HomeMy WebLinkAboutM2009-0036 (2)CITY OF NEWPORT BEACH
Marine Department
October 13, 1981
Agenda No.
TO: MAYOR AND CITY COUNCIL
'FROM: Marine Department
SUBJECT: HARBOR PERMIT APPLICATIONS BY THE CITY OF
NEWPORT BEACH FOR MAINTENANCE DREDGING
Recommendation:
If desired, approve the maintenance dredging applications and the
placing of the dredged material on adjacent beaches.
Discussion:
The applications require City Council approval under the conditions of
approval placed on the City of Newport Beach General Permit for
Maintenance Dredging issued by the U.S. Army corps of Engineers on
February 12, 1974, and subsequently amended on May 10, 1977, to allow
beach restorations. The locations for the proposed dredging and
beach restorations are:
North Bay Front between Diamond and Ruby Streets
North Bay Front at Agate Street end
South Bay Front between Sapphire and.Diamond Streets
The staff has reviewed the projects and has determined that the work
will -be done within the parameters of the Corps of Engineers' permit.
The dredging contractor will place a filter screen around the dredge
area to cOnt rol turbidity. There is no known eel grass in the Vicinity
of the projects.
All dredged material.will be placed on adjacent beaches, which will
aid -in their restoration.
DAVID HARSHBARGER,-DIRECTOR
Marine Department
.Tony Melum
Tidelands Administrator
TM:db
. ........
70
0
Ap" I.a.
ti L,44,,
.00
-11
0
V(CWITY SXETCH
(3Ay, CA4- IFORNIA j ry
0 dr
1 Illy;
vr
IR
No
------------
It
W'i
A lz
<
N 6.
o
63 2 7 R'ff I-
0.4 .v
av
ZZ, — ' r,
0 h as,
VICIMITY 5XETCH
'4 A WPOR 5AY/ CAI IF
/
-5'Oe1nd1r)qS CArd 0(,dlnOIIP
4)elow A-IC007 ZoWer LoW Wopl�r&-. A4ojr.,,,'j',p,
e r0A/&Wo/&/y Ao vZ-,ryr Hoebor 44C.5
Y0614"
eze-
112
17
'bo
fCl K lllsmpaer &e.4cw
All
IT
v MAI. 0
J�
VICIMITY SXETCH
NawpoRr 13AY, CAI. 11FORNIA ffrr
Ha.boe 4 �7 c
are e yabl"Sked 1;2 7�A;s 54ccloasl oryVewparl .450'r,
ty
ZT'. Wyl—rWI-1
-Dr
PERMIT No.
DREDGING APPLICATION
Project Location: End of Sapphire Ave. at South Bay Front, Balboa Island
Cubic Yards to be Drddged: _200
Method of Dredging: Hydraulic Suction
Nature of Dredged Material: Sand/Silt
Disposition of Dredged Material: Place material on adjacent beach
Method of, Material Disposition: Pump through discharge pipe to disposal fill
area
Turbidity Control Method: Filter screen around discharRe site
Effect of dredging on contiguous bulkheading and beaches will
restore depleted beach and reinforce bulkhead
Ir Wm. L. Harris hereby state that I have read the U. S. Army
(print name)
Corps of Engineers permit for maintenance dredging in Newport Harbor, the
City of Newport Beach and Orange County Harbors,Beache.s and Parks District
(if applicable) permit for maintenance dredging and that I accept all the
provisions therein. Additionally I guarantee that the proposed dredging
will not occurbecause of any altering of existing use of the affected
.zone.
City of k1elQQrt Beach Shellmaker, Inc.
(Applicant -type name) .(Contractor -type name)
10/5/81 SigneJ ;.?'�:_y A-4
(Date) rortrac�ox S
Representative
CITY OF NEWPORT BEACH
HARBOR PERMIT
eERMISSION IS HCjjEoy GUARTLI-0 TO CONSTRUCT AMU
MAINTAIN THE FAC-ftJTY ON T',IE PEVERSE HEREOF
AT THE SITE SU,21ECY YO Tl-'.-'- P-AcoViSIONS or
THE HAP13OR OF 14�iiui--IT BEACH Aw
ANY SPECIAL CON'll)"(SSONS L;-`74i:D THIS PERmi,
15 N 0 T T rf. A Jq S F MR A UL E- W.T CONSENT C,
THE CITY NARV,9R C0047,'Dh��'A-."OR G�T-V COUNCIL. TI:
RIGHTS GWEli UNDER r-Et"MIT --:)Rt: PERIMISSIVE ONL co
ANID THIS Ptu-mur MAY UL REVOKED BY TiiE 04TY COUNCI, No
IN ACCORDANCE WITH TiTLE 17 OF THE MUNICIPAL CODE. Sop r
,10 permil
COI.PS 0, it
.,Dullty Per,"
CITY HARBOR COORWNAfon orange C
PINMIT NO. DATE Other'.