HomeMy WebLinkAbout14 - Marina Park Project - Marina Docks (Bid Package 4) - Award of Contract No. 3897-D (CAP09-0070) - PowerPoint (Staff)February 10,
Item No. 14
Agenda Item 14 - Award of Marina Park
Docks Contract
City of Newport Beach
City Council Meeting
February 10, 2015
David Webb
Director of Public Works
- -I 1
� 4
Air
New Marina Facility
• 2 - ADA Compliance Gangways.
• 3 Ton Boat Hoist and Ladder
• Concrete Dock & Support Pile System
• On the Water Launch/ Retrieval & Storage for Sabots,
Lidos, Kayaks, Paddle Boards ...
• Dinghy Dock tie -up area and Storage Racks
• 23 Slip Visiting Vessel Marina
X21 - 40 ft. slips
®2 - 55 ft. slips
X200 ft. Long Dock Side Tie
Water, Sewer, Power, Wi -Fi
• Received Four Bids
• Low Bid 23% higher than Engineers Estimate of $2,380,000
• Bid Review
• Small Specialized Contractor Market
• All Known and Repeatable Contractors
• Generally Tight Bid Grouping
• Overage is Mainly in the Contractor's General Conditions and
Mobilization (which are largely market related)
• Recommend Awarding the Marina Park Dock Contract to
Bellingham Marine Industries of Dixon, California for
$2,937,661.00
• Establish 10% Contingency Fund of $293,739.00
MARINA PARK
MASTER BUDGET
ATTACHMENT B
Items ncfedm Red are errarrimed costs Kati L"a 1-w-as
BwcEraa
BUDGETED
ncnbu
TASF(DESCFUMON
DETAIL COST
TOTAL
TOTAL
C[1AlhES
2
LAND ISRION
8010 8180
ka116
118
cash us. - fees
a
SCE Parcel
900 000
A
HARD COSTS
S 29,543,2811
1
S 29 U3d 810
Taal Mxa4cde5 0 919 Calm rAwAkauancy
a
rbcn and Tree Reloo3on
_ .
Orighal Ccnv=
S =05. 30
Unlimited Emiurxnental hw- I
�Renairder d 10% Cornrm ncy (Be1ae with 340.5131
S -
Norre Used in Ca mact l
Charge Order No- 1
S (67.615)
Credit far Mobile Flames
b
PACKAGE 2 Manna Basin Cmsfruciim
3 7.671.72<
Final Total Corkad Amount= 816�594
Onidnal C07UW
S 4,579.078
The DubaGtaup I
Re ander of 117% Contirge " (Befit with $457,606)
S -
Find - tlsed 6 %. Contrrpanoy I
Bid hen Adqushnent Anxut
3 (& 127)
Final addderddeAe35m in hid quanties I
Charge Order No. 1
5 (26,513)
Deletion of Dew Support I
Charge Osier No- 2
3 13,565
Install Aditional Ro aLFabne fir GS Facility Pad I
Charge Osier No 3
5 10.483
Chanced Canduon rewdxp Amencan Led= wall I
Chorale Order No- 4
3 243A00
Exrarretiw of additional 4000 Cy able be a h sand I
Charged sub- suTace candEian on buNdwad nstal I
Removal of nnknow & abandon ndtim 8 structures I
Chasse Geier No- 5
3 34.302
MR. Added Sand 181h ST. rsnxd be4mk hales I
c
PACKAGE 3: Carnncnrty Ceraer and Pak
I
signal Contract
3 18.748A00
KPRS Cormouution Seryiom Ina I
Reenaindeof 10% Carrtingency (Begs with $1,874,8M)
:: 1,761,Ea,3
= " "a Cccirgency R.rrmning I
Charm Order No- 1
3 27.247
Additional asbestos, footimtaxaew renmals in Demo
Charm Order Nor 2
3 916
Delay Cost assodared with Pad dek-AKY I
Change OnkrNo.3
S 17A26
I
Charge Order No- 4
S 47.726
I
d
PACKAGE k Docks
$ 2.217,741
1r dudes mLK*dy 90k in clock FFBE I
original Caw=
3 2.837.691
4t Awwdrd Yet I
Rerneirdeof10% Conti rVercy Pegi nwith$221.774)
S 28 ?.7&P
'0 %CaitngedyFtemaiiing I
Chanyle Order No- 1
I
5
FDM R.ES FUFM"NGS 8 FF
S 5611100
5W.001)
PRO.IECT TOTAL
$ 39,500,600
1
1
$ 38.9&1.530
Items ncfedm Red are errarrimed costs Kati L"a 1-w-as
Comments /Questions
Your Public Works Department
A Well- Engineered Machine
Protecting and Providing Quality
Public Improvements and Services
ENGINEER'S ESTIMATE.
PROJECT MANAGER:
CITY OF NEWPORTBEACH
PUBLIC WORKS DEPARTMENT
BID LOCATION: City ClerKS Office - City Hall
DATE: 20- Jan -1S TIME 2:30p.m.
BY: LEE CHECKED: PTAUSCHER 1120/2015
Al Operations 8ldaintenance of Marine Construction 1 LS 1 119,200.001 119,200.00 144,OOD.001 144,000.00 175,OOD.00 175,000.00
A2 Installation Floater Insurance 1 LS I 1 10,000.001 10,000,DOI 5,OOD.00I 5,000.00 30,000.001 30,000.00
ENGINEERS ESTIMATE
BELL14GHAM MARINE
JOHN S. MEEK
DUTRA CONSTRUCTION
ITEM
DESCRIPTION
QUANTITY
DESCRIPTION
UNIT
AMOUNT
UNIT
UNIT
AMOUNT
UNIT
AMOUNT
UNIT
AMOUNT
1
General Conditions
1
LS
100,000.00
100,000.D0
301,454.00
301,454.00
195,000.00
195,000.00
60,D00.00
60,000.00
2
Mobilization
1
LS
150,000.00
150,000. D0
200,DOO.O0
200,000.00
210,000.00
210,000.00
285,000.00
265,000.00
3
Cast -In -Place Concrete
1
LS
14,400.00
14,400.00
102 -00.00
102,200.00
79,940.00
79,940.00
60,000.D0
60,OOO.00
4
Handrails and Rags
1
LS
28,7DO.OD
28,700.00
58,69640
58,696.D0
65,50D.00
65,5DO.D0
68,000.00
68,000.00
5
Signage
1
LS
15,000.00
15,000.00
3,358.00
3,358.00
2,800.00
2,80010
16,000.00
16,000.00
6
Marina Electrical
1
LS
182,OOO.DD
182,060.00
167,195.00
167,195.DO
183,OWO0
183,000.DO
235,000. DO
235,001
7
Marine Precast Concrete Piles
1
LS
225, 001
225,00(3.00
362,223.00
362,223.00
318,98D.00
318,980.00
32D,000.00
320,000.00
8
Marina Piping and Equipment Systems
1
LS
125.000.00
125,DOD.00
177,352.00
177,352.00
195,000.00
195,000.00
365,000.00
365.000.DO
9
Flo2 tng Docks
1
LS
1,359,900.00
1,359,960.00
1,370,114.00
1,370,114.00
1,519,000.00
1,519,000.00
1,737,000.00
1,737.000.00
10
Gangways
1
LS
95,000.0(3
95,00(3.00
100,194.00
IDO,194.00
102,24(3.00
102,240.00
110,000.00
110,000.00
11
1 Boat Hoist and Ladder
1
1 LS
1 75,000.00
75,000.00
84,875.00
84,875.00
87,600.00
87,600.00
80,000.00
8D,000.00
12
Project Close OaUAS -Buifts
1
LS
10,000.00
10,ODO.D0
10,000.00
10,000.00
10,000.00
10,000.00
10,001i
10,000.00
EE
2.380,000.00
LOW
2,937.661.00
2ND
2,969,060.00
3RD
3.346,000.00
Al Operations 8ldaintenance of Marine Construction 1 LS 1 119,200.001 119,200.00 144,OOD.001 144,000.00 175,OOD.00 175,000.00
A2 Installation Floater Insurance 1 LS I 1 10,000.001 10,000,DOI 5,OOD.00I 5,000.00 30,000.001 30,000.00
ENGINEERS
ESTIMATE
RE. STAIfE
ENGINEERING
ITEM
DESCRIPTION
QUANTITY
UNIT
AMOUNT
UNIT
I AMOUNT
1
General Conditions
1
LS
100,000.60
100,000.00
445,DDO.O0
445,000.00
2
MobOizatbn
1
LS
150,000.00
150,000.00
269,000.00
269,DOO.DO
3
Cast -In -Place Concrete
1
LS
14,400.00
14,400.00
137,000.00
137,000.00
4
Handrails and Railings
1
LS
28,700.00
28,700.00
30,000.00
30,000.00
5
Signage
1
LS
15,000.00
15,D00.00
17,SOO.00
17,500.00
6
Marina Electrical
1
LS
182,000.OD
182.000.00
197.000.00
197,DOO.D0
7
Marine Precast Concrete Piles
1
LS
225,000.00
225,000.00
329,000.00
329,DDO.00
8
Manna Piping and Equipment Systems
1
LS
125,000.00
125,000.00
197,D60.D0
197,000.00
9
Floating Docks
1
LS
1,359,900.00
1,359,900.00
1,650,000.00
1,650,OD0.00
10
Gangways
1 I
LS
95,000.00
95,000.00
113,400.00
113,400.00
11
Boat Hoist and Ladder
1
LS
75,000.00
75,000.00
96,500.00
96,500.00
12
Project Close OutJAS-Buias
1
I LS
10,000001
10,000.00
10,ODO.O0
10,00010
EE
1 2- MMUU.00
4TH
3,491,400.00