YOU ARE INVITED TO COMMENT ON THIS APPLICATION FOR A PERMIT
APPLICAM Mr. George Reade, Jr.
1300 East Balboa Boulevard
Newport Beach, California .92663
APPLICANT'S AGENT: Mr. Steve Barrett
Gillis.and.Derby, Inc -
(714) 673-1630
ACTIVITY: Under Section 10 of the River and Harbor Act of 1899.to add a
15 -foot extension to an existing Wooden retaining wall at 1300 East Balboa
Boulevard, Lot 1, Block 21, Tract Eastside Addition, in Newport Bayp
Pacific ocean, city of Newport Beach, Orange County, California, as shown
on the attached drawing-
pURpOSE,AND USE, To reduce the rate of sand deposition immeditely to the
West of the wall.
FEDERAL, STATE AND LOCAL AUTHORIZATIONS: Approval has been received from
the City of Newport Beach. Permits or approvals will also be required
from the Water Quality Control Board -Santa Ana Region, and the California
Coastal Commission, prior to issuing the permit.
IMPACT ON HISTORIC PLACES AND NATURAL LANDMARKS: The proposed activity is
not near any of the sites listed in the National Register of Historic
Places or the National Registry of Natural Landmarks. Anyone having
knowledge of archaeological, scientific, prehistoric or historic materials
in the immediate area should contact this office during the comment
period. The permit (if issued) will include a condition that if
potentially significant findings are made during construction, work shall
be suspended immediately. The findings shall be reviewed and appropriate
action will be taken.
ENVIRON14ENTAL IMPACT: A Preliminary Environmental Assessment of the
proposed 15 -foot addition to the existing retainin&wall has determined
that some minor environmental impacts would result from the project -
During the construction phase of the proposed project, a temporary
decrease in both air and water quality may be.expected. Benthic organisms
in the projects immediate area would be eliminated; and some turbidity,
SPLCO-N
Mr. George Reads, Jr.
.Public Notice No. 78-1,9,5
2 February 1979
-which may adversely effect local fouling*.fauna, may be expected.
Observations of existing conditions indicate that the proposed addition to
the retaining wall would possibly cause further sand deposition
immediately to the east of :tbe.project sit.e (possibly interfering with .the
,.use of the neighboring dock's shoreward portion) and a reduction-of-sa'
.deposition on the west side.of-the,.proppse wall. nd
d
Beneficial aspects of the proposediprojeqt may be realized by a local
reduction of wave effects�:and :rAte_.of:saAd�deposition immediately to the
west of the wall resulting in decreased maintenance dredging for the
applicant.
The preliminary assessment�haa conclude . d that no significant adverse
impact upon the human enviro.nment�would result from this,project.
Therefore, at this time, an.',Environmental Impact Statement
to be required. does not appear
CRITERIA: Your written comments or objections should include the number
date of this notice and must reach -this office within thirty (30)
calendar days. The decision whether to issue a permit will be based on an
evaluation of the probable impact of the activity on the public interest.
That decision will reflect the national concern for both protection and
utilization of important resources. The benefit which reasonably may be
expected to accrue from the activity must be balanced a ainst
reasonably foreseeable detriments. .9 its
All factors which,may be relevant to
the activity will be considered;.among those are conservation,,economics,
aesthetics, general environmental concerns, historic values, fish and
wildlife values, flood damage prevention, land use classification,
navigation, recreation, water supply, water quality, and, in general, the
needs and welfare of the people. No permit-willbe
issuance is found to be in the public interest. granted unless its
FOR THE DISTRICT -ENGINEER:
S
Major, CE
Deputy�District Engineer
Cl r K cr Arwoaer &c-4cl-�,
Zl'
U -s' pl,,h..J
64Y 4VFHUE
CV -4 CI 7%6 D)
c
VICIMITY SKETCH
hi#�POgr LNAY, CALWO-NIA it,
5'0u�a"qs
a I ,, OA s belo� AI'D� L."e' Zo, hble'.
"A;s 5ecli"
ri n n
L/.S. 8ULKHEAC LINE
t4ow R4+QtmI*n3 Wo tj
ell P-xIs+jnj Re4a;nInq Wdill
I r 1.11
it
8/71-8a9 6OUILEVRRO
Georo�e Reaae Tr- ea -r B
OOE Balboa CoA.,rvAcrcAGI
-5C4 LE : I =50
O'l r -A
- - 1511
b. That all activities authorized herein shalt, if they involve, during their construction or operation, any discharge of pollutants into
waters of the United States or ocean waters, be at all times consistent with applicable water quality standards, effluent limitations and
standards of performance, prohibitions, pretreatment standards and management practices established pursuant to tile Federal Water
Pollution Control Act of 1972 (P. L. 92-500; 86 Stat. 816), the Marine Protection, Research and Sanctuaries Act of 1972 W.L. 92-532,
86 Star. 1052), or pursuant to applicable State and local law.
c. That when the activity authorized herein involves a discharge during its construction or operation, of any pollutant (including
dredged or fill material), into waters of the United States, the authorized activity shall, if applicable water quality standards are revised
or modified during the term of this permit, be modified, if necessary, to conform with such revised or modified water quality standards
within 6 mooths of the effective date of any revision or modification of water quality standards, or as directed by an implementat on
plan contained in such revised or modified standards, or within such longer period of time as the District Engineer, in consultation with
the Regional Administrator of the Environmental Protection Agency, may determine to be reasonable under the circumstances.
d. That the discharge will not destroy a threatened or endangered species as identified under the Iiinclaingered Species Act, or
endanger the critical habitat of such species.
a. That the permittee agrees to make every reasonable effort to prosecute the construction or operation of the work authorized
herein in a manner so as to minimize any adverse impact on fish, wildlife, and natural environmental values.
1. That the permittee agrees thathewill prosecute the construction or work authorized herein in a manner so as to minimize any
degradation of water quality,
9. That the permittere shall permit the District Engineer or his authorized r6presentative(s) or designers) to make periodic
inspections at any time deemed necessary in order to assure that the activity being performed under authority of this permit is in
accordance with the terms and conditions prescribed herein.
It. That tile permitter, shall maintain the structure or work authorized herein in good condition and in accordance with theplanSand
drawings attached hereto.
L That this permit does not convey any property rights, either in real estate or material, or any exclusive privileges; and that it does
not authorize any injury to property or invasion of rights or any infringement of Federal, State, or local laws or regulations nor does it
obviate the requirement to obtain State or local assent required by law for the activity authorized herein.
j. That this permit may be summarily suspended, in whole or in part, upon a finding by the District Engineer that immediate
suspension of the activity authorized herein would be in the general public interest. Such suspension shall be effective upon receipt by
the permittee of a written notice thereof which shall indicate (11 f the extent of the suspension, (2) the reasons for this action, and
(3) any corrective or preventative measures to be taken by the permittee which are deemed necessary by the District Engineer to abate
inernment hazards to the general public interest. The permittee shall take immediate action to comply with the provisions of this notice.
Within ten days following receipt of this notice of suspension, the permittee may request a hearing in order to present information
relevant to a decision as to whether his permit should be reinstated, modified or revoked. If a hearing is requested, it shall be conducted
pursuant to procedures prescribed by the Chief of Engineers. After completion of the hearing, or within a reasonable time after issuance
of the suspension notice to the permittee if no hearing is requested, the permit will either be reinstated, modified or revoked.
k. That this permit may be either modified, suspended or revoked in whole or in part if the Secretary of the Army or his authorized
representative determines that there has been a violation of any of the terms or conditions of this permit or that such action would
otherwise be in the public interest. Any such modification, suspension, or revocation shall become effective 30 days after receipt by the
permittee of written notice of such action which shall specify the facts or conduct warranting same unless (11 ) within the 30 -day period
the permittee is able to satisfactorily demonstrate that (a) the alleged violation of the terms and the conditions of this permit did not, in
fact, occur or (b) the alleged violation was accidental, and the pormiltere has been operating in compliance with the terms and conditions
of the permit and is able to provide satisfactory assurances that future operations shall be in full compliance with the terms and
conditions of this permit; or (2) within the aforesaid 30 -day period, the permittee requests that a public hearing be held to present oral
and written evidence concerning the proposed modification, suspension or revocation. The conduct of this hearing and the procedures
for making a final decision either to modify, suspend or revoke this per mit in whole or in part shall be pursuant to procedures prescribed
by the Chief of Engineers,
1. That in issuing this permit, the Government has relied on the information and data which the permittee has provided in connection
with his permit application. It, subsequent to the issuance of this Permit, such information and data prove to be false, incomplete or
inaccurate, this permit may be modified, suspended or revoked, in whole or in part, and/or the Government may, in addition, institute
appropriate legal proceedings.
m. That any modification, suspension, or revocation of this permit shall not be the basis for any claim for damages against the
United States,
n. That the permittee shall notify the District Engineer at what time the activity authorized herein will be commenced, as far in
advance of the time of commencement as the District Engineer may specify, and of any suspension of work, if for a period of more than
one week, resumption of work and its completion,
Application No. 7`Nl cj
GEORGE READE, JR.
Name of Applic
a, t
Effective Da 1� 29 November 1979
Expiration Date (If applicable) 2c) November 1982
DEPARTMENT OF THE ARMY
PERMIT
Referring to written request dated 0 7 September 1978 v for a permit to:
(X) Perform work in or affecting navigable waters of the United States, upon the recommendation of tire Chief of Engineers, pursuant
to Section 10 of the Rivers and Harbors Act of March 3, 1899 (33 U.S.C. 403);
( ) Discharge dredged or fill material into waters of [fie United States upon the issuance of a permit from the Secretary of the Army
acting through the Chief of Engineers pursuant to Section 404 of tire Federal Water Pollution Control Act (86 Stat. 816, P.L. 92-500);
( I Transport dredged material for the purpose of dumping it into ocean waters upon the issuance of a permit from the Secretary of the
Army acting through the Chief of Engineers pursuant to Section 103 of the Marine Protection, Research and Sanctuaries Act of 1972
(86 Stau. 1052; P. L. 92-532);
George Readej.:Jr.
1300 East Balboa.Boul6vard
Newport Beach, CA 92663
is hereby authorized by the Secretary or the Airmy:
W
add a 15 -foot extension to an existing wooden retaining wall///
in Newport Bay, Pacific.0cean
1300 East Balboa Boulevard, Lot�l, Block.21,:Tract Eastside Addition, City
:it of Newport Beach,!Orange County, California ///
in aceo,danre ,ith tire plans red drawings attached hereto �vhidi are incorperated fit and made a part of (his perrinit (on dra�vings: give
file nuniber or oth,a, del inite idenEilicanon marks.)
"George geadej.-Jr."
(Sheet 1 of 1)
Dated: .4/5/78
.subject 1. the lollm,ing conditi.ns:
1. General Conditions:
a. That all activities identified and authorized herein shall be consistent with the terms and conditions of this permit; and that any
activities riot specifically identified and authorized herein shall constitute a violation of the terms and conditions of this permit which
may result in the modification, suspension or revocation of this permit, in whole or in part, as set forth more specifically in General
Conditions I or k hereto, and in the institution of such legal proceedings as the United States Government may consider appropriate,
whether o; not this permit has been previously modified, suspended or revoked in whole or in part.
6NG FORM 1721 FIDITION OF 1 APR 74 IS OBSOLETE. (ER 1145 2 303)
1 Jut- 77
1