EEL GRASS INSPECTION
NO EELGRASS WITHIN 15'OF PROJECT
"/0 EEL GRASS, IN THE PROJECT AREA
( �jk
SIGNATURE
_� /7 /0,1,
PERMIT DATE
e;o�r
,Ze eo�� -r r I
I e7 .. I I I
pf
V. I BY
'R-IW'S ftE
JOB RM
TDRTE
C iW,4ti 617L
WORKSHEET FOR BUILDING / FIRE PERMIT APPLICATION If7l;
CITY OF NEWPORT BEACH
HARBOR RESOURCES DIV.
PI FARF PRINT nP TY'PF BUILDING DEPARTMENT CITY OF NEWPORT BEACH
1. PROJECT ADDRESS (NOT MAILING ADDRE
FLOOR
SUITE NO.
CITY STATE ZIP
r5 C
PHONE NO.
LEGAL DESCRIPTION
No. UNITS
LOT BLOCK TRACT
ARCH ITECT/DES IGN ER'S ADDRESS
2. DESCRIPTION OF WORK
yl
NEWPZ,,,. ADD 1771 1 ALTER E:]
Check ADDrooriate Box for Annlicant
DEMO Ej
# OF STORIES
VALUATION$
SQ FT
(NEW/ADDED/EXTG)
3. OWNER'S NAME LAST FIRST—
OWNER'S ADDRESS
s/ fo/_
OWNER'S E-MAIL ADDRESS
CITY STATE ZIP
r5 C
PHONE NO.
4. ARCH ITECT/DESIGN ER'S NAME LAST FIRST
LIC. NO.
ARCH ITECT/DES IGN ER'S ADDRESS
ARCH ITECT/DESIGN R'SE-MAIL ADDRESS
CITY STATE ZIP
PHONE NO.
5. ENGINEER'S NAME LAST FIRST
STATE LIC. NO.
ENGINEE I R'S ADDR�Ss
2-5 -V Wor,
NGINEER'S E-MAIL ADDRESS
0 v I A-
CITY STATE ZIP
PHONE NO.
/__1
F] 6. CONTRAC3_QF�- NAME.—
BUSINESS LIC. --STATE
//,_� 7,� 14
11-S
LIC.
- X-1—
�
No. s
Clas
CONTRACTOR'S ADDRESS
CONTRACTOR'S E-MAIL _ ADDRESS
STATE ZIP��
IjI2,,�7
EPO
PHr 7
OFFICE USE ONLY
PERMIT NO.
TYPE OF CONSTRUCTION PLAN CHECK NO.
PLAN CHECK FEE $�j
OCCUPANCY- GROUP PLAN CHECK ENG.
t--ormsxbiag_application d/:ef/u4
WPO
HARBOR RESOURCES DIVISION
829 Harbor Island Drive
Newport Beach, CA 92660
949-644-3034 / Fax 949-723-0589
Pier Permit Conditions
April 4, 2005
Property Address: 4008 Channel Place
With reference to the plans currently under consideration to reconfigure or modify the dock
system',the -following conditions will now be in effect on the above referenced pier.
1. The pier permittee is aware of the Harbor Permit Policies and Chapter 17 of the City of
Newport Beach Municipal Code. The pier permittee understands that the above referenced
r)ier is under the r)urview of these Policies and Codes.
2. Any future work on the above mentioned pier requires permits with the City of Newport
Beach and any other applicable agencies. Painting, replacement of rub rails and work
considered to be cosmetic in nature does not reauire a i)ermit.
3. The conditions set forth in this document pertain to the current, proposed dock system
under consideration. Any future modifications or alterations to the dock system may require
new conditions which mav override or chanae these conditions.
4. Only marine oriented uses are allowed on the pier, pier platform, gangway and float. Patio
furniture, plants etc ... are not permitted.
5. Vessels will be allowed to extend channelward past the end of the float by the width of their
beams.
6. The side property lines project channelward on the same bearing from the bulkhead.
7. The maximum beam of a vessel that is permitted to side tie to the westernmost side of the
float is 7.5'.
7. The maximum beam of a vessel that is permitted to side tie to the easternmost side of the
float is 7.5'.
Signature: ,
Chris Mille�,
A,-)' ( M
rbor Resources Supervisor
�'Ivlo-r
Date
Applicant Signature Print Name Date
Joint Pier Applicant Signature (if applicable) Print Name Date
�-US-4-2005 13:20 FROM:SWIFTSLIPDOCK.COM
ZIMO 14; 1* J.
ALIG-4-2WS JJ.103 FR0M!SWZFTSLjPD0CK.00M
C949) 631-3122
011M
(949) G%-;11PP
ZION,
HARBOR RESOURCES DIVIBIGN
829 Karbor Island Drive
Niswptxt Beach, CA 92660
0494544-3034 1 Fax 949-723-0589
Pier Permit Canditlans
APM 4, 2006
F party Addrm: 4008 Ghannel Plaw
TO:7230589
TO-.7221SW
P. I
With reftranm to the plans cufrer* under consideration to reWhfturb Or Modify this dQGk
3ystiifi;%w*fiow6g ondlGans will now be In effed an the above refilrwmd Pier.
P. 1
I, The PW pances is swam of the Harbor ParmIt Policies and Chapter 17 of ft Oty of
Newport Beach MunidPal Code. The pier permfte understands thot ft abo" Werenwd
pier is under ft vursAaw of theso PollcW and Codes.
?- Any MWra work an the abova mentioned pler requires parmft w1th the CRY of Newport
Beach and any other applicable agencies. Painting, mplacemnt of rub rags and work
wnsidemd to he wsmWo in natum does not reauilm a Permft.
3. The conditions set forth In this document Vermin to the current, proppmW dock system
under consIdemitlon. Any Uute modifications or alteraticins to the dock system may Mquift
now conditieft which mov oiWde or chance +*." candmons.
4. Only marine orlartled uses gre allowed an the pier. pier platfbrM, ganwmy and ftaL Pafio
furnitift, plem at'..am not pennftd.
5. Vmela mfill be allowed to oftnd channalward pml the and of the flast by the Width of Umir
beams,
6. The Me pimparty lines projed ah2nnelward on the sarne bearing ftam the bulkMad.
7. The ma3elmum beam of a vessel that (a Perm*ed in. side to to the wiWarrimast *14e of the
Mat Is 7.51.
7. 11te max1mum beam of a vessel %ft is permbW to side tie to the askeemment aide of tha
flast is 7R.
Joint PiWr"Xp'jQ;n—t ftnatiwira (Ff xp�Drable) Wnt Name - dm*
,ry 0 VL
HARBOR RESOURCES DIVISION
829 Harbor Island Drive
Newport Beach, CA 92660
949-644-3034 / Fax 949-723-0589
APPROVAL IN CONCEPT
APPROVAL IN CONCEPT BY THE CITY OF NEWPORT BEACH as required for permit
application to the South Coast Regional Commission pursuant to California
Administrative Code, Sections 13210 and 13211.
General Description of Proposed Development: Remove existing float, pile and
gangway. Install new 12'x 15'float with (2) new 12" pile, same location as existing.
New 3'x 24'gangway with 4'x 4'gangway lobe on existing pier.
Add ess number mu ' st be stenciled on at least 1 bayward facing pile.
Pier conditions must be signed by applicant prior to final approval.
Wroperty Address: 4008 Channel Place -7
Legal Description:
Warbor Permit Number: 441-4008 --,-1
IPlan Check Number: 0382-2005 1
jApplicant: Stanley Swiatek -I
Applicant's Mailing Address: 4008 Channel Place, Newport Beach, CA 92663
Phone Number: (949) 631-3121
I have reviewed the plans for the foregoing development including:
1. The general site plan, including any roads and public access to the shoreline.
2. The grading plan, if any.
3. The general uses and intensity of use proposed for each part of the area covered
in the application.
And find
Page 1 of 2
)(They comply with the current adopted Newport Beach General Plan, Zoning
Ordinance, Subdivision Ordinance and anv applicable specific or precise plans or,
o That a variance of exception has been approved and final.
A copy of any variance, exception, conditional use permit or other issued permit is
attached together with all conditions of approval and all approved plans including
approved tentative tract maps. On the basis of this finding, these plans are approved in
conceDt and said anDroval has been written uoon said nlans. sianed and dated.
Should Newport Beach adopt an ordinance deleting, amending or adding to the Zoning
Ordinance or other regulations in any manner that would affect the use of the property or
the design of a project located thereon, this approval in concept shall become null and
void as of the effective date of this said ordinance.
In accordance with the California Environmental Quality Act or 1970, and state and local
quidelines adopted thereunder, this development:
/1( Has been determined to be ministerial or categorically exempt.
o Has received a final Exemption Declaration or final Negative Declaration (copy
attached).
o Has received a Final Environmental Impact Report (copy attached).
All discretionary approvals legally required of Newport Beach prior to issuance of a
building permit have been given and are final. The development is not subject to
reiection in principal bv Newport Beach unless a substantial chanae is proposed.
This concept approval in no way excuses the applicant from complying with all
applicable policies, ordinances, codes and regulations of Newport Beach. See attached
conditions to the vier permit.
Tom Rossmiller, Manager, Harbor Resources
re:
.Chris Miller, Harbor Resources Supervisor
April 4, 2005
'Attachments:
Worksheet for Building Permit Application
Drawing
Pier Conditions
Page 2 of 2
INSPECTION FORM
Harbor Resources Department
Date: I
Inspection Requested By:
Inspector: Don Duffy
Pier Address: /—/ 0 0 2 ChW7
Pier Transfer
Reinspection
GFI Present Yes Need None Needed Yes Need
I F
Anti -Siphon / Backflow Present
comments
rass
Yes No
Presentl 1 3
Pump Out
Pier Location.
Yes No
Operational
Recommended Action
Encroachmenet
Address of Complaining Party
Boat Description
_CF Number
Location on Dock
Comments / Observations
Other Request
ITATE OF CALIFORNIA —THE RESOURCES AGENCY ARNOLD SCHWARZENEGGER, Governor
,_9P
CALIFORNIA COASTAL COMMISSION
SOUTH COAST DISTRICT
PO Box 1450
200 Oceangate, 10th Floor
LONG BEACH, CA 90802-4416
www.coastal.ca.gov
Date: July 19, 2005
Permit No. 5-05-143
NOTICE OF ADMINISTRATIVE PERMIT EFFECTIVENESS
Please be advised that the Administrative Permit with the above permit number
which was sent to you on June 24, 2005 -and was reported to the
Commission on Wednesday, July 13, 2005 is now fully effective.
Development of your project is subject to compliance with all terms and conditions
specified in the Administrative Permit.
Should you have any questions please,contact our office.
Sincerely,
PETER M. DOUGLAS
Executive Director
By: MEG VAUGIHA
Coastal Program Analyst
tk CALIFORNIA COASTAL COMMISSION
STATE OF CALIFORNIA - THE RESOURCES AGENCY
Arnold Schwarzenegger, Govemor
CALIFORNIA COASTAL COMMISSION
South Coast Area Office Permit Application No. 5-05-143
200 Oceangate, Suite 1000 Date: June 23, 2005
Long Beach, CA 90802-4302
(562) 590-5071 Page: 1 of 6
ADMINISTRATIVE PERMIT
APPLICANT:
PROJECT
DESCRIPTION:
PROJECT
LOCATION:
Stanley Swiatek
Modify an existing boat dock by removing the existing float, piles and
gangway and replacing them with: a new float of the same dimensions (112
foot by 15 foot) in the same location, two new 12 inch diameter concrete
piles in the same location as the piles to be removed, replacing the 3 foot by
24 foot gangway with a new gangway of the same dimensions, and
construction of a new 4 foot by 4 foot gangway lobe on the existing pier.
4008 Channel Place, Newport Beach, Orange County
EXECUTIVE DIRECTOR'S DETERMINATION: The findings for this determination, and for any
special conditions, appear on subsequent pagEis.
NOTE: P.R.C. Section 30624 provides that this permit shall not become effective until it is
reported to the Commission at its next meeting. If one-third or more of the appointed
membership of the Commission so request, the application will be removed from the
administrative calendar and set for public hearing at a subsequent Commission meeting.
Our office will notify you if such removal occurs.
This permit will be reported to the Commission at the following time and place:
Catamaran Resort Hotel
3999 Mission Blvd.
San Diego, CA 92109
(858) 488-1081
IMPORTANT - Before you may proceed with development, the following must occur:
Pursuant to 14 Cal. Admin. Code Sections 13150(b) and 13158, you must sign the enclosed
duplicate copy acknowledging the permit's receipt and accepting its contents, including all
conditions, and return it to our office. Following the Commission's meeting, and once we have
received the signed acknowledgement and evidence of compliance with all special conditions, we
will send you a Notice of Administrative Permit Effectiveness.
BEFORE YOU CAN OBTAIN ANY LOCAL PERMITS AND PROCEED WITH DEVELOPMENT,
YOU MUST HAVE RECEIVED BOTH YOUR ADMINISTRATIVE PERMIT AND THE NOTICE OF
PERMIT EFFECTIVENESS FROM THIS OFFICE.
PETER DO AS
Executive D* ctor
Py Meg Vaughn
Title: Coastal Program Analyst
5-05-143 Swiatek
Page 2
STANDARD CONDITIONS:
Notice of Receipt and Acknowledgment. The permit is not valid and development shall not
commence until a copy of the permit, signed by the permittee or authorized agent,
acknowledging receipt of the permit and acceptance of the terms and conditions, is
returned to the Commission office.
2. Expiration. If development has not commenced, the permit will expire two years from the
date this permit is reported to the Commission. Development shall be pursued in a diligent
manner and completed in a reasonable period of time. Application for extension of the
permit must be made prior to the expiration date.
3- Interpretation. Any questions of intent or interpretation of any term or condition will be
resolved by the Executive Director or the Commission.
4. Assignment. The permit may be assigned to any qualified person, provided assignee files
with the Commission an affidavit accepting all terms and conditions of the permit.
5. Terms and Conditions Run with the Land. These terms and conditions shall be perpetual,
and it is the intention of the Commission and the permittee to bind all future owners and
possessors of the subject property to the terms and conditions.
SPECIAL CONDITIONS: See pages 4-6
EXECUTIVE DIRECTOR'S DETERMINATION (continued):
The Executive Director hereby determines that the proposed development is a category of
development which, pursuant to PRC Section 30624, qualifies for approval by the Executive
Director through the issuance of an Administrative Permit. Subject to Standard and Special
Conditions as attached; said development is in conformity with the provisions of Chapter 3 of the
Coastal Act of 1976 and will not have any significant impacts on the environment within the
meaning of the California Environmental Quality Act. If located between the nearest public road
and the sea, this development is in conformity with the public access and public recreation policies
of Chapter 3.
FINDINGS FOR EXECUTIVE DIRECTOR'S DETERMINATION:
A. Pro"ect Description and Background
The applicant proposes to modify an existing boat dock by removing the existing float, piles and
gangway and replacing them with: a new float of the same dimensions (12 foot by 15 foot) in the
same location, two new 12 inch diameter concrete piles in the same location as the piles to be
removed, replacing the 3 foot by 24 foot gangway with a new gangway of the same dimensions,
and construction of a new 4 foot by 4 foot gangway lobe on the existing pier.
The subject site is located at 4008 Channel Place in Newport Beach, Orange County. The site
fronts on Newport Harbor. The majority of harbor front, residential development in Newport Harbor
is surrounded by private recreational boat docks. The proposed dock project is similar in function
to other docks associated with residential development in the immediate vicinity. The boat dock
will be used solely for boating recreation purposes. The site has been surveyed by the City of
Newport Beach Harbor Resources Division for eelgrass and no eelgrass was discovered within 15
5-05-143 Swiatek
Page 3
feet of the project area. In addition, Special Condition 4 requires a Caulerpa taxiffiblia survey not
more than 90 days prior to commencement of construction. The surveys are valid for a limited
period of time (until the next growing season for eelgrass and 90 days for Caulerpa taxiffiblia). If
construction does not occur within the respective time periods, subsequent surveys will be
required. Special conditions 3 and 4 identify the procedures necessary to be completed prior to
beginning construction in the case the surveys expire prior to commencement of construction. In
addition, special conditions 3 and 4 identify post -construction eelgrass and Caulerpa taxifolia
procedures.
The nearest public access is located approximately % mile south of the subject site at the public
beach along the Balboa Peninsula. The proposed project has received appruval in concept from
the City of Newport Beach (Harbor Permit No. 441-4008). The applicant has applied for approval
of the proposed project from the U.S. Army Corps of Engineers. In addition, the project has
received clearance from the California Regional Water Quality Control Board (RWQCB), provided
that standard dock construction methods and materials are utilized (see exhibit C).
B. Recreational Marine Resources
The proposed recreational boat dock development and its associated structures are an allowable
and encouraged marine related use. The project design includes the minimum sized pilings and
the minimum number of pilings necessary for structural stability. There are no feasible less
environmentally damaging alternatives available. As conditioned, the project will not significantly
adversely impact eelgrass beds and will not contribute to the dispersal of the invasive aquatic
algae, Caulerpa taxifolia. Further, as proposed and conditioned, the project, which is to be used
solely for recreational boating purposes, conforms with Sections 30224 and 30233 of the Coastal
Act.
C. Water Qualit
The proposed dock work will be occurring on or within coastal waters. The storage or placement
of construction material, debris, or waste in a location where it could be discharged into coastal
waters would result in an adverse effect on the marine environment. To reduce the potential for
construction related impacts on water quality, the Commission imposes special conditions
requiring, but not limited to, the appropriate storage and handling of construction equipment and
materials to minimize the potential of pollutants to enter coastal waters and for the use of on-going
best management practices following construction. As conditioned, the Commission finds that the
development conforms with Sections 30230 and 30231 of the Coastal Act.
D. Public Access
As conditioned, the proposed development will not have any new adverse impact on public access
to the coast or to nearby recreational facilities. Thus, as conditioned, the proposed development
conforms with Sections 30210 through 30214, Sections 30220 through 30224, and 30252 of the
Coastal Act.
E. Local Coastal Program
The LUP for the City of Newport Beach was effectively certified on May 19, 1982. The certified
LUP was updated on January 9, 1990. As conditioned, the proposed development is consistent
with Chapter 3 of the Coastal Act and with the certified Land Use Plan for the area. Approval of
5-05-143 Swiatek
Page 4
the project, as conditioned, will not prejudice the ability of the local government to prepare a Local
Coastal Program that is in conformity with the provisions of Chapter 3 of the Coastal Act. ,
F. California Environmental Quality Act (CEQA)
As conditioned, there are no feasible alternatives or feasible mitigation measures available which
would substantially lessen any significant adverse effect whic ' h the activity may have on the
environment. Therefore, the Commission finds that the proposed project, as conditioned to
mitigate the identified impacts, is the least environmentally damaging feasible alternative and can
be found consistent with the requirements of the Coastal Act to conform to CEQA.
SPECIAL CONDITIONS:
1. Construction Responsibilities and Debris Removal
(a) No construction materials, equipment, debris, or waste shall be placed or stored where
it may be subject to wave, wind, or rain erosion and dispersion.
(b) Any and all construction material shall be removed from the site within 10 days of
completion of construction.
(c) Machinery or construction materials not essential for project improvements shall not be
allowed at any time in the intertidal zone.
(d) If turbid conditions are generated during construction a silt curtain shall be utilized to
control turbidity.
(e) Floating booms shall be used to contain debris discharged into coastal waters and any
debris discharged shall be removed as soon as possible but no later than the end of
each day.
(f) Non -buoyant debris discharged into coastal waters shall be recovered by divers as
soon as possible after loss.
2. Best Management Practices Program
By acceptance of this permit the applicant agrees that the long-term water -borne berthing of
boat(s) in the approved dock and/or boat slip will be managed in a manner that protects
water quality pursuant to the implementation of the following BMPs.
(a) Boat Cleaning and Maintenance Measures:
1 . In -water top -side and bottom -side boat cleaning shall minimize the discharge of
soaps, paints, and debris.
2. In -the -water hull scraping,or any process that occurs under water that results in the
removal of paint from boat hulls shall be prohibited. Only detergents and cleaning
components that are designated by the manufacturer as phosphate -free and
biodegradable shall be used, and the amounts used minimized.
3. The applicant shall minimize the use of detergents and boat cleaning and
maintenance products containing ammonia, sodium hypochlorite, chlorinated
solvents, petroleum distillates or lye.
(b) Solid and Liquid Waste Management Measures:
5-05-143 Swiatek
Page 5
1 . All trash, recyclables, and hazardous wastes or potential water contaminants,
including old gasoline or gasoline with water, absorbent materials, oily rags, lead
acid batteries, anti -freeze, waste diesel, kerosene and mineral spirits shall be
disposed of in a proper manner and shall not at any time be disposed of in the water
or gutter.
(c) Petroleum Control Management Measures:
Oil absorbent materials shall be examined at least once a year and replaced as
necessary. The applicant shall recycle the materials, if possible, or dispose of them
in accordance with hazardous waste disposal regulations. The boaters shall
regularly inspect and maintain engines, seals, gaskets, lines and hoses in order to
prevent oil and fuel spills. Boaters shall also use preventive engine maintenance, oil
absorbents, bilge pump -out services, or steam cleaning services as much as
possible to clean oily bilge areas and shall not use detergents while cleaning. The
use of soaps that can be discharged by bilge pumps is prohibited.
3. Eelgrass Surve
A. Pre Construction Eellgrass Survey. A valid pre -construction eelgrass (Zostera
marina) survey shall be completed during the period of active growth of eelgrass
(typically March through October). The pre -construction survey shall be completed
prior to the beginning of construction and shall be valid until the next period of active
growth. The survey shall be prepared in full compliance with the "Southern
California Eelgrass Mitigation Policy" Revision 8 (except as modified by this special
condition) adopted by the National Marine Fisheries Service and shall be prepared
in consultation with the California Department of Fish and Game. The applicant
shall submit the eelgrass survey for the review and approval of the Executive
Director within five (5) business days of completion of each eelgrass survey and in
any event no later -than fifteen (115) business days prior to commencement of any
development. If the eelgrass survey identifies any eelgrass within the project area
which would be impacted by the proposed project, the development shall require an
amendment to this permit from the Coastal Commission or a new coastal
development permit.
B. Post Construction Eelgrass Survey. If any eelgrass is identified in the project
area by the survey required in subsection A of this condition above, within one
month after the conclusion of construction, the applicant shall survey the project site
to determine if any eelgrass was adversely impacted. The survey shall be prepared
in full compliance with the "Southern California Eelgrass Mitigation Policy" Revision
8 (except as modified by this special condition) adopted by the National Marine
Fisheries Service and shall be prepared in consultation with the California
Department of Fish and Game. The applicant shall submit the post -construction
eelgrass survey for the review and approval of the Executive Director within thirty
(30) days after completion of the survey. If any eelgrass has been impacted, the
applicant shall replace - the impacted eelgrass at a minimum 1.2:1 ratio on-site, or at
another location, in accordance with the Southern California Eelgrass Mitigation
Policy. All impacts to eelgrass habitat shall be mitigated at a minimum ratio of 1.21
(mitigation: impact). The exceptions to the required 1.21 mitigation ratio found
within SCEMP shall not apply. Implementation of mitigation shall require an
amendment to this permit or a new coastal development permit unless the
5-05-143 Swiatek
Page 6
Executive Director determines that no amendment or new permit is required.
4. Pre -construction Caulerpa Taxifolia Surve
A. Not earlier than 90 days nor later than 30 days prior to commencement or
re -commencement of any development authorized under this coastal development
permit (the "project"), the applicants shall undertake a survey of the project area and
a buffer area at least 10 meters beyond the project area to determine the presence
of the invasive alga Caulerpa taxifolia. The survey shall include a visual
examination of the substrate.
B. The survey protocol shall be prepared in consultation with the Regional Water
Quality Control Board, the California Department of Fish and Game, and the
National Marine Fisheries Service.
C. Within five (5) business days of completion of the survey, the applicants shall submit
the survey:
for the review and approval of the Executive Director; and
to the Surveillance Subcommittee of the Southern California Caulerpa Action
Team (SCCAT). The SCCAT Surveillance Subcommittee may be contacted
through William Paznokas, California Department of Fish & Game
(858/467-4218) or Robert Hoffman, National Marine Fisheries Service
(562/980-4043).
D. If Caulerpa taxifolia is found within the project or buffer areas, the applicants shall
not proceed with the project until 1) the applicants provide evidence to the Executive
Director that all C. taxifolia discovered within the project area and all C. taxifolia
discovered within the buffer area have been eliminated in a manner that complies
with all applicable governmental approval requirements, including but not limited to
those of the California Coastal Act, or 2) the applicants have revised the project to
avoid any contact with C. taxifolia. No revisions to the project shall occur without a
Coastal Commission approved amendment to this coastal development permit
unless the Executive Director determines that no amendment is legally required.
ACKNOWLEDGMENT OF PERMIT RECEIPT/ACCEPTANCE OF CONTENTS:
I/We acknowledge that I/we have received a copy of this permit and have accepted its contents
including all conditions.
Applicant's Signature Date of Signing
5-05-143 Swiatek noEGpls bt dk admn 7.05 mv
4, t4
31
26 F tA t;
AV —OPOR
AV
AV VKW3d FE —3 411
AN Hollm N AV W3 fE
3_ 1
v &a
- - - - - - - - - - -
ly 3NI
iE 25 it
Lij
= A
LW A
:19
V
91
*20.
<PIS
- ----- - -------
An
Its
is
v )U
Z11 q
I K � .�S� 5-05-143
14A!;� TM,Ivw mu�% w INS
VIM
9mm
t 113
Id
it
is m din. It lin".1
mi rr4
All
—5
133IJ
2 "P2 RECEIV,
-, 11 IR
R -0- ED
10NUVW Soutb CoOst Regior,
III No
8A A PR 1 2005
C CAL/FoRN/,,
T� 3 11 C
om
r i7i-
--cw-
—vo
mo
COASTAL COMMISSION
"A
c.,.l t
wi
EXHIBIT #—
MAP
..CIT -Y of'NEWPORT BEACH
RECEIVED
Soutk Coast Region
APR 1 1,2005
LIFORNIA
COASTA.L COMMISSION
BA HARBOR RESOURCES DIV.
P I E
CITY OF NEWPORT BEACH
tv
YICINITY MRP PROFILE 1'
sunscl Bch .: 01D,040 9mXS PFE D?RESSED INFEET RtM DEt,,
aZYRTIONS BASU ON �� L%U LN HATEP,
EEL GRASS INSPECTION
NO EEL GRASS WITHIN 15'OF PROJECT
3'4o& vF ci""--)riligCo,-istalConunission[3 EEL GRASS'lN THE PROJECT AREA
0
de �s stric f
Re'"Ove- rx"S41,4? FIOAT, p,
_
_Sp. " 0
6.+m� mqcl . ;l 5'—
I --, 1.57' . ermityll) ----------------------- SIGNATURE
:rn -4 k+ I( IVe 4-v 1 7—
wi'ttj z lvei-v -------------------------- /0
PERMIT # DATE
,Alew
........................
z -
7, 5'
—/View 12,X16'rim-f
3 & 'O'IWA
q
a,"
COASTAL COMMISSION
ro..D 6
EXHIE31T #__
J�_
PAGE --OF
51TE ?6.kN
pl 6N " I p1l",
qoo�c
gional W
California Re ater Quality Control Board
Santa Ana Region a
3737 Main Street, Suite 500, Riverside, California 92501-3348 Arnold Schwarzenegger
Alan C. Lloyd, Ph.D. Phone (951) 782-4130 - FAX (951) 78 1 m6288
Agency Secrelary http://www.waterboards.ca.gov/�santaana RECEIVED
SoutH Coast Regiorl
April 12,2005 APR 1 4 2005
Beth Swift CALIFORNIA
Swift Slip Dock and Pier Builders, Inc. COASTAI,. COMMIS510N
2027 Placentia Avenue
Costa Mesa, CA 92627
PROPOSED REBUILDING OF BOAT DOCK, STANLEY SWIATEK� 4008 CHANNEL
PLACE, NEWPORT BEACH, ORANGE COUNTY
Dear Ms. Swift:
If standard dock construction methods and materials are utilized, this project should not adversely
impact water quality. A statement has been submitted that there will be no waste discharged from
the proposed project. Based on these assurances, clearance is provided.
However, should the Army Corps of Engineers determine that this project requires a Section 404
permit it will be necessary for the project proponent. to obtain from this Board a Water Quality
Certification under Section 401 of the Clean Water Act.
Should you have any questions, please contact me at (951) 782-3288.
Sincerely
J. Shami
Water Resources Control Engineer
cc: California Coastal Commission, Long Beach
Army Corps of Engineers — Erik Larsen
County of Orange, County Property Permits Division — Patricia Bigger
JIS/blutag243let
California Environmental Protection Agency
Recycled Paper
COASTAL COMMISSION
045
EXHIBIT # co
PAGE--A--()F
.-C I T,Y OVNEWPORT BEACH
NEWP
C P I E B A Y
YICLN.ITY MRP
PROF I LE I
gice
ME, a 10 1
.'fornia Coastal COMMISS10-11
S h� 6ast Dist * 't Of e 43
R U 5 1
Pe No -----------------------
C
Apj
'f'
By: ---------------------------
Date: -------------------------
HARBOR RESOURCES DIV.
CITY OF NEWPORT BEACH
RECEiVEZ) 0 EE L L GRASS INSPECTION
540�e OF South coast Re N EEL GRASS WITHIN 15' OF PROJECT
peo"Ov't FIOA-F, Pile glonO EEL GRASS IN THE PROJECT AREA
64-nj wqy APR 1 1 2005.
AT
ivi-�tj z A-ew C0,4STCAL/Fop SIGNATUR
A NiA
409CA-�;en �-J-s PERMIT #
eVY4, 3'fX-ZZII DATE
6 4.9 Wf/r 44e
4'e;,!� �;17 --/
14
z-ev,ew
15" .74'
q
Califorriia Coastal cornmission
South Coast District of.&e
APPROVED 1:2,
Permit No.
By:
a --- ---------- --------
EFFECTIVE
- _ 7-
Date. -
P1 AN \1
p1q Air �W'fttt�
JOB RORSS �60 C DATEL
.TUI --28-2005 15:38 FROM:SWIFTSLIPDOCK.COM
cr
REPLY TO
ATTERrION Of.
Office of the Chef
Regulatory Branch
C949) 631-3122 TO:7230589 P.5
DEPARTMENT OF THE ARMY
LOS ANGELES DISTRICT,, CORPS OF ENGINEERS
P.0 BOX 632711
.LOS ANGELES, CALIFORNIA 90053-232A
swift Slip Dock and Pier Builders
cJo Stanley Swiatek
Attentiolv. Peter Swift
2027 Placentia Avenue
Costa Mesa, California 92627
Dear Mr. Swift:
may 5, 2005
00 6-CLM). Under the
Reference is made to your request of April 15, 2005 (File No.2 50119
provisions of Section 10 of the Rivers and Harbors Act of March 3,1899 (33 U.S.C. 403), you are
hereby authorized to remove and replace the existing 12 -foot by 15 -foot floating boat dock, two
12 -inch pilings, 3 -foot by 24 -foot gangway, and install a 4 -foot by 4 -foot landing with one 12 -
inch support pile. The only change in the configuration is add. ing a 4 -foot by 4 -foot lobe and
replacing the 20 -foot gangway with a 24 -foot gangway in the city of Newport Beach, Orange
County, California, as shown on the enclosed drawings.
The owner or authorized responsible official must sign and date all copies of this Letter of
Permission (LOP) indicating that he/she agrees to the work *as described and will comply with all
conditions. One of the signed copies of this Letter of Permission must be returned to the Corps of
Engineers (a pre -addressed envelope is enclosed). In addition, please use the two attached
postcards to notify this office as to the dates of commencement (within 10 days prior to the start of
construction) *and completion of the activity (within 10 days following the end of construction).
Furthermore, you are hereby advised that the Corps of Engineers has established an
Administrative Appeal Process which Is fully described in 33 CFR Part 331 . The complete appeal
process is diagrammed in the enclosed Appendix B.
Thank you for participating in our regulatory Program.
Sincerely,
Mark Durham
Chief, South Coast Section
Regulatory Branch
I
JUL_28-�2005-15'38 FROM:SWIFTSLIP[DOCK.COM C949) 631-3122 TO:7230589 P.2
ity Control Board
California Regional Water Quali
Santa Ana Region
3737 Main Street,'Suite 500, Riverside, CalifOrnis 92501-3348 Arnold Schwarzenegger
Alan C. Lloyd, Ph.D. Phonic (951) 7824130 - PAX (951) 781-6288 Gavernar
Agency Secretary hVi/www.waterboards.ca.govlsantaana
April 12,2005
Beth Swift
Swift Slip Dock and Pier Builders, Inc.
2027 Placentia Avenue
Costa Mesa, CA 92627
pRoposED REBUIELDING OF BOAT DOCK, STANLEY SWIATEK, 4008 CHANNEL
PLACE, NEWPORT-BE-ACH5 -ORANGE- 00UNTY
Dear Ms. Swift:
If standard dock construction methods and materials are utilized, this project should not adversely
impact water quality. A statement has been submitted that there will be no waste discharged from
the proposed project. Based on these assurances, clearance is provided.
However, should the Army Corps of Engineers determine that this project requires a Section 404
permit, it will be necessary for the project proponent to obtain from -this Board a Water Quality
Certification under Section 401 of the Clean Water Act.
Should you have any questions, pleasc contact me at (951) 782-3288.
Sincerely,
J. Shami
water Resources Control Engineer
Califo ' Coastal Commission, Long Beach
cc: rma
Army Corps of Engineers - Erik Larsen
County of orange, County property Permits Division —Patricia Bigger
imblutaS243let
California Environmental Protection Agency
RecycW Paper
"'L9
117*53'
—P, 7 —7 4a ik
'Os
6CA H
LBOA
i.50A
4 C,
GrOU.12d 1-inZ
CC R(jhA
VICINITY S K E TC, H D: -L IMAR 3
"K., L E -ILES
A1
Newport Bay California
!,-a � ed orn. Ln-,; n; P! -�.s J S.. ZE "0 �4� s r s
�'COAZ //7
.5!E
7
Is'
q007C,,
SN
Oft -
4 --6.6
..........
--7.P
...............
-5z
13
0,
-53
0, -9
0
0
c"41
Pz- /�V/v
70
Fierand Lan �:nc, I' c, z
Nevvpor-i-
Nevvport Beac,,-�, Ccs;; 'or, -.:a
Appl,�fio�iyt
Iv
Q
V/
A y
CN
ViCNITY SKE77C.In'
NSWPORT 5AY, CALiFORNiA
1VA1,_-Z_
/lr-lz- A (fll�5
.9. 0
Iv
Q
V/
A y
CN
ViCNITY SKE77C.In'
NSWPORT 5AY, CALiFORNiA
1VA1,_-Z_
/lr-lz- A (fll�5