HomeMy WebLinkAbout116-0814RICHARD K. SHOOREN & ASSOCIATES
Consulting Civil Engineers
12755 Brookhurst St. #203
Garden Grove, CA 92640
(714). 636-1620
PRODI1Cf.ZDFI N es 1w-, GMW, Mau Dun.
1r6-Jtf°
JOB KG-S. -61Lt 1N. bAq rv.:). LI
SHEET N0,
OF
CALCULATED BY DATE I - 1 0 - 10
CHECKED BY DATE
- eAhl! pc ash -89 -PC-kf.%rr* mn-8tti
,7WPORT REAC14
H A
AM L
TO
PERMISSION Is Z, Lr.
TH7
AT THE
THE HARS OR
ANY SPEC-M-L
US NOT
TPE CITY
RUGHTS
AND THIZ Z; CIO E.
IN ACCORDANCE V01011 1- 17
AT
-4 4k-.y
...........................
M, N . . yp
com* cf
CITY. ` �' NEWPORT BEACH .: HARBOR APPLICATION NO. ¢
i
w�r'S"'ttiri
iL7o Sa'i'Y.::s
TO
AT PEE ro-.,Z
HE
"HIE
Y
M^
¢¢ �.� � �i°n'4i�J
Mal,
B.a �.`" 1 � r✓ri 't a y �`5 �C4"p
,; t.r
tr' /a .rrn
°i.
RICHARD K. SHOGREN &. ASSOCIAr, :S
Consulting Civil Engineers
12755 Brookhurst St. Suite 203
GARDEN GROVE, CALIFORNIA 92640
(724) 636-1620
TO CITY OF NEWPORT BEACH.— Marine Dept.
70 Newport Pier
Newport Beach, CA
DATE
12/15/89
JOB NO.
225/524
ATTENTION
Tony Melum
RE:
Bulkhead Plans — Mack Lot
812 & 814 West Bay Av.
Newport Beach, CA
- P� --t '-za �V __ N
a
> WE ARE SENDING YOU ❑ Attached ❑ Under separate cover via the following items:
❑ Shop drawings ❑ Prints ❑ Plans ❑ Samples ❑ Specifications
❑ Copy of letter ❑ Change order ❑
COPIES
DATE
NO.
DESCRIPTION
2
12/15/89
Drawing No. C-1, Rev. A (Wet —Stamped)
2
12/15/89
it C-2 Rev. A 11
2
1 12/15/89
if C-3 Rev. A
1—set
Structural Calcs
1
Soils Report by: Petra Geotechnical, Inc.
THESE ARE TRANSMITTED as checked below:
❑ For approval ❑ Approved as submitted
❑ For your use ❑ Approved as noted
❑ As requested ❑ Returned for corrections
❑ For review and comment ❑
❑ FOR BIDS DUE 19
REMARKS
❑ Resubmit copies for approval
❑ Submit copies for distribution
❑ Return corrected prints
❑ PRINTS RETURNED AFTER LOAN TO US
COPY TO
SIGNED: mfh
PRODUCT 240.2 a Inc., Groton, Mass. 01471. If enclosures are not as noted, kindly notify us at once.
_J
PERMIT NO.
DREDGING APPLICATION
Project Location: 812 W. Bay Ave.
Cubic Yards to be Dredged: 222
Method of Dredging: Hydraulic Suction
Nature of Dredged Material: Sand/Silt
Disposition of Dredged Material: Haul to sea and dump at Latitude 33°31'42"N,
Longitude 117°5414811W
Method of Material Disposition: Barge to sea
Turbidity Control Method: Material to be contained in dump barge at
dredge site.
Effect of dredging on contiguous bulkheading and beaches None
I, LaVerne Harris , hereby state that I have read the U. S . Army
(print name)
Corps of Engineers permit for maintenance dredging in Newport Harbor, the
City of Newport Beach and Orange County Harbors,Beaches and Parks District
(if applicable) permit for maintenance dredging and that I accept all the
provisions therein. Additionally I guarantee that the proposed dredging
will not occur because of any altering of existing use of the affected
zone.
J. D. Mack
(Applicant -type name
12/20/83
(Date)
Newport Dredging Co.
Contractor -type name)
e
Signed:'-- "'I, � _
Contractor's
Representative
snf
C/ r Y of / il�a�ipd �r
�E'-4cf1
ti�
�r,.Lo;�_Beoch
1 UFO",
Ae
,•,ra •r,�
p O epceow� D
/ cww
a
i0 ,L
V I C I M I T Y S A:
E T C H ws,r Asrrr
T
222
/ Niwvowr 5AY, CAL aioRwA
. y i Jerry,
SoUr) d")95 ore e.roicssaad in !orb and adWOiff
dep /h s be/ow htcon LoaNaSr L o- B 340r. Mora►.ci a.
ron9e of r�'dc 4p,�Prwx,1,woiw/y' /O !m�m-1 Hcirbor 1,nc.5
are esiob/r'5hrd is /h:5 secil'on oyr'vewp~f Bar.
,
!
f
,f
ft
1
32
44
7
Z
! a 4 po e e ss ' Ll� lit)
4/�/
/r✓��uj1��� Olt OA e /Z%/.3
��
../o
fnpi I.'Ur•
y!
�!I!� f4
CITY OF NE PORT BEACH
H A R B GRI, P E R Ml 70:i
?ZRMISSION IS GRlJ',NT4%'D TO CONISTRUCT AN,
MAINTAIN THE FACUIATY REWERSE HERM,
-!�T THE SITE HIZDICATfEM, V S ON
THEE HARBOR PMFI��19'r F,":-,'i�IP40,RT REACH AN:
ANY SPECIAL C0R,aDl,VTlGrl-:7' PERM"
1-9 NOT
THE CVVY tnPlllZ.`liN-lllUi' t',0UM"'L. TH
V
AND THIS F2Mr4'kA" Sh]"''
IN ACCORDAN1�Z W.71-3'
cl-lid'y VS111Y, W tGQIRDINATO�,
-8-/
7=F
P IT, NO. DATE
SPECIAL cONDITIONS:
Corps 01 %c �'
PeTmit
oransz cou'OV Permit e-
ot er J��7
PERF,MT ISSUED SUBJECT TO
DREDGE Va-ITERIAL SEEING
Application No. 74-191 U. S. Army. Engineer District, Los Angeles
Name of Applicants a,Corps of Engineers
Effective Date 16 aanUary�1975 Los Angeles, California
Expiration Date 31 December 19.77
DEPARTMENT OF THE ARMY
PERMIT
Referring to written request dated 28 June 1974 for a permit to:
er orm work in or affecting navigable waters of the United States, upon
the recommendation of the Chief of Engineers, pursuant to Section 10 of the
Rivers and Harbors ,Act of March 3, 1899 (33 U. S. C. 403);
( ) Discharge dredged or fill material into navigable waters upon the issuance
of a permit from the Secretary of the Army acting through the Chief of Engineers
pursuant to Section 404 of the Federal Water Pollution Control Act (86 Stat.
816, P. L: 92-500);
( ) Transport dredged material for the purpose of dumping it into ocean waters
upon the issuance of a permit from the Secretary of the Army acting through
the Chief of Engineers pursuant to Section 103 of the Marine Protection,:
Research and Sanctuaries Act of 1972 (86 Stat. 1052; P. L. 92-532);
J. D. Mack
P. 0. Box 15427
Las Vegas, Nevada 89114
is herebyauthorized b the Secretary of the Arm to
Y Y Y� construct a pier, ramp
and floating dock I
n Newport Bay, Pacific Ocean
814 W. Bay Avenue, Lot 32, Tract 884, City of Newport Beach, Orange County,
California
n accor ante with the plans and drawings attached hereto which are incorporated
in and made a part of this permit on drawings:
J. D. Mack
Job No. 74007
Subject to the following conditions: 6/28/74
FORM
(ER 1145-2-304)
SPL I MAY 74 581 DER 1145-2-303) Page 1 of 5
< PREVIOUS EDITIONS ARE OBSOLETE
�s v R
IQELockj' in .,'
Tel ,,i. l�Is%%�ilG1V��� II o1.' -.�'� 7- C _•__ /��o/ Q�•� --- -
r 2 -
^3 O
VICI NI Tr SkETCH
j �a i✓��%%�'>`A+a� � Nswao�T 3.�ti� C.4[r�ou ntla yP '/ = .try
�4. ... _ 6"OU170"n95 nre e.( a
P Cssed /n Ice/ Ont-/ danofC
a'op�hs be%o+•v /Ncpr/ Lower. Low Wvter. Mor�.P.U.»
ron9e fldc OPprux/.no�o/j' .O /acf Norbo,-
Ore cafob/r;56Qd ii> "415 sccf.on o/a/cwPorf
-,I HO 414 4A
ni
1 L . f
7j.
Re-
Pfw--J. Cr
1 J 1 A.aPG L /41VT Al.d! i' r
1 .rl artE.19
T. General Conditions
(a) That ,all activities identified and authorized herein shall be
consistent with the terms, and conditions of this permit; and that any
activities not specifically identified and authorized herein shall'
constitute a violation of the terms and conditions of this permit which
may result in the modification, suspension or revocation of this permit,
in whole or in part, as set forth more specifically in General Conditions
j or k hereto, and in the institution of such legal proceedings as the
United States Government may consider appropriate, whether or not this
permit has been previously modified, suspended or revoked in whole or in
part.
(b)_ That all activities authorized herein shall, if they involve
a discharge or deposit into navigable waters or ocean waters, be at all
times consistent with applicable water quality standards, effluent
limitations and standards of performance, prohibitions, and pretreatment
standards established pursuant to Section 301, 302, 306 and 307 of the
Federal Water Pollution Control Act of 1972 (P. L. 92-500; 86 Stat. 816),
or pursuant to applicable State and local law.
(c) That when the activity authorized herein involves a discharge or
deposit of dredged or fill material into navigable waters, the authorized
activity shall, if applicable water quality standards are revised or
modified during the term of this permit, be modified, if necessary to
conform with such revised or modified water quality standards within'
6 months of the effective date of any revision or modification of water
quality standards, or as directed by an implementation plan contained
in such revised o.r modified standards, or within such longer period of
time as the District Engineer, in consultation with the Regional
Administrator of the Environmental Protection Agency, may determine to be
reasonable under the circumstances.
(d) That the permittee agrees to make every reasonable effort to
prosecute the construction or work authorized herein in a manner so as
to minimize any adverse impact of the construction or work on fish
wildlife and natural environmental values.
(e) That the permittee agrees that it will prosecute the construction
or work authorized herein in a manner so as to minimize any degradation
of water quality.
(f) That the permittee shall permit the District Engineer or his
authorized representative(s) or designee(s) to make periodic inspections
at any time deemed necessary in order to assure that the activity being
performed under authority of this permit is in accordance with the terms
and conditions prescribed herein.
(g) That the permittee shall maintain the structure or work authorized
herein in good .condition and in accordance with the plans and drawings
attached hereto.
(h) That this permit does not convey any property rights, either in
real estate or material, or any exclusive privileges; and that it does
not authorize any injury to property or invasion of rights or any
infringement of Federal, State, or local laws or regulations, nor does it
obviate the requirement to obtain State or local assent required by law
for the activity authorized herein.
(i) That this permit does not authorize the interference with any
existing or proposed Federal project and that the permittee shall not
Page 2 of 5
be;entit'led to compensation for damage or injury to the structures or
work authorized herein which may be caused by or result from existing
or future operations undertaken by the United States in the public interest.
(j) That this permit may be summarily suspended, in whole or in part,
upon a finding by the District Engineer that immediate suspension of the
activity authorized herein would be in the general public interest. Such
suspension shall be effective upon receipt by the permittee of a written
notice thereof which shall indicate (1) the extent of the suspension,
(2) the reasons for this action, and (3) any corrective or preventative
measures to be taken by the permittee which are deemed necessary by the
District Engineer to abate imminent hazards to the general public interest.
The permittee shall take immediate action to comply with the provision
of this notice. Within ten days following receipt of this notice of
suspension, the permittee may request a hearing in order to present
information relevant to a decision as to whether his permit should be
reinstated, modified or revoked. If a hearing is requested., it shall
be conducted pursuant to procedures prescribed by the Chief of Engineers.
After completion of the hearing, or within a reasonable time after issuance
of the suspension notice to the permittee if no hearing is requested,
the permit will either be reinstated, modified or revoked.
(k) That this permit may be either modified, suspended or revoked
in whole or in part if the Secretary of the Army or his authorized
representative determines that there has been a.violation of any of the
terms or conditions of this permit or that such action would otherwise
be in the public interest. Any such modification, suspension, or re-
vocation shall become effective 30'days after receipt by the permittee
of written notice of such action which shall specify the facts or conduct
warranting same unless (1) within the 30-day period the permittee is able i
to satisfactorily demonstrate that (a) the alleged violation of the terms
and the conditions of this permit did not, in fact, occur or (b) the
alleged violation was accidental, and the permittee, has been operating
in compliance with the terms and conditions of the permit and is able to .'
provide satisfactory assurances that future operations shall be in full
compliance with the terms and conditions of this permit; or (2)'within the
aforesaid 30-day period, the permittee requests that a public hearing be
held to present oral and written evidence concerning the'.proposed modifica
tion, suspension or revocation. The conduct of this hearing and the procedures f
for making a final decision either to modify, suspend or revoke this permit
in whole or in part shall be pursuant to procedures prescribed by the
Chief of Engineers.
(1) That in issuing this permit, the Government has'relied on the
information and data which the permittee has provided.in connection with
his permit application. If, subsequent to the issuance of this permit,
such information and data prove to be false, incomplete or inaccurate,
this permit may be modified, suspended or revoked, in whole or in part,
and/or the Government may, in addition, institute appropriate legal proceedings.
(m) That any modification, suspension, or revocation of this permit
shall not.be.the basis,for any claim for damages against the United States.
(n) That the permittee shall notify the District. Engineer at what time
the activity authorized herein will be commenced, as far in advance
Page 3 of 5
.of the time of commencement as the District Engineer may specify, and
of any suspension of work, if for a period of more than one week, re-
sumption of work and iL's completion.
(o) That if the activity authorized herein is not started on or
before 31st day of December 1975 , and is not completed on or before
31st day of December 19 77, this permit, if not previously revoked or
specifically extended, shall automatically expire.
(p) That.noattempt shall be made by the permittee to prevent the
full and free use by the public of all navigable waters at or adjacent
to the activity authorized by this permit.
(q) That if the display of lights and signals on any structure or
work authorized.herein is not otherwise provided for by law, such
lights and signals as may be prescribed by the. United States Coast
Guard shall be installed and maintained by and at the expense of the
permittee.
(r) That this permit does not authorize or approve the construction
of particular structures, the authorization or approvalof which may
require authorization by the Congress or other agencies of the Federal
Government.
.(s) That if and when the permittee desires to abandon the activity
authorized herein, unless such.abandonment is part of a transfer
procedure by which the permittee is transferring his interests herein
to a third party pursuant to General Condition v hereof, he must restore
the area to a condition satisfactory to the District Engineer.
(t) That if,the recording of this permit is possible under applicable
State or local law, the permittee shall take such action as may be
necessary to record this permit with the Register of Deeds or other
appropriate official charged with the responsibility for maintaining
records of title to and interests in real property.
(u) That there shall be no unreasonable interference with navigation
by the existence or use of the activity authorized herein.
(v) That this permit may not be transferred to a third party without
prior written notice to the District Engineer, either by the trans
feree's written agreement to comply with all terms and conditions of
this permit or by the transferee subscribing to this permit in the space
provided below and thereby agreeing to comply with all terms and conditions
'
of this permit. In addition, if the permittee transfers the interests
authorized herein by conveyance of realty, the deed shall reference this
permit and the terms and conditions specified herein and this permit
shall be recorded along with the deed with the Register of Deeds or other
appropriate official.
I
Page `4 of 5
-]lix
TO THE PERMITTEE
Please make all reports re status of work under this instrument, direct to the District Engineer, Department of the
Army, Los Angeles 'District. Corps of Engineers, P.O. Box 2711, Los Angeles, California 90053.
The attention of the applicant is directed to the conditions of the permit, which specify that the District Engineer
shall be notified as to the date of commencement, the dates of suspension of the work, and date of completion.
If it is anticipated that the work will not be completed by the date of expiration, application should be made to the
District Engineer, well in advance of that date, for extension of time to continue the work, provided that there has
been no change in the attendant circumstances.
The following forms are attached for your convenience, and it is requested that the appropriate one bp completed
and returned to this office as work progresses. (Extra copy is for your record.)
-- -- - - - - -- (cut on line)
Subject: Completion of work under. Department of the Army permit. (Date)
District Engineer, Corps of Engineers, Department of the Army, Los Angeles, California
In compliance with the conditions of the permit dated 19___ for
--- this is to notify you that such work was completed on _--_- ---�- 19
'-(Po+saittoo) M-------------Address)------ ^---------
Signed: ------------- -
-----
--- - -- -- - - -- -- -- -!(out on line)
19
Subject: Resumption of werit under Department of the Army permit.
C )
To: District Fxgineer, Corps of Engineers, Departmnt of the Army, Los Angeles, California
In compliance with the conditions of the permit issued _�—____, 19_-_for _---__—---
- —_—_—„- this Is to nottfy'ycu that work will be resumed on _— 19 _--
--------- ---- --7AWe Te )------------------_�-------
Signed: --------- ........... ----- -
-- ----- - - - - -- -- ----- - - - - ----- - - - - -- --- - - (cut on line)
19
Subject: Nap enslan of work under Department of the Amy permit.
er s i Engineers, of e A L s Angeles, California
To: DistrictEngineer, Corp o Engin th my, o Ange ,
In compliance with the canditians of the permit issued , 19—__ for j
th1A is to notify you that work will be suspended * for _.... days, beginning
_, (s If for sore than 1 uveh)
Signed:--_—_-� -- -
-- -- - - ----------------- - - - - -- - - -- - - - - -- (cut on, line)
( Date) Subject: Co:mnencemert of wont under Department of the Army permit.
To: District Engineer, Corps of Engineers, Department of the Ariry, Los Anooles, Call fornia
In compliance with the conditiona of the permit issued----__— 19 __—for —__
this is to notify you that the authorized work will be camasetic0d
LA FL 2.25
„a 8:gtned: _
------
d3 PERMITTEE
Please make all reports re status of work under this instrument, direct to the. District Engineer, Department of the
Army. Los Angeles District. Corps of Engineers, P.O. Box 2711, Los Angeles, California 90053.
The attention of the applicant is directed to the conditions of the permit, which specify that the District Engineer
shall be notified as to the date of commencement, the dates of suspension of the work, and date of completion.
If it is anticipated that the work will not be completed by the date of expiration, application should be made to the
j
District Engineer, well in advance of that date, for extension of time to continue the work, provided that there has
been no change in the attendant circumstances.
The following forms are attached for your convenience, and it is requested that the appropriate one be completed.
and returned to this office as,work progresses. (Extra copy is for your record.)
-- -- ------- - - -- ---------- -- - - -- - (cut on line)
Sabject: Completion of work under Department of the Arley permit. (Date)
District Engineer, Corps of Engineers, Department of the Army,,.. Los Angeles, California
In compliance with the conditions of the permit dated _ _—• 19--- for ---------
-_�-- — — this is to notify you that such work was completed on --__-_-- -- 19
�Pe+stti t to a)-------------� Address) --------------------
Signed: -------------- ---------
-- - - -- -- -- - - - -- - - - - -- (out on line)
Subjectt Resumption of wnrlt under Department of the Army permit. r )
'Ton District Engineer, Corps of Engineers, Departrient of the Army, Los Angeles. Caiifemia
n em liance with the conditions of the rm1 t Issued
e i s L w w -- — - it
-----------_--� this to no I fy you that work ill be resumed on -- -_-.._— 19 _
-• --------------- -- --
- Si geed•------------- ---._------.._
-- -- ---- - - - - -- - - - - -- - -- - ----- - - - - -- -(cut on I{ne)
I9_
AiDlectt :iyapenslot of work under Department of the Army permit.
To: District Engineer, Corps of Engineers, Department of the Army, Los 'Angeles, California
In compliance with the conditions of the VemIt Issued 19 for
----��__-__— this is to notify you that work will be suspended +' for days, beginning — 19e -. !s if for sore that 1 uweh)
#�eaeaT;
SI geed: --- ---- --
-- - ---- -- - - -- - - - ----- - - - - -- - ------- (cuton lino)
------
--- — 19--_
Subject., Commencement of work under Department of the Army permit. Dote)
To; District Engineer, Corps of Engineers, Department nf the Army, Los Angeles. California
In compliance with the conditions of the permit issued ----__— 19 __—for __
this is to notify you that the authorized work will be ccmm emcee
LA FL 225
h �a Si ed:
s 1 i^
w
^n
LIFOP '
Coast conservauoo COM MOSMn
Construction of a new dock and ramp and relocation
Project Name of existing dock and ramp on adjacent lots.
Newport Beach
�'��;��'• � ��.ao $12,„ and. $14 W. Bay Avenue, wp
September 29 1974 Mo. P-7-11-74-3613
MUST BE POSTE® PROMINENTLY
AT CONSTRUCTION SITE
Melvin J. Carpenter
Executive Director,
South Coast Conservation Commission �
i ,III
age
Lnd Permit P
II
V.
VI .
r, ;
Whereas, at a public hearing held on 11ttgi_i.: t 19, 1971.,.
date
at Long Beach by a unanimous vote here --
location
by approves the application for Permit Number P-7-11-74-3613
pursuant to the California Coastal Zone Conservation Act of
1972, subject to the following conditions imposed pursuant to
the Public Resources Codes Section 27403:
None
Said terms and conditions shall be perpetual and bind all future
owners and possessors of the property or any part thereof unless
otherwise specified herein.
The grant of this permit is further made subject to the following:
A. That this permit shall not become effective until the attached
verification of permit has been returned to the South Coast
Regional Conservation Commission upon which copy all'permittees
have acknowledged that they have received a copy of the permit
and understood its contents. Said acknowledgment 'should be
returned within ten working days following issuance of this
permits
B. That said development is to be commenced on or before 360
days from effective date of issuance.
Therefore, said Permit (Standard,,MffffXXJ No. P-7-11-74-3613
is hereby granted for the above described development only, sub-
ject to the above conditions and subject to all terms and pro-
visions of the Resolution of Approval by the South Coast Regional
Conservation Commission.
Executed at Long Beach, California on behalf of the South Coast
Regional Conservation Commission on September 2 , 1974 •
M.J. Ca me
Executive Director
IzNIA COASTAL ZONE CONSERVATION mCVi�I�;�iS OSION
SOUTH COAST REGIONAL CONIMISSION
666 E. OCEAN BOULEVARD, SUITE 3107
G;
P.O. BOX 1450
LONG BEACH, CALIFORNIA 90801
W
(213) 4.16-4201 (714) 846-0648
RESOLUTION OF APPROVAL AND PEP2� T
Application Number: P-7-11-74-3613
Name of Applicant: J.D. Mack
$12 W. Bay Avenue, Newport Beach 92660
6
Permit Type: Q Standard
Ii
[] Emergency
3
Development Location: 812 and 814 W. Bay Avenue, Newport Beach
i
Development Description: Construction of a new dock and ramp and
relocation of existing dock and ramp on adjacent lots.
Commission Resolution:
I. The South Coast Conservation Commission finds that the proposed
J
developments
A. Will. not have a substantial adverse environmental or ecolog-
ical. effect.
B Is consistent with the findings and declarations set forth
.
in Public Resources Code Sections 27001 and 27302•
•
I,
C. Is subject to the following other. resultant statutory pro-
i
visions and policies:
City of NeERort Beach ordinances
1
D. Is consistent with the aforesaid other statutory provisions
l
and policies in that
approval in concept has been issued
E. The following language and/or drawings clarify and/or facil-
Coast Regional
itate carrying out the intent of the South
Zone Conservation Commission:
application, site map, plot plan and approval in concept
I, L
ROLL CALL \
... 4
r
`\����� August 12, 1974
;NCEx
II. The public improvements constructed in conjunction Tract 8v
with Tract No. 8094 (Lido Park Condominiums),
located on the northeasterly side of Lido Park Drive,
and in conjunction wit'n Use Permit No. 1620, were
accepted; and the City Clerk was authorized to release!;
the Faithful Performance Bond and to release the
Labor and Materials Boyd i:h six months provided that
no claims have been filed. (A report from the Public
Works Director was presented. )
12. The installation of terr_porary banners and signs in City Arta;
Ivarious locations throughout the City to advertise the Festival'
City Arts and Music Festival sponsored by the City
Arts Commission to be held September 21. (A report
from the City Arts Commission was presented. )
j13 The following harbor Permit was approved, subject ar,3
to the prior approval of the U.S. Army Corps of Per:=:i s
Engineers and to the applicant obtaining permits
for any plumbing, electrical and fire protection
installations from applicable City departments:
14.
Application of J. D. Mack for revision to Harbor
Permit Nos. 116-812 and 116-814 to replace one
standard "U" shape float with a 6' wide x 57' long
float at 812 West Bay Avenue and to replace an
existing rectangular float with a new 8' wide by
61' long float at 814 West Bay Avenue. (A report
from the Marine Department was presented. )
The following maintenance dredging harbor permit
application, were approved, subject to the conditions
of approval under the Blanket Maintenance Dredging
Permit issued by the U. S. Army Corps of Engineers:
#¢151-1209, Robert Webb, 1209 North Bay Front;
#116-816, Marie Monaco, 816 W. Bay Avenue. (A.
report from the Marine Department was presented. )
� ITEMS REMOVED FROir/i THE CONSENT CALENDAR:
I I i i
i'viOtio i
ryes �xi�xlx�x'!,x!xjx'
-V
i
_1arbo.r
Pc rrnit /
Dredging
A report from the Co nmunity Development Departmen4 S c;recrest
regarding the estate s-_-I went of the name of the alley Lang
between Seaward Road and Morning Canyon Road as
"Shorecrest Lane, '' parelleling the north side of East
Coast H4-::wwy in Corona del Mar, was postponed to
August 26.
A _ i�� '�r�+.. •�. ,{-rn stir} .-�.n.�-„rliv±.`r ^r_.... �.. ?.'., �n .r._�.
MARINE DEPARTMENT
August 12, 1974 ITEM NO.: H-13 (b)
TO: MAYOR AND CITY COUNCIL
FROM: Marine Department
SUBJECT HARBOR PERMIT APPLICATIONS #116-812 AND #116-814
BY J. D. MACK TO REVISE EXISTING FACILITIES AT
812 AND 814 WEST BAY AVENUE
Recommendation
If desired, approve the Harbor Permit Application subject to:
1. The approval of the U. S. Army Corps of Engineers.
2. The applicant obtaining permits for any plumbing,
electrical and fire protection installations from
applicable City Departments.
Discussion
City Council approval is required under Section 5 paragraph B
which states;
"Prior approval of the City Council will be required before
the Marine Department.may issue any permit that does not
conform to the standard harbor drawings and the adopted
Harbor Permit Policies".
The proposed floats differ from the standard drawings only in
configuration, not in structural design.
The proposed revisions will replace one standard "U" shape float
with a 6' wide x 57' Tong float at 812 W. Bay and will replace
an existing rectangular float with a new 8' wide by 61' long
float at 814 W. Bay.
The applicant for both of these City harbor permits is the same
individual. He owns both parcels of contiguous upland property
at 812 and 814 West Bay. Each upland lot has a dwelling unit on
Page. Two
the lot and are independent of each other. This is the reason
that this subject Harbor Permit is being processed as two harbor
permits rather than a single application. If both lots were
combined as one parcel with one dwelling, the applicant would be
restricted by the Council's Harbor Permit Policies from maintain-
ing two pier and float structures.
R. E. REED, DIRECTOR
-- b
D. Harshbarger
Assistant Director
Marine Department
DH•GEW:1f
U. S. Corps of engineers
Post Office Box 2711
Los Angeles, California 90053
Attention: Waterways Control Section.
Subject: Harbor ,Permit Application No.
Dear Sir:
I hereby request a U. S. Corps of Engineers` Permit for the
construction and installation of a revised dock
and appurtenances thereto, to be loc`atea in Newport stay, naywara of
mot No. 32 , Block No. - f Tract 884 , Newport
]6e'ach, Cal rornia. I am tre owner of 4EHe aforementioned property, an'
x 17.,ve made application for a Ha--bor Permit to the City of Newport Baac
T.e adjoining property owners are:
Loy 33 , Block -
J. D. Mack
812 W. Bav Ave.
Newport Beach, Calif.
Date _ 6 28/74
Enc.Plans dated 6/28/74
3 Sepia
7 copies
Lot 308,31 , Block -
Trac —$84
Salvatore R. Monaco
816 & 818 W. Bay Ave.
Newport Beach, Calif.
Respec fully submitted,
J. D. Mack
812 W. Bay Ave.
Newport Beach
CITY Or NEWPORT BEACH APPROVAL
The harbor and Tidelands Adrainistrator of the City, of Newport Bear^.,,
has reviewed Harbor Permit application by �/J �r �A,/, ,. �i
and subject to the approval of the U. S. Corps of Engineers, wilt issUe
Harbor Permit No. %/ ,j
D`.* iia -shbarger, Captain
Date Marine Safetv Department
CC:
U. S. Corps of Engineers
Post Office Box 2711
Los Angeles, California 90053
Attention Waterways Control Section
Subject: Harbor Permit Application No.
Dear Sir:
I hereby request a U. S. Corps of Engineers' Permit for the
construction and installation of a revised boat dock
and appurtenances thereto, to be located in ewport ay, aywar of
Lot No. 32 , Block No. - , Tract 884 , Newport
Beach, CaaT arnia. I am t e owner of the aforimen oned property, and
I have made application for a Harbor Permit to the Ci.ty'of Newport Beach.
The adjoining property owners are:
Lot 33 , Block Lot , Block
Tract 884 Tract �` 84
J. D. Mack
812 W. Bay Ave.
Newport Beach
Date 7/15/74
Enc.a Plans dated 6/28/74
3 Sepia
7 copies
Salvatore R. Monaco
816 W. Bay Ave.
Newport Beach
yJRespetfu y submitted,
D: Mack
814 W. Bay Ave.
Newport Beach
CITY OF NEWPORT BEACH APPROVAL
The Harbor and Tidelands Administrator of the City of Newport Beach
has reviewed Harbor Permit application by
and subject to the approval of the U. S. Corps of Engineers, will issue
Harbor Permit No.
Date
D. Harshbarger, Captain
Marine Safety Department
CC:
Q'ro
TITLE INSURANCE
AND TRUST
June 19, 1974
City of Newport Beach
3300 West Newport Boulevard
Newport Beach, California
Re: Our Escrow #LV-150818-N
Gentlemen:
We are enclosing herewith our check to your order in the
amount of $50.00 together with the application for transfer
of permit signed by Dale Mc Coig and HarrietMc Coig as
transferers, and Jerome D. Mack, Trustee and Transferee.
Would you please process this permit and forward the copy
of the application signed by the City Harbor Coordinator,
when approved, to Mr. Mack, C/O Valley Bank of Nevada,
113 South Fourth Street, Las Vegas, Nevada, 89101.
If there are any questions or problems or, additional require-
ments in connection with this, please advise.
Very truly yours,
Norma Wadsworth
Manager, Escrow Department
NW:ss
Encls.
Title Insurance and Trust Company 309 South Third Street P.O. Box 890 Las Vegas, Nevada 89101 702 385 5566
ATICOR COMPANY
Iv
.. . .......
,/Vz
F4
ViCiNH7Y S K rE TC 1w,
XZWP02T ZAY, CALiFORNiA
Zr. A
Cal /Z7 /'CC,"
C7,7
t7"
STATUS SHEET
HARBOR PERMITS
TRANSFER
Location Permit #
Date Application Received Fee Rec' d
Request for Inspection
Escrow Co.. r j'r� Date
—/—/ ate Inspection Made
Date Deficiency Letter Sent (if applicable)
Date Deficiency Corrected (if applicable)
Date Orange, County Notified (if 'applicable)
�%- .-`74'--Date Transfer Completed
STATE OF CALIFORNIA RONALD REA"N.
o -
CALIFORNIA COASTAL ZONE CONSERVATION COMMISSION 1':{
SOUTH COAST REGIONAL COMMISSION
666 E. OCEAN BOUXEVAAD, SUITE 3107
P.O. BOX 1450
LONG
4364201 CALIFORNIA 4"6 a1 Julp 29, 1974
NOTICE .OF PU3LIC HEARING
Pursuant to order of the California Coastal Zone Conservation
Conmission, notice of public hearing is hereby given. Said publiq
hearing is scheduled on the August 19, 1974 Agenda for
application for Permit, Number P-7-11-'74-3613
*# as submitted by. J.D. Mack
The subject request is to permit Construction of a new dock and
ramp and relocation of existing dock and ramp on adjacent lot .
at
$12 & 814 W. Bay Ave., Newport Beach
Said agenda public hearings will commence at 9:00-a.m..
on August 19, 1974
at Harbor Department Administration Building
925 Harbor Plaza Drive, Long Beach_- Board Room" Sixth Floor
during which time all persons either favoring or opposing the
application will be heard. Any written correspondence regarding
the application should be directed to this office prior to the hear
ing date.
All interested individuals who wish additional information may con-
tact this office.
``�``� �
A CAL
M. J. C pant
Executi�"e Director
*** FOR APPLICANT ONLY...
COPY. OF THIS NOTICE IS TO BE PO
)TED ON SUB
AUMpYYpyYgM1'ic
,
H i
lft
�1r� ��yA Wuti
O c i
SS7 i� lS911
Ul18US)Ud
N
r,
0
00
a
N
Ln
c
N
z m
00
M
(Lr
►--1
Q
a0w
d
u
U—
U
Z
o o
Q m
co
U
$
m
0
a
�
�
z
0
4
y0
P
G
.1117
JOB V'1LaGV, KGS. _f51`� YJ'•
L`? �f OV.p. oco�'�f5c7`�
RICHARD K. SHOGREN & ASSOCIATES
I
Consulting Civil Engineers SHEET NO.
OF
12755 Brookhurst St. #203 CALCULATED BY
DATE- � o - 10
Garden Grove, CA 92640
(714) 636-1620 CHECKED BY
DATE
ae)Li -89
� R m�T �t�-8tti
fop 0%a'!p///6 ZOl SLdB:Eb.f9�OO
I
.... .... ...: ............ ......... .....: .....(........., .... ... ....
i MOP
... .. ...........
�- .41 5772�29, 0 E. se.
..._
.
............. :.............. .........
=00
SS
................................... ...... ..', .. ....'; . ... .... ......_............
,i {.' ..� ..
77
.....
.... . ,........ ... .............
' 6LxK l+b=L
.
�
........: ..:. ..
... ....
l _ i✓61J }/oJ E
............._......................
pr oJ�aa}
o
;
.....' .......................
..:..
....... ..
...
.....
; o
a
:
........; ... :.......
..,
.... .
.... ........ ..,.., _ a ;.
> .
W
..................... .....
_.....................:.. ..... ..
!.
.............. :............................ :... ...,... .......,
....... ... ........
,,.,, ..:,
1.
...... ..
...... ..
....
..
... ..
.......
.... .... ........ .. ..... ....
�,
n
..
......., .,.... .... .... `L,...s .- .:
L....... ..
.... ....
.... ........ .... .... ,..... . .. .,.. ................_.,..,... ......... .. ..
P
i
...
1..............................................
4yEN
.!/E :,
.. _' '.
......
..... .. ,. .. .. .,... ...... ... .. .,,... .... ..
...... ..... .. ... ................... .. ..:....... .... ......... :, ....... :, .......,.,, 0.. .,.. ....
... .. ......... ......
SGoFE C3F . .
Wa{Z(c :... F3 f+d tnd GC1 t G .. r T'C) CX(VrING..S�tE .TPsLE,..
. ..
q
', ', f-�LiPa N�tnf G�1+3C.12'-C.Tt�: .`"il���• .
_
rxooucr2D4.1 � Inc, GMW, Mm 01471
6M R" { ' w d � ID'" Y� 1 R BEACH
� g9 CTRM
PERMISSION is
AT TRF ails �e }' , tr S� a .
THE HAREO� 6aE a r.
ANY SP-Fc-W.L
is NOT
TJ4E CITY
i
RIGHTS
AND THIS
IN ACCOid63ANCZ i`Gw 0 71TLf AT itiMi.��i rvis^ , s+,ter LvOE,'
°', 0.—
1
CITY�A��a" �aa .wr �� ar:�C,a�
�h.i .y � V[r r�' �' _'
i1bf.• Z g®'
eF e L...................................
S-"�&ax�A a N
F°"C3�'iQ�ra rCoiN.".i9?'Fr^IR,,R..
B m F'L.
corps �r
!� y
_2410 Newport Boulevard TRAUTWEIN
BROTHERS
Newport Beach, Calif. 92660
GENERAL ENGINEERING CONTRACTORS
Contractors License No. 258975A
Phone (714) 673-1960
To• J. D. Mack
Dear• Mr_ Mack•,
FLOATS AND BULKHEADS
PIERS, PILE DRIVING, ETC.
RECEIVED
MAY 3 1974
South Coast Regional commission
Enclosed please find our quotation to you on your
proposed project at 812 W. Bay Ave.
If the quotation is agreeable to you, please sign the
original and return it to us as soon as possible with
your check for the applicable down payment. Retain
the carbon copy for your records.
For your convenience and to expedite the processing
of the permits, etc. that are necessary to the above
project, I can sign for you as your agent on all such
documents. If this is your desire please endorse below.
I authorize you to act
Sincerely,
TRAUTWE BROTHE
Y t
Sa`tft Kniss
my age t on the above pr j�ect.
S ignatu-xe ^
Date