TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: Public Works Department
Sean Crumby, Associate Civil Engineer
949- 644 -3315
scrumby @city.newport- beach.ca.us
SUBJECT: JAMBOREE ROAD STREET REHABILITATION - APPROVAL OF
PROFESSIONAL SERVICES AGREEMENT WITH DEWAN, LUNDIN
AND ASSOCIATES
RECOMMENDATION:
Approve a Professional Services Agreement with Dewan, Lundin and Associates Inc.,
of Garden Grove, California, for Jamboree Road Street Rehabilitations, (1) from
University Drive to Bristol Street, and (2) from San Joaquin Hills Road to Ford Road at a
contract price of $85,708.00 and authorize the Mayor and City Clerk to execute the
Agreement.
DISCUSSION:
Over the past few years several segments of Jamboree Road have been rehabilitated.
Those sections are:
• Coast Highway to San Joaquin Hills Road in FY 1998 -1999
• Ford Road (Eastbluff Drive) to Bison Avenue in FY 2003 -2004
• Bison Avenue to University Drive (Eastbluff Drive) in FY 2002 -2003
This year the Orange County Transportation Authority (OCTA) approved an allocation
of approximately $85 million in federal roadway funds to cities and the County in
Orange County as part of the Arterial Highway Rehabilitation Program (AHRP) to
rehabilitate arterial streets. These funds require a City match and are to be
administered through Caltrans over the next two years. On January 25, 2005 the
agencies in Orange County submitted applications for qualified projects. The City of
Newport Beach had seven such applications of which six were approved (one is still
pending). Two of those projects are to rehabilitate the remaining sections of Jamboree
Road that lie between Coast Highway and Bristol Street. Those sections are (1)
University Drive to Bristol Street, and (2) San Joaquin Hills Road to Ford Road. The
proposed improvements for the first section (University to Bristol) are budgeted as a FY
2005/06 Capital Improvement Program project. The proposed improvements for the
second section (San Joaquin Hills to Ford) are scheduled to be budgeted in the FY
2006/07 Capital Improvement Program. The construction cost is estimated to be
$800,000 for each project. The City's matching portion for each project will be
SUBJECT: Jamboree Road Street Rehabilitation - Approval of Professional Services Agreement With Dewan Lundin and
Associates
July 26, 2005
Page 2
$400,000 and will be funded from either Gas Tax or Measure M Tumback. In addition
to rehabilitating the streets, the median curbs will be re- established in both sections.
Dewan, Lundin and Associates performed engineering services for the last two
segments of Jamboree Road (Ford to Bison and Bison to University). In both cases
numerous proposals were received and DL &A was chosen based upon firm
qualifications, past experience with similar projects, and availability. Both of those
projects were successfully constructed near the contract cost with minimal change
orders. Due to this recent high level of performance and timing needed to effectively
submit the plans to Caltrans, staff negotiated with DL &A to provide the necessary
scope of services for a fee of $42,854.00 for each section totaling $85,708.00. This fee
is approximately five (5 %) percent of the projected construction cost.
The scope of DL &A's professional services will include:
• Aerial topographic survey
• Ground topographic survey
• Utility investigation and coordination
• Preparation of plan and profile improvement plan sheets
• Preparation of pavement cross section plan sheets
• Preparation of pavement striping and signage plans
Preparation of project Specifications
• Preparation of construction quantity and cost estimates
• Assistance during bidding
• As -built plans.
Environmental Review:
Engineering design services are not a project as defined in the California Environmental
Quality Act (CEQA) Implementing Guidelines. However, at the time of award (for
construction) it is likely that the project will be determined exempt from the CEQA
pursuant to section 15302 of the CEQA Implementation Guidelines. This exemption
covers the maintenance and alteration of existing public facilities with negligible
expansion of the facilities in areas that are not environmentally sensitive.
Funding Availability:
There are sufficient funds available in the following account for the project:
Account Description
Gas Tax — Jamboree Road Rehabilitation
Prepared b r
Sean Crumby, P.E. �/ /
Associate Civil Engf{{eer
Attachment: Professional Services Agreement
Project Location Map
Account Number Amount
7181 C5100831 $85,708.00
Submitted b i
Stepp G. Badum
Pudic Works Director
FY 2002/2003 PROJEC TO AREA 1
RESURFACED
?� FY 2003 /2004'•
PROJECT AREA 2 D
FORD RD TO
SAN JOAQUIN HILLS
RESURFACED
FY 1998/1999'
CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT
JAMBOREE ROAD
REHABILITATION PROJECTS
JULY 2005
SC
N.T.S