As per your request, I am submitting to you an enhancement plan for the BPPA beach
property on Balboa Blvd. between M and Granada Streets. The attached package was
the one used by the BPPA's Beach Improvement Committee for it's presentation to the
Board members. Some residents of the immediate vicinity were also present. You will
also find a survey sent to the membership and it's corresponding results. This action was
approved by the board on Saturday, February 11.
Approved were the following items:
1. Installation of a 4' Iron fence, to replace the existing chain link fence.
2. Construction of a concrete deck, approximately 15' by 20', to be placed in the
vicinity between the two existing palm trees.
3. Acquisition of a concrete table to be placed on the concrete deck.
In addition, we will replace the two existing benches with more aesthetically
pleasing concrete benches.
4. Repair and widen the existing stairs as an improvement to the water access. A
7i second stainless steel handrail will be added for extra safety.
fi 5. Landscaping improvements would be limited to the installation of low -
maintenance greenery around the trees and possibly along the wood fence
adjoining the property.
6. The installation of a "Lapa-lapa" (see attached photo) to be placed close to
the fence and concrete deck.
All other items on the improvement agenda were rejected.
Sincerely;
Mary e Javaler - 673-7146
Vice -President
I
IA A •
BEACH
ENHANCEMENT
FROFO5AL
*1
y February 9, 1995
m
FROM: MALCOLM DUNN
DATE: 2-9-95
SUBJECT: BPPA BEACH ENHANCEMENT REPORT
Since it's inception, this committee has met, discussed, and reviewed the issue of
improving the beach property, and has the pleasure of reporting the following:
1. FENCE: The committee is recommending the installation of a wrought iron
fence to replace the existing chain link fence. The dimensions will remain the same, and
has found that -the new fence will add more view to the bay. The suggested colors for this
fence are tan or beige.
Specifications: 106' of fencing 4' tall.
One 3' wide by 4' tall gate.
One set of double gates for I wide opening.
Using 1"X1.5" tube frames.
1.5"X1.5" tube posts.
3/4" X 3/4" square tube pickets, 5" apart.
Metallized.
Quotes: MESA IRON: $6470.00 Painted & Installed.
BAY IRON: $5368.00 Painted & Installed.
NOTE: We also received a quote for a brick like facade to be attached to the
concrete wall. An estimated cost of $800.00 to be added to the above item.
2. ACCESS TO WATER: This committee reviewed several alternatives. A
grand plan to create a cove like setting would be too expensive and with considerable
permit requirements. It's therefore that this committee is proposing the expansion of the
existing stairs to double the current width. We have had an offer of a stainless steel rail
free of charge. ( a $2,000 value).
Quotes: JOHN SLAUGHTER - CONTRACTOR:
$1,000.00
Y
3. DECKING AND WALKWAY: As part of the enhancement proposal, the
committee has decided to recommend the installation of a concrete deck. This deck
would be situated on the South eastern corner of the property, by the water. This
location would be accessed "sand -free by a 3' wide winding path coming from the small
gate entrance. The dimensions of the deck would be 15' deep by 33' wide.
Quotes: JOHN SLAUGHTER- CONTRACTOR:
$2,000.00
4. LANDSCAPING: Although we have agreed that some low maintenance
landscaping would be nice to have, we have not agreed on exactly what. We will defer
the green aspect of the landscaping to future action. In addition we would like to include
the following beach furniture to this item:
One round concrete table w/hole for umbrella. (Seats 8 people) $625.00
Two concrete benches to replace existing ones. $285.00 ea.
5. SHADE: This item has had mixed reviews by the members of the committee.
The subject of installing a "Laps- lapa" will be open to discussion for approval. Please
refer to the available pictures for reference. All wood will be treated and hardware is
galvanized for minimum maintenance requirements. The dimensions vary from those in
the photos in consideration to view obstruction and aesthetics. Specs: 6.5' high with a 8'
diameter canopy.
QUOTE: CHIP BURDEN - CONTRACTOR
Membership fee + materials ( $275.00 )
6. BBQ: There will be no BBQ built.
GAME COURT: There will be no game court.
8a. SHOWER: A structure consisting of a 8" post similar to the one used for the
lapa-lapa will be used to hold the water pipe to the shower. A frond thatched roof would
add to the decor. The post would be attached to the ground via concrete footing and all
materials required are treated.
Quote: CHIP BURDEN - CONTRACTOR.
$225.00
8b. WATER FOUNTAIN: A very pleasing combination of style and function is
being recommended. please review the photos provided.
Quote: Not available at present time.
9. LIGHTS: There will be no lights installed.
10. DRAWING: In the event this board considers that a drawing would be required
to help visualize the proposed "New Look" we have the services of a Landscape Architect
student that will be able to provide a conceptual drawing of the said enhancements.
QUOTE: Steve Stahley
$320.00
Total dollar ammount for the proposed improvements:
Respectfully submitted;
BPPA Beach Improvement Committee
Malcolm Dunn
Elaine Linhoff
Chan Lefebvre
Bob Yant
Attachments:
Photo binder
Property plan
Survey results
Table brochures
REVISED SURVEY RESULTS
A tabulation of the 49 responses to the beach improvement survey revealed the following
QUESTION
Y
N
N/A
#/0/0
#/1io
0/0/0
i 1.
Would like the beach improved:
37/76
5110
7/14
�2)
Raise fence:
24/49
2o/41
5/10
3.
Improve access to the water:
29/59
13/27
7/14
r4
Improve landscaping:
32/65
11/22
6/13
�5.
Install a shaded area:
14/28
29/59
6113
i.
�5.
Install a BBQ:
14/28
2s/58
2/14
'-,,7!
Install a game court:
io/20
33/67
6/13
i
C8. ,'
Upgrade shower:
29/59
13/27
7/14
Install lights:
16/33
26/53
2/14
010.
�0
Survey incorporated to a final plan:
38/77
5/10
6/13
ONCRETE TABLES
Q-LBT-PTS-1 5'-7"W x 81 x 33"HT
(ASSEMBLY REQUIRED)
Q-QCPS-7 5'8"W x 7'6"L x 33"HT
ALSO AVAILABLE IN 14'L, 211,
AND 28' LENGTHS
Q-RT-B-42 42"DIA. x 33"HT
ALSO AVAILABLE IN 36"DIA.
AVAILABLE WITH OR WITHOUT
UMBRELLA HOLE
(ASSEMBLY REQUIRED)
Q-LBT-SD-1 5'4"W x 81 x 33"HT
(ASSEMBLY REQUIRED)
Q-QCPTH-7 5'8"W x 76"L x 33"HT .
ALSO AVAILABLE IN 141, 211,
AND 28' LENGTHS
Q-FCRT-42 42"DIA. x 33"HT
AVAILABLE WITH OR WITHOUT
UMBRELLA HOLE
(ASSEMBLY REQUIRED)
s
*ALL PRODUCTS ARE DELIVERED TO SITE, AND PLACED WITHIN 15' OF OUR CRANE EQUIPPED TRUCK. ASSEMBLY AND
INSTALLATION ARE PRICED SEPARATELY,
QUICK CRETE PRODUCTS CORP.
P.O. BOX 639
741 W. PARKRIDGE AVE.
NORCO, CALIFORNIA 91760
909 / 737-6240 FAX 909 / 737-7032
1U\9\92
* MANUFACTURING TOLERANCE +— 1/4"
a AVAILABLE IN ALL "QUICK CRETE" STANDARD COLORS AND TEXTURES
* REINFORCED WITH #3 REBAR AND WOVEN WIRE MESH
* MOUNTING OPTIONS AVAILABLE
* NOTE ALL DIMENSIONS MEET AMERICAN DISIBILITIES ACT
36"
7U"
M
QUICK CRETE PRODUCTS CORP. 4 BENCH FOOD COURT
741 W. PARKRIDGE AVE.
P.O. BOX 639 Q-FMT-42
NORCO, CA. 91760
(714) 737-6240 FAX 1714) 737.7032
m
Ili
-,fi
BPPR BENCH ENNONICEMENIT PROJECT
The Balboa Peninsula Point Association is currently developing a plan to
enhance the Association's beach and pier area. Please help by completing
this survey and mailing it to the BPPA, P.O. Box 826, Balboa, CA 92661.
The deadline for returning this form is January 5, 1995. If you
have any questions, contact Malcolm Dunn, 673-1609.
Please circle Y for yes; N for no.
I would like for the BPPA beach property to be improved. Y N
The fence surrounding the property should be raised to Y N
six feet.
Access to the water from the beach should be improved. Y N
The landscaping of the property should be improved. Y N
A shaded area for outdoor dining should be installed. Y N
A, fixed barbeque should be constructed on the property. Y N
A court for horseshoes and other games should be built. Y N
The shower set up should be upgraded.
Y N
Night time lights for membership use should be installed. Y N
The BPPA should incorporate member survey recommendations Y N
into a final plan and schedule for project completion.
Of the above surveyed items, my top priorities
Your N
Please add any additional comments on reverse.
REVISED SURVEY RESULTS
A tabulation of the 49 responses to the beach improvement survey revealed the following:
QUESTION Y N NIA
do/ fiioi Rio/.
1.
Would like the beach improved:
2.
Raise fence:
3.
Improve access to the water:
4.
Improve landscaping:
5.
Install a shaded area:
6.
Install a BBQ:
7.
Install a game court:
8.
Upgrade shower:
9.
Install fights:
10.
Survey incorporated to a final plan:
37/76
5/10
7/14
24/49
2o/41
5110
29/59
13/27
7/14
32/65
11/22
6/13
14/28
29/59
6/13
14/28
2s/58
7/14
io/20
33/67
6/13
29/59
13/27
7/14
16/33
26/53
7/14
3s/77
5110
6/13
VIJ
F R 0 M
,y gg 2410 Newport Boulevard
a ° Newport Beach, Caiifornio 92663-3793
'�+ Telephone1714) 673-11960
Cc�t....... License tip. 322996A
To Balboa Peninsula Point Association
Date May 11, 1.983
1730 Miramar—__—.—.-
alboa. Ca. 9
Attn.- Bill Gurr
The foi{owing quotation is for:
All labor, material and equipment necessary to perform the
following:
Build and install a new 4"x28' pier. Pier to be constructed
using treated wood except for the top handrail and the side -
rail which will be painted white. Pier to be supported by
2 concrete T-head pile.
Build and install a new 31x16' ramp. Handrail to be in-
stalled only on northerly side. Ramp construction to be of
treated wood and painted handrail to match the pier.
Remove and destroy (2) pipe pile, install one new pile and
reuse in the existing location the one wood pile.
Connect the existing dock sections together along with a
new 10' section in order to make the dock 50' long not
including the 41x8' end dock section. TrE Existin(i ninaes
to remain.
All handrails and siderails to be primed only. Owner to
do all painting.
Permits and drawings by owner„
Terms: Payment open completion.
TOTAL-.. $6,385 00
Quote good for acceptance
within 60 days.
TRAUTWEIN BROTHERS
WATERFRON 'NSTRUCTTON
-"Sa.. el F. Kni ss
ACCEPTED:
Contractors are required by )aw to be licensed and regulated by the Comractors State License Foard, Any quesfians corveerr.-
ing a contractor may be referred iu the registrar of the board whose address is: Contractors' State License Board, 4020 N
r a.
May 12, 1969
Dr. William Atkinson
1552 Fast Ocean Boulevard
Newport Beach, California
SUBJECT: Harbor Permiv'4108-a2128
Dear Dr. Atkinsona
Pursuant to our conversation last Friday morning, I have
enclosed a copy of the drawings for the Harbor Facilities
under the permit for the• Balboa Peninsula Point Association.
If you would, please, 2 would like to have an indication
as accurately as possible of the location of the two floats
and the temporary float that, you wish to put out this summer.
In so far as practical, it should be drawn to the graphic
skale shown on the right of the drawing.. On the reverse of
the drawing, if you can give me the times during which you
would normally wish to have this out on an annual basis-
using termirerogy such as "from end of school to and includ-
ing Labor Day" -then I will see that the permit is modified
to provide for this on an annual basis.
If you have any questions, please nail me at 673-2110 or
feel free to drop in at the the City Hall.
Very truly yours,
G. M. Dawes
GMD/bg
May 19, 1969
Dr. William Atkinson
1552 East Ocean.Blvd.
Newport Beach, California
SUBJECT. Harbor -Permit #108-2129::'
Dear Dr. Atkinson,
am enclsing a revised Harbor Permi-,,#108-2129 for the
Balboa Peninsula Point Association. You will note that
special conditions are included on the reverse of the per-
mit,, and I hope thatthese special conditions will prove
praefiieai to the Association. They have been checked
and cleared by the Orange County Harbor Distriet as well,
as my office.
It is requested that the enclosed permit be made a part
of the permanent files of the Association.
If you have any further questions, please call me at
673-2110 or feel free to drop in at the City Hall.
very truly yours,
G. X. Dawes
City Harbor Coordinator
t Y
A J C) rzm t)
_ � a aoas+ ,�u.�oe.a smrnc.rr.e.wc
.. iar. H cugrr roirs<
•''!Sfi w• c ra..
lot
. -'••- '�'! E'so. iY.-rr /dnv.�o.i.�t I:^-.�! Arm.
r
ir
i<r
iv " p ry avi
C E 4K .
VICINITY SKETCH
7.fi1,.:� %/� a�7,' Jri' NLM/•IIT L�'I° c4U• • ? �
„ [� ��(•IY Mtwl< lI1Ilw' 4N M.<r>•'!- MwI M(/w/ .dwr1' M
Qs�/i�'//✓Ci r.� .w,�+er,f.wwrr�r .e �s
[
ii Iwi �.y•�,
I
I
I
I w
I I
n
I
�I 1 ,.�oii...�.yae lmritirta.�vs
� ,s/•'.' kan►1 cw*-, ~.~wx c ram
-12'70 --
r�
'�