HomeMy WebLinkAbout05 - Wastewater Pump Station RehabilitationCITY OF NEWPORT BEACH CITY COUNCIL STAFF REPORT Agenda Item No. 5 October 12, 2004 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Michael J. Sinacori, P.E. 949 - 644 -3311 msinacori@cfty.newport-beach.ca.us SUBJECT: MARINERS, CHINA COVE AND 62ND STREET WASTEWATER PUMP STATION REHABILITATION, INCLUDING FERNLEAF AVENUE STREET IMPROVEMENTS — AWARD OF CONTRACT NO. 3585 RECOMMENDATIONS: 1. Determine that the project is exempt from environmental review pursuant to Section 15302 of the California Environmental Quality Act Implementing Guidelines. 2. Approve the plans and specifications. 3. Award Contract No. 3585 to GCI Construction for the Total Bid Price of $1,582,170 and authorize the Mayor and the City Clerk to execute the contract. 4. Approve Amendment No. 2 to Professional Services Agreement with PBS &J for Final Design and Construction Support services for $27,800. 5. Approve a Budget Amendment transferring $350,000 from the Sewer Main Master Plan Improvements Account No. 7531- C5600292, $23,000 from the Sewer Access Road Maintenance Account No. 5600 -8186 and $188,000 from the un- appropriated Wastewater Enterprise Future Infrastructure Reserve to the Sewer Pump Station Master Plan Improvements Account No. 7532- C5600100. DISCUSSION: At 2:00 P.M. on September 15, 2004 the City Clerk opened and read the following bids for this project: BIDDER TOTAL BID AMOUNT Low GCI Construction $1,582,170.00 2 SoCal Pacific Construction Corporation $1,771,400.00 Subject: Mariners, China Cove & 62nd Street Wastewater Pump Station Rehabilitation, including Fernleaf Avenue Street Improvements — Award of Contract No. 3585 Date: October 12, 2004 Page: 2 The low bidder, GCI Construction, possesses a California State Contractors License Classification A as required by the project specifications. GCI has satisfactorily completed similar projects for other municipalities and many projects for the City of Newport Beach. In the early 1990's they completed the pump station rehabilitation project at Cameo Shores. The low total bid amount was significantly higher than the Engineer's Estimate of $925,000. Originally, only new electrical controls were to be considered at each of the three sites. However, new piping and pumps were required at all three locations as the design neared completion, along with some structural improvements at the China Cove Station to increase access to the pump room. In general, rehabilitation projects in existing pump stations are very difficult to estimate. In addition, the construction industry has seen increases in cost due oil, concrete and steel prices. PROJECT DESCRIPTION: In 1996, the City completed the Master Plan of Sewers, which identified approximately $10M in infrastructure improvements for the wastewater system. Each of the twenty pump stations the City owns and maintains were listed within the Master Plan and reflected some level of improvement. The older stations were identified as priorities and throughout the ten -year improvement window each station would be rehabilitated. Please see attached exhibit for the location of the twenty City and seven County pump stations. China Cove's station was constructed over 50 years ago and is noted as 'Category I' for emergency response because of its close proximity to the Bay and the risks associated with wastewater backup into residences. The improvements for the China Cove station include the installation of state -of- the -art controls that will better alert the operations staff of any malfunction that would potentially cause sewer spills into the Newport Bay. The current controls are outdated with some components still in place from the original construction. The rehabilitation will also include new bypassing capabilities that will allow backup connections for either an emergency generator or portable pumps. Currently the only backup for the single pump at China Cove is City Vactor trucks. As noted above, complete mechanical piping changes were added to the project along with the addition of a backup submersible pump in the wet well. These improvements, though planned for in future years, are necessary now to comply with new Waste Discharge Requirements to reduce potential for wastewater spills. In addition, Femleaf Avenue (road adjacent to the China Cove Pump Station) will be rehabilitated in concert with the pump station improvements. Mariners Pump station was constructed in 1962. Although there is ample room for two pumps at this location, the station has only one pump currently installed. The improvements for Mariners pump station call for the installation of the identical controls, generator, and bypass pump connections proposed at China Cove. Also included is the installation of the second pump and replacement of the existing pump to improve reliability along with replacement of the station piping. Subject: Mariners, China Cove & 62nd Street Wastewater Pump Station Rehabilitation, including Fernleaf Avenue Street Improvements —Award of Contract No. 3585 Date: October 12, 2004 Page: 3 Improvements for the 62nd Street Pump Station in Newport Shores include the installation of a wet well and the identical controls and generator bypass pump connection proposed for China Cove and Mariners. The station currently has no wet well and the pumps operate continuously (24 hours per day). In addition, most of the piping through out the station will be replaced along with the two pumps to meet today's reliability standards. Environmental Review: The project was determined to be exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15302 of the CEQA Implementing Guidelines at the time the project was authorized by the City Council. This exemption covers the maintenance and alteration of existing public facilities with negligible expansion of the facilities in areas that are not environmentally sensitive. VALUE ENGINEERING AND COST SAVINGS The project bid was higher than anticipated and it also higher than the Council approved budget for the project of $1,013,544. A value engineering meeting was held between the Contractor, Consulting Engineer and Pump Manufacture to develop ways to reduce the cost of the overall project. Several areas of savings were identified and are as follows: • Reducing water proofing coating costs • Reducing pump equipment costs (spare parts) • Modifying force main improvements at Mariners • Modifying structures and bypass at China Cove • Modlfying structures at 62nd Street Total Savings $122,741 $40,496 $31,001 $9,900 $30.050 $234,188 If Council decides to move forward with the project, staff would recommend deleting the above items totaling $234,188 to bring the project more in line with the available budget. The total cost of the Contract to GCI Construction would then be reduced to $1,347,982. Consultant Services. Schedule and Funding Availability: Attached for Council consideration is Amendment No. 2 with PBS&J for final design and construction support services. Their original contract was $72,164 and Amendment No. 1 increased this to $93,164. Amendment No. 2 compensates the consultant an additional $27,800 for final design efforts along with providing construction support services that include shop drawing review and record drawing preparation. Per the Contract Specifications the Contractor will have 150 consecutive working days to complete the work which should allow for the major construction activities to be completed prior to the summer season in the beach areas of China Cove and Newport Shores. The work at 62 "d Street Pump Station is also being coordinated with the approved underground assessment district work. Subject: Mariners, China Cove & 62nd Street Wastewater Pump Station Rehabilitation, including Fernleaf Avenue Street Improvements — Award of Contract No. 3585 Date: October 12, 2004 Page: 4 Upon approval of the recommended Budget Amendment funds are available in the following accounts for the project: Account Description Sewer Pump Station Master Plan Imps. Street/Bikeway Improvements Account Number Amount 7532- C5600100 $1,526,865 7181- C5100019 $83,105 Total: $1,609,970 The contingency for any unforeseen work for the project will be realized from the $234,188 in savings described above. Staff would anticipate no more than 5% in unanticipated construction cost, or roughly $70,000, for this project. Staff will also continue to research other cost saving options during the course of construction. Prepared by: J. S11aci Engineer Attachments: City Pump Station Location Map Bid Summary Budget Amendment FwsERSwewsnarem.COUNaLIFVa to 12WanM C,iecov Us PSAma C-se doo Submitted by: ;n G. Badum Works Director U Q W `m r cc O a W Z LL O } H U r Z W H cc Q a W 0 U) Y cc O2 U J m a LL1 p W LL1 ro Y H S ~ U _> Wp U = U v V 'I Z w Y O a m H p 0 U O p m a d C O N O m d 3 m U w d c 6i H H I O O � U _ C a N N W H Q m :5 W U OZw Z Q U w W Z Z 0 O Z m U w m '.. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O 0 0 0.0. O O O O O O O O 00 O O 0 0 0 0 0 0 0 0 0 0 0 O O O O o o 0 o o o 0 66 o O O 0 0 0 0 0 0 0 0 0 0 0 O O O o Z � O N 0 0 0 O O n 0 (D n M N n 0 0 0 0 O O O O N of cO cp n N N U V - � M m a m U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 q 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0000000 «i o ov o 0 00000000 0 (n O O O O O O O M N V 0 0 O O O O O O O O M O N M M O o�n o 000 o M �n o 000000 o m 00000 0 0 0 0 0 0000 0 0 0 0 0 0 0 0 0 0 0 O O 0 0 0 0 0 O 0 O 00 O O 00 O O 00 0 0 0 0 0 0 00 0 O O 00 O O O O O O O O O O O O O O 0 0 0 0 0 0 0 0 0 0 0 O O 60 V Z 0 O 0 O 0 O 0 O 0 00 0 0 00 O O N of O N n O O O N m m 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N m 0 (O 0 of cp m O O O of N �- � N (D O O cp M C M n N C C° O N C M V a C O 00 O O O O O 00 O 00 0 0 0 0 0 0 0 0 0 0 0 O O O O U o O O O o O O o o 00 O O O O � 000 000000 n «i o0 0000000 o m o o co ro o 0 Z 0 0 0 00 0 0 O N 0 0 0 0 0 0 0 0 N � O m N n 6,6 N co n O N Ol N O co In N N M 0 0 0 00 0 0 0 00 0 00 0 0 00 0 0 0 0 0 0 0 0 0 0 0 0 O O O 00 O O O 0.0. O 00 o 0 0 00 0 0 0 0 0 0 0 0 0 0 0 o o o 06 0 0 0 o 00 C 0 0 0 0 0 0 0 0 0 0 0 O O 0 0 00000000000000 00000000 0 0 0 0 �n �n o O N N N O N N N C6 Ol O O 6,6 N n N N O O N N E U N n O n N N (n n O t!l N W Q v 00 O 00 O O O 0 0 0 0 0 0 00 0 0 0 0 0 0 0 0 0 0 00 C O O O O O O O O O O O O O 0 0 0 0 0 0 0 0 0 00 O O 00 m O O O O O O O N 6 6 6 6 0 0 0 0 0 0 0 0 0 0 0 O O N O W 00 O 000 O O M N 0 0 O O O O O O O O M O O Z 00 O 00 O O O N N N O N N O N N n N N O N n V n N Ol n Y (n (n Mn Mn Mn Mn Mn LL LL LL LL (n (n Mn w Mn Mn (n w w (n LL LL LL LL LL LL Q H J J J J J J J J (n (n (n J J J J J J J J J J (n J J w w w W H Q 0 O 0 O - I �- Tl N (D O O d Z U v v S O o a c Q U _O _ F y o x W a y O U a a N m m c W J m m Za m .. m v] 7 aEi o > 0 LD U H 7 - v o W EL c a Vi N y C N 'o m ro m c U O o¢ o f m U o o an d U IL n (n W - O m Q Mn m 0` W Z O m C Mn C (5 O Z N O D a (i LL m ro m LL pm E ro�0 E v a dd- m ° h m Q ° Q O 'w x ' x N i o E E w 3 Q m U w p 2 i w a.z U o N 0� w O m > v > N c, N Q o Q W ' W a y y 0 w 7 o% E , m m E E , a J o E 0 v o v D :5 w:5 :5 :5m m mm C :E :E :E¢m m m(5 m(5 Um � W W`j a N a M a¢ O N a (D a h a OJ a Ol a O N M 0, m N m M m V m �Il m (O m n m OJ m T m O 7 N H U a a a a N m m m m m m N a m m U a m (fl °o N `o d L N J 2 U Q W W` r cc O a W Z LL 0 } H U r Z W H cc Q a W 0 U) Y cc O U J m a lil m :5 Y FW- _ ~ U Q _> W p U = U m V U U Z W Y U Q m Q U O J 0 m a L d Q d N d N C0 c m L U ui F- F- O p O U I� m m C � N � C W Cr W Q CC :5 W U W Z (n Q Cc :5 wF U Z W C7 O Z¢ W LL N N P N a 0 0 0 0 0 0 0 0 0 0 O O O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 p F o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O N O N OJ-' O N N Ol O O O O O O O Ol N V (p N N O N n O 7 N N I� t7 N 17 [O N Il [O O u V m Q n a m U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O N (O N DJ O O O O 0 0 0 0 0 0 O N m m 0 0 0 0 0 (n F 00 N N N t7 N N O O (D 0 t7 O 00 O Lri O O O O O 0 0 Q Z m OJ N O N O I, N N n Z N 0 0 0 0 0 0 0 0 0 0 O O O O O O O O O O O O O O O O O 0 0 0 0 0 O O O O O O O O O O O O O O O O O O 0 0 0 0 0 0 6 0 6 0 6 0 6 6 0 O O O O O O O O O O O O O O O O O p V Z N Oi O N N c7 N V O N O O O O O O N O cD O N O O N O c7 O O � O M O O O O O O N 10 O O N c7 O n rG n � O tp cD O N N N O� 0 7 N OC u Q N m C O 0 0 0 0 0 0 0 0 0 O O O O O O O O O O O O O O O O U 0 0 0 0 0 0 0 0 0 O O O O O O O O O O O O O O O O U F O O O N O O V O N CD O t7 O O O O O O O O O O O O O O O O O N O O O N (O OJ N V O O O O O O 3 O N O O O O O O O O N O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O O O O O O O O O O O O O F o 0 0 0 0 0 0 0 0 0 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O� t7 O O O O O O N O O O O 0 0 0 0 0 0 0 0 0 0 0 �fJ O O O M O N N O O N N V 6 O N 6 m N N N N 6 O (D t7 O I� O E O N t7 N t7 O O N O : W Q N � d 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C O N O O O O O O O O O O O O O O O O O O O O O O O O N V N O O 0 0 0 0 0 0 0 t7 O N N 0 0 0 W W Z O N N 0 0 0 0 0 N O O N W N N N N 0 N 6 O � O I� N t7 N t7 m O N Q LL LL LL LL LL LL LL U) (n (n (n (n 0 0 0 LL LL Q LL LL LL 0 U U y f_- W (n (n J (n J N J J J J J J J J J J fn W J (n J J J J f- Z O O O O O O - � > d U E O w = E C7 c ro y IL Q m a C L Y � U) U (0 41 S a w a E ° U a 9 8 .x W w Z o ¢ c J 2 ro d d a m m c m J m U F d zf w `c m c m _ i0 w m F N V a c a Y C7 o w m F- c c m U yl j c vii m gT Y c ro m m °' U U CC Ua0 d 0 E Ema m a0Y o �N W ¢ r w ro a m 3Ua cc E m �,� mzco c w [n m a > a w'o " -¢ F- Um o Oa da > > a -r O¢ O W C7 c ro c 3 c° c .a O to - m 'a C7 :° c U m F c o a U, O O ro m LL U ro a n LL ¢ a _ U ._ U F- C N V ro 3 ro c o_ u U LL U U c ._ U a U° U c�> a �' m F- J L.x a a `° x a u'u0 �° c °mU'o m mQa u L a co V uYi dO Q W ua W..ww ;�U __ O oy EL,z dLO W _LO 6 m�aU 0 >0 C N J V E J J F J U U ro m 2 Q a C N c m E f- L N J F- O O O O O— Q N L u O r y' > O _ y a Q E¢¢ E c E E iO F- W d '� £ E V V V¢¢ E¢¢ c m 'c > F- =o m a5 a5 w O 0 N 0 O J o ro m` m '^ �' � as as a� as as o vi 9 2 0 Q ¢ ¢ ¢ ¢ U ¢ ¢ F- D 2 F w F- 0 [D I� l0 Ol O N t7 O W co N N P N a AMENDMENT NO. 2 TO PROFESSIONAL SERVICES AGREEMENT WITH PBS &J FOR MARINERS, CHINA COVE AND 62ND STREET PUMP STATION REHABILITATION THIS AMENDMENT NO. 2 TO PROFESSIONAL SERVICES AGREEMENT, entered into this day of , 2004, by and between the CITY OF NEWPORT BEACH, a municipal corporation, (hereinafter referred to as "CITY ") and PBS &J, whose address is 18022 Cowan, Suite 100A, Irvine, California, 92614 -6805 (hereinafter referred to as "Consultant'), is made with reference to the following: RECITALS: A. On November 26, 2002, CITY and CONSULTANT entered into a Professional Services Agreement, hereinafter referred to as "AGREEMENT ", for design services for the Mariners, China Cove and 62"tl Street Pump Station Rehabilitation, hereinafter referred to as "PROJECT". B. On August 5, 2003 the CITY and CONSULTANT entered into Amendment No. 1 to reflect additional services not included in the AGREEMENT and to extend the term of the AGREEMENT to December 31, 2004. C. CITY desires to enter into this AMENDMENT NO. 2 to design additional changes and provide an estimate for bidding assistance. D. CITY desires to compensate CONSULTANT for additional professional services needed for PROJECT. E. CITY and CONSULTANT mutually desire to amend AGREEMENT, hereinafter referred to as "AMENDMENT NO. 2" as provided here below. NOW, THEREFORE, the parties hereto agree as follows: 1. CONSULTANT shall be compensated for services performed pursuant to this AMENDMENT NO. 2 according to "Exhibit A" dated September 29, 2004 attached hereto. 2. Total additional compensation to CONSULTANT for services performed pursuant to this AMENDMENT NO. 2 shall not exceed Twenty -seven thousand, eight hundred and 00/100 Dollars ($27,800.00). 3. The term of the AGREEMENT shall be extended to December 31, 2005. 4. Except as expressly modified herein, all other provisions, terms, and covenants set forth in AGREEMENT shall remain unchanged and shall be in full force and effect. IN WITNESS WHEREOF, the parties hereto have executed this AMENDMENT NO. 2 on the date first above written. CITY OF NEWPORT BEACH, A municipal corporation APPROVED AS TO FORM: Homer Bludau City Manager By: City Attorney 70W.9 Print Name f: \users \pbw\shared \agreements \fy 02- 03 \pbs &j - mariners, china cove pump station -amend 2.doc September 29, 2004 Mr. Michael J. Sinacori, P.E. City of Newport Beach 3800 Newport Boulevard Newport Beach, CA 92658 -8915 Subject: Second Amendment to the Design Scope of Work Revisions and Construction Support Services Proposal for the City of Newport Beach, Mariners, China Cove and 62nd Street Pump Station Rehabilitation Dear Mr. Sinacori: PBS &J is pleased to submit the Second Amendment to the Design Scope of Work Revisions and Construction Support Services proposal for the Mariners, China Cove and 62nd Street Pump Station Rehabilitation. To facilitate your review, we summarized project Scope of Work revisions and amendment requests to date in the following paragraphs. Original Scope of Work In October 24, 2002 PBS &J was selected to provide final design services including civil, mechanical and electrical improvements to upgrade and rehabilitate the Mariners, China Cove., and 62 "d Street pump stations. Our staff worked with the Newport Beach staff to develop the rehabilitation concepts and outline constraints to construction. The original scope of work also complied with the City's latest standards and requirements. The initial contract amount was $72.164. First Amendment As a result of unforeseen field conditions and client requested changes, we mutually agreed to amend the original scope of work. The First Amendment was submitted to the City on June 3, 2003. Included in the First Amendment were several elements to include: • Install new submersible pump system in existing sewer manhole at China Cove Pump Station • Modify existing dry pit manhole to accommodate a new access hatch at China Cove Pump Station • Replacement of existing sewage pumps at 62nd Street Pump Station • Perform hydraulic calculations for existing storm drain system at 62 "d Street Pump Station The First Amendment complied with the City's 75 percent design review comments by incorporating additional design scope changes for China Cove and 62 "d Street pump stations. The compensation for the First Amendment was in the amount of $21,000. Second Amendment At the request of the City, PBS &J was asked to design a few additional changes and to provide an estimate for bidding assistance. These are outlined below for your convenience. Additional Design Scope of Work Change sewer inlet piping alignment and configuration into the 62nd Street Pump Station dry pit. 2. Lower the 62nd Street Pump Station wetwell to accommodate a ductile iron flare bell. 3. Add additional bid items and specifications (pressure grouting and waterproofing). 4. Miscellaneous electrical and instrumentation additions and revisions. Attend additional review meetings with City staff. 6. Additional coordination efforts with vendors. Prepare construction documents addenda during bidding phase. Construction Support Services Scope of Work Task I — Project Management. Project management is a continuous task throughout the project that includes principal -in- charge project overview, correspondence, schedule and budget monitoring, and invoice preparation. Task 2 — Review Submittals. We will review a total of 13 submittals, which will include eight general and mechanical, one structural and four electrical submittals. This includes three hours of review and processing time for each submittal. We assume that the Contractor will submit these items directly to the City, who will then forward them to PBS &J for review. PBS &J will return reviewed submittals to City staff for distribution. Task 3 — Review Requests for Information /Clarification (RFURFCs). Under this task, we will review and respond to six RFMRFCs, assuming two hours per response. We will also review and respond to four electrical /instrumentation RFURFCs. Task 4 — Record Drawings. We will prepare record drawings based on Contractor's red -lines and deliver one set of full size reproducible drawings. Compensation We propose that compensation for our services be on an hourly basis with a not to exceed price ceiling of $27,800. To support our proposed compensation, we are enclosing Table 1 which summarizes additional design scope of work changes and work tasks for construction support services. If you have any questions or require additional information, please do not hesitate to call me or Rom Young. Very truly yours, PBSU David Yang Senior Project Manager § / {\ \3 \iA \ } \\ City of Newport Beach NO. BA- 018 BUDGET AMENDMENT 2004 -05 EFFECT ON BUDGETARY FUND BALANCE: Increase Revenue Estimates NX Increase Expenditure Appropriations AND Transfer Budget Appropriations SOURCE: from existing budget appropriations X from additional estimated revenues X from unappropriated fund balance EXPLANATION: This budget amendment is requested to provide for the following: AMOUNT: $561,000.00 Increase in Budgetary Fund Balance X Decrease in Budgetary Fund Balance No effect on Budgetary Fund Balance To increase expenditure appropriations for the Mariners, China Cove and 62nd Street Wastewater Pump Station Rehabilitation, C -3585. ACCOUNTING ENTRY: BUDGETARY FUND BALANCE Fund Account Description 530 3785 Wastewater - Future Infrastructure REVENUE ESTIMATES (3601) Fund /Division Account Description EXPENDITURE APPROPRIATIONS (3603) Division Number Account Number Signed: Signed: Financial Approval: Administrative Services Director City Manager Signed: City Council Approval: City Clerk Debit Credit $188,000.00 , $350,000.00 $23,000.00 $561,000.00 /o- y- Date /,0/0/6 ate Date Description Division Number 7531 Sewer Main Replacement Account Number C5600292 Sewer Main Master Plan Division Number 5600 Utilities - Wastewater Account Number 8186 Sewer Access Road Maintenance Division Number 7532 Sewer Pump Station Improvement Account Number C5600100 Sewer Pump Station Improvement Division Number Account Number Signed: Signed: Financial Approval: Administrative Services Director City Manager Signed: City Council Approval: City Clerk Debit Credit $188,000.00 , $350,000.00 $23,000.00 $561,000.00 /o- y- Date /,0/0/6 ate Date