bid amount is 8 percent below the Engineer's Estimate of $95,000. The low bidder, Albert W. Davies, possesses a General Contractor's "A" contractor's license as required by the project specifications. Albert W. Davies is currently working on the Dover Drive Zone II Water Transmission Main Replacement and Street Rehabilitation and has completed several similar projects successfully for other local public agencies. SUBJECT: BUCK GULLY SEWER BY- PASS/SIPHON ABANDONMENT - AWARD OF CONTRACT NO. 3566 October 8, 2002 Page: 2 PROJECT DESCRIPTION The sewer system within the Shorecliffs community is served by two crossings under Buck Gully, the main siphon and a bypass siphon, which convey flow to the Buck Gully Sewer Pump Station. The main sewer siphon crossing Buck Gully was replaced after the last El Nino storms. The Buck Gully sewer siphon bypass also crosses Buck Gully upstream of the main siphon crossing. Storm and urban runoff over the past few years have slowly exposed the City's bypass sewer siphon. In addition to serving as an alternative method of conveying sewer flows during the maintenance of the main sewer siphon and pump station, the by -pass siphon also serves five homes along Evening Canyon Road. During the re- construction of the main siphon, the bypass was used to serve the entire community during construction. Recently, we also used the bypass during construction activities on the Buck Gully Pump Station. Since the bypass sewer is currently exposed and may be subjected to damage and potential sewer spills during this winter's storm flows, staff has designed an alternate sewer piping scheme to service the five homes and take the current bypass line out of service. This project will mitigate the current environmental concerns in the short term and provide staff adequate time to plan on a future replacement scheme for the bypass sewer. The proposed project calls for the installation of approximately 200 feet of 8 -inch sewer main in new easements along Evening Canyon Drive. Some of the new main will be tunneled to minimize disruption to residents' backyards. The remaining portions of sewer main will be installed by open cut construction methods. The sewer will re -route the services from five homes that currently drain to the bypass siphon, and connect them to the main siphon line. The by -pass (exposed in two places within the creek bottom), will remain in place, but be out of service. A future bypass sewer replacement and Buck Gully erosion repair /stabilization project may take place if the City is successful in securing outside grant funding. The project will be constructed in concert with a new house at 219 Evening Canyon Road. The property is cleared and in the initial stages of re- grading. The homeowner's contractor will allow the City access to construct the sewer main. PROJECT SCHEDULE AND FUNDING The project will begin upon City Council's approval and the acceptance of the new easements.by the City Manager and should be completed in approximately one month. The aggressive schedule is being set to minimize disruptions to the current residents, to coordinate with the new residential construction at 219 Evening Canyon, and to ensure completion before the winter storm season. City staff is currently preparing documents to secure easements for the realignment of the sewer through three properties. The three affected property owners have agreed to provide these new easements to expedite the project. No work can begin until the easements are accepted by the City Manager in accordance with Resolution 92 -82. The summary vacation of the former easements will be submitted to Council for approval at a later date. 2 SUBJECT: BUCK GULLY SEWER BY- PASSISIPHON ABANDONMENT -AWARD OF CONTRACT NO. 3566 October 8, 2002 Page: 3 Staff recommends the City Council 1) approve the plans and specifications; 2) award Contract No. 3566 to Albert W. Davies for the Total Bid Price of $87,810, and authorize the Mayor and the City Clerk to execute the contract; 3) establish an amount of $8,700 to cover the cost of unforeseen work; and 4) authorize a Budget Amendment appropriating $96,510 from the unappropriated Wastewater Fund Balance to Account No. 7531 - 05600292. WORKS DEPARTMENT G. Badum, Director Miofiael J. S'n�,a ori, P.E, Principal Civil Engineer Attachment: Project Location Map Bid Summary H F S Z U W S W m Q �a LLI IL 3x W ce E LL.3 OV U m CL CL o$ 8.. 0 °o $°O, o n o o O q w p o c < m Q m w $o o m o 0 0 o m 0 0 0 0 0 0 0 0 0vi vi$000$0 m .. $ o 0 0 0 0 o m o F o m 0vvi P$°n iti Z$ v m n m p° N m N~ m M P N m Q A P IO O O S O O$ O O �.$K $0 O~ .. va-7 PrvM ry °o °° 0 °O, $ $ °O °O °o �+ tl f O O M88888- r v Z S N $ 0 V1 O N ry VI O C 0 P M m m M P N P ry IR o p B 2 c Q W S M P O VI S N A Vl Z p ll Z P N OJ VI O Y V1 V1 N O O •- p M m J d < A O > Q m m ° 3 o m o 0 0 0 0 m o o m$$ o 0 0 0 w r o 0 0 d 0 0 0 $ $ 0 0 0 0 4 Z P N P 4°!1 O n VI V1 VI p ��n P I-. °O $$°n$ $°oo Z o P o00 00 min q O Vf m M O VI O� V1 Vf N O L w Q m °Z$° �oo Li $oUlW Ln LA 0 d N O m � LLJ LLJ w O N E H D EE o N L P a a _ m Z b u u q d p `w E E m v` u F & m $ c 2 1 m f W d m �^ O 1y_% m O�< W^z G K f W �wG faA.MB��<�s N L) w a . �O� ci z I = U Q a z Cl) v O W o �- n. � 0 Cl) cNU 0 S z v Cl) Q ~ J N L O m cu } N O n. m O ti O C) f U o \1 CO O LU w z 1 a Q W Z3:3: U ° } �Z ti ��� U oir Q n. d z a CO j > ti m > Lu S / W W s zz J ❑ (D Q (D ca L Z Y Q QC \ m� go m City of Newport Beach BUDGET AMENDMENT 2002 -03 EFFECT ON BUDGETARY FUND BALANCE: Number 7531 Sewer Main Replacement Increase Revenue Estimates fq Number Increase Expenditure Appropriations Number Transfer Budget Appropriations SOURCE: Number Number from existing budget appropriations PX from additional estimated revenues Number from unappropriated fund balance EXPLANATION: NO. BA- 018 AMOUNT: $96,510.00 Increase in Budgetary Fund Balance AND X Decrease in Budgetary Fund Balance No effect on Budgetary Fund Balance This budget amendment is requested to provide for the following: To increase expenditure appropriations related to the Buck Gully Sewer By- Pass/Siphon Abandonment - Award Contract No. 3566. ACCOUNTING ENTRY: BUDGETARY FUND BALANCE Fund Account 530 3605 REVENUE ESTIMATES (3601) Fund/Division Account EXPENDITURE APPROPRIATIONS (3603) Division Account Division Account Division Account Division Account Division Account Signed: Signed: Signed: Amount Debit Credit Description Sewer Enterprise Fund Balance $96,510.00 Description f Administrative Approval: City Manager City Council Approval: City Clerk Director $96,510.00 /10- /,-c,) Z Date Date Date Description Number 7531 Sewer Main Replacement Number 05600292 Sewer Main Mstr Plan Improvement Number Number Number Number Number Number Number Number f Administrative Approval: City Manager City Council Approval: City Clerk Director $96,510.00 /10- /,-c,) Z Date Date Date