HomeMy WebLinkAbout08 - C-3373 - Newport Blvd-Balboa Blvd Roadway & Storm Drain RehabilitationCITY OF NEWPORT BEACH CITY COUNCIL STAFF REPORT Agenda Item No. s December 17, 2002 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Fong Tse 949 -644 -3340 ftse@city.newport-beach.r-a.us SUBJECT: NEWPORT BOULEVARDBALBOA BOULEVARD ROADWAY AND STORM DRAIN REHABILITATION - AWARD OF CONTRACT NO. 3373 RECOMMENDATIONS: 1. Approve the plans and specifications. 2. Award Contract No. 3373 to Sully Miller Contracting Company for the Total Bid Price of $1,767,365, and authorize the Mayor and the City Clerk to execute the contract. 3. Establish an amount of $176,735 to cover the cost of unforeseen work and materials testing. DISCUSSION: At 11:00 AM on November 27, 2002, the City Clerk opened and read the following bids for this project: BIDDER TOTAL BID AMOUNT Low Sully Miller Contracting Company of Anaheim $1,767,365.00 2 All American Asphalt of Corona $1,881,532.00 3 Sequel Contractors, Inc. of Santa Fe Springs $1,882,200.00 4 Hillcrest Contracting, Inc. of Corona $1,890,404.00 5 GCI Construction, Inc. of Costa Mesa $1,993,750.00 6 Excel Paving Company of Long Beach $2,152,992.00 Upon a review of the bids, staff discovered that three (3) of the submitted bids contained clerical errors in their computations. The corrected actual bid amount (as denoted by and the bid standing are revised as shown below. Subject: NEWPORT BOULEVARDIBALBOA BOULEVARD ROADWAY AND STORM DRAIN REHABILITATION — Award of Contract No. 3373 Date: December 17, 2002 Page: 2 BIDDER Low Sully Miller Contracting Company 2 Sequel Contractors, Inc. 3 Hillcrest Contracting, Inc. 4 All American Asphalt 5 GCI Construction, Inc. 6 Excel Paving Company ACTUAL BID AMOUNT $1,767,365 $1,882,200 $1,890,404 $1,891,532* $1,994,950* $2,376,488* The low total bid amount is twenty -two percent below the Engineer's Estimate of $2,280,000. The disparity between the Engineer's estimate and the low total bid amount is mainly due to the lower Mobilization, Excavation, Glass Grid, and concrete prices bid. The low bidder, Sully Miller Contracting, possesses a General Engineering Classification "A" contractor's license as required by the project specifications. Sully Miller recently satisfactorily completed the City's similar Balboa Boulevard roadway and storm drain rehabilitation project from Medina Way to 12`h Street. The work, which includes both Newport Boulevard and Balboa Boulevard from 16"' Street to 261' Street, provides for the construction /installation of the following: • 242,000 square feet of roadway 100,000 square feet of Glasgrid pavement reinforcing fabric • 23,500 square feet of sidewalk 3,000 square feet of driveway approaches 3,000 linear feet of 2 -foot wide median gutter • 5,000 linear feet of curb and curb and gutter 15 curb access ramps 2,000 linear feet of storm drains 13 curb inlets 9 junction structures 1,000 linear feet of PVC irrigation piping stubs among other work items The storm drain improvements will replace an existing deteriorated 12 -inch diameter corrugated metal pipe below the existing medians; improve the drainage on Balboa Boulevard through the installation of new catch basins and reinforced concrete storm drain pipes; and eliminate the numerous ponding areas that result from storm and nuisance water. The roadway reconstruction will facilitate drainage by improving and correcting the cross slope of the roadway, eliminating problems associated with numerous trench and pavement settlements, pavement cracking, and uplifted concrete roadway slabs, and providing a smoother and quieter ride surface for the motorists. The existing sidewalks from 16` Street to 2151 Street will be widened along with the construction new concrete curbs and gutters. In addition, the existing Newport Boulevard eastbound curb and sidewalk between 23rd Street and 26`h Street along the City's "26`h Street Parking Lot" will be realigned to provide the necessary space needed to accommodate a new 2 -way turn -left pocket to improve traffic circulation and turning movements in the area. 2_ Subject: NEWPORT BOULEVARDIBALBOA BOULEVARD ROADWAY AND STORM DRAIN REHABILITATION — Award of Contract No. 3373 Date: December 17, 2002 Page: 3 In order to minimize inconvenience to the community, Sully Miller is required to complete all construction work and install temporary pavement striping within 100 workdays. After a 15 -day waiting period for the moisture of the new asphalt pavement to reach the desired level, Sully Miller will return to the site for approximately one week to install the permanent pavement striping and markings. Traffic control requirements stipulate the following: • At least one lane in each travel direction shall be maintained between 9 a.m. and 3 p.m. on workdays At least fifty- percent of the existing parking spaces and two lanes in each travel direction shall be maintained during non -work hours The traffic lanes and on- street parking spaces in the vicinity of the Mixmaster /McFadden Square shall remain open between 11 a.m. and 1 p.m. on work days so as to minimize inconvenience for patrons visiting the area restaurants This project was approved by the Orange County Transportation Authority for competitive Federal Arterial Highway Rehabilitation Program (AHRP) funds. The funding obligation and reimbursement from the Federal Highway Administration are processed through Caltrans. Environmental Review: Per Federal funding requirements, a negative archaeological and historic /cultural study and report was completed for this project. A categorical exemption was issued for the work. No other environmental reviews were required. Funding Availability: There are sufficient funds available in the following accounts for the work: Account Description Gas Tax Measure -M Tumback AHRP AB2928 Storm Drain Improvements Sidewalk and Curb and Gutter Prep b Fo Tse Associate Civil Engineer Attachments: Project Location Map Bid Summary Account Number Bid Amount Continaency 7181- C5100593 -0- $125,303 7281- C5100593 $413,022 -0- 7285-05100593 $514,321 $51,432 7191- C5100593 $363,000 -0- 7012- C5100008 $400,000 -0- 7013- C5100020 $77,022 -0- Total: $1,767,365 $176,735 Submitted Badum s Director O !Q U O H D v J > m J Q m m 2 LW�/ O � m U m m d C CDC a M si ch s 00 Z lS lS Q �oZ i Z Q M O 0 J NEWPORT �� rs Q g�J� 0\JO ogre m r J OP s Q 0 O�PG\ I- s � �S Y 1S 2 p w Z W A