HomeMy WebLinkAbout10 - Balboa Island Bayfront Repairs 2002-2003E CITY OF NEWPORT BEACH CITY COUNCIL STAFF REPORT Agenda Item No. 10 March 23, 2004 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department R.Gunther, P.E. 949 - 644 -3311 rgunther @city.newport- beach.ca.us SUBJECT: BALBOA ISLAND BAYFRONT REPAIRS FY 2002 -2003 — COMPLETION AND ACCEPTANCE OF CONTRACT NO. 3554 RECOMMENDATIONS: 1. Accept the work. 2. Authorize the City Clerk to file a Notice of Completion. 3. Authorize the City Clerk to release the Labor and Materials bond 35 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code. 4. Release the Faithful Performance Bond 1 year after Council acceptance. DISCUSSION: On April 8, 2003 the City Council authorized the award of the Balboa Island Bayfront Repairs FY02 /03 contract to Ranco Corporation. The contract provided the construction of new concrete sidewalks along East Bay Front between Grand Canal and Balboa Avenue, along North Bay Front between Park Avenue and Emerald Avenue, and along West Grand Canal between the Grand Canal Bridge and the first alley north of South Bay Front. Surface drainage is now directed toward the public bulkhead and intercepted by new area drains at select locations for below grade discharge into the nearby street end catch basins via new 6 -inch diameter PVC underground drainpipes. In addition, deteriorated concrete sidewalk panels and curbs at various locations on Garnet Avenue, Emerald Avenue, and Abalone Avenue were reconstructed. The contract has now been completed. However, the contract took longer than the . scheduled contract time due to an inadequate work force and the time to do corrective work on concrete areas that had to be re- poured. Because of delays due to re- design SUBJECT: Balboa Island Bayfront Repairs FY 2002 -2003 - Completion And Acceptance of Contract No. 3554 March 23. 2004 Page 2 work related to conflicting utilities and minimal slope, no liquidated damages were charged to the contractor. A summary of the contract cost is as follows: Original bid amount: $165,440.00 Actual amount of bid items constructed: $145,262.00 Total amount of change orders: $4,019.28 Final contract cost: $149,281.28 The decrease in the amount of actual bid items constructed under the original bid amount resulted from deletion of a seawall waterstop and miscellaneous items. The final overall construction cost including change orders was 9.77 percent under the original bid amount. One change order in the amount of $4,019.28 provided for the additional seawall coping patchback repair. Environmental Review: The project was determined to be categorically exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15302 of the CEQA Implementing Guidelines for the maintenance of existing public facilities with negligible expansion of the facilities in areas that are not environmentally sensitive. T he work consisted of the reconstruction of existing concrete walkway improvements and did not impact any environmental resources. Staff filed the Notice of Exemption for this project with the County Clerk on March 14, 2003. Funding Availability: Funds for the project were expended from the following account: Account Description Account Number Balboa Island Bayfront Repairs 7231- C5100314 The original contract completion date was November 21, 2003 season and additional work, the contract completion date was order to January 23, 2003. Punch list items were completed by F extended final completion date. Amount $149,281.28 Due to the holiday extended by change ebruary 20, 2004, the Prepared by: Submitted b a Z, R. Gunt er, P.E. S #e G. Badum Construction Engineer tic Works Director SUBJECT: Balboa Island Bayfront Repairs FY 2002 -2003 - Completion And Acceptance of Contract No. 3554 March 23, 2004 Page 3 ,0 11