HomeMy WebLinkAbout08 - C-3538 Lido Isle Bridge Repair & Water Main. CITY OF NEWPORT BEACH
CITY COUNCIL STAFF REPORT
Agenda Item No. 8
April 13, 2004
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: Public Works Department
R.Gunther, P.E.
949 - 644 -3311
rgunther@city.newport-beach.ca.us
SUBJECT: LIDO ISLE BRIDGE REPAIR AND WATER MAIN REPLACEMENT —
COMPLETION AND ACCEPTANCE OF CONTRACT NO. 3538
RECOMMENDATIONS:
1. Accept the work.
2. Authorize the City Clerk to file a Notice of Completion.
3. Authorize the City Clerk to release the Labor and Materials bond 35 days after
the Notice of Completion has been recorded in accordance with applicable
portions of the Civil Code.
4. Release the Faithful Performance Bond 1 year after Council acceptance.
5. Approve a Budget Amendment appropriating $24,124.40 from Gas Tax Account
No. 7181- C5100302 and $19,390.00 from Sidewalk, Curb, and Gutter
Replacement Account No. 7013- C5100020 into the Lido Isle Bridge Repair
Account No. 7013- C5100673.
DISCUSSION:
On July 22, 2003, the City Council authorized the award of Lido Isle Bridge Repair and
Water Main Replacement contract to Denboer Engineering & Construction, Inc. The
contract provided for the construction of the following items of work on the Lido Isle
Bridge and on the utility systems leading onto and across the bridge:
1. Replaced concrete sidewalks on the bridge
2. Provided concrete, epoxy injection, shotcrete, and mortar repairs on the bridge
and its wingwalls
3. Removed the top portion of the high southerly bridge railing and replacing it with
an aluminum pipe railing to match the northerly railing as closely as possible
4. Replaced the navigation lighting and conduits on the bridge and lighting conduit
and controller in Via Lido Park
5. Repainted the bridge
6. Replaced the primary Lido Isle water main in Via Lido between Lafayette Avenue
. and Via Lido Soud
7. Installed flex joints on the water main at each end of the bridge
SUBJECT: Lido Isle Bridge Repair and Water Main Replacement -Completion And Acceptance of Contract No. 3538
April 13, 2004
Page 2
This 70 year -old bridge needed to have the deteriorated steel and concrete replaced,
the antiquated navigational lighting fixtures and lighting circuitry upgraded, and the
leaking water main replaced. During the course of construction it was discovered that
the sewer line beneath the bridge had deteriorated and needed to be replaced to avoid
the potential of a leak occurring directly into the harbor. A Change Order was
subsequently issued for the sewer line replacement
The contract has now been completed to the satisfaction of the Public Works
Department. A summary of the contract cost is as follows:
Original bid amount: $634,074.00
Actual amount of bid items constructed: 696,193.70
Total amount of change orders: 93,942.83
Final contract cost: $790,136.53
The increase in the amount of actual bid items constructed over the original bid amount
resulted from the need for additional shotcrete repair, trowel - applied mortar repair,
epoxy injected crack repair, and zinc coating on channels. The final overall
construction cost including Change Orders was 24.6 percent over the original bid
amount. Per the Council Policy, the City Manager approved the additional funding.
Eight Change Orders totaling $93,942.83 were issued for this project as follows:
Change
Order No. Amount Description
1 $0.00 No -cost time extension to obtain Coast Guard permit
2 $38,975.00 Replacement of the sewer line beneath the bridge
3 $12,850.00 Removal and disposal of concrete abutment walls to
install water and sewer mains and replace sidewalk
4 $8,912.06 Removal of concrete and slurry from around piping
under the bridge and miscellaneous items
5 $12,223.27 Demolition and removal of monolithic concrete curb
over structural I -beams
6 $4127.50 Additional traffic control, including flag- persons, for 5
days
7 $16,855.00 Installation of reinforced sidewalk on the bridge
approaches and replacement of sidewalk over the
water and sewer mains.
Environmental Review:
0
The project is exempt from the California Environmental Quality Act (CEQA) pursuant to
Section 15302 of the CEQA Implementing Guidelines. This exemption covers the
maintenance and replacement of existing public facilities with negligible expansion of the
facilities. A Categorical Exemption was prepared by the Public Works Department and .
filed with the County Clerk.
SUBJECT'. Lido Isle Bridge Repair and Water Main Replacement -Completion And Acceptance of Contract No. 3538
April 13. 2004
Page 3
Funding Availability:
The Lido Isle Community Association (LICA) contributed funds to improve the bridge
railing in order to provide an unobstructed view of the harbor. The Budget Amendment
listed below will fund the difference between the original budget amount and the total final
project cost. Funds for the project were expended from the following accounts:
Account Description
Lido Isle Bridge Repair
LICA Contribution for Railing Modifications
Water Main Replacement Program
Sewer Maintenance Fund
April 13, 2004 Budget Amendment
Pending Council Approval
Account Number
Amount
7013- C5100673
$391,749.99
7251- C5100673
$30,000.00
7501- C5500578
$285,897.14
7531- C5600292
$38,975.00
7013- C5100673
$43,514.40
TOTAL $790,136.53
The original contract completion date was November 22, 2003. Due to additional
quantities of bridge repair work, the replacement of the sewer beneath the bridge and
other change order work, the contract was extended to March 9, 2004. All work was
completed by the revised completion date.
Prepared by:
R. Gunther, P.E.
Construction Engineer
S
m G. Badum
Works Director
City of Newport Beach NO. BA- 04BA -048
BUDGET AMENDMENT
2003 -04 AMOUNT: $43,514.40
EFFECT ON BUDGETARY FUND BALANCE:
Increase Revenue Estimates
Increase Expenditure Appropriations AdID
PX Transfer Budget Appropriations
SOURCE:
from existing budget appropriations
from additional estimated revenues
from unappropriated fund balance
EXPLANATION:
This budget amendment is requested to provide for the following:
P XIncrease in Budgetary Fund Balance
Decrease in Budgetary Fund Balance
No effect on Budgetary Fund Balance
To transfer expenditure appropriations for the Lido Isle Bride Repair and Water Main Replacement Project, C -3538.
ACCOUNTING ENTRY:
BUDGETARY FUND BALANCE
Fund Account Description
REVENUE ESTIMATES (3601)
Fund /Division Account Description
EXPENDITURE APPROPRIATIONS (3603)
Description
Division Number 7181 Gas Tax
Account Number C5100302 Street/Bikeway Improvement
Division Number 7013 Street
Account Number C5100020 Sidewalk, Curb, & Gutter Replacement
Division Number 7013 Street
Account Number C5100673 Lido Isle Bridge Repair
Division Number
Account Number
Signed: �-
Financial Approval: Administrative Services Director
Signed: 940619--/.
Administrative Approval. City Manager
Signed:
City Council Approval: City Clerk
Amount
Debit Credit
$24,124.40
$19,390.00
$43,514.40
O
Date'
Ga
Dale
Date
0
.. ......... I"--
- - - -- -city o hieawport Seach— NO. - -BA- 04879--C48 - - -.
BUDGET AMENDMENT
2003 -04 AMOUNT: $a3,sla.ao
EFFECT ON BUDGETARY FUND BALANCE:
Increase Revenue Estimates
Increase Expenditure Appropriations AND
qX Transfer Budget Appropriations
SOURCE:
from existing budget appropriations
from additional estimated revenues
from unappropriated fund balance
EXPLANATION:
This budget amendment is requested to provide for the following:
q XIncrease in Budgetary Fund Balance
Decrease in Budgetary Fund Balance
No effect on Budgetary Fund Balance
To transfer expenditure appropriations for the Lido Isle Bride Repair and Water Main Replacement Project C -3538
ACCOUNTING ENTRY:
BUDGETARY FUND BALANCE
Fund Account
REVENUE ESTIMATES (3601)
Fund /Division Account
EXPENDITURE APPROPRIATIONS (3603)
Description
Description
Division Number
Account Number
Signed:
Signed
Signed:
ncial
Services Director
City Council Approval: City Clerk
Amount
Debit Credit
$24,124.40
$19,390.00
$43,514.40
Date'
4OI
afe
((6 /�
Date
Description
Division
Number
7181
Gas Tax
Account
Number
C5100302
Street/Bikeway Improvement
Division
Number
7013
Street
Account
Number
C5100020
Sidewalk, Curb, & Gutter Replacement
Division
Number
7013
Street
Account
Number
C5100673
Lido Isle Bridge Repair
Division Number
Account Number
Signed:
Signed
Signed:
ncial
Services Director
City Council Approval: City Clerk
Amount
Debit Credit
$24,124.40
$19,390.00
$43,514.40
Date'
4OI
afe
((6 /�
Date