Loading...
HomeMy WebLinkAbout07 - Begonia Park Playground ImprovementsCITY OF NEWPORT BEACH CITY COUNCIL STAFF REPORT Agenda Item No. 7 August 9, 2005 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department R.Gunther, P.E. 949 -644 -3311 rgunther@city.newport-beach.ca.us SUBJECT: BEGONIA PARK PLAYGROUND IMPROVEMENTS — COMPLETION AND ACCEPTANCE OF CONTRACT NO. 3641 RECOMMENDATIONS: 1. Accept the work. 2. Authorize the City Clerk to file a Notice of Completion. 3. Authorize the City Clerk to release the Labor and Materials Bond 35 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code. 4. Release the Faithful Performance Bond one year after Council acceptance. 5. Authorize the Public Works Director to approve Change Order No. 2 in the amount of $14,447.33 and authorize the encumbrance of an additional $14,374.21 and budget amendment appropriating the same amount from Unappropriated BET Fund Balance, 270 -3605, to account 7271- C4120724. DISCUSSION: On January 25, 2005, the City Council authorized the award of the Begonia Park Playground Improvements to Horizons CCI Services Inc. This project involved removing and disposing of existing improvements, grading, installing drains, constructing PCC sidewalk, playground rubber surface material, and rubber curbing, installing City- furnished playground equipment, modifying the irrigation system and installing sod and landscaping. After the contractor had started construction it became apparent that a revision to the park design was needed to create a two -level play area with connecting walkways. While there were advantages in a single -level play area, the revised design eliminated the safety hazard associated with retaining walls. Additionally, the park design calls for using a shredded rubberized material that could be subject to mildew if exposed to standing water. The revised design provided better drainage away from the play area. These revisions added additional costs to the project, particularly for soil import, SUBJECT: Begonia Park Playground Improvements —Completion and Acceptance of Contract No. 3641 August 9, 2005 Page 2 additional grading, and additional sidewalk. The lessons learned on this park will be reflected in future park designs. The contract has now been completed to the satisfaction of the Public Works Department. A summary of the contract cost is as follows: Original bid amount: $74,147.45 Actual amount of bid items constructed: $74,188.27 Total amount of change orders: $32,591.58 Final contract cost: $106,779.85 The final overall construction cost including Change Orders was 44 percent over the original bid amount. The City Manager gave his written authorization to exceed the original contract amount up to 24% per the City Council Policy F -3. The following two Change Orders were issued for the project: Change Order No. 1 in the amount of $18,144.25 provided for a revised construction plan that allowed for a tiered level of in the grading of the park which reduced the slopes and made it safer for public use. Change Order No. 2 in the amount of $14,447.33 provided for additional grade changes, sidewalk adjustments, garden walls and miscellaneous work. Construction costs for this project have exceeded the 125% threshold of the original contract. Change Order No. 2 requires Council approval for the additional expenditure. Staff is recommending the approval of this Change Order and is also requesting authorization to encumber additional funds from the BET Fund Balance to accommodate Change Order No. 2. Upon approval of the recommended budget amendment, the expenditure breakdown for this project will include the following: Account Description General Fund General Fund Begonia Park Playground Contributions Prepared by: R. Gunther, P.E. Construction Engineer Improvements Account Number Amount 7013- C5100020 $5,200.00 7015- C4120431 $5,740.00 7271- C4120724 $64,292.40 7251- C4310708 $31,547.45 Total $106,779.85 Submitted by: Badum s Director City of Newport Beach NO. BA- 06BA -005 BUDGET AMENDMENT 2005 -06 AMOUNT: S2s,s2�.5a EFFECT ON BUDGETARY FUND BALANCE: Increase Revenue Estimates Increase in Budgetary Fund Balance X Increase Expenditure Appropriations AND �X Decrease in Budgetary Fund Balance Transfer Budget Appropriations No effect on Budgetary Fund Balance SOURCE: from existing budget appropriations from additional estimated revenues PX from unappropriated fund balance EXPLANATION: This budget amendment is requested to provide for the following: To increase expenditure appropriations for Begonia Park Playground Improvements. ACCOUNTING ENTRY: BUDGETARY FUND BALANCE Fund Account Description 270 3605 Build Excise Tax Fund - Fund Bal. REVENUE ESTIMATES (3601) Fund /Division Account Description EXPENDITURE APPROPRIATIONS (3603) Signed: City Council Approval: City Clerk Amount Debit Credit $28,821.54 $28,821.54 jf: -6r— Date tJ OS� Date Date Description Division Number 7271 Building Excise Tax Fund Account Number C4120724 Begonia Park Playground Imrpovments Division Number Account Number Division Number Account Number Division Number Account Number Signed: r 'nancial Approval: Administ ive Services Director Ili Z, Signed: Administrative Approval: City Manager Signed: City Council Approval: City Clerk Amount Debit Credit $28,821.54 $28,821.54 jf: -6r— Date tJ OS� Date Date