HomeMy WebLinkAboutM2005-0067�z,4-
4 A
4GPERMIT
i,,� urces; Division
Address: 1/10 // lo31 qz) )�d3 -e uja le r
Pier.Permit#:-, Ile5;2-11o7-
Action Status
Application Received
Date.
/ --)- b- �-
Eelgrass Inspection
Eelgrass
Present
No "X
Date:
// 7
Yes
H. R. Approval to
Comments:
Completed -
Submit to Agencies
0 tc , jA4
Date:
Sent to Corps/Costal
Date:
1,7-yi /0
OK from Corps
Yes
A 16
No
OK from Coastal
Yes
No
Dredging Approval
H. R.
Initials: ct-1
1
Date:
6 �,� /C
Completion Report
--
Date:
Received
K] e q h I An"
COM ents. -eed ne;�)hboy( fyern-1'7</Oq belcyz
IM �""M
L.-MMIT
Divls'ion
Address: qO 3 / qz) 7 j�-�Ige avler
PierPermit M 1/0 7
Action Status
Application Received
Date:
/ ?- b -
Eelgrass Inspection
Eelgrass
Present
No
x
Date:
7 /W
Yes
H. R. Approval to
Comments:
Completed
Submit to Agencies
0 tc S,4 c. jA4
Date:
. ItI211CI-1
Sent to Corps/Costal
Date:
/0
OK from Corps
Yes
h 16
No
OK from Coastal
Yes
6-
- //
No
Dredging Approval
H. R.
Initials:
Date:
6 k5
Completion Report
Date:
Received
COM ents, -fteed nie,,,coh bo/ r10 C C,4 I f Vem 1:,7 Cl Cq be kyv-
V�a OVO row, I
WP
Action
DREDGING PERMIT
Harbor Resources Division
Address: IVO// 403/ q -z)-7
Pier Permit #: - Vo 7
Status
Application Received
Date:
Eelgrass Inspection
Eelgrass
Present
No X
Date:
// 7
Yes
H. R. Approval to
Comments:
Completed
Submit to Agencies
0 �c -�z3 se,4
Date:
Sent to Corps/Costal
Date:
OK from Corps
Yes
6 h 16
No
OK from Coastal
Yes
6—
No
H. R.
Date:
Dredging Approval
Initials:
b5
Completion Report
Date:
Received
--Ioq belcrz
Corn entsm Ke ed ne,',,)h bo/ 11e)+1fiCr/vVio,, fym-
WP
4 1 ft
POSTDREDGING
COMPLETION REPORT
The permittee shall send one (1) copy of the post -dredging report for each completed individual
dredging project to the Corps and the CCC documenting compliance with all general and
special conditions defined in this permit. The post -dredging report shall be sent within 45 days
after completion of the complete individual dredging project authorized in fl -ds permit. The
post -dredging report shall include the following information for the completed individual
dredging project:
PermitNumber: //*Z — Wr'>
Start Date: / 21 / Completion Date:
Total dredgedmaterial to Beach: 116
to Sea (LA3):
Total acreage impacted: .03
Mode of dredging and transportation, and method and frequency of disposal:
#va&2�=c&t (, r- Stet e, Kd'&N e -a.4 'J".
Tug 6r other vessel logs documenting'contact with I�SCG N4SO Long Beach fe-fore each trip to
the LA -3 ocean disposal site.
USCG Contact: AIY4--y No
Form.of dredged material: (:11W Cohesive
Procedure and location where the disposal barge or scow was washed: /V/9 -
A certified report from the dredging site inspector and the captain of any tag or other vessel
used to transport and dispose of dredged material at LA -3 indicating all general and special
permit conditions were met. Any violationsj�e permit shall be explained in detail.
All conditioning permits were met: Cles No
Post -project surveys of Eelgrass beds potentially affected by the dredging:
The post -dredging report shall be signed by a duly authorized representative of the permittee.
The permittee's representative shall make the following certification:
I certify under penalty of law that this document and all attachments were prepared under my
direction or supervision in accordance with a system designed to ensure that quaZifted personnel
properly gather and evaluate the information submitted. Based on my inquiry of the person or
persons who manage the system, or those directly responsible for gathering the information, the
information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false in 07ff
10
�Afi * 'p, i , ncluding the
possibility offine and imprisonmentfor knowing violations.44
Signature
CITY OF NEWPORT BEACH
Harbor Resources Division
829 Harbor Island Drive
Newport Beach, CA 92660
June 17, 20005
Army Corps of Engineers
Attn: Cori Farrar
911 Wilshire Blvd.
Los Angeles, CA 90017
RE: Extension Request for Approved Dredgin2 Applications
Dear Cori,
Per your earlier instructions to this office via email, this letter requests your approval to
extend the project completion deadline for the attached application, to July 23, 2006 (1
year after the permit expiration date of July 24, 2005.)
Thank you for your consideration in this matter. Please feel free to contact me 'with any
questions you may have.
Sincerely,
T,-/
Chris Miller
Harbor Resources Supervisor
(949) 644-3043
emiller(a�,city.ngyMort-beach.ca.us
S7,ATE OF CALIFORNIA - THE RESOURCES AGENCY ARNOLD SCHWARZENEGGER, Govemor
CALIFORNIA COASTAL COMMISSION
South Coast Area Office
200 Oceangate, Suite 1000
Long Beach, CA Mayll,2005
(562) 590-5071
Mr. Tom Rossmiller
City of Newport Beach/Division of Harbor Resources
829 Harbor Island Drive
Newport Beach, CA 92660
Subject: Condition Compliance — Coastal Development Permit 5-99-282, as amended
& Conformance with Consistency Certification CC -078-99 & CC -077-01
Dear Mr. Rossmiller:
Commission staff have received information submitted as evidence of compliance with Coastal Development
Permit 5-99-282, as amended, and/or as evidence of conformance with Consistency Certifications CC -078-99 or
CC -077-01 for the following sites in the City of Newport Beach:
City
Harbor
Permit #
Site Address
Beach
Disposal
Qty* (cu -yds)
Ocean
Disposal
Qtyt (cu.yds)
Cumulative
Total* for 2004
175-836
& 175-
84n
836 Via Lido Nord
224
0
I �1"�-4G7
401, 403, 46TE.. Edgewater.
220
0
151
—Emerald Avenue Public Dock @ North Bayfront
40
171-941
941 Via Lido Soud & 944 Via Lido N6rd
210
-0
0
117-1236
1236 W. Bay Avenue
125
0
Sub -total
0
Year-to-date total
2247
2764
5011
Commission staff have reviewed the information submitted and determined that the above referenced dredging
events conform with Consistency Certifications CC -078-99 and/or CC-077-01'and that no further federal
consistency review is necessary from the Commission for the dredging components of the projects. In addition,
the proposed beach disposal events have been reviewed and found by the Executive Director to be consistent with
Special Conditions 1-3 and 9-12 of Coastal Development Permit 5-�99-282, as amended. No further review is
necessary from the Commission for the beach disposal components of the projects.
Please be advised that only the projects described in the materials submitted for the sites listed above have been
found to conform with Consistency Certification CC -078-99 and CC -077-01 and/or conform with the terms and
conditions of Coasta ' I Development Permit 5-99-282, as amended. Any change in the projects may cause them to
lose their status as consistent with CC -078-99 and CC -077-01 and/or CDP 5-99-282, as amended. This
certification is based on information provided by the recipient of this letter. If, at a later date, this information is
found to be incorrect or incomplete, this letter will become invalid, and any development occurring at that time
must cease until a new determination regarding conformance with CC -078-99 and CC -077-01 and/or CDP 5-99-
282, as amended, is obtained.
If you have any,questions, please contact me at (562) 590-5071
Sincerel
r Schwine,
Supervisor, Regulation & Planning, Orange County Area
CC: Mr. Mark Delaplaine, California Coastal Commission
Ms. Cori Farrar, U.S. Arr�y Corps of Engineers
M
or Mr. Mark Delaplaine at (415) 904-5200.
Not to Exceed 50.0 cubic yards per dredging and beach disposal event
t Not to Exceed 1,000 cubic yards per dredging and off -shore disposal event
* Not to Exceed 20,000 cubic yards per year
REPLY TO
ATTENTION OF:
Office of the Chief
Regulatory Branch
DEPARTMENT OF THE ARMY
LOS ANGELES DISTRICT, CORPS OF ENGINEERS
PO BOX 532711
LOS ANGELES, CALIFORNIA 90053-2325
May 31, 2005
City of Newport Beach Harbor Resources Division
Attention: Mr. Tom Rossmiller
829 Harbor Island Drive
Newport Beach, California 92659
Dear Mr. Rossmiller:
This is in reply to your applications dated April 26, 2005 for Department of the Army
Permits to conduct maintenance dredging, per Regional General Permit No. 54 in Newport Bay,
Newport Beach, Orange County, California. This letter authorizes maintenance dredging and
beach deposition at nine sites within Newport Bay (see below).
USACE
city
Site Address
Volume
Affected
Beach
Ocean
Base #
Harbor
(Cubic
Area (est.;
Disposal
Disposal
Permit #
Yards)
acres)
200500713
171-941
941 Via Lido Soud & 944 Via
210
0.05
Yes-
No
Lido Nord
Supratidal
200500714
117-1236
1236 W. Bay Ave
125
0.02
Yes-
No
Supratidal
200500715
151
Emerald Ave Public Dock @
40
0.02
Yes-
No
North Bay Front
Supratidal
200500716
112-407
401, 403,407 E. Edgewater
220
0.03
Yes-
No
Supratidal
200500717-1
175-836
836 and 840 Via Lido Nord
224
0.07
Yes-
No
200500717-2
175-840
Supratidal
200501061
116-1132
1130-1140 W. Bay Ave
340
0.05
Yes-
No
Supratidal
200501406
132-515
507 & 515 Harbor Island Dr.
190
0.19
Yes —
No
Supratidal
-2-
USACE
city
Site Address
Volume
Affected
Beach
Ocean
Base #
Harbor
(Cubic
Area (est.;
Disposal
Disposal
Permit #
Yards)
acres)
200501414-1
137-70
70 Beacon Bay (West, Middle,
220
0.05
Yes-
No
200501414-2
East Docks)
145
0.05
Supratidal
200501414-3
123
0.04
200501415
105-2525
2525 Ocean Blvd
500
0.05
Yes —
No
Supratidal
Totals
2337
0.62
2337 cy
0
Based on the information you have provided, the Corps of Engineers has determined that
your proposed activity complies with the terms and conditions of Regional General Permit
(RGP) No. 54.
As long as you comply with the general permit conditions of RGP No. 54, an individual
pern-Lit is not required. This letter of verification is valid until July 24, 2006 to accommodate the
requested year extension past the expiration of RGP No. 54. A general permit does not grant
any property rights exclusive privileges. Also, it does not authorize any injury to the property
or rights of others or authorize interference with any existing or proposed Federal project.
Furthermore, it does not obviate the need to obtain other Federal, State, or local authorizations
required by law.
Thank you for participating in our regulatory program. If you have any questions, please
contact Corice J. Farrar of my staff at (213) 452-3296.
Sincerely,
A
Mark Durham
Chief, South Coast Section
Regulatory Branch
Enclosure
Clry,
47—
117'ZO
- -'7
NEWPORT E5 A Y
PIZ6
L--3F--4--r -Li"
NE�DC, I W C,
—4—
L -INE
NO EEL GRASS WITHIN 15'OF PROJEC
0 EEL GRASS IN THE PROJECT ARE:A
Nei
eo;
01,i�, MAYlAgoroved
SIGNATURE
I Z -207 IL /17 101
DATE
PERMIT #
Z HARBOR RESOURM
CITY OF NEWPORT B
lit,
ikL-66A 6�"'Ce AZr4 Tk�W4
�4, -*CA P-4 A& AA iS R
- It - OOA�w 64ep
7;k.4c7-
COAV7WA C r4* AN 0,4
M,
ro 4000 Arae.
46
-a-o"f
ce-
-19,y "Err"
VIC$ AJ I TY SkETCH
S'o 4/,-3 a"I 9 5 or* CP')CPI
&0-0"o
aO)W OA 3 Alle017
re7o.01?a,
al -e
NEWPORT E5 A Y
PIZ6
L--3F--4--r -Li"
NE�DC, I W C,
—4—
L -INE
NO EEL GRASS WITHIN 15'OF PROJEC
0 EEL GRASS IN THE PROJECT ARE:A
Nei
eo;
01,i�, MAYlAgoroved
SIGNATURE
I Z -207 IL /17 101
DATE
PERMIT #
Z HARBOR RESOURM
CITY OF NEWPORT B
lit,
ikL-66A 6�"'Ce AZr4 Tk�W4
�4, -*CA P-4 A& AA iS R
- It - OOA�w 64ep
7;k.4c7-
COAV7WA C r4* AN 0,4
M,
6
Zo
STATE & FEDERAL AGENCY
DREDGING APPLICATION
Permit No. c'� -7
Payment: 6AI��
Check No: Date:
Hi;S.00
Project Location:
�/o 7
Latitude/Longitude:
IU -33 3 6, 2
U-) p -2,y S4 -f, 0
Cubic Yards to be Dredged:
;22
Method of Dredging-
YV a. -qLt C 40'k -A
Nature of Dredged Material (Graip size data):
X4 lh�. C -.0 rk
Disposition of Dredged Mat rial:
A� 0 ne C L (7 ( 3 14Q1qSa_
Method of Material Disposition:
Ap 0 "AID h <_� (�14 �,o6 V
v
Effect of Dredging on Contiguous Bulkheading and Beach
,nyCFHeM�omBEACH
Project Begins:_",,,0Af�m/� Project Ends:
9\0 � — -5)� q �-,
Page 2
Dredging Application
1, /Plaq k S, Ae-5 (Applicant/Applicant's agent), hereby certify that I have
read the U.S. Army Corps of Engineers permit, RGP#54 and the California Coastal
Commission permit #5-99-282 for maintenance dredging in Newport Harbor and that I
will comply with all of the conditions of those permits. I will further hold the City
harmless from and indemnify them against any claim for damages arising out of the
exercise of these permits. In addition, 1, as the applicant shall reimburse the City of
Newport Beach for all attorney's fees and other costs expended by them in defending
any claim, lawsuit, or judgment arising out of the activities of the applicant carried on
under the authority of such permit.
Applicant — Please Print
a- k -'S, /-, -,,
Contractor — Please Print
Date
Signed:
Applicant/Agent
Dec 21 04 08:23a NBC Applied Environmental 714 850 4040 p.3
MBC SAMPLE ANALYSIS SUMMARY
STATION LOCATION: 407 E, Edgewai
SAMPLE COLLECTION DATE: 12/10j'2004 TEST METHOD-- Sieve Analysis
Method 2 (PILrr.b 1981
COI-LECTED BY: Intracoastal Dredging ANALYSIS START DATE: 121012004
A B
DREDGE SITE RECEIVING BEACH
ToW Dry Weight of Sample� 772.66 grams (g) 190-32 grams
Analysis Weight (Split Wt.): 49.94 g 40.27 g
Visual Description: A light &own fine sand A light brown fine sand
with small shell hash. with small shell hash �
Fraction Fraction Fraction Fraction
Weight % of Total weiqht % of Total
Gravel / Shell Hash Fracbon: 0.00 g 0% 0.00 g
>2.0mm (> -10)
#10 Sieve
Sand Fraction: 48.34 g 97 % 39.47 g 98 %
<2.Omm >0.063mrn ( < -1� > 40)
#230 Sieve
Silt/ Clay Fraction.- 1.60 g 3 % 0.80 g 2 1/c
<0.
COLLEC71ON Outline of sample collection and analysis:
Samples collected by a hand coring device driven into a representative area o"Ithe 6edge
site and rece�ving beach. Stored in plastic containers and immediately delivered to the lab.
SAMPLE PREPARATION
Ent�re sample transferred irito 1 liter class containers, deionized wa'teF added, and
mixed to desalt and disperse the sediment. The sediment is allowed to completely
settle and the clear water is removet by siphoning. Tine sample is placed in a drying
oven at 500C and occasionally stirred until the entire sample is comple,tely dry. The dry
sample is transferred to a desiccator for coolin4g. The sample is dis,aggregated and a
Riff le sediment spiitter is used to evenly split the sample to reduce the quantity of
material to be ana�yzed to an allowable retent;on weight for the sieves.
SAMPLE ANALYSIS
The dry split fraction is processed through a # 10 U.S. standard sieve to remove the
gravei/shell fraction of the sample, The material retained on the sieve is weighed and
value recorded. The material passing through the # 10 sieve is wet sieved thrOLgh a
9230 sieve to remove the silticlay fraction. The material retained on the sieve is
transferred back into the glass container and placed back into the drying oven at 500C.
The remaining sample is allowed to completely dry and the material is weighed and
recorded to yield the sand fract�lon. The sitUclay fraction is calculated by subtracting
the gravellshell and sand fractions from the total analysis weight
MBC AppYed Environmental Sciences, 3000 Redhill Avenue, Costa Mesa, CA 92526
Eelgrass Survey Reporting Form
(Version 1.0, June 20, 2003)
This form is required to be submitted for any surveys conducted for the eelgrass, Zostem
marina, that are required to be conducted under federal or state permits and authorizations
issued by the U.S. Army Corps of Engineers and the Coastal Commission. The form has been
designed to assist in identifying eelgrass while ensuring that the required information is
consistently documented. Surveys required to be conducted for this species are subject to
modification through publication of revisions to the eelgrass survey policy. It is incumbent upon
the authorized permittee to ensure that survey work is following the latest protocols. For further
information on these protocols, please contact: Robert Hoffman, National Marine Fisheries
Service, (562) 980-4043, or William Paznokas, California Department of Fish & Game, (858)
467-4218).
Site Name:
(common reference)
ZI e) -3, q 0 -7 e�:
1 Survey Contact:
�(name, phone, e-mail)
k 7 6 --AO 7
Permit Re erence:
(ACOE Permit No.,
RWQCB Order or Cert. No.)
Hydrographic System:
(bay, estuary, lagoon, or
harbor)
Specific Location:
(UTM, Lat./Long., datum,
accuracy level, attach
tr-) 7, 0/0
electronic survey area map if
possible)
Was Eelgrass
Yes, Eelgrass was found at this site.
Detected:
No, Eelgrass was not found at this site.
Description of
Permitted Work:
ertcle e 47 �We q LIA 7,9e & C k 5
(describe briefly the work to
�
be conducted at the site
the permits identified
,Iunder
above)
Substrate
type:
site
Description of Survey
Effort:
Survey date
and time
1 -7 10 14 /qJ 6
(please describe the surveys
period:
conducted including type of
survey (SCUBA, remote
video, etc.) and survey
methods employed, date of
work, and survey density
(estimated percentage of the
ottom actually viewed).
Describe any limitations
encountered during the
survey efforts.
Horizontal
visibility in
water:
31
Survey type
and methods.
Lk P7
4st
Survey
personnel:
j
Mq VZ
Survey
density:
>
Survey
limitations:
Other Information:
(use this space to provide
any additional information or
references to attached
materials such as maps,
reports, etc.)
Eelgrass Survey Reporting Form (version 1.0, 6/17/03)
Caulerpa Survey Reporting Form
This form is required to be submitted for any surveys conducted for the invasive exotic alga Caulerpa taxifolia
that are required to be conducted under federal or state permits and authorizations issued by the U.S. Army Corps
of Engineers or Regional Water Quality Control Boards (Regions 8 & 9). The form has been designed to assist in
controlling the costs of reporting while ensuring that the required information necessary to identify and control
any potential impacts of the authorized actions on the spread of Caulerpa. Surveys required to be conducted for
this species are subject to modification through publication of revisions to the Caulerpa survey policy. It is
incumbent upon the authorized permittee to ensure that survey work is following the latest protocols. For further
information on these protocols, please contact: Robert Hoffman, National Marine Fisheries Service (NOAA
Fisheries), (562) 980-4043, or William Paznokas, California Department of Fish & Game, (858) 467-4218).
Report Date:
12,111:7 lo 14
Name of bay, estuary,
I I
lagoon, or harbor:
100 Z
Specific Location Name:
I
(address or common
reference)
A/04'r t /-/0 7
Site Coordinates:
-
(UTM, Lat./Long., datum,
/'t; 4�& 'e
accuracy level, and an
0
electronic survey area map
or hard copy of the map
must be included)
Survey Contact:
Ze --lo
(name, phone, e-mail)
S -S 19 ;26 7
Personnel Conducting
Survey (if other than
above): (name, phone,
e-mail)
Permit Reference:
(ACOE Permit No.,
RWQCB Order or Cert. No.)
z2 C C) 1,2 C. /-9 -4 yc
Is this the first or second
survey for this project?
S
Was Cauterpa Detected?:
(if Caulerpa is found, please
Yes, Caulerpa was found at this site and
immediately contact NOAA
Fisheries or CDFG personnel
identified above)
has been contacted on date.
kk, _No, Caulerpa was not found at this site.
Description of Permitted
Work:
(describe briefly the work to
L -)o q- -S //'P
be conducted at the site
under the pen -nits identified
above)
Description of Site:
Depth range:
cej
Substrate type:
(describe the physical and
biological conditions within the
survey area at the time of the
survey and provide insight into
variability, if known. Please
Temperature:
Salinity:
Dominantflora:
provide units for all numerical
infon-nation).
in �9—
Dominantfauna:
Exotic species
encountered
(including any
other Caulerva
species):
Other site
description notes:
Description of Survey
Survey date and
Effort:
time period:
A136
(please describe the surveys
conducted including type of
Horizontal
-visibility in water:
survey (SCUBA, remote
video, etc.) and survey
methods employed, date of
work, and survey density
Survey type and
methods:
(estimated percentage of the
bottom actually viewed).
Survey personnel:
Describe any limitations
encountered during the
survey efforts.
Survey density:
> o 7o
Survey limitations:
Other Information:
(use this space to provide
additional information or
references to attached maps,
reports, etc.)
�-autuj pa ourvey meponing r orm tversion i.z, I U/J I /V4)
6e 117- - �16 7
Cl r Y- n,*- Alev,,v
12,, j- �'� i
l'-, Ae
7-
r 'dr -4
- 46
AW
44
cl
ViCIMITY SKETCH
5'Ov'70�"g.5 are eXR,-c5-5-ed' I"? Iver' al5ce 'ci-0110"If
ao)v "A 3 be/ory Awco'7 forve.- Zovv
/40 IWO�,601 11;1e.S
NEWPORT bAY
E�D G I rQ C,
10
U.�, PMR4*Aj�.7
7.7
Cr"L
loo
91AIASOA ONY-54LJr.: ALA;;l Tk:��j
44 A4 x 7-,c,4 c, -
AA -1 4 -CP 7-
C'e't A -O.&
C -AA -1 7'5
A4,0Dee ss Z/o o --s, go 7 "A, C rO Air
'�LLP f-veL A_
Mark Sites
Intracoastal Dredging
P. 0. Box 498
Balboa Island, CA 92662
June 11, 2005
Property Owner
409, E. Edgewater -
Newport Beach, CA 92661
Dear Property Owner,
This letter is to inform you that your neighbors at 401, 403, and 407 E. Edgewater have
applied fbr a permit to dredge. The proposed project is sho�vn in the accompanying
drawing.
The city's Harbor Resources Department asks that this notice be sent as a courtesy. Any
questions- you may -have s4hould be directed to that departinmit's supervisor, W Chris
Miller, at (949) 644-3043.
Sincerely,
Mark Sites
hdracoastal Dredging
(949) 675-1071
Action
DREDGING PERMIT
Harbor Resources Division
Address: -T,51-c
Pier Permit #:
Status
Application Received
Date: / -,5- - e) C/
Eelgrass Inspection
Eelgrass
No
Date:
Present
YesV/
H. R. Approval to
Comments:
dtec1!5e- carwod eejoca-),!�
Completed
Date:
Submit to Agencies
Zbe/og
Sent to Corps/Costal
Date: C52-11 A
OK from Corps
Yes /0
No
OK from Coastal
Yes
No
H. R. C/M
Date:
Dredging Approval
Initials: 41,2161
Completion Report
Date:
Received
Comments:
STATE OF CALIFORNIA - THE RESOURCES AGENCY ARNOLD SCHWARZENEGGER, Governor
CALIFORNIA COASTAL COMMISSION
South Coast Area Office
200 Oceangate, Suite 1000
Long Beach, CA 90802-4302 April 29, 2004
(562) 590-5071
Mr. Tom Rossmiller
City of Newport Beach/Division of Harbor Resources
829 Harbor Island Drive
Newport Beach, CA 92660
Subject: Condition Compliance — Coastal Development Permit 5-99-282, as amended
& Conformance with Consistency Certification CC -078-99 & CC -077-01
Dear Mr. Rossmiller:
Commission staff have received information submitted as evidence of compliance with Coastal Development
Permit 5-99-282, as amended, and/or as evidence of conformance with Consistency Certifications CC -078-99 or
CC -077-01 for the following sites in the City of Newport Beach:
City
Harbor
Permit #
Site Address
Beach
Disposal
Qty (cu.yds)
Ocean Cumulative
Disposal Total* for 2004
(cu.yds)
139-5
5 Harbor Island
335
...Qtyt
0
143-28
28 Harbor Island
0
187
133-97
97 Linda Isle
0
433
133-102
102 Linda Isle
0
340
175-220
220 Via Lido Nord
0
129
116-1200
1200 West Bay
311
0
Sub -total
646
1089
Year-to-date total
Commission staff have reviewed the information submitted and determined that the above referenced dredging
events conform with Consistency Certifications CC -078-99 and/or CC -077-01 and that no further federal
consistency review is necessary from the Commission for the dredging components of the projects. Inaddition,
the proposed beach disposal events have been reviewed and found by the Executive Director to be consistent with
Special Conditions 1-3 and 9-12 of Coastal Development Permit 5-99-282, as amended-. No further review is
necessary from the Commission for the beach disposal components of the projects.
Please be advised that only the projects described in the materials submitted for the sites listed above have been
found to conform with Consistency Certification CC -078-99 and CC -077-01 and/or conform with the terms and
conditions of Coastal Development Permit 5-99-282, as amended. Any change in the projects may cause them to
lose their status as consistent with CC -078-99 and CC -077-01 and/or CDP 5-99-282, as amended. This
certification is based on information provided by the recipient of this letter. If, at a later date, this information is
found to be incorrect or incomplete, this letter will become invalid, and any development occurring at that time
must cease until a new determination regarding conformance with CC -078-99 and CC -077-0.1, and/or CDP 5-99-
282, as amended, is obtained.
'If you have a� questions, please contact me at (562) 590-5071
Sincerely,
ar Schwing
Supervisor, Regulation & Planning, Orange County Area
CC: Mr. Mark Delaplaine, California Coastal Commission
Ms. Cori Farrar, U.S. Army Corps of Engineers
or Mr. Mark Delaplaine at (415) 904-5200.
Not to Exceed 500 cubic yards per dredging and beach disposal event
Not to Exceed 1,000 cubic yards per dredging and off -shore disposal event
Not to Exceed 20,000 cubic yards per year
�?'ATES Of
REPLY TO
A17ENTION OF:
Office of the Chief
Regulatory Branch
DEPARTMENT OF THE ARMY
LOS ANGELES DISTRICT, CORPS OF ENGINEERS
PO BOX 532711
LOS ANGELES, CALIFORNIA 90053-2325
May 3, 2004
City of Newport Beach Harbor Resources Division
Attention: Mr. Tom Rossrm'ller -
PO Box 1768
Newport Beach, California 92658-8915
Dear Mr. Rossrm'ller:
This is in reply to your applications dated January 23, 2004 and April 19, 2004, for
Department of the Army Permits to conduct maintenance dredging, per Regional General Permit
No. 54 in Newport Bay, Newport Beach, Orange County, California. This letter authorizes
maintenance dredging at three sites within Newport Bay (see below) and transport of dredged
material for ocean disposal at LA -3.
USACE
City
Site Address
Volume
Area (est.)
Beach
Ocean
Base #
Harbor
(Cubic
(Acre)
Disposal
Disposal
Permit #
Yards)
(Cubic
Yards)
200401072
133-97
97 Linda Island
433
0.067
No
433
— site I
200401072
133-102
102 Linda Island
340
0.065
No
340
— site 2
200401073
143-28
28 Harbor Island
187
0.026
No
187
Totals 1
960
0.068 1
0 cy
960
Based on the information you have provided, the Corps of Engineers has determined that
your proposed activity complies with the terms and conditions of Regional General Permit (RGP)
No. 54. Furthermore, you must comply with the following non -discretionary Special
Condition:
1. The permittee shall ensure that there are no direct impacts to onsite eelgrass beds
and/or patches to be avoided. Prior to the conunencement of construction activities, the
perinittee shall flag with surface buoy(s) the limits of the dredging footprint, as shown on the
approved dredge application, to delineate areas of i-inpact permitted within waters of the U.S.
Any additional acreage impacted outside of the approved dredge footprint resulting in a direct
impact to eelgrass would require mitigation at a 1.2:1 ratio, per the Southern California Eelgrass;
Mitigation Policy.
As long as you comply with the general permit conditions of RGP No. 54 and the Special
Condition, an individual permit is not required. This letter of verification is valid until
July 24, 2005, when RGP No. 54 will expire. A general permit does not grant any property
rights exclusive privileges: Also, it does not authorize any injury to the property or rights of
others or authorize interference with any existing or proposed Federal project. Furthermore, it
does not obviate the need to obtain other Federal, State, or local authorizations required by law.
Thank you for participating in our regulatory program. If you have any questions, please
contact Con'ce J. Farrar of my staff at (213) 452-3296.
Sincerely,
Mark Durliam
Chief, South Coast Section
Regulatory Branch
wp() A��
1r 0
Project Locatio—n:
STATE & FEDERAL AGENCY
DREDGING APPLICATION
Permit No. / 3 3- 16
Payment: $436-00
Check No: 2252 5 12/15/03
Date:
102 Linda Isle I
Project Begins: Project Ends:
WILL SCHEDULE PROJECT WHEN WE RECEIVE PERMIT
Page 2
Dredging Application
1, Lorenzo c. Miller (Applicaht/Applicant's agent), hereby icertify that I have
read t e U.S. Army Corps of Engineers permit, RGP#54 and the California Coastal
Commission permit #5-99-282 for maintenance dredging in Newport Harbor and that I
will comply with all of the conditions of those permits. I will further hold the City
harmless from and,:.indemnify them against any claim for damages arising out of the
exercise of these permits. In addition, 1, as,the applicant shall reimburse the City of
Newport Beach for all aftorney'sfees and other costs expended by. them' in defending
any claim, lawsuit, or judgment arising out'of the activities of the applicant carried on
under the authority of such permit.
Mariners Escrow - David Rosenbaum
Applicant F-Ilease Print
Shellmaker Inc.
(;ontractor — Please Print
December,31, 2003
Uate
Signed: C,
Applicant/Agent
ovr Nzwoavr dx.4c.4v ;::Tloe
_0�, 12A In 57 155
ro 4..4 _arocA
3,
I * Nol
0 EEL
/'�. 6� /i a t� ".PA I Iliswolaffr C7AY, IL;ALlJr0XtNlA ? :t. I I
-3 d.A17-2. 1
36/0 /P7 rvw.'� Ono'
/o Y2 e4"'p 7"4 A-?eO'7 LOVVilte 1-42W
ra"57.r /0 �/1�74ej,
Ore CZ�061t'5hffd f;7 'lh;S SCCY'loo? ot'%Alcw�
3 3
VA
q, z I
LWC�
I NSPE '710Ni'77 47
GRASS WITHINWOF PROJECT
kSS IN THE PRQ IECT AREA
_' /,7,- i -c YVA �v I
SIGNATURE F�_/O / 162-
IATE
�_) A,-- 7 Al2 4 0 o 3
S DIV.
FAr.
ea7-;10Z B4X, Te-,4cr; 3
A P/IdM
roa 4., c' Pi -"DA I
CoAlrwA c 7
/lo'.
#& A.F '::�l
a
dr
"Ar_�.swr + , A' At ')- 4-7
Alga -or,
cl "T
Z
C%
0
--f '4v
VICIMITY SkETCH
/'�. 6� /i a t� ".PA I Iliswolaffr C7AY, IL;ALlJr0XtNlA ? :t. I I
-3 d.A17-2. 1
36/0 /P7 rvw.'� Ono'
/o Y2 e4"'p 7"4 A-?eO'7 LOVVilte 1-42W
ra"57.r /0 �/1�74ej,
Ore CZ�061t'5hffd f;7 'lh;S SCCY'loo? ot'%Alcw�
3 3
VA
q, z I
LWC�
I NSPE '710Ni'77 47
GRASS WITHINWOF PROJECT
kSS IN THE PRQ IECT AREA
_' /,7,- i -c YVA �v I
SIGNATURE F�_/O / 162-
IATE
�_) A,-- 7 Al2 4 0 o 3
S DIV.
FAr.
ea7-;10Z B4X, Te-,4cr; 3
A P/IdM
roa 4., c' Pi -"DA I
CoAlrwA c 7
3-3 -
Cl r r N",00gr 9,e.4clv
12AIYIP
ro Srocj%
Ip
X
Af
--4 AD 0 OCT -7 --- 7
*0.0 42 D
73
Coo*
vc,;
0
VICIMITY SKETCH
Rr 15 A CAL torostNIA
V CFA -,-v, 117 A'Vr7' 01)Ol CiWnO,�&
1,lo Y?- 46"CIOW A-fCO07 4osover Zow WoYCI
0I
VNIX A7 11�7C,5
Ore -e io'b1t*Shwal -;I /A;s . SecrIII
3 3 1A)
16 /U)
/0/2 VA VIAj
P�Cg- IWFA LUj
r -n
T4 A,!�. IA12
-:7-0 73 A) 0. 9 0
4P,0,L1C-,4A-17-5 AIA"Iff :bau))l 96>SCALUM 341e, 7AE,4 C7-,'
5-N&I
-Xp,& Aoogsss; /02 i-io,-)oA IrLf CoAlr.4rA c ro At 4.,
momen I
W MININ
imann,
DAVID H. LEE &ASSOCIATES, INC.
GEOTECHNICAL ENGINEERING ENGINEERING GEOLOGY
Als. Lisa Miller
SHELLMAKER, INC.
2035-F Placentia Avenue
Costa Mesa, CA 92627
December 22, 2003
Our Project K03.077.00
SUBJECT: Phi Grain Size Test Result for the Soil Sample Obtained from
the Mariners Escrow Property located at 102 Linda Isle Drive,
Newport Beach, California 92660.
Dear Ms. Miller -
Presented herewith is the result of our phi grain size -analysis performed on the
soil sample provided to us by your firm. The test procedures were in
accordance -with ASTM D422-63 (1998) -and U.S. Army Corps of Engineers
Report Number CETA 79-7 criteria.
Please do not hesitate to call if you have any questions after you have reviewed
the attached data.
Respectftflly submitted,
Karen Masterson
Project Engineer
11 Mm"""114713
David H. Lee
Geotechnical Engineer
Attachments: Plate 1 Grain Size Summary
Plate 2 Cumulative Grain Size Distribution PHI Units
Distribution: Addressee (1)
IlDhiasrv�swye),detalPROJECTSV<03.077.00V<030770Q_PHLGSLetteu�doc ,
Sieve Opening
Particle Diameter in
U.S. Standard
% Material Cumulative Percent
(mm)
Phi Units
Sieve Size
Retained by Weight
Retained
-----------------------------------------------------------
38.1
-5.25
11/2"
0
0.0
19
-4.25
3/4"
0
0.0
Gravel 9.5
-3.25
3/811
0.9
0.9
4.75
-2.25
4
0.4
1.3
2.83
-1.50
7
0.2
1.5
2
-1.00
10
0.2
1.7
-----------------------------------------------------------
1.41
-0.50
14
0.2
1.8
1
0.00
18
0.2
2.1
0.71
0.50
25
0.3
2.4
0.5
1.00
35
0.8
3.1
0.35
1.50
45
1.8
4.9
Sand
0.25
2.00
60
5.4
10.4
0.177
2.50
80
3.9
14.2
0.125
3.00
120
1
15.2
0.088
3.50
170
0.3
15.5
0.075
3.75
200
0.1
15.6
0.063
4.00
230
0.2
15.8
-----------------------------------------------------------
Silt-Clay <0.063
<4.00
<230
84.2
100
A sample was provided to David H. Lee & Associates, Incorporated in a sample bag by
Shellmaker. The sample consists of a SILTY CLAY to CLAYEY SILT (CL-MLIML): very
dark gray to dark olive gray (5Y 2.5-3/1-2); wet; scattered seashell and seashell fragments.
The sample was obtained from the Mariners Escrow Property, 102 Linda Isle Drive, Linda
Isle, Newport Beach, California at a depth of -6.0 to -3.5 feet MLLW.
SENSE SEE SENSE
smossis'nomin'
;
David H. Lee & Associates, Inc.
--
PFH GRAIN SIZE SUMMARY
23011 Moulton Parkway, Suite D-1 1
ZSNENMINNNNNNNIII�
Laguna Hills, CA 92653
NESS
mom 11111111101110's
Telephone: 949-461-5690
Fax: 949-461-7901
CLIENT: SHELLMAKER, INC.
DATE:
December, 2003
"M
mm
00
00
�S i-te N a m e:
I(common reference)
Survey Contact:
(narne, phone, e-rnail) e,
jPermit Reference: 11
IPA CQO CE Pern-�t No., -t. No.)
'W B Order or Cer
Hydrographic System:
(bay, estuary, lagoon, or
harbor)
FSpecific Location-
(UTM, Lat./Long., daturn,
accuracy lev�el, attach 4
e lectro c s
ru ��ey re m pif
lectror& sux-vey area map if
" "��J�
possible)
Was Caulerpa Yes, Caulerpa was found at this site and
Detected:
(if Caulerpa is found, please
has been contacted on date.
ir=ediately contact the
perniitting agency project
staff and NNUS or CDFG No, Caulerpa was not found at this site.
personnel identified above)
Description of
Permitted Work:
(describe bri�fly the work to
be conducted at the site
under the perrnits identified
above)
Description of Site: epth range:
(describe the physical and
biological conditions within
the survey area at the time of
the survey and provide
insight into variability, if
known. Please provide units
for all nuxnerical
inforriiation).
C)
Caulerpa Survey Reporting Form (version 1.0, 9/18/01)
Caulerpa Eradication in Southem
California
0 Southwelzt Region Ho e Page
Survey
ersonnek
Survey
density
Survey
limitations:
Other Information:
'1
(use this space to provide
[
any additibnal infonnation or
references to attached
to
, " "" �'J�z ""I,
materials such as maps,
report etc.)
s'
L
Caulerpa Survey Reporting Form (version 1.0, 9/18/01)
Caulerpa Eradication in Southem
California
0 Southwelzt Region Ho e Page
Date:
Inspection Requested By:
Inspector:
Pier Address:
Pier Transfer
INSPECTION FORM
Harbor Resources Department
Don Duffy
0 L
Reinspection
GFI Present Yes Need None Needed Yes Need
Anti -Siphon / Backflow Present
Other Comments
Eeigrass
Yes No
Presentl 4.-' 1
Pump Out
Pier Location
Yes No
Operational
Recommended Action
Encroachmenet
Address of Complaining Party
Boat Description
CF Number
Location on Dock
Comments / Observations
Other Request
//�-/d 4,K - / 4� e, ?
Cl r r :vr Nww,=ovr dewc-A-1
12A In
40,
—I Ao,
rR
c"o,
0
4�' Lire,,
VICI P -J I TY SKETCH IWAOr -1447'ry
NXwP*Wr SAY, CALIFCIANIA
3 Z/O slounal'^Fs are exaressed 0.-7& o4vno/e
-3 A beloW I-fcro,7 I -Ower Zo- WQX&^
33 0
0 UJ
4" jjl�
P1 :,0- A4,FA P Llou 6:
T-, r i
Y4017/7/7/- I -TA 3 u �J44er-,4,0
103
0 0
I
r= 4z)
�1-0 73 AJ 0. -0
PPL / c,4Aj-rs Az4,wo :L6o)-W. KoseA am ec77-,'/0Z 70A C 7-: 4
r-,11- 15-z—f CoZ-;�4A c rom /--, C , /71
Tt
I ir
V I. C I M'T TY �5 KEE T C H
-
Y?
Rol IF 1151.
S5
/74:0w-blc�r 4
V -1c,
W,
A Y
T T T-7 -7�-,-
?
q�7
Ir
C -e
ex i
)elk
lox
pjeY'
ARBOR RESOURC �SDIW
H
T
P;%o-- 7, B-�
CITY OF -N�W ACH
Y
4�
Ja
rS,
7
4 CT
WORKSHEET FOR BUILDING / FIRE PERMIT APPLICATION
CITY OF NEWPORT BEACH
P1 FASE PRINT OR TYPF BUILDING DEPARTMENT
1. PROJECT ADDRESS (NOT MAVUG ADDRESS) "I
FLOOR
S U I T E 70.
'--j /1 7
PHONE
312-
4. ARCH ITECT/DESIGN ER'S NAME LAST FIRST
LEGAL DESCRIPTION
�OUN�ITS�
LOT BLOCK TRACT
CITY STATE ZIP
41P
2. DESCRIPTION OF
Z,q,q— /
USE
# OF STORIES
VALUATION $
NEW Fj ADD F'I ALTER E] DEMO SQ FT
wAivirg C/I (NEW/ADDED/EXTG)
Check ADDrooriate Box
3. OWNER'S NAME LA FIRV
Is I /* W-r—
A R, ollner
OWNER'S ADDRESS 5�� 44C
'16 7 a7 4
OWNER'S E-MAIL A-DDRESS
CITY (3 STA��, ZIP
PHONE
312-
4. ARCH ITECT/DESIGN ER'S NAME LAST FIRST
LIC. NO.
ARCH ITECT/DESIGNER'S ADDRESS
ARCHITECTIDESIGNER'S! E-MAIL ADDRESS
CITY STATE ZIP
41P
PHONE NO.
F] 5. ENGINEER'S NAME FIRST
STATE LIC. NO.
Z/� r
ENGINEER'S,,�ESA
INEER'S E-MAIL ADDRESS
CITY STATE ZIP
PHONE NO.
6. CONTRACTOR'§,WAME
RUSI ES�,�L
INo.
PTATE LIC
Class
COMTRAC,t� R'S ADDRESS
7,0 7
CONTRACTOR'S E-MAIL ADDRESS
'ITY ZIP
CLI�
C cY Z6 ?z 71
PH5>NE_�4cl.
7 --3/
OFFICE USE ONLY
PERMIT NO
TYPE OF CONSTRUCTION PLAN CHECK NO. -
OC UPANCY - GROUP PLAN CHECK FEE $
PLAN CHECK ENG.
or,ms
WORKSHEET FOR BUILDING / FIRE PERMIT APPLICATION 11116<
CITY OF NEWPORT BEACH
BUILDING DEPARTMENT
PLEASE PRINT OR TYPF=
1. PROJECT ADDRESS (NOT MAILING ADDRESS)
FLOOR
SUITE NO.
qu'r 7
OWNER'S E-MAIL ADDRESS
CITY
LEGAL DESCRIPTION
No. UNITS
LOT— BLOCK TRACT
F-1 4. ARCH ITECT/DES IGN ER'S NAME LAST
2. D ESCRIPTION OF WORK 1 5 �7Lq USE
ixz�
# OF STORIES
VALUATION$
N EW ADD F-1 ALTER E] DEMO 0 SQ FT
m4nf 6i'l I (NEW/ADDED/EXTG)
Check Appropriate Box for Applicant
3. OWNER'S NAME LAST
r-ormsxtsiag__appncauon blztiu4
A 7"
W
OWNER'S ADDRESS
7
OWNER'S E-MAIL ADDRESS
CITY
STA�F-
Z?l
PHONE
>
F-1 4. ARCH ITECT/DES IGN ER'S NAME LAST
FIRST
LIC. NO.
ARCH ITECT/DES IGN ER'S ADDRESS
ARCHITECT/DESIGNER'S E-MAIL ADDRESS
CITY
STATE
ZIP
PHONE NO.
F� 5. ENGINEER'S NAME
LAST
FIRST
STATE LIC. NO.
ENGINEER'S ADDRESS
ENGINEER'S E-MAIL ADDRESS
CITY
STATE
ZIP
PHONE NO.
6. CONTR
,5TT� �
BUSINESS LIC.
STATE L ' IC. C-2
No Class
CONTRACTOR'S ADDpESS
,v ?'-7 , 4���f
CONTRACTOR'S E-MAIL ADDRESS
STATE
ZIP,
q
PHONENO
OFFICE USE ONLY
TYPE OF CONSTRUCTION
OCCUPANCY- GROUP
PERMIT NO.
PLAN CHECK NO.
PLAN CHECK FEE $
PLAN CHECK ENG.
r-ormsxtsiag__appncauon blztiu4
CALIFORN,IA COASTAL COMMISSION
South Coast Area Office
200 Oceangate, Suite 1000
Long Beach, CA 90802-4302
(562) 590-5071 March 18, 2002
Mr. Tony Melum
Division of Harbor Resources
City of Newport Beach
P.O. Box 1768
Newport Beach, CA 92658-8915
Subject: Condition Compliance – Coastal Development Permit 5-99-282
& Conformance with Consistency Certification CC -078-99
Dear Mr. Melum:
Commission staff have received information submitted as evidence of compliance with Coastal
Development Permit 5-99-282 and/or as evidence of conformance with Consistency Certification
CC -078-99 for the following sites in the City of Newport Beach:
City
Harbor
Permit #
Site Address
Beach
Disposal?
(Yes/No)
Beach
Disposal
Qty' (ydS3)
Ocean
Disposal?
(Yes/No
Ocean
Disposal
Qty 2 (ydS3
Cumulative
Tota13 for
2002
112-407
401. 401-1/2. 403.
405. 407 E, Edoewater
Yes
440
No
0
112-427
421.423.425.&
427 E. Edaewater Place
Yes
260
No
0
—
Total
700
0
892
Commission staff have reviewed the information submitted and determined that the above
referenced dredging event conforms with Consistency Certification CC -078-99 and that no further
federal consistency review is necessary from the Commission for the dredging component of the
project. In addition, the proposed beach disposal has been reviewed and found by the Executive
Director to be consistent with Special Conditions 1, 2, and 3 of Coastal Development Permit 5-99-
282. No further review is necessary from the Commission for the beach disposal component of
the project.
Please be advised that only the project described in the materials submitted for the site listed
above have been found to conform with Consistency Certification CC -078-99 and/or conform with
the terms and conditions of Coastal Development Permit 5-99-282. Any change in the project may
cause it to lose its status as consistent with CC -078-99 and/or CDP 5-99-282. This certification is
based on information provided by the recipient of this letter. if, at a later date, this information is
found to be incorrect or incomplete , this letter will become invalid, and any development occurring
at that time must cease until a new determination regarding ponformance with CC -078-99 and/or
CDP 5-99-282 is obtained.
If you have any questions, please contact me at (562) 590-5071 or Mr. James Raives at (415)
904-5200.
I -� S L
in3cere y,
arl Schwingg
Coastal Program Analyst
Cc: Mr. James Raives, California Coastal Commission
Ms. Cori Farrar, U.S. Army Corps of Engineers
1 Not to Exceed 500 cubic yards per dredging and beach disposal event
2 Not to Exceed 1,000 cubic yards per dredging and off -shore disposal event
3 Not to Exceed 20,000 cubic yards per year
C/ r Y- ows- Nwo:�Pofr
a>c 14� nM MA-eMt*\ ONPOMM4
Ive itow Me 6
iT P.
6 eA
PEMC�WF- -SAND LA
1>ocy� K.DArf),
F1 tIfF, S
I jzol?�-E
L4,0,04. /
117- -�lo 7
.- .1 1- of.-�O,'c
,s'o,V.,7dl,,95 are expecs'5— Iry
&#�—oAr 3 46CIO&V 41CO17 LOrVdrr ZOW
Ao Aeo-rho,-
>T bAY
A--
%
Di� ED c, i w c,
Y"i' P'ERWA� 4 -NE
777-
I rid-,
EEL GRASS INSPECTION
NO EEL GRASS WITHIN 15'OF PROJECT
13 EEL GRASS IN THE PROJE TAREA
io,
74
'iT
AV PERIMIT
ATF
9,AL4�6A 0'ky---lJL-e: AL4;;VTk---*,j
M-E��K oz
e,-, c5ctw-1 mm6p-
Avg,-.-
it
cp 7-
194 'It.
r4*AV
7-,C,4c7'
ro. 1$.'7'7
0A 7-e
AO
AD
0'ara
16
viciturry
SRETCH WAdr ii(rTr
Neowpowr &^Y,
CA4 IFOR1,41A
Jerrr
.- .1 1- of.-�O,'c
,s'o,V.,7dl,,95 are expecs'5— Iry
&#�—oAr 3 46CIO&V 41CO17 LOrVdrr ZOW
Ao Aeo-rho,-
>T bAY
A--
%
Di� ED c, i w c,
Y"i' P'ERWA� 4 -NE
777-
I rid-,
EEL GRASS INSPECTION
NO EEL GRASS WITHIN 15'OF PROJECT
13 EEL GRASS IN THE PROJE TAREA
io,
74
'iT
AV PERIMIT
ATF
9,AL4�6A 0'ky---lJL-e: AL4;;VTk---*,j
M-E��K oz
e,-, c5ctw-1 mm6p-
Avg,-.-
it
cp 7-
194 'It.
r4*AV
7-,C,4c7'
ro. 1$.'7'7
0A 7-e
MBC SAMPLE ANALYSIS SUMMARY
STATION LOCATION: 423 E. Edgewater, Balboa, CA
SAMPLE COLLECTION DATE:
25 -Jan -02
TEST METHOD: Sieve Analysis:
Method 2 (Plumb 1981)
COLLECTED BY: Randy Brown ANALYSIS START DATE: 25 -Jan -02
A
B
DREDGE SITE
RECEIVING BEACH
Total Dry Weight of Sample:
160.77 grams (g)
157.63 grams (g)
Analysis Weight (Split Wt.):
79.77 g
4 -
77.05 g
Visual Description:
Gray medium sand
Gray medium sand
Fraction ffaction
Fraction Fraction
Weight % of Total
Weight % of Total
Gravel Shell Hash Fraction:
2.16 g 3 %
4.07 g 5 %
>2.Omm (> -1�)
*10 Sieve
Sand Fraction:
76.48 g 96 %
72.24 g 94%
<2. Omm >0.063mm < -1 � > 4�)
#230 Sieve
Silt/ Clay Fraction: 1.13 g 1 % 0.74 g 1 %
<0.063rnm (< 4
COLLECTION Outline of sample collection and analysis;
Samples collected by a hand coring device driven into a representative area of the dredge
site and receiving beach. Stored in plastic containers and immediately delivered to the lab.
SAMPLE PREPARATION
Entire sample transferred into 1 liter glass containers, - deionized water added, and
mixed to desalt and disperse the sediment. The sediment is allowed to completely
settle and the c- 16ar, wat e*r ig removed by-sipho-ning. The sa m-ple-'fis placed fin"a-drying
oven at 500C and occasionally stirred until the entire sample is completely dry. The dry
sample is transferred toa desiccator for cooling. The sample is disaggregated and a
Riffle sediment splitter is used to evenly split the sample to reduce the quantity of
material to be analyzed to an allowable retention weight for the sieves.
SAMPLE ANALYSIS : .
The dry split fraction is processed through a * 10 U.S. standard sieve to remove the
gravel/shell fraction of the sample. The material retained on the sieve is weig hed and
value recorded. The material passing through the * 10 sieve is wet sieved through a
*230 sieve ' to remove the silt/clay fraction. The material retained on the sieve is
transferred back into the glass container and placed back into the drying oven at 500C.
The remaining sample i's allowed to completely dry and the material is weighed and
recorded to yield the sand fraction. The silt/clay fraction is calculated by subtracting
the gravel/shell and sand fractions from -the total analysis weight.
MBC Applied Environmental Sciences, 300O.Redhill Avenue, Costa Mesa, CA 92626
V
REPLY TO
ATTENTION OF:
Office of the Chief
Regulatory Branch
DEPARTMENT OF THE ARMY
LOS ANGELES DISTRICT, CORPS OF ENGINEERS
P.O. BOX 532711
LOS ANGELES, CALIFORNIA 90053-2325
City of Newport, Harbor Resources
Attention: Tony Melum
3000 Newport Harbor B.L-%r d
PO Box 1768
Newport Beach, Califon -da 92658
Dear Mr. Melum:
April 30,2002
This is in reply to your applications dated February 26, 2002 and March 14, 2002, for
Department of the Army Permits to conduct maintenance dredging, per RGP 54 in Newport
Bay, Newport Beach, Orange County, California. This letter authorizes, maintenance dredging
at three sites within Newport Bay (see below).
USACE
city
Site Address
—FYa7rd
olum
Volume
e
Area (est.)
Area (es
Beach
Ocean
Base #
Harbor
(Cubic
(Cubic
Disposal
Isal
Thce(�
D s
Disposal
Permit #
Yards)
S)
j 20020088
112-407
401,4011/2,403,405,407
440
2250sy
Yes –
No
E. Edgewater Ave
supratidal
i
I zone
200200881
112-427J
421, 423,,425., 427 E.
260
1200 sy
I Yes –
No
j
Edgewater Place
supratidal
zone
200200762
112-500
Adams Street End at
160
900 sf
Yes –
No
Edgewater
(100 sy)
nearshore
zone
Totals
860
3550sy
860 cy
- Based on the,information you have provided, the Corps of Engineers has determined that
your proposed activity-comphes with the terms and conditions of Regional General Permit
(RGP) No. 54.
-2 -
As long as you comply with the general permit conditions of RGP No. 54" an individual
pern-Lit is not required. This letter of verification is valid until July 24, 2005, when RGP No. 54
will expire. A general permit does not grant any property rights exclusive privileges. Also, it
does not authorize any injury to the property or rights of others or authorize interference with
any existing or proposed Federal project. Furthermore, it does not obviate the need to obtain
other Federal, State, or local authorizations required by law.
Thank you for participating in our regulatory program. If you have any questions, please
contact Corice J. Farrar of my staff at (213) 452-3296.
Sincerely,
Mark Durham
Chief., South Coast Section
Regulatory Branch
wpo
N',
tit
V
4Z
Project Location:
onqitude:
LO -3 .1;-,4
DREDGING APPLICATION
PERMIT NO. 112- /4/,��-7
,E Z) r�,Eo d��,e A t,/E-
zu)AD47-]�SE,q�2� .
. 9-25a L h /
Cubic Yards to be Dredged:
/"i) V-dZQ� -7�7 i3�7- n2nkE kAAJJ3LL4-X—'7) /VJ
I Method of Dredging:
of Dredged -41aterial (Grain size d�tp):
C
_TRq ) r,/ LSEA-,4 SAAID
v.; s tion of Dredged Material:
eF
:_;yi I
i Method of Material Dt"SP5��Itlon:
-SA Plb LL�L-L LLAfr AdOVE 46� 7-IZC- Z-1 AIF 14
iE, EL
Effect of Dredging on Contiguous Bulkheading and Beaches:
,-ok VA= L"LL)
S4AT7;�� L&4 r 4A),b
ro )t=Lo,4-7- 47- Z-ZU-) -77-bE. /Vo ac -L- &-,�CASS /A/
6 1 A4&
Project Begins: Project Ends:
4D
0
Page 2
Dredging Application
I
A L 4 - rF- j6 r by certify that I have
---Y --v _�gr_._._,(Applicant,/Applirant's agent), he�e
read the U S Army Corps of Engineers permit, RGP#5,4 and the California Coastal
Commission permit #5-99-282 for maintenance dredging in Newport Harbor and that I
will comply with all of the conditions of tho'se permits. I will further hold the City
harmless from and indemnify them against any ciaim for darna4es arising out of the
exercise of' these permits. In addition, 1, as the applicant shall reimburse the City of
Newpert Beach for all attorney's fees and other costs expended by them in defending
any claim. lawsuit, or judgment arising out of the activities of the applicant carried on
under the authority of such permit.
A LLE 0 YT F— u)AC-r r6 0
130R�JF-rrA O-A-&SE�- -M)a--1' b -c I
Applicant — Please Print
Ccantra�c r P-- Please'Print
Date
Signed: �-:77
Applicant/Agent
Ci r Y, oo-
a,. t*� reK PtAlroF.V\ A, pV4TIO,,4
+
iT
-Jol
PEfyXo'*F- ---;;AN.D 04E
Docj-:� FLDAr5-
0-7 1�—
.."CA
061A.
<
//Z -C16
,CI -If *-- 09 Lv ).-
p
VICIMITY SKETCH
ooe-
Qsw.oaffr 0-^Y,
Ce4r -'e) i�rcf' al�0(
46 4r/O A�feO'7 10 -VO" 1-/0
0 x / "7*0
W F> ex re.- i
T bAY
NE -D G 1 r4 C,
I T
r I 1,(NE-
I EEL GRASS INSPECTION
NO EEL GRASS WITRIN 15'OF PROJECT
rn e
1. P� , -- �j It), CL UMAZi-ZI IN I ME PROJE TAREA
j+, Ptj!�t *- " :t I Q
AVE, PERMIT -4'—
#
'7
&At-aCA
It OAJw *ky5lc
,0 7"; 194 l< I
__LAEA�r7'
raAV-r �WV I" VZC-:�. Co.. -2 S - -7
RAe7WACrOAN O -A 71-0'
MBC SAMPLE ANALYSIS SUMMARY
STATION LOCATION: 403 E. Edgewater, Balboa, CA
SAMPLE COLLECTION DATE, 25 -Jan -02 TEST METHODi Sieve Analysis:
Method 2 (Plumb 1981)
COLLECTED BY: Randy Brown ANALYSIS START DATE: 25 -Jan -02
Total Dry Weight of Sample:
Analysis Weight (Split Wt.):
Visual Description:
A
DREDGE SITE
241.99 grams (g)
119.40 g
Gray/brown medium sand
B '
RECEIVING BEACH
157-63 grams (g)
95.69 g
Gray/brown medilJ4 sand
Outline of sample collection and analysis.
COLLECTION
Samples collected by a hand coring device driven into a representative area of the dredge
site and receiving beach. Stored in plastic containers and immediately delivered to the lab.
SAMPLE PREPARATION
Entire sample transferred into I liter glass containers, deionized water added, and
mixed to desalt and disperse the sediment The sediment is allowed to completely
settle and the clear water is removed by siphoning, The sample is placed in a drying
oven at '500C and occasionally stirred unfil the entire sample is completely dr�y The dry
sample is transferred to a desiccator for cooling. The. sample is disaggregated and a
Riffle sediment splitter is used,to evenly split the sample to reduce the quantity of
material to be analyzed,to an allowable retention weight for the sieves.
SAMPLE ANALYSIS
The dry split fraction is processed through a # 10 U.S. standard sieve to remove the
gravellshelf fraction of the sample. The material retained on the sieve is weighed and
value recorded. The material passing through the # 10 sieve is wet sieved through a
#230 sieve to remove the silt/clay fraction. The material retained on the sieve is
transferred back into the glass container and placed back into the drying oven at 500C.
The remaining sample is allowed to completely dry and the material is weighed and
recorded to yield the sand fraction. The silt/clay fraction is calculated by subtracting
the gravel/shell and sand fractionsfrom the total analysis weight.
M8C Applied Environmental Sciences, 3000 Redhill Avenue, Costa Mesa, CA 9.2626
Fraction
Fraction
Fraction
Fraction
Weight
%ofTotal
Weight
% of Total
Gravel / Shell Hash Fraction:
1.63 g
1 %
1.04 g
1 %
>2.0mrh (> -1�)
#10 Sieve
Sand Fraction.
115�65 g
97%
93.9,g
98%
<2.Omm >0.063rnm < -10 > 40)
#230 Sieve
Silt / Clay Fraction:
2.12
2 %
075 g
1 %
<0.063mm (< 4
Outline of sample collection and analysis.
COLLECTION
Samples collected by a hand coring device driven into a representative area of the dredge
site and receiving beach. Stored in plastic containers and immediately delivered to the lab.
SAMPLE PREPARATION
Entire sample transferred into I liter glass containers, deionized water added, and
mixed to desalt and disperse the sediment The sediment is allowed to completely
settle and the clear water is removed by siphoning, The sample is placed in a drying
oven at '500C and occasionally stirred unfil the entire sample is completely dr�y The dry
sample is transferred to a desiccator for cooling. The. sample is disaggregated and a
Riffle sediment splitter is used,to evenly split the sample to reduce the quantity of
material to be analyzed,to an allowable retention weight for the sieves.
SAMPLE ANALYSIS
The dry split fraction is processed through a # 10 U.S. standard sieve to remove the
gravellshelf fraction of the sample. The material retained on the sieve is weighed and
value recorded. The material passing through the # 10 sieve is wet sieved through a
#230 sieve to remove the silt/clay fraction. The material retained on the sieve is
transferred back into the glass container and placed back into the drying oven at 500C.
The remaining sample is allowed to completely dry and the material is weighed and
recorded to yield the sand fraction. The silt/clay fraction is calculated by subtracting
the gravel/shell and sand fractionsfrom the total analysis weight.
M8C Applied Environmental Sciences, 3000 Redhill Avenue, Costa Mesa, CA 9.2626
A -a
DREDGING APPLICATION
Ini
�t 43�"
-7
PERMIT -NO.
401,
VN -1
- — - - - - - - - - - - - - - - - - -
0
ka-a 1P
Project Location:
e-& k L 2 3
ra C� '71 ill
Latitude/Lonaitude:
Cubic Yards to be Dredged:
Method of DiLread Ing,
61 17
Nature of Dredged Material (Grain siz4'data)-
Disposition of Dredged Material:
11 1,01-1,t1d AE
Wethod of Material Disposition:
r4 -
5/ e- 1w-Ja ;�� r C -,o 7 c ?-ie 7�i t3 z, //"x , a
Effect of Dredging on Contiguous Bulkheading and Beaches:
6y P 14 r /Z' -Z
We Sz,
Project Begins: . Project Ends:
F, EdGle Ae -
-wc
C7—
,3-2441
Page 2
Dredging Application
1, "7- (Applicant/Applicant's agent), hereby certify that I have
re4d the U.S. rmy Corps of Engineers permit, RGP#54 and the California Coastal
Commission pp rmit #5-9,9-282 for maintenance dredging in Newport Harbor and that I
will comply with all of the conditions of those permits. I will further hold the City
harmless from and indemnify them against any claim for damages arising out of the
exercise of these permits. In addition, 1, as the applicant shall reimburse the City of
Newport Beach for all attorney's fees and other costs expended by them in defgnding
any claim, lawsuit, or judgment arising out of the activities of the applicant carfied on
under the authority of such permit.
. S7,
Applicant - Please Print
Contractor - Please Print
O/Z
Date /
�-M
Signed:
Z Pp - Ircint/A90-t —
z�2 -2
ITY OF NEWPPRT BERCH.
cl" of
am
NNW
UFFM
-zc
oc&W
�f t �CIWITY HRP MIT
JEj 1Y
'Ic
NO EEL GRASS WI -r IN 150F PROJECT
IH
M EELGRASS.INTHEPROJEC AREA
8a
-SIGIN RE
Y
ZZ 4—
P FEWIT 0,
4r�
-; fq,
rodd .7,
6e-
Alc Ve,
*
AW c"ill
A
c7z
Ari epi 1414 E 4Q3 -F
5 --
ye
..6
V)
Nk -
FPPO M�Tls hac TOB FMOESS 1-01
L( 2 It ?(are-
-CMTY OF NEWPORT 8f-r'r,,H
HARBOR PEEN �'C
PERMSSION IS HEREBY QRPn%l7ZD TO CONSTRUCT A.�
MAINTAIN
,THE FACILM S�F&GYrN THJ','z ll,-Z�Tl�-;-i��' E
AT THE SITE It4rDICA-:-�ZY,
s rz�'-
THE HARBOR
-H AN
ANY SF.Mr-..L
gs NOT
MGHTS G%V�RMk ull��Ullz�2 Gi,L.
A � D. 7 �i 15 110 r, R, W4 T M AY E�� 2"If c"TIV C-14>U-Xl�c�i
IN ACCORDANC;Z W42TH rjriv--- 17 OF lkl�r-- MUMCiPAL GODE.
CITY HARBOR COORDINATTR4
PERMlIr N%:�-
CONSTRUCTION PEH IT,.
DATE ...... 7
7
...............
Ul AUACHED SHEET
SPSCIAL C(lNMM*M&'-
corps of rrlZ permit
Grarage County Perfaft
cdhwl- 5e�� V e- c- /zP, 7 7
STATUS SHEET
HARBOR PERMITS
LOCATION 4(n?
-: A w
o 4,
New
PERMIT NO.
_74
Revision
APPLICANT NAME
Dredging
CONTRACTOR
77
Date Rec'v —Fee Amt. 7
Fee Processed
Date Reviewed
by Marine Dept.
Approved
Denied
Corection
Required - Description
City Council: Approved
Remarks
DATE MATERIAL SENT/APPROVED
C.O.E. SCRZCC
1. Application
2. Consent Ltr. 6-�
3. "Waste" Ltr.
4. Drawings
5. Staff Report
6.
8.
REMARKS
DATE FINAL INSPECTION
Denied
SARWQCB J.H.C.
OR. CTY.
6-�-
�
krs
SPLCO-N
DEPARTMENT OF THE ARMY
LOS ANGELES DISTRICT. CORPS OF ENGINEERS
P. 0. BOX 2711
LOS ANGELES. CAUFORNtA 90053
Mr. Robert S. SchriT-rime r
1182 Turndell Road
La Habra, CA 90631
Dear Mr. Schririner:
2 Nove-n�ber 1977
Thank you for your letter of notifying us of
15 Julv 1
your Lntent to construct a pier addition to an existing ier at
407 E. Edgewater Ave., Lot 11, Block 2, Tract Balboa Bayside Addition.
Your drawings have been reviewed and generally conform to the provisions
of General Permit GP 004 for privately owned boat docks
in Newport Bay
Providing you have complied with State and local laws you may proceed
with the work.
Your proposed work has been assigned General Permit No. GP 004-015
If you have any further questions please feel free to call our Navigation
Branch at (213) 688-50'06- and refer to this number. A copy of the General
Permit is inclosed.
1 Incl
As stated
S S 1"�
FL 537
Apr 77
Sincerely yours,
/R 0 WUN , P
Chief, Construction -
Operations Division
STATE OF CALIFORNIA EDMUND G. BROWN JR., Governor
CALIFORNIA COASTAL COMMISSION
SOUTH COAST REGIONAL COMMISSION
666 E. OCEAN BOULEVARD, SUITE 3107
P.O. BOX 1450
LONG BEACH, CALIFORNIA 90801
(213', 590-5071 (714) 846-0648 COASTAL DEVELOPMENT PERMIT
Application Number:
Name of Applicant:
A-8-31-77-1769
Robert S. Schrimmer
1182 Turndell Rd., La Habra, CA 90631
Permit Type: E]Emergency
FIStandard
N Administrative
Development Location: 407 E. Edgewater Avenue
Newport Beach, CA
Development Description: Add a 6' x 14' pier platform to existing private
pier. Platform to be supported by pier and 1 new pile. RWQCB approval,
with new area to remain behind U. S. Pierhead line.
I. The proposed development is subject to the following conditions imposed
pursuant to the California Coastal Act of 1976:
None
Condition/s Met On N/A By
am -Page 1 of 2
Page 2 of 2
II. The South Coast Commission finds that:
A. The proposed development, or as conditioned, is:
1. The developments are in conformiEy with provisions of Chapter
3 of the California Coastal Act of 1976 and will not prejudice
the ability of the local government to prepare a local coastal
program that is in conformity wit:h the provisions of Chapter 3
of the California Coastal Act of 1976.
2. If located between the nearest public road and the sea or shore-
line of any body of water located within'the coastal zone, the
development is in conformity with the public access and public
rec"reation policies of Chapter 3 of the California Coastal Act
of 1976.
3. There are no feasible alternatives, or feasible mitigation
measuresy as provided in the California Environmental Quality
Act, available for imposition by this Commission under,the power
granted to it which would substantially lessen any significant
adverse impact that the development, as finally proposed may
have on the environment.
1II. Whereas, at a public hearing, held on October 3, 1977 at
(date)
Torrance by a unanlienous vote, permit application
number A-8-31-77-1769
is approved.
IV. This permit may not be assigned to another person except as provided
in Section 13170, Coastal Commission Rules and Regulations.
V. This permit shall not become effective until a copy of this permit
has been returned to the Regional Commission, upon which copy all
permittees or agent(s) authorized in the permit application have
acknowledged that they have received a copy of the permit and have
accepted its contents.
VI. Work authorized by this permit must commence within two years from
the date of the Regional Commission vote upon the appil"cation. Any
extension of time of said commencement date must be applied for prior
to expiration of the permit.
VII. Issued on behalf of the South Coast Regional Commission on
October 4 _P 197 7 -
receipt of Permit Number
contents.
(date)
7/27/77
10 -4 -.d -A -0 '4� J .0 It .0
7FMM��l dF
M. J. Ca4kntef
Executive Director
am/sws
. permittee/agent, hereby acknowledge
A-8-31-77-1769 and have accepted its
(sign��_Eure-�-
-K C) P,
In
J7
CO< A
CLIP
/ rr
ZZ,
Al.
'571 7`25'
Vic I "ji
ry''.
0 C Mr, 7ie�r-,
h d
1 12"
C-7 AL�,/
- Tn'
4,'4-
tigARBOR APPLIC
101PI N -9 7.
714-171
CITY OF NEWPORT BEACH -
HARBOR PERMIT
PERMISSION IS HEREmy GRANTED TO CONSTRUCT AND,
MAINTAIN THE FACILITY SROv"'%" ON T -HE REVERSE HEREOF -
AT THE SITE INDICATED, SUB.IECT -,:o
.IS OF
THE HARBOR PE.R.rA;T POLICIES Cv- `30s!�'T BEACH AND
ANY SPECIAL L�'STZ . D pER&gjT
IS NOT TRANSFEPABLE W�ITHOU-. CQjlJtsrN-llr c"17
THE C�TY HARBOR C0023'.)INAT37 Gf� THE
PIGHTS GIVEN UNDER THIS PER:,�ff ALR't-r ONIL
_ 11 y
AND THIS PERMIT rilAY BE REVOI�tED ':-lY T-l"qa CL"TV COUt%lCiL
IN ACCORDANCE TH TL 17 F TME IVIUN:ChPAL CODE.
'T
CITY R CGORDINATO
-Z
A /7 `�C -7/
PE IT No.
UA -TE
TRANSFERRE
FROM.*
TO:
PERMIT NO. 112-407D
DREDGING COMPLETION CERTIFICATION
I hereby certify that 97 cubic yards of material were
dredged adjacent to- 407 E. Edgewater
(address)
and that the material was disposed of at sea at Latitude 33'31'42"N,
Lonaitude 117'54'48"W
—RobQjZt S. Schrimmer
(Applicant -type name)
Al2ril 16, 1975
(Date-)--
location and/or description
Shellmaker, Inc.
(Contractor -type name)
Signed: 1&�' cl
Contractor"rs--
Representative
MARINE DEPARTMENT
March 10, 1975 ITEM NO.: H-14
,TO: MAYOR AND CITY COUNCIL
FROM: Marine Department
SUBJECT: HARBOR PERMIT APPLICATION FOR MAINTENANCE DREDGING
PERMIT NUMBERS 1,12-407, 259-140, 109-1318 AND CERTAIN
CITY STREET ENDS
RECOMMENDATION
If desired, approve the Maintenance Dredging Harbor Permit Applications.
DISCUSSION
These applications require City Council approval under the conditions
of approval of the City of Newport Beach "blanket" permit for main-
tenance dredging issued on February 12, 1974, by the U. S-, Army Corps
of Engineers.
The locations and applicants for the proposed maintenance dredging are:
Robert Schrimmer, 407 E. Edgewater
259-140 - Arthur Vitarelli, 140 S. Bayfront
109-1318- Jane Stockwell, 1318 E. Balboa Blvd.
- City of Newport Beach, No. end Via Koron, Lido Isle
- City of Newport Beach, So. end Via Fermo, Lido Isle
- City of Newport Beach, End of "Ell Street, Balboa Penn.
- City of Newport Beach, End,of "F" Street, Balboa Penn.
- City of Newport Beach, End of "D" Street, Balboa Penn.
- City of Newport Beach, End of Buena Vis ta St., Balboa Penn.
- City of Newport Beach, End of Adams St., Balboa Penn.
The staff has reviewed the proposed dredging both at private property
locations and at the street -ends and have determined that the work to
be done is within the parameters of the Corps of Engineers permit. There
is no anticipated adverse affect on proximity beaches or contiguous bulk-
heads.
Additional information regarding the street -end dredging is contained in
a memo to the Council from the City Manager.
PAGE TWO
DH: GEW:1f
COUNCILMEN
ROLL CALL
Ok
A
CITY OF . NEWPORT BEACH
March 10, 1975
MINUTES
General Plan Amendment No. 23, an amendment to the
Cir i culation Element as it pertains to recommended
improvements for Pacific Coast Highway between the
Upper Bay Bridge and MacArthur Boulevard, including
the MacArthur Boulevard and Avocado Avenue inter-
sections. (A report from the Community Development
Department was presented.)
(Letters from Peter Weisbrod opposing the widening
and conversion of Coast Highway through Corona del
Mar and into a "speed through way," from George
Watson opposing restriction of parking on the Coast
Highway in'Corona del Mar, from Charles and DeeDee
Masters opposing restriction or elimination of parking
on Pacific Coast Highway and against the creation of
a six -lane highway in Corona del Mar and from Alan
Blum regarding traffic on the Coast Highway in relation
to high density were presented.)
7. The public improvements constructed in conjunction
with Tract No. 7800, located southeasterly of Ford
Road and Jamboree Road in the Big Canyon Planned
Community were accepted; and the City Clerk was
-authorized to release Faithful Performance Bond No.
H39389 and to release the Labor and Materials Bond in
six months provided that no claims have been filed.
(A report from the Public Works Director was presented.
8. An Equal Employment Opportunity Statement of Assur-
ances for Federal -Aid Highway Projects was approved,
and the Mayor and City Clerk were authorized to
execute the document on behalf of the City. (A
report from the Public Works Director was presented.)
9. The plans and specifications for a Bicycle Trail on
Coast Highway from Riverside Avenue to The Arches,
Contract No. 1695, were approved; and the City Clerk
was authorized to advertise for bids to be opened at
2:00 P.M. on March 31, 1975. (A report from the
Public Works Director was presented.)
10.
The plans and specifications for Irvine Avenue
Resurfacing from Westcliff Drive to Santiago Drive,
Contract No. 1694, were approved; and the City Clerk
was authorized to advertise for bids to be opened at
10:30 A.M. on April 1, 1975. (A report from the�
Public Works Director was presented.)
The following maintenance dredging harbor permits
were approved, subject to the conditions of approval
�sued
under the Blanket Maintenance Dredging Permit i,
by the U. S. Army Corps of Engineers: iLlj
, � 2---4-03.,
Robert Schrimmer, 407 E. Edgewater; LZ5_9_-JA0, Arthur
Vitarelli, 140 S. Bayfront; #LO9-13L c
J8, Jane Stolkwell,
1318 E. Balboa Boulevard; and permits for the City of_-�
Newport Beach for the following street ends: "E
Street, "F" Street, "D" Street, Buena Vista Str et
and Adams Street on the Balboa Peninsula; and the
north end of Via Koron and the south end of Via Fermo
on Lido Isle. (A report from the Marine Department
was presented.) 1i
Volume 29 - Page 54
INDEX
General
Plan
Tract 7800
Civil
Rights
Act
Bicycle
Trails
Irvine AvE,
Resurfaci_,�:
2, -
CITY OF NEWPORT BEACH
TO: Santa Ana Regional Water Quality
Control Board
6833 Indiana, Suite 1
Riverside, CA 92506
Gentlemen:
CALIPOkNIA
March 4, 1975
The enclosed permit drawing application(s) is being sent
for your information in accordance with conditions of
City Hall
3300 W. Newport Blvd.
Area Code 714
673-2110
approval under the U. S. Army Corps of Engineers "blanket"
permit for maintenance dredging issued to the City of
Newport Beach on February 12, 1974.
The City Council of Newport Beach will hear the application
at its March 10, 1975 meeting.
If you have any questions regarding this application, please
contact the City of Newport Beach, Marine Safety Department
at (714) 673-2110.
R. E. REED, DIRECTOR
MARINE S-A Ty DEPARTMENT
Glen E. Welden
marine Affairs Aide
GEW: 1 f
cc: BSFW, EPA, F & G
#112=407, 259-140? 109-1318
PERMIT NO
DREDGING APPLICATION
Project Location: 407 E. Edgewater
Cubic Yards to be Dredged: 97
Method of Dredging: Hydraulic Suction
Nature of Dredged Material: Sand/Silt
Disposition of Dredged Material: Haul to sea and dump at Latitude 33'31142"N,
Longitude 117'54'48"w.
Method of Material Disposition: Barge to sea
Turbidity Control Method: Material to be contained in Dump Barge at
dredge site.
Effect of dredging on contiguous bulkheading and beaches None
Bill Harris hereby state that I have read the U. S. Army
(print name)
Corps of Engineers permit for maintenance dredging in Newport Harbor, the
City of Newport Beach and orange County Harbors,Beaches and Parks District
(if applicable) permit for maintenance dredging and that I accept all the
provisions therein. Additionally I guarantee that the proposed dredging
will not occur because of any altering of existing use of the affected
zone.
Robert S. Schrimmer
(Applicant -type -name)
February 21. 1975
(Difte-) - -
Shellmaker. Inc.
(Contractor -type name)
Signed: �AT
Contractor's
Representative
CiTy OF NEWPORI�i MACH
HARROOR FE" M111"T
PERMISSION gs AND
UD
.7,
MAINTAIN' T"S
.4T -ln-m emn
T'H E HA',R, P- "Z 1,
ANY
10
1A
7 77
PERMIT NO. DATE
Grange
3 -1/0