Loading...
HomeMy WebLinkAboutM2006-0009HARBOR RESOURCES DIVISION 829 Harbor Island Drive Newport Beach, CA 92660 949-644-3034 / Fax 949-723-0589 APPROVAL IN CONCEPT APPROVAL IN CONCEPT BY THE CITY OF NEWPORT BEACH as required for permit application to the South Coast Regional Commission pursuant to California Administrative Code, Sections 13210 and 13211. General Description of Proposed Development: Design reinforcing of the existing seawall w/new continuous concrete coping on top of the existing coping tied to a fnumber of continuous deadmen w/dvwidag tie -backs. 1 0'X1 O'dock extension on either side of float. Address number must be stenciled on at least I bayward facing pile. jPier conditions must be signed by applicant prior to final approval. I Property Address: 59 Balboa Coves, Newport Beach, CA 92663 Legal Description: lHarbor Permit Number: 1011-59 1 IPlan Check Number: 0174-2007 1 jApplicant: Larry Harris I Applicant's Mai.ling Address: 59 Balboa Coves, Newport Beach, CA 92663 Phone Number: (714) 801-2301 I have reviewed the plans for the foregoing development including: 1. The general site plan, including any roads and public access to the shoreline. 2. The grading plan, if any. 3. The general uses and intensity of use proposed for each part of the area covered in the application. Page 1 of 2 And find )C They comply with the current adopted Newport Beach General Plan, Zoning Ordinance, Subdivision Ordinance and any applicable specific or precise plans or, o That a variance of exception has been approved and final. A copy of any variance, exception, conditional use permit or other issued permit is attached together with all conditions of approval and all approved plans including approved tentative tract maps. On the basis of this finding, these plans are approved in concept and said approval has been written upon said plans, signed and dated. Should Newport Beach adopt an ordinance deleting, amending or adding to the Zoning Ordinance or other regulations in any manner that would affect the use of the property or the design of a project located thereon, this approval in concept shall become null and void as of the effective date of this said ordinance. In accordance with the California Environmental Quality Act or 1970, and state and local guidelines adopted hereunder, this development: Has been determined to be ministerial or categorically exempt. o Has received a final Exemption Declaration or final Negative Declaration (copy attached). o Has received a Final Environmental Impact Report (copy attached). All discretionary approvals legally required of Newport Beach prior to issuance of a building permit have been given and are final. The development is not subject to rejection in principal by Newport Beach unless a substantial change is proposed. This concept approval in no way excuses the applicant from complying with all applicable policies, ordinances, codes and regulations of Newport Beach. See attached conditions to the pier permit. 1 1 IN, 1 =% Lisa Walters, Harbor Resources January 30, 2007 Attachments: Worksheet for Building Permit Application Drawing Pier Conditions Page 2 of 2 HARBOR RESOURCES DIVISION 829 Harbor Island Drive Newport Beach, CA 92660 949-1644-3034 / Fax 949-723-0589 Pier Permit Conditions January 30, 2007 Property Address: 59 Balboa Coves, Newport Beach, CA 92663 With reference to the plans currently under consideration to reconfigure or modify the dock system, the following conditions will now be in effect on the above referenced pier. 1. The pier permittee is aware of the Harbor Permit Policies and Chapter 17 of the City of Newport Beach Municipal Code. The pier permittee understands that the above referenced pier is under the purview of these Policies and Codes. 2. Any future work on the above mentioned pier requires permits with the City of Newport Beach and any other applicable agencies. Painting, replacement of rub rails and work considered to be cosmetic in nature does not require a permit. 3. The conditions set forth in this document pertain to the current, proposed dock system under consideration. Any future modifications or alterations to the dock system may require new conditions which may override or change these conditions. These conditions supersede all past conditions associated with this property. 4. Only marine oriented uses are allowed on the pier, pier platform, gangway and float. Patio furniture, plants etc ... are not permitted. 5. Vessels may not extend beyond the end of the float by more than the width of their beam. 6.Your side property lines extend in the water along their same bearing. Vessels shall not encroach upon the neighbor's property. 7. The maximum width of a vessel permitted to side tie to the easternmost side of the float is 101. Signature: Lisa Walters, Harbor Resources Date Applicant Signature Print Name Date Joint Pier Applicant Signature (if applicable) Print Name Date z 0 —E/I 0 LI Ul LI n 2 cis 00 Ua. 0 7, L 0 X z n- z 0.- Lu C) LL -3 z z 0 0 co 7 <06 f Ix it Ul 7a Co —.S jz 0 z 0) CD o '< wwz Q 0 'R �1- 2w 2 ou, "N LU —irw, Icn, CO <z R a. >< EL Ljj cj� u— LLJ 0 a L 2 LLI -71 0 u -I 2� UI LO 0 E -Q =0 VM 3�d NO ONIdo Jc) J N �2 LO :2J NN P- .04 10 0 Nvo c -C" z I COW 0 dAl C) A CL tn' IA 7: �Z-. Z o Er, -IM va 0 z 6 zi Er j. LLI 0 w LARR)IHARRiS lharris@brandallcorp.com I )$fol, �— i (714) 374-2577 (800) 794-8308 BRANDALL MODULAR CORP GENERAL BUILDING CONTRACTOR 19744 BEACH BLVD MODULAR BUILDINGS NO. 410 SITE IMPROVEMENTS HUNTINGTON BEACH, CA 92648 LIC. # 622321 FAX: (714) 374-2582 WORKSHEET FOR BUILDING / FIRE PERMIT APPLICATOWSOR R2SOURCES DIV. CITY OF NEWPORT BEACH 1�71�T�gF IEWPORT BEACfq PLEASE PRINT OR TYPE BUILDING DEPARTMENT 1 - PROjECT ADDRESS (NOT ;AILING ADPRESS) [Bob /) / I ^ 1 11 IFCO-OR �c LEGAL ESCRI LOT BLOCK 2. DESCRIPTION OF WORK NEW Check. Am . —4r--- dEl I TRACT AD5,�O ALTER E] �te Box for �lcant �LAST USE # OF STORIES _IVALUATION $ DEMO SQ FT NeWIADDE TG) _A _ J( ZESS --------- M-7 ILA 0/yEFrS E -IMA !n5ntm DDRESS 7 CITY STAT 1111-46 6� 4 �A. ARCHUEGTIDESIGNER'S NAME 0 4so 0- ARCHI T/DESIGNE 3W CITY STA E E,2N]. ER' N E R&E _9 e, S ENGINECK-6 AL)L)RESS1$,A3 A m4a*� STATE b. UUNTRACTORS NAiFE CV ZIP PHONE No. FIRST LIC. NO, 'w b O&A P- A a 6, ao ?r" ONE NO. ZIP PH :ENGINEER'S E-MAIL ADDRES N HON! I NO lix /(7- 7 I)e-- Z !:ST;ATE� �YOY C!Z E ZIP ��6146? TATE No. aass s UNtz NQ. 4`01-d,-701 01-74 42c:E�)-7PE­RMlT NO. TYPE OF CONSTRUCTION - PLAN CHECK.NO, OCCUPANCY 2, ff- PLAN CHECK FEE $ GROUP I jfi� ���l PLAN CHECK ENG . . ...... L -12/27/206s @9: 45 9496468862 PAIGE 01/01 CAUFORMA - n11�M8ojj_RcS8 AQ6NG _N0�0_8QF1_WARZENEGGE& govaMar CALIFORNIA COASTAL COMMISSION SdUt ' h C006t Area Me 200 amngate, Suite 1000 Ung Bea* CA 90902-4302 (862) 590-0071 0 December 22, 2006 Todd Schooler & Asope., Inc. P01 Fast 171�1 Street, #204 Costa Mesa, CA 92627 RE: NOTWE OF INCOMPLETE APPLICATION Latry Harris; Appitcant #59 Salboa Coves, Newport Beach (Orange.iCounty,),. Location Coastal Development Perailt Ap -, V a P111ca on No "6404' Dear Mr. schooier, The above rOferenced applicati011 was received in this office on November 22, 2006. The project under Consideration is the dernolition and construction of a neW two-story, single-family msidenoe, Wfths.n8ttachedtwo,(2)-pagarag.e.. Additional inforr nation. Is necessary, to. adequately analyze. the proposed pr6ject. Consequentlytheap cation has been ddempd-In n complete pe ding receip�-.of thdfdll6win'giterh�­ ADMAKULEVE, Tfto a proje P alit show'Work to MID eyJs fing bulkhead. and �Isojc( ns ruction oft new ciantifevered deck.. Ths.bttyofNdwp rt each Plarining oepar6e'n' th4s given an approval -in - concept for the demolition and construobon of a now rosidence, but'a,separate, appr . oval in -concept rorn the City of Newport Zeach. Harbor Resources Division for the bulkhead Workand candlevered dwk is necessary, Noconceptual approval from the Harbor Resources Division has �been slibmWeO, ,N conceptual approvat from. the Harbor Resources Division 1 n as $ cop .ary before evaluation of the proposed project can be continued. Therefore, please provide an approval -in - concept and two (2) signedfoll size sets of Plans for the I bul I khead work and cantilevered deck from the City of Newport Beach Harbof 110ources. Divislon. The project plans also show work to the wdstlng dock. Is thistorre 0 . ct? IfSo, please also provide an cipproval-In-c6ricept and two (2) signed full site Sets of plans for the dock work frorn the, 0�jty of Newport Beach Harbor Resourws Division. 2. WATIER QUAL(Ty Please describe the ftasures,, which will be taken to minirnize any Im MAY.have during: and after constrbction based upon pacts the. proposed, project My prpPd§ed construction water quality, For- Instahce please desirAbe 'PlIase Aest�ncinagerhentpreefimsincludin ny' pro'posed, erosion th ilddifi6ri, f6i; ft opier�jrio�al phase 6t ihi project,. please describe any proposed measures to capture, Infiltrate, or treat any runoff fror� t . h�e� proposed deVelopm, gnt,., For i6siance, th#,pTqobt Inp)V69, �y Me S W Sucb as. 1) con struction. of driveway$: pndwalkwpys using 09VOU51 WtefiAls (Cruohed gravel, cOrMtete grid, cobblestones) to.al.10w I . (Weased Percolation. df ruhfoff Iiit6the 666und?,. 2) direct runoff ftom imperviout; Surfaces to , Sheet flowlthrotigh.a biotiftet or bth6r:fiftrhtI6n orligrit6d, W0?,,3) maxlrnk6 on-site Oe=140on of r6n off?; 4) use Infiltration 12/27/2oar, 09:45 9496468862 - PAGE 01/01 UATE-OE cAL(FORNIA - THERESQUR_CES RNOL SqHWARZE @E ova 0� NEG____ CALIFORNIA COASTAL COMMISSION SOCA CoaSt Area OMM 200 Oceangete, sum 10M Long Beach, CA -90602-4302 (562) 560-5071 DeCeMber 22, 2006 M" Todd Schooler & Assoc., Inc. 301 East 170, Stroet, #2o4 Costa Mesa, CA 92627 RE: NOTICE OF INCOMPLETE APPLICATION --taiTY Harris; Applicant #59 Balboa Coves, Newport Beach (Orange County); . Location -3ol at COa-StOl VevelbPment Permit Applift0d" _Nd. 546450 Dear Mr. schooier, The above referenced application was received in this office on November 22, 2006. The project under consideration is the demolition ind'construction of a new two-$tory, Single , family residenoe with an attached two (2)�ca garage. Additional information is n cessary. �q adequaitely analyze the proposed Pr6ject Consequently, the application has been dbeemed -incomplete thi§ fd1l6wft iterh&� pending receipt of 'A" I.' 'SUL' KH't '01 b ANTI;LtWk9D-0E 46666K The i;Ubmitt4d, 0�010avplatlt show 'Work to MID ex . lsting.bulki4.ad'?nd'�lsolcOrratnjct!6n of -a new oknfflevered deck. The bity of Ndwp6ri 6- e0ch Planning Deparinjeinit,has an approval -in' concept for the demolition and construction of a new r8sidonce, but'a. separate approval -in -concept from the City of Newport geach Harbor Resources 1XVISIon for the bulkhead work 'and . Canfilevered deck is necessary. No conqe�ptual approval from the Harbor Resources Div I 18.1on has been submitied. A conceptual approval from the Harbor k u 090 roes Division is necessary before evaluation of the proposed prqjept can be continued. therefore, please provide concept and two (2) signed foil size set of Of an approval-in- ans for the bulkhead work and tantilevered deck from the City of Newport Beach Harbor Resources Division. The project plans also Show work to the existing, dock. Is this correw if so, please al o provide an lipptoval-In-c6ricept and two (2) signed full size sets of plans for th Newport Beach Harbor Resources DNIsion. e dock work from the City of 2. WATIER QUALITY Please describe the rhiassures, w.Noh will be taken to minimize any impacts the proposed project may have during and after Construction based.UPDQ wOter quality., For-. Instance, please d 'bs ariy prpOdsed construction phase best ihinagen1drit 0' c(loes includihg,any* proposed. er es ' on cdfitrbI`iine­a'tu�ed.* In" b6d1[i6'n­, f6e'th*6 op*er�jlo6al h r'a p ase of the project, please describe any proposed measures to capture, infiltraW, or treat any runoff fro th S by M e propo. ed development. For sure$ su instance, Will thd-#jqbbt inciudeh mea - Ch at: 1) constru using 00roUsi Material I s (crushed gravel, con ction of driveways and walkways crete grld% cobble -stones) to allow increas ed Percolation df ruhb# Wo"' the 666und?, 2) dire6t runoff from impe.rviout surfaces to sheet flow throUgh. a biofifter or Wier fl(Wiff6n oftzrftd­'J3Mj3?;'3) maximk6 on'site l5ercol4tion of r�noiV; 4) use infiltration Eelgrass Survey Reporting Form (Version 1.0, June 20, 2003) This form is required to be submitted for any surveys conducted for tile eelgrass, Zostera marina, that are required to be conducted under federal or state permits and authorizafions issued by the U.S. Army Corps of Engineers and the Coastal Commission. The form has been designed to assist in identifying eelgrass while ensuring that the required inf�rmation is consistently documented. Surveys required to be conducted for this species are subject to modification through publication of revisions to the eelgrass survey policy. It is incumbent upon the authorized permittee to ensure that survey work is following the latest protocols. For further information on these protocols, please contact: Robert Hoffinan, National Marine Fisheries Service, (562) 980-4043, or William Paznokas, California Department of Fish & Game, (858) 467-4218). N m a e. #50 ga-lboa Coves, Newport Beach I mmon 12�E� rvey Contact: e, phone, e-mail) Lark Sites (949) 675-1071 it Reference: .OE Permit No., RWQCB IRGP rder or Cert. No.) #54 drographic System: ay, estuary, lagoon, or [Lower arbor) Newport Harbor pecific ]Location: Latllmg-, datum, N 33 37.2051 uracy level, attach W 117 55.879' .1 c survey area map if ossible) as Eelgrass Detected: Yes, Eelgrass was found at this site. XXXX Eelgrass was not found at this site. escription of ermitted Work: Cantilevered deck extension. and 10' extensions to existing describe briefly the work to ock float. e conducted at the site under e permits identified above) escription of Site: epth range: escribe the physical and +Vto -6'MLLW i, iological conditions within e survey area at the time of e survey and provide insi nto vanability, if known. ease provide units for all umerical information). ubstrate bstrate e: e - to Sil and to silt over sand T em rature: Temperature: Fand 56 F 56 F a n Y. . 11 it ity: NA Ominant jauna: ora: one ominant [one Mussels on dock floats. xotic ecies countered: None ther site escription otes: None Survey u Tanuar y escription of Survey urvey date ffort: d time Januaryll,2007 1442-1500 lease describe the surveys eriod.- t of onducted including type of urvey (SCUBA, remote ideo, etc.) and survey ethods employed, date of rk, and survey densfty estimated percentage of the ottom actually viewed). escribe any limitations ncounter dunng the urvey efforts. orizontal isibilitY in 8' ater: urvey ope d methods: SCUBA survey using 10' grid pattern. urvey ersonnel. ark Sites Oyer 80% ey itations: TNone ther Information: use this space to provide any itional information or +2.5' MLLW slack tide eren to attached 'als such as maps, Drawing and aerial attached eports, etc.) Eelgrass Survey Reporting Form (version 1.0, 6/17/08) I co rq Z- 0 ig �—z 2 -2% :E 1, 17 -9' N3 11 4" A (A 0 z T -:o 0 MZ- > S -G" -1-103 TY S" a A V, z 0 0 mkv In m V qj" M M fq t TOTAC 'o 10 rq 0 c < , j I AN M T�' fit M!. 101 (D oz % fF �N V\ N) CoNc COPING ON F- > OP OF THE WALL TYP < =j z IM cl, X ID 0 59 r 0 z ;u Z.11 cu (ni ;U— m *2 71 00 N BT- bc-' 0 Z jU z X. (A -.I C., r I 0> m- F ZJ. z 0 rr z xf C) > -I z ZE S, C, $P koll QJF 4 UT It 0,31, 14 OF C. elly Al F=zl F_Z� ___ F OD F=::� C) Q) th c; z "Ogg", A X 4N Caulerpa Survey Reporting Form This form is required to be submitted for any surveys conducted for the invasive exotic alga CaulerPa taxifolia that are required to be conducted under federal or state permits and authorizations issued by the U.S. Army Corps of Engineers or Regional Water.Quality Control Boards (Regions 8 & 9). The form has been designed to assist in controlling the costs of reporting while ensuring that the required information necessary to identify and control any potential impacts of the authorized actions on the spread of Caulerpa. Surveys required to be conducted for this,species are subject to modification through publication of revisions to the Caulerpa survey policy. It is incumbent upon the authorized permittee to ensure that survey work is following the latest protocols. For further information on these protocols, please contact: Robert Hoffman, National Marine Fisheries Service (NOAA Fisheries), (562) 980-4043, or William Paznokas, California Department of Fish & Game, (858) 467-4218). Report Date: 7Name�of January 12, 2007 bay, est�uary, lagoon, or harbor: X woort Newport Harbor Specific Location Name: (address or common reference) #59 Balboa Cove Site Coordinates: (UTM, Lat./Long., datum, N 33 37.205' accuracy level, and an WI 17 55.897' electronic survey area map or hard copy of the map must be included) Survey Contact: "Jam" (name, phone, e-mail) - pj"ul" Mark Sites (949) 675-1071 Personnel Conducting f Survey (if other than [above): (naime, phone, e-mail) same Permit Reference- (ACOE Permit No., RWQCB Order or Cert. No.) City building permit Is this the first or second survey for this project? first Was Caulerpa Yes, Caulerpa was found at this site and Detected?: (if Cauierpa is found, please immediately as been contacted on date. contact NOAA Fisheries or CDFG personnel identified XXXXXXXXX above) No, Caulerpa was not found at this site. -^k' -.7 A VAAAA kvvAblva 1.4, IV/ a I/Ly-f) Description of Permitted Work: (describe briefly the Cautilevered. deck extension and 10' extensions to existing dock work to be conducted at the float. site under the permits identified above) Description of Site: (describe the physical and biological conditions within the survey area at the time of the survey and provide insight into Depth range: +F to –6' MLLW Substrate type: —Temperature: Sand to silt over sand 56 F Salinity-. NA Dominantflora: variability, if known. Please provide units for all numerical information). None Dominantfauna: -Mussels and oysters on seawall and float Exotic species encountered (including any other Caulerpa None species): Other site description notes: None Description of Survey Survey date and Effort: (please describe the surveys timeperiod: January I 1 2007 1442-1500 141 conducted including type of survey (SCUBA, remote video, etc.) and survey methods employed, date of work, and survey density visibility in water.- 8' Survey type and methods: Surveillance level SCUBA survey using 10' grid pattern (estimated percentage of the bottom actually viewed). Describe any limitations Surveypersonnel. encountered during the survey efforts. Mark Sites Survey density: Over 80% Survey limitations: None Other Information: (use this space to provide additional information or +2.5' slack tide references to attached maps, reports, etc.) Drawing and aerial attached -^k' -.7 A VAAAA kvvAblva 1.4, IV/ a I/Ly-f) 0 � 10 L j Pi 7- 70 I z c) 0 ioldulc Ci < -A 0 M z M z m 0 1 Fn z 0 z rq i; 0 (D co I CD H- ICU cl >> 280 cu 5' UAN T f. .� "" -71 r cl R p �;o c� =I 0 z 5, m z 9*27 oo,, 4-1Z 3.0 .3. -0 ow 7'- TOTJ c) 1-71 rr CONC COPING ON F- 11 OF THE -WALL Typ 10 cfl 1,D 4�4 > r- o Z1. V7 '4 1= >Z 1 0 Z -f Z cl, 'n -1 n z 0 rzq F 0-, z M 0 M Z x X En 0=1=1 ,3- m Z 0 0 z 0 > I z M M Ji v .4 �k V� Ilk - zo I+ C, X < 0 0 Z. 2' :E V, ICU cl >> 280 cu 5' UAN T f. .� "" -71 r cl R p �;o c� =I 0 z 5, m z 9*27 oo,, 4-1Z 3.0 .3. -0 ow 7'- TOTJ c) 1-71 rr CONC COPING ON F- 11 OF THE -WALL Typ 10 cfl 1,D 4�4 > r- o Z1. V7 '4 1= >Z 1 0 Z -f Z cl, 'n -1 n z 0 rzq F 0-, z M 0 M Z x X En 0=1=1 ,3- m Z 0 0 z 0 > I z M M Q.—JU ae S4 zz rf N� U c ez V) 3L Ei:3 . . . . . . . . . . ........ ....... 1hj "IV (14 Q 9 000, r F-, 9 OM WP 0* HARBOR RESOURCES DIVISION 829 Harbor Island Drive Newport Beach, CA 92660 949-644-3034 / Fax 949-723-0589 APPROVAL IN CONCEPT APPROVAL IN CONCEPT BY THE CITY OF NEWPORT BEACH as required for permit application to the South Coast Regional Commission pursuant to California Administrative Code. Sections 13210 and 13211. General Description of Proposed Development: Remove and replace 1 O'x 20'float with (2) 12" pile and 3'x 24' gangway, like for like. jAddress number must be stenciled on at least 1 bayward facing pile. Fier conditions must be signed by applicant prior to final approval. 112roperty Address: 59 Balboa Coves, Newport Beach, CA 92663 1 Legal Description: lHarbor Permit Number: 1011-59 1PIan Check Number: 2258-2005 1 jApplicant: Paul Elmore I Applicant's Mailing Address: 59 Balboa Coves, Newport Beach, CA 92663 Phone Number: (949) 631-3121 I have reviewed the plans for the foregoing development including: 1. The general site plan, including any roads and public access to the shoreline. 2. The grading plan, if any. 3. The general uses and intensity of use proposed for each part of the area covered in the application. And find Page 1 of 2 �( They comply with the current adopted Newport Beach General Plan, Zoning Ordinance, Subdivision Ordinance and anv applicable specific or precise plans or, u That a variance of exception has been approved and final. A copy of any variance, exception, conditional use permit or other issued permit is attached together with all conditions of approval and all approved plans including approved tentative tract maps. On the basis of this finding, these plans are approved in conceot and said anoroval has been written unon said olans. sianed and dated. Should Newport Beach adopt an ordinance deleting, amending or adding to the Zoning Ordinance or other regulations in any manner that would affect the use of the property or the design of a project located thereon, this approval in concept shall become null and void as of the effective date of this said ordinance. In accordance with the California Environmental Quality Act or 1970, and state and local quidelines adopted thereunder, this development: X- Has been determined to be ministerial or categorically exempt. o Has received a final Exemption Declaration or final Negative Declaration (copy attached). o Has received a Final Environmental Impact Report (copy attached). All discretionary approvals legally required of Newport Beach prior to issuance of a building permit have been given and are final. The development is not subject to reiection in principal bv Newport Beach unless a substantial chanae is proposed. This concept approval in no way excuses the applicant from complying with all applicable policies, ordinances, codes and regulations of Newport Beach. See attached conditions to the pier permit Tom Rossmiller, Manager, Harbor Resources Siqnature: Chris Miller, Harbor Resources Supervisor October 14, 2005 Attachments: Worksheet for Building Permit Application Drawing Pier Conditions Page 2 of 2 T Pf PARP PRINT r'#P TVP WORKSHEET FOR BUILDING / FIRE PERMIT APPLIGkT I@Np, ARIESOURCES U"',,� CITY OF NEWPORT BEACH 17"� 0 !NEWPORT BEACH� BUILDING DEPARTMENT rwti; 1. PROJECT ADDRESS (NOT MAILING ADDRESS) 7� LOOR SUITE NO. -� /-s PHONE NO. ��T ( Ej 4. ARCH ITECT/DESIGNER'S NAME LAST FIRST LEGAL DESCRIPTION No. UNITS LOT BLOCK TRACT CITY STATE ZIP "t - 7u—s E 2. DESC�R_IPTION OF WORK I I'mulf &+r- 11 12- # OF STORIES VALUATION $ ADD ALTER DEMO SQ FT L-7 K (NEW/ADDED/EXTG) Check. ArmiroDriate Box 3. OWNER'S NAME LA�� FIRST OWNER'S ADDRESS OWNER'S E-MAIL Af DRESS CITY STATE ZIP Kill- -3 PHONE NO. ��T ( Ej 4. ARCH ITECT/DESIGNER'S NAME LAST FIRST LIC. NO. ARCH ITECT/DESIGN ER'S ADDRESS ARCHITECT /DESIGNER'S E-MAIL ADDRESS CITY STATE ZIP PHONE NO. 5. ENGINEER'S NAME LAST FIRST V -L -t STATE LIC. NO. — -e,"% I ENGINEER'S ADDRESS 7s,-Ov vtA c4ki-16 0�w/m- ENGINEER'S E-MAIL ADDRESS CITY ZIP 6. CONTRACTOR'S �IAME _,BUqNESS LIC. 9TATE LIC. CONTRACTOR'S AQDR—ESs e, CONTRACTOR'S E-MAIL ADDRESS CITY STATE z I P�/'\ D�— I ? 7 P *N E(� 0.3 PERMIT NO. TYPE OF CONSTRUCTION PLAN CHECK NO. - GROUP PLAN CHECK FEE$ OCCUPANCY PLAN CHECK ENG. rmsitsiag appication OCT -6-2005 10:-7,3 FROM:SWIFTSLIPDOCK.COM C949) 631-3122 TO:7230589 P.7 59 Balboa Coves, Newport Beach, CA Eelgrass Survey Reporting Form (Version 1.0, June 20, 2003) This form is required to be submitted for any surveys conducted for the eelgrass, Zostera marina, that are required to be conducted under federal or state permits and authorizations issued by the U.S. Army Corps of Engineers and the Coastal Comn-tission. The form has been designed to assist in identifying eelgrass while ensuring that the required information is consistently documented. Surveys required to be conducted for this species are subject to modification through publication of revisions to the eelgrass survey policy. It is incumbent upon the authorized permittee to ensure that survey work is following the latest protocols. For further information on these protocols, please contact: Robert Hoffman, National Marine Fisheries Service, (562) 980-4043, or William Paznok-as, California Department of Fish & Game, (858) 467-4218. OCT-�-2005 10:34 FROM:SWIFTSLIPDOCK.COM C949) 631-3122 TO:72305eg P.8 * Required Information Site Name: oa Coves, Newport Beach, CA (common reference) Survey Contact: Rick Ware, (949) 412-9446, rware.crm@earthlink-net (name, phone, c -mail) Permit Reference: Coastal Commission and ACOE Permits Pending (ACOE Permit No., CCC Permit No.) Hydrograpbic System: Developed Harbor (bay, estuary, lagoon, or harbor) Specific Location: 59 Balboa Coves, Newport Beach, CA (UTM, Lat.fLong., datum, accuracy level, attach NAD 83 State Plane CA VI (X,Y): 6049828,47, electronic survey area map 2173387.15 if possible) Was EeJgrass Detected: Yes, Eelgrass wag found at this site. *XXX— No, EelgEass was not found at this site. Description of Removal of existin - g dock and pilings followed by Permitted Work: construction of new gangway and dock as well as (describe briefly the work to installation of two new pilings. be conducted at the site under the perinits identified above) Description of Site: Depth range: Water depths range between (describe the physical and approximately +0.5 ft to -8.6 ft NELW. biological conditions within the survey area at the time Substrate Sediments consisted of sands of the survey and provide insight into variability, if type: throughout the entire survey area with knowjj. Please provide units the exception of finer silts near the for all numerical pierhead line. Temperature: Water temperature was in the 65 degree information. Fahrenheit range. Salinity: Salinity variable, from 20s to 35 ppt, depending on depth and the time of I year. OCT -6-2005 10:34 FROM:SWIFTSLIPDOCK.COM (949) 631-3122 TO:7230589 P.9 Description of Survey Dominant Dominant flora was green algae (L77va Effort: flora: inlestinalis), sea lettuce ([Na (please describe the surveys period: californica') and �Chaetornorpha conducted including typc of finum), brown algae (Colpomenia survey (SCUBA, remote sinuosa), (Dictyota flabellata), and Horizontal 15 feet on either side of the diver. (Dietyopteris undulata), wireweed visibility in (Sargassum inuticum), and red algae water: (Acrosorium ciliolatum). Dominant Invertebrates observed included Pacific fauna: Blue Mussels (Mytilus galloprovincialis), tube -dwelling anemones (Pachycerianthus fimbriatus), ectoprocts (Zoobowyon verticillatum), orange chain tunicates (Botrylloides diegensis), tunicates (Ciona intestinalis), and scallops (Argopecten aequisulcatus), Fish observed included topsmelt.(Atherinops affinis), spotted sand bass (Paralabrax maculatofasciatus), black perch (Embiotocajacksoni), round sting Mys (Urolophus halleri) and striped gurfperch (Embiotoca lateralis) Exotic No exotics were observed. species encountered: Other site description notes. Description of Survey Survey date October 3, 2005 from 1230 to 13.1.5. Effort: and time (please describe the surveys period: conducted including typc of survey (SCUBA, remote Horizontal 15 feet on either side of the diver. video, etc.) and sur-vey visibility in methods employed, date of water: work, and survey density (estimated percentage of the DCT -5-2005 10:34 FROM:SWIFTSLIPDOCK.COM C9,49) 631-3122 TO:7230589 P.10 bottom actually viewed). Survey type The underwater survey was conducted Describe any limitations and methods: using SCUBA. Transects were swam encountered. U'Uring thhe every five mmeters along tille shorefi-nee survey efforts. out to the pierhead line. Transect visual width was approximately 30 feet (15 feet on each side of the diver). Bottom type, common marine life, and the presence or absence of Zostera marina was noted. Depths were standardized to Mean Lower Low Water (MLLW) based upon time of observation and tidal corrections for the Newport Bay Entrance, Corona del. Mar NOAA tidal survey station. Survey -The survey was conducted by Mr., personnel: Stephen Whitaker, Senior Marine Technician of Coastal Resources Management. Survey The total dock improvement project density: area size within Area of Potential Effect i,q 8, 100 sq & Of the 8, 100 sq ft in the APE, 8,100 sq ft of seafloor were surveyed. This accounts for 100 % of the area within the dock improvement APE project area. Survey None limitations: Other Information: See Maps of Project Site (attached) (use this space to provide any additional information or references to attached materials such as maps, Morts. etc.) Eelgrass Survey Reporting Form (version 1.0, 6/20/03) CITY OF NEWPORT.BERCH. CITY OF NEWPORT BERCH UPPER NEWPOR'r W BRY f WLM ISLE 1p OCERA( YICINITY MRP NNW mr, cmvulm X, NO EEL GRASS WITHIN 160FFPROJE-`,'.�� 0 EEL GRASS IN THE PROJECT AREA, fvez SIGNATURE Id PERWjIT# DATE t --.t HARBOR RESOURCES DiM CITY OF NEWPORT BEAC�,,' 4��117'13 01,111 r pi le- . NOT JETTY PROFILE ly = 40' MMINGS ARE DR;ESSED IN FEET FIND DENOTE ELEVRTIONS: BRSED ON WJ:N LOU LOW WRTER. 4,10 Ki r,w4w- I e 0 F'to tt > � 6 A-- 3 f\'L zx nf PLAN vibN lw 40 1 FPR-IW'S WE �040rT JOB.RDDRESS 57, F,46�p,� CCVe5 )MTE S- 05- 66 4 co ''r," -1� iitt p 'I N LW %T, MT., JET TY VICINJITY HRP -jmy DENOTE �4 4gi4w ji' Ll 9- NO EEL ORASS"' .#1THIN.15"OF PROJECT "OJECTAREA, t1vo 0 tELGRASSAI *e ;Ati0w ke I 'SIGNATURE.: 7 W1 Z -1z" 10! F (6 (tt: PERMITI UATRZ A`�' 3 .�4 4 HARBOR RESOURCESDIV ITY' WIPUTBE C OFNE AC6, r t alifornia C Commission 94,th Coast:District office PROVE ermit N ............. Y. IA4W r7FECrIVE ate: ------------ - dFF F. p em v I WN 40 FF? 1 AR, j �3- co ''r," SI ATE OF CALIFORNIA —THE RESOURCES AGENCY ARNOLD SCHWAPZENEGGER, Governor CALIFORNIA COASTAL COMMISSION Aoaz_�" SOUTH COAST DISTRICT PO Box 1450 200 Oceangate, 10th Floor LONG BEACH, CA 90802-4416 (562) 590-5071 www.coastal.ca.gov Date: January 24, 2006 Permit No. 5.05-425 NOTICE OF ADMINISTRATIVE PERMIT EFFECTIVENESS Please be advised that the Administrative Permit with the above permit number which was sent to you on December 21, 2005 and was reported to the Commission on Wednesday, January 11, 2006 is now fully effective. Development of your project is subject to compliance with all terms and conditions specified in the Administrative Permit. Should you have any questions please contact our office. Sincerely, PE T ER DOUGLAS Executi- i rector _13y: tLAU IN�DA OWENS Coastal Program Analyst dt CALIFORNIA COASTAL COMMISSION STATE OF CALIFORNIA - THE RESOURCES AGENCY ARNOLD SCHWARZENEGGER, Govemor CALIFORNIA COASTAL COMMISSION South Coast Area Office Permit Application No. 5-05-425 200 Oceangate, Suite 1000 Long Beach, CA 90802-4302 Date: December 20, 2005 --- (562) 590-5071 Page 1 of 6 W3e ADMINISTRATIVE PERMIT APPLICANTS: Jonetta Elmore, Trustee PROJECT DESCRIPTION: Demolish and remove existing boat dock like -for -like consisting of- 10'x 20' float, 3' x 24' gangway, two (2) 12" concrete pilings and use of Douglas Fir and Trex composite materials for deck surface. PROJECT LOCATION: 59 Balboa Coves, Newport Beach (Orange County) EXECUTIVE DIRECTOR'S DETERMINATION: The findings for this determination, and for any special conditions, appear on subsequent pages. NOTE: P.R.C. Section 30624 provides that this permit shall not become effective until it is reported to the Commission at its next meeting. If one-third or more of the appointed membership of the Commission so request, the application will be removed from the administrative calendar and set for public hearing at a subsequent Commission meeting. Our office will notify you if such removal occurs. This permit will be reported to the Commission at the following time and place: Wednesday, January 11, 2006 10:00 a.m. Los Angeles Harbor Hotel 601 S. Palos Verdes Street San Pedro, CA 90731 (310) 519-8200 IMPORTANT - Before you may proceed with development, the following must occur: Pursuant to 14 Cal. Admin. Code Sections 13150(b) and 13158, you must sign the enclosed duplicate copy acknowledging the permit's receipt and accepting its contents, including all conditions, and return it to ouroffice. Following the Commission's meeting, and once we have received the signed acknowledgement and evidence of compliance with all special conditions, we will send you a Notice of Administrative Permit Effectiveness. BEFORE YOU CAN OBTAIN ANY LOCAL PERMITS AND PROCEED WITH DEVELOPMENT, YOU MUST HAVE RECEIVED BOTH YOUR ADMINISTRATIVE PERMIT AND THE NOTICE OF PERMIT EFFECTIVENESS FROM THIS OFFICE. PETER DOUGLAS Executive Director By: Laurinda R. Owens Title: Coastal Program Analyst 5 -05 -425 -[Elmore] Administrative Permit Page 2 of 6 STANDARD CONDITIONS: 1 Notice of Receipt and Acknowledgment. The permit is not valid and development shall not commence unfil a copy of the permit, signed by the permittee or authorized agent, acknowledging receipt of the permit and acceptance of the terms and conditions, is returned to the Commission office. 2. Exviration. If development has not commenced, the permit will expire two years from the date this permit is reported to the Commission. Development shall be pursued in a diligent manner and completed in a reasonable period of time. Application for extension of the permit must be made prior to the expiration date. 3. Inte1pretation. Any quesbons of intent or interpretation of any term or condition will be resolved by the Executive Director or the Commission. 4. Assignment. The permit may be assigned to any qualified person, provided assignee files with the Commission an affidavit accepting all terms and conditions of the permit. 5. Terms and Conditions Run with the Land. These terms and conditions shall be perpetual, and it is the intention of the Commission and the permittee to bind all future owners and possessors of the subject property to the terms and conditions. SPECIAL CONDITIONS: See pages four to six. EXECUTIVE DIRECTOR'S DETERMINATION (continued): The Executive Director hereby determines that the proposed development is a category of development, which, pursuant to PRC Section 30624, qualifies for approval by the Executive Director through the issuance of an Administrative Permit. Subject to Standard and Special Conditions as attached, said development is in conformity with the provisions of Chapter 3 of the Coastal Act of 1976 and will not have any significant impacts on the environmenf within the meaning of the California Environmental Quality Act. If located between the nearest public road and the sea, this development is in conformity with the public access and public recreation policies of Chapter 3. FINDINGS FOR EXECUTIVE DIRECTOR'S DETERMINATION: A. Proeect Description The subject site is located at 59 Balboa Coves in the City of Newport Beach (Exhibits #1-2). Single- family residences characterize the subject site and the surrounding area. The proposed project (Exhibit #3) involves the removal and replacement of an existing floating dock like -for like consisting of: 10' x 20' float, 3' x 24' gangway, two (2) 12" concrete pilings and use of Douglas Fir and Trex composite materials for deck surface. The proposed project is located in the water next to the project site and no work is proposed on the existing adjacent bulkhead. The dock project will be used for boating related purposes to serve a single-family residential development. The site has been surveyed by the City of Newport Beach Harbor Resources Division for eelgrass and no eelgrass was discovered within 15 feet of the project area. In addition, Special 5 -05 -425 -[Elmore] Administrative Permit Page 3 of 6 Condition 3 requires a Caulerpa taxilfolia survey not more than 90 days prior to commencement -of construction. The surveys are valid for a limited period of time (until the next growing season for eelgrass and 90 days for Caulerpa taxilfolia). If construction does not occur within the respective time periods, subsequent surveys will be required. Special Conditions 2 and 3 identify the procedures necessary to be completed prior to beginning construction in the case the surveys expire prior to commencement of construction. In addition, Special Conditions 2 and 3 identify, post -construction eelgrass and Caulerpq taxifolia procedures. Public access is available along walkway/bikeway/accessway on the Pacific Coast Highway north of the project site and also along Newport Boulevard east of the project site. The proposed project has received an approval in concept from the City of Newport Beach Harbor Resources Division. The Regional Water Quality Control Board (RWQCB) has determined that the proposed project will not adversely impact water quality if standard construction methods and materials are used. The applicants have applied for a permit from the U.S. Army Corps of Engineers. B. Marine Resources The proposed recreational boat dock development and its associated structures are an allowable and encouraged marine related use. The project design includes the minimum sized pilings and the minimum number of pilings necessary for structural stability. There are no feasible less environmentally damaging alternatives available. As conditioned, the project will not significantly adversely impact eelgrass- beds and will not contribute to the dispersal of the invasive aquatic algae, Caulerpa taxifolia. Further, as proposed and conditioned, the project, which is to be used solely for recreational boating purposes, conforms to Sections 30224 and 30233 of the Coastal Act. C. Water Quality The proposed work will be occurring on, within and adjacent to coastal waters. The storage or placement of construction material, debris, or waste in a location where it could be discharged into coastal waters would result in an adverse effect on the marine environment. To reduce the potential for construction related impacts on water quality, the Executive Director imposes special conditions requiring, but not limited to, the appropriate storage and handling of construction equipment and materials to minimize the potential of pollutants to enter coastal waters. To reduce the potential for post -construction impacts to water quality the Executive Director requires the continued use and maintenance of post construction BMPs. As conditioned, the Executive Director finds that the development conforms to Sections 30230 and 30231 of the Coastal Act. D. Local Coastal Proararn The LUP for the City of Newport Beach was effectively certified on May 19, 1982. The certified LUP was updated on January 9, 1990. As conditioned, the proposed development is consistent with Chapter 3 of the Coastal Act and with the certified Land Use Plan for the area. Approval of the project, as conditioned, will not prejudice the ability of the City of Newport Beach to prepare a Local Coastal Program that is in conformity with the provisions of Chapter 3. E. California Environmental Quality Act (CEQA) As conditioned, there are no feasible alternatives or additional feasible mitigation measures available that would substantially lessen any significant adverse effect that the activity may have on the environment. Therefore, the Executive Director finds that the proposed project, as conditioned to mitigate the identified impacts, is the least environmentally damaging feasible alternative and is consistent with the requirements of the Coastal Act to conform to CEQA. 5 -05 -425 -[Elmore] Administrative Permit Page 4 of 6 SPECIAL CONDITIONS: 1. Water Qualitv A. Construction Responsibilities and Debris Removal (1) No construction materials, equipment, debris, or waste will be placed or stored where it may be subject to wave, wind, or rain erosion and dispersion. (2) Any and all construction material will be removed from the site within 10 days of completion of construction. (3) Machinery or construction materials not essential for project improvements will not be allowed at any time in the intertidal zone. (4) If turbid conditions are generated during construction a silt curtain will be utilized to control turbidity. (5) Floating booms will be used to contain debris discharged into coastal waters and any debris discharged will be removed as soon as possible but no later than the end of each day. (6) Non -buoyant debris discharged into coastal waters will be recovered by divers as soon as possible after loss. B. Best Management Practices Program By acceptance of this permit the applicant agrees that the long-term water-bome berthing of boat(s) in the approved dock and/or boat slip will be managed in a manner that protects water quality pursuant to the implementation of the following BMPs. (1) Boat Cleaning and Maintenance Measures: a. In -water top -side and bottom -side boat cleaning shall minimize the discharge of soaps, paints, and debris. b. In -the -water hull scraping or any process that occurs underwater that results in the removal of paint from boat hulls shall be prohibited. Only detergents and cleaning components that are designated by the manufacturer as phosphate - free and biodegradable shall be used, and the amounts used minimized. c. The applicant shall minimize the use of detergents and boat cleaning and maintenance products containing ammonia, sodium hypochlorite, chlorinated solvents, petroleum distillates or lye. (2) Solid and Liquid Waste Management Measures: a. All trash, recyclables, and hazardous wastes or potential water contaminants, including old gasoline or gasoline with water, absorbent materials, oily rags, lead acid batteries, anti -freeze, waste diesel, kerosene and mineral spirits will 5 -05 -425 -[Elmore] Administrative Permit Page 5 of 6 be disposed of in a proper manner and will not at any time be disposed -of in the water or gutter. (3) Petroleum Control Management Measures: a. OiLabsorbent materials shall be examined at least once a year and replaced as necessary. The applicant will recycle the materials, if possible, or dispose of them in accordance with hazardous waste disposal regulations. The boaters will regularly inspect and maintain engines, seals, gaskets, lines and hoses in order to prevent oil and fuel spills. Boaters will use preventive engine maintenance, oil absorbents, bilge pump -out services, or steam cleaning services as much as possible to clean oily bilge areas. Bilges shall be cleaned and maintained. Detergents will not be used for cleaning. The use of soaps that can be discharged by bilge pumps is prohibited. 2. Eelgrass Surve A. Pre Construction Eelgrass Survey. A valid pre -construction eelgrass (Zostera marina) survey shall be completed during the period of active growth of eelgrass (typically March through October). The pre -construction survey shall be completed prior to the beginning of construction and shall be Valid until the next period of active growth. The survey shall be prepared in full compliance with the "Southern California Eelgrass Mitigation Policy" Revision 8 (except as modified by this special condition) adopted by the National Marine Fisheries Service and shall be prepared in consultation with the California Department of Fish and Game. The applicant shall submit the eelgrass survey.for the review and approval of the Executive Director within five (5) business days of completion of each eelgrass survey and in any event no later than fifteen (15) business days prior to commencement of any development. If the eelgrass survey identifies any eelgrass within the project area, which would be impacted by the proposed project, the development shall require an amendment to this permit from the Coastal Commission or a new coastal development permit. B. Post Construction Eelgrass Survey. If any eelgrass is identified in the project area by the survey required in subsection A of this condition above, within one month after the conclusion of construction, the applicant shall survey the project site to determine if any eelgrass was adversely impacted. The survey shall be prepared in full compliance with the "Southern California Eelgrass Mitigation Policy" Revision 8 (except as modified by this special condition) adopted by the National Marine Fisheries Service and shall be prepared in consultation with the Califomia Department of Fish and Game. The applicant shall submit the post -construction eelgrass survey for the review and approval of the Executive Director within thirty (30) days after completion of the survey. If any eelgrass has been impacted, the applicant shall replace the impacted eelgrass at a minimum 1.21 ratio on-site, or at another location, in accordance with the Southern California Eelgrass Mitigation Policy. All impacts to eelgrass habitat shall be mitigated at a minimum ratio of 1.21 (mitigation: impact). The exceptions to the required 1.21 mitigation ratio found within SCEMP shall not apply. Implementation of mitigation shall require an amendment to this permit or a new coastal development permit unless the Executive Director determines that no amendment or new permit is required. 5 -05425 -[Elmore] Administrative Permit Page 6 of 6 3. Pre -construction Caulerpa Taxifolia Surve A. Not earlier than 90 days nor later than 30 days prior to commencement or re -commencement of any development authorized under this coastal development permit (the "project"), the applicant shall undertake a survey of the project area and a buffer area at least 10 meters beyond the project area to determine the presence of the invasive alga Caulerpa taxifolia. The survey shall include a visual examination of the substrate. B. The survey protocol shall be prepared in consultation with the Regional Water Quality Control Board, the California Department of Fish and Game, and the Nafional Marine Fisheries Service. C. Within five (5) business days of completion of the survey, the applicant shall submit the survey: (1) for the review and approval of the Executive Director; and (2) to the Surveillance Subcommittee of the Southern California Caulerpa Action Team (SCCAT). The SCCAT Surveillance Subcommittee may be contacted through William Paznokas, California Department of Fish & Game (858/467-4218). or Robert Hoffman, National Marine Fisheries Service (562/980-4043). D. If Caulerpa taxifolia is found within the project or buffer areas, the applicant shall not proceed with the project until 1) the applicant provides evidence to the Executive Director that all C. taxifolia discovered within the project and buffer area has been eliminated in a manner that complies with all applicable governmental approval requirements, including but not limited to those of the California Coastal Act, or 2) the applicant has revised the project to avoid any contact with C. taxifolia. No revisions to the project shall occur without a Coastal Commission approved amendment to this coastal development permit unless the Executive Director determines that no amendment is legally required. ACKNOWLEDGMENT OF PERMIT RECEIPTACCEPTANCE OF CONTENTS: I/We acknowledge that I/we have received a copy of this permit and have accepted its contents including all conditions. Applicants' Signature Date of Signing E:\Admin. Permits\2006\2005-01\5-05-425 (Elmore) NB Dock LO.doc oi �ULUR/ Z2 J2 lilt ck re COASTAL COMIV EXHIBIT # PAGE OF ISSION KNA cc) 0- T M 4 '%zz— oi �ULUR/ Z2 J2 lilt ck re COASTAL COMIV EXHIBIT # PAGE OF ISSION L k !2 31 HUM � 8 �'. o; m = " co (A m m, m m 0-0 3.0 m =112 - M, cn -A m V; T4 m c= W La m Q) cl W) E: cn z 1� F" m 03 ch I w 1 S4. - ARb AN, 81un 9 COASTAL COMMISSION BOU4eWA,o EXHIBIT PAUt I ur I 49-1:3 P�727 ��199 t7T-' 'nN :�NOHd uTjsnj o.Ad% P91�2W TOSUOO : WMi--' CITY OF:NEWPORT.BERCH. CITY, OF NEWPORT BERCH MY ERY .1 '0 --z: i9ciric OCERN Y[CINITY MR.. mm W, ago= NO EEL GRASS WITHIN I 5'OF PROJECT Cl EEL GRASS IN THE PROJEQTARI�b /see Amache, SIGNATURE IdlIqlK PERMIT# DAT&i! iARBOR RESOURICIES DlVvy DITY OF NEWPORT BMW. "—h"; � m1no" 1"'11411K C-11 2- , (> pi le. tl .1 0 = 40' JEM PROF I LE imy. MMM FK DMM IN FEL7 RND DENOTE azmiom - wm ON IlmL%u LOW Wwm. -4410 F K, to x ao (O(tt- e— 3 A-1 wty b, 44 q- t 10 i zo I FPPLIOW'S Wff Irnorae. JOB mrfm '57, E146 bppr el -10 V, It! 5%v 11 9�� <; � 1( �9 6W'r:5�- 77, 77 -7 - CaRforrua Coastal Conunission 0outh Coast District Office APPROVEJ. — 05 - 4 Permit No. - -1t ----------------- By: ------------------------- EFFECrIVE 'Date: ------- i- COASTAL COMMISSION EXHIBIT # 5 PAGE I OF I 4T DEPARTMENT OF THE ARMY LOS ANGELES DISTRICT, CORPS OF ENGINEERS P.O. BOX 532711 LOS ANGELES, CALIFORNIA 90053-2325 REPLY TO ATTENTION OF: Office of the Chief Regulatory Branch Jonetta. Elmore c/o Swift Slip Dock & Pier Builders Attention: Beth Swift Permit Coordinator 2027 Placentia Avenue Costa Mesa, California 92627-3405 Dear Ms. Elmore: November 18,2005 Reference -is made to your request of October 20,2005 (File No. 200600129-SJH). Under the provisions of Section 10 of the Rivers and Harbors Act of March 3,1899 (33 U.S.C. 403), you are hereby authorized to replace an existing floating dock structure, like -for -like, bayward of 59 Balboa Coves, within Newport Bay, in the City of Newport Beach, Orange County, California, as shown on the enclosed drawings. The owner or authorized responsible official must sign and date all copies of this Letter of Permission (LOP) indicating that he/she agrees to the work as described and will comply with all conditions. One of the signed copies of this Letter of Permission must be returned to the Corps of Engineers (a pre -addressed envelope is enclosed). In addition, please use the two attached postcards to notify this office as to the dates of commencement (within 10 days prior to the start of construction) and completion of the activity (within 10 days following the end of construction). Furthermore, you are hereby advised that the Corps of Engineers has established an Administrative Appeal Process which is fully described in 33 CFR Part 331. The complete appeal process is diagrammed in the enclosed Appendix B. Thank you for participating in our regulatory program. PERMITTEE Sincerely, Mark Durham Chief, South Coast Section Regulatory Branch DATE SWIFT SLIP Dock and Pier Builders, Inc. 2027 Placentia Avenue Costa Mesa, CA 92627 (949) 631-3121 Fax (949) 631-3122 email: bhswiftslip@sbcglobal.net www.swiftslipdock.com November 10, 2005 Adam Fischer California Regional Water Quality Control Board 3737 Main Street Riverside, CA 92501 Re: Paul Elmore Boat Dock Project 59 Balboa Coves, Newport Beach, Orange County Dear Mr. Fischer: This is in response to your recent notification regarding the change in procedures for certification from the Regional Water Quality Control Board for boat dock projects involving pile replacement. I The notice submitted on behalf ofthe above -referenced applicant is being submitted according to Regional Board General Certification for dock pile replacement, issued on September 29, 2005. 2. The telephone number of the applicant is (626) 446-0875. 3. A Federal permit number is not yet available. 4. Longitude: 117W 55.875' Latitude: 33N 37.214' 5. Enclosed with this letter is check number 31915 for the $60 filing fee. 6. The information in the notice concerning the above -referenced application is complete and accurate. Please contact our office if you should have any questions. Very truly yours, SWEFT SLIP DOCK & PliR BUILDERS /az;Lj� Beth Swift Permit Division /brs Enclosures 13 :-17 FROM: TO:162&303-1019 ocober 14, 2005 HARBOR RESOLOWS ixivisum 629 hiarbor Island Drive NWWWrt Sea&, CA MOO 949-644-3034 1 Fax 949.723-05N Pler Permit Candfflons PropefW AWren: 59 Balboa Coves, Newpcxt Sewft, CA 926M 144h rWemrwa to 'he 080" cu""ly under c0Md8Mtkm to Mawffgure or awdify to dock SYMOM %S fOKOWIng qMdRIOM %Q11 rK%v be In effea an On above reliut� pier. 1. The pier parmdWe b &WUM Of the Harbor- Parn PORCIM -end Chaptw 17 atom City ol NvMX"86achMUnWpgI0ode. The OWPermiMmunderstmM that the above referencec 081 j$ under 4h* purview of them %ikdw anci C�Ddgg, 2. AnYhftrOWOrkonthosbcmFnWtioriedpWrrequimepermH*vvKhglgeKyofNgwport 9 9.1& and anY 011w Q13113ficable agemim. Pubting. nqNscomerd of rub rails &W work conskiered to be cometic In naWry does not re"ft jj pgyftt. 3. The condidans Selfbith In this docunwnt peftirs to Itis cuffm* Pmpoead dock sydarn urWer c0nsifttaWn. Any future Madiffcations of aftnglom tD the do* system may requiYe 110W c0ndMOTIR ~ WMY Cvorrk% or chanip Owe Condiborse, The" cond6orw supersede all P"t WndftM associated wM #ft propetty. 4. Only mark* oriented uum are allowed on the pier, p1m plaftsm. garigway and AWL Pabo furtifture. Plunft str...we not Permfted. S. Yoijr side property &W& aftnd In the Watew Wom Ou3jr eanw� beerkiq� vase&% must not enm"CaM UWn the nelghbae3 pmpwty. S. VS"WB msy not eAend b*YWW Itm andef the flont by grWoo thm the width of Itisir beefn- 7. The nvixknum beam af a vesed d%d is DwrrmVM in idde fia tn ON% &nw1&rnmwvm& -lei - _fii­ JokTt 1`160WIRmnz _S1 g--naturn Ptint Nam P. 2 / 3 V. "4,VW �4v,ry .MW CITY OF NEWPORT BEACH 829 Harbor Island Drive, Newport Beach, CA 92659 949-644-3034/Fax 949-723-0589 March 14, 2006 Evie Compton Real Estate Fax: 949.650.5220 Re: HARBOR PERMIT TRANSFER Pier Permit# 1011-59 Larry & Edwina Harris 59 Balboa Coves Newport Beach, CA 92663 Phone cell (714) 801.2301 Dear Evie: The Harbor Resources division has received the completed & signed application and fee. The pier inspection performed by our office has determined that it meets City standards. The permit will be transferred into the buyer's name and billed at the address shown above. Thanks for your help. For further assistance in this matter, please contact me at 949. 718. 1844. Sincerely, mLke v -re Harbor Resources Division WOrSTAMA rmlllm�mmffribl. V EVIE COMPTON Phone (949) 646-8711 56 Balboa Coves Cell (949) 466-7266 Newport Beach, CA 92663 Fax (949) 650-5220 I -ab 27 08 01sSSp Compton 02/2712006 IM t4j ft rim S496505220 HAA"IDR PERAGT TR"SFM"PUCA'ff0N M EUrbw hdmd Drive Nkwpmt Smadhi, CA SMW 11"0, - =,-:-J I -z PMA "Ou"fa Bung P.3 laffar"X R P, y 11W E�DLJiNA PAkOS a."- -am f7t-'fV4 � S-?,dcc-1bocL Te4ephom No.: Z- C�t� (71/4,) 9'ol 13UYWO SWUWJM: A�11,�,� L Jobt Owner S%Pdurm "ft,aaw C="Pwr. **P.ddmft "Em"ON NuMbW. Closing Deft (ESSTaft): YZAEUMMAWWWWWWREP, .1 cc) V e -S A) 6 cjq zf:�, 0 air rnmeMUST BE COWLWE TO BROW THE PRWEW MERMOMM Lod F., - i I df 7 -Ir 7 Dow WOM- 7ft pwaiff ft ram 10 ilift by dW CAW CMWR af Me 17 dfffw Ab*pW Son c h A*uWkW Cbdw- r�- F-mb 27 06 01255P Contpzork !349650522a P-3 02/27JZDIDS AM t#302 IPAM lavowcas .173 !7#' "-'r. *OCW* of AWkaton: VO 10(,P PmTmt Nm*er. **Pmpeft Axhfrwa: t 2, 2, Q =S **supes tuaws; 7 filnAj e7 MIng L-ki 04-7 47, TeWphow Nm: Buyees Swpatums: .Ickd Ownfw ftnakwe: C=npaw. - fi/d ffe'd�g 6-�- wftAddless-- P17 **Escmw lfuntbiw-- lt*F= a aming Dow (ffs*nwk3y. frEUS MUST BE COMPLUM TO EGM THE PM=EM Inspection Daw- Raimpection CWft: Fee pakk Check No: AppkmWn CmWtoW- khftvrRvavwvm speawomawom- by am CAW coma* JW 4aWnhume SO �� -17 OF&M lOwpartOSeCh AftWOW CodkL V -d oaasosss-b-s uOqdwO3 eoo:Go go al jew 03/15/2006 WED 11:09 FAX FAX TX REPORT TRANSNISSION OK JOB NO. 0107 DESTINATION ADDRESS 6505220 PSWD/SUBADDRESS DESTINATION ID ST. TIME 03/15 11:08 USAGE T 00'36 PGS. 1 RESULT OK March 14,2006 Evie Compton Real Estate Fax: 949.650.5220 CITY OF NEWPORT BEACH 829 Harbor Island Drive, Newport Beach, CA 92659 949-644-3034/Fax 949-723-0589 Re: HARBOR PERMIT TRANSFER Pier Permit # 1011-59 Larry & Edwina Harris 59 Balboa Coves Newport Beach, CA 92663 Phone cefi (714) 801-2301 Dear Eviie: The Harbor Resources division has received the completed & signed application and fee. The pier inspection performed by our office has determined that it meets City standards. The permit will be transferred into the buyer's name and billed at the address shown above. Thanks for your help. For further assistance in this matter, please contact me at 949. 718. 1844. Sincerely,- hA 'I bio i I viv 0001 STATUS SHEET HARBOR PERMIT TRANSFER LOCATION 0'e" PERMIT NO. .Sel I er Vy--) Buyer Date Application Received: 0 A Date Fee Received: Request for Inspection made by: Escrow Co. Escrow Officer Da te Escrow No. Address Phone: Date Inspection made: Deficiency Letter sent: Transfer completed: Date Inspection: 1. Location 2. Pl.umbing: 3. Electrical 4. Structural: 5.OTHER: REMARKS: Inspected by: Deficiency corrected: BUYERS' NAME(S) ADDRESS OF FACILITY: PERMIT CLIFFORD AN 8, ]boa Coups, N19- MAILINdj*KjHFjlAT. AlIDERSON EPHONE NO. FEE I!CH . ECK NO. DATE alboa'Cqv Rl a ow- rt, aarphONI rA 979Q, I cl APPRAkd -- -1111 v 3986 40-PLIdAt IS HEREBY MADE TO TRANSFER HAio fbN qR PERMIT OCHD ------------------ CHARLES -.-W. GRAHAM GLORIA N. GRAHAM XG RS' NAME(S) BUYERS' NAME(S) (ABOVE N M BE b) COUNCIL 'PUBLIC WORKS OF SELLER IGNA URE OF BUYER bE PT. ESCROW., SIGNATURE OF SELLER --gPNATURE OF BUYER INSPECTION SIGNATURE OF JOINT OWNER APPLICATION APPROVED ADATE) -C!TY RARBOR t!OORbyATOR SPECIAL CONDITIONS- This P—ERMIT IS REVOCABLE -BY THE CITY COUNCIL IN ACCOR ANCE WITH TITLE 17 OF THE MUNICIPAL CODE. CITY OF NEWPORT BEACH. CALIF. W. FORN 66-1013 REV. I WGNATU RE OF BUYER SIGNATURE DF -J0-1N-TOW-N-ER APPLICATION APPROVED (DATE) CITY OF NEWPORT BEACH. C ALIF. WX FORM 64-1013 RIXV. ... ... ...... PERMIT DATE OR AD RESS OF FACILITY: BUYERS' NAKEM DAW, CK NO. 1p m Pill �IsjiEREBY, 140tTC NSFER'HARBOit P R"n ':. TE MOVE -APP', rp'l _14 mail" UYERS - TV ED SELLER9',NAME(S) "34 Y� : P 1.6 wo ---------- I - - -- ---------- �SIGNATURE OF BUYER DEPT- Sj6gATURE 0 , F SELLER ii6itow WNER APOL19ATION APPROVED (DATE) cl -OORDINATOR wrrH TITLE I ARBOR C __ -I- cou NCIL IN ACCORDANr Cc �b­-­:.THIspERMITISRlE ___TiTIoNs _VOr ;L By THE CODE— WX FORM'66-1013 REV' crry OF NFWPOR-r BXACH, CALIF CITY OF NEWPORT BEACH P.O. BOX 1768, NEWPORT BEACH, CA 92658-8915 P0 ft july 12, 1986 Mariners Escrow 4 Corporate Plaza Newport Beach, C A 91660 Re: Escrow 3535DM Attn: Dana Sirs: We return herewith your check 9790 for pier transfer of pier at 58 Balboa Coves. This pier is part of the number of piers belonging to the Balboa Coves Community Association; therefore it will not be transferred to the new owner of the property at 58 Balboa Coves. If you have questions, please call 644-3044. Sincerely Tony Melum by DB 3300 Newport Boulevard, Newport Beach 2 . It t Im . I zo 7-,oqA C 7— elf -Tea .f.�Jfo, . fA 'Idl C,WA 0 WWS9 IL�11 4 I LAN C000" VQ L 6W"A oll Cv.—V 040F .,-p .'ev'o, avve okrovo.Ar c;*,-Pt^s A4L-.g" Iowo-oe Lodo- Wcvldr.- "&7,rpepv&4o" owoTgo ak,0 /0 Atyce. cr-o"w.-wO -VOCA00— --o' MO—APOW-JO &16PY- ,o%ootp /0// 60 Rose-, All"'th L'Pre of 12 14-70 -/,q 5 AFA 4/0 1 - '*',D t CE ^�.rjlllr APO ac7,ff VY F f"cl I rA 40e IrA , C AA ~dvwq2-v4r,p 4 A A(,OIV 45, AA AIR, F, AWA mowolmoer AVA)" Aolf W�-Okl Y- 49 e Ac:.0-� CAI ArOeA,01A so 4ca 4�0 W a. &,- *,oApar X4A449 ,.Vpa&r ZS 49. 4,OVddPffAe AW4ff Vp