Loading...
HomeMy WebLinkAboutM2006-0012CITY of NEWPORT BEACH I uj TO L.B. L'L- 80' 201 - - a - r co c/? ZD +11.0' :D NE ZD P I E R W. T 0.00, SITE BAY IPPIE P/c ol 2.0 3.00' 7.01 IML SCALE IN MILES PROFILE V ICINITY MAP 1 30, I.NEWPORT HARBOR, CALIFORNIA NOTES: 1) MOVE GANGWAY ZEAST 2) ADD 14"CONCRETE ANCHOR PILE 2.0' HARFIBOR RESOURCES DW. CITY OF NEWPORT BEACH '—'—L OP—ASS MSPECT�lr','N VNO EE�:L:�GRASS WITHIN 160F PROIJECT I I M(Ga ,�ASS I EFROJECTAREA C I C." = --- -- SIGISLATURE �3'2— 6 - 18"—� 8- � 9- P EIR f�d IT $ 30' APPLICANTS NAME -LARRYBUCKELEW JOB ADDRESS 1432 WEST BAY AVE. RACT 626 B LO C K 1 S.J.13. LOT 4 ONTRACTOR D A T E 12/05 WORKSHEET FOR BUILDING / FIRE PERMIT APPLINNOR RESOLIFICES DIV. CITY OF NEWPORT BEACH CITY OF NEWPORT BEACH BUILDING DEPARTMENT f I=A-ql= PRINT nR TVPF= w l.'PROJECT ADDRESS (NOT MAILING ADDRESS) FLOOR SUITE NO. I �- ?, - —` UJe5i Q--,as,� LEGAL DESCRIPTION No. UNITS LOT 4 BLOCK TRACT (0 -2- (p 2. DESCRIPTION OF WORK 0—,�5,p i USE C1.0 ek NEWXCJ-1 ADDF-1 ALTER E] Check Appropriate Box for ADr)licant DEMO E] # OF STORIES VALUATION 4L04 —c --b SQ FT (NEW/ADDED/EXTG) F] 3. OWNER'S NAME LAST FIRST '> U C- ('-- Z L eAJO OWNER'S ADDRESS OWNER'S E-MATADDRESS ----a CITY STATE ZIP PHONE NO. + R-a a -c -k * 4. ARCH ITECT/DESIGNER'S NAME I -AST FIRST LIC. NO. S 4- o- v--, - R> cA-v- Y—vft I ARCH ITECT/DESIGNER'S ADDRESS ARCH ITECT/DESIGNER'S' E-MAIL ADDRESS 14 7 CITY STATE ZIP PHONE NO. f -2- (o,5- 7 &1 & . 4D * 5. ENGINE5R'S NAME LAST FIRST N2 ACH CITy C* ENGINEER'S ADDRESS ENGINEER'S E-MAIL ADJOIF1 7 Z0005 CITY STATE ZIP PHONE NO. * 6. CONTRACTOR'S NAME BUSINESS LIC. STATE LIC. No. Class CONTRACTOR'S ADDRESS CONTRACTOR'S E-MAIL ADDRESS CITY STATE ZIP PHONE NO. OFFICE USE ONLY Lor - PERMIT NO, a: 11 TYPE OF CONSTRUCTION PLAN CHECK NO. PLAN CHECK FEE $ OCCUPANCY- GROUP PLAN CHECK ENG. HARBOR RESOURCES DIVISION 829 Harbor Island Drive Newport Beach, CA 92660 949-644-3034 / Fax 949-723-0589 Pier Permit Conditions April 5, 2006 Property Address: 1432 W. Bay Ave., Newport Beach, CA With reference to the plans currently under consideration to reconfigure or modify the dock system, the following conditions will now be in effect on the above referenced pier. 1. The pier permittee is aware of the Harbor Permit Policies and Chapter 17 of the City of Newport Beach Municipal Code. The pier permittee understands that the above referenced pier is under the purview of these Policies and Codes. 2. Any future work on the above mentioned pier requires permits with the City of Newport Beach and any other applicable agencies. Painting, replacement of rub rails and work considered to be cosmetic in nature does not require a permit. 3. The conditions set forth in this document pertain to the current, proposed dock system under consideration. Any future modifications or alterations to the dock system may require new conditions which may override or change these conditions. These conditions supersede all past conditions associated with this property. 4. Only marine oriented uses are allowed on the pier, pier platform, gangway and float. Patio furniture, plants etc ... are not permitted. 5. The side property lines extend in the water along their same bearing. No moored vessel shall encroach on these lines. 6. The dock float will be permitted to extend to, but not cross the U.S. Pierhead Line. 7. A moored vessel may not extend beyond the end of the fingers by more than the width of it's beam. 8. The maximum beam of a vessel that is permitted to side tie to the westernmost side of the float is 18'. 9. The maximum beam of a vessel that is permitted to side tie to the easternmost side of the float is 9'. A) Mike Ure, r Resources Date Applicant Signature Print Name Date Joint Pier Applicant Signature (if applicable) Print Name Date HARBOR RESOURCES DIVISION 829 Harbor Island Drive Newport Beach, CA 92660 949-644-3034 / Fax 949-723-0589 Pier Permit Conditions April 5, 2006 Property Address: 1432 W. Bay Ave., Newport Beach, CA With reference to the plans currently under consideration to reconfigure or modify the dock system, the following conditions will now be in effect on the above referenced pier. 1. The pier permiftee is aware of the Harbor Permit Policies and Chapter 17 of the City of Newport Beach Municipal Code. The pier permiftee understands that the above referenced pier is under the purview of these Policies and Codes. 2. Any future work on the above mentioned pier requires permits with the City of Newport Beach and any other applicable agencies. Painting, replacement of rub rails and work considered to be cosmetic in nature does not require a permit. 3. The conditions set forth in this document pertain to the current, proposed dock system under consideration. Any future modifications or alterations to the dock system may require new conditions which may override or change these conditions. These conditions supersede all past conditions associated with this property. 4. Only marine oriented uses are allowed on the pier, pier platform, gangway and float. Patio furniture, plants etc ... are not permitted. 5. The side property lines extend in the water along their same bearing. No moored vessel shall encroach on these lines. 6. The dock float will be permitted to extend to, but not cross the U.S. Pierhead Line. 7. A moored vessel may not extend beyond the end of the fingers by more than the width of it's beam. 8. The maximum beam of a vessel that is permitted to side tie to the westernmost side of the float is 18'. 9. The maximum beam of a vessel that is permitted to side tie to the easternmost side of the float is 9'. Signature: Mike Ure, Harbor Resources Date nature '"" Print Name Date Joint Pier Applicant Signature (if applicable) Print Name Date HARBOR RESOURCES DIVISION 829 Harbor Island Drive Newport Beach, CA 92660 949-644-3034 / Fax 949-723-0589 APPROVAL IN CONCEPT APPROVAL IN CONCEPT BY THE CITY OF NEWPORT BEACH as required for permit application to the South Coast Regional Commission pursuant to California Administrative Code, Sections 13210 and 13211. General Description of Proposed Development: Remove and replace existing dock system and 5 piles. Install new 8'x 51'finger float with 3 pile, 4'x 24' gangway and 1 O'x 14' platform with 2 T -piles. Address number must be stenciled on at least 1 bayward.facing pile. Fier conditions must be signed by applicant prior to final approval. jProperty Address: 1432 W. Bay Ave., Newport Beach, CA Legal Description: Harbor Permit Number: 118-1432 1131an Check Number: 1584-2005 jApplicant: Larry Buckelew Applicant's Mailing Address: 1432 W. Bay Ave., Newport Beach, CA Phone Number: (949) 642-2674 I have reviewed the plans for the foregoing development including: 1. The general site plan, including any roads and public access to the shoreline. 2. The grading plan, if any. 3. The general uses and intensity of use proposed for each part of the area covered in the application. Page 1 of 2 And find They comply with the current adopted Newport Beach General Plan, Zoning Ordinance, Subdivision Ordinance and any applicable specific or precise plans or, o That a variance of exception has been approved and final. A copy of any variance, exception, conditional use permit or other issued permit is attached together with all conditions of approval and all approved plans including approved tentative tract maps. On the basis of this finding, these plans are approved in concept and said approval has been written upon said plans, signed and dated. Should Newport Beach adopt an ordinance deleting, amending or adding to the Zoning Ordinance or other regulations in any manner that would affect the use of the property or the design of a project located thereon, this approval in concept shall become null and void as of the effective date of this said ordinance. In accordance with the California Environmental Quality Act or 1970, and state and local guidelines adopted hereunder, this development: X Has been determined to be ministerial or categorically exempt. o Has received a final Exemption Declaration or final Negative Declaration (copy attached). o Has received a Final Environmental Impact Report (copy attached). All discretionary approvals legally required of Newport Beach prior to issuance of a building permit have been given and are final. The development is not subject to rejection in principal by Newport Beach unless a substantial change is proposed. This concept approval in no way excuses the applicant from complying with all applicable policies, ordinances, codes and regulations of Newport Beach. See attached conditions to the pier permit. Tom Rossmiller, Manager, Harbor Resources re: Mike Ure, Harbor Resources April 5, 2006 Attachments: Worksheet for Building Permit Application Drawing Pier Conditions Page 2 of 2 .-CITY of NEWPORT BEACH f uj lui TO L. B*. U.11 .Z, 80, m c'? +11.0, C/i wp P I E R T 0.00, P,4 C/ SITE BA.Y PIE M 1 W. P/c 2.0011 3. 0' It 0 :�-7-0' 8,0��, 0 IML I . loll SCALE IN MILES PROFILE VICINITY MAP. ill 301 NE W P'O R T HARBOR, CALIFORNIA HARBOR RESOURCES D1 NOTES: CITY OF NEWPORT BEACH 11) MOVE GANGWAY ZEAST EEL GRASS MSPECT M MINO EEL GRASS WITHIN 160F PROJECill' 2) ADD 14"CONCRETE ANCHOR PILE 0 �PR SINT OJECTAREA .SIGNATURE iffi:1 fl L �� 2 1 0' 18-'-� 8'�- 9'A PERMIT # DATE 71 80' it f NEW PILE 24'� 14'1 1 30' 35' 5' SITE� SJ.13. APPLICANTS N . AME LARRY BUCKELEW; TRACT 626� B L.0 C K A L'O T 4: POB ADDRESS W2 WEST BAY AVE. CONTRACTOR DATE 12/05 Y of NEWPORT BEACH I Lu I.Lu 80' )20 3: �a- a- C/� +11.0, :5 ZD i�!, 2.00'11 1 3.00' PROFILE 0.00, M.L.L.W. 8.50' 1 " = 30' rO L.B. NE Wp P I E R P Cl r� TE BAY )A c/p, c PI E 0 C IML I SCALE IN MILES VICINITY M�AP -NEWP ORT HA , BOR, CALIFORNIA NOTES: EEL GRASS INSPECTION NO EEL GRASS WITHIN 15'OF PROjEG`[ 1) REMOVE AND DEMOLISH EXISTING Cl EE GRASS I )HE PROJECTAREA PIER, GANGWAY, SLIP FLOAT AND 5 - PILES. vj� 2) INSTALL NEW "8'X 51'FINGER FLOAT SIGNATURE WITH 3 - PILES, 4- X 24- GANGWAY AND 1 O'X 14'PIER PLATFORM WITH 2 - T -PILES. L o Ly5 PERMIT # DATE 7- 20' 18"-� 8' 9--A - HARBOR RESOURM DIV. \kNPORT BEACH �, � 45,� QITY OF NE F�- Li L �24' 4-1 a IT 1 30' A 35' 2f 161 1 SITE' S.J.B APPLICANTS NAME LARRY BUCKELEW TRACT 626 BLOCK LOT 4' JOB ADDRESS 1432 WEST BAY AVE. CONTRACTOR D A T E 12/05 STATE OF CALIFORNIA - THE RESOURCES AGENCY CA LIFORNIA COASTAL COMMISSION SOUTH COAST DISTR.ICT OFFICE P 0 BOX 1450 200 OCEANGATE 10TH FLOOR LONG BEACH, CA 90802-4325 (562) 590-5071 ARNOLD SCHWARZENEGGER, Govemor WWI , Di AMENDMENT TO COASTAL DEVELOPMENT PERMIT Date: May 18, 2006 Permit Application No.: 5-05-381 -Al Issued to: Larry Buckelew for: Demolish and remove existing pier, gangway, U-shaped slip float and five piles and replace with new 8'x 51'finger float with three piles, 4'x 24'gangway and 10'x 14' pier platform with two "T" piles. at: 1432 W Bay Ave, Newport Beach (Orange County) has been amended to include.the following changes: Move location of proposed gangway two feet east and installation of one additional 14 inch diameter, concrete anchor pile (bringing the total number of anchor piles to four). This amendment was determined by the Executive Director to be immaterial, was duly noticed, and no objections were received or the Commission concurred with the Executive Director's determination of immateriality (Sec. 13166 (b)(2)). This amendment will become effective upon return of a signed copy of this form to the South Coast District Office. Please note that the original permit conditions are still in effect. Sincerely, PETER M. DOUGLAS Executive Director By: Meg Vbughn Coastal Program A40 ACKNOWLEDGMENT I have read and understand, the above amendment and agree to be bound by its Conditions and the remaining conditions of Permit No: 5-05-381. Date: Signature: AM ENDMENT TO COASTAL DEVELOPMENT PERMIT Date: May 18, 2006 Permit Application No.: 5-05-381 -A I Page 2 of 2 STANDARD CONDITIONS: 1. Notice of Receipt and Acknowledgment. The permit i s not valid and development shall not commence until a copy of the permit, signed by the permittee or authorized agent, acknowledging receipt of the permit and acceptance of the terms and conditions, is returned to the Commission office. 2. Expiration. If development has not commenced, the permit will expire two years from the date on which the Commission voted on the application. Development shall be pursued in a diligent manner and completed in a reasonable period of time. Application for extension of the permit must be made prior to the expiration date. 3. Interpretation. Any questions of intent or interpretation of any condition will be resolved by the Executive Director or the Commission. 4. Assignment., The permit may be assigned to any qualified person, provided assignee files with the Commission an affidavit accepting all terms and conditions of the permit. 5. Terms and Conditions Run with the Land. These terms and conditions shall be perpetual, and it is the intention of the Commission. and the permittee to bind all future owners and possessors of the subject property to the terms and conditions. Y of NEWPORT BEACH LU TO L.B_ U-1 K 80' 1.620' ­�j m C/i Cl? I :::;. +11.0, 1 E R IVE VV P 2� P 0.00, C/ 81 C BAY F I M.L.L.W. P/C 0 3.00' 7.0'� 0 IML 8.0' SCALE IN MILES PROFILE V.11CINIT-Y- MAP ­ 30 NEWPORT HARBOR, CALIFORNIA NOTES: RECEIVEl) Mt,7160FR RESOURCES F�lv. "O'jt' COOst Region CITY OF NT�NPORT , BEACH 11) MOVE GANGWAY ZEAST 2) ADD 14" CONCRETE ANCHOR PILE APR 4 2006 51/iN 0 E E L G R A S S" W' I �T"H` �I'N 5 O"'F� 'P R C)JEE" 0 EELGRASSI =ER 0 J E C T A RE : A -CALIPORNIA CbASTAL COA�MISSett SlOWURE z 0 - OT 20' 8'� 9'� PER101T 4 Qustal Conumssion 'Q:mt I[Xistrict Office 80, NEW p1l F: ---- ------- Date: fi2.4'1 Ll 14' 30' _4 35' 21 [51 SITE' S.J.B. APPLICANTS NAME ;LARRYBUCKELEW TRACT 626 B L.O. C K 1 LOT 4 JOB ADDRESS 1432 WEST BAY AVE. CONTRACTOR DATE 12/05 OfTy�'_ of NEWPORT BEACH Uj Lu T 0 f3. 80' 20."­­�,,, L -D ri -7 cl- co +11.0, W p P I E T 0 0.00, P SITE BAY M.L.L.W. P I E c 2.00'1� -S.00, 0 c 8.50' 0 1 1 IML SCALE IN MILE PROFILE VICINITY A P XARBOR, 30' _N_EWPORT CALIFORNIA NOTES: I EEL GRASS INSPECTION REMOVEAND DEMOLISH EXISTING PIER, GANGWAY, SLIP FLOAT AND A NO EEL GRASS WITHIN 15'OF PROJE 5 - PILES. 9 1! . 0 EEL GRASS IN THE PROJECTAREA 2) INSTALL NEW_;IeX 51'FINGER FLOAT L12 r i �� milic", WITH 3 - PILES, 4'X 24'GANGWAY AND I O'X 14'PIER PLATFORM WITH 2 - T -PILES. SIGNATURE �/ (43 z 6 1201a�;_ 7 ---PERM1T#-- 2 0' 18'-�-t 8' 9'4 ----HARBOR RESOURCES DIV. CITY OF NEWPORT BEACH I <�:7h,,l� Milk; 6 Califomia Coastal Cothmission South Coastpistr t 6f.fice. �E 38 24' &PRO'N/ 10, [14': pFEcr1VE D ate: ------]Digs, j, 35 2 Ff c -M - SITE U.B. A P P L I C A N T S N A M E LARRY BUCKELEW TRACT 626 B L 0 C K 1 LOT 4 JOB ADDRESS 1432 WEST BAY AVE. CONTRACTOR DATE 6/05 STATE OF CALIFORNIA --THE RESOURCES AGENCY CALIFORNIA COASTAL COMMISSION SOUTF-t-COAST DISTRICT PO Bo� 1450 200 Oceangate, 10th Floor LONG BEACH, CA 90802-4416 (562) 590-5071 www.coastal.ca.gov ARNOLD SCHWARZENEGGER, Govemor Date: November 28, 2005 Permit No. 5.05-381 NOTICE OF ADMINISTRATIVE PERMIT EFFECTIVENESS Please be advised that the Administrative Permit with the above permit number which was sent to you on November 1, 2005 and was reported to the Commission on Thursday, November 17,2005 is now fully effective. Development of your project is subject to compliance with all terms and conditions specified in the Administrative Permit. Should you have any questions please contact our office. Sincerely, PETER M. DOUGLAS Executive irector By: LAUR14A (OWENS Coastal Program Analyst dt CALIFORNIA COASTAL COMMISSION ;��' ;14' STATE OF CALIFORNIA - THE RESOURCES AGENCY ARNOLD SCHWARZENEGGER, Governor CAUFORNIA COASTAL COMMISSION Permit Application No. 5-05-381 South Coast Area Office 200 Oceangate, Suite 1000 Date: October 27, 2005 Long Beach, CA 90802-4302 (562) 590-5071 Page 1 of 6 Fri 3b ADMINISTRATIVE PERMIT I APPLICANTS: Larry Buckelew PROJECT DESCRIPTION: Remove and replace existing U-shaped floating dock, pier and gangway and five piles and replace with new 8'x 51'finger float with three piles, 4' x 24' gangway and 10' x 14' pier platform with two "T" piles. PROJECT LOCATION: 1432 W. Bay Avenue, Newport Beach (Orange County) EXECUTIVE DIRECTOR'S DETERMINATION: The findings for this determination, and for any special conditions, appear on subsequent pages. NOTE: P.R.C. Section 30624 provides that this permit shall not become effective until it is reported to the Commission at its next meeting. If one-third or more of the appointed membership of the Commission so request, the application will be removed from the administrative calendar and set for public hearing at a subsequent Commission meeting. Our office will notify you if such removal occurs. This permit will be reported to the Commission at the following time and place: Friday, November 18, 2005 9:00 a.m. Westin LAX 5400 West Century Boulevard Los Angeles, CA (310) 216-5858 IMPORTANT - Before you may proceed with development, the following must occur: Pursuant to 14 Cal. Admin. Code Sections 13150(b) and 13158, you. must sign the enclosed duplicate copy acknowledging the permit's receipt and accepting its contents, including all conditions, and return it to our office. Following the Commission's meeting, and once we have received the signed acknowledgement and evidence of compliance with all special conditions, we will send you a Notice of Administrative Permit Effectiveness. BEFORE YOU CAN OBTAIN ANY LOCAL PERMITS AND PROCEED WITH DEVELOPMENT, YOU MUST HAVE RECEIVED BOTH YOUR ADMINISTRATIVE PERMIT AND THE NOTICE OF PERMIT EFFECTIVENESS FROM THIS OFFICE. PETER DOUGLAS Executive Director By: Laurinda R. Owens Title: Coastal Program Analiit 5-05-381 -[Buckelew] Administrative Permit Page 2 of 6 STANDARD CONDITIONS: 1. Notice of Receipt and Acknowledgment. The permit is not valid and development shall not commence until a copy of the permit, signed by the permittee or authorized, agent, acknowledging receipt of the permit and acceptance of the terms and conditions, is returned to the Commission office. 2. Expiration. If development has not commenced, the permit will expire two years from the date this permit is reported to the Commission. Development shall be pursued in a diligent manner and completed in a reasonable period of time. Application for extension of the permit must be made prior to the expiration date. 3. Interpretation. Any questions of intent or interpretation of any term or condition will be resolved by the Executive Director or the Commission. 4. Assignment. The permit may be assigned to any qualified person, provided assignee files with the Commission an affidavit accepting all terms and conditions of the permit. 5. Terms and Conditions Run with the Land. These terms and conditions shall be perpetual, and it is the intention of the Commission and the permittee to bind all future owners and possessors of the subject property to the terms and conditions. SPECIAL CONDITIONS: See pages four to six. EXECUTIVE DIRECTOR'S DETERMINATION (continued): The Executive Director hereby determines that the proposed development is a category of development, which, pursuant to PRC Section 30624, qualifies for approval by the Executive Director through the issuance of an Administrative Permit. Subject to Standard and Special Conditions as attached, said development is in conformity with the provisions of Chapter 3 of the Coastal Act of 1976 and will not have any significant impacts on the environment within the meaning of the California Environmental Quality Act. If located between the nearest public road and the sea, this development is in conformity with the public access and public recreation policies of Chapter 3. FINDINGS FOR EXECUTIVE DIRECTOR'S DETERMINATION: A. Project DescriDtion The subject site is located at 1432 West Bay Avenue in the City of Newport Beach (Exhibits #1-2). Single-family residences characterize the subject site and the surrounding area. The proposed project (Exhibit #3) involves the removal and replacement of an existing U-shaped floating dock, pier and gangway and five piles and replacement with a new 8'x 51'finger float with three piles, 4'x 24' gangway and 10'x 14' pier platform with two "T" piles. The dock project will be used for boating related purposes to serve a single-family residential development. The site has been'surveyed by the City of Newport Beach Harbor Resources' Division for eelgrass and no eelgrass was discovered within 15 feet of the project area. In addition, Special Condition 3 requires a Caulerpa taxilfolia survey not more than 90 days prior to commencement of 5-05-381 -[Buckelewl Administrative Permit Page 3 of 6 construction. The surveys are valid for a limited period of time (until the next growing season for eelgrass and 90 days for Caulerpa taxilfolia). If construction does not occur within the respective time periods, subsequent surveys will be required. Special Conditions 2 and 3 identify the procedures. necessary to be completed prior to beginning construction in the case the surveys expire prior to commencement of construction. In addition, Special Conditions 2 and 3 identify post-c6nstruction eelgrass and Caulerpa taxifolia procedures. Public access is available at the street -end of 15 th four blocks to the west and also along Bay Avenue where there is an existing walkway/bikeway/accessway. The proposed project has received an approval in concept from the City of Newport Beach Harbor Resources Division. The Regional Water Quality Control Board (RWQCB) has determined that the proposed project will not adversely impact water quality if standard construction methods and materials are used. The applicants have applied for a permit from the U.S. Army Corps of Engineers. B. Marine Resources The proposed recreational boat dock development and its associated structures are an allowable and encouraged marine related use. The project design includes the minimum sized pilings and the minimum number of pilings necessary for structural stability. There are no feasible less environmentally damaging alternatives available. As conditioned, the project will not significantly adversely impact eelgrass beds and will not contribute to the dispersal of the invasive aquatic algae, Caulerpa taxifolia. Further, as proposed and conditioned, the project, which is to be used solely for recreational boating purposes, conforms to Sections 30224 and 30233 of the Coastal Act. C. Water Quality The proposed work will be occurring on, within and adjacent to coastal waters. The storage or placement of construction material, debris, or waste in a location where it could be discharged into coastal waters would result in an adverse effect on the marine environment. To reduce the potential for construction related impacts on water quality, the.Executive Director imposes special conditions requiring, but not limited to, the appropriate storage and handling of construction equipment and materials to minimize the potential of pollutants to enter coastal waters. To reduce the potential for post -construction impacts to water quality the Executive Director requires the continued use and maintenance of post construction BMPs. As conditioned, the Executive Director finds that the development conforms to Sections 30230 and 30231 of the Coastal Act. D. Local Coastal Program The LUP for the City of Newport Beach was effectively certified on May 19, 1982. The certified LUP was updated on January 9, 1990. As conditioned, the proposed development is consistent with Chapter 3 of the Coastal Act and with the certified Land Use Plan for the area. Approval of the project, as conditioned, will not prejudice the ability of the City of Newport Beach to prepare a Local Coastal Program that is in conformity with the provisions of Chapter 3. E. California Environmental Qualltv Act (CEQA As conditioned, there are no feasible alternatives or additional feasible mitigation measures available that would substantially lessen any significant adverse effect that the activity may have.on the environment. Therefore, the Executive Director finds. that the proposed project, as conditioned to mitigate the identified impacts, is the least environmentally damaging feasible alternative and is consistent with the requirements of the Coastal Act to conform to CEQA. 5-05-381 -[Buckelew] Administrative Permit Page 4 of 6 SPECIAL CONDITIONS: 1. Water Quality A. Construction Responsibilities and Debris Removc1l (1) No construction materials, equipment, debris, or waste will be placed or stored where it may be subject to wave, wind, or rain erosion and dispersion. (2) Any and all construction material will be removed from the site within 10 days of completion of construction. (3) Machinery or construction materials not essential for project improvements will not be allowed at any time in the intertidal zone. (4) If turbid conditions are generated during construction a silt curtain will be utilized to control turbidity. (5) Floating booms will be used to contain debris discharged into coastal waters and any debris discharged will be removed as soon as possible but no later than the end of each day. (6) Non -buoyant debris discharged into coastal waters will be recovered by divers as soon as possible after loss. B., Best Management Practices Program By acceptance of this permit the applicant agrees that the long-term water -borne berthing of boat(s) in the approved dock and/or boat slip will be managed in a manner that protects water quality pursuant to the implementation of the following BMPs. (1) Boat Cleaning and Maintenance Measures: a. In -water top -side and bottom -side boat cleaning shall minimize the discharge of soaps, paints, and debris. b. In -the -water hull scraping or any process that occurs under water that results in the removal of paint from boat hulls shall be prohibited. Only detergents and cleaning components that are designated by the manufacturer as phosphate - free and biodegradable shall be used, and the amounts used minimized. c. The applicant shall minimize the use of detergents and boat cleaning and maintenance products containing ammonia, sodium hypochlorite, chlorinated solvents, petroleum distillates or lye. (2) Solid and Liquid Waste, Management Measures: a. All trash, recyclables, and hazardous wastes or potential water contaminants, including old gasoline or gasoline with water, absorbent materials, oily rags, lead acid batteries, anti -freeze, waste diesel, kerosene and mineral spirits will 5-05-381 -[Buckelew] Administrative Permit Page 5 of 6 be disposed of in a proper manner and will not at any time be disposed of in the water or gutter. (3) Petroleum Control Management Measures: a. Oil absorbent, materials shall be examined at least once a year and replaced as necessary. The applicant will recycle the materials, if possible, or dispose of them in accordance with hazardous waste disposal regulations. The boaters will regularly inspect and maintain engines, seals, gaskets, lines and hoses in order to prevent oil and fuel spills. Boaters will use preventive engine maintenance, oil absorbents, bilge pump -out services, or steam cleaning services as much as possible to clean oily bilge areas. Bilges shall be cleaned and maintained. Detergents will not be used for cleaning. The use of soaps that can be discharged by bilge pumps is prohibited. 2. Eelgrass Surve /' A. Pre Construction Eelgrass Survey. A valid pre -construction eelgrass (Zostera marina) survey shall be completed during the period of active growth of eelgrass (typically March through October). The pre -construction survey shall be completed prior to the beginning of construction and shall be valid until the next period of active growth. The survey shall be prepared in full compliance with the "Southern California Eelgrass Mitigation Policy" Revision 8 (except as modified by this special condition) adopted by the National Marine Fisheries Service and shall be prepared in consultation with the California Department of Fish and Game. The applicantshall submit the eelgrass survey for the review and approval of the Executive Director within five (5) business days of completion of each eelgrass survey and in any event no later than fifteen (115) business days prior to commencement of any development. If the eelgrass survey identifies any eelgrasswithin the project area, which would be impacted by the proposed project, the development shall require an amendment to this permit from the Coastal Commission or a new coastal development permit. B. Post Construction Eelgrass Survey. If any eelgrass is identified in the project area by the survey required in subsection A of this condition above, within one month after the conclusion of construction, the applicant shall survey the project site to determine if any eelgrass was adversely impacted. The survey shall be prepared in full compliance with the "Southern California Eelgrass Mitigation Policy" Revision 8 (except as modified by this special condition) adopted by the National Marine Fisheries Service and shall be prepared in consultation with the California Department of Fish and Game. The applicant shall submit the post -construction eelgrass survey for the review and approval of the Executive Director within thirty (30) days after completion of the survey. If any eelgrass has been impacted, the applicant shall replace the impacted eelgrass at a minimum 1.2:1 ratio on-site, or at another location, in accordance with the Southern California Eelgrass Mitigation Policy. All impacts to eelgrass habitat shall be mitigated at a minimum ratio of 1.21 (mitigation: impact). The exceptions to the required 1.21 mitigation ratio found within SCEMP shall not apply. Implementation of mitigation shall require an amendment to this permit or a new coastal development permit unless the Executive Director determines that no amendment or new permit is required. 5-05-381 -[Buckelew] Administrative Permit Page 6 of 6 3. Pre -construction Caulerpa Taxifolia Surve -Ai Not earlier than 90 days- nor later than 30 days prior to commencement or re -commencement of any development authorized under this coastal development, permit (the "project"), the applicant shall undertake a survey of the project area and a buffer area at least 10 meters beyond the project area to determine the presence of the invasive alga Caulerpa taxifolia. The survey shall include a visual examination of the substrate. B. The survey protocol shall be prepared in consultation with the Regional Water Quality Control Board, the California Department of Fish and Game, and the National Marine Fisheries Service. C. Within five (5) business days of completion of the survey, the applicant shall submit the survey: (1) for the review and approval of the Executive Director; and (2) to the Surveillance Subcommittee of the Southern California Caulerpa Action Team (SCCAT). The SCCAT Surveillance Subcommittee may be contacted through William Paznokas, California Department of Fish & Game (858/467-4218) or Robert Hoffman, National Marine Fisheries Service (562/980-4043). D. If Caulerpa taxifolia is found within the project or buffer areas the applicant shall not proceed with the project until 1) the applicant provides evide�ce to the Executive Director that all C. taxifolia discovered within the project and buffer area has been eliminated in a manner that complies with all applicable governmental approval requirements, including but not limited to those of the California Coastal Act, or 2) the applicant �has revised the project to avoid any contact with C. taxifolia. No revisions to the project shall occur without a Coastal Commission approved amendment to this coastal development permit unless the Executive Director determines that no amendment is legally required. ACKNOWLEDGMENT OF PERMIT RECEIPT/ACCEPTANCE OF CONTENTS: I/We acknowledge that I/we have received a copy of this permit and have accepted its contents including all conditions. Applicants' Signature Date of Signing G:\Admin. Permits\2005\2005-1 1\5-05-381 (Buckelew) Administrative Permit LO.doc L III §EE MAP c\j is: c rn SITE co co co COASTAL COMMISSION EXHIBIT # < PAGE—I—OF A dVW 33S �0�"WW& L661 JAMUdOO "Z 0 0, 0. In kkl ol 1 7— G L L 4 Slhl r -h A (0. It rOh CW N R--. lhl (SO-ZhIl all 7 Plhf Ahl T 111A ahl IN 41hi 1rh, Z Ar,*/ G + L --W- L 1, 1 SITE 137.yls I 'le RECEIVED 7 South Coast Region to: SEP 2 6 2005 0a :ALIFORNIA C�ASTAL COMMISSION c\j c\j :�z cl-) @ rst COASTAL COMMISSION 61 EXHIBIT # PAGE OF ------------- �CIT'-Y of NEWPORT BEACH 2.00' I ui Lu T 0 :z 80' 20,'-,-"j- u� +11.0' wr PIER 0.00' P,4 C/ SITE NA I I W S.00' 8.50' f�_" I) a - / -/_� 2- I �� ____1 1 1 IML 0 , 'it 1, 1 SCALE IN MILES PROFILE VICINITY MAP 30' 1 N_E.WPO§T HARBOR, CALIFORNIA NOTES: 1) REMOVE AND DEMOLISH EXISTING PIER, GANGWAY, SLIP FLOAT AND 5 - PILES. 2) INSTALL NEWW X 51 - FINGER FLOAT WITH 3 - PILES, 4! X 24'GANGWAY AND 1 O'X 14' PIER PLATFORM WITH 2 - T -PILES. _7 20' 18-4- 8' 9' _-7- 777, i f 80, 5T T 24' 4' 5 3� 2 SITE� APPLICANTS NAME LARRYBUCKELEW JOB ADDRESS 1432 WEST BAY AVE, RACT EEL GRASS INSPECTION ,0' NO EEL GRASS WITHIN 1 5'0F PROM 0 EEL GRASS IN THE PROJECT AREA _chr(''� Millar see/%"h'� SIGNATURE _<;kjrve:�r 0-43 Z 6 holo�;- -DATE ---HARBOR RESOURCES DIV. CITY OF NEWPORT BEACH 6 Califomia Coastal Co §outh Coastittt � �ce'. y- , APPROVED .,A 38 Permit No --------------- . L py: .................. i__� ------ T=cn"VE Date: -------------- I" =_201 t1vs* be S" se+b,?,L Fro., pj/-, c.M- COASTAL COMMISSION 626 13 L EXH1131T # P r., r: nc CONTRACTOR cn CD �D (A �D W CD z CD cn _q i5 _q STATE OF CALIFORNIA —THE RESOURCES AGENCY ARNOLD SCHWARZENEGGER, Govemor CALIFORNIA COASTAL COMMISSION SOUTH COAST DISTRICT PO Box 1450 200 06eangate, 16th Floor LONG BEACH, CA 90802-4416 (562) 590-5071 www.coastal.ca.gov X/f - -7 6 � - 2- 3 -7 0 Date: November 28, 2005 /'d " 5 C - l Z 'r 670 Permit No. 5-05-381 NOTICE OF ADMINISTRATIVE PERMIT EFFECTIVENESS Please be advised that the Administrative Permit with the above permit number which was sent to you on November 1, 2005 and was reported to the Commission on Thursday, November 17, 2005 is now fully effective. Development of your project is subject to compliance With all terms and conditions specified in the Administrative Permit. Should you have any questions please contact our office. Sincerely, PETER M. DOUGLAS Executive Pirector By: LAURINDA OWENS Coastal Program Analyst dt CALIFORNIA COASTAL COMMISSION STATE OF CALIFORNIA - THE RESOURCES AGENCY ARNOLD SCHWARZENEGGER, Govemor CALIFORNIA COASTAL COMMISSION South Coa�t Area Office Permit Application No.5-05-381 200 Oceangate, Suite 1000 Long Beach, CA 90802-4302 Date: October 27, 2005 (562) 590-5071 Page 1 of 6 Q� Fri 3b ADMINISTRATIVE PERMIT APPLICANTS: Larry Buckelew PROJECT DESCRIPTION: Remove and replace existing U-shaped floating dock, pier and gangway and five piles and replace with new 8'x 51'finger float with three piles, 4'x 24' gangway and 10' x 14' pier platform with two "T" piles. PROJECT LOCATION: 1432 W. Bay Avenue, Newport Beach (Orange County) EXECUTIVE DIRECTOR'S DETERMINATION: The findings for this determination, and for any special conditions, appear on subsequent pages. NOTE: P.R.C. Section 30624 provides that this permit shall not become effective until it is reported to the Commission at its next meeting. If one-third or more of the appointed membership of the Commission so request, the application will be removed from the administrative calendar and set for public hearing at a subsequent Commission meeting. Our office will notify you if such removal occurs. This permit will be reported to the Commission at the following time and place: Friday, November 18, 2005 9:00 a.m. Westin LAX 5400 West Century Boulevard Los Angeles, CA (310) 216-5858 IMPORTANT - Before Vou may proceed with development,.the following must occur: Pursuant to 14 Cal. Admin. Code Sections 13150(b) and 13158, you must sign the enclosed duplicate copy acknowledging the permit's receipt and accepting its contents, including all conditions, and return it to our office. Following the Commission's meeting, and once we have received the signed acknowledgement and evidence of compliance with all special conditions, we will send you a Notice of Administrative Permit Effectiveness. BEFORE AND YOU MUST HAVE RECEIVED BOTH YOUR ADMINISTRATIVE PERMIT AND THE N PERMIT EFFECTIVENESS FROM THIS OFFICE. PETER DOUGLAS Executive Director By: Laurinda R. Owens Title: Coastal Program Anal�st 5-05-381 -[Buckelew] Administrative Permit Page 2 of 6 STANDARD CONDITIONS: 1 Notice of Receipt and Acknowledgment. The permit is not valid and development shall not commence until a copy of the permit, signed by the permittee or authorized agent, acknowledging receipt of the permit and acceptance of the terms and conditions, is returned to the Commission office. 2. Expiration. If development has not commenced, the permit will expire two years from the date this permit is reported to the Commission. Development shall be pursued in a diligent manner and completed in a reasonable period of time. Application for extension of the permit must be made prior to the expiration date. 3. Interpretation. Any questions of intent or interpretation of any term or condition will be resolved by the Executive Director or the Commission. 4. Assignment. The permit may be assigned to any qualified person, provided assignee files with the Commission an affidavit accepting all terms and conditions of the permit. 5. Terms and Conditions Run with the Land. These terms and conditions shall be perpetual, and it is the intention of the Commission and the permittee to bind all future owners and possessors of the subject property to the terms and conditions. SPECIAL CONDITIONS: See pages four to six. EXECUTIVE DIRECTOR'S DETERMINATION (continued): The Executive Director hereby determines that the proposed development is a category of development, which, pursuant to PRC Section 30624, qualifies for approval by the Executive Director through the issuance of an Administrative Permit. Subject to Standard and Special Conditions as attached, said development is in conformity with the provisions of Chapter 3 of the Coastal Act of 1976 and will not have any significant impacts on the environment within the meaning of the California Environmental Quality Act. If located between the nearest public road and the sea, this development is in conformity with the public access and public recreation policies of Chapter 3. FINDINGS FOR EXECUTIVE DIRECTOR'S DETERMINATION: A. Pro 0 ect Description The subject site is located at 1432 West Bay Avenue in the City of Newport Beach (Exhibits #1-2). Single-family residences characterize the subject site and the surrounding area. The proposed project (Exhibit #3) involves the removal and replacement of an existing U-shaped floating, dock, pier and gangway and five piles and replacement with a new 8'x 51'finger float with three piles, 4',x 24' .gangway and 10'x 14' pier platform with two "T" piles. The dock project will be used for boating related purposes to serve a single-family. re I sidential development. The site has been surveyed by the City of Ne,wpor . t Beach Harbor Resources Division for eelgrass and no eelgrass was discovered within 15 feet of the, project area. In addition, Special Condition 3 requires a Caulerpa taxilf6lia survey not more than 90 days prior to commencement of 5-05-381-[Buckelew] Administrative Permit Page 3 of 6 construction. The surveys are valid for a limited period of time (until the next growing season for eelgrass and 90 days for Caulerpa taxilfolia). If construction does not occur within the respective time periods, subsequent surveys will be required. Special Conditions 2 and 3 identify the procedures, necessary to be completed prior to beginning construction in the case the surveys expi rior to_, commencement of construction. In addition, Special Conditions 2 and 3 identify post_Construction eelgrass and Caulerpa taxifolia procedures. Public access is available at the street -end of 15 th four blocks to the west and also along Bay Avenue where there is an existing walkway/bikeway/accessway. The proposed project has received an approval in concept from the City of Newport Beach Harbor Resources Division. The Regional Water Quality Control Board (RWQCB) has determined that the proposed project will not adversely impact water quality if standard construction methods and materials are used. The applicants have applied for a permit from the U.S. Army Corps of Engineers. B. Marine Resources The proposed recreational boat dock development and its associated structures are an allowable and encouraged marine related use. The project design includes the minimum sized pilings and the minimum number of pilings necessary for structural stability. There are no feasible less environmentally damaging alternatives available. As conditioned, the project will not significantly adversely impact eelgrass beds and will not contribute to the dispersal of the invasive aquatic algae, Caulerpa taxifolia. Further, as proposed and conditioned, the project, which is to be used solely for recreational boating purposes, conforms to Sections 30224 and 30233 of the Coastal Act. C. Water Quallit The proposed work will be occurring on, within and adjacent to coastal waters. The storage or placement of construction material, debris, or waste in a location where it could be discharged into, coastal waters would result in an adverse effect on the marine environment. To reduce the potential for construction related impacts on water quality, the Executive Director imposes special conditions requiring, but not limited to, the appropriate storage and handling of construction equipment and materials to minimize the potential of pollutants to enter coastal waters. To reduce the potential for post -construction impacts to water quality the Executive Director requires the continued use and maintenance of post construction BMPs. As conditioned, the Executive Director finds that the development conforms to Sections 30230 and 30231 of the Coastal Act. D. Local Coastal Program The LUP for the City of Newport Beach was effectively certified on May 19, 1982. The certified LUP was updated on January 9, 1990. As conditioned, the proposed development is consistent with Chapter 3 of the Coastal Act and with the certified Land Use Plan for the area. Approval of the project, as conditioned, will not prejudice the ability of the City of Newport Beach to prepare a Local Coastal Program that is in conformity with the provisions of Chapter 3. E.. California Environmental Quality Act (CEQA) As conditioned, there are no feasible alternatives or additional feasible mitigation measures available that would substantially lessen any significant adverse effect that the activity may have on the environment. Therefore, the Executive Director I finds that the propos I ed project, as conditioned to m. itigate the identified impacts, is the least environmentally damaging feasible alternative and is. consistent with the requirements of the Coastal Act to conform to CEQA. 5-05-381 -[Buckelew] Administrative Permit Page 4 of 6 SPECIAL CONDITIONS: 1. Water Quality A. Construction Responsibilities and Deb'dis" Removal (1) No construction materials, equipment, debris, or waste will be placed or stored where it may be subject to wave, wind, or rain erosion and dispersion. (2) Any and all construction material will be removed from the site within 10 days of completion of construction. (3) Machinery or construction materials not essential for project improvements will not be allowed at any time in the intertidal zone. (4) If turbid conditions are generated during construction a silt curtain will be utilized to control turbidity. (5) Floating booms will be used to contain debris discharged into coastal waters and any debris discharged will be removed as soon as possible but no later than the end of each day. (6) Non -buoyant debris discharged into coastal waters will be recovered by divers as soon as possible after loss. Best Management Practices Program By acceptance of this permit the applicant agrees that the long-term water-bome berthing of b.oat(s) in the approved dock and/or boat slip will be managed in a manner that protects water quality pursuant to the implementation of the following BMPs. (1) Boat Cleaning and Maintenance Measures: a. In -water top -side and bottom -side boat cleaning shall minimize the discharge of soaps, paints, and debris. b. In -the -water hull scraping or any process that occurs under water that results in the removal of paint from boat hulls shall be prohibited. Only detergents and cleaning components that are designated by the manufacturer as phosphate - free and biodegradable shall be used., and the amounts used minimized. c. The applicant shall minimize the use of detergents and boat cleaning and maintenance products containing ammonia, sodium hypochlorite, chlorinated solvents, petroleum distillates or lye. (2) Solid and Liquid Waste, Management Measures: a. All trash, recyclables, and hazardous wastes or potential water contaminants, including old gasoline or gasoline with water, absorbent materials oily rags, lead acid batteries, anti -freeze, waste diesel, kerosene and minQl spirits will 5-05-381 -[Buckefew] Administrative Permit Page 5 of 6 be disposed of in a proper manner and will not at any time be disposed of in the water or gutter. (3) Petroleum Control Management Measures: a. Oil absorbent-material.s sh ' all be examined at least once a year and replaced as necessary. The applicant will recycle the materials, if possible, or dispose of them in accordance with hazardous waste disposal regulations. The boaters will regularly inspect and maintain engines, seals, gaskets, lines and hoses in order to prevent oil and fuel spills. Boaters will use preventive engine maintenance, oil absorbents, bilge pump -out services, or steam cleaning services as much as possible to clean oily bilge areas. Bilges shall be cleaned and maintained. Detergents will not be used for cleaning. The use of soaps that can be discharged by bilge pumps is prohibited. 2. Eelgrass; Surve A. Pre Construction Eelgrass Survey. A valid pre -construction eelgrass (Zostera marina) survey shall be completed during the period of active growth of eelgrass (typically March through October). The pre -construction survey shall be completed prior to the beginning of construction and shall be valid until the next period of active growth. The survey shall be prepared in full compliance with the "Southern California Eelgrass Mitigation Policy" Revision 8 (except as modified by this special condition) adopted by the National Marine Fisheries Service and shall be prepared in consultation with the California Department of Fish and.Gam,e. The applicant shall submit the eelgrass survey for the review and approval of the Executive Director within five (5) business days of completion of, each eelgrass survey and in� any event no later than fifteen (15) business days prior to commencement of any development. Iftheeelgrass survey identifies.any eelgrass within the project area, which would be impacted by the proposed project, the development shall require an amendment to this permit from the Coastal Commission or a new coastal development permit. B. Post Construction Eelgrass Survey. If any eelgrass is identified in the project area by the survey required in subsection A of this condition above, within one month after the conclusion of construction, the applicant shall survey the project site to determine if any eelgrass was adversely impacted. The survey shall be prepared in full compliance with the "Southern California Eelgrass Mitigation Policy" Revision 8 (except as modified by this special condition) adopted by the National Marine Fisheries Service and shall be prepared in consultation with the California Department of Fish and Game. The applicant shall submit the post -construction eelgrass survey for the review and approval of the Executive Director within thirty (30) days after completion of the survey. If any eelgrass has been impacted, the applicant shall replace the impacted eelgrass at a minimum 1.2:1 ratio on-site, or at another location, in accordance with the Southern California Eelgrass Mitigation Policy. All impacts to eelgrass habitat shall be mitigated at a. minimum ratio of,1.2:1 (mitigation: impact). The exceptions to the required 121 mitigation ratio found within SCEMP shall not apply. Implementation of mitigation shall require an amendment to this permit or a new coastal development permit unless the Executive Director determines that no amendmentor new permit is required. 5-05-381 -[Buckelew] Administrative Permit Page 6 of 6 3. Pre -construction Caulerpa Taxifolia Surve A. Not earlier than 90 days nor later than 30 days prior to commencement -or re -commencement of any development authorized under this coastal development: permit (the "projecf), the applicant shall undertake a survey of the project area and a buffer area at least 10 meters beyond the project area to determine the presence of the invasive alga Caulerpa taxifolia. The survey shall include a visual examination of the substrate. B. The survey protocol shall be prepared in consultation with the Regional Water Quality Control Board, the California Department of Fish and Game, and the National Marine Fisheries Service. C. Within five (5) business days of completion of the survey, the applicant shall submit the survey: (1) for the review and approval of the Executive Director; and (2) to the Surveillance Subcommittee of the Southern California Caulerpa Action Team (SCCAT). The SCCAT Surveillance Subcommittee may be contacted through William Paznokas, California Department of Fish & Game (858/467-4218) or Robert Hoffman, National Marine Fisheries Service (562/980-4043). D. If Caulerpa taxifolia is found within the project or buffer areas, the applicant shall not proceed with the project until 1) the applicant provides evidence to the Executive Director that all C. taxifolia discovered within the project and buffer area has been eliminated in a manner that complies with all applicable governmental approval requirements, including but not limited to those of the California Coastal Act, or 2) the -applicant has revised the project to avoid any contact with C. taxifolia. No revisions to the project shall occur without a Coastal Commission approved amendment to this coastal development permit unless the Executive Director determines that no amendment is legally required. ACKNOWLEDGMENT OF PERMIT RECEIPTACCEPTANCE OF CONTENTS: I/We acknowledge that I/we have received a copy of this permit and have accepted its contents including all conditions. Applicants' Signature Date of Signing G:\Admin. Permits\2005\2005-1 1\5-05-381 (Buckelew) Administrative Permit LO.doc Lir SEE 919 MAP SITE co: -,(M , co VN 5-05�3�1 -COASTAL COMMISSION EXHIBIT # PAGE -J --OF A OIMVN�F�ffflWWW L661 iH9NAd03—=— CITY'of NEWPORT BEACH Lu En :1-2.0( i TO L.B. .ui ui 80' C15 +11.0' PIER P, P,4 C, SITE-: BAY —0.00, P I 4 M.L.L.W. 0c'EF'4 S.00 8.50' IML 0 S ALE IN MILES PROFILE VICINITY MAP 30' IN-EWP . ORT HARBOR, CALIFOR-N'IA NOTES: 1) REMOVE AND DEMOLISH EXISTING PIER, GANGWAY, SLIP FLOAT AND 5 - PILES. 2) INSTALL NEWIWX 5V FINGER FLOAT WITH 3 - PILES, 4� X 24! GANGWAY AND 1 O'X 14' PIER PLATFORM WITH 2 - T -PILES. 20' 18' 8' !K- 9' 80, 151'" 24" 41 j:1 14' 2 SITE: APPLICANTS NAME LARRYBUCKELEW ITRACT JOB ADDRESS 1432 WEST BAY AVE EEL GRASS INSPECTION ,K NO EEL GRASS WITHIN I 5'0F PROM 0 EEL GRASS IN THE PROJECT AREA chr"'� m/116- seeam""'h'v SIGNATURE ��vrve,-;, (43 z 6 hala�;- --DATE HARBOR RESOURCES DIV. CITY OF NEWPORT BEACH fl 116 6 Califomia Coastal Cobpmssion �outh Coast APPROVED�1111 t PermitNo ------------- ........ �3y: ------------------ ------ Tu�TEcrivE t)ate: -------------- rIvsk be s' se+6,q,L 1p//_ - c -M - COASTAL COMMISSION 626 BL EXHIBIT CONTRACTO I R PAGE F 02 C-) S .0, cz '0 t L mzN-q3.Lbno.( Z ro, 01h1l nz r4,, MIN �S" /,r*t ----------- 1rh, @ frh, -crhi SITE ALN32LAY -'-77Y-Ls H.W3-71-414 z" RECEIVED lSouth Coast Region Ast SEP 2 6 2005 CALIFORNIA V 160 Z� C ASTAL COMMISSION Cal &/Ste Err/ ZSl C STAL COMMISSION OA -7-0 EXHIBIT # J33&JS miff-7-:Uxls PAGE OF ---------------- STATE OF,CALIFORNIA - THE RESOURCES AGENCY ARNOLD SCHWARZENEGGER, Governor CALIFORNIA COASTAL COMMISSION ­%outh Coast Area Office �,�oo 6ceangat6, Suite 1000 5-05-381 -Al Long Beach, CA 90802-4302 (562) 590-5071 NOTICE OF PROPOSED PERMIT AMENDMENT TO: All Interested Parties FROM: Peter Douglas, Executive Director DATE: 2 May 2006 SUBJECT: Coastal Development Permit No. 5-05-381. granted to Larry Buckelew on November 18, 2005 for: Removal of an existing U-shaped floating dock, pier and gangway and five piles and replacement with new 8' x 51'finger float with three piles., 4' x 24' gangway and 10'x 14' pier platform with two "T" piles. AT: 1432 W. Bay Avenue, Newport Beach, Orange County The Executive Director of the California Coastal Commission has reviewed a proposed amendment to the above referenced permit, which would result in the following change(s): DESCRIPTION OF AMENDMENT REQUEST (5 -05 -381 -Al): Move location of proposed gangway two feet east and installation of one additional 14 inch diameter, concrete anchor pile (bringing the total number of anchor piles to four). FINDINGS: Pursuant to 14 Cal. Admin. Code Section. 13166(a)(2) this amendment is considered to be IMMATERIAL and the permit will be modified accordingly if no written objections are received within ten working days of the date of this notice. This amendment has been considered "immaterial" for the following reason(s): No eelgrass exists within the project vicinity. The underlying permit is subject to special conditions requiring pre- and post -construction eelgrass. surveys as well as a pre - construction Ca'ulerpa taxifolia survey. In addition, existing special conditions imposed 'construction responsibilities and debris removal requirements, and a best management practices program. The special conditions of the underlying permit remain in effect. The changes proposed under this amendment do not raise any new issues not already addressed by those existing special conditions. Therefore, as amended and conditioned, the project remains consistent with the Chapter 3 policies of the Coastal Act, previous Commission approvals and does not prejudice the City's ability to prepare certified LCP. If you have any questions about the proposal or wish to register an objection, please contact Meg,Vaughn at the Commission Area office in Long Beach (562) 590-5071. 5-05-381 Al Buckelew ImMat 5.06 mv S-TATL Oir� CALIFORNIA - THE RESOURCES. AGENCY Arnold Schwarzenegger, Govemor CALIFORNIA COASTAL COMMISSION South Coast�Area Office 200 Oceangate, Suite 1000 Long Beach, CA 90802-4302 (562) 590-5071. May 2, 2006 Re: Application/Appeal No 5 -05 -381 -Al STATUS LETTER The status of this matter is noted below. XX Your application was filed on 4 April 2006. The public hearing is tentatively scheduled on 10 May 2006 in Costa Mesa. This tentative scheduling inform# -tion is being provided for your convenience and is subject to change.' Written notification of final scheduling of th.e,hearing, along with a copy of the staff report, will be mailed approximately 10 days prior to the hearing. IMPORTANT: The enclosed Notice of Pending Permit must be posted on the site, in a conspicuous place, within 3 days of its receipt. This application is incomplete and cannot be filed or processed until the items listed on the attached sheet have been completed and submitted to the District Office. If these items have not been received by the date indicated, the entire package will be returned to you. Please be advised that the items needed to complete your application must be submitted to this office by This file is being returned as the application submitted is deemed incomplete. The required substantive documents are missing. Please see the attached sheet. This appeal was received and has been determined to be a valid appeal. You will be notified of the place and date of the public hearing. This appeal was received but has been determined invalid for the following reason: There will be a 10 working day appeal period, if we receive no objections during this period, you'll receive Vour immaterial amendment. Meg Vaughn Staff Analyst NOTICE OF ii q lum A � A PERMIT APPLICATION FOR DEVELOPMENTON THIS SITE IS PENWING BEFORE THE CALIFORNIA COASTAL COMMISSION. APPLICATION NUMBER: 5 -05 -381 -Al DATE NOTICE POSTED: For further.. -information, please. phone or write the office listed below between 8 AM and 5 PM, weekdays. - f CALIFORNIA COASTAL COMMISSION I SOUTH COAST DISTRICT PO Box 1450 . - 200 Oceangate, 10th Floor LONG BEACH, CA. 90802-4416 California Regional Water Quality Control Board Santa Ana Region Alan C. Lloyd, Ph.D. 3737 Main Street, Suite 500, Riverside, California 92501-3348 Arnold Schwarzenegger Agency Secretary Phone (951) 782-4130 — FAX (951) 781-6288 — TTY (951) 782-3221 Governor http://www.waterboards.ca.gov/santaana July 25, 2005 Steve Barrett P.O. Box 1457 Newport Beach, CA 92659 PROPOSED REBUILDING OF BOAT DOCK, LARRY BUCIKELEW, 1432 WEST BAY AVENUE, NEWPORT BEACH, ORANGE COUNTY Dear Mr. Barrett: If standard dock construction methods and materials are utilized, this project should not adversely impact water quality. A statement has been submitted that there will be no waste discharged from the proposed project. Based on these assurances, clearance is provided. . However, should the Army Corps of Engineers determine that this project requires a Section 404 permit, it will be necessary for the project proponent to obtain from this Board a Water Qua] ity Certification under Section 401 of the Clean Water Act. Should you have any questions, please contact me at (951) 782-3288. Smcerel I Shami Water Resources Control Engineer cc: California Coastal Commission, Long Beach Army Corps of Engineers — Erik Larsen County of Orange, County Property Permits Division — Patricia Bigger JIS/blutag255let California Environmental Protection Agency OD %,,,* Recycled Paper STATE OF CALIFORNIA ARNOLD SCHWARZENEGGER, Govemor, CALIFORNIA STATE LANDS COMMISSION 100 Howe Avenue, Su.ite 100 -South Sacramento, CA 95825-8202 Mr. Steve Barrett P.O.'Box 1457 Newport Beach, CA 92659 PAUL D. THAYER, Executive Officer (916) 574-1800 FAX (916) 574-1810 Relay Service From TDD Phone 1-800-735-2929 from Voice Phone 1-800-735-2922 September 13, 2005 Contact Phone: (916) 574-0234 Contact FAX. (916) 574-1955 File Ref: G09-02 RE: Proposed Modification for Replacing the Existing Pier, Gangway and Slip Float with a New Pier, Gangway and Finger Float Located at 1432 West Bay Avenue, Newport Beach Dear Mr. Barrett: This is in response to your recent request on behalf of your client for a determination by the California State Lands Commission (CSLC) whether it asserts a sovereign title interest in the property that the subject project will occupy and whether it asserts that the project will intrude into an area that is subject to the public easement in navigab le, w a., ters. The . 'propos�ed project, involving the replacement of -the.existing,.pier gangway and slip float with a new pier, gangway and finger float, is located on lands which have been legislatively granted to the city of Newport Beach pursuant to Chapter 74, Statutes of 1978, as amended, with minerals reserved to ' the State. Therefore, CSLC authorization will not be required. Your client should, however, apply to all other agencies having approval authority over the project, including the city of Newport Beach. This letter does not constitute, nor should it be construed as, a waiver or limitation of any right, titl e or interest of the State of California in any lands undbr its jurisdiction. If you have any questions, please do not hesitate to contact me at (916) 574-0234. Sincerely, Jen ife hesi Public La.nd Management Specialist cc: Chris Miller, City of Newport Beach Fernie Sy, CCC DEPARTMENT OF THE ARMY LOS ANGELES DISTRICT, CORPS OF ENGINEERS P.O. BOX 532711 LOS ANGELES, CALIFORNIA 90053-2325 November 22,2005 REPLY TO ATTENTION OF: Office of the Chief Regulatory Branch Larry Buckelew C/o Steve Barrett P.O. Box 1457 Newport Beach, California 92659 Dear Mr. Buckelew: Reference is made to your request of October 14,2005 (File No. 200600128-SfH). Under the provisions of Section 10 of the Rivers and Harbors Act of March 3,1899 (33 U.S.C. 403), you are hereby authorized to modify an existing floating dock structure bayward of 1432 West Bay Avenue, within Newport Bay, in Newport Beach, Orange County, California in Newport Bay in Newport Beach, Orange County, California, as shown on the enclosed drawings. The owner or authorized responsible official must sign and date all copies of this Letter of Permission (LOP) indicating that he/she agrees to the work as described and will comply with all conditions. One of the signed copies of this Letter of Permission must be returned to the Corps of Engineers (a pre -addressed envelope is enclosed). In addition, please use the two attached postcards to notify this office as to the dates of commencement (within 10 days prior to the start of construction) and completion of the activity (within 10 days following the end of construction). Furthermore, you are hereby advised that the Corps of Engineers has established an Administrative Appeal Process which is fully described in 33 CFR Part 331. The complete appeal process is diagrammed in the enclosed Appendix B. Thank you for participating in our regulatory program. Sincerely, Mark Durham Chief, South Coast Section Regulatory Branch I hm due ALI 12/3jos PEIP41TTEE DATE guaeleW -2 - When the structures or work authorized by this permit are still in existence at the time the property is transferred, the terrns and conditions of this LOP will continue to be binding on the new owner(s) of the property. To validate the transfer of this permit and the liabilities associated with compliance with its terms and conditions, have the transferee sign and date below. TRANSFEREE Enclosure(s) DATE NOTES: of NEWPORT '11EACH PIER, GANGWAY, SLIP FLOAT AND C17Y U� LU I.Uj T 0 Z' WITH 3 - PILES, 4' X 24'GANGWAY AND 1 O'X 14'PIER PLATFORM WITH 2 - T -PILES. f 80' T_ -7— 77; cl? 46"""', 1511" C/� +11.0' C/? I =) 24' 4' L P I E 0=0 1 0.00, P'4 SITE BAY 2 I M.L.L.W. C/p/ C P I E 2.00'� \ 00 0 /V h j 8.50' 0 1 1 IML SCALE IN MILES PROFILE tIN VIC INITY MAP. if[ = 30 _E VV P . ORT HARBOR, CALIFO.RNIA NOTES: 1) REMOVE AND DEMOLISH EXISTING PIER, GANGWAY, SLIP FLOAT AND 5 - PILES. A 9 - 2) INSTALL NEW,�IeX 51' FINGER FLOAT WITH 3 - PILES, 4' X 24'GANGWAY AND 1 O'X 14'PIER PLATFORM WITH 2 - T -PILES. 2 i 0' 18 8' 9 T_ -7— 77; 80, 46"""', 1511" 24' 4' L 14' 35' 2 SITE: FHLICANTS NAME LARRYBUCKELEW OB ADDRESS 1432 WEST BAY AVE EEL GRASS INSPECTION - NO EEL GRASS WITHIN I 5'OF PROJE 0 EEL GRASS IN THE PROJECTAREA ,67hrll� Millew SIGNATURE J /_ _x --- /,-/ 3 z 6 hala�;- PERMIT - —nAT;: TRACT 626 CONTRACTOR ---HARBOR RES01IRCES DIV. CITY OF NEWPORT BEACH <5hel"� Mili, 6 , V, 1 30' Husk be s sc+bq, Fro -n P)4 - c � M - S.J.B. 13 L�O 0 K 1 LOT 4 DATE 6/05 -3 - PERMIT CONDITIONS General Conditions: 1. The time hrnit for completing the authorized activity ends on December 7,2007. If you find that you need more time to complete the authorized activity, submit your request for a time extension to this office for consideration at least one month before the above date is reached. 2. You must maintain the activity authorized by this permit in good condition and in conformance with the terms and conditions of this permit. You are not relieved of this requirement if you abandon the permitted activity, although you may make a good faith transfer to a third party in compliance with General Condition 4 below. Should you wish to cease to maintain the authorized activity or should you desire to abandon it without a good faith transfer, you must obtain a modification of this permit from this office, which may require restoration of the area. 3. If you discover any previously unknown historic or archeological remains while accomplishing the activity authorized by this permit, you must immediately notify this office of what you have found. We will initiate the Federal and state coordination required to determine if the remains warrant a recovery effort or if the site is eligible for listing in the National Register of Historic Places. 4. If you sell the property associated with this permit, you must obtain the signature of the new owner in the space provided and forward a copy of the permit to this office to validate the transfer of this authorization. 5. You must allow representatives from this office to inspect the authorized activity at any time deemed necessary to ensure that it is being or has been accomplished with the terms and conditions of your permit. Furthermore, you must comply with the following non -discretionary Special Conditions: Special Conditions: 1. The permitted activity shall not interfere with the right of the public to free navigation on all navigable waters of the United States. 2. No dredging or earthwork is authorized by this permit. 3. Creosote treated pilings shall not be placed in navigable waters or waters of the United States unless all of the following conditions are met: a) The project involves the repair of existing structures that were originally constructed using wood products; b) The creosote treated pilings are wrapped in plastic; c) The use of plastic -wrapped creosote pilings is restricted to marine waters; -4- d) Measures are taken to prevent damage to plastic wrapping from boat use. Such measures may include installation of rub strips or bumpers; e) The plastic wrapping is sealed at all joints to prevent leakage. The plastic material is expected to maintain its integrity for at least ten years, and plastic wrappings that develop holes or leaks are repaired or replaced in a timely manner. 0 4. No other modifications or work shall occur to the docking structure. 5. A pre-constructim survey of the project area for Caulerpa taxifoha will be conducted in accordance with the Caulerpa Control Protocol (see http://swr.ucsd.edu/hcd/ccpvl.htin) not earlier than 90 days prior to planned construction and not later than 30 days prior to construction. The results of that survey shall be transmitted to NOAA Fisheries and CDFG at least 15 days prior to initiation of proposed work. In the event that Caulerpa is detected within the project area, no work shall be conducted until such time as the infestation has been isolated, treated, and the risk of spread is eliminated. 6. If the pern-Littee's project has the potential to impact EFH, specifically eelgrass, the permittee is required to conduct two years of post -construction monitoring per the mapping guidelines in the Southern California Eelgrass Mitigation Policy (see: http:/ /swr.nmfs.noaa.gov/hcd/eelpol.htin). A determination of the need and/or amount of eelgrass mitigation shall be made based upon two annual surveys conducted post -construction, during the time period of August to October, which document any changes in the area and/or density of the bed in the vicinity of the proposed project. If the monitoring surveys demonstrate an adverse impact to eelgrass, it will be mitigated in accordance with the policy. All required surveys will be submitted to the Corps and NOAA Fisheries within 30 days of each survey completion. The pern-tittee shall submit a signed agreement of understanding for two-year monitoring and 7 -year mitigation and monitoring, to the Corps and NOAA prior to issuance of the final pem-dt. 7. No debris, soil, silt, sand, sawdust, rubbish, cement or concrete washings thereof, oil or petroleum products, from construction shall be allowed to enter into or placed where it may be washed by rainfall or runoff into waters of the United States. Therefore, the pen-nittee shall employ all standard Best Management Practices to ensure that toxic materials, silt, debris, or excessive erosion do not enter waters of the United States during project construction. Upon completion of berthing improvements, any excess material or debris shall be removed from the work area and disposed of in an appropriate upland site. 8. The permittee shall discharge only clean construction materials suitable for use in the oceanic environment 9. The perrr-dttee shall notify the Army Corps of Engineers of the date of commencement of operations and the date of completion of operations at least five days prior to such completion. 10. The permittee shall notify the Commander Eleventh Coast Guard District, and the Coast Guard Marine Safety Office / Group LA -LB not less than 14 calendar days prior to commencing work. The notifications, either letter, fax, or e-mail, shall include as a minimum the following information: -5- a. Project description including the type of operation (i.e. dredging, diving, construction, etc). b. Location of operation, including Latitude / Longitude (NAD 83). c. Work start and completion dates and the expected duration of operations. The Coast Guard need to be notified if these dates change. d. Vessels involved in the operation (name, size and type). e. VHF -FM radio frequencies monitored by vessels on scene. f. Point of contact and 24 hour phone number. g. Potential hazards to navigation. h. Chart number for the area of operation. Addresses: Commander, 11th Coast Guard District (oan)Coast Guard Island ATIN: Local Notice to Mariners Building 50-3 Alameda, CA 94501-5100 TEL: (510) 437-2986 FAX: (510) 437-3423 U.S. Coast Guard Marine Safety Office / Group LA -LB Attn: Waterways Management 1001 South Seaside Ave., Bldg 20 San Pedro, CA 90731 TEL: (310) 732-2020 FAX: (310) 732-2029 11. The Permittee or their contractors shall not remove, relocate, obstruct, willfully damage, make fast to, or interfere with any aids to navigation. The Contractor shall notify the Eleventh Coast Guard District in writing with a copy to the Contracting Officer, not less than 30 calendar days in advance of the time he plans to operate any equipment adjacent to any aids to navigation which requires relocation or removal. Should any federal aids to navigation (AtoN) be affected by this project, the permittee shall contact the US Coast Guard AtoN office at (510) 437-2982. 10 12. If the work requires that private aids to navigation be established, the permittee or contractor should contact Mr. Brian Aldrich of the US Coast Guard at (510) 437-2983. 13. Upon the US Coast Guard s receipt of the notification to start work, a copy of the applicant's letter will be sent to the Coast Guard Captain of the Port (COTP) of Los Angeles/Long Beach for review. The COTP may modify the deployment of marine construction equipment or mooring systems to safeguard navigation during the project. Questions concerning lighting, equipment placement, and mooring should be directed to the COTP at (310) 383-1600. 14. The permittee shall send a post -project survey to the National Oceanic and Atmospheric Service for chart updating: Gerald E Wheaton, NOAA, Regional Manager, West Coast and Pacific Ocean, DOD Center Monterey Bay, Room 5082, Seaside, CA 93955-6711. 15. The permittee understands and agrees that, if future operations by the United States require the structure or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal or alteration. Further Information: 1. Congressional Authorities: You have been authorized to undertake the activity described above pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403). 2. Limits of this authorization. a. This permit does not obviate the need to obtain other Federal, state, or local authorizations required by law. b. This permit does not grant any property rights or exclusive privileges. c. This permit does not authorize any injury to the property or rights of others. d. This permit does not authorize interference with any existing or proposed Federal project. 3. Limits of Federal Liability. In issuing this permit, the Federal Government does not assume any liability for the following: a. Damages to the permitted project or uses thereof as a result of other permitted or non- pen-nitted activities or from natural causes. b. Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on behalf of the United States in the public interest. -7- c. Damages to persons, property, or to other permitted or non-pem-dtted activities or structures caused by the activity authorized by this permit. d. Design or construction deficiencies associated with the pen-nitted work. e. Damage claims associated with any future modification, suspension, or revocation of this permit. 4. Reliance on Applicant's Data: The determination of this office that issuance of this permit is not contrary to the public interest was made in reliance on the information you provided. 5. Reevaluation of Permit Decision. This office may reevaluate its decision on this permit at any time the circumstances warrant. Circumstances that could require a reevaluation include, but are not limited to, the following: a. You fail to comply with the terms and conditions of this permit. b. The information provided by you in support of your permit application proves to have been false, incomplete, or inaccurate (See 4 above). c. Significant new information surfaces which this office did not consider in reaching the original public interest decision. Such a reevaluation may result in a determination that it is appropriate to use the suspension., modification, and revocation procedures contained in 33 CFR 325.7 or enforcement procedures such as those contained in 33 CFR 326.4 and 326.5. The referenced enforcement procedures provide for the issuance of an administrative order requiring you to comply with the terrns and conditions of your permit and for the initiation of legal action where appropriate. You will be required to pay for any corrective measure ordered by this office, and if you fail to comply with such directive, this office may in certain situations (such as those specified in 33 CFR 209.170) accomplish the corrective measures by contract or otherwise and bill you for the cost. 6. Extensions. General condition 1 establishes a time limit for the completion of the activity authorized by this permit. Unless there are circumstances requiring either a prompt completion of the authorized activity or a reevaluation of the public interest decision, the Corps will normally give you favorable consideration to a request for an extension of this time limit. Permit Number: H.* LOS ANGELES DISTRICT U.S. ARMY CORPS OF ENGINEERS CERTIFICATION OF COMPLIANCE WITH DEPARTMENT OF THE ARMY PERMIT Name of Permittee: Date of Issuance: 200600128-SJH Larry C. Buckelew December 7,2005 Upon completion of the activity authorized by this permit, sign this certification and return it to the following address: U.S. Army Corps of Engineers Regulatory Branch ATTN: CESPL-CO-R-200600128-SJH P.O. Box 532711 Los Angeles, CA 90053-2325 Please note that your permitted activity is subject to a compliance inspection by an Army Corps of Engineers representative. If you fail to comply with this pern-Lit you may be subject to permit suspension, modification, or revocation. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the ten -ns and conditions of said permit. Signature of Pern-dttee Date YOU MUST RUN AND ATTACH Is I III Applicant: Larry Buckelew File Number: 200600128-SJH Date: November 22, 2005 Attached is: See Section below X INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission) A PROFFERED PERMIT (Standard Permit or Letter of permission) B PERMIT DENIAL C APPROVED JURISDICTIONAL DETERMINATION D PRELIMINARY JURISDICTIONAL DETERMINATION E 7C W ela �- WERS �a A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including, its terms and conditions, and approved jurisdictional determinations associated with the permit. OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section Il of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit. ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights C, C, to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process ZD by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Z� Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received Z� 0 Z� by the division engineer within 60 days of the date of this notice. C, E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the L, preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. M L 1--m-4-81 - MAP A -r, --,7L,,- MIR REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objection's are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may i)rovide additional information to clarify the location of information that is already in the administrative record. I If you have questions regarding this decision and/or the appeal process you may contact: DISTRICT ENGINEER Los Angeles District, Corps of Engineers ATTN: Chief, Regulatory Branch P.O. Box 532711 Los Angeles, CA 90053-2325 If you only have questions regarding the appeal process you may also contact: Douglas R. Pomeroy, Appeal Review Officer U.S. Army Corps of Engineers, CESPD-ET-CO 333 Market Street San Francisco, CA 94015-2195 Tel. (415) 977-8035 FAX (415) 977-8047 Tel. (213) 452-3425 FAX (213) 452-4196 1 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government zn t� t, t, consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and will have the opportunityto participate in all site investigations. I Date: of am)ellant or Telephone number: -10 - Applicant Options with initial Proffered Permit I nitial proffered pormit,sent to. applicant Applicant/Coirpssign. standard Does per rnit o r a p pl icarit acce pts "<a plicaniacceptih� letter of permission. <terms, and condftions of the rm The project is authorize.d. Yes initial proffered permit? No Applicant sends specific objections to district,engineer. The district engineer Will, either: modify the permit to remove all objectionable conditions, remove some of the objectionable conditions, or not modify thepermit. A;profferpd permit is sent to the applicant for reconsideration with an: NAP and an RFAform. Applicant/Corps sign standard Does the' permit or applicant accepts applicant accept the letter of perrriission. 4. --<terms and conditions of rms The project is authorized. Ybs the proffered p.ermit� Appendix B IM. Applicant declines the proffered permit. The,declined individual permit may be appealed by submitting a RFA to the division engineer \Mthin 60 days of the date of the NAP (see Appendix A). Eelgrass Survey Reporting Form (Version 1.0, June 20, 2003) This form is required to be submitted for any surveys conducted for the eelgrass,'Zostera matina, that are required to be conducted under federal or state permits and authorizations issued by the U.S. Army Corps of Engineers and the Coastal Commission. The form has been designed to assist in identifying eelgrass while ensuring that the required information is consistently documented. Surveys required to be conducted for this species are subject to modification through Publi cation of revisions to the eelgrass survey policy. It is incumbent upon the authorized permittee to ensure that survey work is following the latest protocols. For further information on these protocols, please contact: Robert Hoffinan, National Marine Fisheries Service, (562) 980-4043, or William Paznokas, California Department of Fish & Game, (858) 467-4218). * Required Information Site Name: (common reference) Buckelew Residence 1432 West Bay Avenue Newport Beach, CA 92661 Survey Contact: (name, phone, e -mad) Debbie Karimoto (949) 887-7041 (cell) (949) 830-1173 (fax & office) debkarimoto(& ,cox.net Permit Reference: (ACOE Permit No., City of Newport Beach Permit# 118-1432 CCC Permit No,) Hydrographic System: (bay, estuary, lagoon� or Newport Harbor harbor) Speeffic Location: (UTK Lat/Long., datum, Approximately accuracy level, attach 33.6076080 N electronic survey area map if 117.9156920 W possible) See attached maps Was Eelgrass Detected: Yes, Eelgrass was found at this site. xxx No, Eelgrass was not found at this site. Description of Permitted Work: Remove existing dock and replace with new dock. (describe briefly the work to be conducted at the site under the pemuts identified above) Depth range: 2-12' -Tide varied between + 2.12' and 2.18' at time of survey. Substrate type: Soft, silty sediment & compact silty sediment Temperature: 690 Salinity: Normal bay range of 30-33 ppt Dominantflora: Unidentified red and green algae—NO celgrass Dominantfauna: Barnacles Wegabalanus valifornicus) Mussels (Mytilus caftforianus) Sand bass, Stingrays, Tube -dwelling anemones, Moon jelly (Aurelia aurita), Tunicates Exotic species encountered: None Other site description notes: None Eelgrass. Swvey Repoiling Form (version 1.0, 6/20/03) Survey date and time 20 June 2005, 1:30-2:30 pin petiod. Hotizontal visibility in 5-10 feet water: Survey type and SCUBA survey, Diver swam transects throughout methods: APE. Survey personnel: Debbie Karimoto (949) 887-7041 (cell) Survey density: —100% of APE; no eelgrass found Survey limitations: None Other ]Information: (use this space to provide See map and site survey sketch any additional information or references to attached materials such as maps, reports, etc. Eelgrass. Swvey Repoiling Form (version 1.0, 6/20/03) Site Address. 1432 West Bay Avenue Newport Beach CA 92661 Site Address: 1432 West Bay Avenue Newport Beach CA 92661 Blue outline reflects survey perimeter. All area within that perimeter was surveyed. Site Adiress.- 1432 West Bay Avenue Newport Beach CA 92661 Site Address. 1432 West Bay Avenue Newport Beach CA 92661 Unidentified red and green algae and a juvenile bass Tube -dwelling Anemone (Packycerianthusfimbriatus) eating a Moon Jelly (Aurefia aurita) With unidendfied red and green algae (NOT Edgrass sp-) , CALIFORNIA STATE LANDS COMMISSION 100 Howe Avenue, Suite 1 00 -South Sacramento, CA 95825-8202 Mr. Steve Barrett P.O. Box 1457 Newport Beach, CA 92659 September 13, 2005 PAUL D. THAYER, Executive Officer (916) 574-1800 FAX (916) 574-1810 Relay Service From TDD Phone 1-800-735-2929 from Voice Phone 1-800-735-2922 Contact Phone: (916) 574-0234 Contact FAX. (916) 574-1955 File Ref: G09-02 RE: Proposed Modification for Replacing the Existing Pier, Gangway and Slip Float with a New Pier, Gangway and Finger Float Located at 1432 West Bay Avenue, New � ort Beach p Dear Mr. Barrett: This is in response to your recent request on behalf of your client for a determination by the California State Lands Commission (CSLC) whether it asserts a sovereign title interest in the property that the subject project will occupy and whether it asserts that the project will intrude into an area that is subject to the public easement in, navigable waters. The proposed project, involving the replacement of the existing pier, gangway and slip float with a new pier, gangway and finger float, is located on lands which have been -legislatively granted to the city of Newport Beach pursuant to Chapter 74, Statutes of 1978, as amended, with minerals reserved to the State. Therefore, CSLC authorization will not be required. Your client should, however, apply to all other agencies having approval authority over the project, including the city of Newport Beach. This letter does not constitute, nor should it be construed as, a waiver or limitation of any right, title or interest of the State of California in any lands under its jurisdiction. If you have any questions, please do not hesitate to contact me at (916) 574-0234. cc: Chris Miller, City of Newport Beach Fernie Sy, CCC . Sincerely, aiennifer Lucchesi Public Land Management Specialist STATE OF CALIFORNIA ARNOLD SCHWARZENEGGER, Govemor CALIFORNIA STATE LANDS COMMISSION 100 Howe Avenue, Suite 1 00 -South Sacramento, CA 95825-8202 Mr. Steve Barrett P.O. Box 1457 Newport Beach, CA 92659 September 13, 2005 PAUL D. THAYER, Executive Officer (916) 574-1800 FAX (916) 574-1810 Relay Service From TDD Phone 1-800-735-2929 from Voice Phone 1-800-735-2922 Contact Phone: (916) 574-0234 Contact FAX. (916) 574-1955 File Ref: G09-02 RE: Proposed Modification for Replacing the Existing Pier, Gangway and Slip Float with a New Pier, Gangway and Finger Float Located at 1432 West Bay Avenue, New � ort Beach p Dear Mr. Barrett: This is in response to your recent request on behalf of your client for a determination by the California State Lands Commission (CSLC) whether it asserts a sovereign title interest in the property that the subject project will occupy and whether it asserts that the project will intrude into an area that is subject to the public easement in, navigable waters. The proposed project, involving the replacement of the existing pier, gangway and slip float with a new pier, gangway and finger float, is located on lands which have been -legislatively granted to the city of Newport Beach pursuant to Chapter 74, Statutes of 1978, as amended, with minerals reserved to the State. Therefore, CSLC authorization will not be required. Your client should, however, apply to all other agencies having approval authority over the project, including the city of Newport Beach. This letter does not constitute, nor should it be construed as, a waiver or limitation of any right, title or interest of the State of California in any lands under its jurisdiction. If you have any questions, please do not hesitate to contact me at (916) 574-0234. cc: Chris Miller, City of Newport Beach Fernie Sy, CCC . Sincerely, aiennifer Lucchesi Public Land Management Specialist Mariners Escrow 949-721-8157 CITY OF NEWPORT BEACH 829 Harbor island Drive, Newport Beach, CA 92659 949-644-3034/Fax 949-723-0589 Re: Pier Permit 118-1432 1432 W. Bay Ave., Newport Beach, CA Escrow # 24511 -TE Dear Sirs: The City of Newport Beach has inspected the above property and found that it meets City standards and the permit will be transferred. If you require further assistance in this matter, please call 644-3034. Sincerely, 42r e Arcese arbor Resources Division AUG -01-03 11:50 FROM—Mariners Escrow Civic Plaza 9497290190 T-173 P.002/002 F-932 HARBOR PERA41T NTSFER APPLICAITON Date *of Applicaton: PermitNumber: Property Address: 1432 w- 3rt Bear -h. 92661 Buyees Names: C. Buclik- .jew and,'ElIzabeth H. Buck6jew Billing Address: ql*761- /Vf -/77 le Telephone No.: --k Seller's Names: to�Wft" f-, Seller's Signatures: Joint Owner Signature: Escrow Company: 'K-�xinerr- E-scrOw cOrPoratIcT Escrow Number: '45 -fTZ Fax#: 942 721 Inspection Date: fl6l��3 Reffispection Date; Fee Amount: c�k' - / � 4 '!�-D Date Paid: Gheck Number: Application Approved: Z'o -. — Harbor Resources SignaturelDate Special Gonditions: This permit is revocable by, the City Council in accordance with Title 17 or the Newport Beach Municipal Code. PROPERTY: 1432 W. Bay Avenue Newport Beach, CA 92661 BUYER: Larry C. Buckelew Elizabeth H. Buckelew We appreciate your business! a f We appreciate your business! f 4 Marin Fax 9 Re: Dear Sirs: 11 JE CITY OF NEWPORT BEACH 829 Harbor island Drive, Newport Beach, CA 92659 949-644-3034/Fax 949-723-0589 The above dock was inspected by The Harbor Resources Division of the City of Newport Beach inspected the dock at the property mentioned above. We cannot transfer the pier permit until the following deficiencies have been corrected and the property has been re -inspected: 1. It needs an anti -siphon device installed The Newport Beach City Council Harbor Permit Policies state: 10.D. "At the time of transfer, all harbor structures shall be inspected for compliance with the City's minimum plumbing, electrical and structural requirements, and the conditions of the existing permit. All structural deficiencies must be corrected prior to transfer of the permit." Please call 644-3034 to request a reinspection. Once the property has passed reinspection the pier will be transferred. Sincerely, L Division of Harbor Resources August 4, 2003 Mariners Escrow 949-721 -O+eO-- 9 / 5 1 Re: Pier Permit Transfer #118-1432 Escrow # 24511 -TE Dear TE: Attached are the instructions for pier permit transfers. As noted, the total transfer fee is due at the request for a transfer. I will hold this order until I receive the remaining $192.50 and then process as soon as possible. Thanks for your help in this matter. Sinc rely, OA rrie Arcese Harbor Resources Division INSPECTION FORM Harbor Resources Department 8/_-1 Date: 103 Inspection Requested By: Inspector: Don Duffy Pier Address: 64 - Pier Transfer 5Reinspection GFI Present Yes N ed Yes ;,- e, 7ed None Needed Anti -Siphon Backflow Present 0 00,15� Other Comments Eellgrass Yes No PresentF----T- PUMP Out Pier Location Operational I Yes I No -1 Recommended Action Encroachmenet Address of Complaining Party Boat Description CF Number Location on Dock Comments / Observations Other Request RBR RP118.14312 /1.1 Servi-ce Addr 1432 BAY AVE W NOTICE DATE: ol/18/2001 ALLEN, JOHN C 03/01/2001 DUE DATE: C/o CHRISTINE REITINGER C" rjg T7# 37 $78.00 &4� Total Amount Due MP RP11814321 ?800 /07 w C�v Cj I ,� 110 116 -k C) ;!j 7-7 Ile vicwrry Tc,,4 ISAY, CAtjr-a"t^ 0. Mcs- or* /0 olpwt. hay. /5 .4 y All F/F Av-,14 7. It 15771"r- 4ECP Y ILI 141 --o 3 cr' Ll Adq 411 oj 77t-AC17- IJIC A V C—: &,, u, & 14 i IV '&do A 37co/& 64, AP -414/C.' -X,4 f CITY OF NEWPORT BEACH ENCROACHMENT PERMIT (Please type or print. Press hard - making 3 copies.) Permit# EP Amount Fee Paid $ Receipt # Sewer Fee Receipt,# -i I I , water Fee Receipt# APPLICATION FOR: 0 CURB CUT 0 SEWER CONNECTION (CHECK ONE) 0 STREET EXCAVATION 0 WATER �O UNDERGROUND UTILITY 0 OTHER ADDRESS OF WORKN�V /V4/(51 APPLICANT'S NAME 05 ADDRESS Phone OWNER'aNAME ADDRESS Phone CONTRACTPR!S NAME ADDRESS 40 Office Phone Job Site Phone CONTRACTOR'S CITY BUSINESS LICENSE NO. 017-377 —STATE LICENSE NO., Th Ii thereby make�aaplicption t ,q app ican c W q "m6w i (See attached plans) WORKERS'C 1 0 M PENSAT . ION INSURA14CE (Required by Section 3 1 800 of Labor Code)', Applicant has furnished to the City a certificate of workers' compensation insurance issued by an admitted insurer and conforming to Section 3800 of. the -Labor Code; or an exact copy thereof. certified byJhe insurer. The insurance certificate shows the expiration date of the policy. If the policy lapses or is cancelled, this permit shall be,deemed to be revoked. 2 Insurer Policy No. Expiration Date' The terms ions pkKi's**Vermit are printed on both sides of this form. Applicant hereby acknowledges that he has r t n term and conditions, and that he agrees to abide 4y them.. (Applicant's. Sigvnature) �Date), ------------------------------------------------------------------------------ SPACE BELOW THIS LINE FOR OFFICE USE -------------- --------------------------------------------------------------- DEPARTMENT APPROVAL, REQUIRED. .DATE SIGNATURE 7, TITLE SPECIAL CONDITIONS OF APPROVAL REQUIRED BY CITY: PERMIT ISSUED BY: DATE ISSUED: EXPIRATION DATE OF PERMIT: PERMIT DENIED 0 White - Permit Pink - Temporary Yellow - Applicant Office Copy TO BE FILLED IN BY FIELD PERSONNEL Inspector Requested Time and Date of Inspection: Time Date Contractor Remarks Date Work Inspected Inspector's TERMS AND CONDITIONS 1. Encroachment permits shall be taken out in the name of the owner of the benefited property. A signed �opy of the permit and approved construction plans-sball: be kepJ at the job site at, all times.- A, 2�, The'�a*lpplicii,fit�grees to indemnify and hold the City, its authorized agents, officers, representatives and employees harmless from tiny liability, suit or action of an� description arisin'g'o.uit 61,anya�,�ident, loss or damage-to.persons or property occurring as a proximate result of any %�4 646"kaken ijnde�r,thi 3." kll Work sh�al[l'�6e done in accordance with the approved.plans, ah&the Standard Special Provisions and Standard Drawinqs'df the City cf Newport Beach, And in compliance with all applicable State laWs and City ordinances. construction within p,ublic rights-of-way must.be performed by licensed contractors, 6.nle,ss waived bv the Public A irtme'ht -shill �66tafrf p&fr�its:topdft6rm'--6kcA\i�t!6.n, o -,renc.-wor 'frorr(e6tWild a D v'sidli' 6f Jhdusfridt' t 5.'i�bh 660s )r t k Safety prior to commencing underground construction. Trench excavation and backfill shall conform to Section 306-1. of.the City's.Standard Special Provisions. Walls and faces of all excavations over .5. feet, in, de,pth,.shall be �-effeqtively� protected by a shoring system,, sloping, of the ground, or other equivalent mepris-Trenches less than 5 f -ity, P ded when hazardous ground movement may be expected. eet de '6'shall be guar 6. All: work must be inspected by the Public Works Department. Forms and subgrades must be inspected and approved before concrete, is ordered. Sewers,. pipelines aryd subgrade construction must be inspected. and appr�pyed before backfilling. Public Works_Jnspectors are normally available during working, hours upon .24 hours ''adva hc'e notice. Call (714) 644-3311 toa I rran . ge'4orah'-i*nspb�tilorl. Separate Utilities Departrn'�ritinsp-eqflori'ma be necessary. 7. Permits for excavation work required to install water and/or sewer services shall ndiiberissue I d-4til- , jitility..— connection fees have b�enlpajd..Aftbr fees have been paid, the Public Works -"Department will's6nd the permit application to the Utilities D�Pahment'for approval. All utilities connections mus t-�behnsp'_ed­t6d-­b tfi�' Utili ities— Department prior to backfilling. The applicant shall notify the Utilities Department at (7�4) 644-3011 at least 72 -hours' in advance of work for utility inspections. 8. Barricades mu ' st be provided and maintained around all trenches, excavations and obstructions. Bardcade&'rhust be properly lighted at.'night. All, signs, flags, lights and. 'other warning and safe I ty devices shall conform to the requirements of the current "Manual of Warning Signs' Lights and Other Devices for Use in Performance of Work upon Highways;" issued by the California Department of Public Works� If barricades are- not provided by the applicant for the protection of the public, the City may place barricades for which the applicant will be charged $10.00 per barricade per day,- with a minimum charge of $35.00. 9. Access to fire hydrants shall be maintained atall times. 10. Priorto undertaking anyworkwhich will -extend intoatraffic laneand I imp I ede the normal flow of traffic, the applicant must first secure the written approval of the Public Works Department's Traffic Division. The Traffic Division may require written approval from the License Supervisor, who will notify the Police and Fire Departments prior to allowing the streets to be closed.-Traff ic Control must be perWork Area Traffic Control Handbook (WATCH). 11. The applicant must notify the gas, electric, telephone and cablevision companies before starting any underground construction. Call Underground Service Alert at 1-800-422-4133 at least 48 hours before digging. 12. Refuse or unused materials shall be removed within 24 hours after completion of the work. If materials are not so removed, the City may remove the materials and bill the applicant. 13. A permit for a driveway approach shall be considered null and void if changes made by the applicant eliminate the need for a driveway. The driveway approach shall be removed, and the curb and gutter replaced at the applicant's expense. 14. Work which has been done prior to issuance of a permit is subject to rejection and/or fine. S CITY OF NEWPORT BEACH Permit# EP - ENCROACHMENT PERMIT Amount Fee Paid $ (Pfies"e type or print. Press hard - making 3 copies.) Receipt # APPLICATION FOR: 0 CURB, CUT 0 SEWER CONNECTION Sewer Fee Receipt # (CHECK ONE) 0 STREET EXCAVATION 0 WATER CQNNEC 10 El 0 88 ater Fee Receipt # UNDERGROUND UTILITY OTHER ADDRESS OF WORK /432 'APPLICANT'S NAME ADDRESS Phone 05Ptx�r- 41 ir, OWNER'S% NAME ADDRESS Phone CONTRACTOR'S. NAME ADDRESS Office Phone Job Site Phone CONTRACTOR'S CITY BUSINESS LICENSE NO. STATE LICEN SE NO. The applicant hereby makes applicati on. to Jo" (See. attached plans) WORKERS' COMPENSATION INSURANCE (Required I by Section 3800 of Labor Code). 4 ­kI 77� 0, IL& el Applicant has furnished to the City a certificate of workers' compensation insurance issued by an admitted insurer and conforming, to Section 3800 of the Labor Code; or an exact copy thereof certified by the insurer; The:insurance certificate shows the expiration date of the policy. If the policy,lapses or is cancelled, this permit shall be deemed to be revoked. Polic N Insurer y 0 Expiration Date The terms ions is ermit are printed on both sides of this form. Applicant hereby acknowledges that he has r e4amer-p -s n, itermOnd conditions, and that he agrees to abide by them. (Applicant's Signature) (Date).. -------------------------- --------------------------------------------------- SPACE BELOW THIS LINE FOR OFFICE USE --------------------- - - - ---- - - - - - -- -- I --- — - - - - - ------------- ----- DEPARTMENT APPROVAL REQUIRED, DATE SIGNATURE -,TITLE SPECIAL CONDITIONS OF'APPROVAL REQUIRED BY CITY: PERMIT ISSUED BY: DATE ISSUED: EXPIRATION DATE:OF PERMIT: PERMIT DENIED 0 TO BE FILLED IN BY FIELD PERSONNEL Inspector Requested Time and Date of Inspection: Time Date Contractor Remarks Date Work Inspected Inspector's 'Signature TERMS AND CONDITIONS 1. Encroachment permits shall be taken out in.the name of the owner of the benefited property. A signed copy of the permit and approved construction plans shall be kept at the job site at all times., 2. The applicant agrees to indemnify and hold the City, its authorized agents, off rcers, representatives and employees harmless from any liability, suit or action of any description arising out of.any accident, loss or damage to persons or property occurring as a proximate result of any work undertaken under this permit. 3. All work shall be done in accordance with the approved plans, and the Standard Special Provisions and Standard Drawings of the City of Newport Beach, and in compliance with all applicable State laws and City ordinances. 4. All construction within public rights-of-way must be performed by licensed contractors, unless waived by the Public Works Department. 5. Contractors shall obtain permits to perform excavation or -trbncb work from the California Division of Industrial Safety prior to commencing underground construction. Trench excavation and backfill shall conform to Section 306-1 of the City's Standard Special Provisions. Walls and faces of all excavations over 5 feet in depth shall be effec ' tively protected by a shoring system, sloping of the ground, or other equivalent means. Trenches less than 5 feet in depth shall be guarded When hazardous ground movement may be expected. All work must be inspected by the Public Works Department. Forms and subgrades must be inspected and approved before concrete is ordered. Sewers, pipelines and subgrade construction must be inspected and. approved before backfilling. Public Works inspectors are normally available during working hours upon 24 hours advance notice. Call (714) 644-3311 to arrange1or an inspection. Separate Utilities Department inspection may be necessary. 7. Permits for excavation work required to install water and/or sewer services shall ndt 'be rissued- -until, Litility..,- connection fees have been paid. After fees have been paid, the Public Works Department will send the permit application to the Utilities Department for approval. All utilities connections must- be inspeGt6d-by the UtHities— Department priorto backfilling. The applicant shall notifythe Utilities Department at (714) 644-3011 at least72 hours in advance of work for utility inspections. 8. Barricades must be provided and maintained around all trenches, excavations and obstructions. Barricades must be properly lighted at night. All signs, flags, lights and other warning and safety devices shall conform to the requirements of the current "Manual of Warning Signs' ' Lights and Other Devices for Use in Performance of Work upon Highways," issued by the California Department of Public Works. If barricades are not provided by the applicant for the protection of the public, the City may place barricades for which the applicant will be charged $10.00 per barricade per day, with a minimum charge of $35.00. 9. Access to fire hydfants shall be maintained at all times. 10. Prior to undertaking any work which will extend into a traff ic lane and impede the normal flow of traffic, the applicant must first secure the written approval of the Public Works Department's Traffic Division. The Traffic Division may require written approval from the License Supervisor, who will notify the Police and Fire Departments prior to allowing the streets to be closed. Traffic Control must be per Work Area Traffic Control Handbook (WATCH). 11. The applicant must notify the gas, electric, telephone and cablevision companies before starting any underground construction. Call Underground Service Alert at 1-800-422-4133 at least 48 hours before digging. 12. Refu se or unused materials shall be removed within 24 hours after completion of the work. If materials are not so removed, the City may remove the materials and bill the applicant. 13. A permit for a driveway approach shall be considered null and void if changes made by the applicant eliminate the need for a driveway. The driveway approach shall be removed, and the curb and gutter replaced at the applicant's expense. 14. Work which has been done prior to issuance of a permit is subject to rejection and/or fine. -CITY OF NEWPORT BEACH Permit# EP_ ENCROACHMENT PERMIT Amount Fee Paid $ (Rjlpasia type or print. Press hard - making 3 copies.) Receipt # APPLICATION FOR: D.CURB.CUT 0 SEWER CONNECTION Sewer Fee Receipt # (CHECK ONE) 0 STREET EXCAVATION 11 WATER C0NNECTIOt4 0 0 kWater Fee Receipt # -UNDERGROUND UTILITY OTHER ADDRESS OF WORK APPLICANT'S NAME ADDRESS Phone OWNER NAME ADDRESS Phone CONTRACTOR'S NAME 5, 4 ADDRE S Office Phone 11 Job Site Phone' _zb�Y�Pz_ -7 CONTRACTOR'S CITY BUSINESSLICENSE NO. STATE LICENSE NO. The applicant hereby makes application to 7; K-. //a- 7, (See attached?plans) WORKERS' COMPENSATION INS'URANCE (Required by Section 3800 of Labor Code). Applicant has furnished to the City a certificate of workers' compensation insurance issued by an admitted insurer and conforming to Section 3800 of the Labor C-bde; oraft exact copy thereof certified by the insurer. The insurance certificate shows1he expiration date of the policy. If de policy lapses or is cancelled, this permit shallbe deemed to, be revo I ked. Insurer Policy No. Expiration Date The terT%.apd,4Mffd*tions of-th'i's',permit are printed on both sides of this form. Applicant hereby acknowledges that he has read�a nd� kan8 ffid, nd,6;r�tads i ,termsfand conditions, and that he agrees to abide by them. n� (Applicant's Sijnature) (Date) ------------------ ------------------------­-- I ------------------------ SPACE BELOW THIS LINE FOR OFFICE USE. -------------------------------------------------------------------------- DEPARTMENT APPROVAL REQUIRED, DATE SIGNATURE - TITLE' SPECIAL CONDITIONS OF APPROVAL REQUIRED BY CITY: PERMIT ISSUED BY: DATE ISSUED: EXPIRATION DAT&OF PERMIT: PERMIT DENIED 11 TO BE FILLED IN BY FIELD PERSONNEL Inspector, Requested Time and Date of Inspection: Time Date Contractor Remarks Date Work Inspected Inspector's Signature TERMS AND CONDITIONS 1 Encroachment permits shall be taken out in the name of the owner of the benefited property. A signed copy of the permit and approved construction plans shall be kept at the job site at all times. 2. The applicant agrees to indemnify and, hold the City, its authorized agents, off icers,: representatives and employees, harmless from any liability, suit or action of any description arising out of any accident, loss or damage to persons or property occurring as a proximate result of any work undertaken under this permit. 3. All work shall be done in accordance With the approved plans, and the Standard Special Provisions and Standard Drawings of the City of Newport Beach, and in compliance with all applicable'Statb laws'and City ordinances.' 4. All construction within public rights-of-way must be performed by licensed contractors, unless waived by'the Public Works Department. 5. Contractors shall -obtain permits to -perform excavation or trench work from the.Callfornia Division of Industrial Safety prior to commencing underground construction. Trench excavation and backfill shall conform to Section 306-1 of the C ity's,. Standard. Special Provisions. Walls and,faces of. all excavations over 5 feet in depth shall be effectively protected by a shoring system, sloping,of the ground, or,other equivalent means. Trenches less than 5 feet in depth shall be guarded wheh'hazardous "ground movemen . t may be e I xpected 6. All'work� must be inspected by the Public Works Department. Forms and subgrades'must be,inspected and approved before concrete is ordered. Sewers,- pipelines and subgrade construction-, must,be. inspected and approved before backfilling. Public Works inspectors are normally available during working hours upon 24 hours advance notice. Call (714) 6,44-331,1 to arrange for an.inspection. Separate Utilities, Department inspection. may be necessary. 7. Permits for excavation work required: ta-install water and/or sewer services shall not be issued�until Utility�_ connection fees have been paid. After fees have been paid, the Public Works Department will send the permit application -to the Utilities Department for approval. All utilities connections must be inspected by the.Utilities Department priorto backfilling.7he applicantshall notifythe Utilities Department at (714) 644-�30111 atleast72 hours in advance of work for utility inspections. 8. Barricades must be provided and maintained around all trenches, excavations and obstructions. Barricades must be,. properly lighted at night. All sighs, , flags, lights and�. other warning, and safety devices shall conform to the requirements of the current "Manual of Warning Signs',. Lights and Other Devices for Use in Performance of Work upon- Highways," issued by the California Department of Public Works. If barricades are not provided -by the applicant for the protection of the public, the City may place barricades for which the applicant will be charged $10.00 per barricade per day, with a minimum charge -of $35.00. 0. 'Access to -fire hydrants shall be maintained at all times. 10. Prior to undertaking any work whichwill extend into a traffic lane I and impede the no I rmal . flow of traffic, the applican t must first,secure the written approval of the Public Works Department's Traffic Divisio ' n. - The Traffic Division may, require written approval from the License Supervisor, who will notify the Police and Fire Departments prior t o allowing the streets to -be closed. Traffic Control -must be per Work, Area Traffic Control Handbook (WATCH). , 11. The applicant must notify the gas, electrici telephone and cablevision companies -before starting any underground construction. Call Underground Service Alert at 1-800-422-4133 at least 48 hours before digging. 12. Refuse or unused materials shall be removed. within 24 hours after completion of the work. If materials are not so removed, the City may remove the materials and bill the applicant.' 13. A permit for a driveway approach shall be considered null and void if changes made by the applicant eliminate the need for a driveway. The driveway approach shall be removed, and the curb and gutter replaced at the applicant's expense. 14. Work which has been done prior to issuance of a permit is subject to rejection and/or fine. CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT SKETCH FOR ENCROACHMENT PERMIT NO. EP - (Sketch to be drawn in triplicate Job Address Owner Telephone No. Existing Curb and Gutter A ?161 carrt's Sfignak2u�re Di�te I Please make a sketch of the immediate vicinity showing all property lines, dimensions, street names, location of trees, light standards, fire hydrants, parking meters or other existing improvements which might be affected by the proposed encroachments. Works shall be done according to City specifications and is subject to City inspection. CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT (714) 644-3311 REQUIREMENTS FOR DRAWINGS To Be Attached to Encroachment Permits 1 . 3 sets of drawings shall be on standard sized sheets, 8-21" x 11". For extensive projects which do not lend themselves to an 8-2L11 x 11" drawing, a full size drawing suitable for exhibit to be posted on the Council board shall be prepared. 2. Drawings shall have a title block indicating applicant's name, address of work and who prepared the drawings. 3. The drawings shall be prepared to scale. 4. The following items must be accurately depicted on the drawings: a. Property lines. b. Distance from property line to all encroachments in the public right of way. c. Dimensions of proposed improvements. d. The height of all encroaching structures must be clearly shown, and the datum plane must be clearly indicated. This means, for example, that if the height of a wall is specified, it must be clearly stated where the height is to be measured from. e. Type of encroachment. f. All improvements affected by the proposed encroachments must be shown. g. Street names. CHNICAL OPERATIONS Ofadc�e Darlopmw 321Z Oe=4 Callfix* 92,463 CHNICAL OPERATION0,06, OsadHe 73�vlo Post S90; 321Z awport a.4 cjjfi,.w - a 92663 IHNICAL OPERATIONS Ofadche )�vlo c pmW 321Z Atw,bOff -c&aA alifi=4 CAL -IF. LIC. 4p68--1 O�ADCW DEVELOPMENT Of.mmzwiat T�Eii9r,,, - Jg,dj,, 3609 BALBOA - POST OFFICE BOX 3212 NEWPORT BEACH. CA 92659 SAM 0SADCHt OWNER BUS. PH. (714) 650-8300 4M IQJ dv AJ---- NL -- SOWnO(ff7qtS 011-0 A7 AdWt Cr,,,V OW70YW,' OlVIVA4S bOlOW "04OV? ed;'#VdW- 6PW W470461.—. AftinfAWORP ,-a",3w ov /0 Awt. No. -,606- hcoms s4rcjo,�,V7 Owe A*).Vaor�o 00Y. Lie, 0 At (A( Ul -T'O SS- x I 5, Ul -T'O SS- L T A N L API,,,Y IS NOT T-ii"'%N�,,�,' i T TUF CrTy RMNITS AND THIS Pa� "'Url C"! JIR ACCORDANCE WA MW TITLE 17 GF Z A jft M NO NO, IT 'ON ocurp 2 c'F pen."n4t oran'..' comn'tif par M- BUYERS' NAME(S) A 0, "m 114 ADDRESS OF FACILITY: PERMIT,# #jwm*, ;;iN - , fte. I —Avt TELEWfQ,---AO. T, Pa. CHECK No. DATE APPROVED BY: .DATE APPLICATION IS�HEREBY MADE TO TRANSFER HAR- BOR PERMIT OCHD �NG SELLERS' NAME(S) BUYERS' NAME(S) (ABOVE NAMES TO BE TYPED) COUNCIL D PUBLIC WORKSF� NATURE SIG OF SELLER S ; IONA . T URE OFtftkR DEPT. SIGNATURE,,OF SELLER �-�,:,�IGNAT RE OF BUYER , INSPECTION El APPLICATION APPROVED (DATE) ---------- SPECIAL CONDITIONS- I A S: plj:-5RMI'r, IS�REVOCAIBLEBY.THj: CITY HARBOR COOKJJINAT6i OF THE MUNICIPAL C' .�ODE.: CITY COUN CIL ng Acco PANCEWITH7ITLE 17 CITY OF NEWPORT: BEACH, CALIF. I �wx FORN 69.1013 REV. MEMO FROA� ,,�2 - If - dl-'- /— �2- JoHN C. ALLEN ATTORNEY AT LAW C, WI US H laLIFO,--EVA R D 1800 CEL,l 0DR, W'LSH'RE '-" z LCII A111 �CALIFOIIIN'IA 90017 GLENDA, LE, CA 91207 Ac— ................ oe- -Ole C \I-' Z-0- �IIIFORT�� -February 9, 1988 Mr. and Mrs. John C. Allen 1432 West Bay Avenue Balboa, CA 92663 Dea r S i r: A check of�the City Harbor Permit files has shown that the permit for the pier and float at -1432 West Bay Avenue Newport Beach, is registered to Ja.nes J. Birmingham. A transfer application must.be completed and a transfer fee paid each time the permit has ichanged ownership. Chapter 17.24.030 of the Municipal Code addresses the transfer of a pier permit and rpads as follows.:. "No person shall transfer a permit for a pier, float or similar structure granted under the provisions of this chapter without prior written approval of the City." Failure to pay the transfer fees can be grounds for revocation of the Harbor Permit in accordance with Chapter 17.24.090 of the Municipal Code. Your cooperation in bringing this permit up to date will avoid any action by.the City'. Yours truly,,,, AA11 Tony,Me m Tidelands dministrator Telephone: 714-644-3044 TMAb 'March 1, 1988 Mr. and Mrs. JOhn C. Allen 1432 West Bay Avenue Balboa, CA 92661 Dear Sir: The City of Newport Beach Marine Department has recived a request to transfer pier permit # 118-1432 for the property located at 1432 West Bay Avenue NewpOrt Beach, CA. We cannot transfer thp,, pier permit until the following. deficiencies have been corrected and we have been notified: A City -approved anti -syphon device is required at the water connection to the piEr and float. 2. Electrical conduit and wiring should be extended to the 3. bottom of t he ramp and connected to a pull box. T The structure was inspected. on 2./29/88 and in accordance with Section 10-D of the Harbor Permit Policies it' cannot be transferred until it meets City requirements. 10.D."At the time of transfer, all harbor structures shall be inspected for -compliance with the City's minimum plumbing, electrical and structural requirements, and the conditions of the existing permit. All structural deficiencies must be corrected prior to transfer of the permit.n A permit for plumbing or electrical work must be obtained from the Building Department of the City. PLEASE ADVISE THIS DEPARTMENT WHEN THE:ABOVE DEFICIENCIES HAVE BEEN CORRECTED. . When notified, the structure will again be inspected and when the requirements have been met the pier permit will be transferred. PLEASE TELEPHONE (714) 644-3044'TO REQUEST A REINSPECTION OF THE STRUCTURE.- If you have questions please call this'number. Slncgx.eiy,, Tony M . um Tidelands Administrator 3300 Nevport Boulevard, Newport Beach LOCATION PERMIT NO.--ji/gr/ c,,Y Sel I er Oa te.App) ication Received: Date Fee Received:" Request for Inspection made by: Escm Co. ti Escrow Officer Escrow No.-------. Address Phene: t Da te � I nspecti on madel, /7 Deficiency Letter sent:!:17 Deficiency corrected: Transfer completed: Date Inspection: 1. Location 4. Structural: 5.OTHER: REMARKS: Inspected by: 117132 I Al V�l , I't 43 0.0 Awa A mo* VICINITY SKETC1.4 ftwof AMY 2c) fr-4MWkP4dA Pr CWV CVAVA1X49rh6tY W� t.,�v soc,;0,007 oor A4wAvv-;f 00Y. A y I 45 -YJ _5 7/ A/,,,,' gx/,sr/ Aje- 1--,4-oA -r CC Ll T + 3:57' It - 3 r I 2� 15 ;ov /Z`/ ar 4-1 6 Lc O'L 'A VC - /43 2- W. 43AY A V4= Ale P.47e. Api