HomeMy WebLinkAbout05 - C-3333 - Balboa Village Improvements Phase 1CITY OF NEWPORT BEACH CITY COUNCIL STAFF REPORT Agenda Item No. s December 17, 2002 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Bob Stein, P.E. 949 - 644 -3311 rstein@city.newport-beach.ca.us SUBJECT: BALBOA VILLAGE IMPROVEMENTS PHASE 1, CONTRACT NO 3333 — COMPLETION AND ACCEPTANCE RECOMMENDATIONS: 1. Accept the work. 2. Authorize the City Clerk to file a Notice of Completion. 3. Authorize the City Clerk to release the Labor and Materials bond 35 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code. 4. Release the Faithful Performance Bond 1 year after Council acceptance. DISCUSSION: On September 25, 2001, the City Council authorized the award of the Balboa Village Improvements Phase 1 contract to GCI Construction, Inc., of Costa Mesa, California. The contract provided for installing a storm drain system, installing a new water main, reconstruction of streets and sidewalks using special concrete materials, installing new streetlights, relocating and planting new trees, planting new landscape areas, and installing new street furniture. The contract has now been completed to the satisfaction of the Public Works Department. A summary of the contract cost is as follows: Original bid amount: $3,256,935.05 Addition of the Balboa Pier Parking lot per Change Order No. 1 185,468.76 Modified Original Bid Amount 3,442,403.81 Actual amount of bid items constructed: 3,232,652.50 Total amount of change orders Nos. 2 - 8 560,168.95 Final contract cost: $3,792,821.45 For this complex project, over one hundred design changes and field adjustments were made during construction resulting in eight change orders. SUBJECT: BALBOA VILLAGE IMPROVEMENTS PHASE 1, CONTRACT NO 3333 —COMPLETION AND ACCEPTANCE December 17, 2002 Page 2 Change Order No. 1, for approximately $192,000, added the reconstruction of the Balboa Pier parking lot and the two adjacent metered parking lots to the Village project. Change Order No. 2, for approximately $96,000, added landscape areas and changed the Pier parking lot gate equipment. Change Order No. 3, for approximately $40,000, was for a change in the Pier Plaza wall material from masonry block to cast -in -place white concrete. Change Orders Nos. 4 through 8 - totaling approximately $311,000, were issued due to unforeseen field conditions and design adjustments. Specific changes included: • Special traffic control measures during the holiday season and during spring break • Additional landscape and irrigation improvements • The Balboa Pier Plaza tree grates & up lights • Electrical system modifications • Installation of decorative bollards With the Balboa Pier parking lot reconstruction project (implemented through Change Order No. 1) included as part of the original construction cost, the final overall construction cost including Change Orders Nos. 2 through 8 was 16.24 percent of the modified bid amount. Funds for the project were expended in the following accounts: Description Balboa Village Water Main Water Distribution and Piping Sewer Manhole Replacement Balboa Village Plan General Fund Balboa Village Plan CDBG Balboa Village Off - Street Parking Balboa Village Neighborhood Enhancement Balboa Village Gas Tax Balboa Parking Lot Equipment Parking Lot Facilities Account No. 7501- C5500635 7501- C5500578 7533- C5600339 7013- C5100543 7161- C5100543 7022- C5100543 7024- C5100543 7181- C5100543 7231- C2370608 7231- C2370610 Total Amount $ 250,000.00 88,921.00 7,700.00 1,958,912.45 285,000.00 545,901.00 174,400.00 249987.00 40,000.00 192,000.00 $ 3,792,821.45 All work major work items were completed on May 31, 2002, the scheduled completion date. GCI Construction's punch list tasks were completed on October 18, 2002. Environmental Review: (Not applicable) Prepared by: Submitte by: Bob Stein, P.E. St6phen G. Badum Project Manager /ublic Works Director