HomeMy WebLinkAboutM2006-0021Date of Applica(on:
Pro,-..,
Buyer's Names:
Billing Address:
Telephone No.:
Buyer's Signatures:
Seller's Names:
Seller's Signatures:
Joint Owner Signature
HARBOR PERMIT
TRANSFER APPLICATION
829 Harbor Island Drive
Newport Beach, CA 92660
2013 Permit Number:
The Robert B. Stewart, Jr. Trust
—Henry Neill Lehr, Jr. and Stephanie Ann Lehr
I Cq - 14 15
I ZQ's I
Henry Neill Lehr, Jr Stepanie Ann Lehr
** Escrow Company: Mariners Escrow Corporation
Address: 1100 Newport Center Drive. Suite 200, Newport Bea
Escrow Number: 45534 -BF ** Fax Number:
Escrow Officer: -Brian Foxcroft Phone Number:
Closing Date (Estimated): August22,2013
949-640-6040
"STARRED ITEMS MUST BE COMPLETED TO BEGIN THE PROCESS.
Inspection Date: Reinspection Date:
Fee Paid:
Application Completed:
Harbor
Special Conditions: This permit is revocable by the City Council
In accordance with Title 17 of Newport Beach Municipal Code
HARBOR PERMIT
TRANSFER APPLICATION
829 Harbor Island Drive
Newport Beach, CA 92660
Date of Application: July 26, 2013 Permit Number:
Property Address: 1415 East Bay Avenue, Newport Beach, CA 92661
Buyer's Names: —The Robert B. Stewart� Jr. Trust
Billing Address:
Telephone No.:
Buyer's Signatures:
** Seller's Names: —Henry Neill Lebr, Jr. and Stephanie Ann Lehr
** Seller's Signatures
/7f* -144 1, '14n�Ar �9- k2 -Q
Henry Ne#1 Lehr, Jr I U Stepdnie Ann Lehr
Joint Owner Signature:
** Escrow Company: Mariners Escrow Corporation
Address: 1100 Newport Center Drive, Suite 200, Newport Beac
Escrow Number: 45534 -BF ** Fax Number:
Escrow Officer: —Brian Foxcroft Phone Number:
Closing Date (Estimated): August22,2013
949-640-6040
"STARRED ITEMS MUST BE COMPLETED TO BEGIN THE PROCESS.
Inspection Date:
Fee Paid:
Application Completed:
Reinspection Date:
Check No.:
Harbor Resources SignaturelDate
Special Conditions: This permit is revocable by the City Council
In accordance with Title 17 of Newport Beach Municipal Code
HARBOR PERMIT
TRANSFER APPLICATION
829 Harbor Island Drive
Newport Beach, CA 92660
Date of Application: May 14, 2013 Permit Number:
Property Address: 1415 E.Hay.Avenue, Newport.Beach, CA 92661
Buyer's Names: —Ha rryBerkowitz and Alec Glasser
Billing Address:
Telephone No.:
Buyer's Signatures:
Harry Berkowiz Alec Glasser
Seller's Names: —Irhe,layne'T. Lehr 2006 QPRT, dated September 13, 2006
Seller's Signatures:
Henry Neill Lehr, Trustee Stephanie Ann Lehr, Trustee
Joint Owner Signature:
Escrow Company: Mariners Escrow Corporation
Address: 1100 Newport Center Drive, Suite 200, Newport Beach, CA. 92660
Escrow Number: 451.1.1 -BF Fax Number: 949-721-8157
Escrow Officer: —Brian Foxcroft Phone Number: 949-640-6040
Closing Date (Estimated): June 27, 2013
"STARRED ITEMS MUST BE COMPLETED TO BEGIN THE PROCESS.
Inspection Date:
Fee Paid:
Application Completed:
Reinspection Date:
Check No.:
Resources SignaturelDate
Special Conditions: This permit is revocable by the City Council
In accordance with Title 17 of Newport Beach Municipal Code
6/10/13
Mariners Escrow
Fax# 949.721.8157
Re: 1415 E. Bay
Escrow#451 11 -BF
Dear Mariners Escrow,
CITY OF NEWPORT BEACH
829 Harbor Island Drive, Newport Beach, CA 92659
949-644-3044/Fax 949-723-0589
kz '; �-
144%
The City of Newport Beach has inspected the above pier and found it to meet
City standards. Once we receive the application signed by both the buyer
and seller the pier will be transferred.
Thanks for your help and if you require further assistance in this matter please
call 949.644.3044.
Sincerely,
4k A/4&"
Lisa Walters
INq I.P.TC14411 11101 0.1 IT,
Harbor Resources Department
Date: 2-b 15
Inspection Requested By:
Inspector:
Pier Address: J J�4 ID
Pier Transfer
GIFI Present
Anti -Siphon / Backflow Present
Other Comments
co I (I I c� Reinspection
Yps Need None Needed Yes Need
Eelgrass
Date Time F] Eelgrass Within 15'of Project
[—] Eelgrass Within 15'- 30' of Project
F� No, Eelgrass in Project Area
Pump Out
Pier Location
Yes No
Operational
Recommended Action
Encroachmenet
Address of Complaining Party
Boat Description
CF Number
Location on Dock
Comments / Observations
Other Request
P X
w I
" 1 21
"M W-
.....................
" 1 21
CITY 9F NEWPORT BEACH
CITY OF
NEWPORT BERCH
kwT UIPM
DRY k�
IPFW
Pi
VICINITY MRP JETTY
' vi
&w�
t�
e we
0 L -L, 11 --311 V 11 -' � 4
�, PROFILE I' = 40'
EFET
iuma;T'NGS -FK
10
SaMINGSSFKBR EWRESSED IN FEET AND DENOTE
,ELEVATIONS BASEI ON MEAN LOWER LOKWAYER.
-2-3 Of.
v� Z�-nr
-7z �-
FPPLICANT'S NRIE Ale—
NAM
_h6p JOB ADDRESS I
vi te
UTY OF
PLAN VIEW 1-
�tVf— DATE
Worksheet for Building/Fire Permit Applicatioi Lis
Please print 3 copies City of Newport Beach RESOURCES
Building Department My OF NEWFURT E`
1. Project Address (Not mailing address) 3'MFloor Suite No
11415 E Bay Ave F_
Legal Description Lot F__ BlockF_ Tract F_ # Units
2. Description of Work
Use I Moor Boat
Replace 32T" pile under pier & Re -Deck
City 1, N B
# Stories F_
Tenant Name if Commercial
Valuation $ —
FIZZ111,19, 01
Architect/Designers Address
Architect/Designers E-mail Address
F- New I— Add F- Alter F- Demo
Scl Ft (new/add/extended)F
Check Appropriate Box for Applicant/Notification Information
F- 3. Owner's Name
Last I Leher First FJayne
Owner's Address
Owner's E-mail Address
F1415—E Bay Ave
I
City 1, N B
State FCA zip F92661 Telephone F949-631-3121
F- 4. Architect/Designer's
Name Last First Lic. No. F
Architect/Designers Address
Architect/Designers E-mail Address
city I
State zip F_ TelephoneF—
F- 5. Engineer's Name
Last Bazley First FT, Lic. No. [CS00I 9
Engineers Address
Engineers E-mail Address
12500 Via Cabrillo Marina #200 1
City I San Pedro
State FcA zip F Telephone F310-548-3132
F- 6. Contractor's Name
Last First Lic. No. 797052 Class FA
Swift Slip F F
Contractors Address
Contractors E-mail Address
12027 Placentia Ave
bhswiftslip@sbcglobal.net
City I Costa Mesa
State F—A zip F92627 Telephone F949-631-3121
OFFICE USE ONLY
PERMIT NO. AN 1415
TYPE OF CONSTRUCTION
PLAN CHECK NO.
PLAN CHECK FEE $
OCCUPANCY- GROUP
PLAN CHECK ENG.
BUYERS' HARMS)
ADDRESS OF FACILITY:
I PERMIT #
AVY
usits,
Toult
1415 SAW SAT
1169-
TELEPHONE NO.
NO. DATE
MAILING ADDRESS
=F��CHECK
I
VAX&" X)lto
0
223 286 11 0
412-1 CLS"
PERMIT
-W
A 15�1.APPLICATION
�A
PLICATION 15 HEREBY MADE TO TRA.�I�K
15 HE EBY M
nAmOwn
APPROVED B
APFBOVEDB
El
OCHD
A
(ABOVE NAMES
TO BE TYPE.)
ENG
COUNCIL
-- -�I�NATBREDF SELLER
F LL R
S E:E
SIGNATURE OF BUYER
::::�
;PUBL!C WORKS
DEPT
- —,GN�TBI101 SILIIR
SIGNATURE OF BUYER
ESCROW
�11NSPECTION
S N 0 F JOINT OWNER
—ji-GN-A—TURE OF JOINT OWNER
PLICATION PROVEC
P ATION AP
A PLI C
(DATE)
r -A
is
CITY OF NEWPORT BEACH, CALIF.
,CITY OF NEWPORT BEACH HARBOR APPLICATION NO.
k
AL�
'1171rx
reel o�"( 01"ole
below Lower Low Male,,j AJaXl�u�
'�:Cm 9
VZ -e,(. '�rho, 1,e7e.S
Ore e i0blf'SheW '/h;S SeCllo" orrAlew,,orl' 5 -r-
1A
I d��POIWI &,-
Alo
-T'r
;cvy
I Ll
Z-, 15C71hCO
L
4vJ
/.f7) .,,Iou �JD. S32 -04-
L- Z4F,1-1,e
AC`P!41C4N7-.!9 IVAoWdr
&a160a
A,0 -0 -e --,V-9
Ale
7-.0407' -4c1W, 1640CIC 4or
'Olk- 0/ r-O&I/&�01;7 49, 0.r. 0
Kilf) 477-IX�; J-0
PeAWM-&K 0-,O.A,/.
oR
X1411
0
po '�d.
ce
Col.
V(CiMITY SKETCH
N,�PoRr 5AY, CAL iroa"t
reel o�"( 01"ole
below Lower Low Male,,j AJaXl�u�
'�:Cm 9
VZ -e,(. '�rho, 1,e7e.S
Ore e i0blf'SheW '/h;S SeCllo" orrAlew,,orl' 5 -r-
1A
I d��POIWI &,-
Alo
-T'r
;cvy
I Ll
Z-, 15C71hCO
L
4vJ
/.f7) .,,Iou �JD. S32 -04-
L- Z4F,1-1,e
AC`P!41C4N7-.!9 IVAoWdr
&a160a
A,0 -0 -e --,V-9
Ale
7-.0407' -4c1W, 1640CIC 4or
'Olk- 0/ r-O&I/&�01;7 49, 0.r. 0
Kilf) 477-IX�; J-0
PeAWM-&K 0-,O.A,/.
CITY Or NEWPORT BEACH
HARBOR PERNIPT
PrIMISSION fs H rn1---sy CRAPITEI) -ro Cl,,,
41tiNrAIN y 11 STRUCT ANV
-r r"t
17",
"HE HAF Rrvij,?tE it
TV 0- To CREOF,
c"Al.-rJoNs Of
(7C
�,ur
-AC11 AN;
'ERMr
'N Acc
C)NIL,
�TY cojjNC(j
'Nt 41' L cQoc.
rill
0 IM UCrj,j r
1STR ON PERI-mvill
DATE ......
SPECIAL Cor4DITIONS:
"" " E."s"Reers Permit
arc,Mre county Permit
Other
C�i &-(? ;p --e & —k3
TRAUTWEIN BROS.
WATERFRONT CONSTRUCTION xm N --
General Engineering Contractors
2410 He�part W�d. Hwpm "ach, Calif. 92663 A4—/e-�-
(714) 673-1960
CHXD- Ity- DATE
kav,
z
C,V, I �? C-- -
F-1
X)/Lor
4�1
41
lv�j
State of California, G e orge Deukmej ian, Governor 9/27/83
California Coastal Commission
South Coast District .
245 West Broadway, Suite 380
P.O. Box 1450
Long Beach, California 90801-1450
(213) 590-5071
COASTAL DEVELOPMENT PERMIT NO. 5-83-601
page 1 of 2
On— September 15, 1983 , The California Coastal Commission granted to
Neill Lehr 8400 Reseda Blvd., Northridge, CA
this permit for the development described below, subject to the attached
Standard and Special conditions.
Relocate existing private boat dock and add five feet to back walk.
The project is located on Balboa Peninsula.
SITE: 1415 E. Bay Street, Newport Beach
Issued on behalf of the California Coa
Kg=' 11W PEOUT X WA VALID
MISS A* I J11 A UM UP TW ftNT
MTN THE S"D ACK1111011111011ANT NAS
WN U769U TO INE COMMISSO Orfla.
OCT 3
Executive Director
and
I V ga-aa DHP/r
ACKNOWLEDGEMENT
The undersigned permittee ack'nbwledges
receipt of this permit and agrees to abide
by all terms and conditions thereof.
Date Signature of Permittee
5/61
Coastal Development Permit No. 5-83-6bi
Page 2
STANDARD CONDITIONS;
1 , Notice of �gei,1,4�1 Ag1nL4,1,e The permit is riot valid and construction shall not commence until a copy of
n6 y
the pe mit n authorized agent, acknowledging receipt of the permit and acceptance of the
terms and conditions. is returned to the Commission office.
2. Expiratim. If construction has not commenced, the permit will expire two years from the date on which the Commission
voted on the application. Construction shall be pursued in a diligent manner and completed in a reasonable period of
time. Application for extension of the permit must be made prior to the expiration date.
3. CM1
ijg ME All construction must occur In strict compliance with the proposal as set forth in the application for
, su ject to any special conditions set forth below. Any deviation from the approved plans must be reviewed and
approved by the staff and may require Commission approval.
4. Interr,,,W12�, Any questions of intent or Interpretation of any condition will be resolved by the Executive Director
e ' ss Ion.
S. Inspections. The Commission staff shall be allowed to Inspect the site and the development during construction,
subject to 24-hour advance notice.
6. A ' m t The permit may be assigned to any qualified person, provided assignee files with the Commission an
aM viNt cceVting all terms and conditions of the permit.
7. Terms and Conditions Run with the Land. Thes e terms and conditions shall be perpetual, and it is the intention of the
Commission and the permittee to bind all future owners and possessors of the subject property to the terms and
conditions,
SPECIAL CONDITIONS: none
I
a m U, 11 14wr
1601A -fil % rv: A
11&4 J 4ULIOM
.4, 1 - 1 10. A U I VV
44K,V, ff) e(W
41 QM"A oklt
CITY OF NEWPORT BEACH HARBOR APPLICATION NO. /0
0 0 0
4 t
Ci
.100R 010c -/z Z-
/', = So'
1-4
-pea
Alc w 4/00c/
4v
ar Irj ,
0
slouna"495 ore In ',,/ "o,
&ep �A 5 below Aleor, Lower Low Waxz�m
SQ�Ith op, H6rbo, /,n&.5
seclon orveWp,,1 Bar.
A 1) V t L
1,0 0
1 V,6Lt N
,C. &b,16oa &It-ol
1412 C,
� " 1 30,
L
7
4
4UG 11983
CALWORN"k
COMMISSION
CoASIAC100'sT ()ISIR0
SOUTH
5-83-601
MARINE DEPARTMENT
ch CITY HALL
= NEWPORT BLVL
NEW"CH. CA Q=
7 AA�14'
f, 2- --F 3
76T,�zT,w
IOU �JD. 93 Zo4
APA41C4IV7�9 V4Wdr
&a160a
J00 A,0J0de,-$S
46(d.
f) 4;ry - /NO
2,eAWN &?- 0-,0. A/. a47'0
<1
0,
\<
.4W
VIC)MITY SKETCH wait Jrr
NEwpoar aAy CAL jr,aNtA
Jlrrr
slouna"495 ore In ',,/ "o,
&ep �A 5 below Aleor, Lower Low Waxz�m
SQ�Ith op, H6rbo, /,n&.5
seclon orveWp,,1 Bar.
A 1) V t L
1,0 0
1 V,6Lt N
,C. &b,16oa &It-ol
1412 C,
� " 1 30,
L
7
4
4UG 11983
CALWORN"k
COMMISSION
CoASIAC100'sT ()ISIR0
SOUTH
5-83-601
MARINE DEPARTMENT
ch CITY HALL
= NEWPORT BLVL
NEW"CH. CA Q=
7 AA�14'
f, 2- --F 3
76T,�zT,w
IOU �JD. 93 Zo4
APA41C4IV7�9 V4Wdr
&a160a
J00 A,0J0de,-$S
46(d.
f) 4;ry - /NO
2,eAWN &?- 0-,0. A/. a47'0
REPLY TO
ATTENTION OF:
Regulatory Branch
SUBJECT: Remodel Dock For Neill Lehr
DEPARTMENT OF THE ARMY
LOS ANGELES OISTRICT, CORPS OF ENGINEERS
P. 0. BOX 2711
LOS ANGELES, CALIFORNIA 900013
June 1 , 198 3
Sam Kniss
Trautwein Brothers
2410 Newport Boulevard
Newport.Beach, California 92663-3798
Dear Mr. Kniss:
. Thank you for your letter of May 23, 1983 notifying us of your
intent to construct a modification of a boat dock I -at 1415
East Balboa Blvd., Lot 8, Block N & 23, Tract Eastside.
Your drawings have been reviewed and generally conform to the provisions
of General Permit GP 004 for privately owned boat
docks in-Rewport iIay
Providing you have complied with State and local laws you may proceed
with the work.
Your proposed work has been assigned General Permit No. GPO04-155
If you have any furthur qu6stions, please feel free to call our Regulatory
Branch at (213) 688-5606 and refer to this number. A copy of the General.
Permit is enclosed.
Sincerely,
J.P. Fast
Chief, Construction -
operations Division
Enclosure
STATE bf!�CALIFORNIA—RESOURCES AGEN�.
GEORGE DEUKMEJIAN, Governor
-CALIFO
AIA REGIONAL WATER QUALITY CONTROL BOARD
SANTA ANK REGION
6800 INDIANA AVENUE, SUITE 200
RIVERSIDE, CALIFORNIA 9ZS0G
PHONE: (714) 684-9330
May 31, 1983
Mr. Samuel F. Kniss
TrautweAn Brothers Waterfront
Construction
2410 Newport Blvd
Newport Beach, CA 92663-3798
Dear Mr. Kniss:
Remodel dock for
1415 E. Balboa Blvd
Newport Beach, CA 92663
Based on the submitted no liveaboard statement
and standard dock- cons-truction,.water quality
should not be affected and clearance is provided.
Sincerely,
Ga ryy _D. tewart
Staff Engineer
GDS -. ky6
la
.. I I
CITY OF NEWPORT BEACH ITEM NO. F-11
Marine Department
June 27, 1983
TO: MAYOR AND CITY COUNCIL
FROM: Marine Department
SUBJECT: HARBOR PERMIT APPLICATION 109-1415 BY NEILL LEHR
TO REVISE THE RESIDENTIAL FLOAT BOAYWARD OF 1415
EAST BAY AVENUE
Recommendation:
If desired, deny the application.
Discussion:
This application is before the City council as required by Section 5.B of
the Harbor Permit Policies which states:
5.B. "Prior approval of the City Council will be required before the Marine
Department may issue any permit that does not conform to the standard
harbor drawings and the adopted Harbor Permit Policies."
Specifically, the applicant is requesting that the Council waive Section 20.A
which states:
20.A. "All piers and floats for residential properties shall be set back
a minimum of 5 feet from the projection of the property line."
This applicant has a 42 foot vessel which he wishes to berth bayward of his
property. Given the beam width of a vessel of this size, a U-shaped slip
cannot be constructed on a 30 foot lot and provide the required setbacks.
Therefore, the applicant wishes the setback requirement be waived as outlined
in his attached letter of June 3, 1983.
The City Council may approve exceptions to the policies as set out in
Section 24 which states:
24. "The City Council may approve exceptions to any of the requirements and
regulations set forth if there are special circumstances or conditions
affecting the harbor installations that would impose undue hardship on
the applicant or if it would be detrimental to the best interest of the City."
In this case no undue hardship exists, in that the applicant could construct
a structure other than a U-shaped one and berth his boat bayward of his
property. It does not appear that adherence to Section 20.A would be detrimental
to the City's interest.
DAVID HARSHBARDER, Marine Director
Tony Melum� Tidelands Administrator
TM: d1b
CITY OF NEWP.AT BEACH HARBOR AN -ACATION NO..
F
er/S7-�5-
A�
01 OR 0.4 C -/z
/ .1 =450 ,
In, I",
K
Woo "o"..
Col..
c
VICi J%J I TY SkETCH W"r js�r
r
d
5164enol,,,95 0,0 eAprcsSed 1� Aeej� Once oln,,te
ale, -Ohs below 41�0,n /ow" Zow
Pans?e, 0/' p Wxfno"W/,- 10"ce-1 yarbo,
are e , io61,'shcj1p1,�r,11,;s seclo"DrIvewoor/ say-.
4! 0 , 4,1
'1914 ZA S. 0;q
Llne,
z:lo e tJeD. 9 � 2 o4-
2 3
APPI IC4,Vr�F 0VA40,W
f- &al6oa &/Va/
Zar/r/c/P Alr ej
8
or. &�16oa
-00,OV. 70.
ri
ti
-
30'
W�v A-1--oo
A;"&//
A
v
&Y
.4v On 4T
Li
z:lo e tJeD. 9 � 2 o4-
2 3
APPI IC4,Vr�F 0VA40,W
f- &al6oa &/Va/
Zar/r/c/P Alr ej
8
or. &�16oa
-00,OV. 70.
OFFICE OF THE PRESIDENT
June 3, 1983
C /rw/ "/; I - Kvmr W, C &.
8400 RESEDA BOUUEVARD
NORTHRIDCE, CALIFORNIA 91324
Mr. Tony Melum, Harbor Coordinator
c/o Marine Safety Department
City of Newport Beach
3300 Newport Boulevard
Newport Beach, California 92663
Re: New dock at 1415 East Bay Avenue, Newport.Beach
Dear Mr. Melum:
Mrs. Lehr and I are the new owners of the residence
at 1415 East Bay Avenue. We would like to modify
the existing U-shaped slip to accommodate our vessel,
a 42 foot Grand Banks.
We have authorized Mr. Samuel F. Kniss, a partner in
Trautwein Brothers Waterfront Construction, to repre-
sent us in obtaining the necessary permits as well as
handling the construction. This modification would
encroach the setback between our property and that of
Mr. & Mrs. Frank Rhodes at 1417 and 1419 East Bay
Avenue. Mr. Rhodes has no objection at this time. I
understand that if, at a future date, Mr. Rhodes or a
future purchaser of his property should wish the
easement vacated, with 90 days notice I must so modify
the dock. I am in agreement with this premise.
Mr. Meium, I will certainly appreciate your assistance
in obtaining the necessary permit at the earliest
possible date.
Respectfully.yours,
H. Neill L h
President
HNL/dj
P.C. Mr., Frank Rhodes
Mr. Samuel F. Kniss
5
ST�TE OF CALIFORNIA—STATE LANDS IMISSION "GEORGE DEUKMEJIAN, Go�ernor
STATE LANDS COMMISSION
1807 13TH STREET
SACRAMENTO, CALIFORNIA 95814
June 10, 1983
J,
File Ref. SD 83-05-31
Mr. Samuel F. Kniss
Trautwein Brothers
Waterfront Construction
2410 Newport Blvd.
Newport Beach, CA 92663-3798
Dear Mr. Kniss:
16 1 4
J01 14V
a& 4ty .16 1983
Subject: Remodel Dock for Mr. Neill Lehr at 1415 East Balboa��
Boulevard, Newport Beach, CA
The staff of the State Lands Commission has recieved your letter
dated May 24, 1983 and copies of the permit drawing relative to the
remodeling of your client's docking facility in Newport Bay.
This is to advise that the tide and submerged lands over which
the proposed project will extend are sovereign lands of the State of
California that the Legislature granted in trust to the City of
Newport Beach. Therefore, you need not apply to the State Lands
Commission for project authorization. You should, however, apply
to the. City of Newport Beach.for any necessary permits or approvals.
You should also apply to all other agencies having approval authority.
This action does
a waiver of any right,
in any lands under its
JL;bL
not constitute, nor
title, or interest
jurisdiction.
cc: California Coastal Commission
South Coast District
666 East Ocean Blvd., Room 3107
Long -Beach, CA 90801
FR-6bert L. Wynn, City Manager
C-i—ty-of-Newporf B—each
City Hall
3300,,,,Newp9rt,.Boulevard
Newport Beach, CA 92660
bcc: G�90.-�
P C
shall it be construed as,
by the State of California
Very. truly yours,
JUDY LUDLO14
Granted Lands Representative
(916) 445-7134
WATERFRONt CONSTRItTION
To: Neill Lehr Cadillac
2410 Newport Bouleyord
Newport Beach, California 92663.3798
Telephone (714) 673-1960
Contmaors U,enw No. 322996A
April 13, 1983
8400 Reseda Boulevard
Northridge, Ca. 913
Re: New dock @ 1415 E. Balboa Blvd., Newport Beach
Dear Mr. Lehr:,
For Your convenience and to expedite the processing
of the permits, etc. that are necessary to the above
project, I can sign for you as your agent on all such
documents. If this is your desire, Please endorse below.
Please retain one copy for your files.
Sincerely,
TRAUTWEIN BROTHERS
WATERFRO CONSTRUCTION
Samuel F. Kniss
I authorize you to act as my agent on the above project.
SignatAure V
Date
STATUS SHEET
HARBOR PERMITS
LOCATION____j?j
P E RN I l. tlo � AV Revision
APPLICANT NAME
Dredging
CONTRACTOR
Dwe jec I v
Amt. Fee Processed V&
Date Reviewed by Marine Dept.,
Approved_jf��.---- Den i ed
Corection Yequired - Description
City Council. Approved Denied
Remarks
1
2
3
DATE MATERIAL SENT/APPROVED
Application
Consent Ltr.
"Waste" Ltr,
Drawings
Staff Report
REMARKS
C.O.E. SCRZCC- SARWIICB
UATE FINAL INSPECTION
9- ?-- F'5
OR. CTY.
---- ------ - --
CITY OF NEWPORT BEACH
COUNCIL MEMBERS MINUTES
0 0
'P June 27, 1983
0
-V
ROLL \CALL\ tp INDEX
(e) Resolution No. 83-61 modifying the
Res 83-61
Annual Pier Fee pursuant to Section
Pier Fee
17.33.030 of the Newport Beach Muni-
(40)
cipal Code effective July 1, 1983 and
rescinding Resolution No. 82-94.
(f) Resolution No. 83-62 establishing
Res 83-62
Mooring Fees and a Late Payment Penalty
Mooring Fees
pursuant to Section 17.22.050 of the
(40)
Newport Beach Municipal Code, and
rescinding Resolution No. 82-95.
(g) Resolution No. 83-63 amending Subsection
Res 83-63
A of Section 12 of the Harbor Permit
Harbor Permit
Policies relating to the Schedule of
Fees
Fees for Permits to become effective
(40)
July 1, 1983 and rescinding Resolution
No. 82-93.
4. A report from the Marine Department recom-
Harbor Permt
mending denial of HARBOR PERMIT APPLICATION
LEHR
109-1415 by Neill Lehr to revise residential
(51)
float bayward of 1415 East Bay Avenue, was
presented.
Neill Lehr, 1415 E. Bay Avenue, addressed
the Council and stated that he would like
to remodel the boat slip to accommodate his
42 foot Grand Banks. He stated that the modi-
fication would encroach the setback between
his property and that of Mr. & Mrs. Rhodes
at 1417 and 1419 E. Bay Avenue, who have no
objection to the request. He added that if,
at a future date, Mr. Rhodes or a future
purchaser of his property should wish the
easement vacated, he would modify the dock
within 90 days as required.
Motion
X
Motion was made to grant the request, subject
to the 90 -day condition referred to by the
applicant.
Tony Melum, Tidelands Administrator,
addressed the Council and stated that there
is continual pressure to maximize the water
use in the harbor, and they feel by granting
this exception weakens their position in
supporting Council policies. He stated there
are several single -finger slips in the harbor
that have a similar problem, but are able to
back their boats out into the channel, turn
around and back in, re -tie, and handle vessel
maintenance. The request does not interfere
with any swimming activities.
Ayes
x
x
x
The motion was voted on and FAILED.
Noes
x
x
x
Abstain
x
No further action was taken.
Volume 37 - Page 214
CITY OF NEWPORT BEACH
COUNCIL MEMBERS
01,
June 27, 1983
ROLL CAL
Motion
All Ayes
Motion
Motion
All Ayes
MINUTES
Volume 37 - Page 215
INDEX
Ordinance
Live Enter-
tainment
(27)
Santa Ana
Hts Annex
(21)
Legal Adv
(20)
5. Proposed.Ordinance No. _ being,
AN ORDINANCE OF THE CITY OF NEWPORT BEACH
AMENDING CHAPTER 5.28 OF THE NEWPORT BEACH
MUNICIPAL CODE RELATING TO THE ISSUANCE OF
PERMITS FOR LIVE ENTERTAINMENT TO ESTABLISH-
MENTS THAT SERVE FOOD OR BEVERAGES, with
a report from the City Attorney's office,
was presented.
x
Motion was made to defer the subject
ordinance for introduction on July 11, 1983.
6., A report from the City Manager regarding
SANTA ANA HEIGHTS ANNEYATION AND PRE -ZONING,
was presented.
Dan DeMille, representing property owners
in the agricultural area of Santa Ana
Heights addressed the Council and discussed
the Cit;'s intent to paya portion of the
cost of the EIR for Santa Ana Heights
Annexation. He indicated his objections
to the recommendation of participating in
the funding of the EIR.
Jack Mullen, 2031 Mesa Drive, Santa Ana
Heights, appeared in support of the
recommendation.
Bill Warren, 20412 Birch Street, Santa Ana
Heights, addressed the Council and stated
he was not supportive of the City Jointly
funding the EIR, indicating he felt as a
result of the EIR, his ptoperty would be
rezoned.
x
Motion was made to approve the recommendation
contained in the staff report.
x
Substitute motion was made to fund the cost
of an adequate EIR for Santa Ana Heights
Annexation after the proponents for said
annexation have deposited the sum of
$15,000 with the City Finance Director.
7. A report from the City Clerk recommending the
City Council accept the bid of the Daily
Pilot for LEGAL ADVERTISING SERVICES FOR
FISCAL YEAR 1983-84, was presented.
Steve Hadlin, Co -publisher and General
Manager of the Newport Ensign, addressed
the Council regarding the subject recommenda-
tion. He stated he felt there were exterruat-
ing circumstances involved, i.e., the total
circulation of the Ensign is greater than
that of the Daily Pilot in Newport Beach,
the break down per column inch cost per 1,000
circulation is lower than the Daily Pilot,
and the deadline for legal notices is greater
as to lead t-ime in the Doily Pilot as opposed
to the one -day ahead time needed for the
Ensign...
Volume 37 - Page 215
INDEX
Ordinance
Live Enter-
tainment
(27)
Santa Ana
Hts Annex
(21)
Legal Adv
(20)
3 -173438
DOMAMTAWf tOMFER TAXIII,,/
�Comfputedlon "'consideretion . or . value of property corrvirtntd., OF
...... C01hput0d on the consideration or valu.w IOU Ilene or q"'oh'aft",
remaini attimoot4ale.
��ak wm _
A. P. No., FIRST AMERICANT TITLE INSURANCE COMPANY
7�
GRANT DEED
FOR A VALUABLE CONSIDERATION, receipt of which is hereby acknowledged,.,
ROBERT B. MC LAIN AND JOSEPHINE H.,.MC, LAIN, HUSBAND AND WIFE AS JOINT TENANTS
hereby GRANT(S) to
H. NEILL LEHR AND JAYNE LEHR, HUSBAND AND WIFE AS COMMUNITY PROPERTY
the real property in the City.of NEWPORT BEACH
County of ORANGE State of California, described as
LEGAL DESCRIPTION ATTACHED HERETO AS EXHIBIT "A" AND MADE A PART HEREOF,
�Mtmim Z i',t. -, L- '! -1-kA-19=
IM '� �' jag
SUBJECT TO:
1. GENERAL AND SPECIAL TAXES.
2. COVENANTS, CONDITIONS, RESTRICTIONS, RIGHTS OF WAY, EASEMENTS AND
RESERVATIONS OF RECORD, IF ANY.
el,
4
�ak'
STATE OF CALI NIA 83-173438
COUNTY OF— ange
On --_April 18, 1983 before me. the undersigned, a Notary Public;n and for
A
said State, personally appes
and Josephine H. McLain
personally known to me (or proved to me on the basis of sells -
factory evidence) to be the penson(s) whose namels) Ware sub-
scribed to the within Instrument and acknowledged to me that
)QMQShey executed the same.
WITNESS my hand and official seal.
Stgnatu'7'�
il�dred J clNie�illy
OFFICIAL SEAL
Mildred J. McNeilly
NOTARY PUBLIC - CALIFORNIA
PRINCIPAL OFFICE IN
ORANGE COUNTY
MY COMMISSiOn Exp. Oct 4,1985�
(This area for official notarial seal)
SEAL
IC - CA
;- OFFICE IN
E COUNTY
Emp. Oct 4.19M'
I notarial MI)
tQ02 (6182)
83-173438
p j?�k�
7'
PARCEL 1: Lot 18 in Block 23 of East Side Addition to the Balboa",T'r'act, as,shown on
recorded in Book,4�" a.map
page 20 of Miscellaneous Maps, records of Orange County, California.
PARCEL 2: Lot 8 in Block 23 of East Side Addition to the Balboa Tract, as shown I on a map
recorded in Book 4. page 20 of.Miscellaneous Maps, records of Orange County, California,'
together with that portion of Bay Avenue, 30.00 feet wide, as shown on said Map of the
East Side Addition to the Balboa Tract, as vacated by that certain resolution No. 4687
of the City Council of the City of Newport Beach, a certified copy of which was recorded
September 3, 1957 in Book 4025, -page 185 of Official Records of said Orange County, said
portion lying.between the Northerly prolongation of the Easterly and Westerly line , of
said Lot 8.'
PARCEL 3: Lot 8 in Block N of Bay Front section of the Balboa Tract, as shown on a MaR
recorded in book 6, page 15 of Miscellaneous Maps, records of Orange County, California.
PARCEL 4: Beginning at t * he Northeast corner of Lot 8 in Block N of Bay Front Section of
the Balboa Tract,,as shown on a Map recorded in Book 6, page 15 of Miscellaneous Maps,
records of Orange County, California, thence Westerly along the Northerly line of said
Lot 8 to the Northwest corner thereof; thence Northerly along the Northerly extension of
the Westerly line of said Lot 8 to its intersection with the line of ordinary high tide
of the Pacific Ocean in Newport Bay as described in the decree of the Superior Court of
Orange County, California dated July 30, 1928, a certified copy of which was recorded
August 14,-1928-JaL-Book
tide line to its intersection with the Northerly extension of the Easterly line of said
Lot 8; thence Southerly along said extended line to the point of beginning.
Excepting therefrom any portion lying below the line of natural ordinary high tide.
Also excepting any artificial accretions waterward or sa.id.line of ordinary high tide.
EMBIT A
CALIFORNIA
MARINE DEPARTMENT
January 14, 19.75
/0? - 141_5�
City Hall
3300 W. Newport Blvd,
Area Code 714
673-2110
gnglish, Pittroef, Stephens? McHone, Brookes, Peck,, McLain, Rhodes
Dear Sir:
The Los Angeles District of the Army Corps of Engineers has
notified us that you have been placing sand bayward of your
recently installed retaining walls between F and G Streets
on the Balboa Peninsula. Further, they have requested that
we contact you on -this first recorded offense.
The placement of any fill material in the bay is an illegal
act, punishable by federal action, unless prior approval is
granted by the Army. The material must be analyzed for con-
taminant content before being placed anywhere within the
harbor. The analysis of samples is an expense to be born by
the tidelands user, and the samples must meet certain stand-
ards. The standards are reviewed by the Environmental Pro-
tection Agency, the California Fish and Game, the Regional
Water Quality Control Board, and the Department of Interior,
River Basin Studies.
Since this activity is now under very close surveillance by
the Corps of Engineers, and other agencies, we strongly suggest
that you contact this department before any further fill mater-
ial is contemplated to be placed along the shoreline. The permit
procedure must now be strictly adhered to, or, as the Army related
to us, they will file with the Attorney General for prosecution.
This letter is written in order to inform you of the situation in
the event you were previously not aware of it. If you have any
questions, please feel free to contact the U. S. Army Corps of
Page Two
Engineers, Los Angeles District, Harbors, and Waterways Division,
Attention: Mr. John McVey, Area Manager - South Coast Areas,
P. 0. Box 2711, Los Angeles' California 90053 (Tele. (213)688-5607).
We refer you to his office,'since the material has already been
placed, taking the situation from local control.
Again ' if any fUrtqer fill material placement is contemplated,
please do not fail to file for the necessary permits with the
City of Newport Beach Marine Department. This way, we can all
assist in retaining the necessary controls at the local level.
Very truly yours,
MARINE DEPARTMENT
CITY OF NEWPORT BEACH
R. E. Reed, Director
RER: lf
0
CALIFORNIA �,-OASTAL ZONE CONSERVATION COMMISSICnN
SOUTH COAST,REG* ONIAL COMMSSION
666 E. OCEAN !-_U,�VA!a, SUITE 3ID7
P.O. tax 14z)
LONG BEACH, CALIFC;NIA 91301
(213) 46-4231 (714) 846,0"S April 15' 1974
NOTICE OF PUBLIC HEARIN4G
P�rsuant to order of the California.Coastal Zone Conservation
Commission, notice of public hearin.g is hereby given. Said public
hearing is scheduled on the May 6. 1974 Agenda for
application for Permit, 1'umber P-1,-2-74-2c)6o
as submitted by Robert McLain.
The subject request is to permit Construction 'of a -wooden seawall
for beach preservation
at 1415 Bay Front, Nei-mort Beach
Said agenda public hearings will cc=mezice at 9: CO am
on may 6, 197
at Long Beach Harbor Department
925 Harbor Plaza, Long Beach, 6th Floor, Board Room
during which time all persons either -favoring or opposing the
application will be heard. Any written correa-pondence regarding
his off�ice prior to the hear -
the application should be directed to 2.
ing date.
All interested individuals who wishadditional information may con-
tact this office.
MI. J. entU'"
Exe7cutcaemrector-
wk
FOR APPLICANT ONLY...
COPY OF THIS NOTICE IS TO BE POSTED ON SUBJECTPROPERTY
STATUS SHEET
HARBOR PEP24ITS
LOCATION &ZZ0,, ,,/?
New
Revision
00 Dredging
Date Rec'v 1
Fee Amt. Fee Processed
Date Reviewed by M.S.D.
Approved 'Z -*L -?--/6 Denied
Correction Req1d. Desc.
City Council: App oved Denied
Remarks 2_-. L f-7 P
5. Staff Report
6.
7.
8.
REMARKS
J.H.C. Or.Co.
T. 1. C.
DATE MATERIALSENT/APPROVED
C.O.E.
S CRZCC
SARWQCD
1.
Application
7 -7
2.
Consent Letter
.3.
"Waste" Letter
4.
Drawings
5. Staff Report
6.
7.
8.
REMARKS
J.H.C. Or.Co.
T. 1. C.
LOS ANGELES COR�-S OF ENGINEERS
P. 0. sox 2711
LOS ANGELES, CALIFORNIA 90053
SPLCO-N
Mr. Robert B. McLain
1415 E. Balboa Boulevard
Newport Beach, California 92661
Dear Mr. McLain:
22 August 1974
Your permit, dated 22.A.ugust 1974 (74-77), has been validated and is
inclosed. Notice of Authorization and copies of forms for reporting
the status of work are also inclosed.
Sincerely yours,
jeLy! I ; '-W�
1're C CC
3 Incl JOHN V. FOLEY
1. Permit COL, CE
2. Notice of Authorization District Engineer
3. Wrk Status (dupe)
��.Ze of Applicant I CGrps c�f Eq�Qi---ers
I I�nliprl- 'R- e
Effective Date 99 Al,gu,f- IQ74 Los Angeles, California
Expiration Date 11 T)PrPnhP-r 1977
DEPARTYEENT OF THE ARMY
PERMIT
Referring to written request dated 26 November 1973 for a permit to:
01) Perform work in or affecting nav-Jgable waters of the United States, upon
the recommendation of the Chief of Engineers, pursuant to Section 10 of the
Rivers and Harbors Act of March 3. 1899
-a--Y—Discharge dredged or fill material into navigable waters upon the issuance
of a permit from the Secretary of the Army acting through the Chief of Engineers
pursuant to Section 404 of the Federal Water Pollution Control Act (86 Stat.
816, P. L. 92-500),
T—T-7—ransport, dredged material for the i - Durpose of dumping it into ocean waters
upon the issuance of a permit from, the Secretary of the Army acting through
the Chief of Engineers pursuant to Section 103 of the Marine Protection,
Research and Sanctuaries Act of 1972 (86 Stat. 1052; P. L. 92-532);
Robert. B. McLain
1415 E. Balboa Boulevard
Newport Beach, California 92661
is hereby authorized by the Secretary of the Army: -to construct and install a
wood seawall (8 feet high by 30 feet long) , 45 feet shoreward of the U. S.
Bulkhead Linei to remove a portion (shoreward of proposed seawall) of the
existing pier and to join bayward portion of the existing pier with the
seawall
New%port Bay (Pacific
lr---Lot No. 8, Block No. N and 23, Tract Eastside Addition, Neuport Bay, City
of Newport Beach, Orange County, California.
'-rn--ac—c`or�rdance with the plans and drawings attached hereto which are incorporated
in and made a part of this permit on drawings: "Robert B. McLain, 1415 E.
Balboa Blvd., Tract Eas.tside Addition, Block N and 23, Lot 8. Drawn by
=utwein Bros. Dated 6 November A973.'
SUb �UL I -U g
FORM (ER 1145-2-304�
SPL I MAY 74 581 (ER 1145-2-303)
PREVIOUS EDITIONS ARE OBSOLETE
Page 1 of 5
Alc.w wall
50
'11�� 0147L Z—
Ala VC'.4ZX-
-4,'V
VlCh',J!T'i� 5kETCH
11h;5 SCC11-1
L
L
r� L)
6,1
kal
IT I 1 1 4 1
u
C9 /0
A
0
Ale ?�Y
7-�'�407-
,�16oa elvol r�/&�Cf;7 C�as
(I ilf) (Z 7.7 - 13vo
121-'AWV Z,r' '9"O -Y'
ZY
7 o a6 -1 - -- on s
(a) That all activities identified and authorized herein shall be
consistent with the terms and conditions of this permit; and.that any
activities not specifically identified and authorized herein shall
constitute a violation of the terms and conditions of this permit which
may result in the modification, suspension or revocation of this permit,
in whole or in part, as set forth more specifically in General Conditions
j or k hereto, and -'in the institution of such legal proceedings as the
United States Government may consider appropriate, whether or not this
permit has been previously modified, suspended or revoked in whole or in
part.
(b) That all activities authorized herein shall, if they involve
a discharge or deposit into navigable waters or ocean waters, be at all
times consistent with applicable water quality standards, effluent
limitations and standards of performance, prohibitions, and pretreatment
standards established pursuant to Section 301, 302, 306 and 307 of the
Federal Water Pollution Control Act of 1972 (P. L. 92-500; 86 Stat. 816),
or pursuant to applicable State and local law.
(c) That when the activity authorized herein involves a discharge or
deposit of dredged or fill material into navigable waters, the authorized
activity shall, if applicable water quality standards are revised or
modified during the term of this permit, be modified, if necessary to
conform with such revised or modified water quality standards, within
6 months of the effective date of any revision or modification of water
quality standards, or as directed by an implementation plan contained
in such revised or modified standards, or within such longer period of
time as the District Engineer, in consultation with the Regional
Administrator of the Environmental Protection Agency, may determine to be
reasonable under the- circum tances.
(d) That the permittee agrees to make every reasonable effort to
prosecute the construction or work authorized herein in a manner so as
to minimize any adverse impact of the construction or work on fish,
wildlife and natural environmental values.
(a) That the permittee agrees that it will prosecute the construction
or work authorized herein in a manner so as to minimize any degradation
water quality.
'f)
That the permittee shall permit the District Engineer or his
authorized representative(s) or designee(s) to make periodic inspections
at any time deemed necessary in order to assure that the activity being
performed under authority of this permit is in accordance with,the terms.
and conditions prescribed herein.
(g) That the permittee shall maintain the structure or work authorized
herein in good condition a -Lid in accordance with -the plans and drawings
attached hereto.
(h) That this permit does not convey any property rights, either in
real estate or material, or any exclusive privileges; and that it does
not authorize any injury to property or invasion of rights or any
infringement of Federal, State, or local laws or regulations, nor does it
obviate the requirement to obtain State or local assent required by law
for the activity authorized herein.
(i) That this permit does not authorize the interference with any
existing or proposed Federal project and that the permittee shall not.
Page 2 of 5
be entitled to conpensation for damage or injury to the structures or
work authorized herein which may be caused by or result from existing
or future operations undertaken by the United States in the public interest.
(j) That this permit may be surnmarily suspended, in whole or in part,
upon a finding by the District Engineer that immediate suspension of the
activity authorized herein would be in the general public interest. Such
suspension shall be effective upon receipt by the perraittee of a written
notice thereof which shall indicate (1) the extenL of the suspension,
(2) the reasons "or this action, and (3) any corrective or preventative
measures to.be taken by the permittee which are deemed nec essary by the
District Engineer to abate imminent hazards to the general public interest.
The pernittee shall take immediate action to comply with the provisions
of this notice. Within ten days following receipt of this notice of
suspension, the pernittee may request a hearing in order to present
information relevant to a decision as to whether his permit should be
reinstated, modified or revoked. If a hearing is requested, it shall
be conducted pursuant to procedures prescribed by the Chief of Engineers.
After completion of the hearing, or within a reasonable time after issuance
of the suspension notice to the permittee if no hearing is requested,
the permit will either be reinstated, modified or revoked.
(k) That this permit may be either modiflied, suspended or revoked
in whole or in part if the Secretary ol the Army or his authorized
representative determines that there has been a violation of any of the
terms or conditions of this permit or that such action would otherwise
be in the public interest. Any such modifica t4on, suspension, or re-
vocation shall become effective 30 days after receipt by the pernittee
of written notice of such action which shall specify the facts or conduct
warranting same unless (1) within the 30 -day period the permittee is able
to satisfactorily demonstrate that (a) the alleged violation of the terms
and the conditions of this permit did not, in fact, occur or Ob) the
alleged violation was accidental, and the permittee has been operating
in compliance with the terms and conditions of tile permit and is able to
provide satisfactory assurances that future operations shall be in full
compliance with the terms and conditions of this permit; or (2) within the
aforesaid 30 -day period, the permittee requests that a public hearing be
held to present oral and written evidence concerning the proposed modifica-
tion, suspension or revocation. The conduct of thi:s hearing and the procedures
for making a final decision either to modify, suspend or revoke this permit
in whole or in part: shall be pursuant to procedures prescribed by the
Chief o� Engineers.
(1) That in issuing this permit, the Government has relied on the
information and daEa which the permittee has provided in connection with
his permit application. If, subsequent to the issuance of this permit,
such information and data prove to be lalse, incomplete or inaccurate,
this permit may be modified, suspended or revoked, in whole or in part,
and/or the Government may, in addition, institute appropriate legal proceedings.
(m) Thal, any modification, suspension, or revocation of this permit
shall not be the basis for any claim for damalges against the United States.
(n) That the permittee shall notify the District Engineer at what: time
tho �i,!vivitv authori.zod hero.Lu will bc c.ommenced, as far in advance
Page 3 of 5
of the time of commencement as the District Engineer may specify, and
of any suspension of work, if for a period of more than one week, re-
sumption of work and its completion.
(o) That if the activity authorized herein is not started on or
before 311st day of December , 19 75 , and is not completed on or before
31st dav of December 1977, this permi-it, if not previously revoked or
specifically extended, shall automatically expire.
(p) That no attempt shall be made by the permittee to prevent the
full- and free use by the public of all navigable waters at or adjacent
to the activity authorized by this permit.
(q) That if the display of lights and signals or. any structure or
work authorized herein is not otherwise provided for by law, such
'lights and signals as may be prescribed by the United States Coast
Guard shall be installed and maintained by and at the expense of -the
permittee.
(r) That this permit does not authorize or approve the construction
of particular structures, the authorization or approval of which may
require authorization by the Congress or other agencies of tile Federal
Government.
(a) That if and when the permittee desires to abandon the activity
authorized herein, unless such abandonment is part of a 'transfer
procedure by which the permittee is transferring his interests herein
to a third party pursuant to General Condition v hereof, he must restore
the area to a condition satisfactory to the District Engineer.
(t) That if the recording of this permit is possible under applicable
State or local law, the permittee shall take such action as may b a
necessary to record this permit with the Register of Deeds or other
appropriate official charged with the responsibility for maintaining
records of title to and interests in real property.
(u) That there shall be no unreasonable interference with navigation
by the existence or use of the activity authorized herein.
(v) That this permit may not be transferred to a third party without
prior written notice to the District: Engineer, either by the trans-
feree's written agreement to comply with all terms and conditions of
this permit or by the transferee subscribing to this permit in the space
provided below and thereby agreeing to comply with all terms and conditions
of this permit. In addition, if the permittee transfers the interests
authorized herein by conveyance of realty, the deed shall reference this
permit and the terms and conditions specified herein and this permit
shall be recorded along with the deed with the Register of Deeds or other
Page 4 of 5
r's
signature.
Permittee hereby accepts and agrees to comply with the terms and conditions
of this permit.
A
152,� a
By A, Secretary of the Arm
i e, I rc C Ile
v
JQ:Z-,\T V FhT.py
District -Engineer
22 Auguat-1974
Date
Transferee hereby agrees to comply with the terms and conditions of this
permit.
Transferee
val�
Page 5 of 5
19
22 Awwt V:
feet by 33 faw
of the
Wer
aad to ja jaywaz-
LS feet
Wsz%s
jffo"
(PACLfic scw-�;
122-jawarc 0- Hu'',
to tie
Lsawl"
Eay�
Am M
�1;ejqort
If the
T-aC2
Co.
lot
.... h, osange
W 19y,
.. .......
Rob art g,
ISSUEED TO
ncuWva,"
—1,
14,D
Bcacb,
G -
Dewport
I
6E
V�--77
7,i
LA
16 A.
?lease make all reports re status of work under this insutiment, direct to the District Engineer, Department of the
Army, Los Angeles District. Corps of Engineers, P.O. Box 2711, Los Angeles, California 90053.
-he attention of the applicant is directed to the conditions of the permit, which specify that the District Engineer
shall be notified as to the date of commencement, the dates of suspension of the work, and date o, completion.
If it is anticipated tbar the work will not be completed by the date of expiration, application should be made to the
District Engineer, well 'in advance of that date, for extension of time to continue the work, provided that there has
been no change in the attendant circumstances.
The following forms are attached for your convenience, and it is requested that the appropriate one be completed
and returned to this office as work progresses. (Extra copy is for your record.)
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - �cu't crz. I inc)
subject-. mipieti-an o, work under Department of the xv pemuilt. (Date)
.0: DISZrict Engineer, Corps of Engineera, Departraeut of the Art.w. Los Angeles, Ca- -Us
in ampliance wIM Ll.e conditions, Of trie Pe -nit d&ted IS--- for
Mis is to nozif�7 you T27.at such work w—u completed or, 19
(Address)
Signed:
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
29---.
(cut an Itnc)
E-,;b,ect� R4simptlon off -omunder Departzienz, of ne ArFq pernit.
j)IsrrIct Zzglneer. Corps of MigineerS, Depar=-gnt of V21e A -My, LOS Angeles, California
In C,,%pIjanCe WI -b Me Conditions Of tM NZM�t issued lg___for
mis Is to notify you that worir will be resiuned on 19
— ------- — -- — ---- ---------------- — --- -------
I
signed: ----- — - — - — -------- —
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - �Mt On. lina)
Sub, ec--- Ss.,sperislon of work under Department of the Anry pe�Mlr.
To, Dst'jct Engineer, Corps of Zrigineers, Depazr=ent of the Army, Los Angeles, California
it. compiiance with Me conditions or the pern.it issued ... . .. . .... IS__ for - -------
this is to notify you that Wom Will be, suspended * for ..... days, beginning
ig--. /* If for zore t4w. I =eA0
� Si Shed.
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ( cu, t On I i'rx)
19--
&ib;ect: Cwmeacevient of Work under Dapartuient of the Arrty perrilt.
To: District Engineer, Corps of Eqginee�,� Departrent nf the AnV, Los Angeles. California
in win, tho conaizions or the pomit i6stiea if; ___rnr ..... . .
this Is to notify you that the authorized work will be carMlehcee
L.k FL 225
ol .
?'Gaae make all reports ra status of work under ffJs instrument, direct to the District Engineer, Department a,' the
Army, T as geles Disuict. Corps of Engineers, P.O. Be! 2711. Los Angeles, Califorma 90053.
Az. z
Tbe attention of the applicant is directed to the conditions of the pezmlt, whtch specify that the District Engineer
shall be notified as to the date of commencement, the dates of suspension of the work, and date of comp'ation.
It it is im-.'�cipaared that the work will hot be corardsted by the date of expi-ittion, application should be made to the
District Engineer, well in advance of that date, for Extension of time to continue the work, provided that there has
been no change in the attendant circumstances.
The following forms are attached for your convenience, and it is requested that the appropriate one be completed
and returned to this office as work progresses. (Extra copy is for your record.)
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ,cut or. tinc)
S,,bjecc: Ctmpletlai of worl-, under Depar=ent of t�ia AZ.4 pemit. (Late)
.D; Dlst-Mct Engineer, Corps of Engineers, D2parrtmezat of t:,,e AriV. Los MnSeles, C&Ijfr5znIa
In. conplialee 'NIM the cond!ZlonS of the pe—Mir dared 19--- for
r -b -S Is to notlf�' you that, such work Waa 0=pletad 0.11 19
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - (cut on It'no)
aib�oou Resumption of wor-4 under N-partment of ME Arp-v Pe -'-at. ite)
o: Metric' . Engineer, Corps of Engineers. Departr-rit of the Amy, Los Angeles, Call fornia
In c,-zrpl.�ance wltri tne condit.10as of the pem-lt Issued 16 --for
--- — ---- ---- — — Min Is to notify you that work will be resusied on ig
- ------- --- --- 7-4��7�T37) ---- ---------- - - - -- - ------ -
Signed: . . . . . .
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - i cut or. ;inaj
,9ubleoz;: %spenSIM of work under Department of the Ar.MY parTalt.
To: District Engineer, Corps of Engineers, Department of Lie Amy, Los Angeles, California
In coripliance with Ulte condItIms of Me perrait ISSued ... . ........ 19__ for - -------
tbs Is to notify you that Work Will be suspended kl, fo ------ days, beginning
If for �re thari I we,)
Slgied:
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - (cut
on �rta)
Subject: Cpsaencensr.�; of work under Department of the Anny pentait.
TO: Dist-lCt Engineer, Cor-ps of Engineem, Department nf the An -.W, Los An@ales, California
"Mililtinoo 1�10% W10 C'"IdlLiono or rho. oor-,iln Itictied 1�� ___,or ..... . ..
— - — — - — — ------------- — -------- — thin Is ton-otlfy yen that the au*.orlze(I work will be Coatietic0C
LA FL M
0. Box ��7i
LOS ANGELES. CALSFORNIA 9(�053
SPLCO-N
?x. Robert B. Main
1415 E. Balboa Boulevard
Newport Beach, caliioruia 92661
Dear ' . MaLa:7--.
22 August 1074
Your permit, dated 22 August 1974 (74-77), has beea valWated and is
inclosed. Notice of Authorization and copies of forms for reporting
the status of wor! are also in.clowd.
3
I
— ParMt
2. Mice of huthotization
3. --,fork Status
Sincerely yours,
WAN Z FGLEY
COL, az
District Engineer
S14,,TE OF CALIFORNIA
CAUFORO�XIA COASTAL ZONE C-01NISERVATION, COMTVJSSION
SOUTH COAST REGIONAI COM141551,01IN
665 r. OCEA.M 1301_EVAR'D, SU;TE 3107
KO. LOX 1450
LONG BEACH., CALIFORNIA 90M
(213) /,&4261 (714) 346-064-U
RESOLUTIO'N, OF I.PDROVAL PUM P!
An -ication Nuumber., P-4-2-74-29bO
P -L
!,'1a_1y.,e of Applicant- Robert B. McLain
RONIAID REAGAN,
1415.E. Bay Front, Newport Beach 92661
Permit Type. Ox 3 t an d -1 r d
F-1 Emeri-,ency
Development Location: _1_�L15 E�ay_LronL,_Newpo�L_Eeach
Development Description. CoDstruct a wooden seawall for beach
preservation. The wall is 3"xl2" tongue and groove and is to.be
buried 8' deep. Top of the wall -will be +8.0 on or ju,�t below
existing sand profile. (Sand profile is +8.0 mean low lower water)
Commission Resolution:
1. The South Coast Conservation Commission finds that the -proposed
development:
A. V -Lill not have a substantial adverse environmental or ecolog-
ical effect.
B. Is consist-nt.-with the findings and declarations set- forth
� in Public , Resources Code Sections 2/001 and 27302.
C. Is subject to the following other resultant statutory pro-
visions and P014 CieS.
City of Newport Beach ordinances.
D. Is. consistent with the aforesaid other statutor
provisions
and policies. in that:
�Iapproval in concept has been issued.
E. The following language 'and/or drawings clarify and/or facil-
itate carryingg out the intent of the South Coast Regional
Zone Conservation Corn2mission:
application, site map, plot plan and approval in concept.
II. Whereas, at a public hearing held on May 6, 1974
(date)
at Long Beach by a unanimous lbix vote here -
(location)
b -r approves the application for Permnit Number P-4-2-74-2960
pursuant to the California Coastal Zone Conservation Act oi
1972, subject to the following conditions imposed pursuant to
the Public Resources Codes Section 27403:
None
III. Said terms and conditions shall be perpetual and bind all future
owners and possessors of the property or any part thereof unless
otherwise specified herein.
IV. The grant of this permit is further made subject to the following:
A. That this permit shall not become effective until the attached*
verification of permit has been returned to the South Coast
Regional Conservation Copznission upon which copy all permittees
have acknowledged that they have received a copy of the permit
and understood its contents. Said acknowled0lient should be
returned within ten working days following issuance of this
permit.
B. That said development is to be commenced on or before 360
days from effective date of approval.
V. Therefore, said Permit (Standard, Emnx,��_) No. P -4-2-74-226o
is hereby granted for the above described development only, sub-
ject to the above conditions and subject to all terms and pro-
visions of the Resolution of Approval by the South Coast Regional
Conservation Commission.
VI. Executed at Long Beach, California on behalf of the South Coast
Regional Conservation Commission on May 20 , 1974
M.J. Catltente(/
Executive Director
2474
wk
a
Cil'i OF NEVIPORT BEACK HA.`�BOR APPUCADoN NO.
.d I �
ria 8'
'(F
3 p Z0 fop 0
�:1111
�Ond
p AORO-SPID
COM67-AVCTIC'M
0
-4W
VICIrVITY 5KETCH
NI—I-Pr 5AY CAL
olep�h, below �,o� 4o,,, 4.W �o�r,.
Ore e3106115h�d Z;l "A;S SeCl,�,
1 611
/.S. L b? C,
fit
50'
/V� A�ooc 1'.41all
-) ri—
I 1 1 .4V
23 xv-f
Z- 45'aIA6o,�y
Z,-7.r/ri0/-p Ale ?,f
77',107- 5,v O'�
"".j
I
I
DEPARTMENT OF THE ARMY
LOS ANGELES DISTRICT, CORPS OF ENGINEERS
P. 0. BOX 2711
LOS ANGELES, CALIFORNIA 90053
Public Notice No. 74-77
30 May 1974
YOU ARE INVITED TO COMMENT ON THIS APPLICATION FOR A PERMIT
APPLICANT: Robert B. McLain
1415 E. Balboa Boulevard
Newport Beach, California
ACTIVITY: Proposed construction and installation of a wood seawall (8 feet
high by 30 feet long), 45 feet shoreward of the U.S. Bulkhead Line; to remove
a portion 4shoreward of proposed seawall) of the existing pier; to join bay -
ward portion of tfi-e existing pierwith the seawall; and to conduct work on
Lot No. 8, Block No. N and 23, Tract Eastside Addition, Newport Bay, City of
Newport Beach, Orange County, California, as shown on the accompanying drawini.
PURPOSE AND USE: Beach preservation.
FEDERAL, STATE AND LOCAL AUTHORIZATIONS: Approved by the City of Newport
Beach; California Regional Water Quality Control Board - Santa Ana Region
has no objections; and Application No. P-4-2-74-2960 filed with the California
Coastal Zone Commission - South Coast Region.
ENVIRONMENTAL IMPACT: Based on information received, it is not anticipated
that the activity will require the preparation of an Environmental Impact
Statement by this office.
PUBLIC HEARING: Any person who has an interest which may be adversely affected
by the issuance of a permit may request a public hearing. The request must be
submitted in writing to the District Engineer within thirty (30) days of the
date of this notice and must clearly set forth the interest which may be
affected and the manner in which the interest may be affected by the activity.
Activities under Section 103 of the Marine Protection, Re,search and Sanctuaries
Act (PL 92-532) and Section 404 of the Federal Water Pollution Control Act
(PL 92-500) will be considered in conjunction with this notification.
CRITERIA: Your written comments or objections should include the number and
date of this notice and must reach this office within thirty (30) calendar
days. The decision whether to issue a permit will be based on an evaluation
of the probable impact of the activity on the public interest. That decision
will reflect the national concern for both protection and utilization of
important resources. The benefit which reasonably may be expected to accrue
from the activity must be balanced against its reasonably foreseeable detri-
ments. All factors which may be relevant to the activity will be considered;
among those are conservation, economics, aesthetics, general environmental
concerns, historic values, fish and wildlife values, flood damage prevention,
I
Public Notice No. 74-77 30 May 1974
APPLICANT: Robert B. McLain
land u�se classificationl� navigation, recreation, water supply, water
quality, and,. in general, the needs and.welfare of the people. Details.
of changed conditions on the final permitaction will be provided upon
request.
FOR.THE DISTRICT ENGINEER:
JAMES Z. METALIOS
LTC,, CE
Deputy District Engineer
I
2
U. S. Corps of Engineers
Post Office Box 2711
Los Angeles, California 90053
Attention: Waterways Control Section
Subject:: Harbor Permit Application No.
Dear Sir;
I hereby request a U. S. Corps of Engineers' Permit for the
construction and installation of a wood seawall
and appurtenances thereto, to be loZ5—atea-in pw)ort Bia
, bayward ox
Lot No. 8 Block No. N&23 Tract Easts I AddJYion , , Newport
Beach, c7a-ITE-ornia. I am Eli-e--o-w'ner of pr—operty, and
I have maie application for a Harbor Permit to the City of Newport Beach.
The adjoining property owners are:
Lot �&10 Block N&23
-.-- I
TractEaaj��i_de k(fLditian
Frank A. Rhodes
Lot , Block N&2 3
TracF-f��-tside 206(7i -t -ion
R.J. Brookes
1417 E. Balboa Blvd. 1413 E. Balboa Blvd.
Respectfully submitted,
Date 11/26/73 - ------
Fnc. Plans dated 11/16/73
3 Sepia Robert B. McLain
7 copies
--Naw.ppz± -.Beach.Ca3Jfornia
CITY OF NEWPORT BLACH APPROVAL
The Harbor and Tidelands Administrator. 0� the ity of ew ort Beach
7'
has reviewed Harbor Permit application by 'y , O't ew
�e-u. S. Co neers,L7"
11-1i )'c wl -� �Issue
and subject to the approval of t rps of
harbor Permit No.
Da te -:z -,-77- 721-
CC,.
I /Q
Marine SafetV Department
MARINE SAFETY DEPARTMENT
70 Newport Pier
February 25, 1914 .� ITEM NO.: F-1
TO: MAYOR & CTTY COUNCIL
FROM: Marine Safety Department
SUBJECT: JOINT HARBOR COMMITTEE RECOMMENDATION; REF. HARBOR
PERMiT;REVISION APPLICATIONS FOR THE CONSTRUCTION
OF A WOODEN SEAWALL 30 BAYWARD OF VACATED EAST BAY
Action
If desired, (1) deny the revision permits as applied for or (2)
approve the permits subject to the Joint Harbor Committee's
recommendation that the proposed bulkhead be built on the bayward
most line of Vacated East Bay Avenue with approval for wooden
return walls at the F & G Street -ends.
Discussion
The City Council at their regular meeting on January 28 referred
the subject permit revisions to the Joint Harbor Committee for
their recommendation.
The Joint Harbor Committee met on February*13, 1974, and discussed
the attached staff report which was originally prepared for the
Council's January 28 meeting. The staff prior to submitting the
report to the Joint Harbor Committee "drew" in a second sand berm
line representing berm positioning with respect to the proposed
bulkhead. This second berm line measurement was taken in accord-
ance with Councill's.instructions and represents positioning based
on a Public Works survey made on January 29, 1974.
The Joint Harbor Committee after reviewing the staff report, quest-
ioning of staff an ' d testimony by the applicants recommended that
Council not approve the applications as applied for, however, they
did recommend that the proposed wooden bulkhead, if built, be con-
structed no further bayward than the bayward most line of Vacated
East Bay.Avenue,:.with approval for wooden return walls at the F
& G Street -ends.
Page Two
Summarily, the Marine Safety Department has no set recommendati6ns
in this matter since it relates strictly to policy. The staff will
assist the applicants in processing the permits through the South
Coast Regional Zone Conservation Commission and U. S. Army Corps of
Engineers in accordance with Council's policy decision on the loca-
tion of the proposed bul head.
R. E. Reed, Director
Marine Safety Departmen I t
RER:DH: If
Attachments
MARINE SAFETY DEPARTMENT
70 Newport Pier
TO: CHAIRMAN AN. D MEMBERS OF THE J0114T HARBOR COMMITTEE
FROM: MARINE.SAFETY DEPARTMENT
SUBJECT: HARBOR -PERMIT APPLICATIONS FOR THE CONSTRUCTION OF
A WOODEN SEAWALL 301 BAYWARD OF VACATED EAST BAY
AVENUE. BETWEEN F & G STREETS ON THE BALBOA PENINSULA.
DISCUSSION:
The Newport Beach City Council at their meeting on January 28, reviewe - d
the attached Harbof:Permit Application and staff report. The Council
referred the Harbor Permit Applications to the Joint Harbor Committee
for their review and recommendation.
The staff, at the direction of Council,have drawn in a second sand
'berm line' based on the results of a Public Works,survey taken on
January 29, 1974.�.
The first 'berm line' was measured on December 12, 1973, by the Marine
Safety Department staff.
The difference between the two 'berm lines' represents beach prograding
by homeowners contracting with a small equipment operator who, on an
annual or bi-annual basis, pushes sand, at low tide, up in front of the
homes to maintain beach frontage.
R. E. REED, DIRECTOR
MARINE SAFETY DEPARTMENT
D. Harshbarger, Captain
Marine Safety Department
RER: DH: dw
14ARINE SAFETY DEPARTMENT
70 Newport Pier
January 28, 1974
TO: MAYOR AND CITY COUNCIL
FRDM:. Plarine Safety Department
SUBJECT: Harbor Permit Applications for the construction of a
wooden seawall 31' bayLaard Vacated ENS� Biay Avenue
between T -&(,, s Ei�e:E� O_E ThoefBalboa Pe- I su
APPLICA14TS: Prop erty owners; Eastside Addition Tract; Block N & 23.
Listed as follows: Mr. R. English, 1401 D. Balboa Blvd.,
Lot 1;,Mr. G. Stephens, 1405 E. Bal. Blvd., -Lots 3 & 1/2
(4)a Mr. D. McHone, 1409 E. Bal. Blvd.�Lots 1/2 (4) & 5,
Mr. C. Peck, 1411 E. Bal. Blvd. -Lot 6; Mr. R. Brookes,
1413 E. Bal. Blvd. -Lot 7; Mr. R. McLain, 1415 E. Bal. Blvd.,
Lot 8 ; Mr. F. Rhodes, 1417 E. Bal. Blvd. -Lots 9 & 10.
Project Description
Seven of the eiglit property owners bordering the Bay between F & G
Streets on the Easthalboa Peninsula have -applied to the City for
harbor permits to allow for the construction of a wooden seawall 301
bayward of "Vacated East Bay Avenue". The wooden seawall is proposed
to be built at an elevation of +8 MLLW with 301
walls at the F & G Street -ends. length wooden return
Discussion
The subject harbor permit application requires City Council approval
because the proposed seawall would be constructed 30' bayward of
"Vacated East Bay Avenue". The Harbor Permit Policies (Section 16
Bulkheads) was amended by Council in June of 1973. The following
paragraph, applicable -to these pending permits states�*.
"The Marine Safety Department may issue permits for bulkheads,
between U. S. Bulkhead Station Numbers 112-109.not to exceed
the bayward side of the 'Vacated East Bay Avenue'. Concrete
bulkheads and wooden reLaining wall structures proposed to be
constructed bayward of the bayward most line of Vacated East
Bay Avenue shall be subject to City Council approval."
The applications forlots 1 and 10 bordering F I G Street, street -
ends show 301 wood(�!.Ylreturn walls. Because thes"e return walls are
Page 2.
proposed to be constructed of wood rather than concrete they would
also require Council approval to deviate from City Harbor Permit
Policies. Section 16 - Bulkheads, paragraph H, of the Harbor Permit
Policies address the above and states:
"All private bulkheads constructed along street ri 1 -of -way
ght
lines shall conform to the City Standard Drawings for a concrete
bulkhead".
The U. S. Bulkhead Li ne is 115' bayward of the zoning setback line for
the block between F & G Street. The Property between the front of the
homes and the U. S.. Bulkhead Line is owned in fee by the respective
homeowners, but any. construction within this zone where the tide may
ebb and flow requires a harbor permit. Within the majority of the
Harbor, bulkheads,have.been built on the U. S. Bulkhead Line; however,
for this area (Between A and K Streets) it has been the City's basic
position that bulkheads or retaining wall structures should be held
back from the U...S. Bulkhead Line to the bayward side of "Vacated
East Bay Avenue" for the following reasons:
1. To preclude the possibility of sand -fill below the line of ordinary
high tide. I I I
2. To maintain as much as is possible conformity with respect Lo
Section 16, paragraph A of the City's Harbor Permit Policies
establishing a quasi bulkhead line.
3. To retain sand sloping beaches, which are energy absorbing versus
bulkhead structures which can reflect wave energy.
4. The possible retention of an undefined public easement over a por-
tion of private property over which the tide ebbs and flows.
NOTE: It is the staff's understanding (reference the First
American Title Insurance Company, that rights and easements
for Commerce ' Navigation and Fishery is in favor of the public,
or the federal, state or municipal government over any portion
of the subject property which is submerged. Also, at such time
that said submerged lands are filled, in conformance with all
applicable permits, to an elevation above the line of ordinary
high tide, that the above public easement exception will be
thereby eliminated.
The attached proposal drawings should warrant special Council attent-
ion because these are the first harbor permit applications that repre-
sent several homeowners requesting a variance to Council policy. The
magnitude of the project could possibly set a precedent for other
bayfront property owners within the A to R street zone.
The attached summary drawing depicting the F to G street block shows
an existing Sand Berm Line plotted by the Marine Safety Department
Page 3.
staff. This line on an average is approximately 15' landward of
the proposed seawall construction. Currently the sand elevation
at the berm line isapproximately an +8.5 MLLW. The sand level at
the proposed.bulkhead line is approximately a +4.0 MLLW.
The zone between.the proposed wall and the current sand berm line
will require fill.
During recent field inspections of the lower harbor with staff members
from the Bureau of Sport Fisheries and Wildlife and the South Coast
Regional Zone Conservation Commission, bulkhead construction along
sand beaches was discussed. In general, these agencies which review
and comment on harbor permit applications for the U. S. Army Corps
of Engineers, have held to the position that they are opposed to the
continuation of the bulkhead and associated fill process in the lower
Newport Bay. It is their analysis that this can retard water circula-
tion resulting in the degradation of water quality.
Summarily, the applicants are proposing to construct a quasi wooden
bulkhead structure 301 bayward of "Vacated East Bay Avenue" with wooden
return walls.at the F & G Street -ends. The wooden wall bulkhead, based
on staff inspection.,..will require limited landside fill.
In conclusion, themarine Safety Department staff has not made a recom-
mendation on this'application because of the policy nature of the
request. The staff could alter its position on this proposed project
if the bulkhead structure was brought back 30' to the bayward most
line of Vacated East Bay Avenue.
The following alternatives are listed for Council's consideration:
1. Construction of the proposed wooden bulkhead on the Bayward most
line of "Vacated East Bay Avenue" (301 landward of the proposed
location) with concrete return walls,,
2. Construction of the proposed wooden bulkhead on the Bayward most
line of "Vacated East Bay Avenue" with approval for wooden return
walls.
R. E. REED, DIRECTOR
D. Harshbarger, Captain
Marine Safety Department
DH: GEW: 1 f
Attachments
CITY OF NEWPORTBEACH HARBOR APPLICATIOW NO..
4A-)
R X 4
40
"T71
5
VIC) PLJ I TY SkETCH
N'�POI?r DAY FAL [FORWAL
PW01-14 E 14
5'041�dlnqs O'd
/vo Isc,1946 &eII below Alco� 40we, 4ow ",I
are eliab/'S'Agni rclh;S SCIC/lon Bar.
P*N z). -
_T
Fe
Aloao WV,44 __II lu I'll,
A
I A
4 (5 6
.90
Aaa
7_79-4II
ZIAMI AV V '�� J� A I e ZWrAr
or
F
CITY OF NEWPORT BEACH HARBOR APPLICATION NO.
fop 540
�y.
Y.
2
vo SC411'r
--7FT7- Tj
' i5p%g
0"' '14
a0z S"Ve.
- ce"-y 41
VIC)"ITY SkETCH
�'�pomr E3�AY
� CAL IP�At4(A
01, VAPICSSI& 11 IreO 1,& ' .....
lwco� Z,w
pp ,,, /0
cjiob/'She.� ',, /A's secl'o' OrA . ewpo",
7 e
4b),
L44: - S—'e ? "r;v z
it
30
,Vclw A/a
t .4vifflocT
—T— -T
-7 '9
,z-. 5��xl6oa
tp .1
A�Jeere7
-C'.' eal6ocy &/Vc/
401cl.
Al f ',?-7 8
71 f.) 4 7.7 -
�WAWIV &K 10-10-M.
//- /4 - 71
all
ria
j P
AP OICIL r
,va Vjr,4.�X"
I - �li 1111- 11 1 1 - I
It
A I.,,o
.1--.
�16,6 S/lc
VICIMITY ZSKETCI-4
No,,Pc,R,- DAY (-At lrl"ANII�
q
5")
a w�o �/, 5
are e
! L
,17 t
vr I on,)
L 41/0,L� � " " I
U
eal6oa
�D
d&j 4?0X
--L Z77x/r,�k
7.7 - ple,70
-- --------