HomeMy WebLinkAbout07 - C-3505 - CdM Community Youth Center Drainage RemediationOctober 22, 2002 CITY COUNCIL AGENDA ITEM NO. rI TO: Mayor and Members of the City Council FROM: Public Works Department SUBJECT: CORONA DEL MAR COMMUNITY YOUTH CENTER DRAINAGE REMEDIATION - AWARD OF CONTRACT NO. 3505 RECOMMENDATIONS: 1. Approve the plans and specifications. 2. Award Contract No. 3505 to Brongo Construction for the Total Bid Price of $64,650, and authorize the Mayor and the City Clerk to execute the contract. 3. Establish an amount of $6,500 to cover the cost of unforeseen work. DISCUSSION: At 11:00 A.M. on October 10, 2002, the City Clerk opened and read the following bids for this project: BIDDER TOTAL BID AMOUNT Low Brongo Construction $64,650 2 VCI Telecom, Inc. $81,840 3 Atlas- Allied, Inc. $102,370 The low total bid amount is 11.5 percent above the Engineer's Estimate of $58,000. The low bidder, Brongo Construction, Inc., possesses a General Classification "A" contractors license as required by the project specifications. Brongo Construction, Inc., has satisfactorily completed similar projects for the City. The work involved in this project involves: • Removal of sand • Construction of a PCC slab with rubberized surface and artificial turf • Installation of drain lines and inlets • Installation of a PVC sub -drain system with drain inlets • Restoration of turf SUBJECT: CORONA DEL MAR COMMUNITY YOUTH CENTER DRAINAGE REMEDIATION -AWARD OF CONTRACT NO. 3505 October 22, 2002 Page: 2 Consultants have previously determined that subsurface water and moisture buildup has caused continued warping of the floor in the Corona Del Mar Community Youth Center. The solution, as proposed by the City's Engineering Consultant, BV Engineering, has been to implement a corrective drainage system to divert subsurface; flow around the building and eliminate any sump conditions contributing to the buildup of subsurface waters. This will be accomplished by providing drainage in one sump /sand pit area, reconstructing an adjacent sump area /play area with concrete with a rubberized surface; and the construction of a sub -drain system in those areas around the Youth Center to facilitate the drainage of subterranean waters. Contractor is to provide surveying services. There are funds available in Account No. 7015- C4120324 for this project. Respectfully 3RKS DEPARTMENT Badum, Director By: 5�e� -7 "X Stephe Luy, PEE. Project Manager Attachment: Project Location Map Bid Summary 2 U a W m O a W Z LL O r �u H z W a W O Y O U_ J\ W (L 0 0 N O O J � W O ~ O � LU m 2 x F N U p 0 U E N O w N 0 s O Y `m -U U O = > 0 U Llj U Q J Q m O L J d N m m z 0 f W W 6- W a Z Q 0 K W f w C.) a w 0 a Z O K 0 v W J H H O O T O � O � O y GO y M N LLI � W H < wa C w W U Z W C7 O Z = wa m a 0000 0 0 0 O 0 0 0 0 0 ~ 9 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 0 0 0 0 m 0 o 0 m 0 � 0 O 0 o 0° o o (j 0 0 O O O r, O1 O O to 1 = O m an m N n M .-i w N m a N � Q O Q O 0 0 0 000 0000 '^ O O O O O O O O O O O 0 0 0 0 m o m N O O O D Q ZOO O O fn ON N 0 M O O 10 10 m to m an N N 0 0 0 0 O O O 0 0 0 0 0 0 0 0 O O O O o 0 o p �o *oao ooui m00000 z ON 0 ofmolo c;D * w N N * *m * C 0 a s & fh n a N & --� co m EQ O °o N y O O O O O O O O O O O �- 000.0. O O to 0 0 0 0 U N N m a I O 0 Z Z m a N O lO to a to ~ N a N to Z :D a a lD M --� N O O O O O O O O O O O O O O O O O O o 0 0 o p �- O O O O 0 0 0 0 0 0 0 0 = Z 0 0 0 0 w o o O1 O O O 4 0000 m a aoaa00 O N -a a -a N N -a N ~ U, N Q 0 U 0 O O O O O O O O O O O 0 0 0 0 999 9999 00 00 *00 *000 m Z O O O O -*ON N ~ N °O O D N a 1; J O O O O O O O O O O O 0 0 0 0 0 0 0 O O O O p X00 0 0 0 00 00000 .2z moo t[1 0 0 0 O O O 0 0 0 E oul m��00 M O h N V n du1 O N N N Ct W Q co � N v O O O O O O O O O O O O O O O O O O O O O O °o °00 °a WDouloul u°1 �mm0W M N �i J J J J J a W J (n as W W J H H N Q-a O°1 O N M D a N U O � C y c O a s Z M s E U Z O H t o m o 0 LL F u w o o U ` c c_ U N m U 0 t O c vi V 'O O A U y a m 'O m 'O y U N C O v'- m a u c c Z 5 2 t c c x x m c o c E 'ja v * m c c Z c E' C - v m O N� 0 C O 4I CD = a N = N � U N N � w-.Nma mw 00 0) H m a 107718 r - -- °{ PROJECT LOCATION cww.0 1 — /1 FF� HuN, OiF, a G � p�� Q 'uaetisJia ME�uc � r Q 0�� I Ej � C� � Li CC 171 — 426.1j, r N". rr�?!r � �-%mi bN C -3505 CITY OF NEWPORT BEACH DRAWN s ►- DATE PURL IC WORKS DEPORTMENT APPROVED 'od-/ ORNA DEL MAR YOUTH CENTER DRAINAGE REMEDEIATION DRAWING NO. EXHIBI'PA 4