Loading...
HomeMy WebLinkAboutM2009-0009Please print 3 copies Worksheet for Building Combo Permi City of Newport Beach - Building Departr ing F- Grading 17]Drainage F- Elec 1. Project Address (Not mailing address) Tenant Name(if Floor Suite No # Units (if Residential) . .............. ............................... 2. Description of Work P1, iell� ........... ..... ................... ........... ............... I ................. I .......... .......... ....... .. ... ............. Exist House SF Demo House SF Add/Reconstruct House SF .......... .............. ............ 1777 Exist Gar SF F777 Demo Garage SF F777 Add/Reconstruct Garage SF TOTAL HOUSE SF F_ New F_, A�� Alter F -,Demo ...... . TOTAL GARAGE SF Dill IM F77 3. Owner's Name Last First ........... ........ ....... ........ ......... F777777 Owner's Address Owner's E-mail Address ............. ............ � z!� . ............. ........................... ..... ...... ..... - .......... .......... City State Zip Telephon ..... ............... .... . . ........ ... ........ - 5 Use I AZ)A_�- Valuation $ M?!� # Stories 17 Cu Yd Cut F7 Cu Yd Fill F77 Engineer's Address Engineers E-mail Address city [777 ............ . . ...... .... ....... ............ - ....................................... State .......... .......... .......... ................... - .............. ... ....................... Zip Telephone 6. Contractor's Name Lastl. First Lic. No. _777�lass F7 I................................ Contractor's Address Contractor's E-mail Address 7 . F city .... ....... State ....................... ............... .... . ......... .. ... ............... .......... .............................. Zip Telephone F7777 .. _- OFFICE USE ONLY ENERGY P/C FEE $ PERMIT NO. GRADING P/C FEE $ PLAN CHECK NO. Rev 7178107 ELEC/MECH/PLUM P/C PLAN CHECK FEE $ Zc� �- r? L - IF Wo 414 pl?�Pvpeo C, YAO)hf, i$�r IA. all of JCE TC ;4 AF 41 p C� 'Ac 0. J`114157�� lid"" LI cl 40 -MIA //7 J14 303 E- 7r -a e, T z 3ii. ke c-, z c r UAi IL Zi� .44 IF Wo 414 pl?�Pvpeo C, YAO)hf, i$�r IA. all of JCE TC ;4 AF 41 p C� 'Ac 0. J`114157�� lid"" LI cl 40 -MIA //7 J14 303 E- 7r -a e, T z 3ii. ke c-, z c r pwi��7 �lov ,qCy—.f- Lt ( j�O(t,577,,,-4 f3U,-,kAI2E-lV CW OF N E 0�.- - -n .,.Ac -Y HMCP iPIERMIT "Emw -nNSTRUCT AM .wolsslom IN THE RMUM SHOW �:PSE HE9120F, st, INDIrATED lJlj- PROVISIONS OF I PrRMTT P iPORT BEACH AND h 2EON. THIS PERMIT WRiT TEN CONSENT OF ,�R CITY COUNCIL THE amil-� ONLY E PERMISSIVE t� RE� ED THE CITY IL �qj'j-rs rtr"P 7 OF E MUNI cl sOR COORDINAFOR lol-1 PERMIT NO. DArE EPLY TO ATTENTION OF: Office of the Chief Regulatory Branch DEPARTMENT OF THE ARMY LOS ANGELES DISTRICT, CORPS OF ENGINEERS 911 WILSHIRE BOULEVARD LOS ANGELES, CALIFORNIA 90017 Mr. Tony Melurn Tidelands Administrator City of Newport Beach P.O. Box 1768 Newport Beach, California 92659-1768 June 18, 1996 SUBJECT: NOTICE TO PROCEED (File No. 96 -00356 -MFS) Dear Mr. Melum: Reference is made to your letter dated May 17, 1996 in which you submitted on behalf of Ms. Judith Binder at 1903 East Bay Front, a notification for the maintenance dredging of 120 cubic yards of sand and silt material by hydraulic suction and disposal of the dredged material on the adjacent beach. Based on the furnished information, we have determined that the proposed maintenance dredging activity complies with the terms and conditions of Permit No. 89 -211 - GS provided that Ms. Binder's contractor does not exceed the maximum dredging design depth of -5 feet MLLW with a maximum allowable overdepth of -1 foot MLLW. If you have any questions, please contact Mark F. Sudol of my staff at (213) 452-3418. Please refer to this letter and 96 -00356 -MFS in your reply. mja,�i n Mark Durham Chief, South Coast Section Regulatory Branch Enclosure(s) ITT NO. DREDGING APPLICATION Project Location: Iq03 F_ B2�r_Ave. Cubic Yards to'be Dredged: 90 Mlethod of Dredging* HX(I-rqIIIjt, S11r. Nature of Dredged Material: San(14q'It Disposition of Dredged Material: trnna�aQr _t to begeh �eclaimation Method of Material Dis-position:—PI-ponline transoort Tu I r I bidity Control Method: in Pz�'c' of -qredg-na on contiguous bulkheading and beaches Reinforce/protect bulkhead -restore sand to depleted beach 'he U� S. A - Mark Sites hereby state that I have read -mv (print name) Corps of Fngineers per -mit for -,-,ialintenance dredging in Newpo-rt Harbor, tne City of Newport Beach and Orange County Harbors,Beaches and Parks D4 s r,' cl- (if applicable) permit for maintenance dredging an tha- I accept a'I he provisions therein. Additionally -7 guarantee that the proposed ld-redg4nq will no-, occur because of anv altering of existing tase c� +-he a`Ected zone. Chris Brown (Applicant -type name) 12/1/87 Date) Intrnnnnst a - 91mg- (Contracto!�m � name) Signed: Clnt-Storls" RepIresentative Cr' 1. . ,, �L , ! q CO% Permit clher 0, 7:j:e i;- -7 PERWIT ISSUED SUBJECT TO DRECGE NIAMRIAL MING UEA__� 5bd 6ev AT T E i:'� �`L' AM,, —(qo ,.'z NtO. ve�l Cr' 1. . ,, �L , ! q CO% Permit clher 0, 7:j:e i;- -7 PERWIT ISSUED SUBJECT TO DRECGE NIAMRIAL MING UEA__� 5bd 6ev I �r W14 L ORO REPLY TO Office of the Chief Re--ulatory Branch DEPARTMENT OF THE ARMY LOS ANGELES DISTRICT, CORPS OF ENGINEERS P.O BOX 532711 LOS ANGELES, CAUFORNIA 90053-2325 City of Newport Beach Attention: Tony Melum P.O. Box 1768 -Newport Beach, California 92658-8915 Dear Mr- Mehim: June 6, 2001 This is in reply to your application (File No. 200100978 -SMS) dated May 3,2001, for a Department of the Army Penrit to dredge for maintenance just bayward of 1903 East Bay Avenue, 840 Via Lido Nord, 829 Harbor Island, and 101 Via Lido Soud, in Newport Bay in the City of Newport Beach, Orange County, COornia, as described below. Dredge Location Amount of Dredge Material Disposad Location 1- 1903 East Bay Avenue 250 cubic yards Beach disposal 2. 840 Via Lido Nord 125 cubic yards Beach disposal 3. 829 Harbor Island 1000 cubic yards Ocean disposal at L.A. 3 4. 101 Via Lido Soud: 263 cubic yards Ocean disposal at L.A. 3 Based on the information you have provided, the Corps of Engineers has determined that your proposed activity complies with the terms and conditions of Regional General Permit (RGP) No. 54. As Iona as you comply with the general permit conditions of RGP No. 54, an individual permit is not required. This letter of verification is valid until July 24,2005 when RGP No. 54 will expire. A general perndt does not grant any property rights exclusive privileges. Also, it does not authorize any injury to the property or rights of others or authorize irfte3:f�,cnce -,vifll any existing or proposed Federal project. Furthermore, it does not obviate the need to obtain other Federal, State, or local authorizations required by law. Thank you for participating in our regulatory program. If you have any questions, please 0 contact Susan Sturges of my staff at (213) 452-3418. Sincerely, to�"� yaz2��/�- Mark�zm Chief, South Coast Section Regulatory Branch sTATFoFcALiFc)gNiA-THF:RF=soijgr.r.';AC.FMr.Y GRAY DAVIS Gnvemnr CALIFORNIA COASTAL COMMISSION South Coast Ama Office 200 Oceangate, Suite 1000 Long Beach, CA 90802-4302 (562) 590-5071 May 8, 2001 Mr- Tony Melurn Division of Harbor Resources City of Newport Beach P.O. Box 1768 Newport Beach, CA 92658-8915 Subject: Condition Compliance —Coastal Development Permit 5-99-282 & Conformance with Consistency Certification CC -078-99 Dear Mr. Melum: Commission staff have received information submitted as evidence of compliance with Coastal Development Permit 5-99-282 and/or as evidence of conformance with Consistency Certification CC -078-99 for the following sites in the City of Newport Beach: Commission staff have reviewed the information submitted and determined that the above referenced dredging event conforms with Consistency Certification CC -078-99 and that no further federal consistency review is necessary from the Commission for the dredging component of the project. In addition, the proposed beach disposal has been reviewed and found by the Executive Director to be consistent with Special Conditions 1, 2, and 3 of Coastal Development Permit 5-99- 282. No further review is necessary from the Commission for the beach disposal components of the project. Please be advised that only the project described in the materials submitted for the sites listed above have been found to conform with Consistency Certification CC -078-99 and/or conform with the terms and conditions of Coastal Development Permit 5-99-282. Any change in the project may cause it to lose its status as consistent with CC -078-99 and/or CDP 5-99-282. This certification is based on information provided by the recipient of this letter. If, at a later date, this information is found to be incorrect or incomplete, this letter will become invalid, and any development occurring at that time must cease until a new determination regarding conformance with CC -078-99 and/or CDP 5-99-282 is obtained. If you have any questions, please contact me at (562) 590-5071 or Mr. James Raives at (415) 904-5200. Sincer�el�., 21 Karl Schwing Coastal Program Analyst Cc: Mr. James Raives, California Coastal Commission Ms. Susan Sturges, U.S. Army Corps of Engineers 1 Not to Exceed 500 cubic yards per dredging and beach disposal event 2 Not to Exceed 1,000 cubic yards per dredging and off -shore disposal event 3 Not to Exceed 20,000 cubic yards per year Site Address Beach 7, Disposal? (Yes/No) 0 ON a mie 0 ffm a OWNHOWN 3 Tota7h 2001 1111WI115111111111111 141 Via Lido Soud immonliommimi Commission staff have reviewed the information submitted and determined that the above referenced dredging event conforms with Consistency Certification CC -078-99 and that no further federal consistency review is necessary from the Commission for the dredging component of the project. In addition, the proposed beach disposal has been reviewed and found by the Executive Director to be consistent with Special Conditions 1, 2, and 3 of Coastal Development Permit 5-99- 282. No further review is necessary from the Commission for the beach disposal components of the project. Please be advised that only the project described in the materials submitted for the sites listed above have been found to conform with Consistency Certification CC -078-99 and/or conform with the terms and conditions of Coastal Development Permit 5-99-282. Any change in the project may cause it to lose its status as consistent with CC -078-99 and/or CDP 5-99-282. This certification is based on information provided by the recipient of this letter. If, at a later date, this information is found to be incorrect or incomplete, this letter will become invalid, and any development occurring at that time must cease until a new determination regarding conformance with CC -078-99 and/or CDP 5-99-282 is obtained. If you have any questions, please contact me at (562) 590-5071 or Mr. James Raives at (415) 904-5200. Sincer�el�., 21 Karl Schwing Coastal Program Analyst Cc: Mr. James Raives, California Coastal Commission Ms. Susan Sturges, U.S. Army Corps of Engineers 1 Not to Exceed 500 cubic yards per dredging and beach disposal event 2 Not to Exceed 1,000 cubic yards per dredging and off -shore disposal event 3 Not to Exceed 20,000 cubic yards per year POSTDREDGING COMPLETION REPORT The permittee shall send one (1) copy of the post -dredging report for each completed individual dredging project to the Corps and the CCC documenting compliance with all general and special conditions defined in d -ds permit- The post -dredging report shall be sent within 45 days after completion of the complete individual dredging project authorized in this permit. The post -dredging report shall include the following information for the completed individual dredgin . g project. 1. Permit Number: /0 �y - 2. Start Date: (� ./ i & /o I . Completion Date: (:/W 210 1 3. Total dredged material to Beach: 1,20 -," VaL to Sea (LA3): 1 4. Mode of dredging apd transportation, and method and frequency of disp9sal: 5. Tu- or other vessel logs documenting contact with USCG MS0 Long Beach before each trip to the LA -3 ocean disposal site. USCG Contact Yes — No; 6.' Form of dredged material: Slurry )C Cohesive 7. PrggWure and location where the disposal barge or scow was washed: 8. A certified report from the dredging site inspector and thecaptain of any tug or other vessel used to transport and dispose of dredged material at LA -3 indicating all general and special 0 permit conditions were met Any violations of the pern-dt shall be explained in detail. All conditioning permits were met: Yes — No 9. Post -project surveys of Eelgrass beds potentially affected by the dredging: 10. The post -dredging report shall be signed by a duly authorized representative of the permittee. The permittee's representative shall make the following certification: I =dfiy under penalty of hnv that this doCUmLnt and all attuditnents zvere prepared under my direction or supervision in accordance Ttiith a systein designed to ensure that qualified personnel property gather and evaluate the information submitted. Based on my irv7uiry of the person or persons Mio manage the system, or tlwse directly responsible )br gatlxnng the information, the information submitted is, to the best of iny knouiledge and belief true, accurate, and complete. I am aware that there are significant penaltiesfor submittingfalse information, including the possibilihj of fine and imprisonmentfor kno7ving violations. bignature NAME ADORE � APPROVED BY OCHO EWA COUNCIL F� PUBLIC WORKS DEPT ESCROW INSPECTION M CONDITIONS ADDRESS OF PROPOSED FACILITY PERMIT C T ' =.. .. I ELE FEE CHECK NO DATE 5 AP -ATI PL NSTAUK A --MainLenannp-predging A T PT�E ABOVE LOCATION �N ACCORDANCE WITH THE CITY OF DATE APPLIGATION IS HEREBY MADE FOR A . .... ...... RX for CONSTRUCTIREVISE NEWPORT BEACH PERMIT POLICIES AND THE ATTACHED DRAWINO BY -waff±±m&kop—j-". COMPANY DATED May 8, 1996 DATE May 8, 1996 SIGNATURE CITY OF NEWPORT BEACH. CALIF. Vice President WX FORM 68�1010 CESPL�-O TD:452-419-� JUN 18'96 15:18 No.004 P.01 G)mPLYTO Office of the Chief Regulatory Branch Mr. Tony Me)um Tidelands Adn-dnistrator City of Newport Beach P-0. Box 1768 Newport Beach, California DEPARTMENT OF THE ARMY LOS ANGELES DISTRICT, CORPS OF ENGINEERS Oil WILSHIRE BOULEVARD LOS ANGELES, CALIFORNIA 9*017 92659-1768 June 18, 1996 suBjECr: NOTICE TO PROCEED (File No. 96 -00356 -MFS) Dear Mr. Melum; Reference is made to your letter dated May 37,1996 in which you submitted on b-ehalf of Ms. Judith Binder at 1903 East Bay Front, a notification for the maintenance dredging of 120 cubic yards of sand and silt material by hydraulic suction and disposal of the dredged material on the adjacent beach. Based on the furnished information, we have determined that the proposed maintenance dredging activity complies with the terms and conditions of Permit No. 89 -211 - CS provided that Ms. Binder's contractor does not exceed the maximum dredging design depth of -5 feet MLLW with a maximum allowable overdepth of -1 foot MLLW. If you have any questions, Please contact Mark F. Sudol of my staff at (223) 452-3418. Please refer to this letter and 96 -00356 -MFS in your reply. Mark Durham Chief, South Coart Section Regulatory Branch Enclosure(s) PERMIT NO. DREDGING APPLICATION Project Locatign. 1903 E. Bay Cubic Yards to be Drddged: ],a 0 Method Of Dredging: hydraulic suction Nature of Dredged Material: Disposition of Dredged Material: _4,UMU_2= adiacgnt beagh Method of Materi al Disposition:: niRel ine Turbidity Control Method: turbjdiLLr curtain as reauired Effect of dredging on contiguous bulkheading and beaches restores beach and reinforces -bulkhead It T,nrinz hereby state that I have read the U. S. Army pryna t Corps of -Engineers permit for maintenance dredging in Newport Harbort the City of Newport Beach and orange County HarborsiBeaches and Parks District (if applicable) permit for maintenance dredging and that I accept all the provisions therein. Additionally I guarantee that the proposed dredging will not occur because of any altering Of existing use of the affected zone. Judith Binder bel (Applicant -type `RnZie-T� (,(contractor- type wa—m-eT' May 8, 1996 Signed: Ll /,q C t tor s Representative CITY OF NEWPORT BEACH HARBOR PERMIT GRANTED To CONSTRUCT AM[: IS HEREBY FACILITY S"OvIN IN THS PEVERSE "EF'Zof THE C- 1 -3 PROVISIONS 0� SITE INDICATED, SUZJE' OF . ,.,r.OFjT SEACK AN' - ARBOR PEFtT4IT t-OLICtES THIS ;,Eftm- CONDITIONS LiST 10 lll�r'FGN' !�PECfAL If. Vr�..TE�j coNS04T TRANSFERABLid WIrf'"T IL. TW ' CITY COUNC CITY HARBOR AVT E: 014L ,4,rS GIVEN UNDER Tllll� Ij�o f;,i -ZIAE CITY COUNC�l a THIS PERMIT MAY BE RCVO F THE f4UNICiPAL CODa- ACCORI)A",cE wrTH TITLE 17 TOR �"411W-r—o� fq (20 9ATE ,AIT NO - SPECIAL CONDITIONS' Corps Of Engimers Permit oranp county Permit 06M -5c- fz�z-.-r— c� PERMIT ISSUED SUBJECT TO DREDGE MATERrAL sEwc HAULEDTOSEA PLACED ON BEACH----V,2--O�� TRAUTWEIN BROS. ---Z - A 7 WATERFRONT CONSTRUCTION GencTal Engineering Contractors /-5- J 2410 N.� Wd. M.�po,t 9.6, Wif. 92663 (714) 673-1960 sy—i -,,T, 4VZ71-' I � t CHKD BY DATE tp1e",f!l,q ..- "Ljr (L lo N C�- -rL 3A ooe4 I to 4' '1 i L Iwo 4' I ---.Was CITY; OF NEWPORT BEACH March 4, 1986 Chris W. Brown 1144 Altura Terrace Arcadia, CA 91006 Re: Pier permit 109-1903 Dear Mr. Brown: The City of Newport Beach.Marine Department has received a complaint regarding the use of your residenti'al float at1903 E. Balboa Boulevard. Specifically, the complaint is that the float Ts being used in viola�ion of Secti*on 21.A. of the Harbor Permit Policies, which state: 21.A. "Boats moored at private or public docks shall not extend beyond the projection of t�e property lines of the property to which the dock fac fl.itV 4S. connected...". I - I The sailboat moored on the easterly side of your dock must be removed to preclude further action bv this department. If you have questions in this 'regard, please call 644-3044. Sincerely, 07 Tony M41um' Tidelands Administrator TM: db City Hall - 3300 Ncwport Boulevard, Newport Beach, California 92663 STATUS SHEET HARBOR PERMIT TRANSFER LOCATION PERMIT NO. Sel I er. Buye Date Application Received: Date Fee Received: Request for Inspection made Escrow Co. I Da Escrow Officer Escrow N Address Phone: Date Inspection made:- 7� Deficiency Letter sent: Deficiency corrected: Transfer completed: Date Inspection: 1. Location 2. Plumbing: 3. Electrical: 4. Structural: 5.OTHER: REMARKS: Inspected by: CITY OF NEWPORT BEACH HARBOR APPLICATION NOf-ff-7-'-PZ7vq' lit J�i 1k -4q� 14 0. "01!?6 T&C T VICI &J I TY SkETC H ar it: op W600 zu'04�A- 0, S. ed,4_1f.- -17 L 7 "F so zo? -7 1011 pt RLOC 4 Z 7 0 z VA4,44� I go 7—,104C7— Z -or 0WAWAI RY XZ47;eF STATUS S HEET HARBOR PERMITS LOCATION 100 :1 .10 A PERMIT NO. APPLICANT N AME CONTRACTOR Date Rec'v Fee Amt. Date Reviewed by Marine Dept. -5 1 1� 'z Approved Y— YJY Denied f Corection Required - Description City Council: Approved Remarks DATE MATERIAL SENT/APPROVED 1, Application 2. Consent Ltr. j. 4waste" Ltr. 4. Drawings 5. Staff Report 6. 7. 8. REMARKS C.O.E! SCRZCC Den i ed SARWQCB New Revision Dredging Fee Processed J.H.C. OR.-CTY. T�I.0 DATE FINAL INSPECTION A4, ,,io� STATE OF CALIFORNIA GEORGE DEUKMEJIAN, Governor STATE LANDS COMMISSION EXECUTIVE OFFICE 31h S1r-I n C. .11i.f KENNETH CORY, Controller I.rnia 95814 LA LEO T. McCARTHY, Lieutenant Governor A. CLA RICK 'R JESSE R. HUFF, Director of Finance Trautwein Brothers Waterfront Construction 2410 Newport Boulevard Newport Beach, CA 92663-3798 Attn: Samuel F. Kniss Dear Mr. Kniss: Subject: Remodeled Dock Balboa, CA sl�soc` 7 June 17, 1985 �I — File Ref: SO 85-06-04 for M at 1903 E. Bay Avenue, The staff of the State Lands Commission has received your letter, dated May 20, 1985, and copies of the permit drawing relative to the proposed re- modeling of your client's existing docking facilities in Newport Bay. The tide and submerged lands over which the proposed project will extend are sovereign lands of the State of California that the Legislature granted in trust to the City of Newport Beach. Therefore, you need not apply to the State Lands Commission for project authorization. You should, however, apply to all other agencies having approval authority. This action does not constitute, nor shall it be construed as a waiver of any right, title, or interest by the State of California in any lands under its jurisdiction. Very truly yours, JUDY LUDLOW Granted Lands Representative (916) 445-7134 JL :bj cc: Robert L. Wynn, City Manager City of Newport Beach, City Hall 3300 Newport Boulevard Newport Beach, CA 92660 5-85-505 PG:1kj State Of Ca�ifornia, George DeukaMejian, Governor California Coa5tal Commission South Coast District 245 West Broadway, Suite 380 Date: July 15, 19Q5 P.O. Box 1450 rnp Long Beach, California 90801-1450 (213) 590-5071 Toi-Point Development Ccj4aiso&co4A#J) 1144 Altura Terrace SUBJECT: Waiver of Coastal Permit Requirement Based On Your project Plans and information Provided in your permit application for the development described below, the Executive Director of the Coastal Commission hereby waives the requirement for a Coastal Permit* pursuant to 1-7 Section 13250(c), 1-:7 Section 13253(c), /-7 Section 13238.1—,Title 14, Callrornia Administrative Code. or Any deviation from t�e apglication ��nq,.pjans on file in the Commission N -T L tg =Off-i�ce�ay �neces�siCa E�_Pro3ect. APPLICAITT: Point Development LOCATION OF PROPOSED DEVELOPMENT: 1903 East Bay Avenue, Balboa, Orange County DESCRIPTION OF PROPOSED DEVELOPM�ENTReplace a residential dock, :Pier, and ramp. d'his Waiver is not valid unless the site has been Posted with the notice provided by the Commission office and until Commission. it has been reported to the We anticipate reporting this item to the Commission on July 23-26,1935. If the Commission objects to this Waiver Of Permit requiremeFts, �a coastal permit will be required- You must contact the District Office on or after the date shown above to verify the status of this waiver. TOM Crandaill r I South Coast Director CC: Commissioners Fi' Analys-t-� Praveen Gupta CITY OF NEWPORT BEACH Gctober 1, 1985 11.0. BOX 1769, NEWPORT BEACH, CA 92663 3884 Chris Brown 1144 Altura Terrace Arcadia, CA 91006 Dear Sir: A check of the City's Harbor Permit.files has revealed that the permit for the Dier and float at 19031 East Bay Avenue, Newport Beach is registered to D. Smith. A tra nsfer application must be completed and a transfeer'fee paid each time the permit has changed ownership. Chapter 17.24.036 of the Municipal Code addresses the transfer of a permit and reads as follows: "No person shal! transfer a permit for a pier, float or similar structure granted under the provisions of this chapter without prior written approval of the City". Failure to pay the transfer fees can be grounds for revocation of the Harbor Permit in accordance with Chapter 17.24.090 of the Municipal Code. Your cooperation in bringing this permit up to date will avoid any action by the City. Yours truly, Tony Melum Tidetands Administrator TM:db 3300 Newport Boulevard, Newport Beach Samuel Kniss Trautwein Brothers 2410 Newport Blvd. Newport Beach, California 92663-3798 Dear Mr. Kniss: Tbankyou for your letter of 20 May 1985 nortifying us of your intent to construct a private boat slip at 1903 E. Bav Avenue. Your drawings have been reviewed and generally conform to the provisions of General Permpit GP004 for construction of private boat docks in Newport Bay Providing you have complied with State and local laws you may proceed with the work. Your, proposed work has, been assigned General Permit Nlo_ GP 004-187 you have any furthur questions, please feel free to call our Regulatory Branch at (213) 688-5606 and refer to this number. A copy of the General Permit is enclosed. Sincerely, j.P. Fast Chief, Construction - Operations Division Enclosure State of California, George Deukelejian, Governor California Coastal Commission South Coast District 245 West Broadway, Suite 380 P.0- Box 1450 Long Beach, California 90801-1450 (213) 590-5071 TOe-Point Development 1144 Altura Terrace 1. 5-85-505 PG:lkj Date: July IS, 1285 SUBJECT: Waiver of Coastal Permit Requirement R EC E'! Vl� D piannwn!-, AL.F.. Based on vour Projecr plans and information provided in your permit application for the development described below, the Executive Director of the Coastal Commission hereby waives the requirement for a Coastal Permit nursuant to /-7 Section 13250(c), I-TVr s- ection 13253(c), or /-7 Section 13238.1, Title 14, California—Administrative Code. from the a neces APPLICANT: Point Devel plication an plais o, f -E—oastal t)ermqit Commissi ect. LOCATION OF PROPOSED DEVELOPMENT: 1903 East Bay Avenue, Balboa, Orange County DESCRIPTION OF PROPOSED DEVELOPMENT:_ Replace a residential dock, Pier, and ramp. This waiver is not valid unless the site has been posted with the notice ,provided by the Commission office and until it has been reported to the Commission. We anticipate reporting this item to the Commission on July 23-26,1985. If the Commission objects to this waiver of permit req-uirements, a coastal Dernit will be required. You must contact the District Office on or after the date shown above to verify the status of this waiver. Tom Crand4l.1' South Coast Director cc: Commissioners File � Analyst Praveen Gupta 5/83 ILING Maintenanee permit only CITY OF NEWPORT BEACH. CALIF. .. FOR. L E PHONE NO. FEE CHECK M;j -;�. I �� E -L EPH-N. No. ---�—OATt A—LI �-Xr-wdia, �T 62 3-248!. 25. 0 4 2/ 4/85 K: CA 9YU06 gdja CA 9YU06 A ON IS APKLILATON IS A HA.BUR PERMIT TO OCHD cQvxxQcX74wx*Qk— MaiPtain a dock AT THE AEIC�E LOCATION IN ACCORDANCE WITH THE CITY OF ENGR El NEWPORT BEACH PERMIT 10LICS. AN. THE ATTACHED 0 W IN. COUNCIL FJ BY Trautwein Bro Watft Cons. COMPANY PUBLIC WORKS DATED 2/4Z85 Depl� — ESCROW DATE -.FE-TI-N SC.ATU. issued 2/Z/85 SPECIAL CONDITIONS: Maintenanee permit only CITY OF NEWPORT BEACH. CALIF. .. FOR. ponra 1-7 -f- CITY OF NEWPOR'i BEACH HARBOR APPLICATION N ,4L� C -&j e- 7- E? 4y 7� Z,,.f 1-T ? I rt -- VICIMITY 5;<ETCH -7 oil, 3 Z6 are ,4L� C -&j e- 7- E? 4y 7� Z,,.f ? I rt -- VICIMITY 5;<ETCH -7 oil, 3 are Supr-mrrmom / 9 /-) 3 E I e� " �� A -,,I �5 i 10! 1 FA ? I rt -- -7 oil, 3 -7 t-'Af z Supr-mrrmom / 9 /-) 3 E I e� " �� A -,,I �5 i 10! 1 FA CITY OF NEWPG�T BEACH HARBOR PEFUNPUT PERMISSION IS HEREBY CPAM'7M TO CG'!STRZlCT AND MAINTAIN THE FACH �-Y 5113VVN I9ZR7--OF, AT THE SI;E lNDtCj%-jED, SjJ0.2;7.C7. 70 T".:.: OF i 1) xc A THE HARBOR PER.-. , ;-, F-3 C ANY SPEC!AL Cc'llrl:Ttclllt5 Hn� IS NOT TRA�Mf:FE7-4nLE 4, L. THE CITY RIGHTS G:VEN UN'�-7F! -��n5 t'r t! AN D T 1-i I S P'- 2 M IT PP A-V L C C'U �4 IN ACCORDANCE WiTH WFLE 17 OF 61�r fl`� F e5. D 1 'N coemm, CITY HARBO 6 . 9 71 PERMIT NOA DATE SpLclk� Corps of Engineers Permit Orange County Permit Other. CiTY OF NEWPOIR. BEACH HARBOR APPLI( TION NOIS-L.170 VICIMITY SkETCH I N*�PoRr E�AY, CAL 'POaNIA or, &Aorarseof �,n "ec/ once C/."O/e i be/ow �fco� lower low 640,14r^ Alozl�m ran 4? or qbrhoe 1,;,7e5 42re esi,61.5 Ir.,f;v 7,h;s oprvrw 50.r. W-IDO ivsr APAWC4Nr�9 A'4,W4- BUYERS' NAME(S) r-, , OCHD ENS COUNCIL PUBLIC WORKS F-1 DEPT. ESCROW 0 INS CTION Fj Pfransfl� 1:1 SPECIAL CONDI OF THE MUNICI 0 ADDRESS OF FACILITY: 19C' �mslt fty Avenue -TJELEPHO�� NO FEE j CHECK NO. PERMIT # 109-1903 UAlt APPL[CIPON IS HEREBY MADE TO TRANSFER HARBOR PERMIT SELLERS' NAME(S) BUYERS' NAME(S) (ABOVE NAMES TO BE T`YPED) APPLICATION APPROVED THE CITY SIGNATURE OF BUYER SIGNATURE OF BUYER (DATE) IN ACCORDANCE WITH CIT"Y OF NEWPORT BEACH. CALIF. �. F... ..-101� T--- Escrow 72-1220 Complete Escrow Services Date; 9/14/77 Re Pier permit transfer: City of Newport Beach Gentlemen: Enclosed is signed application for pber permit transfer and our escrow check in the amount of $150.00. The property today recorded in the name of Dana H. & Sandi W. Smith, 508 29th St., Newport Beach, California. Please issue new permit for the facility at 1903 E. Bay, Balboa, to the new owners. M you ri Copel d, SEO 759-4135 SC7 SECURITY PACIFIC BANK 106) — 15e�j STATUS SHEET HARBOR PERMITS TRANSFER Location 1!26>.1 Permit # Date Application Received f — ell— -2 -? Fee Rec'd Oral Request for inspection E s C r ow C 0. 0-h P-; r Date /)-n)Date Inspection Made Date Deficiency Letter Sent (if applicable) Date Deficiency Corrected (if applicable) Date Orange County Notified (if applicable) ,Date Transfer Completed CITY OF NEWPORT BEACH Po Mlakch 13, 1986 Robert SuRlpf Hilton Center 900 Wilshire Los Angeles, CA.90017 Dear Mr. Sumpf This letter is in response to your complaint regarding the sailboat moored next door to you at 190 . 3 Fast Biay, w�ich was allegedly en- croaching onto your permit zone. Upon inspection, the boat in question wasIound to have a beam of 13'6". On the Permit drawing, the, dock was shown to have A side set back of 14 feet. I recluested the owner of the boat to have his contractor confirm the "as built"'setback. This rinasurement was retported back to us as 15.12% �The City is, therefore, satisfied that the said sailboat'is mcored .wii�hin its legal permit zone, and no encroachment'exists at this time. if i can be of further assistance you can reach me &t:-644-'3044., Sincerely Q0 . (ame" Ray G;�Ver., Lt., Marine Department cc: Chris Brown 1144 Altura Terrace Arcadia, CA 91006 City Hall - 3300 Newport Boulevard, Newport Beach. California 92663