Loading...
HomeMy WebLinkAboutM2002-0115 (2)'O"W, J_f�int_torT_1 Worksheet for Combo Building & Solar Permit Application a F- Comm] F— Residential City of Newport Beach - Building Division 13 1 NOTE: PLAN CHECK FEES DUE AT TIME OF SUBMkoAnp PRMUPCE&I, F— Building F_ Grading F—Drainage [_ Elec F_ Mech Plum Cu Yd Cut FCITy omWpor BEACH Project Address (Not mailing address) F_ Flood I— Fire F— Liq r— Landslide /A F 13450 VIA OPORTO T— Description of Work Use F Const Type F Re -deck 35'of main walk for slips #703 - #704. Re -deck 29'of main walk for slips #727 - #728 and 4'pastrnainvvaIkfors'ip#7E)3. Re-deek (2) fingersfor slip 0765. Re-deck64'ofmainvvaIkfor # Stories[ # Units (if Resf slips #705 - #708. Valuation New/Add SF RemodelSFI )0(— Garage/New/Add I $ Material/Labor OWNER'S NAME Last Lido Group Retail, LLC First Owner's Address Owner's E-mail Address 13700 Newport - Boulevard #104 Jacquelyn.chung@sbcglobal.net City INewport Beach State CA F Zip 192663 Telephone 1 APPLICANT'S NAME Last lChung First IJacquelyn Applicant's Address Applicant's E-mail Address 12027 Placentia Avenue iJacquelyn.chung@sbcglobal.net City ICosta Mesa State Zip 192627 Telephone 1 949.631.3121 ARCHITECT/DESIGNER'S NAME Last First Lic. No. Arch itect/Des ign er's Address Architect/Designer's E-mail Address City State F Zip Telephone ENGINEER'S NAME Last First Lic. No.1 Engineers Address Engineer's E-mail Address city State F__Zip Telephone CONTRACTOR'S NAMEXOMPANY jSwift Slip Dock and Pier Builders, Inc. Lic. No. 797052 Class A F F Contractor's Address Contractor's E-mail Address 12027 Placentia Avenue iJacquelyn.chung@sbcglobal.net city lCosta Mesa State [CA Zip 192627 Telephone 1 949�631.3121 SETBACKS REAR SETBACKS FRONT PERMIT NO. SETBACKS LEFT SETBACKS RIGHT PLAN CHECK NO. USEZONE DEVELOPMENT NO PLAN CHECK FEES $ 4 ) 2-4 -34- 0 o �'CIVTY OF NEWPORT BEACH CITY OF NEWPORT BERCH UPPER NDFORT BRY 7,07 BRY �'Rcjp,,C OCCRAt PIER WEST .26 JETTY VICINITY MRP ERST I JETTY SOLNDINGS FlRE EXPRESSED IN FEET RM DENOTE NDfw 7- ELUATIONS BRSED ON MERN LOWER LOW WRTER. ef, �z & Ao & 'o 0 0 .40 (ON ED K, V tp 13 IRPRICANT'S NRMELI 1DO kft 0 F ?,1M LI& tJOB FMDRESS 7AqD VIA OR�r± FP'RTt'f - it IZ14 . I co U=0 310 Golden Shm, S.it. 100 Long Beach, CA 90802 Phone: 562.308.2350 V" L3?Q6 4:1 FILL SLOPE NOW_ 0 20' 40' 80, GRAPHIC SCALE ENLARGED PLAN PURPOSE: Emergency sand fill ENLARGED PLAN Emergency Bulkhead Stabilization to stabilize erosion at bulkhead Lido Village Marina toe. 3400 Via Oporto Sand Quantity 250 cy Owner: DJM Capital Partners, Inc. Newport Beach, CA 92663 c1ba Lido Group Retail, LLC IN: Newport Harbor Datum: MLLW 0 AT: Newport Beach 7777 Edinger Avenue, Suite 133 County of Orange State: CA Ad*. Property Owners: Application By: 1. j DJM Huntington Beach, CA 92647 Sheet 2 of 3 Date: 11/2013 310 Gold.,, Sh.re, S.ite 100 LaLong Beach, CA 90802 Phone: 562.308.2350 100.0, EX. BOARDWALK— uJ Ld EX. BUILDING Lij +9.0 4:1 FILL SLOPE +8.0 Ll jZ EX. TIMBER FLOATING DOCK SYSTEM J L 1.5 MLLW L —3.5 UL -i --j --j iPROPOSED U —14.5 2013 EXISTING ELEVATIONS SAND FILL TYPICAL SECTION. SCALE- HORIZ 1:20 VERT 1:10 PURPOSE: Emergency sand fill TYPICAL SECTION Emergency Bulkhead Stabilization to stabilize erosion at bulkhead Lido Village Marina toe. 3400 Via Oporto Sand Quantity 250 cy Owner: DJM Capital Partners, Inc. Newport Beach, CA 92663 IN: Newport Harbor dba. Lido Group Retail, LLC AT: Newport Beach Datum: MLLW 0 7777 Edinger Avenue, Suite 133 County of Orange State: CA Ad'. Property Owners: i Huntington Beach, CA 92647 Application By: 1. DJM I Sheet 3 of 3 Date: —jj-/2013 LOCAL AGENCY REVIEw FORM SECTION A (To BE COMPLETED BY APPLICANT) Applicant Lido Group Retail, LLC Project Description Stabilization of existing seawall to prevent failure due to erosion Location 3400 Via Oporto, Newport Beach Assessor's Parcel Number 423-123-05, 423-123-06, 423-123-07,423-123-08 SECTION B (To BE COMPLETED BY LOCAL PLANNING OR BUILDING INSPECTION DEPARTMENT) Zoning Designation General or Community Plan Designation dulac du/ac CEQA Status M Categori ' cally Exempt Class I- Existing Facilities Item (d) F] Negative Declaration Granted (Date) Environmental Impact Report Required, Final Report Certified (Date) 101 on Other FeTdFC-R1J 4=1 M1-V7z,-01n1J, f Date Title 11 Local Discretionary Approvals Proposed development meets all zoning requirements and needs no local perm its other than building permits. F� Proposed development needs local discretionary approvals noted below. Needed Received F-1 F] Design/Architectural review Variance for Rezone from Tentative Subdivision/Parcel Map No. Grading/Land Development Permit No. F1 n Planned Residential/Commercial Development Approval Site Plan Review Condominium Conversion Permit El El Conditional, Special, or Major Use Permit No. n n Other CEQA Status M Categori ' cally Exempt Class I- Existing Facilities Item (d) F] Negative Declaration Granted (Date) Environmental Impact Report Required, Final Report Certified (Date) 101 on Other FeTdFC-R1J 4=1 M1-V7z,-01n1J, f Date Title 11 Rke ntP_G A -e -a-4 41 gckA -,f - tf-�j Worksheet for Building Combo Permit Application .)mm'l F7 Residential City of Newport Beach - Building Division . NOTE: PLAN CHECK FEE DUE AT TIME OF SU BMj-RTAh^r-4 w%r K713uilding [7 Grading FlDrainage [7 Elec Project Address (Not mailin! Lido Marina Village address Description of Work Reinforcing Existing Seawall by i itilizing Helical Anchrar Plum C. Yd Mech f lffll'�MH use [:71., # Stori r esF_11 # Units (if Res)[711, Valuation $ New/Add SF[ Remodel SF Garage/New/Add 45,000.00 Material/Labor OWNER'S NAME Last Pdo Group Retail First Owners Address L:, Do \�ef)+kAee ZIL-Owner's E-mail Address xJs city F State E77� Zip Telephon APPLICANT'S NAME Last GGGdffw First jRw7dr— Applicanfs Address Applicants E-mail Address JmP-,-�p6Ro 'Z,5_34( City FN7P_W�eRh State Zip 192468q2L,�gelephoneFl - 2q, - ARCHITECTIDESIGNER'S NAME Last First Lic. No. Architect/Designer's Address Architect/Designers E-mail Address city State Zip Telephone ENGINEER'S NAME Last kafari I First[M:7asoud Lic. Nro.IS3812 Engineees Address Engineers E-mail Address 125341 Commercentre Drive Suite 100 State City Lake Forest Zip 192630 Telephone 949-206-9929 CONTRACTOR'S NAMEXOMPANY iSaber 1 Lic. No. ClassF:7 Contractor's Address Contractors E-mail Address . ........ . _­­_ -- ----- -- -------------- city I State zip Telephone F ENERGY P/C FEE $ FIRE P/C FEE $ PERMIT NO. M7.10 1-3— 00 GRADING PIC FEE $ PLANNING P/C FEE $ PLAN CHECK NO.'" _�s io - 2-o 175 ELEC/PLUM/MECH P/C FEE $ PLAN CHECK FEE $ DEVELOPMENT # TOTAL FEES PAID $ (1) w 0 z -i Lu z LU C3 CO IS Ni. z " '. z z 0 - 0 z MAE M E 1.19 1 91 :illg Sig 8 1. PEE iii I HHEN 8 N'� fia 1241 mg VJ 11 i 11. 12 P.H. o' 8"T Se MEE'3 10SH'I BONNIE !kF l - U ji2Ev..'Sj N- 1-pshp- P ig JP Rjom-Es— t"',j ME9 H-- S. Rd 2, MOM Z a qsssmca ' '11AIm d g. Ra2-4 I ZO g d:!, 4K ral n Ull ii U9 !Eg KP 8,ii lam Z Q IE woE2 a 2h; i ug Ugg %m 0 MV!Ni, W9E's1;Ha1SWk bb Q 2; pllii8 81 HE IN I I �flllo a- sp - . ..... ............. M9 oz PH 1 X h h s A 9 I z M. !2 Z U30 H r"' 9 Eli F, N 2VIN ;1� I q Opp- N H i 21 z Ej s 19813g!'E. H 2 ii So IN M F; pip a _- � 'i I � I I I . z C-'Pli WUHRM 8 R RjE6i; S'p 2 Vn 94, fs� t N- WH ON H -D g - J�Efl 9 w INE., : z Ma".Lid.-M, L 16M Wall. .1111KNI I a a -ill l6vol 1 MI C998-SL9 1611,81 - 3NOHd 99996 VlKH0:ll1V3 'HOV38 1U0dNGN 011110di) VIA GOT VH10313/30WMA VNIHVN Diall iNV0l1ddV / H3Nmo dVYi ADINDIA V S31ON WN3lseD ionws C99Z6 VO 'H3V38 LUOdM3N 30VIIIA VNIUM 0011 UV aUvoo'll 9mDHOdNl3U IWMV3S C13SOdOHd S833NION3 wdaonas DINILL1113NOD -:3NI s3[jLvl3ossv 'p S, NOS&KTIS Wvr7111L% JUIL 0 n� O -S 2- F.— d d (1) w 0 z -i Lu z LU C3 CO IS Ni. z " '. z z 0 - 0 z MAE M E 1.19 1 91 :illg Sig 8 1. PEE iii I HHEN 8 N'� fia 1241 mg VJ 11 i 11. 12 P.H. o' 8"T Se MEE'3 10SH'I BONNIE !kF l - U ji2Ev..'Sj N- 1-pshp- P ig JP Rjom-Es— t"',j ME9 H-- S. Rd 2, MOM Z a qsssmca ' '11AIm d g. Ra2-4 I ZO g d:!, 4K ral n Ull ii U9 !Eg KP 8,ii lam Z Q IE woE2 a 2h; i ug Ugg %m 0 MV!Ni, W9E's1;Ha1SWk bb Q 2; pllii8 81 HE IN I I �flllo a- sp - . ..... ............. M9 oz PH 1 X h h s A 9 I z M. !2 Z U30 H r"' 9 Eli F, N 2VIN ;1� I q Opp- N H i 21 z Ej s 19813g!'E. H 2 ii So IN M F; pip a _- � 'i I � I I I . z C-'Pli WUHRM 8 R RjE6i; S'p 2 Vn 94, fs� t N- WH ON H -D g - J�Efl 9 w INE., : z Ma".Lid.-M, L 16M Wall. .1111KNI I Z. M ON, W56IND"aEl H ME a No A. i ip OMM41:0 Rix gilk a -95 41 . -- 4 , , , P g' 6- .' SM -Mg Sil z 2 99 SHIM% �a P8 il 1 §UHN! HHS z ' N '.- - -- 0 R§ R Es ME dml E � Mix 'id g lb H6 1 11 4 to -4" z E . ,, c 8 Fm� cc vllig 'g 0 Eli, WE '- T, LL 8 ti� 0 0 lu p 0 F� lliv MM H P Pw-. V fL o _0 18� Z. M ON, W56IND"aEl H ME a No A. i ip OMM41:0 Rix gilk a -95 41 . -- 4 , , , P g' 6- .' SM -Mg Sil z 2 99 SHIM% �a P8 il 1 §UHN! HHS z ' N '.- - -- 0 R§ R Es ME dml E � Mix 'id g lb H6 1 11 w— agg-CLO total - d Eggs-gzo lots) I 3MONd Uodaa C99CS VINHOJI'lV* 'H3V38 I N SNOILLYCIN3VIN003U WDIHOIL030 M) d n� 01HOdO VIA GCVC 'ON] '93.9inHo VU13313/30V"MA VNIHVN 00111 c99z6 V3 'HOV38 ,LkfO R03IN VNI V�di 30VIIIA 0 1 'IV 03LVOOI SN33NID N3 w8ruonus ONLLinSNOD -3NI 'S3[JLV130SSV 1p NosdMas Kvrlllllmm I',- VO -S AO—��8 iWondc]V 0�0 UN10HOAN13H 1WMVElS a3S0d0Hd A Wei it all e 4 g In rn it In JE In an ei. I n .1 w ME in In 28 1. 1 1 A k—StN 0 t S �2 in Ea It t o*;� V= L1.98- 9 lava] - V COBB-BLO 1OPS) I 3NOHd 990EG VINHOdIWO 'HOV38 1HOdJR3N SMON 1VOIN3 "I inDkvi 61301ov 5NLLVO_U (S+6) 01110do VIA SIM Ni s3sinuo wa.11.0311 1313DY111A VNIUM 01011 iWonddY �ONMO S99Z6 VO '.HOV38 LHOdM3N 3OV-1-IIA VNINVIN 0011 11V 03.LVDO'l 011101:10:11113H TIVMV3S (13-OdOUd n'S'N'O*'D' be gx pt�,�, X gi------- -- 1,fi'gO 9 pill , , 9 g ; 1 1 — ----- I ---- --------- J. - 2E T 11 2. --------- ----- -- -911 fl I Ell N 12.1 him H I HN119 a HE = gjfl �! I iT gg t 6 or, .1 I �il i I . R _4 < N H — — - — — — — — — — — — — 0 — — — — — — — — — J z __j q', z IN L 10, sel 2 1-4 �91 a Rv - ----- 1 7 -------------- In L E>' -------------- I Li T 0 I— ----------- co A r_ cc ------------- - �I L Li 0 z R Li z 0 > . ..... #A L_ LLI - - - - - - - 1 17 --------------- Li M4 ZC Ec ---------- P co mc 0 -------------ED x z 0 j % _j L ---- I JE 1 1, pe -C 9 lor6l. xv:1 C998-szo IGIPOI I 3NOHd C9996 VINHOAWD 'HDV3G lUOdNk3N SlIV130 ONV NOUO3S ...... (.0 A.LHOdO VIA St" 'ONI 'S3SI Ho VU10313/39VIIIA VNIUVW 0 11 999Z6 VO 'HOV38 LUOdM3N 30VIIIA VNIHVW 0011 -.LV a3lvool ""niDnas monsNoo 3NI 'Sllvl3ossv v INvonddv 913NMO DNl3UO=lN[3U_'I-IVMV3S G3SOdOHd NOSdIVIS MVnfM > MR5 "Z - — - - — -- — - — - — - — - — -------------- - .16 I L --- I - — - — - — - — - — - — - — if 'Fl, 7 61, I 1 1 1 : ! 1 E] L if 'T -- ---- 'n 7-7-� P— I - .0 -,OL -j IM 7. ------------ --------- - -- --------- !k ZOE! P 0 HE -j 0 T, 59 'Ei ml s ai I H I ic z — I . —1. 1 — Walters, Li0a From- Plamen Petrov <P.Petrov@wsase.com> Sent: Thursday, August 15, 2013 10:35 AM To: Walters, Lisa Subject: Lido Marina Village Seawall Reinforcing Behind Cruise Ship Eternity Attachments: Lido Marina Village Seawall Reinforcing.pdf Hi Lisa, Attached please find a PDF file containing drawings for Lido Marina Village Seawall Reinforcing Behind Cruise Ship Eternity. We met with Chris Miller on site a couple weeks ago. Thus, he is familiar with this project. Due to the urgency of the matter, I'd like to stop by your office sometime today to get these drawings signed. How does it work for you? Regards, Plamen Petrov, P.E. Senior Project Manager William Simpson & Associates, Inc. Structural Engineers 25341 Commercentre Dr, Suite 100 Lake Forest, CA 92630 Tel. -(949) 206-9929 ext 403 Fax:(949) 206-9955 5 Worksheet for Building Combo Permit Application UU U F Comm1 F Residential City of Newport Beach - Building Div k iR^ES NOTE: PLAN CHECK FEE DUE AT TIME Q=QRRES F713uilding F Grading F7..Drainage F-1 Elec r Mech F Plum QU YU41Y ur lltww�.l Dcmv..n Project Address (Not mailing address) Wut e I 3440 VIA OPORTO Description of Work Use Remove 4'x 89'exsting deck headwalk Replace Douglas Fir Vvood section. with new wood decking # Stories17 # Units (if Res)[ .. ..... ...... .......... ...... . ... .. ........................... ............... .. ............................ . ............................................... - .................. .......... .................. New/Add SFJ Remodel SF Garage/New/Add Valuation $ '000 Material/Labor OWNER'S NAME Last DJM Capital Partners ...... ......... ............. .... .. ..... ........................................................................ First ... ................................... ........... . . ...... ........... ... ................... ­­. - I Owner's Address Owner's E-mail Address 7777 Edinger Avenue Suite 133 n.chung@sbcglobal.net City Huntington Beach .................... ... ... ...... ...... State ................. zip F9 2647 Telephone 949.631.3121 ........... .............. ...... . . APPLICANT'S NAME Last Swift First ete . ...................... F .......... ............ .. .......... . .... ... Applicant's Address Applicant's E-mail Address 2027 Placentia Avenue .................. .......... .............. ............ ... Jacquelyn.chung@sbeglobal.net city Costa Mesa . .............. State .......... Zip 92627 Telephone 949.631.3121 .................... .. ....................... ARCHITECT/DESIGNER'S NAME Last .................................................. ............................................................. First Lic. No. ..... .... ......................... Arch itect/Desig ner's Address 17 Arch itect/Designer's E-mail Address ...... . . ........... ................. . .. ................................................................... City 17777 ..................... ...................................... . ... .................. . . .. ... ....................................................... State . . .. . . .. .. . .... ..... . ................................... ... .......................... Zip Telephone ENGINEER'S NAME Last First Lic. No. .......... ............ .. ............................ ..... Engineer's Address Engineer's E-mail Address F.- .. .... ...... . . .. ..... . .. ........ . . .. .. ...... .. .......... city ............ .. . . . .... ........ ... ... ............... .... ...................... ..... State ..................... zip Telephone CONTRACTOR'S NAMEXOMPANY jSwift Slip Dock and Pier Builders, Inc. Lic. No. Class JA .......... . . ... .. . ............... ............ ­­ .... ...................... ...... - .................... Contractor's Address Qontractor's E-mail Address 2027 Placentia Avenue ...... ... . ................. . ...... Jacquelyn.chung@sbcglobal.net City Costa Mesa State Zip Telephone 949.631.3121 .......... - ..... ...... ..... ..... - ....................... - ENERGY P/C FEE $ FIRE P/C FEE $ PERMIT NO. GRADING P/C FEE $ PLANNING P/C FEE $ PLAN CHECK NO. C 2_0 LZ) ELEC/PLUM/MECH P/C FEE $ PLAN CHECK FEE $ DEVELOPMENT # TOTAL FEES PAID $ �CIJY OF NEWPORT BERCH CITY OF NEWPORT BEACH UPPER NDVORT w BRY S*.Y, RA MR f %Al �_7 LL — BW Ll "'RC_lf -IC 541114OL11VE PIER OCE'RN WEST JEM PROF I LE 1 50 Y[CINITY MRP NOPM Bff. CHLUUM JETTY SOLJNDINGS ARE EXPRESSED IN FEET AND DENOTE _ELURTIONS ERSED ON MEAN LOWER LOW WRTER. MOOR gso�Rcjs DIV. NEWPORT BAY CIV.0f BEAN A hea'awal oy NN a U-� n -p -c � 'll'o _,%cl clecvlag. =4 M. ilk I In I low ��llmllwllllllvjrlu MNA ---ffim Lic No Class First Last S14 c ................. Ad ........... .......... ................. I ...................... nfrZtc r's E-ma�il Address 0e, em .............. .......... .................................................... ............. .................................. State zip PEU-1419P ,RGY P/C FEE $ PLAN CHECK NO. OING P/C FEE $ PLAN CHECK FEE $ H/PLUM P/C )r0v 0 11tic vay [br( nar 0S W ,-T t,�c �, CCX-Y--, (Y -N e_r-c,� C,_\ �', e-, -f- ov-�(Ne V— r\;. -A-0 HARBOR PERMIT 5k_Z415 TRANSFER APPLICATION 829 Harbor Island Drive Newport Beach, CA 92660 949-64,4-304.4/fx 949-723-0589 **Date o.f Applicaton: Permit Number: 13L **Property Address: nmp� **Buyer's Names: Buyer's Signatures: Billing Address: Telephone No.: * I *Sel: er's Names: Seltees-gigRature� Se I I eer�s Je4it­Gwna� Signature: "Escrow Company: "Address **Escrow Number, Closing Date (Estimate): *-*STARRED ITEMS MUST BE -COMPLETE TO BEGIN -THE PROCESS. - Inspection Date: Reinspection Date: Fee Paid: Qheck No: ST7?,o2_ Application Complete:_- ki- Harbor Resources SignaturelDate Special Conditions: This permit is revocable by the City Council in accordance With Title 17 of the Newport Beach Municipal Code, Fidelity National Title Fax# 949.477.6835 Re: Pier Permit #124-3400 3400 Via Oporto Escrow # 23018703 Dear Fidelity National Title, The Harbor Resources division has received the completed, signed application and fee for the pier permit transfer. The pier inspection performed by our office has determined that it meets City standards. Thank you for your help. For further assistance in this matter, please contact this office at 949.644.3044. Sincerely, Lisa Walters Harbor Resources FLAIRBOR PERMIT A lv:� TRANSFER APPLICATION 829 Harbor Island Drive Newport Beach, CA 92660 949-644-3044/fx 949-723-0589 **Date of Applicaton: 5-lek Permit Number: 'Property Address: **Buyer's Names: Buyer's Signatures: - Billing Address: kj9 X, IVA,*-Xf,4- -�4ee� #//.2V ,�Qnc Telephone No.: /- 410&) 'Seller's Names: WUC = VENJU46.-LL12, 211,, 12 7-�k VV LL�p ag- CkU V r Jeint49Wn4Cr Signature: g, 'Escrow Company: /V A Ala In W tig Phone#,,,,,,,,ft-6a-'/?// 'Address tbye-, S (L&le, 411AW &A�h "Escrow Number: **Fa"x j Closing Date (Estimate): mhv Email: 1jdUYs,&;X. BOM *STARRED ITEMS MUST BE COMPLETE TO BEGIN THE PROCESS. Inspection Date: Reinspection Date: Fee Paid: Check No: Application Complete: Harbor Resources Signatureffiate Special Conditions: This permit is revocable by the City Council in accordance with Title 17 of the Newport Beach Municipal Code. REORDER 805 - U.S. PATENT NO. 5538290, 5575508,5641183, 5785353, 5984364, 6030000 Vendor No. 62201 Check No. 577802 UhhhNULKlU I KAUKIU Vendor Name: CITY OF NEWPURT BEAGH, UALII-UKNIA uneCK uate: ub/i tvi a .................. N,.M T.T. ........ ............. ...... g�qo. ... . - ........ . ...... W. '.'u - -.T' 05/16/2013 73051613278 16000/City of Newport Beach, CA re: Harbor Permit Transfer Application/K $ 278.00 Karen M. Willis Tel. 650.289.7877 Fax 650.462.7821 WillisK@gtiaw.com May 16,2013 VIA FEDEX City of Newport Beach 829 Harbor Island Drive Newport Beach, CA 92660 Attention: Lisa Walters ALBANY Re: Lido Permit Transfer AMSTERDAM ATLANTA Dear Lisa: AUSTIN BERLIN - Please find enclosed the Harbor Permit Transfer Application and a check in the amount of BOSTON $278.00 regarding the foregoing. BRUSSELS - CHICAGO Please let me know if you have any questions regarding the enclosed. DALLAS DELAWARE DENVER Sincerely yours, FORT LAUDERDALE HOUSTON GREENBERG TRAURIG, LLP LAS VEGAS LONDON' LOS ANGELES MIAMI MILAN - Karen Willis NEW JERSEY NEW YORK Enclosures ORANGE COUNTY ORLANDO PALM BEACH COUNTY PHILADELPHIA PHOENIX ROME - SACRAMENTO SHANGHAI SILICON VALLEY TALLAHASSEE TAMPA TOKYO' TYSONS CORNER GREENBERG TRAURIG, U -P 0 ATTORNEYS AT LAW 0 WWW-GT-LAW.COM WASHINGTON, D.C. 1900 University Avenue, 5th Floor 0 East Palo Alto, California 94303 N Tel 650.328.8500 Fax 650.328.8508 WHITE PLAINS SV 3471705720 ZURICH -SMATEGIC ALLIANCE INSPECTION FORM Harbor Resources Department Date: Inspection Requested By: Inspector: Pier Address: (Pier Transfer Reinspection GFI Present Yes., Need None Needed Yes Need Anti -Siphon I Backflow Present Other Comments Eelgrass Pate Time F] Eelgrass Within 15' of Project. F] Eelgrass Within 15'- 30'of Project F] No. Eelgrass in Project Area Pump Out Pier Location Yes No Operational Recommended Action Encroachmenet Address of Complaining Party Boat Description CF Number Location on Dock Comments / Observations Other Request Map Output Page 1 of I http://www6.city.newport-beach.ca.uslseirvleticom.esri.esrimap.Esrimap?ServiceName=n... 05/20/2013 m J-: 9- 9 C� & - & m & m" & - & N& " & - C� C� LO m Ln U-) Ln U) U) En L, L" C, 0 m "o uj m N N m N m = 8 � � ol cc� V- r% q- cl v- 'Zr� v- v! -I- I- V� V� G� C� V - r -Z" z * C, Z Z 01 Z Z Z 1 0 < < < < < < < < < z 0 10-1 0-1 01- fW2 OR rl 0 0 -j -j 0 -1 -j 0 0 0 0 Ld 0 -j 0 UJ 0 L, 0 UJ a- LU�CL -i -j u o ulo ui � LU � ui � Lu � U � Lu - Lu 2 Lu 2 u 0 UO UO uo 0 0 U0 wo U- U� 0 a- cr < C�� :� C� :% �� ;% w �� ce < w > 0 > 2E > > > > g > <L < < LL r Lu < Air uj __j 'Z LU 3�: LO > C:, -------------------- 0 LU LU C� Ln M rj 0 C� Ln CY uj Ln Vi Ln L� g- 8 tu � , L� ff t� t ff I, 9 9 9 9 C? 9 In C� c� C� C:� C� C� C� C� Ln Zn Ln Ln cn U) Ln LO U) 1� U) U') Ln U) 9 Ln a, -0 CD 0 CD 0 , 0 C� v C� , - ;I Lr! "t c� C� 0 UJI >1 =) m z co m t -u LU LU 0 UJ u 3: U: UJ V 0 LU 3: v 0 LU CL u 3: -j U, u of, < a- 0 Lu u 0 D� n < 0- 0 0 LU n 0 M LLJ u 0 a LU n u 0 LU 0 u n fl� 0 _j 2 LU U 0 LU Z z F- 9 C) z < CE w z - , z w L" m < — > 11' < — < > ce ;< :� = > g < 5 'C' U, m u m 10 0"o m m m a- COA V- m -;r m NIR m >- x >1 CD 0 " t�m =Itf t Iff L I C, U) LU d C� of C� C� e Ln (n (n �n U) Ln LO LO U) 'n LO 3: w m I m m -im M m m 0 z 2 ce M m Lu 0 � C, M M 00 co r rL "r 0� V- 1� 'T 'Zt� V- rt 'T v� ;r CT� Z ,:- z z zj�2 z 0, z M 0- CLI a- 0-- C) < < <1 < < < < < < Ot '-.0 to -j 0 -10 -j 0 0 o 0 -j 0 Lu LLI LLJ LIJ M -i o -j 0 LU 0 UJ 0 LL, 0 u 0 u 0 Lu Lu � Lij LU - LU 0 u U 0 U 0 0 u 0 u < o Q) n ccf < a� < 0 ui cl-, 0 0 w w a! < < o< > > C� w 0 Ln Lu M om MM om Lij .. i LU ck: Rl CL. LU 0 C:) . ................ 0 LLI Lul C� 0 u) Z C:) ZD 0 (D LL: CY (n 01.0 LLJ Ln z 0 Ln U,, �9 M 9 It 9 E LU ff - 9 tf 'o 9- �-: Ln c� L, Ln & U) LA U') V) C� LO C� U) Zn �:,Ln (A Ln C) LA 0- w n CL M M -01 M 14 z M I m C) M 80 C, C, M z C, M 0 z m olm 0 0 810 15 m m 0— 0 �- o 0 �q -1 C� m co 0 < < 0. < 0- < 0- < a uj co z M co t -u LU LU 2 , Lij u 0 , du n -i 0, -0 I'y _j u -j 'o < 'o Ld L) Lu 0 0 -j -J, LU Lu u 'If 0 -1 Lu Ln o< Lu z z 0 g - z C, > > m < > < > a- > < ul (1) ui (DI'M" ul- OIM 10 MIM *M NO -Mo >—O- xl` 3:i >'M 0 gym m - z 2 HAftop TRAAfSFERAARuCAnO,V in Halbow m*jW Ov MW %Nck CA SW* D'"OfAp"Cabn: PMPI"tY Address: —34o�o-V�rjs (�Porto Akrives mm": ammtt MkVAddt"*- VIA Onrwt�- !t!!Port Beath 11 Cdlifo�nin 92663- 190) 6Z5-8 2 BWW$ Sellers MMOW soitees swnetwes: aid Jolm OwrWr $*&W", Escrow Cooqmny.- P-mtv/ A- Addrws Esmow fluatm -97659- 7 Cimft Dab (EsOmift): -Nvpr- -I C Fee A App�� pleft: , Ex. V.P., FOIIS-- (714) n Date. ChqCk N"ber SPOCW CW�Onc Aft PWW is W40m" by Mo C44f COurXW In 800 ,OftM **h TWO I I Of ft NOWWff 5000 Wnk*W Code. 710 N. -97,659-SAI Fox S.- (714), 8.m-�M- Make Oft (60=): lnspoc*m n Daft. Foo A Ch"k Nlimbw, AppOcathm C pleft: I _ 2 O_D - 2 yf -97,659-SAI Fox S.- (714), 8.m-�M- Make Oft (60=): lnspoc*m n Daft. Foo A Ch"k Nlimbw, AppOcathm C pleft: _V �WPO Date of Applicaton: Property Address: HARBOR PERMIT TRANSFER APPLICATION Permit Number: Buyer's Names: Billing Address: Telephone No.: Buyer's Signatures: Seller's Names: Seller's Signatures: Joint Owner Signature: Escrow Company: Address Escrow Number: Fax #: Closing Date -(Estimate): Inspection Date: Reinspection Date: Fee Amount: Date Paid: Check Number: Application Complete: & Harbor Resources SignaturelDate Special Conditions: This permit is revocable by the City Council in accorda nce.with Title 17 of the Newport Beach Municipal Code. Ww'"MIF15- WORKSHEET FOR BUILDING PERMIT APPLICATION CITY OF NEWPORT BEACH �BUILDING,& PLANNING DEPARTMENTS. PLEASE PRINT 1.PROJECT ADDRESS (NOT MAILING ADDRESS) FLOOR SUITE NO. ZIP" 3400 Via Oporto, Newport Beach N/A N/A 92663 LEGAL DESCRIPTION No. UNITS LOT BLOCK TRACT N/A 2.DESCRIPTION OF WORK reconfiguration of existing dock to accomodate ndw-vessel. for Electr-W- Cr Iseq, ESTIMATED $ VALUATION EXISTING STRUCTURE SQ.'FT. PROPOSED NEW'/ ADDITIONAL SQ. FT. NEW ADD, ALTER DEMO IF] OTHER. USE OF STRUC I TURE commercial No- OF STORIES N/A 3.OWNER'8 NAME LAST FIRST M.I. PHONEVO. Marvin Engineering Co.., Inc. Dba Lido Marina Village,� (940, .675-8662, OWNER'S ADDRESS CITY STATE, ZIP 3400 Via Oporto #104 Newport B=each CA APPLICANT'S NAME LAST FIRST PHONE NO. Shellmaker Inc. (940) 548-5359" APPLICANTIS ADDRESS CITY STATE Z IP 875 B. West 15 th Street'. Newport Beach CA 92663 5.ARCHITECTI,S NAME LAST FIRST STATE LIC.. NO.. ARCHITECT'S ADDRESS CITY STATE ZIP PHONE NO. '6.ENGINEERIS NAME LAST FIRST STATE LIC. NO. Kn&ss & Associates Kniss Sam '17277 EXG�INEERIS ADDRESS, CITY STATE ZIP PHONE NO.733- ff� 30 Irvine CA 92714� 949737#$4-9"11 7.CONTRACTOR-IS NAME LIC. CLASS STATE LIC. NO. Shellmaker Inc A&B 561434 CONTRACTOR'S ADDRESS CITY STATE ZIP�, PHONE NO. 875 B, West 15th StT!T!=r�,qr I ewpor tB cd CA. 92663 (949)5485359 COMPANY NAME�(if d ffe en NEWPORT, BUS. LIC. NO. BT0009706 _7 OFFI`CE USE"ON 4ding Dept Yellow Casfiie�. Pink: Applicant Ly ------ - ��hit'�:'j Bu LCITY OF, NEWPORI BEACH �ERMIT NO. TYPE QF��CONSTRUCTIO PLAN CHECK Nlb.' OCCUP NCY GROUP CLAS'S CODE A U (:��ILAN CHECK;FEE $ WPM wv, �,V_W_ pm ".4 1� 1 m! !I: WORKSHEET FOR BUILDING P9RMIT APPLfCATION 4"",, T CITY OF'NEWPOkT BEACI1 BUILDING & PLANNING DEPARTMENTS, PLEASE PRINT, 1.PROJECT , ADDRESS (NOT MAILING ADDRESS) FLOOR '�SUI =NO. ZIP 3400 Vi� 00ott6j,Newport Beach N/A N/A 926,03 LEGAL,DESCRIPTION No LOT BLOCK TRACT dqFk to acComodate 2.DESCRIPTION OF WORK reconfigurati" of existing neV'vessel for,Ele0trU Crutset, ESTIMATED $ VALUATION, .EXISTINGSTRU RE, SQ.1FT. -CTU PROPOSED NEW, ADDITIONAL S,Q. FT. NEW. ADD ALTERI DEMO OTHER USE,OF.1STRUCTUAE commercial N'01.. OF STORIES N :3. OWNER S, NAME IAST FIRST M'. PHONE, NO'. Dba ge Marvin Engineering 'Co.,% Lido Marina Villa 67t Z OWNEWS,ADDkES8' sCiTY"', STATE `1� 'Z IP �Via potto #104 Newport Bea 96 cwa "I""OZANT, 'I'S NAME. LAST FIRST PH- 0 E; NO. C 944 'S -,535 40 . . . . . . . . . . . . - - - - - - - - - - - - ----------------- ---------- APPLI-C1�,­NT,S,41ADDRESS:, Ci Ty STATE, zip :875 S, Weiit:��15.th .,Street Newport Beach 9266 3 5. ARCHITECT, S,NAME FIRST, LAST STATE LIC. ARGHITECT.'s -ADDRESS CITY' STAT E PHONE- NO., STA LIC. NO�.,�;:"-,_ m 6.ENGINEERIS NAME: LAST FIRST Associates Kniss �'Sam 17-2 71 ENGINEER'S ADDR'E88� CITY STATE ZIP "PHONE: NO.7 3 6'4 Irvine CA 92 714'' 7.CONTRACTO RIS NAME LIC. CLASS: STATE. LI C' " shelliake"r Inei 56143 4:, ZIP,', 0 EPH E NR 6359 CONTRACT OR "'S DP Y� STATE 87!5 t, West 15th treat NeUpor eac CA: 92663 v-5 4 NAME (-j"r' diffelrent).'... NEW N I C SEP 2, 0 200 01i te. OFFICE USE'Iit�,ONtY Building�Dept Yettow: cas'mer�� Pink,:: Apolilcaht OF NE J, kC Ty .,BEA 6_ WPQ -.,PERMIT NO. TYPROF.CONSTRUCTION PLAN CHECK NJO OCCUP NCY GROUP LAS� C CHECK F EE j,TY OF WEST 9:— NEWPOk-f CITT OF NEWPORT BERCH occ - VICINITY MRP Kwou 1tw, BERCH 7uup�pm - I , \ MAC N DRY PIER WEST JETTY Qj r- Z-Av. R,4 j vi \,,_- —4 Z:-�, -54 ItIC /,&r 4,0 ll� PROF I LE 1 5�O EF67 'EM S%MINCS Fll;E: DTWSSED IN FEET AtC DENOTE a-EVATIONS MSD ON MERN LOlelER LOH WFER. r7 - JL -J �j � ! - -Z li r t Aplo V- _j R�t 'MA 'Alf D E P T. CITY VPE�PORT��ACH EEL GRASS I NSPECTION T y, 0,9 0 �7-4!:-� It-' NO EEL allA S r7---7 off EE� G4SS IN T:H: E D'' PRO ECT A�EA WA L :5x, /a—/- Eta j P�pqbyj -qA Al. F SAM F. TNISS CONSULTING CIVIL ENGR-. o.. 1 7 911 -01 YRY 103rO'dd 0 C - 17 3 7 7 Exp. 3HI NI SSV�19 133 0 19 A'GATE TRVINE,CA. 92614 Lp SSVde 133 ON 0 (949) 733-8430 OF NOljVoI INN 131 FPPLIG�VT'S 4W JJOB RDDRESS FWor, Y11-- DFTTE-- S�4/ZT—T / pa7 2�- 3) IPIAI,4 Ns 714 S. IoRlo J-��C-_ 7- L//-/ I!,=-- F 5 Li -t I I . . . .. I , r97 s N(;. 17377 rr, Exp 17�. OF C h0�'3 -/70 c zzr- 1,L ;E�057,2--- �SxCILC7 Ilk) c 1-0 1S5 Ek GR�SS INSPECTION 77 941) 733-S4-lro �O EEL GRASS �EL GRASS JIN TH k4i GNATURE I Kq8M I T DA.TE ARINE DEPT. CITY OF NEWPORT BEACH Z� 7,A 9 - S CPO -'*A &4--'A 4(' LIL— -i 16 -1-7 Z�rxx- zc-4,c, 4t Or 4:'-4 S ' cr 2% 7'- 't' & 4. / 4 4� e tv,op7zg=.#,u :F7 A4, Aj 4.9-8.93 -If eA Ple�--'AP A 7 at! z 2 -jr- Aj 4.9-8.93 -If �. -j Of 6w A: �A i /. r r /9 AewrC, , ed'. .(c;ftJ) 3 Pcr' C,Vzrc� e- -L, 4". z e -e 4z�� 9 "—.e et Z- 4:7 I A. A d- 5 Z- r- 7 /—,S, 4 /W 57- Z> 75-A-5 7ZVOr -Z O'iP CC 7 9 0/-) r" Y.Ig jr- 0--4Wlj MJ.7- C,Vzrc� e- -L, 4". z e -e 4z�� 9 "—.e qw loel,#AJ Zr CA. 5PZ,4 "4 D.-tZ-A 7.-12>-d "Se- s, / / 67 4rewc-4: w -r-" J 4P.,g;tj:> 2- 7,9 73;X.Z- ?- S z,.& 7 z Olt le" 7r. 1 '0" ,nee, 67 4rewc-4: w -r-" J exocP�A V"44-4'5-� — zeo eel, 'z714 1—;:7 1!5Z —A%rL/I Is 2-1 z 9 /571 al &::Oe - 2—P, 1-) 31 r — lr4 "r,p,o w Y_ _Z Z, cb-74 Z' it, P/4-'ff dw dw if t4' I- e 4_5 Ilf a Ae 41 19;UFAL AOI(Af /9-0 14,0 :514 F 7z- lw P 7 4-1 -7;P / 4- Awl 9 916 ,4 r �z �, ,,:%x*:r 7,5- -Y dr �, ,,:%x*:r W5 sq. PRESTRESSED CONCRETE PILE 10-1/2" WIRES 6000 PSI CONCRETE LEVER O -TENSION 1/2 3/4 CRACKING 14' 3166, 4360 4954 5549 15' 2955 4069 4624 5179 16' 2770 3815 4335 4855 17' 2607 3590 4080 4570 18, 2463 3391 3853 4316 19, 2333 3212 3650 4089 20' 2216 3052 3468 3884 21' 2111 2906 3303 3699 22' 2015 2774 3153 3531 23' 1927 2654 3016 3377 24' 1847 2543 2890 3237 25' 1773 2441 2774 3107 26' 1705 2347 2668 2988 27' 1642 2261 2569 2877 28' 1583 2180 2477 2774 29' 1528 2105 2392 2678 30' 478 �034 -231-2 CLIENT JOB NO. PROJECT ENGR 52%�e5 DATE SHEET NO.— OF CK — DATE Z- 11z '7 2 A 5n(j7- eo 74—k-4 Q�, x 0�7 -4 D/V- CA, 4v -77 Ci 4, 24 --1 L4. 41D ju�o-z Z)4,D U 1 1 L I V �-AUL i (-,�j LTR REVISIONS L - VARIES DATE i By I 1-1--ily rj.Dry - I QUANTITY = 8 NOTES 3. -Lq " 4000 PSI @ TRANSFER L MOVING Pc 6000 PSI @ 28 DAYS & TIME OF DRIVINC MIX DEStriN 44 UV -119A 2, REINFnRCING PRESTRESSING STEEL SHALL C13NFORM TO ASTM A-416 C-RADC 270 V-13 SPMAL W-3.5 SP]RAL AS S)OWN IN PLAN vlEv. 3. EFFF7r:TTVF PRLjT,= EFi'ECTIV� PRESTRESS IN STRAND = J64.7 KST EFFECTIV--- PRESTRESS IN CONCRETE = 779 PSI' 4. SFr-TInN PRnPFRTIES 18' SQUARE PILE AMLA = 3d4 SU.jN. As = 10 STRAND X .153 SOAN, = 1.53 SQ,IN. ,STRANDS EQJALLY SPAM VETGHT = 350 POUNDS PER FE30T S. PILE PTcxup PnfNTs .15L 35L 35L qL a PoINr PICKUP V 01ANFER A1.1, L WJAW 2 POINT PICKI;P SECTION A- A N. T. S. DRAWN A, r F "TTI T T V "RD v &t UL— Ll Lil CHECKED I APPRLIVFD 18' SQUARE PPCSTPRE'-34SED PILE S.D. Nc. INTRA AMERICAN FOUNDATION & DRILLING DWG NCL R EV. UNOCAL SRO A 15 - 2'--" 4 WILMINGTON, CALIFORNIA scALE N,T.S, SHEET 13F mmwwbm� FILE NO: PILE-CHT.6 1211 sq. PRESTRESSED CONCRETE PILE 4-1/2" Wires 6000 PSI Concrete I LEVER. I 0-TENSIONF 1/2 3/4 CRA 131 908 1288 1478 1667 141 842 1196 1372 1548 15' 787 1116 1281 1445 16, 737 1047 1201 1355 171 694 985 1130 1275 181 655 930 1067 1204 19, 621 881 1011 1141 201 590 837 960 1084 21 562 797 915 1032 221 536 761 873 985 231 513 728 835 942 241 492 698 800 903 251 472 670 768 867 261 454 644 738 834 271 620 711 803 WENT JOB NO. PROJECT cz-ft ENOR 2r�*C DATE CK DATE SHEET NO.- OF jj cb L), 7 go;, CA; z 4 19, -r *Aj 7 -IT fX4 �L At Ze) + 6 94- -7 !02 -4e,5 -r v I p i JL A CA. tJ 6 5P r--FZn 47 47— 1 ---- - -------- Al CAA4KeAdc—, eb 7 - - ------------- -- ---- ---------- pvc .7Er I " Q WA. QrIKAL bVAUIN(3 12 We* 4 1/20 f 276k 81;1nds Il", Pvc Jot T=, e t'b 6 -04. spitol an 7.9w I.D. Clrvtv SPECIFICAtIONS CLA58: - - - - - - - - - - - - - -- CONCRE79 WIX: - - - - - - - - CHJ-6,463 -5 120`0 PILE SECTION CONCRE79 f'c=e000 P.S.1,4 28 ctyl --3500 9 - 1/21, DIA. 27ok Quantity i:tr�h A.S.7.14, A-414 SPIPAL . . . . . . . . . . . . . . AFEA OF S7EEL: - - - - - - - - 163 SiQ. 4 Blyinds = .622 IHI'TIAL FORCE 61RAND: _ 20,750 Lbs. x d( StrarleS 'EFF PRESTRESS (30750.1 52X2 0000 toz'r,'tr,) X 4 Sitond 7SO PSI -443 Sq In I T1 U 771L I r loo- UL 7- c o a AWWA N, WA w IL S cwyl L OR KIASAW70W, CA Ckik:4ft'Al tMovirl- foo. " 1 12 X VARIES PILE SECTION 1 0 07 -PP- 364 Wrfld kill —.of— IV V n-iN- HARBOR RESOURCES DIVISION 829 Harbor Island Drive Newport Beach, CA 92660 949-644-3034 / Fax 949-723-0589 APPROVAL IN CONCEPT APPROVAL IN CONCEPT BY THE CITY OF NEWPORT BEACH as required for permit application to the South Coast Regional Commission pursuant to California Administrative Code. Sections 13210 and 13211. General Description of Proposed Development: Modify existing docks to comply with City of Newport Beach fire code standards. Address number must be stenciled on 1 bayward facing pile. jPier conditions must be signed by applicant prior to final approval. 113roperty Address: 3400 Via Oporto, STE 104, Newport Beach, CA 92663 Legal Description: lHarbor Permit Number: 124-2400 jPlan Check Number: 3012-2004 1 1 jApplicant: Lido Marina Village Applicanfs Mailing Address: 3400 Via Oporto, STE 104, Newport Beach, CA 92663 Phone Number: 949-675-8662 I have reviewed the plans for the foregoing development including: 1. The general site plan, including any roads and public access to the shoreline. 2. The grading plan, if any. 3. The general uses and intensity of use proposed for each part of the area covered in the application. And find Page 1 of 2 HARBOR RESOURCES DIVISION 829 Harbor Island Drive Newport Beach, CA 92660 949-644-3034 / Fax 949-723-0589 Pier Permit Conditions November 19, 2004 Property Address: 3400 Via Oporto, STE 104, Newport Beach, CA 92663 With reference to the plans currently under consideration to reconfigure or modify the dock system, the following conditions will now be in effect on the above referenced pier. 1. The pier permittee is aware of the Harbor Permit Policies and Chapter 17 of the City of Newport Beach Municipal Code. The pier permittee understands that the above referenced r)ier is under the r)urview of these Policies and Codes. 2. Any future work on the above mentioned pier requires permits with the City of Newport Beach and any other applicable agencies. Painting, replacement of rub rails and work considered to be cosmetic in nature does not reauire a Dermit. 3. The conditions set forth in this document pertain to the current, proposed dock system under consideration. Any future modifications or alterations to the dock system may require new conditions which mav override or chanae these conditions. 4. Only 'marine oriented uses are allowed on the pier, pier platform, gangway and float. Patio furniture, plants etc ... are not permitted. 5. Vessels will be allowed to project beyond the end of the finger / slip by the width of their beam. Signature:/ / 64-i � V1,61 ) 1-710 Chris 'Mil*'r, Harbor Resolurce Supervisor Ap Print Name Joint Pier Applicant Signature (if applicable) Print Name They comply with the current adopted Newport Beach General Plan, Zoning Ordinance, Subdivision Ordinance and any applicable specific or precise plans or, o That a variance of exception has been approved and final. A copy of any variance, exception, conditional use permit or other issued permit is attached together with all conditions of approval and all approved plans including approved tentative tract maps. On the basis of this finding, these plans are approved in concent and said ar)r)roval has been written unon said Oans. sianed and dated. Should Newport Beach adopt an ordinance deleting, amending or adding to the Zoning Ordinance or other regulations in any manner that would affect the use of the property or the design of a project located thereon, this approval in concept shall become null and void a's of the effective date of this said ordinance. In accordance with the California Environmental Quality Act or 1970, and state and local guidelines adopted thereunder, this development: XHas been determined to be ministerial or categorically exempt. o Has received a final Exemption Declaration or final Negative Declaration (copy attached). c Has received a Final Environmental Impact Report (copy attached). All discretionary approvals legally required of Newport Beach prior to issuance of a building permit have been given and are final. The development is not subject to reiection in principal bv Newport Beach unless a substantial chanae is proposed. This concept approval in no way excuses the applicant from complying with all applicable policies, ordinances, codes and regulations of Newport Beach. See attached conditions to the pier permit. Tom Rossmiller, Manager, Harbor Resources Signature: Chris Miller, Harbor Resources Supervisor November 19, 2004 Attachments: Worksheet for Building Permit Application Drawing Pier Conditions Page 2 of 2 WORKSHEET FOR BUILDING FIRE PERMIT APPLICATION HARBOR RESOURCES DiV. CITY OF NEWPORT BEACH PORT BEACH CITY OF NEI ,I P1 FARF PPINT (W TV= BUILDING DEPARTMENT ckvl' �- M, " ("b"I'A 1. PROJECT ADDRESS (NOT iTAILING ADDRESS) F1 OOR SUITE NO. 3400 Via Oporto, Newport Beach 714 434-9922 LEGAL DESCRIPTION No. UNITS LOT BLOCK TRACT I 2. DESCRIPTION OF WORK USE Modify existing - docks to comply with City of Newport Beach fire code standards # OF STORIES IVALUATION $ 40, 000. 00 NEW F-1 ADD F-I Check Appropriate Box E] 3. OWNER'S NAME f --j - / ) DEMO [:] Lido Marina Village OWNER'S ADDRESS 3400 Via Oporto, Suite 104 CITY STATE Newport Beach CA F] 4. ARCHITECT/DESIGNER'S NAME ARCHITECT/DESIGNER'S ADD CITY STATE 5. ENGINEER'S NAME LAS William Simpson & Assoc. Inc. ENGINEER'S ADDRESS 151 Kalmus Drive C-140 CITY STATE Costa Mesa CA 6. Eh0eN1TymAakTOR'S1NA er nc�E CONTRACTOR'S ADDRESS 2035F Placentia Avenue CITY STATE Costa Mesa CA OFFICE USE ONL Y TYPE OF CONSTRUCTION OCCUPANCY- GROUP SQ FT ZIP PHONE NO. 92663 (949) 675-8662 FIRST LIC. NO. E-MAIL ZIP IPHONE No-. FIRST . STATE LIC. NO Jafari Masoud I S 3812 1 ENGINEER'S E-MAIL ADDRESS ZIP PHONE NO. 92626 714 434-9922 BUSINESS LIC. STATE Li��.— BT00009706 561434 A&B —E-MAIL No. Class CONTRACTO?�S ADDRESS ;hellmaker@sbcglobal.net ZIP PHONE NO. 92627 1949 548-5359 PERMIT NO. PLAN CHECK NO. PLAN CHECK FEE $ 10, PLAN CHECK ENG. ICITY OF NEWPORT BERCH CITY OF INEWORT MU" low my A&- e7 191ciric "ZRN — os 'ICINITY Mw me= Nw. wvv-op() / / S-,rl RA MR :4- 117 BRY WEST JETTY PFOF I LE 1 5,0 lm;_ [!n --- - 010.0 $ if '. �:.� 1.31 & 13 1 11 12 6 3 - j(s-k.;m: 3" ,Eiqts-- 3. !k. .; 13 FIRE & MARINE DEPT CITY OF NEWPORT BEA &6VPOA'Crr 54y -.Seff .06rA /4 5;41 r e f 7F T 7, 7 J L -J Ll 1 L.77.3 140 J, AXAAAW 00014s _j 6.4y �6X RAMP SAM F. KNISS CONSULTING CIVIL ENGR-, CL17377 19 AGATE IRVINE,CA.. 92614 (949) 733-8430 U. S. AK`0�716C 7- 1F IT T - CIV 0 F C N oV, 4-L r, 461)41ey49'4i0 EEL GRASSINSPECMN 125"*� NO EEL GRASS Cl EEL GRAS N THE PR JEC EA %SIGNATURE -7,41LM V I BN FPR- I W'S WE /- /,V 0 A4,4,qlvA V& -L.44 I 133TE 4 a I JOB 540-0 YIA OAVM M C. rl, /,! F� / , 0, 0 e I-AA146 (3) HeAl Ae# 1014e R,,-�OkIS f "cx' 11 1D.J. //- -7 A�rl- OCA 7. -e -,O le"O Z"r ooc14 SAM F.-KNISS CONSULTING CIVIL ENGE. C-17377 19 AGATE IRVINE, CA. 92614 (949) 733-8430 SP6-�c--7-? OP -2- 2-/E\ RELOCATED OR (N) 12^ SO CONC PILES— PROPO5ED 15'x61.5' FLOATING DOCK TO SUPPORT THE 80' LC ADA (E) RELOCATED OR /N\ 16" 3O CONC /N\ 12" SO CONC PILE - (E) GANGWAY TO 0 REMAIN /k TO BE ~ U WIDENED ~ `` .. PROPOSED 80' LGU ADA GANGWAY BY OTHERS� (E) RELOCATED ORE /N\ 12" 3D C0NC � CONCRETE PLATFORM TO SUPPORT THE ' ADA GANGWAY--� 27'-6^± `ROPOSED 8'x93' lDAllNG DOCK 20" 3(} C0NC qLE TYP TOTAL OF 4) `ROPOSED 4'x4' |EMOVABLE FILLET E\ FLOATING DOCK �m_r,-, 4/ZA IIjEr-��1ouw-Z ------------- \—(E) BULKHEAD DOCKS & PILING LAYOUT APUCANTS NAME :UD0 MARINA VILLAGE LOT: TRACT: JOB ADDRESS :LIDO MARINA VILLAGE Cum\naC|uR :SHELuwaKER. INC. DATE NEWPORT BEACH, CA 92663 2035 F PLACENllA AVENUE \ � COSTA MESA, CA 92627 ST,' 'DF C'�k!_IFORNIA -THE RESOURCES AGENCY ARNOLD SCHWARZENEGGER, Governor CALIFORNIA COASTAL COMMISSION SOUI h COAST DISTRICT PO Box 1450 200 Oceangate, 10th Floor LONG BEACH. CA 90802-4416 www.coastal.ca.gov 3400 Via Oporto, Ste.#104 Newport Beach, CA 92663 Date: February 14, 2006 Permit No. 5-05-005 Please be advised that the Administrative Permit with the above permit number which was sent to you on January 19, 2006 and was reported to the Commission on Wednesday, February 8, 2006 is now fully effective. Development of your project is subject to compliance with all terms and conditions specified in the Administrative Permit. Should you have any questions please contact our office. Sincerely, PETER M . dOUGLAS By: FE"IE J). SY CoastaV�am Analyst cc: Local Planning Dept. Shellmaker, Inc., Attn: Lisa E. Miller, President dt CALIFORNIA COASTAL COMMISSION S�ATE'01` CALIFORNIA - THE RESOURCES AGENCY ARNOLD SCHWARZENEGGER, Govemor CALIFORNIA COASTAL COMMISSION South Coast Area Office Permit Application No. 5-05-005 200 Oceangate, Suite 1000 Long Beach, CA 90802-4302 W 3a Date: January 19, 2006 (562) 590-5071 Page 1 of 7 ADMINISTRATIVE PERMIT APPLICANT: Marvin Engineering Company AGENT: Shellmaker, Inc. Attn: Lisa Miller PROJECT DESCRIPTION: Removal and demolition of a portion (6'x 42'hdadwalk, 2-4'-6" x 40' fingers, 1- 14" square pile and 1-12" square pile) of an existing commercial wood dock system and installation of a new wood section (8' x 93' section, 4-20" square concrete piles and 2-18" square concrete piles) and relocation of an existing pile (12" square pile). Currently, there are four (4) slips and post project there will be four (4) slips. PROJECT LOCATION: 3424 Via Oporto, Newport Beach (Orange County) EXECUTIVE DIRECTOR'S DETERMINATION: The findings for this determination, and for any special conditions, appear on subsequent pages. NOTE: P.R.C. Section 30624 provides that this permit shall not become effective until it is reported to the Commission at its next meeting. If one-third or more of the appointed membership of the Commission so request, the application will be removed from the administrative calendar and set for public hearing at a subsequent Commission meeting. Our office will notify you if such removal occurs. T his permit will be reported to the Commission at the following time and place: Wednesday, February 8, 2006 10:00 am City Council Chambers 276 4th Ave Chula Vista, CA 91910 IMPORTANT - Before you may proceed with development, the following must occur: Pursuant to 14 Cal. Admin. Code Sections 13150(b) and 13158, you must sign the enclosed duplicate copy acknowledging the permit's receipt and accepting its contents, including all conditions, and return it, to our office. Following the Commission's meeting, and once We have received the signed acknowledgement and evidence of compliance with all special conditions, we will send you a Notice of Administrative Permit Effectiveness. BEFORE YOU CAN OBTAIN ANY LOCAL PERMITS AND PROCEED WITH DEVELOPMENT, GTIVENF-55 FKUNI THIS UFFICE. PETER DOUGLAS Executive Director By: Fernie Sy Title: Coastal Program Analyst 11 5 -05 -005 -[Marvin Engineering Company] Administrative Permit F;age 2 of 7 STANDARD CONDITIONS: 1 Notice of Receipt ' and Acknowledgment. The permit is not valid and development shall not commence until a copy of the permit, signed by the permittee or authorized agent, acknowledging receipt of the permit and accepta nce of the terms and conditions, is returned to the Commission office. 2. Expiration. If development has not commenced, the permit will expire two years from the date this permit is reported to the Commission. Development shall be pursued in a diligent manner and completed in a reasonable period of time. Application for extension of the permit must be made prior to the expiration date. Interpretation. Any questions of intent or interpretation of any term or condition will be resolved by the Executive Director or the Commission. 4. Assignment. The permit may be assigned to any qualified person, provided assignee files with the Commission an affidavit accepting all terms and conditions of the permit. 5. Terms and Conditions Run with the Land. These terms and conditions shall be perpetual, and it is the intention of the Commission and the permittee to bind all future owners and possessors of the subject property to the terms and conditions. SPECIAL CONDITIONS: See pages four to seven. EXECUTIVE DIRECTOR'S DETERMINATION (continued): The Executive Director hereby determines that the proposed development is a category of development, which, pursuant to PRC Section 30624, qualifies for approval by the Executive Director through the issuance of an Administrative Permit. Subject to Standard and Special Conditions as attached, said development is in conformity with the provisions of Chapter 3 of the Coastal Act of 1976 and will not have any significant impacts on the environment within the meaning of the California Environmental Quality Act. If located between the nearest public road and the sea, this development. is in conformity with the public access and public recreation policies of Chapter 3. FINDINGS FOR EXECUTIVE DIRECTOR'S DETERMINATION: A. Proiect Location and Descriotion The subject site is located at 3424 Via Oporto in the Lido Marina Village in the City of Newport Beach (Exhibits #1-2). The Lido Marina Village area of Newport Beach is designated for Recreation and Marine Commercial and/or Retail and Service Commercial uses and the proposed project adheres to this designation. The surrounding area is currently developed with similar private commercial boat docks, retail establishments, restaurants and a waterfront walkway. These existing facilities provide public access recreation and visitor commercial opportunities. The proposed project involves removal and demolition of a portion (6' x 42' headwalk, 2-4'-6" x 40'fingers,, 1-14" square pile and 1-12" square pile) of an existing_ commercial wood-dock-sys-tern and installation -of -a new wood section (-8' x 9T section, 4-20" square concrete piles and 2-18" square concrete piles) and relocation of an existing pile (12" square pile) (Exhibit #3). Currently, there are four (4) slips, each 40 -feet in length and post project there will be four (4) slips, two (2) slips will be 40 -feet in length and two (2) slips will be 93 -feet in length. Electra Cruises operates a charter boat business from these docks. The proposed project will 5 -05 -005 -[Marvin Engineering Company] Administrative Permit Page 3 of 7 not accommodate any new boats, only existing boats. The applicant is not seeking any change to the existing charter operation. The purpose of this project is to bring the dock system into compliance with the City of Newport Beach fire code, as recent City inspections of the site disclosed fire code violations. The new configuration will allow for safer docking of their large vessels with a proper ingress and egress in case of fire or other emergency. The dock project will be used for commercial boating related purposes to serve Electra Cruises at the Lido Marina Village. The site had been surveyed on November 10, 2004 by the City of Newport Beach Harbor Resources Division for eelgrass and no eelgrass was discovered within 15 -feet of the project area. Surveys completed duriing the active growth phase of eelgrass are valid for 60 -days with the exception of surveys completed in August -October. A survey completed in August - October shall be valid until the resumption of active growth (i.e., March 1). The project is agendized for the'February 2006 Coastal Commission Hearing and by this time the eelgrass surveys would not continue to be valid since 60 -days have passed since the survey was completed. The site has also been surveyed for Caulerpa, taxiffiblia and none was found. This survey was completed on December 14, 2004 and is only valid for 90 -days. The project is agendized for the February 2006 Coastal Commission Hearing and by this time the Caulerpa taxiffiblia survey would not continue to be valid since it had passed 90 - days from when the survey was completed. Thus, an up-to-date eelgrass and pre -construction Caulerpa taxiffiblia, surveys must be conducted. These eelgrass and Caulerpa taxiffiblia surveys are valid for a limited period of time (until the next growing season for eelgrass and 90 days for Caulerpa taxiffiblia). If construction does not occur within the respective time periods, a subsequent survey will be required. If any eelgrass or Caulerpa taxiffiblia are found on the project site, Special Conditions No. 2 and No. 3 identify the procedures necessary to be completed prior to beginning any construction. The proposed project has received an approval in concept from the City of Newport Beach Harbor Resources Division. The Regional Water Quality Control Board (RWQCB) has determined that the proposed proje! ct will not adversely impact water quality if standard construction methods and materials are used. The applicant has also applied for a permit from the U.S. Army Corps of Engineers. The National Marine Fisheries Service (NMFS) has reviewed the project and has no objections to the proposed work. The California Department of Fish and Game (CDFG) has also reviewed the project and determined. that the will not result in a significant impact to fish and wildlife resources and their habitats. Section 30600(c) of the Coastal Act provides for the issuance of coastal development permits directly by the Commission in regions where the local government having jurisdiction does not have a certified Local Coastal Program. The City of Newport Beach only has a certified Land Use Plan and has not exercised the options provided in 30600(b) or 30600.5 to issue its own permits. Therefore, the Coastal Commission is the permit issuing entity and the standard of review is Chapter 3 of the Coastal Act. The certified Land Use Plan may be used for guidance. B. Marine Resources The proposed recreational,, boat dock development and its associated structures are an allowable and encouraged marine related use. The project design includes the minimum sized pilings and the minimum number of pilings necessary for structural stability. There are no feasible less environmentally damaging alternatives available. As conditioned, the project will not significantly adversely impact eelgrassi beds and will not contribute to the dispersal of the invasive aquatic algae, Caulerpa taxifolia. Further, as proposed and conditioned, the project, which is to be used solely for recreational boating purposes, conforms to Sections 30224 and 30233 of the Coastal Act. 5 -05 -005 -[Marvin Engineering Company] I Administrative Permit Page 4 of 7 C. Water Qualit The proposed work will be occurring on, within, or adjacent to coastal waters. The storage or placement of construction material, debris, or waste in a location where it -could be discharged into coastal waters would result in an adverse effect on the madne environment. To reduce the potential for construction related impacts on water qualit I y, the Commission, imposes special conditions requiring, but not limited to, the appropriate storage and handling of construction equipment and materials to minimize the potential of pollutants to enter coastal waters. To reduce the potential for post -construction impacts to water quality the Commission requires -the continued use and maintenance of post construction BMPs. As conditioned, the Commission finds that the development conforms to Sections 30230 and 30231 of the Coastal Act. D. Local Coastal Program The LUP for the City of Newport Beach was effectively certified on May 19, 1982. The certified LUP was updated on January 9, 1990. As conditioned, the proposed development is consistent with Chapter 3 of the Coastal Act and with the certified Land Use Plan for the area. Approval of the project, as conditioned, will not prejudice the ability of the local government to prepare a Local Coastal Program that is in conformity with the provisions of Chapter 3. E. California Environmental Quality Act (CEQA) As conditioned, there are no feasible altematives or additional feasible mitigation measures available that would substantially lessen any significant adverse effect, that the activity may have on the environment. Therefore, the Commission finds that the proposed project, as conditioned to mitigate the identified impacts, is the least environmentally da-maging feasible altemative and can be' found consistent with the requirements of the Coastal Act to conform to CEQA. SPECIAL CONDITIONS: Water Quality A. Construction Responsibilities and Debris Removal (1) No construction matedals, equipment, debris, or waste will be placed or stored where it may be subject to wave, wind, or rain erosion and dispersion. (2) Any and all construction material will be removed from the site within 10 days of completion of construction. (3) Machinery or construction materials not essential for project improvements will not be allowed at any time in the intertidal zone. (4) If turbid conditions are generated during construction a silt curtain will be utilized to control turbidity. (5) Floating booms will be used to contain debris discharged into coastal waters and any debriis discharged will be removed as soon as possible but no later than the end of each day. 5 -05 -005 -[Marvin Engineering Company] Administrative.Permit Page 5 of 7 (6) Non -buoyant debris discharged into coastal waters will be recovered by divers as soon as possible after loss. B. Best Management Practices Program By acceptance of this permit the applicant agrees that the long-term water -borne berthing of boat(s) in the approved dock and/or boat slip will be managed in a manner that protects water quality pursuant to the implementation of the following BMPs. (1) Boat Cleaning and Maintenance Measures: a. In -water top -side and bottom -side boat cleaning shall minimize the discharge of soaps, paints, and debris. b. In -the -water hull scraping or any process that occurs under water that results in the removal of paint from boat hulls shall be prohibited. Only detergents and cleaning components that are designated by the manufacturer as phosphate - free and biodegradable shall be used, and the amounts used minimized. c. The applicant shall minimize the use of detergents and boat cleaning and maintenance products containing ammonia, sodium hypochlorite, chlorinated solvents, petroleum distillates or lye. (2) Solid and Liquid Waste Management Measures: a. All trash, recyclables, and hazardous wastes or potential water contaminants, including old gasoline or gasoline with water, absorbent materials, oily rags, lead acid batteries, anti -freeze, waste diesel, kerosene and mineral spirits will be disposed of in a proper manner and will not at any time be disposed of in the water or gutter. (3) Petroleum Control Management Measures: a. Oil absorbent materials shall be examined at least once a year and replaced as necessary. The applicant will recycle the materials, if possible, or dispose of, them in accordance with hazardous waste disposal regulations. The boaters will regularly inspect and maintain engines, seals, gaskets, lines and hoses in. order to prevent oil and fuel spills. Boaters will use preventive engine maintenance, oil absorbents, bilge pump -out services, or steam cleaning services as much as possible to clean oily bilge areas. Bilges shall be cleaned and maintained. Detergents will not be used for cleaning. The use of soaps that can be discharged by bilge pumps is prohibited. 2. Pre -and Post -Construction Eelarass Survey(s) A. Pre Construction Eelgrass Survey; A valid pre -construction eelgrass (Zostera marina) survey shall be completed during the period of active growth of eelgrass (typically March through October). The pre -construction survey shall be completed prior to the beginning of construction and shall be valid until the next period of active growth. The survey shall be prepared in full compliance with the "Southern California Eelgrass Mitigation Policy" Revision 8 (except as modified by this special condition) adopted by the National Marine Fisheries Service and shall be prepared in consultation B. 5 -05 -005 -[Marvin Engineering Company] Administrative Permit Page 6 of 7 with the California Department of Fish and Game. The applicant shall submit the eelgrass survey for the review and approval of the Executive Director within five (5) business days of completion of each eelgrass survey and in any event no later than fifteen (15) business days prior to commencement of any development. If the eelgrass survey identifies any eelgrass within the project area which would be impacted by the proposed project, the development shall require an amendment to this permit from the Coastal Commission or a new coastal development permit. Post Construction Eeigrass Survey. If any eelgrass is identified in the project area by the survey required in subsection A of this condition above, within one month after the conclusion of construction, the applicant shall survey the project site to. determine if any eelgrass was adversely impacted. The survey shall be prepared in full compliance with the "Southern California Eelgrass Mitigation Policy" Revision 8 (except as modified by this special condition) adopted by the National Marine Fisheries Service and shall be prepared in consultation with the California Department of Fish and Game. The applicant shall submit the post -construction eelgrass survey for the review and approval of the Executive Director within thirty (30) days after completion of the survey. If any eelgrass has been impacted, the applicant shall replace the impacted.eelgrass at a minimum 1.2:1 ratio on-site, or at another location, in accordance with the Southern California Ee.lgrass Mitigation Policy. All impacts to eelgrass habitat shall be mitigated at a minimum ratio of 1.21 (mitigation: impact). The exceptions to the required 1.21 mitigation ratio found within SCEMP shall not apply. Implementation of mitigation shall require an amendment to this permit or a new coastal development permit unless the Executive Director determines that no amendment or new permit is required. 3. Pre -construction Caulerpa Taxitolia Surve A. Not earlier than 90 days nor later than 30 d ays prior to commencement or re -commencement of any development authodzed under this coastal development permit (the "project"), the applicant shall undertake a survey of the project area and a buffer area at least 10 meters beyond the project area to determine the presence of the invasive alga Caulerpa, taxifolia. The survey shall include a visual examination of the substrate. B. The survey protocol shall be prepared in consultation with the Regional Water Quality Control Board, the California Department of Fish and Game, and the National Marine Fisheries Service. C. Within five (5) business days of completion of the survey, the applicant shall submit the survey: (1) for the review and approval of the Executive Director; and D. (2) to the Surveillance Subcommittee of the Southern California Caulerpa Action Team (SCCAT). The SCCAT Surveillance Subcommittee may be contacted through William Paznokas, California Department of Fish & Game (858/467-4218) or Robert Hoffman, National Marine Fisheries Service (562/980-4043). If Caulerpa taxifolia is found within the project or buffer areas, the applicant shall not proceed with the project until 1) the applicant provides evidence to the Executive Director that all C. taxifolia discovered within the project and buffer area has been eliminated in a manner that complies with all applicable governmental approval 5 -05 -005 -[Marvin Engineering Company] Administrative Permit - Page 7 of 7 requirements, including but not limited to those of the California Coastal Act, or 2) the applicant has revised the project to avoid any contact with C. taxifolia. No revisions to the project shall occur without a Coastal Commission approved amendment to this coastal development permit unless the Executive Director, determines that no amendment is legally required. ACKNOWLEDGMENT OF . PERMIT RECEIPTACCEPTANCE OF CONTENTS: I/We acknowledge that I/we have received a copy of this permit and have accepted its contents including all conditions. Applicant's Signature Date of Signing H:\FSY\Staff Reports\Feb06\5-05-005-[Marvin Engineering Company]AP(NB) UK LAI I vwm- 4 . A -- 61 Hill �i -Aft got b (�Oo -90-9 . rx 'a IJ -0 EXHIBIT # —A PAGE OF— ck: JO 2 . 14 4D C\j AV NVP GE OAL, 001 UO'SaN 4SOOD (�Oo -90-9 . rx 'a IJ -0 EXHIBIT # —A PAGE OF— (E) FLOAMG OOCK To FjDA#M K PP07ECTM TIM a:-OATMG DOCK At HATCHED To BE 09074m PROP`OM FLOA11W 5W FOR ENLA;RM R TVP UJ4.0. _,cr FLGAING OOCK PLAN _J ._J L__j I I L ld (E) RAW T'W J r - - t I!V Z=z (N) LOCA7XW OF IHE RELOCATED PILE—— —Pqopo= FulsTNG DOCK A PILES 0 POCHM ARCEA (E) SROCXEN COK PU TU BE REPLACM VATH OW OF TK R94OVED WCKS,PkFS (IF JN QOM CONOTMN) k BE RFLOCATED ON THE OTHER SiOE or RAw "2'* Ov" COASTAL COMMISSION EXHIBIT#- PAGE- OF STRUCTURAL GENERAL NOTES- Ammkolft AM F"Tweaft CK 3ECllONS 1904 & ISM 94ALL BE I- ALL MAIL& FASTD*RS AMU wARDWApE SHALL ge Sy *"-M NOT DIP GAL~ZED W AM APPROVAL BEFUM ANY CONCRM OR EFOKY CUATM L NAVE A WINMUM CD"T CORIENT 2- AL NACS WU BE 16d (Mt4W MAMEM) HELICAL I,*KM NAK-S. WITH AM OF WK F"t USE IN A SALT 047M MWOM 99UNG VIELD SYROWTH OF F�g. KOW P% U.N.O. IALL BE CERWED By A CONCRETE TeSTIF#G 3- MMJW 94ALL BE 0 ACCOIDANCE W1�4 TABLUS, 23 -*-9-1 23-0-9-2 FdA REGISI CK* ENGINEER. OF 7W MC, "M CW DRAWMM , COMPRMW STMKY14 aF mm P.Q 4, ALL HARDWARE SWAjj W kjAsurFar �sjg. ov "c!m.Agtjmrw Date: Inspection Requested By: Inspector: Pier Address: Pier Transfer INSPECTION FORM Harbor Resources Department 11 /57 /01-/ Don Duffy �,Vod kj;q ////o lit -Z -C I & Reinspection GFI Present Yes Need None Needed Yes Need Anti -Siphon I Backfiow Present Other Comments Yes No . / ; " :�z 1 4,"-- - ,�,,r Present] ---4h*ffrp- Out Pier Location Yes No Operationall I Recommended Action Encroachmenet Address of Complaining Party Boat Description .CF Number Location on Dock Comments Observations Other Request f C'4 IL cq 04 D cl 0 .006 z z V T cc LU a s�2 z ze ze ze (r) Z2 c�6 .. ......... Z ze z Z DA wig z 2 J CL w Z Zt7 A -i ce CL > 0 0 Zt, ul > ........... 2 z d z. V) . ...... . . .... ........ .. < . .. . ..... ---- — ------ - lo V 0 uj CC o,og ow. 'd CC G z �i! i - — -------- sm A SmZ 4:1 t I LLJ F— - 1w Oo - 2L ch 5, < 9 z CE C/) _j LU Z2 .. . ........ . .. IL (p LU o ze LUZ 2 Eze a: =ED 06 .. ........ 29 ------------- . ..... . ........ < 29 29 99 z V) C) z Z -777F -o Ad j w oij z ... . . ....... .. ............ LL LL n mm z .0 -OL m > OC) 06 0 cc .0. ZL 9L 2L 2L SL 29 .. . ................. ........ . ........ ... .. . ...... cn Li < E5 ou < Z � mi, . . ........ ... cn . ............ . ... . ........ .. _j LLI CA Q� EEM 1 ul 0 3� 53.1 5 a z k, o .. ..... ..... I o I I I,, ... . . ........ .... . . . .. . ..... ...... . ... A ri 41 cz z 0 IQ n� ,M, I 40OZ/9 WOM-J� A Mi wd �Z LOISUOL '��G MD—W-1—* 1-� �P —0:--lU February 4, 2000 Dwight Belden Watttson Breevast '600 Birch St., Suite 250 Newport Beach, Ca 92660 Re: Lido Village Marina Dear Mr. Belden: The Fire and Marine Department has been informed by you that a sale of the Lido Marina Village is in the final process and could be completed within the next two weeks. The Newport Beach Harbor Permit Policies I O.B states: "Whenever a permittee sells the abutting upland property, a request shall be made to the City to transfer the permit. Forms for this purpose may be obtained from the Marine Division." An inspection is required of the facility for structural requirements relative to safety violations, electrical code violations, sanitary violations, and other requirements as specified in Chapter 17 of the Municipal Code or the appropriate sections of the Harbor Permit Policies. The City has the authority to refuse to consent to a transfer of a harbor permit when the permittee is in violation of Title 17 of the Newport Beach Municipal Code or applicable Harbor Policies. Specifically, the Harbor Policy prohibits the transfer of any permit when there are 'structural deficiencies". In recent months the Lido Village Marina has had inspections related to structural deficiencies, berthing, and parking requirements by this division. In addition, the Fire Marshall's Office has recently conducted an inspection of the marina. Call 949-644-3106 in regards to the inspection. A letter listing the deficiencies was send to the Lido Management (see attached). Most of the structural deficiencies noted in the report have been corrected, but there axe still some corrections remaining. Continued berthing violations were noted in a separate letter (attached) and have not been corrected. Compliance for parking is still an issue. Harbor Permit Policy 17.A. "All commercially operated boat docking facilities shall provide 0.75 parking stalls for each single boat slip and 0.75 parking stalls for each 25 feet of available mooring space not classified as a slip." The City Planning Department has notified this office that Lido Village Marina does not provide adequate parking for the number of slips for their marina tenants or for the commercial charter boats passengers. It is this office's position that a transfer of the Harbor Permit is not possible until all violations are corrected. If you require additional information, please call 949-644-3043. Sincerely Wes Armand Fire and Marine Department Marine Environmental Management Division Cc: Robin Clauson Patricia Temple Tony Melum STATE OF CALIFORNIA - THE RESOURCES AGENCY ARNOLD SCHWARZENEGGER, Govemor CAUFORNIA COASTAL COMMISSION South Coast Area Office Permit Application No.5-05-005 �0� 200 Oceangate, Suite 1000 W 3a Date: Janbary 19, 2006 Long Beach, CA 90802-4302 a (562) 590-5071 Page 1 of 7 ADMINISTRATIVE PERMIT APPLICANT: Marvin Engineering Company AGENT: Shellmaker, Inc. Attn: Lisa Miller PROJECT DESCRIPTION: Removal and demolition of a portion (6' x 42' headwalk, 24-13" x 40' fingers, 1 - 14" square pile and 1-12" square pile) of an existing commercial wood dock system and installation of a new wood section (8' x 93' section, 4-20" square concrete piles and 2-18" square concrete piles) and relocation of an existing pile (12" square pile). Currently, there are four (4) slips and post project there will be four (4) slips. PROJECT LOCATION: 3424 Via Oporto, Newport Beach (Orange County) EXECUTIVE DIRECTOR'S DETERMINATION: The findings for this determination, and for any special conditions, appear on subsequent pages. NOTE: P.R.C. Section 30624 provides that this permit shall not become effective until it is reported to the Commission at its next meeting. If one-third or more of the appointed membership of the Commission so request, the application will be removed from the administrative Calendar and set for public hearing at a subsequent Commission meeting. Our office will notify you if such removal occurs. i -his permit will be reported to the Commission at the following time and place: Wednesday, February 8,2006 10:00 am City Council Chambers 276 4th Ave Chula Vista, CA 91910 IMPORTANT - Before you may proceed with development, the following must occur: Pursuant to 14 Cal. Admin. Code Sections 13150(b) and 13158, you must sign the enclosed duplicate copy acknowledging the permit's receipt and accepting its contents, including all conditions, and return it to our office. Following the Commission's meeting, and once we have received the signed acknowledgement and evidence of compliance with all special conditions, we will send you a Notice of Administrative Permit Effectiveness. BEFORE YOU CAN OBTAIN ANY LOCAL PERMITS AND PROCEED WITH DEVELOPMENT, YOU MUST HAVE RECEIVED BOTH YOUR ADMINISTRATIVE PERMIT AND THE NOTICE OF PERMIT EFFECTIVENESS FROM THIS OFFICE. PETER DOUGLAS Executive Director By: Fernie Sy Title: Coastal Program Analyst 11 5 -05 -005 -[Marvin Engineering Company] Administrative Permit Page 2 of 7 STANDARD CONDITIONS: 1 Notice of Receipt and Acknowledgment. The permit is not valid and development shall not commence until a copy of the permit, signed by the permittee or authorized. agent, acknowledging receipt of the permit and acceptance of the terms and conditions, is returned to the Commission office. 2. 3. 4. 5. Expiration. If development has not commenced, the permit will expire two years from the date this permit is reported to the Commission. Development shall be pursued in a diligent manner and completed in a reasonable period of time. Application for extension of the permit must be made prior to the expiration date. Intenwetation. Any questions of intent or interpretation of any term or condition will be resolved by the Executive Director or the Commission. Assignment. The permit may be assigned to any qualified person, provided ass'ignee files with the Commission an affidavit accepting all terms and conditions of the permit. Terms and Conditions Run with the Land. These terms and conditions shall be perpetual, and it is the intention of the Commission and the permittee to bind all future owners and possessors of the subject property to the terms and conditions. SPECIAL CONDITIONS: See pages four to seven. EXECUTIVE DIRECTOR'S DETERMINATION (continued): The Executive Director hereby determines that the proposed development is a category of development, which, pursuant to PRC Section 30624, qualifies for approval by the Executive Director through the issuance of an Administrative Permit. Subject to Stancard and Special Conditions as attached, said development is in conformity with the provisions of Chapter 3 of the Coastal Act of 1976 and will not have any significant impacts on the environment within the meaning of the California Environmental Quality Act. If located between the nearest publi c road and the sea, this development is in conformity with the public access and public recreation policies of Chapter 3. FINDINGS FOR EXECUTIVE DIRECTOR'S DETERMINATION: A. Pro*ect Location and Description The subject site is located at 3424 Via Oporto in the Lido Marina Village in the City of Newport Beach (Exhibits #1 -2). The Lido Marina Village area of Newport Beach is designated for Recreation and Marine Commercial and/or Retail and Service Commercial uses and.the proposed project adheres to this designation. The surrounding area is currently developed with similar:private commercial boat docks, retail establishments, restaurants and a waterfront walkway. These existing facilities provide public access recreation and visitor commercial opportunities. The proposed project involves removal and demolition of a portion (6' x 42' headwalk, 24-6" x 40' fingers, 1-14" square pile and 1-12" square pile) of an existing commercial wood dock system and installation of a new wood section (8' x 93' section, 4-20" square concrete piles and 2-18" square concrete piles) and relocation of an existing pile (12" square pile) (Exhibit #3). Currently, there are four (4) slips, each 40 -feet in length and post project there will be four (4) slips, two (2) slips will be 40 -feet in length and two (2) slips will be 93 -feet in length. Electra Cruises operates a charter boat business from these docks. The proposed project will 5 -05 -005 -[Marvin Engineering Company] Administrative Permit Page 3 of 7 not accommodate any new boats, only existing boats. The applicant is not seeking any change to the existing charter operation. The purpose of this project is to bring the dock system into� compliance with, the City of Newport Beach fire code, as recent City inspections of the site disclosed fire code violations. The new configuration will, allow for safer docking of their large vessels with a proper ingress, and egress in case of fire or other emergency. The dock project will be used for commercial boating related purposes to serve Electra Cruises at the Lido Marina Village. The site had been surveyed on November 10, 2004 by the City of Newport Beach Harbor Resources Division for eelgrass and no eelgrass was discovered within 15 -feet of the project area. Surveys completed, dudng the active growth phase of eelgrass are valid for 60 -days with the exception of surveys completed in August -October. A survey completed in August - October shall be valid until the resumption of active growth (i.e., March 1). The project is agendized for the February 2006 Coastal Commission Hearing and by this time the eelgrass surveys would not continue to be valid ,,--since 60 -days have passed since the survey was completed. The site has also been surveyed for Caulerpa taxiffiblia and none was found. This survey was completed on December 14, 2004 and is only valid for 90 -days. The project is agendized for the February 2006 Coastal Commission Hearing and by this time the Caulerpa taxiltblia survey would not continue to be valid since it had passed 90 - days from when the survey was completed. Thus, an up-to-date eelgrass and pre -construction Caulerpa taxiffiblia, surveys must be conducted. These eelgrass and Caulerpa taxiffiblia surveys are valid for a, limited period of time (until the next growing season for eelgrass and 90 days for Caulerpa taxiffiblia). If construction does not occur within the respective time periods, a subsequent survey will be required. If any eelgrass or Caulerpa taxiffiblia are found on the project site, Special Conditions No. 2 and No. 3 identify the procedures necessary to be completed prior to beginning any construction. The proposed project has received an approval in concept from the City of Newport Beach Harbor Resources Division. The Regional Water Quality Control Board (RWQCB) has determined that the proposed project will not adversely impact water quality if standard construction method sand materials are used. The applicant has also applied for a permit from the U.S. Army Corps of Engineers. The National Marine Fisheries Service (NMFS) has reviewed the project and has no objections to the proposed work. The California Department of Fish and Game (CL-1,FG) has also reviewed the project and determined that the will not result in a significant impact to fish and wildlife resources and their habitats. Section 30600(c) of the Coastal Act provides for the issuance of coastal development permits directly by the Commission in regions where the local government having jurisdiction does not have a certified Local Coastal Program. The City of Newport Beach only has a certified Land Use Plan and has not exercised the options pro ded in 30600(b) or 30600.5 to issue its own permits. Therefore, the Coastal Commission is the permit issuing entity and the standard of review is Chapter 3 of the Coastal Act. The certified Land Use Plan may be used for guidance. B. Marine Resources The proposed recreational boat dock development and its associated structures are an allowable and encouraged marine related use. The project design includes the minimum sized pilings and the minimum number of pilings necessary for structural stability. There are no feasible less environmentally damaging alternatives available. As conditioned, the project will not significantly adversely impact eelgrass beds and will not.contribute to the dispersal of the invasive 'aquatic algae, Caulerpa taxifolia. Further, as proposed and conditioned, the project, which is to be used solely for recreational boating purposes, conforms to, Sections 30224 and 3023,3 of the Coastal Act. 5 -05 -005 -[Marvin Engineering Company] Administrative Permit Page 4 of 7 C. Water Quali The proposed work will be occurring on, within, or adjacent to coastal waters., The storage or placement of construction material, debris, or waste in a location where it could be discharged into coastal waters would result in an adverse effect on the marine environment. To reduce the potential for construction related impacts on water quality, the Commission imposes special conditions requiring, but not limited to, the appropriate storage and handling of construction equipment and matedals to minimize the potential of pollutants to enter coastal waters. To reduce the potential for post -construction impacts to water quality the Commission requires the continued use and maintenance of post construction BMPs. As conditioned, the Commission finds that the development conforms to Sections 30230 and 30231 of the Coastal Act. D. Local Coastal Program The LUP for the City of Newport Beach was effectively certified on May 19, 1982. The certified LUP was updated on January 9, 1990. As conditioned, the proposed development is consistent with Chapter 3 of the Coastal Act and with the certified Land Use Plan for the area. Approval of the project, as conditioned, will not prejudice the ability of the local government to preparea Local Coastal Program that is in conformity with the provisions of Chapter 3. E. California Environmental Quality Act (CE As conditioned, there are no feasible alternatives or additional feasible' mitigation measures available that would substantially lessen any significant adverse effect that the activity may have on the environment. Therefore, the Commission finds thatthe proposed project,as conditioned to mitigate the identified impacts, is the least environmentally damaging feasible alternative and can be found consistent with the requirements of the Coastal Act to conform to CEQA. SPECIAL CONDITIONS: 1 . Water Quality A. Construction Responsibilities and Debris Removal (1 No construction materials, equipment, debris, or waste -will be placed or stored where it may be subject to wave, wind, or rain erosion and dispersion. (2) Any and all construction material will be removed from the site within 10 days of completion of construction. (3) Machinery or construction materials not essential for project improvements will not be allowed at any time in the intertidal zone. (4) If turbid conditions are generated during construction a silt curtain will be utilized to control turbidity. (5) Floating booms will be used to contain debris -discharged into, coastal waters and any debris, discharged will be removed'as soon as possible but no later than the end of each day. 5 -05 -005 -[Marvin Engineering Company] Administrative Permit Page 5 of 7 (6) Non -buoyant debris discharged into coastal waters will be recovered by divers as soon as possible after loss. B. Best Management Practices- Program By acceptance of this permit the applicant agrees that the long-term water -borne berthing of boat(s) in the approved dock and/or boat slip will be managed in a manner that protects water quality pursuant to the implementation of the following BMPs. (1) Boat Cleaning and Maintenance Measures: a. In -water top -side and bottom -side boat cleaning shall minimize the discharge of soaps, paints, and debris. b. In -the -water hull scraping or any process that occurs under water that results in the removal of paint from boat hulls shall be prohibited. Only detergents and, cleaning components that are designated by the manufacturer as phosphate - free and biodegradable shall be used, 'and the amounts used minimized. c. The applicant shall minimize the use of detergents and boat cleaning and maintenance products containing ammonia, sodium hypochlorite, chlorinated solvents, petroleum distillates or lye. (2) Solid and Liquid Waste Management Measures: a. All trash, recyclables, and hazardous wastes or potential water contaminants including old gasoline orgasoline with water, absorbent materials� oilyrags, lead acid batteries, anti -freeze, waste diesel, kerosene and mineral spirits will be disposed of in a proper manner and will not at any time be disposed of in the water or gutter. (3) Petroleum Control Management Measures: a Oil absorbent materials shall be examined at least once a year and replaced as necessary. The applicant will recycle the materials, if possible, or dispose of them in, accordance with hazardous waste disposal regulations. The boaters will regula:irly inspect and maintain engines, seals, gaskets, lines and hoses in order to prevent oil and fuel spills Boaters will use preventive engine maintenance, oil absorbents, bilge pump -out services, or steam cleaning services as much as possible to clean oily bilge areas. Bilges shall be cleaned and maintained. Detergents will not be used for cleaning. The use of soaps that can be discharged by bilge pumps is prohibited. 2. Pre -and Post -Construction Eelgrass Survey(s) A. Pre Construction Eelgrass Survey. A valid pre -construction eelgrass (Zostera marina) survey shall be completed during the period of active growth of eelgrass (typically March through October). The pre -construction survey shall be completed prior to the beginning of construction and shall be valid until the next period of active growth. The survey shall be prepared in full com pliance I with the "Southern California Eelgrass Mitigation Policy" Revision 8 (except as modified by this special condition) adopted by the National Marine Fisheries Service and shall be prepared in consultation 5 -05 -005 -[Marvin Engineering Company] Administrative Permit Page 6, of 7 with -the California Department of Fish and Game. : The applicant shall submit the eelgrass survey for the review and approval of the Executive Director within five (5) business daysof completion of each eelgrass survey and in any event no later than fifteen (15) business days prior to -commencement of any development. Iftheeelgrass survey identifies any eelgrass within the project area which would be impacted by the proposed project, the development shall require an amendment to this permit from the Coastal Commission or a new coastal development permit. B. Post Construction Eelgrass Survey. If any eelgrass is identified in the project area by the survey required in subsection A of this condition above, within one month after the conclusion of construction, the applicant shall survey the project site to detennine, if any eelgrass was adversely impacted. The survey shall be prepared in full compliance with the "Southern California Eelgrass Mitigation. Policy" Revision 8 (except as modified by this special condition) adopted by -the National.Marine Fishedes Service and shall be prepared in consultation with the California Department of Fish and Game. The applicant shall submit the post -construction eelgrass survey for the review and approval of the Executive Director within thirty (30) days after completion of the survey. If any 6elgrass has been impacted, the applicant shall replace the impacted eelgrass at a minimum 1.21 ratio on-site, or at another location, in accordance with the Southern California Eelgrass Mitigation Policy. All impacts to eelgrass habitat shall be mitigated at a minimum ratio of 11.21 (mitigation: impact). The exceptions to the required 1.2:1 mitigation ratio found within SCEMP shall not apply. Implementation of mitigation shall require an amendment to this permit or a new coastal development permit unless the Executive Director determines that no amendment or new permit is required. 3'. Pre -construction Caulerpa Taxifolia Survey A. Not earlier than 90 days nor later than 30 days prior to commencement or re -commencement of any development authorized under this coastal development permit (the "project"), the applicant shall undertake a survey of the project area and a buffer area at least 10 meters beyond the project area to determine the presence of the invasive alga Caulerpa taxifolia. The survey shall include a visual examination of the substrate. B. The survey protocol shall be prepared in consultation with the Regional Water Quality Control Board, the California Department of Fish and Game, and the National Marine Fisheries Service. C. Within five (5) business days of completion of the survey, the applicant shall submit the survey: (1) for the review and approval of the Executive Director; and (2) to the Surveillance Subcommittee of the Southern California Caulerpa Action Team (SCCAT). The SCCAT Surveillance Subcommittee may be contacted through William Paznokas, California Department of Fish & Game (858/467-4218) or Robert Hoffman, National Marine Fisheries Service (562/980-4043). D. If Caulerpa taxifoiia is found within the project or buffer areas, the applicant shall not proceed with the project until 1) the applicant provides evidence to the Executive Director that all C. taxifolia discovered within the project and buffer area has been eliminated in a manner that complies with all applicable governmental approval 5 -05 -005 -[Marvin Engineering Company] Administrative Permit Page 7 of 7 requirements, including but not limited to those of the California Coastal Act, or 2) the applicant has revised the project to avoid any contact with C. taxifblia.� No revisions to the project shall occur without ar Coastal Commission -approved amendment to this coastal development permit unless the Executive Director, determines that no amendment is legally required. ACKNOWLEDGMENT OF PERMIT RECEIPTACCEPTANCE OF CONTENTS: I/We acknowledge that I/we have received a copy of this permit and have accepted its contents including all conditions. Applicant's Signature Date of Signing'. H:\FSY\Staff Reports\Feb06\5-05-005-[Marvin Engineering Company]AP(NB) r i 'Wet 14 A -dft Tt. pul b a OISSIWWOD VIN80jilVD NVP U0169N 4slooD 44n CUARD.I't -0 t " tL In Olt EXHIBIT # Z PAGE OF= cl: So CL L. z Lu OISSIWWOD VIN80jilVD NVP U0169N 4slooD 44n CUARD.I't -0 t " tL In Olt EXHIBIT # Z PAGE OF= cl: So I 11C /.a CL OISSIWWOD VIN80jilVD NVP U0169N 4slooD 44n CUARD.I't -0 t " tL In Olt EXHIBIT # Z PAGE OF= (E) FLOATM OOOC TO fjDAAIN k K PROEM np D= AT HAT04ED To K REmoym "%%WlJQW OOCK R FOR OLARGM Tw UJ4.m P1110POSED FLOAMO 000c ftm r. -1 Fl I L- -J L- L .-J L L L IV 13rW Id (F6) RAMP r (4) LOCA7M OF THE RMOCATED PILE--.— - r I -PRonm nmTm 0= a PkU 0 PoC"ML AMA SMOCKEM COK ME TO WE REPLAM VATH OW OF 7K RDAMM OOCKS PILES rIN WW CONCITMN) & BE RELOWED w 7K 07HER SIM OF RAMP COASTAL COMMISSION EXHIBIT# S PAGE I OF STRUCTURAL GENERAL NOTES MPAJM *AD PAS t G TO COC SECMS 1904 iW& 94ALL K t- ALL KA" FASMM AM wAjqDWARE 94ALL BE STA"LM NOT 01P CALWMZED W AM APPROUk 8V AINY CONCRElf OR DVXY WAIM L NAW A WOOM CEMBOT CON71ENT 2. ALL NAILS *AALL K l6d W48- MANIEM) WaIM TRKAID NAM WID4 AM CW Milk FUt USE R4 A SALT WATM MOWN 9ENMG V*U SIREPIM OF Fvq-* 90,000 P% u.1f.CL IALL BE MR sy A CopKam TESTPfG RAKM StXL K Of ACCMDMM wTW TA&E-5 234-9-1 & 23 -*-9-2 FdA REGIS; crft Emomm. air 7w cw— Uim ON ORAWAM COMPRESSIW STWCTW OF 80W O -q 4, ALL HARDWAW SWAI i W wAsm w Ar m. ov - mamrw Tw REPLY TO ATTENTMN OF: Office of the Chief Regulatory Branch Lido Marina Village c/o: SheRmaker Inc. Atteatiorr Lisa E Miller 2035 F Placentia Avenue Costa Mesa, California 92627 Dear Ms. Miller. DEPARTMENT OF THE ARMY LOS ANGELES =TNCT, CORPS OF ENGINEERS P.0 BOX 532711 LOS ANGELES, CALIFORNIA 90053-2325 January 25,2005 903 2 53 (,o -2-o oT- Reference is made to your request of December 29,20N (F& No. 20050MO-CLNI). Under the provisions of Section 10 of the Rivers and Harbors Act of March 3, 1899 (33 US.C. 403), you are hereby authorized to reconfigure the dock by adding art W wide finger. that is 93' long and removing the eAsting fingers in Newport Bay, Newport Beach, Orange County, CAffornia, as shown on'the enclosed drawings. The owner or authorized responsible offidd must sign and date all copies of this Letter of Permission (LOP) . indicating that he/she agrees to the work as described and will comply with all conditions. One of the signed copies of this Letter of Pennission must be returned to the Corps of Engineers (a pre -addressed envelope -is enclosed). In addibonplease use the two attached postcards to notify this office as to the dates of commencement (within 10 days prior to the start of construction) and completion of the activity (within 10 days following the end of construction). Furtherrnore, you are hereby advised that the Corps of Engineers has established an Administrative Appeal Process which is fully described in 33 CFR Part 331. The complete appeal process is i in the enclosed Appendix B. Thank you for participating in our regulatory program Sincerely, Mark Durham Chief, South Coast Section Regulatory Branch -2- 37 0 57 DATE When the struchn-es or work authorized by flus pemut are still in existence at the Eme the property is transferred, the term and conditions of this LOP will continue to, be binding on the new owner(s) of the property� To validate the tramsfir of this pem-tit and ffie liabihties associated with compliance with its term and conditions, have the transferee sign aud date below. I -3- PERAWCONDMONS General Conditions: 1. The time limit for completirig the authorized activity ends two years after the date of this signed LOP. If you find that you need more time to complete the authorized activity, stibmit your request for a time extension to this office for corwderation at least one month before the above date is reached. 2. You must maintain the activity authorized by this perrrut in good condition and in conformance with the terms and conditions of this permit You are not relieved of this requirement if you abandon the permitted activity, although you may make a good faith transfer to a durd party in compliance with General Condition 4 below Should you wish to cease to mamtam the authorized activity or should you desire to abandon it without a good faith transfer, you must obtain a moctificalion of this permit from this, office, which may require restoration of the area. 3. If you discover any previously unknown historic or archeological remains while accomplishing the activity authorized by this permit, you must immediately notify this office of what you have found- We will initiate the Federal and state coordination required to deterrnme if the remains warrant a recovery effort or if the site is eligible for listing in the National Regis -ter of Historic Places. 4 if you sell the property associated with this permit, you must obtain the signature of the new owner in the space provided and forward a copy of the permit to this office to validate the transfer of this authorization. s Yon must allow representatives from this office to inspect the authorized activity at any tirne deemed necessary to ensure that it is being or has been accomplished with the terms and conditions of your permit Furthermore, you must comply with the following non -discretionary Special Conditions: Special Conditions: 1. The Permittee -understands and-agreer, that, if future operations by the United States require the structure or work herem authorized, or 4 in the opinion of the Secretary of the Army or lus authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the -navigable waters, the Permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to'the United States No claim. shall be made against the United States on account of any such removal or alteration. I Creosote treated pilings shall not be placed in navigable waters or waters of the United States unless all of the following conditions are met. Ma a), The project involves the repair of existing structures that were originally constructed using wood products; b) Me creosote treated pilings are wrapped in plastic, c) The use of plastic -wrapped creosote pilings is restricted to marine waters, d) Measures are taken to prevent damage to plastic wrappirig from boat use Such measures may mdude installation of rub strips or bumpers, e) The plastic wrappirig is sealed at all Joints to prevent leakage - f) The plasfac material is expected to maintain its integrity for at least ten years, and plastic wrappings that develop holes or leaks are repaired or replaced in a timely manner - 3 No debris, scal, silt, sand, sawdust, rubbish, cement or concrete washings thereof, oil or petroleum products, from construction shall be allowed to enter into or placed where it may be washed by rainfall or runoff into waters of the United States. Therefore, the Permittee shall employ all standard Best Management Practices to ensure thatt toxic materials, silt, debris, or excessive erosion do not enter waters of the United States during project construction. Upon completion of berthing improvements� any excess material or debris shall be removed from the work area and disposed of in an appropriate upland site. 4 The perrruttee, shaH discharge only dean construction materials suitable for use in the oceanic environment 5. The Peimittee shall notify the Army Corps of Engineers of the date of commencement of operations and the date of completion of coperations at least five days prior to such completiori. 6. Prior to the couimencement of construction, the Permittee shall notify the US Coast Guard in writing. Please include: name of company conducting the operation, work to be completed, project location, hours of operafton, duration of project, equipment being used, and an on-site point of contact This information will be used in the Local Notice to Mariners (LNM) to no - the maritirne community of activities affecting navigation. Please send the notification letter to: US Coast Guard, 11th District, Attw- QM1 Mike Carlson, Staff Symbol:- can, Coast Guard lisland, Bldg. 50-6, Alameda, CA 94501-5100. 7 Should any federal aids to navigation (AtoN) be affected by this project the Permittee shall. contact the US Coast Guard AtoN office at (510) 437-2982. 8. Upon the US Coast Guard's receipt of the notification to start work, a copy of the applicanes letter will be sent to the Coast Guard Captain of the Port (COTP) for review. The COTP may modify the deployment of marine construction equipment or mooring systems to safeguard navigation during the project Questions concerning hghtin& equipment placement, and mooring should be directed to the COTP. 9. A pre -construction survey of the project area for Caulerpa taxificilia will be conducted in accordance with the Caulexpa Control Protocol (s6e htip://swr.ucsd.edu/hcd/ccpvLhbn) not earlier than 90 days prior to planned construction and not later thari 30 days prior to construction The results of that survey shall be ftwismitted to NOAA Fisheries and CDFG at least 15 days prior to inibation of proposed work. In the event that Caulerpa is detected within the project am, -5 - no work shall be conducted until sudh fame as the infestation has been isolated, treated, and the risk of spread is eliminated. 12 Your use of the permitted actmty must not mterfere with the publics qft to ftee navigation on all navigable waters of the United States. 13 You must install and mamtam, at your e)q>ense, any safety lights and signals prescribed by the United States Coast Guard (USCG), through -regulations or otherwise, on your authorized facilities. Ihe USCG may be readied at the following telephone number I& Brian Aldrich (510) 437-2983. 0. Further Information: 1. Congressianal Authorities: You have been aulhoriz� to undertake the activity described above pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.0 403). 2- Liadts of this authorization - a. niis permit does not obviate the need to obtain other Federal, state, or local authorizations requiredbylaw- b. This permit does not grale- any PrOPerty:r'gbts or exdusive Privileges - c. T-lus permit does not authorize any injury to the property or rights of others. d. This permit does not authonze interference with any e)asbng or Proposed Federal project 3 Limits of Federal Liability In issuing this permit, the Federal Goverraxwnt does not assume any liability for the following: a. Damages to the pemutted project or uses thereof as a result of other permitted or unpermitted activities or from natural causes. b. Damages to the permitted project or uses thereof as a result of current or future activities underhiken by or on behalf of the United States in the public interest c. Damages to persons, property, or to other permitted or unpermitted activities or structures caused by the activity authorized by this permit. d. Der ,Ign or construction deficlencies associated with the permitted work. e_ Damage claims associated with any future modification, suspension, or revocation of this permit - 4. Rehance on Apphcant's Data The deWxn-unation of this office that issuance of " permit Is not contrary to the public interest was made in reliance on the information you provided. 5. R his petmit at any eevaluation of Pennit Decision. ibis office may reevaluate its demon on t bme the crrcurristances wan -ant Circuuist�nces that could require a reevaluation include, but are -not limited to, the following: a. you fafl to comply with the terms and conditions of this pem-dt. b The information pro vided by you it, support of your permit applicafion proveri to have been false, incomplete, or inaccirr�ate (See 4 above). -7- c- Significant new inforirnation. surfaces which this office did not consider in. readung the original public interest decision. Such a reevaluation may result in a that it is appropriate to use the suspension, modification, and revocation procedures contained in 33 CFR 325.7 or enforcement procedures such as those contained m 33 CFR 326 4 and 326-5. The referenced enforcement procedures provide for the issuance of an administrative order requiring you to comply with the terms and conditions of your permit and for the initiation of legal action where appropriate You will be required to pay for any corrective measure ordered by this office, and if you fad to comply with such directive, this officeirtay in. certam situations (such as those specified in 33 CFR 209 170) accomplish the corrective measures by contract or otherwise and bffi you for the cost 6. Extensions. General condition. 1 establishes a time limit for the completim of the activity authorized by this permit. Unless there are circumstances requiring either a prompt completion of the authorized activity or a reevaluation of the public interest decision., the Corps will. notmally give you favorable consideration to a request for an extension of this time hirtit. 05/26/2006 06:33 818BB14213 RICHARD H BERGER PAGE 06/24 RECORDING REQUESTEM BY' Awn WNW RECORD= MAIL TO * SPAM kROVO THTS LIVE FOR RWORDER'S USE Tx3:S 2jSsjM0M= OF GROMM LEASES ("Asaignment") is made and entered int, -,5 as of the _ day of 2006, by and between mARVIN ENGI.aZERING CO., INC., a California corporation ("Assignor") and WREC LIDO VENTUREr LLC, a Delaware limited liability company P'Assignee,,). RECITALS A. Pssignor is the le8see or sublessee under certain ground leases, deEcribed as follows (collectively, the nGround Lease�i": 1. Lease, dated December 1, 1971, by and between Harry M. Kelso, as lessor, and Donald M. Koll, a married man, as his sole and —Ve-'p-arate property, as lessee, a Short Form of which was recorded December 10, 1971, in Book 9921, Page 859, official Records, regarding certain real property described as Parcel 1 in Exhibit W' attached hereto, as such Lease was assigned by such lessee to Assignor, by an instrument recorded May 23, -1990, as Izistrument No. 90-277175, Official Records of orange county ("Official Records") (the "Marvin Assignment.") ; 2. Lease, dated June 1, 1973, by and between Earl 0. Sawyer and Eleanor B. Sawyer, husband and wife, collectively as 17QaMor, and Donald M. Kill and Dorothy B. Koll, husband and wife, collectively as lessee, a Short Form of which was recorded Tune 6, 1973, in Book 10736, Page 326, Of -ficial Records, regarding certain real property described in Parcel 2 in Exhibit "A' attached hereto az such Lease was assigned by such lessee to Assignor by the Marvin Assignment. 3. Lease, dated June 1, 1973, by and between Earl 0. Sawyer and Eleanor B. Sawyer, husband and wife, collectively as le-ssor, and Donald M. Koll and Dorothy B. Koll, husband and wife, collectively as lessee, a Short Form of which was recorded June 6, 1973, in Bcok 10726, Page 342, Official Records, regarding certain real prope.=ty desc=ibed as Parcel 3 in Vxhibit W attached hereto, as assignet by such lessee to Assignor by the Marvin A.=isiqnment. 4. Lease, dated January 2, 1966, by and between Calvin G. Rohre and Arlene L. Rohrs, husband and wife, collectively as lessor, and zTarnes W, Berkshire and Pauline F. 'Berkshire, husband 05/26/2006 06:33 8188814213 RICHARD H BERGER PAGE 07/24 and wife, collectively as lessee, a Short Form of which was recorded Jaiyaary 4, 1966, in Sook 7797, Page 653, Off iCial Records, regarding ce*rtain real property described as Parcel 4 in Exhibit W attached hexeto, as assigned by such lease to Assignor by the Marvin Aseig-nment . s. Lease, dated Nove-mber 9, b� and between aune aphnson, as lessor, auld Donald M. Koll, as lessee, a Short Form of whf8rwas recorded De,,2ember 18, 1973, in Book 11031, Page 23, Official Records, regarding certain real property described as Parcel 5 in F.xhibit 'W' z.,ttached hereto, as assigned by such lessee to Assignor by the Marvin Assignment: B. Azaignor and Assignee have entered into a Purchase azd Sale Agreemws.-nt and Joint Escrow instructions dated as of September 14, 200S ("?urchase and Sale Agreement") , in which Assignor has agreed to convey all of its interest in the Ground Leases to Assignee. C. Assignor desires to assign to Assignee, and Assignee desires to accept from Assignor, all of Assignor's right, title and interest in, to and under each and every one of the Ground Leases. FOR VWXABLE CONSID39RAT70N, the receipt and sufficiency of which are hereby acknowledged, the parties hereto agree as follows: 1, A9,,,U_cMnenZ, Azsignor does hereby unconditionally assign, sell, transEer, grant, convey and set over unto Assignee all of Assignor's right, title, options, and interest under the Grouzid Leases. 2. Aalampl�i=. Assignee hereby accepts and agrees to assume all of the obligations, responsibilities, and liabilities of Assignor sel: forth in the terms and provisions of, or otherwise required pursuant to, the Ground Leases, which arise after the date hereof . 3. ttorney -Egeg. Tf any suit or action is instituted to enforce thf---! rights of either party under this Assignment, the successful ].-;arty, as adjudicated by a court, shall be eatitled to reasonable ai.ttorney fees and court costs. 4. Zp- r This Assignment shall be governed and construed in accordance with Calitornia law. SIGNATURE PAGE FOLLOWS LMEC/LidoYSale9MMMs igrG COIJ -I dLe-NIPS 2 05/26/2006 06:33 8188814213 RICHARD H BERGER PAGE 08/24 -IN w3:Tjq.ESS WIMREOV, this Assignment is executed as of the date first above written. "ASSIGNOR" MARVIN ENGINPEERING CO. , INC. a California corporation 13Y.- GEMiD M. FRIEDYLI�X Executive Vice President "ASSIGNEE" WREC LIDO VENTURE, TLC a Delaware limited liability company By: WREC Lido, LLC, A Delaware limited liability company. Its managing member By: Wasserman Vornado Strategic Real Estate Fund, LLC, its managing Member By, David D. Wasserman Managing Member TMC/Lift/SaIAWRECAAF I gnG rT-U.1dJA1-113e$ RECORD=0 REQUBSTM 33�y.- Fgp'S'!�TCORD'No RUMESITED 5, AMERICAUMLECOUF�ANY SLl6DNISJQN DEPARTMENT AM WREN RWORDM) MAIL po: IMEC Lldo Venture IJX I C/O Wasserymn:lReal Estate Capital LL P-0- Box 6187 Providence, Rbode Islamd 02940 Recorded In Official Records, orange County Tom D;bly� CI6Yk-R0con$er 20060003624,35 04:19prn 05130joB M 59 AU 9 0-01D 0-00 0.00 0-00 7A.00.0= 0 . 000, - 00 SPACB ABOVS 7UTZ LnM ZrCa ==a=. 6 11SX ASSL02M OF LIZASE TRIS ASSIGMMNT OV LEASE is +ade and entered into as of the day of b�, an6 between MARVIN ENG-TNEERING CO:T INC-, a CaT,-fornia cOrPOratioa Z'%ssigmro) and WREC LIDO VENTURE LLC, a Delaware limited li�abijity roTapany ('Assignee,9 A. Assignor is the lessee or sublessee Pnder a certair, Amended and Restated Lease Agreement, described a' follows: Amended and Restated Lease Agreem�nt, dated August 21, 1987, bY and between Olen Propertios Corp., as lessor, and Traweek in -vestment COMPanY. as lessee ("Lease"), regaz-ding certain real p-joperEy des "crihed in Exhibit "Ae attached hereto ' and the boat docks described in Exhibit "Ba attached hereto. 8. The following agreements and dc>--ument s were executed Prior to the August 21, 1987 Amended and Restated Lease Agreement and are made a Part of this Assignment: I- Agreement, dated 2january between City of Newport Seach and Newport Ra:Lboa Savings and Loa�rt Associatic�rl; Lease Agreement, dated June 27, 1972, betweer, Trq>e:rial -Savings and Loan Association of Newport- Pasadena, as lessor, and Donald M. roll, as lessee; 3. Lease Assignme6t, undated, between. Imperial Savings Association, as lessor, and Olen Properties Corp., as lessee; 4- Joint Use Agreement, dated January 3, 1974, between Imperial Savings and Loan Association and Donald M. Koji; 5. First Amendment to Lease, dated May .9, 1974, between Imperial Savings and Loan Association and Donald M. Koji; I 6- Acceptance and Agreement. dated October 21, 1981, between imperial Savings and Loan Association and Traweek Investment Fund No. 12, Ltd-; 7. Assignment, dated July 2, 1981, between gelson S. Zand and Traweek in -vestment pund No_ 12, Ltd-; a. Settlement Agreement between Olen. Properties Corp. and Traweek Investment Fund No_ 22, Ltd - C. Assignor and Assignee have entered into a Purchase and Sale Agreement and Toint Escrow Instructions dated as of September 3-5' 2005 ("Purchase and Sale Agreement"), in which Assignor has agreed to convey all its 'interest in the Lease to Assignee, D. Assignor desires to assign t desires to accept from Assignor _O Assignee, and Assignee , al of Assignor's right, title and interest in, to and under the Lease. FOR VALUABLE C0XSIDER&T2:()N, the receipt and sufficiency of which are hereby acknowledged, the Parties hereto agree as follows: 1. Assic4nment, Assignor does hereby unonditionally assign, sell, transfer, grant, convey and set Over unto Assignee all of Assignor's rights, title, OPtions, and interest under the Lease and other agreements and ass ignments. decribed in Recitals A and 13- 2. Assumotion- Assignee hereby accepts and agrees to assume all of the obligations, responsibilities, and liabilities of Assignor set forth in th terms and ozovisions of, e or otherwise required pursuant to, the Lease and the other agreements and ass3.9nments, which arise after the date hereof- 3- Attorney Fees- If any suit or action is instituted to enforce the rights of either party under this Assignment, the successful party, as adjudicated by a court, shall be entitled to reasonable attorney fees and court -costs. 4- gzOve--ninq Law, This Assignment shall be governed and construed in accordance with California law. IN WITNESS WEMREOP, this Assignment is executed as of the date first above written_ "ASSIGNOR,, MARVIN ENGINEERING Co., INC_ a California co:rporation 2 7- Assignment, dated July 2, 1981, between Nelson S, Zand and Traweek Investment Fund No. 12, Ltd.; 8. Settlement Agreement between Olen Properties Corp - and Traweek investment Fund No. 12, Ltd� C- Assignor and Assignee have entered into a Purchase and Sale Agreement and Joint Escrow instructions dated as Of September IS, 2005 ("Purchase and Sale Agreement"), in which Assignor has agreed to convey all its interest in the Lease to Assignee. D, Assignor desires desires to accept from ASSig to assign to Assignee, and Assignee nor, al of Assignor's right, title and interest in, to and under the Lease - FOR VALUABLE CONSIDERATION, the receipt and sufficiency of which are hereby acknowledged, the Parties hereto agree as follows, I- Assignment. Assignor does hereby unconditionally assign, sell, tral�s'feZgrant, convey and set over unto Assignee all of Assignor,s rights, title, Options, and interest under the Lease and other agreements and assignments described in Recitals A and B. 2. Assumption. Assignee hereby accepts and agrees to assume all of the obligations, responsibilities, and liabilities of Assign,or set forth in the terms and Provisions of, or otherwise required pursuant to, the Lease and the other agreements and assignments, which arise after the date hereof. Attorney Fees- It any suit o ction is instituted to enforce tITe r—i-g—h—ts—of either party unrer this Assignment, the Successful party, as adjudicated by a court, shall be entitled to reasonable attorney fees and court costs. 4. Governing Law. This Assignment shall be governed and construed in accordance -with California law. IN WITNESS WHEREOF, this Assignment is executed as of the date first above written. 'ASSIGNOR" MARVIN ENGINEERING Co_, _INC_ a California Corporation By: Kd President SIGNATURES CONTINUED ON FOLLO�MNG PAGE [.TD0JASS'1GMEXT0FLZASF 2 WRE C LIDO VENTURE LLC a Delaware limited liability coTrpany By: WREC Tido-LLC, A Delaware limited Tiability company, its managing member By: Wasserman vornado Strategic Real Estate Fund, LLC, Its Sole Member By-- Wass rman SREC Partners LLC it Ma'T aging Member RNII EY: - 4 Managing Member 4 ORT,6� March 18,2005 Vili Boyadjiev 3416 Via Oporto, Suite 202 Newport Beach, CA 92662 Subject: 3400 Via Oporto, Multiple Berthing Action Plan Fern-dt Number HC2004-066 Dear Ms. Boyadjiev: I am in receipt of your letter dated March 13, 2005, proposing an action plan to resolve the issue of multiple berthing with regards to the vessel/habitat called Anthenea. As stated in your proposal, the vessel's electrical outboard motor and two batteries are stored in dry storage. It is our understanding that this vessel is 0 moored permanently as its use is for display purposes only. The diagram provided outlined areas of the marina available for moor mig of the 0 Anthenea. The locations are acceptable provided surrounding vessels can be readily removed in an emergency without the necessity of moving the Anthenea. Based upon the information provided, your action plan is approved with the following conditions: 1. There shall be no habitation of this vessel in the marina. 2. No fuel sources shall be stored on the vessel or placed on the adjoining dock fingers. 3. The vessel remains stationary for display purposes only. If you have any questions, feel free to contact Nadine Morris at (949) 644-3105. Thank you for your cooperation. We look forward to achieving a fire safe harbor in Newport Beach. Sincerely, Timothy Riley Fire Chief cc: Donna Larson, Lido Marina Village FRO!� " FAX NO. : Mar. 15 2005 03:17PM P1 1.55 ANTHENEA, N'�- �11 7 �"Ih I'll, �N1111111 �' h MARCH 13,2005 VILI BOYADJIEV 3416 Via Oporto -9202 Newport Beach CA 97663 (949) 723-5552 Newport Beach CA 92663 'W Riley, my name isMs.111i BoyadjIiev. I am one of the owners of a 14 tT feet in. diameter, (176 square feet inside 0 ice space) boat/habitat called Aiathenea. The unit does not have fuel tank on board, upon necessity we use a smal I 4,9 electrical outboard, equipped with remote control, which is stored in dry storage, Anthenea has space for two smal I batteries, but the batteries are removed and are also in storage. There are spaces inside lagoons in Lido Marina Village that will, be able to house Anthenea, without presenting fire hazard, I took the liberty to include a drawing of the lagoon and would I ike to invite you to inspect Anthenea, with hope that after inspection you will allow further stay of Anthenca in Lido Marina Village. My contact number is: (949) 929-5617 FROM 5�� Mar. 15 2005 03:17PN 0 P U 76" hfi'� t--T(Ti 7, 7 S ID AF 71, �,N� ki HARBOR RESOURCES DIV. ^I CITY OF NEWPORT BEACiri 67t-7 v i r m ,,I, t,Ql 1, � I / / -7 /C/-1 5 -off Lo 4t -o �l iYP U.N.O� F-1 F c� (E) RAMP TYP Ul �N (N) LOCA TION OF THE RELOCATED PILE n1 z. ( C-\ Ej FLOATiNG DOCK TO REMAIN & Do E P R f -) 'E - ( -1 =lH - D T,� TkP FLOATING DOCK AT HIATCHED 4 TO BE REMUVEED 3 1 -0 �t mononQE:,n I Mat 0, DOCK WIDTH l R FOR ENLARGED l� �SPROPOSED- 2 DOCK PLAN LU L J L L cn 25'46" 0 (VE�NE 1 o" 5 Z' 'VERIFY% PROPOSED FLCSTING DOCK PILES Co) POCHED AREA (E) BROCKEN CONC PILE TO BE REPLACED WITH ONE OF THE REMOVED DOCKS PILES (IF IN GOOD CONDI'FtON) & BE REU3CATEDD ON THE OTHER SIDE OF RAMP TVERIF—Y) 1! ig MR 5 CITY OF NEWPORT BEACH H- i.;'r' 4`1 or, VICINITY MAP N.T.S. A NEWPORT BAY, CALIFORNIA NORTH % 7 -so u V 0 RT B EP", A 01 V'ANM� NI AXA�:- - 1 IF'.(--, X A A Mi&l A \;It I A - I I � -- (N) 2-18" SQ CONC PILES I PROPOSED 8' x 93' FLOATING DOCK (N) 20" SQ CONC PILE TYP (TOTAL OF 4) PROPOSED 4' x 4' FILLET TYP (E) FLOATING DOCK (E) BULKHEAD PILING tAYOU-7 N.T.S. WORKSHEET FOR BUILDING FIRE PERMIT APPLICAT n, A9 CITY OF NEWPORT BEACH PLEASE PRINT OR TYPE BUILDING DEPARTMENT b 1. PROJECT ADDRESS (NOT MAILING ADDRESS) FLOOR SUITE NO. LEGAL DESCRIPTION No. UNITS LOT BLOCK TRACT 2. DESCRIPTION OF WORK NIQD(710-01, -'5hP;,q-k Dih, 01 USE f 7-,3 1, # OF STORIES VALUATION NEW F-I ADD Ej ALTE�R, DEMO SQ FT i �,3 a fi, L (NEW/ADDED/EXTG) Check Annronriate Box for Annlic�-nf 3. OWNER'S NAME LAST FIRST OWNER'S OWNER'S E-MAIL ADDRESS �DDRESS,, Ll w1j 6UL- I CITY STATE ZIP PHONE NO. 4. ARCH ITECT/DES IGN E R'S NAME LAST FIRST LIC. NO. ARCH ITECT/DES IGN E R'S ADDRESS ARCHITECT/DESIGNER'S E-MAIL ADDRESS CITY STATE ZIP PHONE NO. 5. ENGINEER'S NAME LAST FIRST STATE LIC. NO. ENGINEER'S ADDRESS ENGINEER'S E-MAIL ADDRESS CITY STATE Z'[P PHONE,,,NO,( ce >1( - u 'I� �) 10 F] 6. CONTRACTOR'S NAME BUSINESS L C- STATE LIC. CONTRACTOR'S ADDRESS CONTRAdTOR'S E-MAILAODRES,5) CITY STATEP�- ZIP PHONE NO. OFFICE USE ONLY PERMIT NO. TYPE OF CONSTRUCTION PLAN CHECK NO. PLAN CHECK FEE $ OCCUPANCY- GROUP PLAN CHECK ENG. -Forms-SIdg application 8/27/04 i - cp�71 A Lf Z4 9-11 Message Miller, Chris From: Miller, Chris Sent: Thursday, May 19, 2005 9:44 AM To: Donna Larson Subject: Illegal Piling Replacement Donna, Page 1 of 1 It has come to my attention that a single pile has been removed and replaced with another pile in approximately the same location at your facility at Lido Marina Village. Harbor Resources does not have any records of such a request for pile replacement. Therefore, this replacement is in violation of the City's permitting process. With that said, Harbor Resources wants to ensure a safe harbor to the best of our ability. If a serious problem were to occur on the docks and it needed immediate attention, we have allowed, in some cases and through a written request, the applicant to make the necessary repairs before permits could be pulled, in the interest of safety. Then, after the docks were secure, an "after the fact" permit could be pulled. This request for immediate attention / repair work for this pile never occurred and the pile was replaced without any communication with the City. Therefore, you are required to immediately apply for an "after the fact" permit with the City. Please be prepared to supply a schematic of your docks with a description of the work performed and two color photos of the new pile that was replaced. Also, pile calculations for the specific pile installed will need to be shown to the Building Department plan checkers. Please feel free to call me with any questions. I will expect to see an application filed with the City by Friday, May 27 or Administrative Citations may follow. Thank you, Chris Miller Harbor Resources Supervisor (949) 644-3043 http:I/Ww\e�.qily.newppq-be�ac�h.ca.us/HBR/ 06/03/2005 CITY OF NMT NEWPORT BERCH NBqPORT BAY A 4ii4� NUT c OCCRIV VICINITY MRP NEMIW MY, CFLIFORNO w BFLBOR ISLAND RY ":g l-oN A a 7- P, 6 A%Ls T JETTY IEFIST JETTY SOUNDINGS ARE EXPRESSED IN FEET AND DENOTE 21- _A0 RPPLICRNT'S NRME JOB RDDRESS -2,9�OZZfl� DATE �j zr ZT HARBOR PERMIT TIMNSFER APPLICATION 10 f & -449 Date of Applicaton: Permit Number:— *7 &Z2 Property Address: o,�9 V j )q ��9 1"o AAER,)A:fk7- —57 4cH Buyer's Names: Billing Address: 4 '5 Telephone No.: LV/ 4, 7S- T &&' -2- Buyer's Signatures Seller's Names: Seller's Signatures: Joint Owner Signature: Escrow Company: Address9/,oS- j_,gL1W"r-- Escrow Number.",,?R,?,,b,?,-2-,,) Fax#: Ciosing Date (Estimate). J e4-2-1, Inspection Date: Reinspection Date: Fee Amount - Date Paid: Application Complete: Check Number: Harbor Resources SignaturelDate Special Conditions: This permit is re vocable by the City Council in arcordance with Title 17 of the Newpo/l Beach Mur'icipal Code. � W� k - Au S�-b ,g 2005 CITY OF NEWPORT BEACH 829 Harbor island Drive, Newport Beach, CA 92659 949-644-3034/Fax 949-723-0589 First American Title Insurance Co. 714-800-3260 Re: Escrow NCS -97659 -SAI Pier Permit #124-3400 3400 Via Oporto301 Morning Star Lane Dear Sirs: The pier permit will be transferred as of September 8, 2005, closing date. Buyer is to be made aware that docks are currently not up to City standards and it is understood that they will need to be repaired or replaced in the near future. If you require further assistance in this matter, please call 644-3034. Sincerely, Lorr'�e Araese Lorrie Arcese Harbor Resources Division . — — — 1-1111 ... —, ". '' — . � , " , , '' V mARom PEFtpwr TMNSFER APPUCA TION M~ WMd Dr. fiewport Mock, CA RM W4W&U3ffax *WT234M Daft of Ap"ostion: Pannit Number. Mgagj& Pooporty Addraw: 3w via 2Eorto I-alifArmig .pr qz- Ur Bw4ws Names: Z=tb pr Wing Addrmw: aW Tokoftne No.: IfP-vMrt BesO, Callfarnis 92663 1949) §ZSJ&&, swoes sloruftres: woes Nwows: "fees $19noWres: 1- 9( 'a I P., CEO 5 d _O�4, Ex. V Jolt* Owywr Ew-mw COMMY: Pizat, Amag . Q==7115 TftM I Q= Q=Wux *"1*UjjQ5 Imrine C=a =UL -CA 92618 E$Cf*w Mkonber. FA-.9,7659-sAr P*X*: (714) 2M::3M clooft DOW lff"Mat*' &Wrgphar & =5 InspooWn Dow R$InopwUon Doft- FwAftXMt Oft Paid.. Check Number Appftgom Cognples: . *04do spww comoom'. 7w, F4 I ?WNW Of Pwv*=Wt OY 00 CgV Coundl in f000ftim *a UU otthe p"Mxr? soam Mwftlow coo. HARBOR PERMIT TRANSFER APPLICATION 829 Harbor Island Dr. Newport Beach, CA 92660 949-644-3034/Fax 949-723-0589 Date of Applicaton: Permit Number: 6003686--.oQ Property Address: 3400 via Oporto lleupar-f ('ali-farnia Buyses Names: Zzzth (Xv�rtpr Propggties 92 0 LLC Billing Address: 3400 yjj QWrj, Newport Beach, California 92663 Telephone No.: (949) Q�-M62 Buyer's Signatures: F0, h Quarte Propertie� -9.2, LLC By.- -4;� FA)T THOMAS, Sellees Names:4j,-u;jLjn RnZjua.-ring seiieesSignatures: Joint Owner Signature: Escrow Company: First Am-rjr .an litle U=e Q=20m Address§1 1,114 Center Drive, �Le. 450. Irvine, Q 2618 —9 Escrow Number. NCS -97659 -SAT Fax #: (714) 800-3260 Closing Date (Estimate): septcgjbar 8, 2()09 Inspection Date: Reinspection Date: Fee Amount: Date Paid: Check Number: Application Complete: Harbor Resources Signaturivate Special Conditions. ThiS permit is mvocable by the City Council in OCCOrdat?Ce with Tiffe 17 of the Newport Beach Municipal Code. California F gional Water Quality 'ontrol Board Santa Ana Region Terry Tamininen 3737 Main Street, Suite 500, Riverside, California 92SOI-3348 Aimold Schwarzenegger Scc.,etaryjor (951) 782-4130 - Fax (951) 781-6288 Governor Environmental littp://www.waterbo-�rds.ca.gov/santaana Protection December 24, 2004 Lisa E. Miller, President Shellmaker, Inc. 2035F Placentia Avenue Costa Mesa, CA 92627 PROPOSED REBUILDING OF BOAT DOCK, ELECTRA CRUISES, 3400 VIA OPORTO, NEWPORT BEACH, ORANGIE COUNTY Dear Ms. Miller: If standard dock construction methods and materials are utilized, this project should not adversely impact water quality. A statement has been submitted that there will be no waste discharged from the proposed project. Based on these assurances, clearance is provided. However, should the Army Corps of Engineers determine that this project requires a Section 404 permit, it will be necessary for the project proponent to obtain from this Board a Water Quality Certification under Section 401 of the Clean Water Act. Should you have any questions, please contact J. Shami at (951) 782-3288. Sincerely, Mart ;il�me=(Jun) T. 0 irez, Jr P.i Chief" Re,-ulations Sect -10311 cc: California Coastal Commission, Long Beach Army Corps of Engineers - Erik Larsen County of Orange, County Property Permits Division - Patricia Bigger JIS/blucag2371et California Environmental Protection Agency cl* Recycled Paper ;3 - C1 S T 6S8-17SG-b1G OU I J a �'J e W T I a q S e9T :OT 90 -17;� Uer shellmaker ina. Iecember 16, 2004 California Regional Water Quality Control Board Santa Ana Region 3737 Main Street Suite 500 Mverside, CA 92501-3339 Re-_ 3400 Via Oporto, Newport Beach — Electra Cruises Dear Mr- Martinez, I am enclosing the City of Newport Beach Approval in Concept and the completed caulerpa survey for the above referenced project- As you can see, there is no eelgrass or caulerpa at the site. All work will be done in accordance with the City of Newport Beach General Permit and no vessel waste will be discharged at this location. There are no Least Tern nesting grounds at this location so there will be no impact on that My client is removing some fingers and reconfiguring the docks by adding an 8! mfide finger that is 93' long- The purpose of this project is to comply With the new mandated City of Newport Beach fire codes. Electra Cruises operates a charter boat business out of Lido Marina Village and the new configuration will allow for safer docking of their large vessels with a proper ingress and egress in case of fire or other emergency. I would appreciate it if you could respond to me on this matter, as the California Coastal Commission will want to see proof that I have obtained your approval - Thank you in advance for your assistance. Sincerely, Lisa E. Miller President 2035F Placentia Ave-, Costa Mesa, CA 92627 Phone (949) 548-5359 Fax (949) 548-5315 General Engineering Contrar--tors/License No. 561434/Marine Construction and Dredging 6 -d S T EsoiPsGi?G OU I J a -,I e W I I a q S eLT:OT 90 tla Uer 12/30/2004 09:56 Z)ATE - TO, FROM - 949673305G NBLG HQ j . 'DA&Z'8, A�, 3400 V18 Oporto #104 llewpoxt &w*, C'C .phone rminbtr., 949 6751%62 -73 8517 FAX; 673 305g mil NeWPO-rt Reach Donna Lar Attached is a T�"--Lt&r which all boat tenants5 will be rec-e-lvir,g wir-h t -heir jamary invoice, PAGE 02 12 11; 3 0 / 2 0 0 4 09: 56 9496733056 �01 19* I -li[Carel TD� Fantasea Cruises FROM,- Management FV: f949,,51��p DATE 121,10104 As January 31, 2005 is within the 30 day not - agreement, the Landlord hereby give f-- tc) cOmPly in YOur iease 5 TenAllt its 30 day notice to comply With The City of Newporl Beach and the Newport 130ach Fire Department ,0 SLOCKING or RAFTING of any vess(9j. 5top ALL If 811Y blocking and/or rafting continues after that date you WJjj be in default of YOur lease agreement and Landlord may- at Landlord OPtion trOat the occwrrenco as a breach of the Lease Agreement and pursLjo what legal action a.S May be required, If YOLI hOve $nY question5, please call me.'ap-ytiTe INNIZIN "I 14,151 CITY OF NEWPORT BEACH FINAL LETTER - COMPLETE HARBOR RESOURCES - 829 Harbor Island Dr., Newport Beach, CA 92660 Tom Rossn-ffller - 949-644-3041 Chris Miller - 949-644-3043 FIRE DEPARTMENT - P.O. Box 1768, Newport Beach, CA 92658-8915 Nadine Morris - 949-644-3105 LIDO MAR -INA VILLAGE ATTN: DONNA LARSON 3400 VIA OPORTO, STE 104 NEWPORT BEACH, CA 92663 Dear Commercial Pier Permittee, Permit number: HC2004-066 Location : 3400 VIA OPORTO Status: CLOSED 12/16/2004 This is an acknowledgement letter stating that you have successfully corrected the violations previously noted in the City report that was sent to you earlier this year. Your docks have met the minimum standards as set by The City of Newport Beach Municipal Code. Your actions will help reduce the potential for fire related injury and property damage in Newport Harbor. Please remember that it will be your responsibility to ensure that your docks maintain this level of safety in the years to come. The Harbor Resources and Fire Departments will be conducting routine inspections of your property in the future. Thank you for your compliance. Please feel free to give us a call if you should have any additional questions. CHRIS MILLER - HARBOR RESOURCES SUPER VISOR NADINE MORRIS - FIRE DEPARTMENT INSPECTOR Page I of 2 CITY OF NEWPORT BEACH FINAL LETTER - COMPLETE HARBOR RESOURCES - 829 Harbor Island Dr., Newport Beach, CA 92660 Tom Rossmiller - 949-644-3041 Chris Miller - 949-644-3043 FIRE DEPARTMENT - P.O. Box 1768, Newport Beach, CA 92658-8915 Nadine Morris - 949-644-3105 LIDO MARINA VILLAGE Permit number: HC2004-066 ATTN: DONNA LARSON Location 3400 VIA OPORTO 3400 VIA OPORTO, STE 104 Status: CLOSED NEWPORT BEACH, CA 92663 DATE COMMENTS 12/16/2004 Berthing 05/04/2004 All boats, including structures that float and have a fuel source, shall be readily removed in an emergency without the necessity of moving other boats. At the time of the inspection, many vessels were berthed in most of the lagoons. They were unable to navigate out into the channel without moving a larger vessel. NFPA 303 Chapter 5 Section 5. 1.1 08/04/2004 Action plan for multiple berthing for Electra Cruises approved and shall be implemented by January 30,2005. 11/01/2004 Action Plan Approved for Lido Marina Village. Implementation by January 30, 2005. CHRIS MILLER - HARBOR RESOURCES SUPER VISOR NADINE MORRIS - FIRE DEPARTMENT INSPECTOR Page 2 of 2 77,71Z�4 77' W PORT BE, � No-,,�ernber2,7201104 Dornia Larson Lido Marina Village Z-7 ,3400 Via Oporto, Suite 104 Newport Beac.1h, CA 92663-6302 Su!�7,ect: 3400 Via Oporto - Multiple Bert-1hing Action Plan Permit Nu: -ober HC2004-066 Dear Ms. Larson: 4 1 am in receipt off y our letter dated Oc-tolber 27, 2004, rec-arding the issue of rn ultiple beert-hing occurring h at t e above subject location. Your corres-oondertce states that nrultiple berflaing be discontinued at Liclo Marina V-1111age. IVe appreciate your concer-i-I for the safety of the ILarbor a,. -,d the decision to chan-e -,,,-oux bus-1--neess -,practice to comply with H'tie National Fire Protection Association (NITA 303). This action pian submitted is approved and required to be implemenated by January 30, 200-3. I The remal*-nirLgviolaL--,,onsn,.oted on our notice dated September 23,2004-1, will be reinspected on or after Novem-ber 10, 2004� P, -,'ease contact Nadhn Morris at,1949) 644-310-5 if, -have any quesfioi�s. 71,31-iank you for your cooperation. Welookforward to achieving a fire safe T- T 4- . iar bo -i- in ewpor L Beach. ............ R', 77,71Z�4 77' W PORT BE, � No-,,�ernber2,7201104 Dornia Larson Lido Marina Village Z-7 ,3400 Via Oporto, Suite 104 Newport Beac.1h, CA 92663-6302 Su!�7,ect: 3400 Via Oporto - Multiple Bert-1hing Action Plan Permit Nu: -ober HC2004-066 Dear Ms. Larson: 4 1 am in receipt off y our letter dated Oc-tolber 27, 2004, rec-arding the issue of rn ultiple beert-hing occurring h at t e above subject location. Your corres-oondertce states that nrultiple berflaing be discontinued at Liclo Marina V-1111age. IVe appreciate your concer-i-I for the safety of the ILarbor a,. -,d the decision to chan-e -,,,-oux bus-1--neess -,practice to comply with H'tie National Fire Protection Association (NITA 303). This action pian submitted is approved and required to be implemenated by January 30, 200-3. I The remal*-nirLgviolaL--,,onsn,.oted on our notice dated September 23,2004-1, will be reinspected on or after Novem-ber 10, 2004� P, -,'ease contact Nadhn Morris at,1949) 644-310-5 if, -have any quesfioi�s. 71,31-iank you for your cooperation. Welookforward to achieving a fire safe T- T 4- . iar bo -i- in ewpor L Beach. October 27, 2004 City of Newport Beach Fire Department PO Box 1768 Newport Beach, CA. 92658-8915 Attention: Nadine Morris Subject: Lido Marina Village Reference: HC2004-066 Dear Ms. Morris. In reference to your letter of Sept. 23, 2004 regarding certain maintenance items needed to be repaired and/or replaced this will be completed no later than November 10, 2004. In regards to the Multiple Berthing, the tenants who are in violations have been notified and understand this is not permitted by City NFPA 303 Chapter 5, Section 5. 1. 1., and this code will be enforced by the City come January 3 1, 2005. They have all stated they will work with the City and management to correct this. ifyou have, -any questtons, or; -H can be ofam, -�,rffi­ s­ic'e F-- -all Sincerg-ly, Cc: City of Newport Beach Harbor Resources (Chris Miller) File CITY OF NEWPORT BEACH FINAL LETTER - COMPLETE HARBOR RESOURCES - 829 Harbor Island Dr., Newport Beach, CA 92660 Tom Rossmiller - 949-644-3041 Chris Miller - 949-644-3043 FIRE DEPARTMENT - P.O. Box 1768, Newport Beach, CA 92658-8915 Nadine Morris - 949-644-3105 LIDO SAILING CLUB ATTN: NORM REST 3300 VIA LIDO NEWPORT BEACH, CA 92663 Dear Commercial Pier Permittee, Permit number: HC2004-064 Location : 3300 VIA LIDO Status : CLOSED 10/27/2004 This is an acknowledgement letter stating that you have successfully corrected the violations previously noted in the City report that was sent to you earlier this year. Your docks have met the minimum standards as set by The City of Newport Beach Municipal Code. Your actions will help reduce the potential for fire related injury and property damage in Newport Harbor. Please remember that it will be your responsibility to ensure that your docks maintain this level of safety in the years to come. The Harbor Resources and Fire Departments will be conducting routine inspections of your property in the future. Thank you for your compliance. Please feel free to give us a call if you should have any additional questions. CHRIS MILLER -HARBOR RESOURCES SUPERVISOR NADINE MORRIS - FIRE DEPARTMENT INSPECTOR Page I of2 CITY OF NEWPORT BEACH W, COMPLETE FINAL LETTER HARBOR RESOURCES - 829 Harbor Island Dr., Newport Beach, CA 92660 Tom Rossmiller - 949-644-3041 Chris Miller - 949-644-3043 FIRE DEPARTMENT - P.O. Box 1768, Newport Beach, CA 92658-8915 Nadine Morris - 949-644-3105 LIDO SAILING CLUB ATTN: NORM REST 3300 VIA LEDO NEWPORT BEACH, CA 92663 DATE COMMENTS Permit number: HC2004-064 Location 3300 VIA LIDO Status: CLOSED 10/27/2004 Berthing 09/10/2004 Marinas with multiple berthing violations must submit an action plan to resolve the infractions by January 30, 2005. Action plans must be approved by Fire Chief Riley by the deadline posted on the cover sheet of this report. 10/26/2004 Action plan approved. Shall be implemented by January 30, 2005. CHRIS MILLER -HARBOR RESOURCES SUPERVISOR NADINE MORRIS - FIRE DEPARTMENT INSPECTOR Page 2 of 2 -24 , NO October 26, 2004 Norman Rest, President Lido Sailing Club 3300 Via Lido Newport Beach, CA 92663 Subject: 3300 Via Lido, Newport Beach - Multiple Berthing Action Plan Permit Number HC2004-064 Dear Mr. Rest: I am in receipt of your letter dated October 18, 2004, regarding the issue of multiple berthing occurring at the above subject address. Due to the nature of your business, your correspondence stated that multiple berthing at the facility will need to continue. It is our understanding that vessels will be multiple berthed only during normal business hours. In the event of a vessel fire in the harbor, it is imperative to remove exposed vessels immediately. Employees shall be trained to respond without delay and take appropriate measures. After hours, all vessels will be arranged such'that any vessel can be readily removed in an emergency without the necessity of moving other vessels. The action plan submitted is approved and required to be implemented by January 30, 2005. Please contact Nadine Morris at (949) 644-3105 if you have any questions. Thank you for your cooperation. We look forward to achieving a fire safe harbor in Newport Beach. Sincerely Fire Chief Lido Sailing Club 3300 Via Lido Newport Beach Ca' 92663 Fire Chief Riley Dear Sir, 10/18/04 On or before 111105 Lido Sailing Club as a matter of policy will birth all boats, at night, in the attached configuration. Business hours 9am> 8pm summer and 9am> 5Pm winter, except boat parade nights, we will maintain a non -rafting non -blocking configuration in the Lido marina at the above address. We, as a sailing Club when docks are manned with doe personal may raft or side tie as a matter of staging or routine maintenance however intend to adhere to the letter and sprit of the fire codes when docks are unmanned or at night. egards Norman Lido Sailing Clut 949 494 3658. C, A 2 -P 7i -F6 0 CZ �Q 7Q �2 -2 > .. . .... .. ..... CD O'm .. . . ... . .. ........ . . ...... .. . . ...... ..... . . . ....... . . ....... ... ....... . CITY OF NEWPORT BEACH VICINITY MAP N.T.S. NEWPORT BAY, CALIFORNIA ON NORTH EEL GWS iNSPECTfON NO EEL GRASS WITHIN 15OF PROJECT 0 EEL, RASS IN THE PROJECT AREA SIGNATURE i It kdI04 13. Y-) PERMIT� DATE HARBOR RESOURCES DIV. CITY OF NEWPORT BEACH C1111; � tj[jbt tj llqlrjl 191-n" (N) 2-18" SQ CONC PILES :1ROPOSED 8' x 93' -LOATING DOCK N) 20" SQ CONC 'I LE TYP TOTAL OF 4) --) FLOATING DOCK (E) BULKHEAD PILING LAYOUT N.T.S. APLICANTS NAME :LIDO MARINA VILLAGE LOT: ITRACT: A ', /11 ; A N' TP An700 Q,�_ip-j it ,I/ j r) L I DU 0" Imll /-A' R 11 N /-\ V I L L E- ",-. I !\ — IKER, INIC. DATE NEWPORT BEACH, CA 92663 2035 F PLACENTIA AVENUEJ 10/13/04 I COSTA MESA, CA 92627 d 0 > LLJ + LLJ 11 Lu > LL) LLJ c6 > _j LLJ a- LLJ -H Ld -i a - Ll 0 > Li LLJ LLJ LLJ LLJ Lli Lu Ld CK 0 i LLJ L'i -H 7 Ld -0 0 cD 7 L W I 0 L > Ll L, LU i -i L Li 01 -H W Ld -0 Of plp=q L) 0 > > bi Ld < > L'i 0 ui L 0 0 0 -i a- < -H LL uj Z 0 Ld Y < c� V) -J 0 — I 0 D _j LLJ 0 a- 0 0 m cr —LLi a - L PILE ELEVATION N. T. S. SOUNDINGS ARE EXPECTED IN FEET AND DENOTE ELEVATIONS BASED ON MEAN LOWER LOW WATER. APLICANTS NAME : LIDO MARINA VILLAGE LOT: ITRACT: [r)Q Ar)r)D�7QQ i IMr) KA A A A CONTRACTOR :SHELLMAKER, INC. L-u�-/ MARINI-N VILLAGE NEWPORT BEACH, CA 92663 2035 F PLACENTIA AVENUE� 1 O'�1'3'/ :0 4 COSTA MESA, CA 92627 August 4, 2004 Donna Larson, Property Manager Lido Marina Village 3400 Via Oporto, Suite 104 Newport Beach, CA 92663-6302 Subject: 3400 Via Oporto, Multiple Berthing Action Plan Permit Number HC2004-066 Dear Ms. Larson: I am in receipt of your letter dated July 30, 2004, proposing an action plan to resolve the issue of multiple berthing occurring at the above subject property with your tenant Electra Cruises Inc. As outlined in the action plan and diagrams provided, the removal of two fingers at Dock E will allow for the docking of boats in a manner that will no longer impede the removal of vessels at the dock. Your action plan is approved and required to be implemented by January 30, 2005. A permit from the City's Building Department is required for the removal of these two fingers and the modification to an existing finger. Prior to obtaining this permit, please contact Chris Miller or Tom Rossmiller in Harbor Resources at (949) 644-3034 to obtain an application. Please begin the permit process promptly to allow for review by various City departments. I appreciate your response to the multiple berthing violation and look forward to further cooperation to correct this problem. Sincerely, Timothy Riley Fire Chief V ON THE NVA=ON7r...1.N NEWPORT BF-kCH, CAUFORNU MANAGEMENT / LEASING OFFICE 3400 VIA OPORTO, SUITE 104, NEWPORT BEACH, CA 92663-6302 - (949) 675-8662 - FAX: (949) 673-8517 30 July 2004 Fire Chief Tom Riley City of Newport Beach HAND DELIVERED 7/30/04 Reference is made to Tom Rossmiller's letter of 01 July 2004 regarding Compliance for commercial docks. On behalf of Electra Cruises Inc., I would like to request an extension until 30 January 2005, as they will be modifying their docks in order to comply with the berthing conditions. Following please find a copy of Electra Cruises current docking and a copy of their proposed reconfiguration. Thanks you for your usual prompt attention to our request. Should you have dy Goodman at Electra Cruises (949 -723 - Property Manager A V -n W I I i�j I ff �p 4 -rl i* A 40, Page 1 of 2 Miller, Chris From: Jeff Allen Dallen@hbplaw.com] Sent: Monday, May 05, 2003 3:12 PM To: cmiller@city.newport-beach.ca.us Cc: Martin Rodriguez; Kenc@ljbank.com; Dyoder@ljbank.com Subject: Proposed loan by La Jolla Bank to Cannery Village, LLC; transfer of pier permit Dear Chris: Thank you for taking the time to discuss my concerns about La Jolla Bank's ability to exercise the pier permit rights of its prospective borrower, Cannery Village, LLC, in the event the Bank were to succeed to ownership of the borrower's "upland" leasehold estate by foreclosure. I understand from speaking with you that if the Bank could prove to the City that the Bank had acquired the upland leasehold estate of Cannery Village, LLC, then upon the Bank's submission to the Harbor Resources Division of a simple form that essentially provides contact information and upon payment of a filing or processing fee in the amount of a few hundred dollars, the Harbor Resources Division would either approve the transfer of Cannery Village's existing pier permit to the Bank or would issue a new pier permit to the Bank, so that the Bank would then be able to generate income from renting out the permitted boat slips, as is now being done by Cannery Village, LLC. Such transfer or issuance would not require any discretionary approval by the City Council or any other City agency or board, but instead would be ministerial in nature (meaning that it would be something to which the Bank would be entitled upon compliance with the City's procedural requirements). I further understand that the transfer or issuance of a pier permit to the Bank could be accomplished even without the signature or consent of Cannery Village, LLC (even though the transfer form calls for the signature of the "seller") as long as the Bank can demonstrate to the City that the Bank has acquired the upland leasehold estate. This last point is important, because the Bank cannot count on the cooperation of a defaulting borrower against whom the Bank has foreclosed. Please confirm by return e-mail that my understanding is correct. If I have misstated or misunderstood anything, then please let me know in what particular respect I have done so. Also, I would appreciate receiving from you, by mail or fax, a copy of the pier permit transfer application form referred to above. My contact information is set forth below. Thanks again for all your assistance. I look forward to hearing back from you at your earliest convenience. Jeff Jeffrey S. Allen Law Offices of Jeffrey S. Allen 707 Wilshire Boulevard, Suite 5350 Los Angeles, California 90017-3500 Telephone: (213) 228-6515 Facsimile: (213) 228-6532 E -Mail: jallen@ aw.com -hkpL- Attention! Confidential! The information contained in this transmission is intended only for the personal and confidential use of the designated recipient. This transmission may be an attorney client communication and as such is privileged and confidential. If the reader of this transmission is not the intended recipient, you are hereby notified that you have received this transmission in error, and that any review, dissemination, distribution or copying of this transmission is strictly prohibited. If 08/06/2003 P CITYOF NEWPORT BEACH P.O. BOX 1768, NEWPORT BEACH, CA 92658-8915 -,July , 30,2002 Marvin Engineening Co. 3400 Via Oporto, Suite 104 Newport Beach, CA 92663 Re: pier permit CP 1243 3 3 6 1 for 3 3 3 6 Via Oporto Dear Sirs: This is notice that the property owner at 3336 Via Oporto has applied for a permit to -fevise the pier and dock bayward from his property. The City of Newport Beach Harbor Resources Division has given him an Approval In Concept for the proposed work. This application will require approval of both the Army Corps & the Califoraia Coastal Cominission. If this application is approved by the above-mentioned agencies and the City approves the plans, a permit will be issued for the work. If there is a permit issued for this revision, the Public Purnpout Station that is required for your marina will have to be installed elsewhere within the Lido Village Marina. The location for the pump will have to be reviewed and approved by the City and the work to install the. pump must be done under a Harbor Construction Permit issued by the Building Department. If you require additional information in regards to this matter, please contact either Wes Armand or Tony Melum at 949-644-3034. Sincerely, Wes Armand Harbor Inspector Harbor Resources Division Cc: Robin Clauson, Assistant City Attorney 3300 Newport Boulevard, Newport Beach b ob General Engineering & Electrical MIKE KILBRIDE, LTD. P.O. Box 3341 Newport Beach, CA 92659 949-548-0106 Lic. # "A" & "C-1 0" 738400 Fax 949-548-1616 �PLLEx 5n ".0 ,-02Z, US 126 S 5 all O'�071 101 — nq. ns -11) * \1 ? 1A �E(,bM\AP, S&EC �50v'cc s%@ji ca C to�SA A '-*"- . -C Ll C- UITIA y 1A 06 WORK6HEET FOR BU"'IL"DI. I NG PERMIT APPLICATION CITY OF NEWPORT BEACH BUILDING & PLANNING DEPARTMENTS PLEASE PRINT !.PROJECT ADDRESS (NOT,-MAIL�NG ADDRESS) FLOOR SUITE NO. ZIP -7zl LEGAL DESCRIPTION No. UNITS LOT BLOCK TRACT 2.DESCRIPTION OF WORK Y ESTIMATED$ VALUATrON Dro EXISTING STAUCTURE-80.FT. PRCDPOSED NEW / ADDITIONAL SQ. FT. NEW ADD ALTER DEMO7, OTHER USE 0 F S TRU, C T U R E .L No. OF STORIES P.OWNER'S NAME LAST FIRST M.I. PLIOg NO. CITY P��;wt ZIP P H (-') NEE I �,'O OWNER'S ADDRESS 4 c.? CITY STAT F Al ZR —J "G.EUG-IREER' NAME LAST FIRST STATE LIC. NO., 4.APPLICANT'S NAME LAST FIRST PHONE NO. APPLICANT'S ADDRESS CITY STATE P CITY STATE ZIP APHONE NO. 5.ARCHITECT'S NAME LAST FIRST ISTATE LIC. NO. 7.CONT-RACTOR'S NAXE V ARCHITECT'S ADDRESS CITY ISTATE ZIP P H (-') NEE I �,'O "G.EUG-IREER' NAME LAST FIRST STATE LIC. NO., ENGINEER'S ADDRESS CITY STATE ZIP APHONE NO. 7.CONT-RACTOR'S NAXE V LIC. CLASS STA,?,E7lLllC, N011�� -x� R CQNTRA TOIZ� ?S ADDRE SS J'? CITY TATE ZIP PHONE NO Vk COMPANY NAME (if differe-nt) Jvl- NEWPORT BUS. LIC. NO OFFICE USE ONLY White: BuiLding Dept Yettow: Cashier Pink: Appticant 0 0 PERMIT NO. TYPE OF CONSTRUCTION PLAN CHECK NO. OCCUPANCY — GROUP CLASS CODE PLAN CHECK FEE LIDO MARINA', jj��'VILLAGE ONTHEWATERFROINT IN NEWPORT BEACH. C--kLIFOR"NIA, 3400 VIA OPORT' M�NAGEMENT / LEASING OFFICE 0:,--SUII'E 104, NEWPORT BEACH, CA 92663-6302 - (949) 675-8662 FAX: April 29, 2602 Robert Burnham City Attorney CITY OF NEWPORT BEACH 3300 Newport Blvd. Newport Beach, CA. Dear Mr. Burnham: W On March 11, 2002 Lido Marina Village received a lette'r from Wes Armand, Harbor Inspector for the City of Newport Beach. The context of the letter was, Lido is in violation of the Fire Code regarding the ingress and egress of boats. Lido promptly notified the tenants of the violation and the tenants must comply. Lido's tenants contacted other marinas in Newport Beach to verify they had received the same letter regarding this violation. As there are over 30 marinas in the Newport harbor that "stack" boats (one boat blocks another). NO other marina had received a notice from the Marine Department or any other agency in Newport Beach. It is my understanding the Marine Department made a physical inspection of ALL marinas in the Newport Beach basin and have noted all marinas who are violating this Fire Code. The Marine Department has prepared a letter notifying the other marinas of the violation but has not mailed the letter to them, as they have not been authorized to do so. My complaint is if the City is aware of the violations by all these marinas why was Lido is the ONLY one who has been given the written notice to comply. Please explain this unequal enforcement of the fire code. Sincerely, Don"tarson Property Manager Cc: Newport Beach Horner Bludau, City Manager �x8ny Mellum, Marine Department Wes Armand, Marine Department R. Berger J. Friedman File 5 June 29, 2001 James M. Whitelaw Attorney at Law 18191 Von Kannan Avenue Irvine, Ca 92612-0187 Dear Mr. Whitelaw: In our meeting this morning we discussed the requirements for transferfirig a pier permit from the seller to the buyer within a time frame. The Harbor Permit Policies require that a request shall be made to the City to transfer the permit and the application must be made within 30 days from the date that the abutting upland property changed ownership. I am attaching a copy of the policy for your information. If you require additional information regarding this policy, please call either Tony Melurn or me at 644- 3044. Sincerely, WV Wes Armand Harbor Resources Division WA H-1 CB') Whenever a pern-dttee sells the abutting upland property, a request shall be made to the City to transfer the permit. Forms for this purpose may be obtained from the Harbor Resources Division. Failure to apply for a transfer within 30 days from the date that the abutting upland property changed ownership will result in an additiong'-fee bythe City. - C. The Harbor Resources Division is authorized to approve transfers to the new owners or long-terin lessee of the abutting upland property. D. Prior to the transfer of a Harbor Permit, all harbor structures shall be inspected for compliance with the City"s minimum plumbing, electrical and structural requirements, . and the conditions of the existing permit. All structural deficiencies must be corrected prior to the transfer of the permit A fee win be charged for this inspection, established by Resolution of the City Council. DREDGING A. All dredging will require a permit from the Harbor Resources Division and may be subject to engineering approval by the Public Works Department. B. Major dredging outside the established harbor lines will require prior approval by the Harbor Resources Division and the U.S. Corps of Engineers. C. Maintenance dredging bayward of residential and commercial property shall be the responsibility of the Harbor Permittee for the zone delineated by the bayward prolongations of upland side property lines and the U.S. Project line. FEES A. INITIAL PERMIT FEES The Harbor Resources Division may charge the fees identified in the Master Fee Schedule for initial pennits and for pier fees. Initial permit fees to not include Building Department fees, but they do include Public Works Department fees. B. PIER FEES Annual pier fees are due and payable on 1 March in accordance with the schedule identified in the Master Fee Schedule. 0 C) m W 0 < W ;5*w;aX w�—< N ol 1� wN 00 w w -N 00 WO (7, wn C� -0 J, w r) W> m z C) CD > r) - �! > > X > E < — z T> m 3� z m X > -) C:� z M :* m 3 �� z m 6 0 m E3 r- 0 n 5 m m - C) r C) m r - 00 rm- Oc') x E5 m o m m 0 r m 0 r- m r- 0 0 m r - 0 m m r- C3 �Z, co m Z co C= > > > > > > > > 0 > z 2 z z m z z 2 z -2 CIO 0 0 �10 c, L:, c, L� ao c,,� 'o L� * Ln :E (A.* Ln Ln Ln * Ln Ln Ln Ln u) Ln (n 10 z p z p �D P p Z p p p �2 P �2 P P P '7' m iz, '7' m : 0 -H C, : :., m 6 m q6 6 41 Ln m al U "I,, � - I Lo 1p RNA, Ln G) c> 0 B .-A WWII 0 co < u-, M �D ep m g0l z C) m "j c— a, co < < 0 > > > > 5 X > -D 0 X 0 0, 0' > 0 > r) �� n 0 r) 0 n 0 n m n 0 m M m -0 m 0 Q o n 0 0 r- 0 r- 0 0 r- 0 r- m m m m 0 r- 0 0 r- 0 r - m 0 m r- m r- 0 0 0 r r) 0 z > > > > > > > m a - > 0 zo, z z -a - a - -20 �z �z 0 z z z z ko 41 N -N -Nt� C, C. N w C, m I pt Ln�, U) Ln cn Lo w cn Ln ul Ln �L (n (n Ul) U) Z �O -4 '�g — I 0�-, 1 0-1 u _4 -fl j � LU - 0 U 0 < > ol. 2 a LU u ot, C? I? z C? C? I? �su L: _,o 32 co m r,:' o 1 ci� a, Ln V" 0 LU Z m C. V- r., Cl V- C� 14 'T 1� U, , CD V. U., I I -n m Mo 0 z (1) r, U, m Z — I 0�-, 1 0-1 u _4 -fl j � LU - 0 U 0 < > ol. 2 a LU ot, z LU 0 LU co _,o 32 m m uj 9z 0 -1 io� 0 0 0 U 5 CE < > 0 < 00 -.0 o -j o -1 0 LU 0 _,o Uj 0 -j Lu 0 0 1 201 Lu 0 LU 0 U � 0 -i LU � 0 - 0 LU U � o UJ � 0 Cuf 0, ul A. z un '0 < a-, <L :!� LU Ln z > > g > o< > > C� (n 9 C� Ln > > C� CD co z Q- � ff 9 Lw Iff Lf 190 '49' ff -9 ff �q Iff ff CD & & C� LO Ln Ln (n Ln �n Ln Ln Ln Ln U') � -V (31 m 00 m � m rj C> V. '40 'o Z (71 V, m 0 0- - < ol, ul, 01, u m m m ; S -0 a LU z LU 0 LU co _,o 32 m m uj 9z LU 0 :� —i LU 2E -j LU ;� 0 0 U 5 CE < > E 0 Ui 0 U 0� w ;� LU z z ol, ul, 01, u m m m ; S -0 Li -i 0 71 Cie 0 z z LU 0 LU 0 _,o 32 z < 71 Ln LU z < CL V, < ce 0 NI < 00 w < C) Cie Lu Z LU U-) > 0 C) 00 0 �,W RE Lu Ln < ul A. z Ln LU Ln z Ln C� (n 9 C� Ln C� 0 C� CD co z Q- Li -i 0 71 Cie 0 z 0 Lu u C, n < 0 LU 0 _,o 32 0 .0 Lu,n U ui 0 LU n U 0 Ln LU z < CL V, < ce 0 NI < 00 w < C) cell X. < < Cge > Ir 9CD Li -i 0 71 Cie 0 z CITY -OF NEWPORT BERCH Mry mr 17 u s . gwai, � '. / - �j �\ KOF I LE I w = 401 c*,ND I %-S RW CGIW N FEET R�Z a _Sl:�ED T ELEVRTIONS BR=, CC, LDrU LOW -sill all I 11V 7' c� 5 �j �\ KOF I LE I w = 401 c*,ND I %-S RW CGIW N FEET R�Z a _Sl:�ED T ELEVRTIONS BR=, CC, LDrU LOW Vc 7 c '. \4: �oo ve 0 Id 4 c � P�0�0 f ��,v5-�4fi J-&,� 4a 6 a c kLAja fe, .2 3 m X So Ong EEL GRASS INSPECTION OF PROJE"" T ,-ffJCQ�Ej�SS WITHIN 15' U E -E GRASS "IE PROJE REA SIGN URE PERMIT* PL 1 CQK-, 40 m RESS 3 3 3 G I JOD RD3 -sill all I 5 HARBOR RESOURCE� DIV, 1 CITY OF NEWPORT BOACH Z_ 0 7 4, 5,- c; a 7 C r rAv'A 3336 Via L� do Newijart aeac�, CA 92663 Vc 7 c '. \4: �oo ve 0 Id 4 c � P�0�0 f ��,v5-�4fi J-&,� 4a 6 a c kLAja fe, .2 3 m X So Ong EEL GRASS INSPECTION OF PROJE"" T ,-ffJCQ�Ej�SS WITHIN 15' U E -E GRASS "IE PROJE REA SIGN URE PERMIT* PL 1 CQK-, 40 m RESS 3 3 3 G I JOD RD3 P&ITY OF NEWPOI'6,,,,j BERCH CITYPO NEWORT, WWCH ,%4 rX A7,4 MP eK 00C1,e '4E r ift - I— , Wiiw DRY "'CIFIC 4,0 OCERN L— f)e 0414 14, /-K67.4 0 WmT YICINITY - RP PFOF I LE 1* = 54 WOMI 3W# OLVVIrM rm SMINGS FW DIREM IN FEET RO MOTE BIWIONS RISD ON WM Loa LOW WTER. Slry Oe-rA14 IW7.7 -4 U. 171 1 7 11 1,1101 17 it fl: 11 JL-Jj-jL-j !TI 7 it 11 1 ILI --T Z' I Jj AX AA^P I lf)e. DOCieS 4FI, PAMP A14LC-AIRORT 6AY S. PRO X4fC7' I-IA1,95 it it t L Jll JL- ',I- '-I cgs loft Var- 6ZT mmw� SAM F. KNISS rn CON . SULTING CIVIL ENGR-s- XP. CL17377 19 AGATE Iviv ,IRVINE,GA-. 92614 PLM V11W i =00 (949) 733-8430 1 S/ZI/99 FPR-IUW'S WE,(./470 44ARIV4 V11 -i -Ago JoB - IV, sxi&E r 11DITY OF NEWPORT BERCH 71-1� OCCRN "vs -��Xr VICINITY HRP HOMI XW. 99 111�11 Ew Em dr -AVP RAMP r :4 3-Neid 4*0 Aelirsmels4v p er PFQF I LE 1 50 SMMINGS FK EVESSED IN FEET RO DMITE U.�NWIONS WMD ON PUN LOO LOW WM. Alej;1,00AV7 4.4Y 7' 41AIe rr- 1 n T H I, " ;;!III :,, ." , '1 41 1 ; q III I ' I L Z,, -A AA Al A L —.j III.. Ile A AFAVRORT 6AY IT— TT --- f I L7 177.: 7: L—h7. RAMP SAM F. KNISS C09SULTING CIVIL ENGR-., C -'i7377 19 AGATE ,IRVINE,CA,. 92614 (949) 733-8430 V Ev-. ON OF C PLM Vim is Zoo, IRIPLIOW'S WE /.//;o ofoglv4 V14,i.Aeo t"I JOB MICE 9400 YIA OA.-,vl� m. 6. 119 9 s-we—A-7- / oo ? 4 jAD-A. NA14ew IWO PRIFIrRe-PT4 tolzle � Armoil--- f -T J ilorl-If dc "o 4m, 1.0110, 4-- or— Aw'owv*w4%0%i. SAM F, KNISS CONSULTING CIVIL ENGE. C-17377 19 AGATE IRVINE, CA. 92614 (949) 733-8430 '/�e rA EXP..T Civil. OF c 5P6 -,c--7—? tP�-Z Sent by: usace regulatory bramh 213 452 4196; 07/20100 17:27; jtLEm&-#546; Page 2/4 CITY OF NEWPORT SERCH 'A4 cirl IF JIM '?A Fy AY4.5 \-4 BMW Paciric )v �Z-3-A144,1 4,0 ,-TOE 2�71=1 PROF I LE I Se UMMYMst DiStrict Offic mxw 3w. ovvnwm WMINGS FME MWSSU IN FUT RV IFOE- [_.APPR0V-tjj RZOMONS ERSEM ON WJ:V LOKX LOW WRTER. By: A // 5;47.- e EFFECTIVE lu -- IN 4), 4W erEC 7- Llpe 17 -4 7-V F. 1 7 Jill (I :wf �j L �j �'7 11Z X. AA^0 j F1Rd7ARTCDFpT f --X. Ral- g,41,2�A ell �PA14fA CITY MEVTVRACH r -A OR7 5"'JV EEL GRASS MFECTION A/"L ' ". R.4,AIP SAM F- KNIS:� CONSULTINC CIVIL ENGR-- !9 AGATf, "RVINE,CA. 92614 (949) 733-13430 U. 5� ;r jr r S-il jI-_jI oaf voc -UAt-r- - - --I i - -- - - - - -- -_-_j I-- -- - - --i , E -Q, __j �Flr . pp".511va - -- 4, 0 -# ��7 ." vaim,.immIld 0 3HI wl MV0 133 [1 133 ON CA N01$f#*1 IMYM 131 JOB FMESS ?4oe,- Y,,A oA,7-p,-c JaTn, A A- -r1.,1SE7- /1"T 2 Sent by: usace regulatory branch I 213 452 4196; 07120100 17:27; jtjEm—#546;Page 3/4 V144A6e--Tz1A N-9 7 A/,g-/./ A9, 0 — PropotpA �D p 144b, -C7 "f,,Cj101N)6/ I/*- - 03 'Ya.v M—I 7 X K') 4s via 97 NO. 17377 VL -44-w civiv OF C SK 4zc',e-� -if 4) P"4- -- v K CrM$ k�fc�) Ek GRASS fNSPEC-aQpj -n V/ OEEL GF 8$ 43 N 1�,,I:L 1311A qEL 6RASSPN T' P PR, A� A E KN UNATURE 2, re PqRMITJ DArE f -MCaNA-�R--INE OCP—T. CITY OF NEWPORT BEACH Sent by: usace regulatory branch 213 452 4196; 07/20100 17:28; jgL&L--#546;Pag8 4/4 ls� -JAM I III 64 q 1 4.5 7WO EX. -4-7-A65W DOCtt AEUT-F J7 0. iemee deAACR 151, POCK Li ZY ao - rx SAN F.-Vings CONSULTING CIVIL ENCE. C-17377 19 AGATE IRVIWRt CA. 92614 (949) 733-8430 / �-- 147 1 sRzLC-r,e m -e- LITY OF NEWPORT BEACH CITY OF NEWPORT BEFICH UPPER aw AIL_ S�x ISILM BRY ':'RC_rr_TC OCERN PIER Hm VICINITY MRP JETFY MWW Mr. C&IFUM S'X A7A MP _-4 V/ IL PWFILE 1- = 540 E%7 JEM MMINGS ARE DPRESSED IN FEET AND DENOTE ELEVATIONS BASED ON MEAN LOWER LOW WATER. 10�evlr_lolp _7 154 y 06'rAl/4 Z - _Y, Af,0v-SC 7 Ale rT-11 11 1-7- ff IT f7 :71 I JL IJ_JL_1 EX, 451,14.A_AICFA,,:�� A 7- 5.4 y _TF_ vu Ij it ;FI 7 it If If If it i, RAMP SAM F. KNISS CONSULTING CIVIL ENGR, 7 rr, C-17377 Exp. 19 AGATE IRVINE,CA.. 92614 CIVI\. (949) 733-8430 CNO PLAN VIBN 1- =/,00' FPPLICANT'S NRIE 1A C>Anonc �v. DRT E-- e. -7/_ �'Il JOB ADDRESS 540 0 ;/ A apor, I SW& -r7- / eor 2 Z -1,U::2 AlAeIA14 N-2 714 6,-,? 6/, S, PRO J -EC 7- 03 17 41' Qt -,-410 vz- 97 -V, m Ex,�, Ivi OF c vo c & f, CZE -F 5A/V ILA, C944)) 7 33-.T4-wc S M F. KNISS, CONSULTING ENGINEER RCE #17377 JIM, HRS. F7" eA 1711 - ow CONSOLIDATED ANAHEIM 1122 N. KRAEMER PL. CORPORA TE OFFICES 31 MUSICK A VENUE INLAND EMPIRE 250 E. CAROLINE ST, STE. C LAI.-UNA HILLS 23271 VERDUGG DR. REPROGRAPHICS A A'AHEIM, CA 92806 (714) 630-1663 IRVIN& CA 92618 (949) 588-3839 SAN BERNA DINO, CA 92408 t909) 370-CRCR (2727) LAGUNA HILLS, CA 92653 !943) 581-2563 DIVISION OF LA SON LAS vEeAs OC AIRPORT TUS77N SUPPL Y ORDER DESK 505E CAPOVILLA #101 3182 PULLMAN ST. 560 W. FIRST ST 014) 665-2040 DELIVERY INVOICE LAS VEGASNV 89119 (702J 361-0666 COSTA MESA, CA 92626 (714) 751-2680 TUSTIN, CA 92781 (714) 838-2855 1800) 532-8555 �714j 665-2037 Fax 11:42-00 Your image, Our reputation. NO. 871358 * - **CASH*** SOLD TO: 8200 SHIP TO: 9999999 CONSOLIDATED REPROGRAPHICS SAM KNISS XEROX LETTER IMAGE COST AIRPORT FACILITY 12 75 07 3182 PULLMAN STREET 9.50 230110 XEROX 8.5X1 1 WHITE 20 COSTA MESA CA 92626 -..PAID. 75 0 EA 0.00 100000 (949) 733-8430 12 CUSTOMER COPY INITED SLOC ORDER DATE wo. ISAM JODMAN 6. WAIT 121 I 6/06/00 1 104599 W/C SHIP nPE CARRIER CLERK TIME SLSP TAX SHIFT 0 WAIT FOR ORDER I 1405541-COBIAN, ANDREW 11:42-00 2 Y D 777� PT 230010 XEROX LETTER IMAGE COST 75 12 75 07 9.50 230110 XEROX 8.5X1 1 WHITE 20 75 12 75 0 EA 0.00 100000 DIAZO BLUELINE PRINT 30 12 30 0 SF 5.70 Number of originals: 1 Number of copies: 5 S ze: 24X36 (Appli as to above item) WAIT FOR ALL TERMS: NET 30 Sub Total 15.20 Frei 0.00 PLEASE REMIT TO: P.O. BOX 513865, LOS ANGELES CA, 90051-3865 Tax 1.18 TOTAL 16.38 DOCUMENT REPRINT Deposit 0.00 PAGE 1 ROMMILGIM dm 16.38 CUSTOMER COPY SA'M F. KNISS, CONSULTING ENGINEER RCE #17377 HRS. NGR. t tNGR. HRS. CLERK ANAHEIM CONSOLIDATED 1122 N, KRAEMER PL. A111M, CA 32806 CORPORA TE OFFICES INLAND EMPIRE LAGUNA HILLS 37 MUSICK A VENUE 250 F. CAROLINE ST., STE. C 2327 7 VERDUGO DR IRVINE, CA 92618 SANBERNADINO, CA 92408 LAGUNA HILLS, CA' 92557 ,REPRCyr f774) 630-1663 RAPH, CS (949) 588-3839 (909) 370-CRCR (2727) !94*1 587-2563 DiVISION OF LASON LAS VEGAS OC AIRPORT TUSTIN SUPPLY ORDER DESK 505E. CAPOVILLA #101 LAS VEGASNV 89119 3182 PULLMAN ST. 580 W. FiRST ST COSTA MESA, CA .92626 TUSTIN, CA 9278 I 774J 665-2040 /500; 532-8555 DELIVERY INVOICE (702,1 367-0666 (7 74) 751-2680 014) 838-285-5 714i 665-2037 Fax Your image, Our reputation. --- ***CASH*** NO. 871358 SC�0 TC: 8200 SHIP -0. 9999999 CONSOLIDATED REPROGRAPHICS SAM KNISS AIRPORT FACILITY 3182 PULLMAN STREET COSTA MESA CA 92626 PA (949) 733-8430 IANTED SLOC I GPDER,-�ATE W 0 ;r RANDY GOODMAN WAIT 12� 6/06 -/CO 104599 W/C S��P 71 PE V 0 WAIT FOR ORDER I T IME P i 7AX !Shl�- LERK 405541-COBIAN, ANDREW 11:42:00 2 Y C) — —? I-rEK. No� -SCHIPTION, 77�7' , 1. .. . . . ' ' I! Q �5 P OTV: QT V -011P. IWHSU, I y M � Bt UNIT AMPURT 0 230010 1 XEROX LETTER IMAGE COST 75 12 0 EA 9 S 0 230', -10 1 XEROX 8,5X1 1 WHITE 20 75 12 0 EA 0.00 0101300 DIAZO BLUELINE PRINT 30 12 30 0 5.70 I Number of originals: I Number of copies: 5 Sze: 24X36 pplios to abovehtem) WAIT FOR ALL TERMS: NET 30 Sub Totai 15.20 0.00 PLEASE REMIT TO: P.O. BOX 513865, LOS ANGELES CA, 90051-3865 Tax 1.18 TOTAL 16,38 DCOUMENT REPRINT Depcs�t J 0.00 PAGE _16.38 CUSTOMER COPY OWNER -BUILDER DECLARATION I hereby affirm that I am exempt from the contractor's license law for the following reasons: (Sec. 7031d.5, Business and professions Code). Any City or County which requires a permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provision of the Contractors License Law (Chapter 9, commencing with Section 7000, of Division 3 of the Business and Professions Code) or that he is exempt therefrom and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty for not more than five hundred dollars ($500). — I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through hL, own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner -builder will have the burden of proving that he did not build or improve for the purpose of sale). - I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who contracts for such projects who builds or improves thereon, and who contracts for such projects with a Contractor(s) License pursuant to the Contractor's License Law). I am exempt under Sec. of Business and Professional Code for this reason: Owner's Signature: Contractor: Address: License class: State Board No. License Contractor's Declaration Date: Telephone: City License N I hereby affirm that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, and my license is in full force and effect. Contractor's Signature — Date: SAM F. YCNISS Consulting Civil Engineer, RCE 17377 19 Agate Irvine, CA 92714 (949) 733-8430 INVOICE DATE: JUNE 6, 2000 CLIENT: RANDY GOODMAN ELECTRA CRUISES, INC. 3405 VIA OPORTO NEWPORT BEACH, CA. 92663 (01 0 &1 '0 REFERENCE: CHANGED CALCS, CONST. DRAWING AND SMALL COASTAL DRAWING TO REFLECT ADDITION OF 61 X 91' FINGER DOCK. SEE ATTACHED WORK SHEET HOURLY FEES Principal Engineer 16 -OHours @ 05.00/hr. =$I 200.00 Drafting Hours @ /hr. = Clerical Hours @ /hr. = Deposition/Expert Witness Hours @ /hr. = FEES TOTAL —$1,200.00-= $1,200.00 MILEAGE & EXPENSES Mileage 60.0 miles @ $0.35/per mile 21.00 Expenses 16.38 37.38= $ 37.38 MILEAGE/REIMBURSEMENT TOTAL =$ TOTALDUE $1,237-38 Social Security No. 565-44-1463 Ag, F71' ao'�!7 �47 -7, d, S. -S ;F 4f 4, ao'�!7 �47 -7, 7 Y '7'? 60-4// — �— "— /2--' C- 4 7 em: t z 4-. 7 cp /c�,. " 4� ef I 4- e> 7 Aewre Zi.. (9f,g) 7y3r-Q4-w,-" &txPo #W*R-�4)4 - C-414 4 , L. 4.44-A' -7 R. .94 t -m S" 7,7z Z. 4-- 4:7 Y-A?,f 4, 7-4=-4, :99�' Il- 4:% X'/IM7 73R-3-cw,j 7ZW,40 7 7 onvi k 4 4 - C-414 4 , L. 4.44-A' -7 R. .94 t -m S" 7,7z 7 Y*77 Olki) 7:� Z--I�rpc AgjAd.4&A L1t4.t-4dGW � Z) It 4 (Aow- / 0& a) 4-4 le 40 cl- 79 7 3;3;.z 7 s Of Z, do Ir 7.r. // ", I Br S�,O 720 A4 toad -r&jrer -Z W'*4PW— G 7�-,4 le' It W- 4-4 le 40 cl- �5W9 J% 7 -Ole S)f 4. P, 4,g- 4 = 4's, Loeiti5g�:: Ale -A" -: � r14 " - �- d LC- zo 4-4 9 1571 "CPO PA -e JFI--t OCA T4W R-49 & IW ae L 4 It tf 4, 44 �e qF 4", A -f 4w V -Y tj i -i 6 — 01 Z Z cb-74 Z� 4-, 7 4* 25 e- 49 l/. 4-674AFAL AOI(Af -4-,o /X_O 5"0 12_a 6, = /Z:,"O , /- /- Z- = 9 e-1, -314 CA,44=Ae-,-A) 6- I/ -f 7,T // F 7z- 41 4W -9 ;,,7 119.44CIAM- llz4AO,r, 44, 0,39.40- C-POV) 797- S "41 d�r 4r/ -�- r �—, —8.7 3 � dt- Z,9.z- I 6, -,-- 4,7 7 � A -r A, 10, _L F 14,, Zi I NO. 173771 C exp X CIVI N �flleboF jmvv�o7 dr _L F 14,, Zi I NO. 173771 C exp X CIVI N �flleboF jmvv�o7 18!�5 sq. PRESTRESSED CONCRETE PILE 10-1/2" WIRES 6000 PSI CONCRETE LEVER O -TENSION 3/4 CRACKING 14' 3166 4360 4954 5549 15' 2955 4069 4624 5179 16' 2770 3815 4335 4855 17' 2607 3590 4080 4570 18' 2463 3391 3853 4316 19, 2333 3212 3650 4089 20' 2216 3052 3468 3884 21' 2111 2906 3303 3699 22' 2015 2774 3153 3531 23' 1927 2654 3016 3377 24' 1847 2543 2890 3237 25' 1773 2441 2774 3107 26' 1705 2347 2668 2988 27' 1642 2261 2569 2877 28' 1583 2180 2477 2774 29' 1528 2105 2392 2678 30' 1478 2034 12 2589 CLIENT JOB NO. PROJECTZ's ENGR 52�egE- DATE CK — DATE SHEET NO.— OF I ol )4 /-7 Z' 23 U:5 4N 4t�h A-� e- IAJ 7-' Z)R 4 AJ Z-1 /,�,j ell Z 7 .17377 rn Af Exp. CIVIV -772 OF C All e-7 -7 -7 Z- 4� 4 i '.1 4 1 i 14. 4"D Z)4,D -7LTR L 2 VARWS Li I 1�1 I ) Vi-�UL I ,,Lj. r- H �:. _- u- REVISIONS DATE: i BY I QUANTITY z 8 3. -,Lq " 1-.LjqlN v 1.m rr NOTES 1, CONCRETE f'r. = 4000 PSI @ TRANSFER L MOVING f'r- = 6000 PSI @1 8G DAYS L TIME OF DRIVING MIX DESICN 9 UY-119A 2, REINFDRCING PRESTRESSING STEEL SHALL CONFORM TO ASTM A-416 GRADE E70 3 SPOAL W-3.5 SP]RAL movs Im Pt" vIrv. 3. EFFF7r-TTVF7 PRLjL= M'ECTIVE'- PRESTRESS IN STRAND 164.7 KSl EF--EC71V=-* PRESTRESS 11N CONCRCETE 77Q PSI 4. SFCT]nN PRnPFRTIES 18' SQUARE PILE AXL,A = :3d4 SU.IN. - 144,0 PittsTROING As = 10 STRAND X .153 SOAN, = 1.53 SQdN. r WEIGHT = 350 POUNDS PER FOOT [AND5 GVOJ-L �P^CCD S, PILE P"CKUP POfNTS .15L 35L .35L -15L I fjN 3 POINT PICKUP 1- CMWER A4L. tofteitl 2 POINT PICKUP LIr I wiw SECTION A- A N. T. S. DRAwN CRO IL U TIL I T Y VA UL T L--71' CHECKED APPROVED 12' SMjAPE: PPESSTPE'—�'SED PILE SZ. No. WT. INTR-A AIMERICAN FOUNDATION & DRII-LING DWG. NO- EV. UNOCAL SRO A 15-224 Mm WILMINGTON, CALIFORNIA SCALE SHEET OF [I I NJS, 1 -1 FILE NO: PELE-CHT.6 1211 sq. PRESTRESSED CONCRETE PILE 4-1/2 " Wires 6000 PSI Concrete -LEVER IF O -TENSION 1/2 1 3/4 --F-CiA 131 908 1288 1478 1667 141 842 1196 1372 1548 151 787 1116 1281 1445 16' 737 1047 1201 1355 171 694 985 1130 1275 18, 655 930 1067 1204 19, 621 881 1011 1141 201 590 837 960 1084 211 562 797 915 1032 221 536 761 873 985 231 513 728 835 942 24' 492 698 800 903 25' 472 670 768 867 6 454 644 738 834 271 437 0 711 803 WENT JOB NO. PROJECT C-45 dCAJJ;:�P� ENGR Z�*C DATE - CK - DATE SHEET NO.- OF 1. A16 Av<W�- e4AP - ---------- i 3 ZO f �AJ 7 P,57 a r4 C, Z- yZ 4 r. cz 694- i) 26+ -Z76 �Z- 0 Aj Aj e Lq -T 7 17, ------------ ------------ -- - -- - - - -- ---------- ---------- I 0 Uf%. belKAL bFAEANG P vc .7Er I " 12 lie* 4 1/2'" f 216k 19, Pvc Jet 7�me ISPECIFICA171ONS - 1 11 - - 1- 11 CL A 5 8: - - - - - - - - - - - - - - CONCRE79 UIX.o - - - - - - - - cHj-&4 s3 - 12$'IP PILE SECTION CONCRE7E 679KNOTH: — — — fle 76 Day@ Cc, --3500 9 STRAND., 1/200 DIA. 270t QuantLcy SPIPAL . . . . . . . . . . . . . . AREA CF S7ErL: . . . . . . . . 163 SiQ. In. x 4 Strands IM171AL FORCE I SIRAND: 20v760 Lbs. r. A -Strands EFF PRESTRESS (30750-.152X2 0000 4 Sits-nd 7SO PSI 7:* -443 Sq In ;L!-:Eth A's F.D.D. ----p -, i U 771L I r 1,0- IVA-& UL 7- C ON HKrID V" WILSOHYILLF. OR KIASAW70W, CA Al I'Movir., 0. too. 1 24"� X VARIES PILE SECTION �OWG. 0 -PP- 364 A 7 4111 Nona -yH—M CI -TY OF NEWPORf BERCH CITT OF NEWPORT BEFICH L UPPER c P NDPORT 0 f" aw "ZZ �-*y Z7� T EIRY 'C OCERN p I EGRZ "RCIP' j�E WEST JETTY YICINITY MRP ?43� wy, ��t Qj Zs 'LL1- 4*0 f4-� I EFIST JETTY PFK)F I LE 1 " = 5,� 140 17 T-1 JL -J L -7 :Z APC a . L S -X IqA /I FIRCi 'MARITIDEPT. CITY VPE�PORTV�ACH 1),510p -7- EEL GRASS INSPECTION / E)c NO FFL GRASS U.S. L.IXI,5' i ! . - I I I I : ; I I I - ; F I V F T IT jN T4 Oil EE� G4SS' [I P�R 10) �EC� T A'IR E A LI I - 'k, 'TGITATri P,�qy tL#- - - - - - IWO F SAM F. TNISS c -D CONSULTING CIVIL ENGR-. 0.. 7, m I V3VY 10317OUd 0 C Exp. 1--17377 3HI NI SSVd9 133 0 19 A"]'ATE SSV89 133 ON 0 -TRVINE,CA. 92614 NOI#E0, 1�qbq 131 w (949" 733-8430 OF P:,� FPPLICANT'S 4W JOB RDDK:SS ff H Z-1ZIC - - N -2 714 X`eZ:5�C,47-,�� ' lt'�W 5,F,4C�E mj�;caffoo cf-0 - k�&C�) :�--1'7-7 7 5) 7 33-,�'4ff Propo�p-& Lo F ll--� Y' Qj PRO ARE 1�j V� �YG N AT UR E 10 0 AMITW-- DATE ':4 WTM D E -PT. - CITY OF NEWPORT BEACH 0 ftL GR�SS INSPECTION A i EEL GRASS .IfEL GRASSIIN THk IC) PRO ARE 1�j V� �YG N AT UR E 10 0 AMITW-- DATE ':4 WTM D E -PT. - CITY OF NEWPORT BEACH OFFICE OF THE CITY ATTORNEY P.O. BOX 1768, NE WPORT BEACH, CA 92658-8915 (949) 644-3131 r -M Donna Larson Jerry Friedman LIDO MARINA VILLAGE 3400 Via Oporto Suite 104 Newport Beach, CA, 92663 VIA FACSIMILE (949) 673-8617 RE: HARBOR PERMIT COMPLIANCE ISSUES WITHIN LIDO MARINA VILLAGE Dear Mr. Friedman and Ms. Larson: On November 9, 1999, 1 sent a letter to you outlining certain issues regarding compliance with conditions attached to Harbor Permit No. 124-3400. Under paragraph two of that letter, I discussed the pprmit's parking requirements noting that the Harbor Permit, when issued in 1973, required fifty five (55) parking spaces for seventy three (73) slips and side tides in the Marina. I requested that you provide the Fire & Marine Department with the location,of thirty (30) of the fifty five (55) required spaces. In response to that letter, you notified me that the thirty (30) spaces which are described on the Harbor Permit as being contiguous Wthe marina, were located on the property at 3366 Via Lido. This parking existed at the time the Harbor Permit was issued in 1973, is currently owned by Olen Properties Corp. I have reviewed City records and discussed the issue with our Planning Director. We have confirmed that the parking located at 3366 Via Lido is the parking that was provided contiguous to and for the marina tenants, when the Harbor Permit was issued. 3300 Newport Boulevard, Newport Beach Lido Marina Village Parking March 19, 2001 Page 2 Therefore, I am satisfied that you have identified thelocation of the thirty (30) spaces as required in paragraph two of my November 9, 2000 letter. Very truly yours, Robin L. Clauson, Assistant City Attorney RC:da cc: Homer Bludau, City Manager Patty Temple, Planning Dept. -Tony Melum, Harbor Resources Division F:\Users\cat\shared\da�Debbie�letteARobin\JF-DLmadnaPkg LIDO MARINA VILLACE, A ON THE WATER FRONT... IN NEWPORT BEACH, CALIFORNIA MANAGEMENT/LEASING OFFICE 3400 VIA OPORTO, SUITE 104 NEWPORT BEACH, CA 92663-6302 - (714) 675-8662 - FAX: (714) 673-8517 February 9, 20 ' Wes Armand City of Newport Beach Marine Department 3300 Newport Blvd. Newport Beach, CA. SUBJECT: Lido Marina Village Marina Dear Wes: I have had the opportunity to review the Harbor Permit (#124 3400) dated May 29, 1973. This permit consolidated five (5) existing permits into one (1) but it did not reference the permit numbers which were being consolidated. It appears it did riot include the area directly in front of the restaurant at 3450 Via Oporto, �,�hich is part of this property. As the property is in an escrow perioC, certain documents are required to satisfy the purchaser which includes the permit for the entire marina. Your cooperation in resolving this very important issue is appreciated and if I'can be of any service, please call. anytime. Sincer y,j 7 Y, Donna Larson property Manager Cc; R. Berger G. Friedman File �s Q 4 I is 0 97- ;310 sce 5108 # 2/ Z Ago A&, 679A miq� Ads J 0 S-2i-oo:i2:52PM;Mar-\/Jn Land systems �s Q 4 I is 0 97- ;310 sce 5108 # 2/ Z Ago A&, 679A miq� Ads J 0 j tin PO C %-"'F NEWPORT BEACH ITY 0 RO. BOX 1768, NEWPORT BEACH, CA 92658-8915 June 2, 2000 Lido Village Property Management Marvin Engineering 3400 Via Oporto, Suite 104 Newport Beach, Ca 92663-6302 Re: Harbor Pier Permit 12434001 for Lido Village Marine Dear Sirs: On May 26 the City of Newport Beach Harbor Resources Division inspected the Lido Village Marina and has found: 1. The repairs specified in the inspection letter of March 30, 2000 have all been completed. 2. There were no violations of the Uniform Fire Code relative to berthing vessels. 3. The vessels in the marina were all fastened to the dock properly and not rafted. 4. The number of vessels in the marina this day numbered 76. If you require further assistance in this matter, please call 644-3 )043. Sincerely, Vk/ ///w Wes Armand Fire and Marine Department Marine Environmental Management 3300 Newport Boulevard, Newport Beach -------------- - Melum, Tony From: Armand, Wes Sent: Friday, May 26, 2000 5:02 PM To: Melum, Tony Cc: Clauson, Robin Subject: Lido Village inspection Today I did the final inspection required for transfer of the pier permit at Lido Village. All the boats were berthed in compliance with City Code and the Uniforn Fire Code. There were 76 vessels in the marina during this inspection. All required repairs had been completed with the exception of three electrical receptacles. These I was assured would be repaired by Wednesday of next week. 0 —ETCO DEVELOPMENT, INC. 540 Westminster Mall , Westminster, CA 92683 (714)379-3279 X:103 1. Applicant (Property Owner) Address Telephone 3336 VIA LIDO, NEWPORT BEACH, CALIFORNIA - 3 a -3 4a, Project Address (Street Address) Harbor Permit Number 3. New Construction 4`�Re on Maintenance Dredging Visi _7 -2-2000 No Date 5 4. Fee heck �0 C) �. 5. Brief Description of Proposed Work: REMOVE AND RELOCATE THE EXISTING DOCK RAMP TO THE OPPOSITE SIDE OF THE PROPERTY. 6. Submit 8 1/2" x 11" Drawings (3), Include: 1). Location and dimension of proposed structure including piles and location of existing structures, on adjacent properties. 2). Location of bulkhead, pierhead and project lines. 3). Location of property lines. 4). Location of channel markers within 200 feet. 5). Lot sizes and lot numbers, if available. 6). Existing ground profile beneath proposed structure. 7). Elevation of top and bottom of bulkheads and piles with respect to M.L.L.W. 8). Area and profile of any proposed dredging with elevations showing depths with respect of M.L.L.W. 9). Any special conditions affecting the construction or affecting boating operations. 1 0).Complete all information required in information block, bottom of sheet. Note that the OWNER. of the property is the applicant. 11). Drawing size shall be 8 - 1/2" x 11 12).Scale shall be adequate to clearly show the above information. 13).Existing structures shall be shown in light dashes. New work shall be shown in heavy solid lines. 7. Owner -Builder Declaration must be mp EV( n-reversE side of this sheet) 8. Applicant's/Agent's Signature: Date: 5-2-2000 Joint Permittee Signature (if applicabl4): Date: 9. Work can begin once the City has receild —evidence of the following additiona'l approvals and you have been notified to proceed. ff you begin prior to the notice you will be in violation of the Newport Beach Municipal Code and subject to penalties. 10. Your permit will not be final until we have conducted an on site inspection once construction is completed as per Municipal Code, Section 17.24, if we have not been contacted for a final inspection. OFFICF USE ONLY Approval in Concept. Approval of the City of Newport Beach Council. Approval of the Army Corps of Engineers Approval of the California Coastal Commission. Approval of the City's Public Works Department. Approval of the City's Building Department. Approval of County of Orange. Electrical and/or plumbing permit (Building Department) Issued. (Permit is stamped drawing) Site Inspection. (call 644-3043 for appointment) Site Re -inspection Date Date Date Date Date Date Date Date Date Date Date penvim I hereby affirm that I am exempt from the contractor's license law for the following reasons: (Sec. 7031d.5, Business and professions Code). Any City or County which requires a permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provision of the Contractors License Law (Chapter 9, commencing with Section 7000, of Division 3 of the Business and Professions Code) or that he is exempt therefrom and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty for not more than five hundred dollars ($500). — L as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner -builder will have the burden of proving that he did not build or improve for the purpose of sale). X L as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who contracts for such projects who builds or improves thereon, and who contracts for such projects with a Contractor(s) License pursuant to the Contractor's License Law). I am exempt under Sec. of Business and Professional Code for this reason: Owner's Signature: Date: 5-2-2000 Contractor: ETCO DEVELOPMENT, INC. Telephone: (714)379-3279 Address:— 540 Westminster"Mall, Westminster, CA 92683 License class: -B_State Board No. 591069 City License No. BT -00009802 License Contractor's Declaration I hereby affirm that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, and my license is in full force and effect. Contractor's Signature Date: 5-2-2000 January 19, 19113 Lido Village 7 IFI 17" F1 17:��'H jg"S 11 Ir Z_ /A,& - TO BE M O'q ED 3336 Via Lido 14il Newport Beach, CA 92663 (Apartments) ;��vISEP 5%. f - 2-000 ae-C) PEvGcOPP7gP-TjTf\jC- FIRE & MARINE DEPARTMENT Mer, � 8M MODevolopmon't Inc, 1)lfoslrnins "'A 91", 3, 60609 Disb For: LDO DatePd 05/02/2000 Chk# 060609 Amt Invcd Amt Paid Invoice # C/P C/P # Invoice Desc 340.00 340.00 HAR13OR-PER 0 IUTWR PERNUT AT 3336 f m ;:� ROM : FqX NO. ". 949S7338517 qpr. 19 2033 la:32RM P1 7% Ash VILLAGE �LWPO.tl- k' '�(:P i!111 11 -RN: A MAINACEN,JEN'T j L EASING , ;100 Vi", OPURTC), 104. NEWT10IRT F.F.A,':1i, C'�" 91�66j-6302 - j949) 675466-) AP=il a8, 2000 We5 Arma-rld FA;� Mail 0111V 673 30S8 city of Newport _-eactl Fire and Marine Department Marine Envi=­Rntal Xanagemer.t Post off -ice Box 1768 Newport Beach, CA. 92658 SubJect: PiQx Permit (CP 12434001) Dear Mr. Armand: I am in receipt of your letter dated Maech 30, ') (ze'7.eiVed 4'3/00) 200L regarding the pier permit for Zido Village, YCu noted 5 daficierc_j��z that rmct(�ir� cc� — frec, � r.q. Items I and 2 Attac7hed is a copy of the 'etter del_'VG­c4 to marina tenarit. Item 3, 4 and 5: Scheduled COMPletiOn by Apr-;-! -DO, 2000 The number of bQat3 moored at Lmv chz�­ges con!;5t,7�ntiy, and alt�IcQgh the Citv currently requ-ires. 2� parkinci -ace fo2: ti�e rnar4na there iz and always beer, adecruate par— ' -a, T-Mv- rc, 'I the t&,-nants at Z will 60ntac you the week of '1`14 24 t t/ of the dock . $I' "'Icerelly, Manag6r Cc- J� Fr4edman .R. Berger File -:Pl- I � '01M Fq"< NO. : 949671�3517 Ppr. 19 200a 10: 03PM1 P2 LIDO WANAGEU-ENTT ILEA$ING OFFICE 34Q� V!A NZWOR7 f8A(':H, CA 97663-6X4 - (4i9� 675,80Q - !�AX.��ig),67.34517 April is, 2000 Dear The City of Newport Beach Fire and Marine Department �jas- notified Lido Marina Village of certain vLolatjom�; tnat must be corre(711e(� immediately; 11) 17-2C.010 and !?.20 Q city mi.;njcipal Code, Section � -020 state�; tt�.a, vc-sse'S -,nus, be bertlied anc! cannot be raft,; -,d to another (5ee attach.ed �2) Tht� Urti-form Fi'�ze Codi�;-, Charner 3-1(a) prohibits berth�lng vessels in any manner zhat woula Drev&mt. other vessels from, ingress and egress (see attached), The City c -an and is intend! -,g to f-ine Lido Mai!--ina Village for any of the inf zaction5. 7.ido Marina Village will then pPSS this cost Onto the tenant who violates the code condii:;-icns. The city codes will be strictly enf-orced by L-ido Marina Village. IE the violatLons ara not corrected within the next 30 days LmV will taxe appropriate act -;on. The a)�ove viclation5 are a breach of the LP�Ise agreement, section Your c000eration and p�7vmpt att�e'ltion 70 th-;':5 mattcr is apprecLaLad. Sincerely, Donna Larscn Property Manager Attachmentz NSMC 17�20.010, 17�2Q-020 and F�rR Ccd,,-, Chapter P 'ITY OF NEWPORT BEACH P.O. BOX 1768, NEWPORT BEACH, CA 92658-8915 March 30, 2000 Lido Village Property Management Marvin Engineering 3400 Via Oporto, Suite 104 Newport Beach, Ca 92663-6302 Re: Pier Permit CP12434001 Sirs: The City of Newport Beach Fire and Marine Department has received a request to transfer pier permit CP12434001 for the Lido Village Marina. The facility was inspected by the City of Newport Beach Marine Environmental Division, the City's Deputy Fire Marshal, and the City's Senior Building Inspector. We cannot transfer the pier permit until the following deficiencies have been corrected and we have been notified of the corrections. 1. Chapter 17.20.020 Vessel Tie-up Method. Vessels shall be fastened from both bow and stem. Vessels should not be rafted together. 2. There are several violations to the Uniform Fire Code Chapter 3-1 (a) which prohibits berthing vessels in locations that prevent other vessels from existing the slip or access to the open water. 3. The structural deficiencies at the time of this inspection were large cracks in the cement walkway along the main headwalk. 4. The City Deputy Fire Marshall found several violations with the fire fighting equipment on the docks. Several fire hose cabinets need to have the glass replaced, the hose hanger mechanisms replaced. Some of the hoses in the fire cabinets must be re -hung. There should not be any used or discarded batteries on the dock. Also, there should not be the storage of propane tanks on the docks. 5. The City Senior Building Inspector found several missing covers to the electrical the docks. The electrical mountings for the major disconnects to both the vessels Athena and Electra are rusted and need to be scraped, painted or replaced. The Overhead light on the wooden docks needs to be wired with "hard wire" and a switch installed. All non -twist lock extension cords should be removed from use on the docks (No GFI protection). Some main panel boxes are missing the "dead front" and need to be replaced. Some of the power distribution pack mounts are rusted and require maintenance. When these inspections were being conducted the marina had approximately 97 vessels berthed in the facility. The City Municipal requires 3/4parking space per berthed vessel. 3300 Newport Boulevard, Newport Beach The Newport Beach City Council Harbor Permit Policies require that at the time of transfer, all harbor structures shall be inspected for compliance with the City's minimum standards, and the conditions of the existing pen -nit. All structural deficiencies must be corrected prior to transfer of the permit. Please advise this department when the above deficiencies have been corrected. Call 644- 3043 if you require additional information in regards to this matter or to request a re- inspection. Sincerely, Wes Armand Fire and Marine Department Marine Environmental Management Division PERMIT # BUYER'S NAME ADDRESS OF FACILITY: L I In A F-1 tiA I tL G IC 1241- -w (3 Ll 00 Pik-?,TWV&5 LLC - TE EpHt FEE CHECK MAIWNG ADDRESS TELEPHONE NO. 15C) &,T �.LgAj)v 5LvP- L2e,'S �^ka IS HEREBY MADE TRANSFER HARBOR PERMIT APPROVED BY: DATE A-1 LW13 LIO /1104&o1k) col pAj�-TNE L OCHD If SELLER'S N S) BUYER'S ME(S) ENG (ABOVE NAMES TO BE COUNCIL RE OF SELLER SIGNAT E B ER PUBLIC WORKS F1 DEPT. ATURE OF SELLER SIGNATURE OF BUYER ESCROW INSPECTTION SIGNATURE OF JOINT OWNER APPLICATION APPROVED (DATE) CITY HARBOR INSPEZTOR i SPECIAL CONDITIONS: THIS PERMIT IS REVOCABLE BY THE CITY COUNCIL IN ACCORDANCE WITH TITLE i17 OR THE MUNICIPAL CODE CITY OF NEWPORT BEACH, CALIF. WX FORm 66-1013 REV. P Z < 0 CITY OF NEWPORT BEACH RO. BOX 1768, NEWPORT BEACH, CA 92658-8915 /W Frog March 30, 2000 Lido Village Property Management Marvin Engineering 3400 Via Oporto, Suite 104 Newport Beach, Ca 92663-6302 Re: Pier Permit CP12434001 Sirs: The City of Newport Beach Fire and Marine Department has received a request to transfer pier permit CP12434001 for the Lido Village Marina. The facility was inspected by the City of Newport Beach Marine Environmental Division, the City's Deputy Fire Marshal, and the City's Senior Building Inspector. We cannot transfer the pier permit until the following deficiencies have been corrected and we have been notified of the corrections. P 1. Chapter 17.20.020 Vessel Tie-up Method. Vessels shall be fastened from both bow and stem. Vessels should not be rafted together. 2. There are several violations to the Uniform Fire Code Chapter 3-1 (a) which prohibits berthing vessels in locations that prevent other vessels from existing the slip or access to the open water. The structural deficiencies at the time of this inspection were large cracks in the cement walkway along the main headwalk. 4. The City Deputy Fire Marshall found several violations with the fire fighting equipment on the docks. Several fire hose cabinets need to have the glass replaced, the hose hanger mechanisms replaced. Some of the hoses in the fire cabinets must be re -hung. There should not be any used or discarded batteries on the dock. Also, there should not be the storage of propane tanks on the docks. 5. The City Senior Building Inspector found several missing covers to the electrical the docks. The electrical mountings for the major disconnects to both the vessels Athena and Electra are rusted and need to be scraped, painted or replaced. The Overhead light on the wooden docks needs to be wired with "hard wire" and a switch installed. All non -twist lock extension cords should be removed from use on the docks (No GFI protection). Some main panel boxes are missing the "dead front" and need to be replaced. Some of the power distribution pack mounts are rusted and require maintenance. When these inspections were being conducted the marina had approximately 97 vessels berthed in the facility. The City Municipal requires '/4parking space per berthed vessel. 3300 Newport Boulevard, Newport Beach The Newport Beach City Council Harbor Permit Policies require that at the time of transfer, all harbor structures shall be inspected for compliance with the City's minimum standards, and the conditions of the existing permit. All structural deficiencies must be corrected prior to transfer of the permit. Please advise this department when the above deficiencies have been corrected. Call 644- 3043 if you require additional information in regards to this matter or to request a re- inspection. Sincerely, O'A Wes Armand Fire and Marine Department Marine Environmental Management Division T gi"'i g NEWPORT BEACH FIRE AND MARINE DEPARTMENT Dill", TRANSFER OF PIER PERMIT: INSTRUCTIONS Submit application on card provided by the Marine Environmental Division. DO NOT REMOVE CARBONS OR ADDITIOAAL SA-E-��-C—AIUPT SETS. Complete the following information on the card: A. Name of NEW owner (buyer). B . Address of facility. C. Mailing address of new owner. D . Telephone number of new owner. The Marine Department will fill in the, permit number and other pertinent information. E. Please type or print: SELLER'S NAME(S); BUYER'S NAME(S) F. We must have the SIGNATURE OF SELLER AND SIGNATURE OF BUYER. If the facility is jointly owned, the signature of the joint owner is also requi Note transfer f , e of $326.00. After the card has been completed, returned to the Marine Environmental Department, the fee paid and the facility has been inspected and found to have met the City safety requirements, the pier permit will be transferred. Newport Beach Harbor Permit Policies 10.B states: "Whenever a permittee sells the abutting upland property, a request shall be made to the City to transfer the permit. Forms for this purpose may be obtained from the Marine Division. Failure to a-p-plv for a transfer within 30 days from the date that the abuttin.- woland vrovertv chanLyed ownershi-o will result in an additional fee bv the City." DISPLAY BUSINESS RECORDS: DISPLAY EXIT DISPLAY BUSINESS RECORDS --------------------------------------------------------------------- 03/28/00 BUSINESS NUMBER CP12433361 TOTAL DUE 0.00 BUSINESS NAME LIDO INVESTMENT -C/O D LARSON SERVICE ADDRESS 3336 VIA LIDO APT F ZIP BILLING ADDRESS 3400 VIA OPORTO #104 CYCLE A TAX Y PENALTY N PROPERTY ID NEWPORT BEACH, CA UNAPPLIED CREDIT 0.00 92663 EXPIRES 02/03/2000 SERVICE TITLE BILL REF DATE BILLED PAID DATE PAID CPIER 2000-02 02/03/00 2800.00 2800.00 03/01/00 CPIER 1999-02 02/09/99 2800.00 2800.00 03/10/99 CPIER 1998-02 02/03/98 2800.00 2800.00 03/04/98 CPIER 1997-02 02/05/97 2800.00 2800.00 03/07/97 CPIER 1996-02 02/01/96 2800.00 2800.00 03/29/96 PRESS ESCAPE FOR NEXT SCREEN BUYER'S NA�,` ADDPHS Of FACIL IT Y PERMI I 1_�. ?�, L_,N V 0 K -C o ----D- iWvV%_ F-__ MAII-ING �,DDRVSS Fii: E NO kQ,- m -, 11 NO, j DATE ------ x6o ou APPROVED BY: BAT E APPLICATION IS HEREBY MADE,. 10 1 RANSF ER I IARBOR PERM - IT - J- OCHD TONY SHAW AMIN ETEBAR - ---------- F. N c, Sf_,LLrR'S NAME(S) BUYER'S NAME(S) NANIFS -1 COUNCIL BE Yp IT -F, 'OF-- F__ U is SEL Pulli-Ic worms F IGN*Al UR' - DEPT, Esct�ow SIGNAl_BRf--.S)F_SEI_L,r SIGNATURE OF BUYER NspLolION 'TURE OF: TURE OF: 0 T OWNER A F A-1 10 PROVE—, (DArE) -------- — ------ IT INS EcfoR -------- - SPECIAL (__,.'ONI)FfION�--,. IS RLVOCAM-L ElY _IJIE CITY (,'O(JNCIL- IN ACCORDANCE WITH TIFILE 17 OR THE MLINICIPAL CODE CI] Y OF NEWPORT BEACH, CALIF WX Form 66 10 13 R,, 7,4;1 X ed CITY OF NEWPORT BEACH 3300 NEWPORT BLVD. P.O. BOX 1768, NEWPORT BEACH, CA 92658-8915 TIDELANDS - COMMERCIAL PIER PERMIT STMT HIROTA, EIICHI 2 CORPORATE PLZ #100 NEWPORT BEACH, CA 92660-7929 LOCATION OF PIER: 3336 VIA LIDO 10,000�00 FT X .27 - BILLED 02/07/95 PAST DUE PENALTY INVOICE 199S -Oe BALANCE DUE TOTAL AMOUNT DUE: COML PIER NBR: CPIe433361 RUN DATE: 11/10/9s $2,700.00 1,350.00 $4,050.00 $4,OSO.00 J1114 4Y DIRECT ALL BILLING INQUIRIES TO THE FINANCE DEPT AT (714)644-3iEl AND ALL OTHER INQUIREIES TO THE MARINE DEPT AT (714) 644-3044. PENALITIES WILL BE ASSESSED AT 2S% OF FEE FOR EACH MONTH DELINQUENT, UP TO AND INCLUDING 100%, IN ACCORDANCE WITH NEWPORT BEACH MUNICIPAL RESOLUTION #87S3. Please detach and return the lower portion of this invoice with your payment ............................... ......... I .............. .......... COML PIER PERMIT DUE DATE 12/01/9s HIROTA, EIICHI 2 CORPORATE PLZ #100 NEWPORT BEACH, CA 92660-79eg COML PIER NBR: CP12433361 TOTAL AMOUNT DUE: $4,OSO.00 MS CP12433361 405000 a2/03/! 498339588 WATTSON BREEVAST D8 Mr. Wes Armand Fire and Marine Department 3300 Newport Boulevard Newport Beach, CA 92663 W ^-r ir S 40 M UnOMNr^WIr RE: Harbor Department - Pier Permit Lido MarLaa Village, Newport Beach., CA DearAles: PAGE 02 / 14?41 - :71 1(- C-6 We are in escrow on Lido Marina Village and are la the process of finalizing thepurchase. We inteiid to complete the transaction within the next 2 weeks and need to apply for a traDsfer of te pier permit affecting all of the Lido Marina Village (approximately 73 berihs). Please give us any information you may have that outlines the transfer procedure including the need for any inspections prior to the close of escrow, We would appreciate obtaining all information you may have relative to the current status of the permit and if it is in good -standing and currently elective. Additionally, we need to know if there are any issues with respect to notices or violations that may have been issued and are outstanding- As time is of the essence for us, please have any information made available by Friday, February 4, 2000. Please let us know what additional information you need from us to eff�ct the transfer of the permit. Very trul, yours, Dwight Belden Acquisitions 3600 Birch St., Suite 250 - Newport Beach, CA - 92660 - M93S7.7776 - fax 949.757.7788 loo P�-V- I M� e�� �Wfl 1�1� — IZZM 1911, Annual EANIMV 411 1 HAJZ on DAY 10 Saturday, May 1, 1999 8:30am to 1:00pm * The Cannery Restaurant COW Lafq7ette Ave., Newport 27each) It's time to give bcLck to the hcLrbor thcLt ""After Clean Up Party."' begins gives us so much! loin volunteers of cL11 ages at 10:30 am at The Cannery from loccLl businesses, schools cLnd the residenticLI community tcLking to the water 0 Barbecue! cLnd shore, cleaning up the debris restoring our becLutiful Newport Harbor. I Prize Drawings! After getting your hands dirty for a good I ccLuse, join the fun cLt The Cannery 0 Educational Booths'. IZestcLurcLnt. Invite your family, friends or co- I Entertainment! workers cLnd come out for Me= 11cLrbor I)cLy! We need volunteers and boats... Gold Sponsor Use the form below or call the Chamber at (949) 729-4400. Beacon Bay Auto Washes -------------------------------------------- An eVent OT the El I (We) will volunteer at the event to help clean the harbor. Newport Haftr Are El I will bring my boat to the event. It can accommodate volunteers. Chamber of Comm Name(s) Phone 'I. �Ii �Ic' NO% AIA CLEAN HARBOR DAY 414' 0 k-1 ri Address - Fax Volunteers and boats should be at The Cannery Restaurant by 8:30 am for instructions. Any questions? Please call (949) 729-4400. — ................................................. U I want to be a "Harbor Hugger," helping support the 1999 Clean Harbor Day effort. Enclosed is my contribution for this important community event. I am enclosing: 71 $25 0 $50 71$75 L71 $100 71 Other $ L) Check Enclosed L) Mastercard 13 Visa U Amex Amt. $ Card # Exp. Date Please mail or FAX to: Name on Card Signature Newport Beach Chamber of Commerce 1470 Jamboree Rd., Newport Beach, CA 92660 - (949) 729-4400 - FAX (949) 729-4417 * Wail: Info@NewportBeach.com -7 bo'z LOW - Jerry King PSOMAS 3187 Red Hill Avenue, Suite 250 Costa Mesa, Ca 92626 Re: Lido Village Marina Dear Jerry: Thank you for taking the time to accompany me on the walk through at the Lido Village Marina. It is much better to do this on site rather via a letter. We discussed marina -berthing requirements and viewed existing violations within the Marina. There were several vessels berthed in locations that prevented others vessels from exiting the slip and access to the harbor. This is a violation to the Uniform Fire Code Chapter 3-1 (a)"Berthing and Storage Facilities". Several vessel rafted in violation to the City of Newport Beach Municipal Code 17.20.020 "Vessel Tie-up Method" and Section 17.20. 0 10 "Docking Permission Required". Also one vessel berthed blocking �he Public Pumpout Station in violatio n* to City M.C. Section 17.30.020. "Purapout Facility Required". In addition we saw some structural deficiencies that require repairs. Regarding the berthing violations, the problem stated above could be corrected if the marina management would bring the number of vessels down to the fifth -five (5 5) slips and eighteen (18) side ties authorized in the Harbor Pen -nit for this facility. Please advise the escrow company handling the sale of the property that the harbor pen -nit must be transferred into the name of the new property owner. This is usually. handled during escrow since the buyer wants to know all the corrections that must be made prior to the transfer of the permit. Sincerely, Wes Armand Fire and Marine Department Cc: Tony Melum BERTHING AND STORAGE FACILITIES (el =_ 303-7 Protection equipment. 2-3.3 Transmiss* of Fire Alarm. The. alarm shall be ion transmitted to the fire department immediately upon discovery of any fire. This shall be a duty impressed upon all personnel and especially upon watch personnel. Means for sounding an alarm Of fire for notification of yard personnel and others on the premises shall be pro- vided. 2-3.4 Maintenance of Access. All entries . and internal passageways shall be maintained free of obstructions at all times. Fire protection equipment, either private o . r Public, shall not be obstructed. Fencing shall be arranged ermit prompt access. to fire. fighting to P forces and ap- paratus in an emergency. Chapter 3 Berthing and Storage Facilities '4-1 Design. . Due to the many various corifigurati'ns o land and water areas where marinas and boatyards are located, it is not practical to specify any details of layout.. Each design, however, shall provide the tures: following fea- (a) Each mooring or wharfage berth shall be arranged - so that a boat occupying the- berth can be readily re- moved in an emergency without the necessity of moving another- boat. (b) Mooring and wharfage areas shall be ai7ian . ged to permit boats to enter or leave their berths with'a mini- mum. amount of maneuvering. (c) Access from land to piers and floats shall pe municipal or 'other fire fighting equipment to be locarrtendt where hose lines may be extended to the full length of the pier or floats. (d) Water lines for instant use in firefighting shall be permanently installed accessible to all berthing piers and floats. They shall be protected from freezing whereneces- sary. These water lines shall be connected to an adequate water supply ashore or to motor driven Pumps capable of providing adequate water. The water line layout shall be approved by the authority having jurisdiction. (e) An electricallighting system shall be provided to assure adequate illumination of all exterior shore. areas, piers, and/or floats. The wiring, fixtures, and fittings Shall be provided 'and installt�� * Chapter 5 of this standard. in accordance. with If an auxiliary power supply, arranged to provide lighting for pier and dock areas is not provided, an ap- proved battery -powered emergency lighting fixture con- forming to the requirements of Section 709-16, Natignal Electrical CodeO, and protected fro h in t e'WeA.th,er shall be installed at the outboard end and t e shor" "end of each pier. 3-2 Dry Storage of Boats. 2-1 In addit' 'On to compliance with other sections of -Iis standard, dry storage areas require additional pro- tection due to the -greater degree of congestion and the decreased inspection frequency of each vessel. 3-2.2 Separation of Areas. When. work is carried ou . t on board a vessel in an unsprinklered storage building, an approved fireAetection device shall be maintained within the vessel for the duration of repairs; and the vessel shall be induded on the watch person's regular rounds. 3-2.3 Suitable lockers. or facilities shall be provided for boa' gear, with great care exercised to see that no items subject to spontaneous heating are included, such as oilskin clothing, etc. - 3 -2-4 The use of heaters in a boat storage area shall be prohibited except when necessary to accomplish repairs, in which case they shall be regularly attended . 3-2.5 No flammable liquids or materials shall be kept in boat storage areas. 3-2.6 Fixed or portable ladders of suff'icient length to reach every stored boat shall be so located as to be readily available for use. . 3-2.7 When a boat is to be dry stored for the season, the following precautions shall be taken in. addition to nor- mal winter lay-up preparations: I (a) The entire vessel shall be inspected for any hazard- ous materials or conditions that may be present. (b) All loose combustibles shall be -removed and stored in suitable lockers or segregated safe areas. (c) Liquefied petroleum gas cylinders, alcohol or kerosene from galley fuel tanks, and any reserve fuel sup- plies for the galley shall be removed and stored in a safe area. (d) Batteries of th e lead -add. type shall be removed for storage and recharging whenever practicable. When, for reasons of size and weight, it is impractical to remove bat- teries for storage and recharging, they may be permitted to remain on board provided: (i) The compartment . in which the batteries are located is arranged to provide adequate ventilation to prevent entrapment of released gases; (ii). An approved type battery charger is permanent- ly installed - on the boat so arranged as to provide a suitable trickle charge; - - (iii) The power connection to the trickle charger consists of a three -wire circuit of not less than No. 12 AWG conductors, connected to a source of 110 to 125 volts -single phase, with a control switch and approved cir- cuit protection device arranged to trip at not more than 125 1 percent of the rated amperage of the charger; (iv) There is no connection on the load side of the f .circuit protection device rom this circuit to any other device; (v) The electrical wiring complies with all of the re- quirements of this standard, -and the National Electrical Code, and (vi) The battery is permanently connected to the outlet terminals of the charger and the grounding con- ductor effectively gTounds the charger enclosure. BERTHING AND STORAGE FACILITIFS (_� r, 303-7 re protection equipment. 2-3.3 Transmission of Fire Alarm. The, alarm' 'hall be transmitted to the fire department immediately' upon discovery of any fire.. This shall be a duty impressed upon. all personnel and especially upon watch personnel. Means for sounding an alarm of fire for notification of yard personnel and others on the premises shall be pro- vided. 2-3.4 Maintenance of Access. All entries . and internal passageways shall be maintained free of'obstructions at all times- Fire Drotection equipment, either private o . r public, shall not�be obstructed. Fencing shall be arranged to Permit prompt access. to fire -fighting forces and ap- paratus in an emergency. Chapter 3 Berthing and S . torage Facilities 3-1 Design. Due to the many various configurations o . f land and - water areas where marinas and boatyards are located, it is not practical to specify any details of layout.. Each design, however, shall provide the following fea- tures: V (a) Each mooring or wharfage berth shall be arrange . d, so that a boar occupying the berth can be readily �re- moved in an emergency without the necessity of moving another boat.. (b) Mooring and wharfage areas shall be arian . ged to permit bo aits to enter or leave their berths with'a mini- mum. amount of maneuvering. (c) Access from land to piers and floats shall permit municipal or other fire fighting equipment to be located where hose lines may be extended to the full length of the pier or floats. (d) Water lines for instant use in firefighting shall be permanently installed accessible to all berthing piers and floats. They shall be protected from freezing whereneces- sary. These water lines shall be connected to an adequate water supply ashore or to motor driven Pumps capable of providing adequate water. The water line layout shall be approved by the authority having jurisdiction. (e) An electricallighting system shall be provided to assure adequate illumination 'of all exterior shore areas, Piers, and/or floats. The wiring, fixtures, and fittings d in accordance with shall be provided and install.� Chapter 5 of this standard. (f) If an auxiliary power supp!y, arranged to provide lighting for pier * and dock areas is not provided, an ap- proved battery -powered emergency lighting fixture con- forming to the requirements of Section 700,16, National EleCt7ical CddeO, and protected from shall be installed at the outboard end and the shor"e"' end of each pier. 3-2 Dry Storage of Boats. �-I In addition to compliance wi th other sections of �s standard, dry storage areas require additional pro- tection due to the greater degree of congestion and the decreased inspection frequency of each vessel. 3-2.2 Separa tion of Areas. When work is carried out on board a vessel in an unsprinklered storage building, an approved fire:detection device shall be maintained within the vessel for the duration of repairs; and the vessel shall be included on the watch person's regular rounds. 3-2.3 Suitable lockers or facilities shall be provided for boat gear, with great care exercised to see that no items subject to spontaneous heating are included, such as oilskin clothing, etc. 3-2.4 The use of heaters in a boat storage area shall be prohibited except when iiecessary to accomplish repairs, in which case they shall be regularly attended . 3-2.5 No flammable liquids or materials shall be kept in boat storage areas. 3-2.6 Fixed or portable ladders Of sufficient length to reach every stored boat shall be so located as to be readily available for use. 3-2.7 When a boat is to be dry stored for the season, tl�e follow!"19 precautions shall be taken in -addition to nor- mal 'winter IaY-up preparations: (a) The entire vessel shall be inspected for any hazard- Ous materials or conditions that may . be present. (b) All loose combustibles shall be removed and stored in suitable lockers or segregated safe areas. (c) Liquefied petroleum gas cylinders, alcohol or kerosene from galley fuel tanks, and any reserve fuel sup - Plies for the galley shall be removed and stored in a safe area. (d) Batteries of th e lead -acid. type shall be removed for storage and recharging whenever practicable. When, for reasons of size and weight, it is impractical to remove bat- ien*es for storage and recharging, they may be permitted to remain on board pro�ided: (i) The compartment 'in which the batteries are located is arranged to provide adequate ventilation to prevent entrapment of released gases; (ii) An approved type battery charger is permanent- ly installed - on the boat*, so arranged as to provide a suitable trickle charge; - (iii) The power connection to the trickle charger consists. of a three -wire circuit of not less than No. 12 AWG conductors, connected to a source of I 10 to 125 volts single phase, with a control switch and approved cir- cuit protection device arranged to trip at riot more than 125 . percent of the rated amperage of the charger; (iv) There is no connection on the load side of the .circuit protection device from this circuit to any other device; (v) The electrical wiring complies with all of the re- quirements of this standard, -and the National Elect7ical Code, and (vi) The battery is permanently connected to the Outlet terminals of the charger and the grounding con- ductor effectively grounds the charger enclosure. BERTHING AND STORAGE FACILITIES t.� V, 303-7 re Protection equipment. 2-3.3 Transini * ssion of Fire Alarm. The alarms'fiall be transmitted to he fire department immediately upon discovery of any tfire. This shall be a duty impressed upon all personnel and especially upon watch personnel. Means for sounding an alarm of fire for notification of yard personnel and others on the premises shall be pro- vided. 2-3.4 Maintenance of Access. All entries . and internal passageways shall be maintained free of obstructions at all times. Fire protection equipment, either private o I r public, shall not� be obstructeA. Fencing shall be arranzed to permit prompt access. to fire -fighting forces and �p- paratus in an emergency. Chapter 3. Berthing and Storage Facilities 3-1 Design. Due to the many various configurations o . f land and water areas where marinas and boatyards are located, it is not practical to specify any details of layout.. Each design, however, shall provide the following fea- tures: (a) Each mooring. or wharfage berth shallbe arrange . d. so - that a boat- occupying the berth can be -readily re- moved in an emergency without the necessity of moving another- boat.. (b) Mooring and wharfage areas shall be arian . ged to permit bo aits to enter or leave their berths with * . . mum. amount of maneuvering. a mim- (c) Access from land to Diers and flo . ats shall permit municipal or 'Other fire fighLng eq,uipment to be located where hose lines may be extended to the full length of the pier or floats. (d) Water lines for instant use in firefighting shall be Permanently installed accessible to all berthing piers and floats. They shall be protected from freezing where-neces- sarY. These water lines shall be connected to an adequate water supply ashore -or to motor driven Pumps capable of Providing adequate water. The water line layout shall be approved by the authority having jurisdiction. (e) An electricalligh'ting system shall be provided to assure adequate illumination O'f'4 exterior shore areas, piers, and/or floats. The wiring, fixtures, and fittijigs shall be provided and installed in accordance with Chapter 5 of this standard. (f) If an auxiliary . er su ly, arranged to provide k lighting for pier and Pdoowc areapspis not provided, an ap- proved battery -powered emergency. lighting fixture con- forming to the requirements of Section: 70.0-J.,6., National Electrical CodeO, and protected fro the'wetither shall be installed at the outboard end an'd the sh�'re­­end of each pier. 3-2 Dry Storage of Boats. .2.1 In addition to compliance with ,nis standar Other sections of ,d dry storage areas require additional pro- tection due to the greater degree of conges - tion and the decreased inspection frequency of each vessel. �3-2.2 Separation of Areas. When- work is carried o on board a vessel in an unsprinkltred storage building, aunt approved fire:detection device shall be maintained within the vessel for the. duration of repairs; and the vessel shall be included on the watch person's regular rounds. 3-2.3 Suitable lockers or facilities shall be provided for boat gear, with great care exercised to see that no items subject to Spontaneous heating are included, such as oilskin clothing, etc. 3-Z.4 The use of heaters in a boat storage area shall be prohibited except when necessary to accomplish repairs, in which case they shall be regularly attended. 3-2.5 No flammable liquids or materials shall be kept in boat storage areas. 3-2.6 Fixed or portable ladders of sufficient length to reach every stored boat shall be so located as to be readily .available for use. . 3-2.7 When a boat is to be dry stored for the season, the fbllow�*ng precautions shall be taken in -addition to nor- mal winter lay-up preparations: (a) The entire vessel shall be inspected for any hazard- ous materials or conditions that may be present. (b� All loose combustibles shall be -removed and stored in suitable lockers or segregated safe areas. (c) Liquefied petroleum gas cylinders, alcohol or kerosene from galley fuel tanks, and any reserve fuel sup- plies for the galley shall be removed and stored in a safe area. (d) Batteries of the lead -acid. type shall be removed for storage and recharging whenever practicable. When, for reasons of size and weight, it is impractical to remove bat- ieries for storage and recharging, they may be permitted to remain on board provided. (i) The compartment in which the batteries are located is arranged to provide adequate ventilation to prevent entrapment of released gases; '(ii).*Ari approved type battery charger is p ermanent- ly installed - on the boat, so arranged as to provide a suitable trickle charge; - (iii) The power connection to the trickle charger consists. of a three -wire circuit of not less than No. 12 AWG conductors, connected to a source of 110 to 125 volts single phase, with a control switch and approved cir- cuit protection device arranged to trip at not more than 125 percent of the rated amperage of the charger; (iv) There is no connection on the load side of the circuit protection device from this circuit to any other device; (v) The electrical wiring complies with all of the re- quirements of this standard, and the National Electrical Code, and (vi) The battery is permanently connected to the outlet terminals of the charger and the grounding con- ductor effectively grounds the charger enclosure. Chapter 17.20 1AJ(_±LLNt_T AND MU(JKAGE- Sections: 17.20.010 Docking Permission Required. 17.20.020 Vessel Tie-up Method. 17.20.030 Direct Fueling Prohibited. 17.20.040 Gangway Required—Lights. 17.20.05,0 Dockside Steam Engine Spark Prevention. . Pe=aed aw.2s for smaU venel nworage—See Chapter 17.40. __ 17.20.010 Docking Permission Required. A. No person having.charge of any vessel shall make the same.fast to- any pier in Newport Harbor, or permit the same to remain at such location after finishing loading or unloading such vessel,. without the consent of the owner, agent, or person in charge of any such pier. B. No person shall make fast any vessel to any other vessel already. occupying. any pier, either pub- lic or private, without first obtaining permission Of the City. Mafiager,. except that at the Rhine Vilimf Park the Harbor. Master shall have the authority to authorize this activity under either of the following conditions: (1) A commercial fishing vessel is load- ing, or unloading, and no other mooring or berthing spare is available in the harbor for this purpose; or (2) a vessel is taking refuge -from inclement weather - and no other mooring or berthing space is available in. the harbor for this purpose. In no event shall more than one vessel be. made fast to the dockside vessel and no other vessel shall be made fast to the outboard vessel. Both vessels shall have operators aboard at ail times. C_ No person holding a permit issued under the terms of Chapter 17.24 of this Code or having care, custody, control or use of any pier in Newport Har- bor shall pern-iit or allow a vessel to be made fast to any other vessel which is occupying any pier over which said person or permit holder has control, except as provided in the exceptions found in para - a aph (B) above. (Ord. 1776 § 1, 1978; Ord. 1722 gr 17.20.010 § 1, 1977: Ord. 1577 § 1, 1974: Ord. 1090, 1964: 1949 Code § 10300) 17.20.020 Vessel Tie-up Method. Every vessel lying at any pier in Newport Harbor shall be fastened thereto with such lines, at least from both bow and stem, and in such a manner as to assure the security of such vessel- No permit holder, holding a permit issued under the provisions of Chapter - 17.24 of this Code shall permit or allow any vessel lying at any pier under the control of the permit holder to be fastened in a manner other than is required by this section. (Ord. 1722 §. 2, 1.977: Ord. 1.090. (part), 1964: 1949 Code § 10301) 17.20.030 Director Fueling Prohibited. - - No person shall fuel any vessel with any petro- leum product directly from a t�nk wagon or track. (Ord. 1090 (part), 1964: 1949 Code - § 10303) - .17.20.040 Gangway Required—Lights. Every vessel used for'hire while loading -or un- loading passengers or crew from a pier,or from another vessel shall be,pmvided -with a gangway with manropes or railings, and from - sunset -until sunrise any such gangway shall be lighted adequate- ly to provide visibility as long as such gangway.is or may be used. (OrcL 1090 (part), 1964: 1949 Code § 10304) .17.20.050 Dockside Steam Engine Spark' Prevention. No -person shall use any, donkey engine or other steam. engine on any pier or vessel within Newport Harbor in loading or unloading vessels or otherwise without a bonnet or spark arrester attached to the smokestack of such engine so as to prevent sparks -from- coming into contact with the pier or vessel. (Ord- 1090 (part), 1964: 1949 Code § 10305) Permitted areas for small vessel inoorage—See Chapter 17.40. ,1710.010 Docking Permission Required. A. No person having.charge of any vessel shall make the same fast to any pier in Newport Harbor, or permit the same to remain at such location after finishing loading or unloading such vessel,. without the consent of the owner� agent, or person in charge of any such pier. B. No person shall make fast any vessel to any other vessel already occupying..any pier, eitherpub- lic or private, without first obtaining permission of the City. Mafiager,. except that at the Rhine Wharf Park the Harbor Master shall have the authority to authorize this activity under either of the following conditions: (1) A commercial fishing vessel is load- ing, or unloading, and no other mooring or berthing space is available in the harbor for this purpose; or (2) a vessel is taking reftige.from inclement weather and no other mooring or berthing space is available. in. the harbor for this purpose. In no event shall more than one vessel be made fast to the dockside vessel and no other vessel shall be made fast to the outboard vessel. Both vessels shall have operators aboard at all times. C� No person holding a permit issued under the terms of Chapter 17.24 of this Code or having care, custody, control or use of any pier in Newport Har- bor shall permit or allow a vessel to be made fast to anv other vessel which is occupying any pier over which said person or permit holder has control, except as provided in the exceptions found in para- cl aph (B) above. (Ord. 1776 § 1, 1978; Ord. 1722 gr 17.20.010 1, 1977: Ord. 1577 § 1, 1974: Ord. 1090, 1964: 1949 Code § 10300) 17.20.020 Vessel Tie-up Method. Every vessel lying at any pier in Newport Harbor shall be fastened thereto with such lines, at least from both bow and stem and in such a manner as to assure the security of such vessel. No permit holder, holding a permit issued under the provisions of Chapter - 17.24 of this Code shall permit or allow any vessel lying at any pier under the control of the permit holder to be fastened in a manner other than is required by this section. (Ord. 1722 §. 2, 1.977: Ord. 1.090. (part), 1964: 1949 Code § 10301) 17.20.030 Dirwtor Fueling Prohibited. - No person shall fuel any vessel with any petro- leum product directly from a tank wagon or truck. (Ord. 1090 (part), 1964:1949 Code § .10303) , - .17-20-040 Gangway Requhred--Ught& Every vessel used for -hire while loading -or un- loading passengers or - crew from a pier or from another vessel shall be.provided with a. gangway with manropes or railings, and from- sunset. -until. sunrise any such gangway shall be lighted adequate- ly to provide visibility as long as such gangway. is or may be used. (Ord. 1090 (part).,. 1964: 1949 Code § 10304) .17-20.050 Dockside Steam Engine Spark Prevention. No -person shall use any -donkey engine or other steam engine on any pier or vessel within Newport Harbor in loading or unloading vessels or otherwise without a bonnet or spark arrester attached to the smokestack of such engine so as to prevent sparks from. coming into contact with the pier or vessel. (Ord. 1090 (part), 1964: 1949 Code § 10305) Chapter 17.20 DOCKING AND MOORAGE* Sections: 17.20.010 Docking Permission Required. 17.20.020 Vessel Tie-up Method. 17.20.030 Direct Fueling Prohibited. 17.20.040 Gangway Required—Lights. 17.20.050 Dockside Steam Engine Spark Prevention. Permitted areas for small vessel inoorage—See Chapter 17.40. ,1710.010 Docking Permission Required. A. No person having.charge of any vessel shall make the same fast to any pier in Newport Harbor, or permit the same to remain at such location after finishing loading or unloading such vessel,. without the consent of the owner� agent, or person in charge of any such pier. B. No person shall make fast any vessel to any other vessel already occupying..any pier, eitherpub- lic or private, without first obtaining permission of the City. Mafiager,. except that at the Rhine Wharf Park the Harbor Master shall have the authority to authorize this activity under either of the following conditions: (1) A commercial fishing vessel is load- ing, or unloading, and no other mooring or berthing space is available in the harbor for this purpose; or (2) a vessel is taking reftige.from inclement weather and no other mooring or berthing space is available. in. the harbor for this purpose. In no event shall more than one vessel be made fast to the dockside vessel and no other vessel shall be made fast to the outboard vessel. Both vessels shall have operators aboard at all times. C� No person holding a permit issued under the terms of Chapter 17.24 of this Code or having care, custody, control or use of any pier in Newport Har- bor shall permit or allow a vessel to be made fast to anv other vessel which is occupying any pier over which said person or permit holder has control, except as provided in the exceptions found in para- cl aph (B) above. (Ord. 1776 § 1, 1978; Ord. 1722 gr 17.20.010 1, 1977: Ord. 1577 § 1, 1974: Ord. 1090, 1964: 1949 Code § 10300) 17.20.020 Vessel Tie-up Method. Every vessel lying at any pier in Newport Harbor shall be fastened thereto with such lines, at least from both bow and stem and in such a manner as to assure the security of such vessel. No permit holder, holding a permit issued under the provisions of Chapter - 17.24 of this Code shall permit or allow any vessel lying at any pier under the control of the permit holder to be fastened in a manner other than is required by this section. (Ord. 1722 §. 2, 1.977: Ord. 1.090. (part), 1964: 1949 Code § 10301) 17.20.030 Dirwtor Fueling Prohibited. - No person shall fuel any vessel with any petro- leum product directly from a tank wagon or truck. (Ord. 1090 (part), 1964:1949 Code § .10303) , - .17-20-040 Gangway Requhred--Ught& Every vessel used for -hire while loading -or un- loading passengers or - crew from a pier or from another vessel shall be.provided with a. gangway with manropes or railings, and from- sunset. -until. sunrise any such gangway shall be lighted adequate- ly to provide visibility as long as such gangway. is or may be used. (Ord. 1090 (part).,. 1964: 1949 Code § 10304) .17-20.050 Dockside Steam Engine Spark Prevention. No -person shall use any -donkey engine or other steam engine on any pier or vessel within Newport Harbor in loading or unloading vessels or otherwise without a bonnet or spark arrester attached to the smokestack of such engine so as to prevent sparks from. coming into contact with the pier or vessel. (Ord. 1090 (part), 1964: 1949 Code § 10305) DOCKING AND MOORAGE* Sections: 17.20.010 Docking Permission Required. 17.20.020 Vessel Tie-up Method. 17.20.030 Direct Fueling Prohibited. 17.20.040 Gangway Required—Lights. 17.20.05,0 Dockside Steam Engine Spark Prevention. Permitred arms for small vessel moorage—see Chapw 17.40. .17-20.010 Docking Permission Required. A. No person having.charge of any vessel shall make the same fast to any pier in Newport Harbor, or permit the same to remain at such location after finishing loading or unloading such vessel,. without the consent of the owner, agent, or person in charge of any such pier. B. No person shall. make fast any vessel to any .other vessel already, occupying, any pier, either,pub- I.ic or private, without first obtaining permission of the City. Maiiager,. except that at the Rhine Wharf Park the Harbor Master shall have the authority to authorize tins activity under either of the following conditions: (1) A commercial fishing vessel is load- ing, or unloading, and no other mooring or berthing space is available in the harbor for this purpose; or (2) a vessel is taking refuge frorn inclement weather and no other mooring or berthing space is available in the harbor for this purpose. In no event shall more than one vessel be, made fast to the dockside vessel and no other vessel shall be made fast to the outboard vessel. Both vessels shall have operators aboard at all times. C_ No person holding a permit issued under the terms of Chapter 17.24 of this Code or having care, custodv, control or use of any pier in Newport Har- bor shall permit or allow a vessel to be made fast to any other vessel which is occupying any pier over which said person or permit holder has control, except as provided in the exceptions found in para - g aph (B) above. (Ord. 1776 § 1, 1978; Ord. 1722 gr 17.20.010 § 1, 1977: Ord. 1577 § 1, 1974: Ord. 1090, 1964: 1949 Code § 10300) 17.20.020 Vessel Tie-up Method. Every vessel lying at any pier in Newport Harbor shall be fastened thereto with such lines, at least from both bow and stem, and in such a manner as to assure the security of such vessel. No permit holder, holding a permit issued under the provisions of Chapter - 17.24 of this Code shall permit or allow any vessel lying at any pier under the control of the permit holder to be fastened in a manner other than is required by this section. (Ord. 1722 §. 2, 1.977: Ord. 1.090. (part), 1964: 1949 Code § 10301) 17.20.030 Director Fueling Prohibited. - No person shall fuel any vessel with any petro- leurn product directly from a t�nk wagon or truck. (Ord. 1090 (part), 1964: 1949 Code § .10303) 17-20.W Gangway Required—Ughts. Every vessel used for'hire while loading -or un- loading passengers or - crew from a pier or from another vessel shall be.provided with a * gangway with manropes or railings, and from - sunset. �until sunrise any such gangway shall be lighted adequate- ly to provide visibility as long- as such gangway. is or may be used. (Ord. 1090 (part),. 1964: 1949 Code § 10304) .17.20.050 Dockside Steam Engine Spark Prevention. No person shall use any. donkey engine or other steam engine on any pier or vessel within Newport Harbor in loading or unloading vessels or otherwise without a bonnet or spark arrester attached to the smokestack of such engine so as to prevent sparks from- coming into contact with the pier or vessel. (Ord. 1090 (part), 1964: 1949 Code § 10305) CITY OF'.NEWPORT BERCH CITY OF NEkPORT BERC:H IC7 LJPPER NDfl0RT (D BRY 3 ,I)RCIPIC OCC PIER av YICINITY MRP KWORT IDRf, aL7U;hM EPY -4� /� Y- 3 3 5(, PROFILE V = 40' EFST MTTY SWNDINGS R� D?RESSED IN FEET RND DENOTE DLEWTIONS msF-D ON tf� LO�U LN HRTER. f C T I V 7_ 17 x S. W r wx� Z_ V, Zo7-_-, 7 7- 16 -,E CV 3336 Via Lido -Newport Reach, CA 92663 HARI�OR RESOU ES DX. BE (Apa� winents) CITY 0 W old) 4 ?(O�e r4y /C/� 97 r)5 c rs� t_EEjzGRAS-S INSPECTION a c;< L'uo RA56 WITHIN 2�F PM �2'�'l 3 �ran��jm�'sj [3 :EEL GRAS5 IN T lEu I A -Ttj 4o /I C�l �'5 I" SIGNATURE K_ 2Z 2 - PERMIT # i"'ATE FPPLIGI�F'S NRME Te D 7qD 6) J�_:5 JOB KDRESS333(c 0�z 41do DAT4!gjg?M� 4 1 t e L I I'J 7' 0 u �j PROFILE V = 40' EFST MTTY SWNDINGS R� D?RESSED IN FEET RND DENOTE DLEWTIONS msF-D ON tf� LO�U LN HRTER. f C T I V 7_ 17 x S. W r wx� Z_ V, Zo7-_-, 7 7- 16 -,E CV 3336 Via Lido -Newport Reach, CA 92663 HARI�OR RESOU ES DX. BE (Apa� winents) CITY 0 W old) 4 ?(O�e r4y /C/� 97 r)5 c rs� t_EEjzGRAS-S INSPECTION a c;< L'uo RA56 WITHIN 2�F PM �2'�'l 3 �ran��jm�'sj [3 :EEL GRAS5 IN T lEu I A -Ttj 4o /I C�l �'5 I" SIGNATURE K_ 2Z 2 - PERMIT # i"'ATE FPPLIGI�F'S NRME Te D 7qD 6) J�_:5 JOB KDRESS333(c 0�z 41do DAT4!gjg?M� C I T Y OF '- V E �s / 7-�� C I TY OF MEST ) , EkPORT SERCH '�Rclplc OCC /9/v PIER YICINITY MRP K)FCRT �pf' NDVORT (D BRY BRY 33 5(�, PF10FILE V = 40' EFST JET'Ty SWNDINGS FRE D?RESSED IN FEET RND DE:NOTE D—EVRTIONS BRsF—D oN mEAN LNER LOW HRTER. --c r L ecrylofc 411 " ;es 7: '.�'.`17' k 4, -:5,- 6,9 7 LO A- 7 Of.. 3336 Via Lido Newport Beach, CA 912663 HAR�011 RESO ES DX. (Apa.rnnents) CITY 0 W BE ke?'70vc old 40 4,1 b a ck' LAJO le, v (_5 5-- 1 lzE6jGRASS INSPECTION I/ we"Nb ETC -C) 4q0T"RA'9S WITHIN '1 51 OF ppr)� a YC 3 J, of)5'-im�SA L X,57. 0 EEL GRA7S N THEJT7(0JEC A 3 F IkL"".� 4- (-CCL54- SIGNATURE C) PERMIT # I I.ATE FPPLIMNT'S NAME F-T-i� D 40 6� -5 --709 RDDRESS 33 3 0�z 41do U�' 70 -O,b PF10FILE V = 40' EFST JET'Ty SWNDINGS FRE D?RESSED IN FEET RND DE:NOTE D—EVRTIONS BRsF—D oN mEAN LNER LOW HRTER. --c r L ecrylofc 411 " ;es 7: '.�'.`17' k 4, -:5,- 6,9 7 LO A- 7 Of.. 3336 Via Lido Newport Beach, CA 912663 HAR�011 RESO ES DX. (Apa.rnnents) CITY 0 W BE ke?'70vc old 40 4,1 b a ck' LAJO le, v (_5 5-- 1 lzE6jGRASS INSPECTION I/ we"Nb ETC -C) 4q0T"RA'9S WITHIN '1 51 OF ppr)� a YC 3 J, of)5'-im�SA L X,57. 0 EEL GRA7S N THEJT7(0JEC A 3 F IkL"".� 4- (-CCL54- SIGNATURE C) PERMIT # I I.ATE FPPLIMNT'S NAME F-T-i� D 40 6� -5 --709 RDDRESS 33 3 0�z 41do APPLICATION IfPRKSHEET Xdk BU PI CITY OF NEWPORT BEACH BUILDING & PLANNING DEPARTMENTS PLEASE PRINT !.PROJECT ADDRESS (NOT, MAI�NG: �ODDRESS) FLOOR SUITE NO. ZIP �—LEGAL DESCRIPTION No. UNITS LOT BLOCK TRACT STAe t4 12.DESCRIPTION-OF WORK LAle"IrIx- � z- - 411 A -5 1 1 7A V k W4,1V ' 3? A - 1 9 " /-' ( Z -- EXISTING STAUCTURE-`80.FTI� PROPOSED NEW / ADDITIONAL SQ. FT. NEW ADD - ALTERkL E-1 USE OF STRUCTURE IA4 f,)yj ESTIMATED'$ VALUATrON jFD,o00.` DEMO7� OTHER No. OF STORIES 113.OWNER'S NAME LAST RST L -- M.I. F�g NO. > T OWNER'S ADDRESS CITY -5- q STAe t4 4.APPLICANT'S NAME I LAST FIRST -EHONE NO 'T, APPLICANT'S ADDRESS CITY STATE P 5.ARCHITECT'S NAME LAST FIRST STATE LIC. NO. ARCHITECT'S ADDRESS CITY STATE ZIP PHONE NO. 6.E TEE NAME LAST FIRST STATE LIC. NO. ENGINEER'S ADDRESS CITY STATE ZIP, �''PHONE NO. (3 /0 7.CO S N r�JE LIC. ;qSS S T A47 L-3 V C TRACTOR�S ADDRESS Y CIT ?%JVTAg -T ZIP I 'HONE CO1+PANY, NAME (if differiest) L 5w, Ff -,;� 6 -ill -'l r154 NEWPORT BUS. LIC. NO. OFFICE USE ONLY White: Building Dept Yellow: Cashier Pink: Applicant PERMIT NO. rn,?007, - oo�� TYPE OF CONSTRUCTION PLAN CHECK NO. OCCU NCY - GROUP PLAN CHECK FEE $ CLASS CODE OCCU P Arn CITY OF NEWPORT BEACH P.O. BOX 1768, NEWPORT BEACH, CA 92658-8915 July 30,2002 Marvin Engineering Co. 3400 Via Oporto, Suite 104 Newport Beach, CA 92663 Re: pier permit CP 1243 3 3 61 for 3 3 3 6 Via Oporto Dear Sirs: This is notice that the property owner at 3336 Via Oporto has applied for a permit to revise the pier and dock bayward from his property. The City of Newport Beach Harbor Resources Division has given him an Approval In Concept for the proposed work. This application will require approval of both the Army Corps & the California Coastal Commission. If this application is approved by the above-mentioned agencies and the City approves the plans, a permit will be issued for the work. If there is a permit issued for this revision, the Public Pumpout Station that is required for your marina will have to be installed elsewhere within the Lido Village Marina. The location for the pump will have to be reviewed and approved by the City and the work to install the. pump must be done under a Harbor Construction Permit issued by the Building Department. If you require additional information in regards to this matter, please contact either Wes Armand or Tony Melum at 949-644-3034. Sincerely, V Wes Armand Harbor Inspector Harbor Resources Division Cc: Robin Clauson, Assistant City Attorney 3300 Newport Boulevard, Newport Beach �—� � d7�- i��1,�Y OF NEWPORT GERCH CITY OF Naipm am YICINITY MAP � M utffl*qn- 117 7, N Lit" 31 77 7 �-,- , F -,x, , PMF I LE 1 40' SWCINGS RFE 0021MSSE0 O.EVATIONS RRSED ON �M 0-U LOW WRTER, p1j A k HARBOR RESOURCE�, 00 CITY OF NEWPORT BqAC F4fornia Coastal Commission 30 ou�h oast District Office OV D perrhit AL - -- - ------ 3--- 'rm 3336 Via LAg By: -- --- - --------------- rTTxm F -FT* -C -f I VE Date: -------------- EEL GRASS INSPECTION S�,,,gp )e� wo RC vl zNq EEL E.r HIN 15'OF PROJECT mi� ee a 2 V -3 'f 9 i�l W;5 -Y S 0 PROJEC EA "SIGNATURE 0 PERMIT # DATE 7 D Afl o C� �Z NA JOB O -P-- S 3 3 -3 t. rL �d AT STATEOFCA121FORNIA THE RESOURCES AGENCY GRAY DWS, Governor CALIFORNIA COASTAL COMMISSION SOUTH COAST AREA PO Box 1450 200 Oceangate, 10th Floor LONG BEACH, CA 90802-4416 (562) 590-5071 Date: April 14, 2003 Permit No. 5-02-273 NOTICE OF ADMINISTRATIVE PERMIT EFFECTIVENESS Please be advised that the Administrative Permit with the above permit number which was sent to you on March 19, 2003 and was reported to the Commission on Tuesday, April 8, 2003 is now fully effective. Development of your project is subject to compliance with all terms and conditions specified in the Administrative Permit. Should you have any questions please contact our office. Sincerely, PETER M. DOUGLAS Sk@qufive Di ctor By: FE��EJJ. SY Coaste(l ��gram Analyst tW CALIFORNIA COASTAL COMMISSION STATE OF CALIFORNIA - THE RESOURCES AGENCY GRAY DAVIS, Govemor CALIFORNIA COASTAL COMMISSION South Coast Area Office Permit Application No. 5-02-273 200 Oceangate, Suite 1000 Long Beach, CA 90802-4302 Date: March 20, 2003 (562) 590-5071 Page 1 of 6 TU 3a ADMINISTRATIVE PERMIT APPLICANT: ETCO Development, Attn: Afshin Etebar PROJECT DESCRIPTION: Demolition of an existing dock facility and construction of a new dock facility. Twelve (12) existing 12" piles will be removed and eight (8) 18" octagonal piles will be installed as part of the dock reconstruction. PROJECT LOCATION: 3336 Via Lido, Newport Beach (Orange County) EXECUTIVE DIRECTOR'S DETERMINATION: The findings for this determination, and for any special conditions, appear on subsequent pages. , NOTE: P.R.C. Section 30624 provides that this permit shall not become effective until it is reported to the Commission at its next meeting. If one-third or more of the appointed membership of the Commission so request, the application will be removed from the administrative calendar and set for public hearing at a subsequent Commission meeting. Our office will notify you if such removal occurs. This permit will be reported to the Commission at the following time and place: Tuesday, April 8, 2003 10:00 am Radisson Santa Barbara 1111 East Cabrillo Boulevard Santa Barbara, CA 93103 IMPORTANT - Before you may proceed with development, the following must occur: Pursuant to 14 Cal. Admin. Code Sections 13150(b) and 13158, you must sign the enclosed duplicate copy acknowledging the permit's receipt and accepting its contents, including all conditions, and return it to our office. Following the Commission's meeting, and once we have received the signed acknowledgement and evidence of compliance with all special conditions, we will send you a Notice of Administrative Permit Effectiveness. BEFORE YOU CAN OBTAIN ANY LOCAL PERMITS AND PROCEED WITH DEVELOPMENT, YOU MUST HAVE RECEIVED BOTH YOUR ADMINISTRATIVE PERMIT AND THE NOTICE OF PERMIT EFFECTIVENESS FROM THIS OFFICE. PETER DOUGLAS Executive Director By: Fernie J. Sy Title: -Coastal Program Analyst 5-02-273-(ETCO) Administrative Permit Page 2 of 6 STANDARD CONDITIONS: Notice of Receipt and Acknowledgment. The permit is not valid and development shall not commence until a copy of the permit, signed by the permittee or authorized agent, acknowledging receipt of the permit and acceptance of the terms and conditions, is returned to the Commission office. 2. Expiration. If development has not commenced, the permit will expire two years from the date this permit is reported to the Commission. Development shall be pursued in a diligent manner and completed in a reasonable period of time. Application for extension of the permit must be made prior to the expiration date. 3. Interpretation. Any questions of intent or interpretation of any term or condition will be resolved by the Executive Director or the Commission. 4. Assignment. The permit may be assigned to any qualified person, provided assignee files with the Commission an affidavit accepting all terms and ponditions of the permit. 5. Terms and Conditions Run with the Land. These terms and conditions shall be perpetual, and it is the intention of the Commission and the permittee to bind all future owners and possessors of the subject property to the terms and conditions. SPECIAL CONDITIONS: See pages four to six. EXECUTIVE DIRECTOR'S DETERMINATION (continued): The Executive Director hereby determines that the proposed development is a category of development which, pursuant to PRC Section 30624, qualifies for approval by the Executive Director through the issuance of an Administrative Permit. Subject to Standard and Special Conditions as attached, said development is in conformity with the provisions of Chapter 3 of the Coastal Act of 1976 and will not have any significant impacts on the environment within the meaning of the California Environmental Quality Act. If located between the nearest public road and the sea, this development is in conformity with the public access and public recreation policies of Chapter 3. FINDINGS FOR EXECUTIVE DIRECTOR'S DETERMINATION: A. Proaect Description The proposed project (Exhibit #3) involves demolishing an existing dock facility; removing twelve (12) existing 12" piles; moving two (2) 3' x 24' gangways; installing two (2) 8' x 87' fingers; a 10' x 110' backwalk; two (2) 4' x 5' gangway landings; eight (8) 18" octagonal piles and a 6' x 39'walkway. The new boating facility will provide four (4) berthing slips for four (4) single-family residences. The floating dock system will only be used for boating related purposes. The subject site is located at 3336 Via Lido in the City of Newport Beach (Exhibits #1 -2). The dock project is for boating related purposes and is associated with four single-family homes. The site has been surveyed by the City of Newport Beach Harbor Resources Division for eelgrass and no eelgrass was discovered within 15 feet of the project area. Coastal public access is available near the site at the bridge leading into Lido Island, approximately 264 feet southeast of the project site (Exhibits #1-2). The proposed project has received an approval in concept from the City of Newport Beach Harbor Resources Division. The Regional Water Quality Control Board (RWQCB) has determined that the 5-02-273-(ETCO) Administrative Permit Page 3 of 6 proposed project will not adversely impact water quality if standard construction methods and materials are used. The applicant has applied for a permit from the U.S. Army, Corps of Engineers. B. Marine Resources The proposed recreational boat dock development and its associated structures are an allowable and encouraged marine related use. The project design includes the minimum sized pilings and the minimum number of pilings necessary for structural stability. The pilings are self -mitigating. There are no feasible less environmentally damaging alternatives available. As conditioned, the project will not significantly adversely impact eelgrass beds and will not contribute to the dispersal of the invasive aquatic algae, Caulerpa taxifolia. Further, as proposed and conditioned, the project, which is to be used solely for recreational boating purposes, conforms with Sections 30224 and 30233 of the Coastal Act. C. Water Quality The proposed work will be occurring. on, within, or adjacent to coastal waters. The storage or placement of construction material, debris, or waste,in a location where it could be discharged into coastal waters would result in an adverse effect on the marine environment. To reduce the potential for construction related impacts on water quality, the Commission imposes special conditions requiring, but not limited to, the appropriate storage and handling of construction equipment and materials to minimize the potential of pollutants to enter coastal waters. To reduce the potential for post -construction impacts to water quality the Commission requires the continued use and maintenance of post construction BMPs. As conditioned, the Commission finds that the development conforms with Sections 30230 and 32031 of the Coastal Act. D. LOCAL COASTAL PROGRAM Coastal Act section 30604(a) states that, prior to certification of a local coastal program ("LCP"), a coastal development permit can only be issued upon a finding that the proposed development is in conformitywith Chapter 3 of the Act and that the permitted development will not prejudice the ability of the local government to prepare an LCP that is in conformity with Chapter 3. The Land Use Plan for the City of Newport Beach was effectively certified on May 19, 1982. The certified LUP was updated on January 9 1990. As conditioned, the proposed development is consistent with Chapter 3 of the Coastal Act and with the certified Land Use Plan for the area. Approval of the project, as conditioned, will not prejudice the ability of the local government to prepare an LCP that is, in conformity with the provisions of Chapter 3 of the Coastal Act. E. CALIFORNIA ENVIRONMENTAL QUALITY ACT As conditioned, there are no feasible alternatives or additional feasible mitigation measures available that would substantially lessen any significant adverse effect that the activity may have on the environment. Therefore, the Commission finds that the proposed project, as conditioned to mitigate the identified impacts, is the least environmentally damaging feasible alternative and can be found consistent with the requirements of the Coastal Act to conform to CEQA. 5-02-273-(ETCO) Administrative Permit Page 4 of 6 SPECIAL CONDITIONS: 1 Water Quality A. Construction Responsibilities and Debris Removal (1) No construction materials, equipment, debris, or waste will be placed or stored where it may be subject to wave, wind, or rain erosion and dispersion. (2) Any and all construction material will be removed from the site within 10 days of completion of construction. (3) Machinery or construction materials not essential for project improvements will not be allowed at any time in the intertidal zone. (4) If turbid conditions are generated during construction a silt curtain will be utilized to control turbidity. (5) Floating booms -will be used to contain debris discharged into coastal waters and any debris discharged will be removed as soon as possible but no later than the end of each day. (6) Non -buoyant debris discharged into coastal waters will be recovered by divers as soon as possible after loss. B. Best Management Practices Program By acceptance of this permit the applicant agrees that the long-term water -borne berthing of boat(s) in the approved dock and/or boat slip will be managed in a manner that protects water quality pursuant to the implementation of the following BMPs. (1) Boat Cleaning and Maintenance Measures: a. In -water top -side and bottom -side boat cleaning shall minimize the discharge of soaps, paints, and debris. In -the -water hull scraping or any process that occurs under water that results in the removal of paint from boat hulls shall be prohibited. Only detergents and cleaning components that are designated by the manufacturer as phosphate - free and biodegradable shall be used, and the amounts used minimized. C. The applicant shall minimize the use of detergents and boat cleaning and maintenance products containing ammonia, sodium hypochlorite, chlorinated solvents, petroleum distillates or lye. (2) Solid and Liquid Waste Management Measures: a. All trash, recyclables, and hazardous wastes or potential water contaminants, including old gasoline or gasoline with water, absorbent materials, oily rags, lead acid batteries, anti -freeze, waste diesel, kerosene and mineral spirits will be disposed of in a proper manner and will not at any time be disposed of in the water or gutter. 5-02-273-(ETCO) Administrative Permit Page 5 of 6 (3) Petroleum Control Management Measures: a. Oil absorbent materials shall be examined at least once a year and replaced as necessary. The applicant will recycle the materials, if possible, or dispose of them in accordance with hazardous waste disposal regulations. The boaters will regularly inspect and maintain engines, seals, gaskets, lines and hoses in order to prevent oil and fuel spills. Boaters will use preventive engine maintenance, oil absorbents, bilge pump -out services, or steam cleaning services as much as possible to clean oily bilge areas ' Bilges shall be cleaned and maintained. Detergents will not be used for cleaning. The use of soaps that can be discharged by bilge pumps is prohibited. 2. Pre -Construction Eelgrass Survey A. Pre Construction Eelarass Surve A valid pre -construction eelgrass (Zostera marina) survey shall be completed during the period of active growth of eelgrass (typically March through October). The pre -construction survey shall be completed prior to the beginning of construction and shall be valid until the next period of active growth. The survey.shall be'prepar�d in full compliance with the "Southern California Eelgrass Mitigation Policy" Revision 8 (except as modified by this special condition) adopted by the National Marine Fisheries Service and shall be prepared in consultation with the California Department of Fish and Game. The applicant shall submit the eelgrass survey for the review and approval of the Executive Director within five (5) business days of completion of each eelgrass survey and in any event no later than fifteen (15) business days prior to commencement of any development. If the eelgrass survey identifies any eelgrass within the project area which would be impacted by the proposed project, the development shall require an amendment to this permit from the Coastal Commission or a new coastal development permit. B. Post Construction Eelgrass Surve . If any eelgrass is identified in the project area by the survey required in subsection A of this condition above, within one month after the conclusion of construction, the applicant shall survey the project site to determine if any eelgrass was adversely impacted. The survey shall be prepared in full compliance with the "Southern California Eelgrass Mitigation Policy" Revision 8 (except as modified by this special condition) adopted by the National Marine Fisheries Service and shall be prepared in consultation with the California Department of Fish and Game. The applicant shall submit the post -construction eelgrass survey for the review and approval of the Executive Director within thirty (30) days after completion of the survey. If any eelgrass has been impacted, the applicant shall replace the,impacted eelgrass at a minimum 1.21 ratio on-site, or at another location, in accordance with the Southern California Eelgrass Mitigation Policy. All impacts to eelgrass habitat shall be mitigated at a minimum ratio of 1.21 (mitigation: i m pact). The exceptions to the required 1.21 mitigation ratio found within SCEMP shall not apply. Any off-site mitigation shall require an amendment to this permit or a new coastal development permit unless the Executive Director determines that no amendment or new permit is required. 3. Pre -construction Caulerpa Taxifolia Survey A. Not earlier than 90 days nor later than 30 days prior to commencement or re -commencement of any development authorized under this coastal development permit (the "project"), the applicant shall undertake a survey of the project area and a buffer area at least 10 meters beyond the project area to determine the presence of the 5-02-273-(ETCO) Administrative Permit Page 6 of 6 invasive alga Caulerpa taxifolia. The survey shall include a visual examination of the substrate. B. The survey protocol shall be prepared in consultation with the Regional Water Quality Control Board, the California Department of Fish and Game, and the National Marine Fisheries Service. C. Within five (5) business days of completion of the survey, the applicant shall submit the survey: (1) for the review and approval'of the Executive Director; and (2), to the Surveillance Subcommittee of the Southern California Caulerpa Action Team (SCCAT). The SCCAT Surveillance Subcommittee may be contacted through William Paznokas, California Department of Fish & Game ' (858/467-4218) or Robert. Hoffman,., National Marine Fisheries Service (562/980-4043). D. If Caulerpa taxifolia is found within the project or buffer areas, the applicant shall not proceed with the project until 1) the applicant provides evidence to the Executive Director that all C. taxifolia discovered within the project and buffer area has been eliminated in a manner that complies with all applicable governmental approval requirements, including but not limited to those of the California Coastal Act, or 2) the applicant has revised the project to avoid any contact with C. taxifolia. No revisions to the project shall occur without a Coastal Commission approved amendment to this coastal development permit unless the Executive Director determines that no amendment is legally required. ACKNOWLEDGMENT OF PERMIT RECEIPT/ACCEPTANCE OF CONTENTS: I/We acknowledge that I/we have received a copy of this permit and have accepted its contents including all conditions. Applicant's Signature Date of Signing H:\fsy\Staff Reports\Apri103\5-02-273-[ETCO]AP(NB) r,2 Lo is 14 Al V) Al outh e9i0t7 MAY 14 �001 ('04 s r c 0q, 0A+SS 'oo cl: ZZ: to _tT D Qj COAS L COMMISSION q EXH -IT # PA OF 131 gooLp �oRANGE., MAR, co SEE KAP v - 35, 393110D .. f'. )2 bo 't— y is h N 31M AT RMOAD l2 OoNdy AT tmlm- VIIANOW A AY HU 0 - it: Jill aj outh 3113 l; 3; octst ----- - ------- AA Y 4200, is 7 CALI, C04S rA L 4q 31 50- 1� Ion eg S11) 2 N' cAutop'NIA &S�QN_ cop"SINY C 41AN, ;ri 1 .3 10NOVW COASTAL COMMISSION �j E-XHBTT-#-- PAGE —OF Q. ONYIK3N �j !s Ei -.:I� AA t7 J- -n--WT- HOV39 - AN 92/ 41 6661 1h')NA63 Is a� OF NEWPORT DERCH CITY OF EkKRT SEM YICINITY MRP cj 1�1 — �. MY c v H�5'1 irm j "� ' PF*F ILE 1- = 401 EFST IETTY WjMINGS PFE W�-tMD IN FEE7 AND IXNCT� old EEL GRASS INSPECTION lair, 3C3 e; 0 7 S —51 PROJECJgEA PR. 3336 via Lido 91661 ft 0" ilk, c v H�5'1 irm j "� ' PF*F ILE 1- = 401 EFST IETTY WjMINGS PFE W�-tMD IN FEE7 AND IXNCT� ftmbfc YJ6-!�� Rep �f HARBOR RESOURCE$ DII CITY OF NEWPORT 84AC 6 tx-j�- T111 60ASTAL COMMISSION i 516Z -Z73 �XHIBIT # 2 — 'PAGE t OF --i—. old EEL GRASS INSPECTION lair, 3C3 e; 0 7 S —51 PROJECJgEA PR. 3336 via Lido 91661 'A ftmbfc YJ6-!�� Rep �f HARBOR RESOURCE$ DII CITY OF NEWPORT 84AC 6 tx-j�- T111 60ASTAL COMMISSION i 516Z -Z73 �XHIBIT # 2 — 'PAGE t OF --i—. id 7 old EEL GRASS INSPECTION '4 /16 'n j e Rcvfc4NOEEL OF HIN 16OF PROJECT S PROJECJgEA PR. ta 4 4 ,a 0'r oc "SIGNATURE PERM17 # id 7 CITY OF NEWPORT DERCH CITY OF EWPM BERM LPPER BAY r DRY PRC" -'C 0(-�-r-)., DREPRT L /- 3 3 3(n HEST YINNITY MRP JEM EFST PROF I LE 1 v = 401 m3ecKr MY, O:L� JETTY SWNDItCS ARE DP:�I:SSED IN FEET AND DENOTE ELEVATIONS BRSED ON MEAN LafR LOH HATER. 7467' US. guaw Lllv'y �-:1 s-- / 41 �'eo-lcc T'- L rMri 0 7--5- 7 7- �P 5:7 3336 Via Lido errylo?c 4100q 16 0e� k Newpor-t Reach, CA 92663 (Apay-tinents) �eyoov' old )"r; 'k.j 40 97 �g -(io5evr5. //0 b a, LUO le" v ISEP / /y/ 3 S q' L'j C�/ I x 5- J /;l u Ik,,-,l 4, 0/1 10 APPL I CRNT'S NAME qo nj E� _5 ]JOD RDPESS 333G 0� 41do DATE P z 41ll Ile HEST YINNITY MRP JEM EFST PROF I LE 1 v = 401 m3ecKr MY, O:L� JETTY SWNDItCS ARE DP:�I:SSED IN FEET AND DENOTE ELEVATIONS BRSED ON MEAN LafR LOH HATER. 7467' US. guaw Lllv'y �-:1 s-- / 41 �'eo-lcc T'- L rMri 0 7--5- 7 7- �P 5:7 3336 Via Lido errylo?c 4100q 16 0e� k Newpor-t Reach, CA 92663 (Apay-tinents) �eyoov' old )"r; 'k.j 40 97 �g -(io5evr5. //0 b a, LUO le" v ISEP / /y/ 3 S q' L'j C�/ I x 5- J /;l u Ik,,-,l 4, 0/1 10 APPL I CRNT'S NAME qo nj E� _5 ]JOD RDPESS 333G 0� 41do DATE P 3 5(,o CITY OF'NEWPORT GEHCH LQ CITY OF NEWPORT SESCH UPPER NEWORT u DRY -f 1)... bo e,D �70 -6,0 DRY PRCJ,�-Jc OCE-av PIER 0 U,0 HEST YICINITY MRP JETTY EFST PROFILE lw 40' SWNDINGS ARE DUIRESSED IN FEET AND DENOTE E-EVATIONS BASED ON MEAN LOHER LOH HATER. �2r ro 0 � C �1("q, 7-- 17 k 8(Noi, e- 7AW Z 0 7-5 3336 Via Lido 'Newport Beach, CA 92663 (Apa.rtments) 1 �efov, 01ap AC*j 10 P( of e (4y / / �/ -- , "0 '0 - ') - //0 /' ba c A,, LAja f?,- R"50SEp t - 2.00n ETr C) PEvGLGPrrl Noy(- �2 V x 3 311 s 40 8 41 X/ 5- 5 4-cl 0,1141.0 41 u /(2 6 Ik,, 7. 4-,� nf n>41 oc(e5s, -�o 04,-,- P FPPL I CRN7'S NAME E:- T -C 0 #0 ]JOB RDDWSS 333G 0� 41do DATE 3 -5- CD STATE OF CALIFORNIA - THE RESOURCES AGENCY ORNIA COASTAL COMMISSION South Coast Area Office 200 Oceangate, Suite 1000 Long Beach, CA 90802-4302 (562) 590-5071 Item Wed 29h GRAY DAVIS, Govemor Filed: August 22, 2000 49th Day: October 10, 2000 180th Day: February 8, 20 1 Staff: ALKA htp Staff Report: August 24, 2000 Hearing Date: September 12-15, 2000 Commission Action: STAFF REPORT: REGULAR CALENDAR RECEIVED BY PLANNING DEPARTIMENT C I TY 0 F N E �]V P 0 P. 1' C11--) APPLICATION NUMBER: 5-00-308 AUG 31 240 APPLICANT: Marvin Engineering Co., Inc. AM P IM 71819 1101 1 -1 �1 I -12J I '-1121 S 3 1 1 AGENT: Shellmaker, Inc., Lisa E. Miller � i PROJECT LOCATION: 3400 Via Oporto, Newport Beach Orange County PROJECT DESCRIPTION: Reconfiguration of existing commercial dock to accommodate a new charter vessel for Electra Cruises. LOCAL APPROVALS RECEIVED: City of Newport Beach Fire and Marine Department Approval in Concept, Harbor Permit Number 124-3400; Clearance from the Regional Water Quality Control Board, and Approval from US Army Corps of Engineers. SUBSTANTIVE FILE DOCUMENTS: City of Newport Beach Certified Land Use Plan, Newport Beach Municipal Code Chapter 5.18, City of Newport Beach Harbor Permit Policies, and Coastal Development Permit Application 5-99-397 (Marvin Engineering Co., Inc.). SUMMARY OF STAFF RECOMMENDATION: The major issues of this staff report include fill of coastal waters for boating related purposes, potential impacts upon marine resources, and public access. Staff recommends approval of the proposed development subject to two special conditions. Special Condition No. 1 requires minimization of construction impacts on harbor bottom and intertidal areas, appropriate storage of construction materials, removal of construction debris, and use of best management practices to reduce turbidity related impacts. Special Condition No. 2 requires the applicant to maintain 89 parking spaces in the Lido Marina Village parking structure and comply with the marine charter parking requirements administered by the City of Newport Beach. 5-00-308 (Marvin Engineering Co., Inc.) Page 2 of 9 1. STAFF RECOMMENDATION, MOTION AND RESOLUTION OF APPROVAL: Staff recommends that the Commission make the following motion and adopt the following resolution to APPROVE the permit application with special conditions. MOTION move that the Commission approve CDP #5-00-308 pursuant to the staff recommendation. Staff recommends a YES vote. Passage of this motion will result in adoption of the following resolution and findings. The motion passes only by affirmative vote of a majority of the Commissioners present. RESOLUTION OF APPROVAL WITH CONDITIONS The Commission hereby GRANTS a permit, subject to the conditions below, for the proposed development on the grounds that the development will be in conformity with the provisions of Chapter 3 of the California Coastal Act of 1976, -is located between the nearest public road and the sea and is in conformity with the public access and public recreation policies of the Coastal Act, and will not have any significant adverse effects on the environment within the meaning of, the California Environmental Quality Act. 11. STANDARD CONDITIONS: Notice of Receipt and Acknowledgment The permit is not valid and development shall not commence until a copy of the permit, signed by the permittee or authorized agent, acknowledging receipt of the permit and acceptance of the terms and conditions, is returned to the Commission office. 2. Expiration. If development has not commenced, the permit will expire two years from the date this permit is reported to the Commission. Development shall be pursued in a diligent manner and completed in a reasonable period of time. Application for extension of the permit must be made prior to the expiration date. 3. Interpretation. Any questions of intent or interpretation of any condition will be resolved by the Executive Director or the Commission. 4. Assignment. The permit may be assigned to any qualified person, provided assignee files with the Commission an affidavit accepting all terms and conditions of the permit. 5. Terms and Conditions'Run with the Land. These terms and conditions shall be perpetual, and it is the intention of the Commission and the permittee to bind all future owners and possessors of the subject property to the terms and conditions. 5-00-308 (Marvin Engineering Co., Inc.) Page 3 of 9 Ill. SPECIAL CONDITIONS 1. CONSTRUCTION RESPONSIBILITIES The permittee shall comply with the following construction -related requirements: (a) No construction materials, debris, or waste shall be placed or stored where it may be .subject to wave erosion and dispersion; (b) Any and all debris resulting from construction activities shall be removed from the project site within 24 hours of completion of construction; (c) Disturbance of the harbor bottom and intertidal areas shall be minimized; (d) Turbidity shall be minimized through the use of best management practices including, but not limited to, the use of silt curtains; (e) No machinery shall be allowed at any time on the beach or intertidal zone; (f) Any accidental spills of construction equipment fluids shall be immediately contained on-site and disposed of in an environmentally safe manner as soon as possible; (g) Any construction materials., oils or liquid chemicals or other waste shall not be stored where it is subject to wave erosion and dispersion into the harbor waters. 2. PARKING REQUIREMENT By acceptance of this permit, the applicant acknowledges and agrees to maintain a total of eighty-nine (89) parking spaces in the Lido Marina Village parking structure for the use approved by Coastal Development Permit 5-00-308. In addition, the applicant shall comply with the parking requirements for Marine Charter Permits set forth in Newport Beach Municipal Code Section 5.18.040 (Exhibit 4). IV. FINDINGS AND DECLARATIONS: The Commission hereby finds and declares: A. PROJECT DESCRIPTION AND LOCATION The applicant is proposing to modify an existing commercial dock to accommodate a new charter vessel in the Lido Marina Village area of Newport Harbor (Exhibits 1 and 2). Specifically, the project involves the demolition of an existing dual "U" -shaped dock with three (3) 45' long by 4' wide fingers and a 10' by 40' backwalk, and the relocation of its three (3) pilings. The project also involves the demolition and removal of a 37' long by 4'wide dock and its associated piling. The applicant proposes to replace and reconfigure the existing boat dock, as described below and shown in Exhibit 3. 5-00-308 (Marvin Engineering Co., Inc.) Page 4 of 9 The applicant proposes to construct a new 6'wide by 90' long floating dock with six (6) 18" prestressed concrete guide piles, two (2) relocated 12" piles and two (2) 5' by 5' knee braces. The applicant also proposes to construct a 6'wide by 45' long extension to an existing floating dock. The dock extension will be anchored by three (3) new 18" prestressed concrete guide piles. Another 5' by 5' knee brace with relocated 12" pile will be installed on a portion of the remaining dock to the west of the new docks. The new floats are being constructed to accommodate a, new 61.5, long 250 -passenger yacht, known as the Newport Princess. This new vessel will replace the Galatea, a 607100 -passenger yacht. The Newport Princess will be an addition to Electra Cruises fleet of two yachts, the Electra (87.271 05 -passenger) and the Athena (96.9" long /149 passengers). I n- order to provide parking for the proposed development (i.e. additional charter boat service), the applicant intends to continue operating under the requirements of the City of Newport Beach Municipal Code Chapter 5.18. The City's Municipal Code requires charter operators to provide proof of adequate off-street parking prior to issuance of a Marine Charter Permit. Parking for each charter is provided in either the Lido Marina Village parking structure, the Newport Beach City Hall, and/or through off-site busses/shuttles. (Parking will be described further in Section C of the current report.) B. MARINE ENVIRONMENT 1. Fill of Coastal Waters The proposed project involves the placement of nine (9) new 18" diameter concrete pilings and three (3) relocated 12" diameter pilings in open coastal waters (i.e. Newport Harbor), for a total of twelve (12) pilings. These pilings constitute "fill" of open coastal waters as defined in Section 30108.2 of the Coastal Act. Under Section 30233 of the Coastal Act, fill of open coastal waters is only allowed when several criteria are met: (a) the project must fall within one of the use categories specified; (b) the proposed project must be the least environmentally damaging feasible alternative; and (c) feasible mitigation measures to minimize adverse environmental effects must be provided. Section 30233 of the Coastal Act states, in part: (a) The diking, filling, or dredging of open coastal waters, wetlands, estuaries, and lakes shall be permitted in accordance with other applicable provisions of this division, where there is no feasible less environmentally damaging alternative, and where feasible mitigation measures have been provided to minimize adverse environmental effects, and shall be limited to the following: (4) In open coastal waters, other than wetlands, including streams, estuaries, and lakes, new or expanded boating facilities and the placement of structural pilings for public recreational piers that provide public access and recreational opportunities. The proposed project meets the first criteria because the proposed development is for a boating facility. Fill of open coastal waters, such as Newport Harbor, for the construction of a boating facility is.an allowable use under Section 30233(a)(4) of the Coastal Act. The proposed project requires twelve (12) pilings. The pilings are necessary to secure the proposed dock floats which are necessary to support a boating facility. 5-00-308 (Marvin Engineering Co., Inc.) Page 5 of 9 The applicant has indicated that the floatsvill be used solely for boating purposes. Specifically, the applicant proposes to use the floats as a staging area and to facilitate the loading and unloading of passengers and supplies to the boat. The boat will provide charter boat service. This charter service is for use by the general public. Based on the uses proposed by the applicant, the Commission finds that the proposed dock floats constitute a boating facility. As a boating facility, the proposed dock reconfiguration is a use specifically allowed under Section 30233(a)(4) of the Coastal Act. In addition to the use -related issue, Section 30233 of the Coastal Act also requires that any project involving fill of open coastal waters be the least environmentally damaging feasible alternative. One way to reduce environmental damage to open coastal waters is to minimize the quantity of fill. In this case, the applicant is proposing to remove one (1) existing pile, reuse three (3) 12" diameter piles and place nine (9) new 18" diameter piles. The applicant has indicated that the proposed pilings are the smallest diameter and the minimum quantity necessary to meet current engineering standards for loads needed to serve the new and existing vessels. Therefore, since the proposed project minimizes the quantity of fill of coastal waters, the Commission finds that the proposed project is the least environmentally damaging feasible alternative. Finally, Section 30233 of the Coastal Act also requires that feasible mitigation measures to minimize adverse environmental effects must be provided. The proposed project meets this requirement because the proposed pilings will provide habitat for marine organisms such as mollusks. This replacement hardscape habitat will mitigate for the loss of hard bottom habitat resulting from the placement of the pilings. The proposed project will result in the fill of open coastal waters for a boating facility, which is an , allowable use under Section 30233 of the Coastal Act. In addition, the proposed project is the least environmentally damaging alternative, and does provide feasible mitigation measures. Therefore, the Commission finds the proposed project is consistent with Section 30233 of the Coastal Act. 2. Marine Organisms and Water Quality Section 30230 of the Coastal Act states: Marine resources shall be maintained, enhanced, and where feasible, restored. Special protection shall be given to areas and species of special biological or economic significance. Uses of the marine environment shall be carried out in a manner that will sustain the biological productivity of coastal waters and that will maintain healthy populations of all species of marine organisms adequate for long-term commercial, recreational, scientific, and educational purposes. Section 30231 of the Coastal Act states: The biological productivity and the quality of coastal waters, streams, wetlands, estuaries, and lakes appropriate to maintain optimum populations of marine organisms and for the protection of human health shall be maintained and, where feasible, restored through, among other means, minimizing adverse effects of waste water discharges and entrainment, controlling runoff, preventing depletion of ground water supplies and substantial interference with surface water flow, encouraging waste water reclamation, 5-00-308 (Marvin Engineering Co., Inc.) Page 6 of 9 maintaining natural vegetation buffer areas that protect riparian habitats, and minimizing alteration of natural streams. The placement of pilings has the potential to impact marine organisms and water quality in the project area. Driving pilings can result in direct impacts upon marine organisms inhabiting the location where the piles are being placed. In addition, driving piles can result in the suspension of sediment in the water column resulting in shading and sedimentation impacts upon organisms. Finally, the placement of dock floats can result in shading impacts upon sensitive light -dependent aquatic vegetation (i.e. eelgrass). The proposed development involves construction within coastal waters. An inspection performed by the City determined that no eelgrass exists in the vicinity of proposed project. Therefore, no eelgrass will be affected by the proposed project. - The proposed pilings will be placed in a hardbottom area beyond the existing bulkhead. While the proposed pilings will result in impacts upon the hardbottom habitat, the pilings themselves will provide replacement hard -substrate habitat. Since the surface area of the pilings is greater than the area of impact the proposed project will increase the quantity of hard -substrate habitat. In addition, since there is no eelgrass in the project area, shading impacts from the placement of the dock floats is not anticipated to have any adverse impact upon any sensitive aquatic vegetation. Due to the proposed project's location on the water, the proposed work may have adverse impacts upon water quality and attendant adverse impacts upon biological resources. Storage or placement of construction materials, debris, or waste in a location subject to wave erosion and dispersion would result in adverse impacts upon the marine environment that would reduce the biological productivity of coastal waters. For instance, construction debris entering coastal waters may cover and displace soft bottom habitat. In addition, the use of machinery in coastal waters not designed for such use may result in the release of lubricants or oils that are toxic to marine life. Also, the proposed pile driving activities may also result in the temporary suspension of sediment in the water column. The Regional Water Quality Control Board has determined that the proposed project will not adversely impact water quality if standard construction methods and materials are used. Nonetheless, in order to avoid,adverse construction -related impacts upon marine resources, Special Condition 1 outlines construction related requirements to provide for the safe storage of construction materials and the safe disposal of construction debris. In addition, Special Condition 1 requires the applicant to utilize best management practices, such as a silt curtain, during installation of the pilings to avoid any turbidity related impacts upon water quality and marine organisms. Finally, Special Condition I prohibits placement of machinery on the beach or intertidal zone and requires that any accidental spills of construction equipment fluids shall be immediately contained on-site and disposed of in an environmentally safe manner as soon as possible and any construction materials, oils or liquid chemicals or other waste shall not be stored where it is subject to wave erosion and dispersion into the harbor waters. As conditioned, the Commission finds the proposed development is consistent with Section 30230 and 30231 of the Coastal Act. 5-00-308 (Marvin Engineering Co., Inc.) Page 7 of 9 C. PUBLIC ACCESS Section 30604(c) of the Coastal Act requires that every coastal development permit issued for any development between the first public road and the sea include a specific finding regarding the conformity of the proposed development with the public access and recreation policies of Chapter 3 of the Coastal Act. The proposed development is located seaward of the first public road. Section 30212 of the Coastal Act states, in relevant part: (a) Public access from the nearest public roadway to the shoreline and along the coast shall be provided in new development projects except where: (2) adequate access exists nearby Section 30224 of the Coastal Act states: Increased recreational boating use of coastal waters shall be encouraged, in accordance with this division, by developing dry storage areas, increasing public launching facilities, providing additional berthing space in existing harbors, limiting non -water -dependent land uses that congest access corridors and preclude boating support facilities, providing harbors of refuge, and by providing for new boating facilities in natural harbors, new protected water areas, and, in areas dredged from dry land. Section 30252 of the Coastal Act states, in relevant part: The location and amount of new development should maintain and enhance public access, to the coast by ... (4) providing adequate parking facilities or providing substitute means of serving the development with public transportation... Sections 30210, 30211 and 30212 of the Coastal Act require that new development provide maximum public access and recreation, avoid interference with the public's right of acquired access, and provide public access from the nearest public roadway to the shoreline and along the coast except under certain circumstances. The Lido Marina Village area of Newport Harbor is designated for Recreation and Marine Commercial and/or Retail and Service Commercial uses; The surrounding area is currently developed with similar private commercial boat docks, retail establishments, restaurants and a waterfront walkway. These existing facilities provide public access. Section 30252 of the Coastal Act requires the protection of public access to the beach. An adequate quantity of public parking spaces maintains this access. However, public access can be adversely affected if commercial uses, such as the proposed charter service, in the coastal zone do not provide adequate on-site or dedicated parking to serve the proposed development. In cases of inadequate parking, charter passengers would displace other public users from public parking spaces. The applicant is subject to City of Newport Beach Municipal Code Chapter 5.18 for operation of marine charters (Exhibit 4). According to the City Code, each charter must apply for a Marine Charter Permit from the Revenue Division of the City. Section 5.18.040 specifies that 5-00-308 (Marvin Engineering Co., Inc.) Page 8 of 9 "an application shall be denied if there is substantial evidence that:... 3. The proposed charter does not provide facilities to ensure adequate off-street parking, or the safe loading and unloading or passengers and supplies. For the purpose of this section, parking shall be considered adequate only if one parking space is provided for each three passengers or the applicant can demonstrate, to the satisfaction of the Revenue Manager or Harbor Inspector, that fewer spaces are required because of written passenger commitments to carpool or use different forms of transportation. " The applicant has obtained authorization to use 89 of the 383 (plus 154 valet spots) at the Lido Marina Village parking structure. They have also been granted approval to use all 83 spaces within the City of Newport Beach City Hall to meet their parking needs after 5:30 p.m. Monday—Friday, Saturday all day and Sunday after 1:00 p.m. The applicant states that in the past seven,years they have utilized -the City parking lot only three times. When parking needs cannot be met at the Lido Marina Village parking structure or City Hall, passengers are bussed/shuttled to the charter yachts. The applicant has also provi ded a parking study based upon last year's operation of the Electra, Athena, and Galatea (no longer in use) vessels during peak use season. The Newport Princess will replace the Galatea, which was a 1 00 -passenger vessel. As such, the applicant will have the capacity to charter 150 more passengers than before. The parking study indicates that the existing parking arrangement is adequate to support the additional charter use. No public parking spaces will be required to support the charter service. To ensure that the applicant continues to provide the necessary parking for each charter, the Commission imposes Special Condition 2. Special Condition 2 requires the applicant to comply with the parking requirements for Marine Charter Permits set forth in Newport Beach Municipal Code Chapter 5.18. With this condition, the applicant must demonstrate to satisfaction of the City's Revenue Division that they will provide adequate off-street parking for each charter. Consequently, the proposed dock reconfiguration and additional charter service will not adversely effect public parking in the subject area. As conditioned, the Commission finds the proposed development is consistent with the public access policies of the Coastal Act. D. LOCAL COASTAL PROGRAM Section 30604(a) of the Coastal Act provides that the Commission shall issue a coastal permit only if the project will not prejudice the ability of the local government having jurisdiction to prepare a Local Coastal Program which conforms with Chapter 3 policies of the Coastal Act. The Commission certified the Land Use Plan for the City of Newport Beach on May 19, 1982. As conditioned, the proposed development is consistent with the policies contained in the certified Land Use Plan and with the Chapter 3 policies of the Coastal Act. Therefore, approval of the proposed development will not prejudice the City's ability to prepare a Local Coastal Program for Newport Beach that is consistent with the Chapter 3 policies of the Coastal Act as required by Section'30604(a). 5-00-308 (Marvin Engineering Co., Inc.) Page 9 of 9 E. CALIFORNIA ENVIRONMENTAL, QUALITY ACT ' " Section 13096 of the Commission's regulations requires Commission approval of Coastal Development Permit applications to be supported by a finding showing the application, as conditioned by any conditions of approval, to be consistent with any applicable requirements of the California Environmental Quality Act (CEQA). Section 21080.5(d)(2)(A) of CEQA prohibits a proposed development from being approved if there are feasible alternatives or feasible mitigation measures available which would substantially lessen any significant adverseeffect which the activity may have on the environment. The proposed project has been conditioned for consistency with the marine resource protection policies of Sections 3023Q and 30233 of the Coastal Act. Mitigation measures, in the -form of special conditions require 1) removal of construction debris and minimization of construction impacts, and 2) conformance with the City of Newport Beach Marine Charter Permit requirements, will minimize all adverse effects. The proposed development, as conditioned, is consistent with the Chapter 3 policies of the Coastal Act. There are no feasible alternatives or mitigation measures available which will lessen any significant adverse impact the activity would have on the environment. Therefore, the Commission finds that the proposed project is consistent with CEQA and the policies of the Coastal Act. RkStaff ReportslSept=5-00-308 (Electra Cruises). doc ---e---LUPYRIGHT 1997 1NelW,,l0ZN. PK WR > BLVD 0 BEACH kWU LN r INLAND co 2 )D gJA r E 1 14 �-1 j DDS im if J LE T— G F; IN 9 NAGNO 211WO ST cn IR E OCT 2 1 1999 e. " -�t LYNt 1. Ali % MARINO iL NIA KARL LN 0 FL Lx c MMISSION 0� ARFIRE LX E CIA 2 S RD S N iA 1� GLINCAIRK X IR OUEEMS PARX. Alm NATIONAL LN�l ClR W— LAS LN -9 u cx SIT 21 146 '04 -114 S S, *4L - ARE WHITTI R AV I Soo WO 0� Q I Ic ON V P MDN TJ I V 00 FEDERAL AV �l A lo . I W! -irr-- � AV 1 4, PLACI NTIA AV 1600 '0, '900 PALACE AV C)� 2200 p E AY E3 LIMMG AV POMONA AV lvr, t 5.,o /- 180D 1900 ARNOLD AV 1700 rs NEI— Pl. AKWEIM' !IOLA . TwIR BLVD =4 HINER ST 11900 I -W W fAV r N CKkqLE ST 9 1 Fropf - B V I D 413 4 HARBOR b 19W 2100 ZZW Fowa TP5.4, CD��U co Ise -M COLLE AV co co dYW 68e 33S dIZ i 3g � 3g it t 9 tAt Vil90d -:i., 1A 4l 4f kv TV -VS -j4 WdEs.- K� t a '14 - ; 1, OF NEWPORT BERCH CITT OF NEWPORT BERCH UPPER NEST c BRY ISLMDJ 93Y :,RclrC OCCRN PIER J= YICINITY MAP EF1517 LJ U JUL 0 5 Z000 CALIFORNIA COASTAL COMMISSION E'X, RA MR r\-4 U1 4,0 PWF I LE I v 50 SOUNDINGS FV;E DG)WSSED IN FEET RND DENOTE. ELEVRTIONS BASED ON MEAN LOWER LOW WRTER. 1&14. y TI JL—J L -j �j 40do ZX. RAM 400cler L LI c --x, rOUL A/ FIRE 9ARIN'E DEPT. A� CITY ?VEWORTeACH EEL GRASS INSPECTION Al,!�:A P0 R T 6,4 y �—MLI NO FFL GRA.SS 7 IN THE oil EE� GFWS� 0�: P EA,'' RO ECT 0 I JL /goo ST -C'X. 'COCK Ilya. ~c FS10`4"' SAM F. KNISS CONSULTING CIVIL ENGR-. 0.. 7, m MY 1031`01dd 0 C-17377 xp. 3HI NI SSVkI0 133 0 19 AGATE c1kA\- SSVbD 133 ON 0 !RVINE,CA. 92614 NOLP20! 1010 13j (949) 133-8430 �FPPLICANT'S NW e-- JOB FIDDKSS F-iKO 0A�7-P,71C Ja- DRTE-, sv x -E7- / .0,0 2� 9/ / ,,p 1,41,4 Yle-1 4 A 6;e - ---/- 4-0 N -2 5-/,o -JUL 0520&'_ S' PRO J -'Fc -r HFORtsmk f —f"— oksCOMMIMON TAt (3) IN, M vz- .'d 7 ,,,OF U S. rn No E xp Civil. OF C ALW'D AL �u 0 Qz Z Ek GR�SS INSPECTION s. 40 EEL GRASS 4EL GRASS JIN T7 %4) IZ4 5AIll A" AeA1153r PR r-17,777 9 AC -47r V" VGNATURE 1,eill,vel CA. 9z4,14 1(,/- 3 ydv 4/ 90 _; - _�� 941) 7 33 T4, 'PqAMlTW' DATE -ME'TIM—ARINE D�P­T CITY OF NEWPORT BEACH Chapter 5.18 MARINE CHARTER PERNUT Sections: 5.18.005 Purpose and Findings. 5.18.010 Definitions. 5.18.020 Permit Required—Violations. 5.18.025 Exceptions. 5.18.030 1 Application for Permit. 5.18.035 Marine Charter Filing Fee. 5.18.040 Issuance of PermiL 5.18.045 Conditions. S.18.050 Indemnification. 5.1&OS5 Transfer Prohibited. 5.18.060 Penalty. 5.18.005 Purpose and FTmdingL The, City Council of the City of Newport Beach, in adopting the ordinance codified in this chapter, finds and declares as follows: A. Newport Bay is a limited resource with a large marine and recreational use. B. In the past few years, there has been a dra- matic increase in the number of charter vessels operating in Newport Bay; 1. Many of these vessels are owned or operated by persons who do not have a fixed base of opera- tion on or near the bay that can provide the parking or sanitation facilities necessary to serve their clients and customers. C. Charter activities will, if unregulated, contin- ue to increase the demand for available waterfront parking that is already in short supply which Will increase ti-affic congestion in the waterfront areas, - continue to generate levels of noise which, on occa- sion, have interfered with the many residents who live on the bay, and continue to present a risk of direct discharge of waste into the bay. D. The requirements of the chapter are necessary to minimize the traffic congestion, parking shortag- es, excessive noise, and the discharge of waste that could result from unregulated charter activity. E. "ne charter activities not regulated by Chap- ter 17.41 and this chapter are those which involve 167 5.18.005 so few people as to have only a minimal impact on the traffic, parking and noise problems associated with other charter activities. F. Charter activities on Newport Harbor demand additional City services which are not paid by the patrons or passengers of charter vessels operating in a commercial capacity of the harbor. (Ord. 94-33 I (part), 1994: Ord. 88-37 § I (part), 1988) 5.18.010 Definitions. For the purpose of this chapter, the following definitions shall apply: A. "Bareboat charter shall mean any vessel not inspected by the United States Coast Guard under title 46 of the Code of Federal Regulations and which has been chartered for consideration. B. "Charter" shall mean any vessel inspected by the United States Coast Guard under title 46 of the Code of Federal Regulations and which has been chartered for consideration. C. "Chartered for consideration" shall mean a vessel which has been hired or leased by the owner, directly or through a representative, to any person for a voyage in exchange for the payment of money. the receipt of something of value, or the forgiveness of a debL D. "Commercial fishing vessel" shall mean a vessel registered by the Department of Fish and Game pursuant to Section 7880 of the Fish and Game Code of the State of California, when. operat- ing under the authority of the fish and game permit outside Newport Harbor. E. "Sailing club" shall mean an organization operating from a fixed location and principally engaged in the coordination or facilitation of the use of pleasure boats by its membership. F. "Applicant" shall mean the owner of the vessel or authorized representative of the owner. G. "Sportfishing charter" shall mean a vessel chartered solely for sportfishing outside of Newport Harbor. H. ' "City Managee'shall mean the City Manager of the City of Newport Beach, or his or her respec- tive assignees. 5.18.010 1. "Revenue Manager" shall mean the Revenue Manager of the City of Newport Beach or his or her designee. J. "Newport Bay" shall mean aU waters within the corporate limits of the City of Newport Beach and within which the tide ebbs and flows, -whether or not the ordinary or mean high tide of the Pacific Ocean has been fixed by ordinance, statute, court action or otherwise, and whether or not the lands lying under the tidal water are privately or publicly owned. K. "Person" shall mean an individual, proprietor- ship, firm, partnership, joint venture, syndicate, business trust, company, corporation, association, committee or any other organization or group of persons acting in concert - L. "Harbor Inspector" shall mean the Harbor Inspector of the City of Newport Beach, or his or her designee. M. "Operator shall mean the person who oper- ates or who has charge of the navigation or use of a vessel. N. "Passenger" shall mean every person, other than the master and a member of the crew or other persons employed or engaged in any capacity on board a vessel in the business of that vessel. (Ord. 94-33 § I (part), 1994: Ord. 88-37 § I (part), 1988) 5.18.020 Permit Required—Violations. A. No person shall operate any bareboat charter or certificated charter on the waters of Newport Bay without first obtaining a marine charter permit pur- suant to this chapter. B. No person shall schedule, arrange, or coordi- nate the operation of a bareboat charter or certificat- ed charter on the waters of Newport Bay without fim obtaining a marine charter permit pursuant to this chapter. C. No person who owns a certificated vessel (a vessel inspected by the United States Coast Guard pursuant to Title 46 of the Code of Federal Regula- tions) shall permit or allow the use of the vessel as a certificated charter on the waters of Newport Bay without first obtaining a marine charter permit pur- suant to this chapter. 168 D. No person shall operate a bareboat charter or certificated charter on the waters on Newport Bay without having a valid marine charter permit on board the vessel at all times during the charter. E. No owner of a vessel shall permit that vessel to be used as a bareboat charter on the waters of Newport Bay unless a marine charter permit has been issued for the bareboat charter. (Ord. 94-33 I (part), 1994: Ord. 88-37 § I (part), 1988) 5.18.025 ' Exceptions. Ile provisions of this chapter shall not apply to the following: A. Any vessel operating pursuant to, and in compliance with conditions of, a valid permit issued pursuant to Chapter 17.41 of the Newport Beach Municipal Code; B. Any commercial fishing vessel traversing the waters of Newport Bay to engage in commercial fishing or other operations outside of Newport Bay; C. Vessels operated by a sailing clubowhile carTying six or fewer passengers, provided at least one of the passengers is a member of the saffing club; D. Sportfishing charters; E. Any charter carrying six or fewer passengers; F. Vessels used solely for the purpose of boat repair, maintenance or marine construction. (Ord. 94-33 § I (part), 1994: Ord. 88-37 § L (part), 1988) 5.18.030 Apptication for Permit Application for permit pursuant to: this chapter shall be filed with the Revenue Manager upon forms provided by the City and shall contain the following information: A. The name, business address, and business telephone number of the applicant; B. The name, address and telephone number of the vessel owner, C. All pertinent information relative to the vessel including, but not necessarily limited to, the name of the vessel, the registration number of the vessel assigned by the Department of Motor Vehicles or the United States Coast Guard, the make and model of the vessel, the length of the vessel, and any unique or special features of the vessel; D. 'A full description of the proposed charter including: 1. Ile hours of operation, 2. The route or routes of travel, 3. Maximum number of patrons or passengers, 4. Embarkation and debarkation points, 5. Activities to be conducted on board the char- ter, including any entertainment, 6. Description of any sound amplification pro- posed to beused, 7. Description and location of the parking facili- ties available for the charter, including any written agreement pursuant to which the applicant has ob- tained the right to the parking facilities, and the method by which the applicant proposes to notify all passengers or patrons of the requirement that they park in the designated area, 8. A description of the manner in which the ap- plicant intends to dispose of all sewage, trash and litter resulting from the charter, and . 9. Other information which may be pertinent to vehicular or marine traffic, parking, noise, pollution, litter or any other matter which could adversely affect the health, safety or welfare of those who use, enjoy, or own property near the waters of the New- port Bay; E. Such other information as the Revenue Man- ager deems reasonably necessary to determine whether to issue a permit; F. The application shall be filed no later than five working days before the date the charter is to occur. Applications may be considered if. (1) filed no later than two full working days before the char- ter is to occur-, (2) the applicant demonstrates good cause for the delay in fiUg; and (3) the proposed charter does not require special investigation or the imposition of special conditions. (Ord. 94-33 § I (part), 1994: Ord. 88-37 § I (part), 1988) 5.18.035 Marine Charter Filing Fee. An application for a marine charter permit shall be accompanied by a n of the City Council; provided, however, the fee shall 5.18.030 be no greater than necessary to defer the costs in- curred by the City in administering the provisions of this chapter. (Ord. 94-33 § I (part), 1994: Ord. 88-37 § 1 (part), 1988) 5.18.040 Issuance of PermiL A. Upon receipt of an application for a marine charter permit, the Revenue Manager or Harbor Inspector shall investigate the information contained in the application issue the permit upon a deter- _i;!�a�tion iatapproval- will not adversely ect health, safety or welfare of those who use,�nl oy, o ' t own, property near the waters of Newport BaJ: e application shall be denied if there is substantial evidence that: I . 1. The proposed charter is likely to create noise which would adversely affect the use or enjoyment of the waters of Newport Bay by members of the public, or interfere with the rights of those who own property on or near the waters of Newport Bay; 2. The proposed charter is likely to contribute to the problem of pollution or litter on and in the waters of Newport Bay; 3. 77he, proposed charter does not provide facili- ties to ensure adequate off-street parking, or the safe loading,and unloading of passengers and supplies. For the purpose of this section, parking shall be considered adequate only if one parking space is provided for each three passengers or the applicant can demonstrate, to the satisfaction of the Revenue Manager or Harbor Inspector, that fewer spaces are required because of written passenger commitments to carpool, or use different forms of transportation; 4. The proposed charter, when viewed in con- junction with other anticipated charters and marine operations, is likely to create marine traffic conges- tion or otherwise interfere with the rights of others to use the waters of Newport Bay; 5. The applicant has misrepresented material facts in the application; 1 6. The applicant has, within thekTSO�mgnin�e (90) days, failed to comply with a condition im- :jo�on a previously issued marine cli��r �permit, the applicant received notice of the violation, and 169 .5-19-040 either failed to appeal the notice of violation or the decision on the notice of violation has become final; 7. The proposed charter would not comply with applicable City, County. State or Federal require- ments of law; 8. The vessel proposed to be used by the appli- cant has not been inspected and, the sanitation sys- tem approved by the City for charter use; 9. The applicant has, "within the preceding twelve (12) months, violated this ordinance and/or provisions of Federal or State law because the appli- cant has discharged, or permitted or allowed any other person on the vessel under his or her control or command to discharge I any human or animal excreta from any head, toilet, holding tank or simi- lar facility on a vessel into the waters of Newport Bay, the applicant has received notice of the viola- tion, and a decision on the violation has become final.' B. In the event the Revenue Manager or Harbor Inspector denies the application, the applicant shall have the right to appeal the decision, to the City Manager, by filing a written appeal with the office of the City Manager within five working days from the date on which the applicant has notice of the decision, or at least two working days before the date and time of the proposed charter, whichever provides the most time for consideration of the appeal. The . City Manager shall consider the appeal and render a decision within twenty-four (24) hours (exclusive of weekends and holidays) from the date of the appeal. The decision of the City Manager shall be final. C. The term of the permit shall extend only for the duration of the charter for which the permit was issued. (Ord. 94-33 § I (part), 1994: Ord. 88-37 § I (part), 1988) 5.18.045 Conditions. A. Ile License Supervisor may impose any condition on the permit reasonably necessary to insure the proposed charter provides adequate park- ing facilities, does not create noise, does not pollute or litter the waters of Newport Bay, does not create marine traffic congestion and does not otherwise adversely affect the persons using, working in, or living around Newport Bay. Failure to comply with conditions imposed on any marine charter perrnit shall constitute a violation of this chapter. B. All permits issued pursuant to this chapter are subject to the following standard conditions: 1. Adequate off-street parking shall be provided for all passengers on the bareboat charter or certifi- cated charter, 2. No passenger loading or unloading is to occur at any gas dock or public dock; 3. Passengers transported to or from the charter shall not be picked up from, or unloaded on, City streets; 1 4. All passengers shall be loaded an I d unloaded only from docks or piers in commercially -zoned districts; 5. No amplified sound shall be allowed to ema- nate from the interior of the vessel; 6. No music or sound shall be audible at a point fifty (50) feet from the hull of the vessel;: 7. Music, live entertainment, and all forms of amplified sound are prohibited after ten p.m.; . 8. Air homs, whistles, bells, and other noisemaking equipment shall not be used; �, 9. All trash and Utter generated by the charter shall be properly disposed of in private trash recep- tacle; 10. All charters shall operate in main navigational channels, as far from shore as practical, and the route of travel must be at least one hundred (100) feet from any residence; 11. Each vessel shall be equipped with Coast Guard -approved holding tanks for raw sewage; 12. All Federal, State, County and City statutes, rules, ordinances, laws and regulations shall be obeyed. (Ord. 88-37 § I (part), 1988) 170 5.18.050 Indemnification. Perniittee shall defend, indemnify, and hold City harmless from and against any loss, liability, claim, damage or injury that is in any way related to the bareboat charter or czrtificated charter for which a permit is granted pursuant to this chapter. (Ord. 88-37 § I (part), 1988) 5.18.055 Transfer Prohibited. No permit issued pursuant to this chapter shall be transferred, sold or assigned. Any attempt to trans- fer, sell or assign the permit shall render the penrnit void and of no force and effect. (Ord. 88-37 § I (part), 1988) 5.18.060 Penalty. I Any person violating the provisions of this chap- ter shall be guilty of- a misderne-anor. (Ord. 88-37 § I (part), 1988) 5.18.0551 Chapter 5.20 PAWNBROKERS, SECONDHAND DEALERS AND JUNK DEALERS Sections: 5.20.010 Pawnbroker Defined. 5.20.020 Pawnshop Defined. 5.20.030 Secondhand Dealer Defined. 5.20.040 Junk Dealer and Junk Collector Defined. 5.20.050 Permit& -5.20.060 License Fees. 5.20.070 Reports to Police. 5.20.080 Records Required to be Kept. 5.20.090 Failure to Comply Unlawful. 5.20.100 Disposition of Articles. 5.20.110 Exempt Transactions. 5.20.120 Hours of Operation. 5.20.130 Property Received from Outside State. 5.20.140 Application of Reports and Records Provisions to Other Merchants Selling Secondhand Article& 5.20.010 Pawnbroker Defined. Ile term "pawnbrokee, shall mean a person, firm or corporation engaged in conducting, ma aging or carrying on the business of loaning money, for himself or for any otherperson, upon personal prop- erty, personal security, pawns or pledges, or the business of purchasing articles of personal property and reseffing or agreeing to resell such arficles to the vendors or their assignees, at prices agreed upon at or before the time of such purchase. (Ord. 1295 § 1 (part), 1969) 5.20.020 Pawnshop Defined. The term "pawnshop" shall mean any room, store or place in'which business or activity described in Section 5.20.010 is engaged in, carried on or con- ducted. (Ord. 1295 § I (part), 1969) TE OF CALIFORNIA - THE RESOURCES AGENCY CALIFORNIA COASTAL COMMISSION South Coast Area Office 200 Oceangate, Suite 1000 Long Beach, CA 90802-4302 (562) 590-5071 GRAY DAVIS, Governor Page 1 of 3 Date: September 27, 2000 Permit No: 5-00-308 COASTAL DEVELOPMENT PERMIT On September 13, 2000, the California Coastal Commission granted to Marvin Engineering Co., Inc. Coastal Development Permit 5-00-308, subject to the attached Standard and Special Conditions, for development consisting of: reconfiguration of existing commercial dock to accommodate a new charter vessel for Electra Cruises. More specifically described in the application file in the Commission offices. The development i s within the coastal zone in Orange County at 3400 Via Oporto, City of Newport Beach. issued on behalf of the California Coastal Commission on September 27, 2000. PETER DOUGLAS Executive Director ACKNOWLEDGMENT By: Title: , i�,(i , astal'Prograrn Analyst The undersigned permittee acknowledges receipt of this permit and agrees to abide by all terms and conditions thereof. The undersigned permittee acknowledges that Government Code Section 818.4 which states in pertinent part, that: "A public entity is not liable for injury caused by the issuance ... of any permit . . ." applies to the issuance of this permit. IMPORTANT: THIS PERMIT IS NOT VALID UNLESS AND UNTIL A COPY OF THE PERMIT WITH THE SIGNED ACKNOWLEDGMENT HAS BEEN RETURNED TO THE COMMISSION OFFICE. 14 CAL. ADMIN. CODE SECTION 13158(a). Date Signature of Permittee Please sign and return one copy of this form to the Commission office at the above address. RECEIVED BY PLANNING D['�-`PARTNIENT C ! Ty 0 N, rL"7 F, A r" -1 AM S 1" 2 PM COASTAL DEVELOPMENT PERMIT No. 5-00-308 Page 2 of 3 STANDARD CONDITIONS 1 . Notice of Receipt and Acknowledg ment. The permit is not valid and development shall not commence until a copy of the permit, signed by the permittee or. authorized agent, acknowledging receipt of the permit and acceptance of the terms and conditions, is returned to the Commission office. 2. Expiration. If development has not commenced, the permit will expire two years from the date on which the Commission voted on the application. Development shall be pursued in a diligent manner and completed in a reasonable period of time. Application for extension of the permit must be made prior to the expiration date. 3. Interpretation., Any questions of intent or interpretation of any condition will be resolved by the Executive Director or the Commission. 4. Assignment. The permit may be assigned to any qualified person, provided assignee files with the Commission an affidavit accepting all terms and conditions of the permit. 5. Terms and Conditions Run with the Land. These terms and conditions shall be perpetual, and it is the intention of the Commission and the permittee to bind all future owners and possessors of the subject property to the terms and conditions. SPECIAL CONDITIONS: CONSTRUCTION RESPONSIBILITIES The -permittee shall comply with the following construction -related requirements: (a) No construction materials, debris, or waste shall be placed or stored where it may be subject to wave erosion and dispersion; (b) Any and all debris resulting from construction activities shall be removed from the project site within 24 hours of completion of construction; (c) Disturbance of the harbor bottom and intertidal areas shall be minimized; (d) Turbidity shall be minimized through the use of best management practices including, but not limited to, the use of silt curtains; (e) No machinery shall be allowed at any time on the beach or intertidal zone; COASTAL DEVELOPMENT PERMIT No. 5-00-308 Page 3 of 3 (f) Any accidental spills of construction equipment fluids shall be immediately contained on-site and disposed of in an environmentally safe manner as soon as possible; (g) Any construction materials, oils or liquid chemicals or other waste shall not be stored where it is subject to wave erosion and dispersion into the harbor waters. 2. PARKING REQUIREMENT By acceptance of this permit, the applicant acknowledges and agrees to maintain a total of eighty-nine (89) parking spaces in the Lido Marina Village parking structure for the use approved by Coastal Development Permit 5-00-308. In addition, the applicant shall comply with the parking requirements for Marine Charter Permits set forth in Newport Beach Municipal Code Section 5.18.040 (Exhibit 4). Document2 Printed on September 27, 2000 aMm (marvin engineering co., inc. WORKSHEET FOR BUILDING PERMIT APPLICATION CITY OF NEWPORT BEACH BUILDING & PLANNING DEPARTMENTS PLEASE PRINT A, le I It- J--� '0." "/, 1.PROJECT ADDRESS (NOT MAILING ADDRESS) FLOOR SUITE NO. ZIP 6q i - L -/-I n C I TY STATE ZIP -A'6 LEGAL DESCRIPTION No. UNITS LOT BLOCK TRACT PHONE NO. 2.DESCRIPTION OF WORK /)I/- '2�"'4-24 e ",X R-7 1) X/ 101 -c I A AO� ESJTIMAT1tD'$ VAI;UATI&A�/,-,6,eyjn EXISTI I NG STRUCTURE SQ.FT. PROPOSED NEW / ADDITIONAL SQ. FT. NEW Ej ADD 0 ALTER DEMO 'F OTHER USE OF STRUCTURE No. OF STORIES 3.OWNER'S NAME LAST FIRST M.I. PHONE NO. OWNER'S ADDRESS Ae�lv�;e 40P C I TY STATE ZIP 4.APPLICANT'S NAME LAST FIRST PHONE NO. APPLICANT'S ADDRESS CITY STATE ZIP 5.ARCHITECT'S NAME LAST FIRST STATE LIC. NO. ARCHITECT'S ADDRESS CITY ZIP PHONE NO. -5��4 [��ATE 6 4-�- 7- �� 6.ENGINEER'S NAME LAST FIRST STATE LIC. NO. r .0t)(Dej 3 �ENGINEER'S,ADDRESS CIT STATE ZIP PHONE NO. 7.CONTRACTOR'S NAME LIC. CLASS STATE LIC. NO. -040"— CONTRACTOR'S ADDRESS CITY STATE ZIP PHONE NO. .-'2 na --7 COMPANY NAME (if,different) NEWPORT BUS. LIC. NO OFFICE USE ONLY CJ\X A White: BuRding Dept YeLlow: Cashier Pink: AppLicant PERMIT NO 00 '-,' I TYPE OF CONSTRUCTION PLAN CHECK NO. kf nd' LOU OCCUPANCY - GROUP ( 20�? CLASS CODE ("' PLAN CHECK FEE $ DEPARTMENT OF THE ARMY LOS ANGELES DISTRICT, CORPS OF ENGINEERS P.0 BOX 532711 LOS ANGELES, CALIFORNIA 90053-2325 August 9,02000 REPLY TO Office of the Chief Regulatory Branch Shellmaker, Inc. Attention: Lisa Miller 875b West 15th Street Newport Beach, California 92663-2701. Dear Ms. Miller: Reference is made to your request of June 30, 2000 to amend Permit No. 200000198 -SMS which authorized you to modify an existing dock just seaward of 3400 Via Oporto in Newport Bay in the City of Newport Beach, Orange County, California. Under the provisions of 33 Code of Federal Regulations 325.7(b), your permit is modified as follows: You are hereby authorized to modify the existing dock to the specifications as detailed on the attached drawings. The terms and conditions of Permit No. 200000198 -SMS, except as changed herein, remain in full force and effect. Please note that a copy of this letter is being forwarded to those agencies on the enclosed list. Sincerely, George L. Beams Chief, Construction - Operations Division Enclosure September 13, 2000 Najah Amin Regional Water Control Board Re: Sewaae at Lido Marina Village, 0 3400 Via Opporto, Newport Beach Dear Sir: 7 St On Monday, September 12 about 9:00 am, the City of Newport Beach received a call from a citizen indicating that the pump out at Lido Marina Village was broken and when used pumped sewage directly into the bay. We notified the marina manager, who posted the pump out of order and took the hose off and shut the power down. We also notified the Orange County Health Department and assisted them in posting the area closed. The property owner indicated that the pump would be repaired sometime this week. The County of Orange Health Department will test the area and indicate when the closure signs can be removed. At this time we do not how long the pump operated in the defective condition, but, we felt it was not very long because it was an obvious leek. If you need more information please contact me at 949-644-3041. Sincerely, law. Tony Mel�m', Director Division of Harbor Resources STATE;'�-F CALIFORNIA - THE RESOURCES AGENCY GRAY DAVIS, Govemor CALIFORNIA COASTAL COMMISSION South Coast Area Office 200 Oceangate, Suite 1000 Long Beach, CA 90802-4302 (562) 590-5071 Item Wed 29h STAFF REPORT: REGULAR CALENDAR APPLICATION NUMBER: 5-00-308 APPLICANT: Marvin Engineering Co., Inc. AGENT: Shellmaker, Inc., Lisa E. Miller PROJECT LOCATION: 3400 Via Oporto, Newport Beach Orange County PROJECT DESCRIPTION: Reconfiguration of existing commercial dock to accommodate a new charter vessel for Electra Cruises. LOCAL APPROVALS RECEIVED: City of Newport Beach Fire and Marine Department Approval in Concept, Harbor Permit Number 124-3400; Clearance from the Regional Water Quality Control Board, and Approval from US Army Corps of Engineers. SUBSTANTIVE FILE DOCUMENTS: City of Newport Beach Certified Land Use Plan, Newport Beach Municipal Code Chapter 5.18, City of Newport Beach Harbor Permit Policies, and Coastal Development Permit Application 5-99-397 (Marvin Engineering Co., Inc.). SUMMARY OF STAFF RECOMMENDATION: The major issues of this staff report include fill of coastal waters for boating related purposes, potential impacts upon marine resources, and public access. Staff recommends approval of the proposed development subject to two special conditions. Special Condition No. 1 require—s minimization of construction impacts on harbor bottom and interticlal areas, appropriate storage of construction materials, removal of construction debris, and use of best management practices to reduce turbidity related impacts. Special Condition No. 2 requires the applicant to maintain 89 parking spaces in the Lido Marina Village parking structure and comply with the marine charter parking requirements administered by the City of Newport Beach. 5-00-308 (Marvin Engineering Co., Inc.) Page 2 of 9 STAFF RECOMMENDATION, MOTION AND RESOLUTION OF APPROVAL: Staff recommends that the Commission make the following motion and adopt the following resolution to APPROVE the permit application with special conditions. FIT-Dyt me, I / move that the Commission approve CDP #5-00-308 pursuant to the staff recommendation. Staff recommends a YES vote. Passage of this motion will result in adoption of the following resolution and findings. The motion passes only by affirmative vote of a majority of the Commissioners present. RESOLUTION OF APPROVAL WITH CONDITIONS The Commission hereby GRANTS a permit, subject to the conditions below, for the proposed development on the grounds that the development will be in conformity with the provisions of Chapter 3 of the California Coastal Act of 1976, is located between the nearest public road and the sea and is in conformity with the public access and public recreation policies of the Coastal Act, and will not have any significant adverse effects on the environment within the meaning of the California Environmental Quality Act. [I. STANDARD CONDITIONS: Notice of Receipt and Acknowledgment The permit is not valid and development shall not commence until a copy of the permit, signed by the permittee or authorized agent, acknowledging receipt of the permit and acceptance of the terms and conditions, is returned to the Commission office. 2. Expiration. If development has not commenced, the permit will expire two years from the date this permit is reported to the Commission. Development shall be pursued in a diligent manner and completed in a reasonable period of time. Application for extension of the permit must be made prior to the expiration date, 3 a] Interpretation. Any questions of intent or interpretation of any condition will be resolved by the Executive Director or the Commission. Assignment. The permit may be assigned to any qualified person, provided assignee files with the Commission an affidavit accepting all terms and conditions of the permit. Terms and Conditions Run with the Land. These terms and conditions shall be perpetual, and it is the intention of the Commission and the permittee to bind all future owners and possessors of the subject property to the terms and conditions. 5-00-308 (Marvin Engineering Co., Inc.) Page 3 of 9 Ill. SPECIAL CONDITIONS 1. CONSTRUCTION RESPONSIBILITIES The permittee shall comply with the following construction -related requirements: (a) No construction materials, debris, or waste shall be placed or stored where it may be subject to wave erosion and dispersion; (b) Any and all debris resulting from construction activities shall be removed from the project site within 24 hours of completion of construction; (c) Disturbance of the harbor bottom and interticlal areas shall be minimized; (d) Turbidity shall be minimized through the use of best management practices including, but not limited to, the use of silt curtains; (e) No machinery shall be allowed at any time on the beach or intertidal zone; (f) Any accidental spills of construction equipment fluids shall be immediately contained on-site and disposed of in an environmentally safe manner as soon as possible; (g) Any construction materials, oils or liquid chemicals or other waste shall not be stored where it is subject to wave erosion and dispersion into the harbor waters. 2. PARKING REQUIREMENT By acceptance of this permit, the applicant acknowledges and agrees to maintain a total of eighty-nine (89) parking spaces in the Lido. Marina Village parking structure for the use approved by Coastal Development Permit 5-00-308. In addition, the applicant shall comply with the parking requirements for Marine Charter Permits set forth in Newport Beach Municipal Code Section 5.18.040 (Exhibit 4). IV. FINDINGS AND DECLARATIONS: The Commission hereby finds and declares: A. PROJECT DESCRIPTION AND LOCATION The applicant is proposing to modify an existing commercial dock to accommodate a new charter vessel in the Lido Marina Village area of Newport Harbor (Exhibits 1 and 2). Specifically, the project involves the demolition of an existing dual "U" -shaped dock with three (3) 45' long by 4' wide fingers and a 10' by 40' backwalk, and the relocation of its three (3) pilings. The project also involves the demolition and removal of a 37' long by 4'wide dock and its associated piling. The applicant proposes to replace and reconfigure the existing boat dock, as described below and shown in Exhibit 3. i 5-00-308 (Marvin Engineering Co., Inc.) Page 4 of 9 The applicant proposes to construct a new 6' wide by 90' long floating dock with.six (6) 18" prestressed concrete guide piles, two (2) relocated 12" piles and two (2) 5' by 5' knee braces. The applicant also proposes to construct a 6' wide by 45' long extension to an existing floating dock. The dock extension will be anchored by three (3) new 18" prestressed concrete guide piles. Another 5' by 5' knee brace with relocated 12" pile will be installed on a portion of the remaining dock to the west of the new docks. The new floats are being constructed to accommodate a new 61.5' long 250 -passenger yacht, known as the Newport Princess. This new vessel will replace the Galatea, a 6071 00 -passenger yacht. The Newport Princess will be an addition to Electra Cruises fleet of two yachts, the Electra (872/1 05 -passenger) and the Athena (96.9' long /149 passengers). In order to provide parking for the proposed development (i.e. additional charter boat service), the applicant intends to continue operating under the requirements of the City of Newport Beach Municipal Code Chapter 5.18. The City's Municipal Code requires charter operators to provide proof of adequate off-street parking prior to issuance of a Marine Charter Permit. Parking for each charter is provided in either the Lido Marina Village parking structure, the Newport Beach City Hall, and/or through off-site busses/shuttles. (Parking will be described further in Section C of the current report.) B. MARINE ENVIRONMENT 1. Fill of Coastal Waters The proposed project involves the placement of nine (9) new 18" diameter concrete pilings and three (3) relocated 12" diameter pilings in open coastal waters (i.e. Newport Harbor), for a total of twelve (12) pilings. These pilings constitute "fill" of open coastal waters as defined in Section 30108.2 of the Coastal Act. Under Section 30233 of the Coastal Act, fill of open coastal waters is only allowed when several criteria are met: (a) the project must fall within one of the use categories specified; (b) the proposed project must be the least environmentally damaging feasible alternative - and (c) feasible mitigation measures to minimize adverse environmental effects must be provided. Section 30233 of the Coastal Act states, in parL (a) The diking, filling, or dredging of open coastal waters, wetlands, estuaries, and lakes shall be permitted in accordance with other applicable provisions of this division, where there is no feasible less environmentally damaging alternative, and where feasible mitigation measures have been provided to minimize adverse environmental effects, and shall be limited to the following: (4) In open coastal waters, other than wetlands, including streams, estuaries, and lakes, new or expanded boating facilities and the placement of structural pilings for public recreational piers that provide public access and recreational opportunities. The proposed project meets the first criteria because the proposed development is for a boating facility. Fill of open coastal waters, such as Newport Harbor, for the construction of a boating facility is an allowable use under Section 30233(a)(4) of the Coastal Act. The proposed project requires twelve (12) pilings. The pilings are necessary to secure the proposed dock floats which are necessary to support a boating facility. 5-00-308 (Marvin -Engineering Co., Inc.) Page 5 of 9 The applicant has indicated that the floats will be used solely for boating purposes. Specifically, the applicant proposes to use the floats as a staging area and to facilitate the loading and unloading of passengers and supplies to the boat. The boat will provide charter boat service. This charter service is for use by the general public. Based on the uses proposed by the applicant, the Commission finds that the proposed dock floats constitute a boating facility. As a boating facility, the proposed dock reconfiguration is a use specifically allowed under Section 30233(a)(4) of the Coastal Act. In addition to the use -related issue, Section 30233 of the Coastal Act also requires that any project involving fill of open coastal waters be the least environmentally damaging feasible alternative. One way to reduce environmental damage to open coastal waters is to minimize the quantity of fill. In this case, the applicant is proposing to remove one (1) existing pile, reuse three (3) 12" diameter piles and place nine (9) new 18" diameter piles. The applicant has indicated that the proposed pilings are the smallest diameter and the minimum quantity necessary to meet current engineering standards for loads needed to serve the new and existing vessels, Therefore, since the proposed project minimizes the quantity of fill of coastal waters, the Commission finds that the proposed project is the least environmentally damaging feasible alternative. Finally, Section 30233 of the Coastal Act also requires that feasible mitigation measures to minimize adverse environmental effects must be provided. The proposed project meets this requirement because the proposed pilings will provide habitat for marine organisms such as mollusks. This replacement hardscape habitat will mitigate for the loss of hard bottom habitat resulting from the placement of the pilings. The proposed project will result in the fill of open coastal waters for a boating facility, which is an allowable use under Section 30233 of the Coastal Act. In addition, the proposed project is the least environmentally damaging alternative, and does provide feasible mitigation measures. Therefore, the Commission finds the proposed project is consistent with Section 30233 of the Coastal Act. 2. Marine Organisms and Water Quality Section 30230 of the Coastal Act states: Marine resources shall be maintained, enhanced, and where feasible, restored. Special protection shall be given to areas and species of special biological or economic significance. Uses of the marine environment shall be carried out in a manner that will sustain the biological productivity of coastal waters and that will maintain healthy populations of all species of marine organisms adequate for long-term commercial, recreational, scientific, and educational purposes. Section 30231 of the Coastal Act states: The biological productivity and the quality of coastal waters, streams, wetlands, estuaries, and lakes appropriate to maintain optimum populations of marine organisms and for the protection of human health shall be maintained and, where feasible, restored through, among other means, minimizing adverse effects of waste water discharges and entrainment, controlling runoff, preventing depletion of ground water supplies and substantial interference with surface water flow, encouraging waste water reclamation, 5-00-308 (Marvin Engineering Co., Inc.) Page 6 of 9 maintaining natural vegetation buffer areas that protect riparian habitats, and minimizing alteration of natural streams. The placement of pilings has the potential to impact marine organisms and water quality in the project area. Driving pilings can result in direct impacts upon marine organisms inhabiting the location where the piles are being placed. In addition, driving piles can result in the suspension of sediment in the water column resulting in shading and sedimentation impacts upon organisms. Finally, the placement of dock floats can result in shading impacts upon sensitive light -dependent aquatic vegetation (i.e. eelgrass). The proposed development involves construction within coastal waters. An inspection performed by the City determined that no eelgrass exists in the vicinity of proposed project. Therefore, no eelgrass will be affected by the proposed project. The proposed pilings will be placed in a hardbottom area beyond the existing bulkhead. While the proposed pilings will result in impacts upon the hardbottorn habitat, the pilings themselves will provide replacement hard-substr2te habitat. Since the surface area of the pilings is greater than the area of impact the proposed project will increase the quantity of hard -substrate habitat. In addition, since there is no eelgrass in the project area, shading impacts from the placement of the dock floats is not anticipated to have any adverse impact upon any sensitive aquatic vegetation. Due to the proposed project's location on the water, the proposed work may have adverse impacts upon water quality and attendant adverse impacts upon biological resources. Storage or placement of construction materials, debris, or waste in a location subject to wave erosion and dispersion would result in adverse impacts upon the marine environment that would reduce the biological productivity of coastal waters. For instance, construction debris entering coastal waters may cover and displace soft bottom habitat. In addition, the use of machinery in coastal waters not designed for such use may result in the release of lubricants or oils that are toxic to marine life. Also, the proposed pile driving activities may also result in the temporary suspension of sediment in the water column. The Regional Water Quality Control Board has determined that the proposed project will not adversely impact water quality if standard construction methods and materials are used. Nonetheless, in order to avoid adverse construction -related impacts upon marine resources, Special Condition 1 outlines construction related requirements to provide for the safe storage of construction materials and the safe disposal of construction debris. In addition, Special Condition I requires the applicant to utilize best management practices, such as a silt curtain, during installation of the pilings to avoid any turbidity related impacts upon water quality and marine organisms. Finally, Special Condition I prohibits placement of machinery on the beach or intertical zone and requires that any accidental sp�!lis of construction equipment fluids shall be immediately contained on-site and disposed. of in an environmentally safe manner as soon as possible and any construction materials, oils or liquid chemicals or other waste shall not be stored where it is subject to wave erosion and dispersion into the harbor waters. As conditioned, the Commission finds the proposed development is consistent with Section 30230 and 30231 of the Coastal Act. 5-00-308 (Marvin Engineering Co., Inc.) Page 7 of 9 C. PUBLIC ACCESS Section 30604(c) of the Coastal Act requires that every coastal development permit issued for any development between the first public road and the sea include a specific finding regarding the conformity of the proposed development with the public access and recreation policies of Chapter 3 of the Coastal Act. The proposed development is located seaward of the first public road. Section 30212 of the Coastal Act states, in relevant part: (a) Public access from the nearest public roadway to the shoreline and along the coast shall be provided in new development projects except where: (2) adequate access exists nearby. Section 30224 of the Coastal Act St2teS� Increased recreational boating use of coastal waters shall be encouraged, in accordance with this division, by developing dry storage areas, increasing public launching facilities, providing additional berthing space in exisbng ,,,arbors, limiting non -water -dependent land uses that congest access corridors and preclude boating support facilities, providing harbors of refuge, and by providing for new boatin J "aciiiLlies in natural harbors, new protected water areas, and in areas dredged from dry land. Section 30252 of the Coastal Act sta,,,C�s, - relevant part: The location and amount of ne�v (J�Welopment should maintain and enhance public access to the coast by ... (4) providing adecuate parking facilities orproviding substitute means of serving the development m1h poLl�lc transportation... Sections 30210, 30211 and 30212 of r,,',_�e Coastal Act require that new development provide maximum public access and recre2tiC�',, .-",,oid interference with the public's right of acquired access, and provide public access fro!r� tl'�,3 nearest public roadway to the shoreline and along the coast except under certain cjrcumstan-le�-_ The Lido Marina Village area of New,,., -)q Ciiarbor is designated for Recreation and Marine Commercial and/or Retail and Serv�ce Ccl�-nmercial uses. The surrounding area is currently developed with similar private comn�,�.,J�.�; '.Doat docks, retail establishments, restaurants and a waterfront walkway. These existing provide public access. Section 30252 of the Coastal Act reqt..'�rels, the protection of public access to the beach. An adequate quantity of public parking s,p.icl- maintains this access. However, public access can be adversely affected if corni-Tiercial us,-:-, s�� ��i as the proposed charter service, in the coastal zone do not provide adequate on-site or dedlc�: �-e,�, Darking to serve the proposed development. In cases of inadequate parking, charter passe ncj,,, 's ..�'julcl displace other public users from public parking spaces. The applicant is subject to City of Ne Beach Municipal Code Chapter 5.18 for operation of marine charters (Exhibit 4). Accordi; le City Code, each charter must apply for a Marine Charter Permit from the Revenue Div )f the City. Section 5.18.040 specifies that 5-00-308 (Marvin Engineering Co., Inc.) Page 8 of 9 11 an application shall be denied if there is substantial evidence that:... 3. The proposed charter does not provide facilities to ensure adequate off-street parking, or the safe loading and unloading or passengers and supplies. For the purpose of this section, parking shall be considered adequate only if one parking space is provided for each three passengers or the applicant can demonstrate, to the satisfaction of the Revenue Manager or Harbor Inspector, that fewer spaces are required because of written passenger commitments to carpool or use different forms of transportation, " The applicant has obtained authorization to use 89 of the 383 (plus 154 valet spots) at the Lido Marina Village parking structure. They have also been granted approval to use all 83 spaces within the City of Newport Beach City Hall to meet their parking needs after 5:30 p.m. Monday—Friday, Saturday all day and Sunday after 1:00 p.m. The applicant states that in the past seven years they have utilized the City parking lot only three times. When parking needs cannot be met at the Lido Marina Village parking structure or City Hall, passengers are bussed/shuttled to the charter yachts, The applicant has also provided a parking study based upon last year's operation of the Electra, Athena, and Galatea (no longer in use) vessels during peak use season. The Newport Princess will replace the Galatea, which was a 100 -passenger vessel. As such, the applicant will have the capacity to charter 150 more passengers than before. The parking study indicates that the existing parking arrangement is adequate to support the additional charter use. No public parking spaces will be required to support the charter service. To ensure that the applicant continues to provide the necessary parking for each charter, the Commission imposes Special Condition 2. Special Condition 2 requires the applicant to comply with the parking requirements for Marine Charter Permits set forth in Newport Beach Municipal Code Chapter 5.18. With this condition, the applicant must demonstrate to satisfaction of the City's Revenue Division that they will provide adequate off-street parking for each charter. Consequently, the proposed dock reconfiguration and additional charter service will not adversely effect public parking in the subject area. As conditioned, the Commission finds the proposed development is consistent with the public access policies of the Coastal Act. D. LOCAL COASTAL PROGRAM Section 30604(a) of the Coastal Act provides that the Commission shall issue a coastal permit only if the project will not prejudice the ability of the local government having jurisdiction to prepare a Local Coastal Program which conforms with Chapter 3 policies of the Coastal Act. The Commission certified the Land Use Plan for the City of Newport Beach on May 19, 1982. As conditioned, the proposed development is consistent with the policies contained in the certified Land Use Plan and with the Chapter 3 policies of the Coastal Act. Therefore, approval*of the proposed development will not prejudice the City's ability to prepare a Local Coastal Program for Newport Beach that is consistent with the Chapter 3 policies of the Coastal Act as required by Section 30604(a). 5-00-308 (Marvin Engineering Co., Inc.) Page 9 of 9 E. CALIFORNIA ENVIRONMENTAL QUALITY ACT Section 13096 of the, Commission's regulations requires Commission approval of Coastal Development Permit applications to be supported by a finding showing the application, as conditioned by any conditions of approval, to be consistent with any applicable requirements of the California Environmental Quality Act (CEQA). Section 21080.5(d)(2)(A) of CEQA prohibits a proposed development from being approved if there are feasible alternatives or feasible mitigation measures available which would substantially lessen any significant adverse effect which the activity may have on the environment. The proposed project has been conditioned for consistency with the marine resource protection policies of Sections 30230 and 30233 of the Coastal Act. Mitigation measures, in the form of special conditions require 1) removal of construction debris and minimization of construction impacts, and 2) conformance with the City of Newport Beach Marine Charter Permit requirements, will minimize all adverse effects. The proposed development, as conditioned, is consistent with the Chapter 3 policies of the Coastal Act. There are no feasible alternatives or mitigation measuFes available which will lessen any significant adverse impact the activity would have on the environment. Therefore, the Commission finds that the proposed project is consistent with CEQA and the policies of the Coastal Act. H:�Staff Reports �Sept=5-00-308 (Electra Cruises).doc t S, 887 'p COPYRICWT 1997 7hewa.,?w. ..... ..... A > WBEACH >,BLVD B _,CAT ST 'b iEWLAND 00 z 4 u 2 �Il OR .11 17 U�j I Z� r- PoSTON X 3, MAGNOL om ST KI x OCT 21 1999 MARINO LN .— --rRkwm im x FL LN HIt ONRFIRE LN2 L A� um ul a s No GLE I —TU I wr PIATl0KkL LX _rTr__ cIR j> nXT,, I' - 54R L "R L, > 2-1-5—oo ST Q;c ss s __cs X 0 STATE AV kv V > UALAU— 'AV=[ 1 _a_ MDNROVIA�XM A I- F. 0. r_ i FLYT--d.. i �11 4? IDEL.L TU� ta AV A z, 1600 1700 1900 P"E 1p? p LLACE E3 AV -tie AV POMOM AV E 17oo 1 1900 NNOLD AV Wirt. _,� 1. r TEE OL" Pl. .1 - �% !1 2 > A_XMElM wpu VD T 4 -,v D"LE ST HARBOR BLVD 4c..'v dIZ ry lab Nq 14 34 L9 pq \\.� p .>Alp Is /'Sod Wd�S: /-6, e2 OF NEWPORT BERCH CITY OF NEWPORT LFFU p D4:lw w9T —,/CR I "Y wy PRCIpIC OCERN PIER WEST YICINITY MRP EFIST 93FKRT N;rr, DL70*U JUL 0 5 2000 A00 Qj CALIFORNIA COASTAL COMMISSION Milo r\-4 , 4*7 IT -5 -NF�J li PROF I LE V 50 pal i - 11 is I "A, XlMejfff� :70MMIAMM 3* golft".301K.E. 0112 S,5"!F le a J- 4�, 0,7:ff 7- 41-11-1-- rT 17 7, 17 1 1�1-11 JL—J I- J �j L 7 7 z 0 Z� RA111P L L=J Q=:7 ARKE DE S-1. 1;'A Mc FIRE PT. CITY V��EPORTV�ACH EEL GRASS I NSPECTION 1,00,4> T 5,4 y NO FEL GRASS U-.5. . �T Ir IF IT Cl,! EE� GR�S� jN TkE 0,, PR�OEC�T 0EA�,' I I I I- jL jbi N z-/. coc K Ilya VnIVNOIS SAM F. KNIS--- CONSULTING CIVIL ENGR-. 0. V3�V 103rOW 0 C-17377 Exp, 3Hl NI SSV�9 133 D 19 AGATE SS"O 133 ON 0 IRVINE,CA. 92614 Nol#Eo! ljqN 131 F (949) 733-8430 Ff'R-10:N7'S N9wE JOB RDDRESS Ya 257 9/ , N-2 ZZ4 v!. v cl 20&, S. ,ORo J-Ec 7' HFORNIA I* COMMjs�IONF (3) Ax�lv 1,:5, 0 vz- 97 No. 17377 rn Exp. Lp IVA OF A7 I lu 114CW I rl lk) EK GR�SS INSPECTION 40 EEL GRASS &EL GRASS �N THE; C� PRO 4�A C-17777 9 AC -4 7-E- v- $fGNATURE i 0 AMITV DATE T.M CTM ARINE DEPT. CITY OF NEWPORT BEACH Chapter 5.18 MARINE CHARTER PERAUT Sections: 5.18.005 Purpose and Findings. 5,18.010 Definitions. 5.18-020 Permit Required—V'clations. 5.18.025 Exceptions. 5.18.030 Application for Permit. 5.18.035 Marine Charter PfUzng Fee. 5.18.040 Issuance of Permit. 5.18.045 Conditions. 5.18.050 Indemnification. 5.18.055 Transfer Prohib?--d. 5.18.060 Penalty. 5.18.005 Purpose and Findhags_ The City Council of the City of Newport Beach, in adopting the ordinance codified ,n this chapter, finds and declares as follows: A- Newport Bay is a Urnited resource with a large marine and recreational use. B. In the past few years, there- has been a dra- matic increase in the number of char�tr vessels operating in Newport Bay; 1. Many of these vessels are ownt�l r�r operated by persons who do not have a fixed base of opera- tion on or near the bay that can providc ulie parking or sanitation facilities necessary to -,-- r�c ,heir clients and customers. C. Charter activities will, if unre-,j!.�� contin- ue to increase the demand for availabit waterfront parking that is already in short supq 1,, which will increase traffic congestion in the wate-Front areas, continue to generate levels of noise whLid-i., on occa- sion, have interfered with the man,' , s' ' lents who live on the bay, and continue to prts,�it a risk of direct discharge of waste into the D. The requirements of the chart�t- ?,:--,-.-,"ntcessary to minimize the trff-ic congestion, p�ai-!__;,,.�,g shortag- es, excessive noise, and the dischar,-c .-�`waste that could result from unregulate�d chai4t.- ��::Uvlty_ E. Ile charter activities not rei.',� 17�.�. by Cbap- ter 17.41 and this chapter are t-hosf- ,v� ',-h involve 167 5.18-005 so few people as to have only a minimal impact on the traffic, parking and noise problems associated with other charter activities. F. Charter activities on Newport Harbor demand additional City services which are not paid by the patrons or passengers of charter vessels operating in a commercial capacity of the harbor. (Ord. 94-33 I (part), 1994: Ord. 88-37 § I (part), 1988) 5.18.010 Definitions. For the purpose of this chapter, the following &finitions shall apply: A. "Bamboat charter shall mean any vessel not inspected by the United States Coast Guard under title 46 of the Code of Federal Regulations and which has been chartered for consideration. B. "Charter" shall mean any vessel inspected by the United States Coast Guard under title 46 of the Code of Federal Regulations and which has been chartered for consideration. C. "Chartered for consideration" shall mean a vessel which has been hired or leased by the owner, directly or through a representative, to any person for a voyage in exchange for the payment of money, the receipt of something of value, or the forgiveness of a debt. D. "Commercial fishing vessel" shall mean a vessel registered by the Department of Fish and Game pursuant to Section 7880 of the Fish and Game Code of the State of California, when operat- ing under the authority of the fish and game permit outside Newport Harbor. E. "Sailing club" shall mean an organization operating from a fixed location and principally engaged in the coordination or facilitation of the use of pleasure boats by its membership. F. "Applicant" shall mean the owner of the vessel or authorized representative of the owner. G. "Sportfishing charter" shall mean a vessel chartered solely for sportfishing outside of Newport Harbor. H. "City Manager shall mean -the City Manager of the City of Newport Beach, or his or her respec- tive assipees. 5.196.010 1. "Revenue Manager" shall mean t -l. -,c /enue Manager of the City of Newport Beach or S D., her designee. or certificated charter on the waters of N, %v J. "Newport Bay" shall mean all V1 thin the corporate limits of the City of Newpc; L 3--ach and within which the tide ebbs and flo,�vs, itther or not the ordinary or mean high tide of tl a�--ific Ocean has been fixed by ordinance, c-ourt action or otherwise, and whether or no, 12nds lying under the tidal water are privately o- :�t )!,;cly owned. C. No person who owns a certiflaat, YL "Person" shall men an individuall, 7�'. vessel inspected by the United St2tts C,-�� ship, firrn, partnership, joint venture, pursuant to Title 46 of the Code of Fcd business trust, company, corporati-on, tions) shall permit or allow the usc of t' committee or any other organizaE-Dn or -,--p of persons acting in concerL without first obtaining a marine chl-lfler L. "Harbor Inspector" shall mcan -bor Inspector of the City of Newport Btac'E, i, � is or her designee. M. "Operator shall mean the p,-rssor, -,xr- ales or who has charge of the navigatio.'l C:.- iSc_- of a vessel. N. "Passenger" shail mean every pL,,m, -�+hi��r than the master and a member of the --h cr persons employed or engaged in �y -a-- c n board a vessel in the business of that v s-� "",Ird. � -� I 94-33 § I (part), 1994: Ord. 88-37 § I t"'; ��' 8 8) 5.18.020 Permit Required—Viol A- No person shall operate any bart� rttr or certificated charter on the waters of N, %v without first obtaining a marine chart --r >,u suant to this chapter. B. No person shall schedule, arran-�., -di nate the operation of a bareboat char,er ed charter on the waters of Newport 0�1 first obtaining a marine charter pc --=jt �t �3 this chapter. C. No person who owns a certiflaat, (a vessel inspected by the United St2tts C,-�� d pursuant to Title 46 of the Code of Fcd I tions) shall permit or allow the usc of t' a certificated charter on the waters of N�--,:,� 3ay without first obtaining a marine chl-lfler �U�.- suant to this chapter. 168 D. No person shall operate a bareboat charter or certificated charter on the waters on Newport Bay without having a valid marine charter permit on board the vessel at all times during the charter. E. No owner of a vessel shall permit that vessel to be used as a bareboat charter on the waters of Newport Bay unless a marine charter permit has been issued for the bareboat charter. (Ord. 94-33 1 (part), 1994: Ord. 88-37 § I (part), 1988) -5.18.025 Exceptions. The provisions of this chapter shall not apply to the following: A. Any vessel operating pursuant to, and in compliance with conditions of, a valid permit issued pursuant to Chapter 17.41 of the Newport Beach Municipal Code; B. Any commercial fishing vessel traversing the waters of Newport Bay to engage in commercial fishing or other operations outside of Newport Bay; C. Vessels operated by a sailing club while canrying six or fewer passengers, provided at least one of the passengers is a member of the sailing club; D. Sportfishing charters; E. Any charter carrying six or fewer passengers; F. Vessels used solely for the purpose of boat repair, maintenance or marine construction. (Ord. 94-33 § I (part), 1994: Ord. 89-37 § I (part), 1988) 5.18.030 Application for Perrnk Application for permit pursuant to this chapter shall be filed with the Revenue Manager upon forms provided by the City and shall contain the following information: A. Ile name, business address, and business telephone number of the applicant; B. The name, address and telephone number of the vessel owner, C. All pertinent information relative to the vessel including, but not necessarily limited to, the name of the vessel, the registration number of the vessel assigned by the Department of Motor Vehicles or the United States Coast Guard, the make and model of the vessel, the length of the vessel, and any unique or special features of the vessel; D. A full description of the proposed charter including: 1. T'he hours of operation, 2. Tle route or routes of travel, 3. Maximum number of patrons or passengers, 4. Embarkation and debarkation points, 5. Activities to be conducted on board the char- ter, including any entertainment, 6. Description of any sound amplification pro- posed to be use:4 7. Description and location of the parking facili- ties available for the charter, including any written agreement pursuant to which the applicant has ob- tained the right to the parking facilities, and the method by which the applicant proposes to notify all passengers or patrons of the requirement that they park in the designated area, 1 8. A dmription of the mariner in which the ap- plicant intends to dispose of all sewage, a -ash and litter resulting from the charter, and 1 9. Other information which may be pertinent to vehicular or marine traffic, parking, noise, pollution, litter or any other matter which could adversely affect the health, safety or welfare of those who use, enjoy, or own property near the waters of the New- port Bay; E. Such other infon-nation as the Revenue Man- ager deems reasonably necessary to determine whether to issue a permit; F. The application shall be filed no later than five working days before the date the charter is to occur. Applications may be considered if: (1) filed no later than two full working days before the char- ter is to occur; (2) the applicant demonstrates good cause for the delay in filing; and (3) the proposed charter does not rNuire speciai investigation or the imposition of special conditions. (Ord. 94-33 § I (part), 1994: Ord. 88-37 § I (part), 1988) 5.18.035 Marine Charter Filing Fee. An application for a marine charter permit shall be accompanied by a n of the City Council; provided, however, the fee shall 5.18.030 be no greater than necessary to defer the costs in- cun-ed by the City in administering the provisions of this chapter. (Ord. 94-33 § I (part), 1994: Ord. 88-37 § I (part), 1988) 5.18.040 Issuance of Permit. A. Upon receipt of an application for a marine charter permit, the Revenue Manager or Harbor Inspe,ctor shall investigate the infon-nation contained in the application issue the permit upon a deter- _'�a�mation�at a�pproval will not adversely t health, safety or welfare of those who use,=Ioy, o, 'i own, property near the waters of Newport Bat:yl Oe application shall be denied if there is silbstantW evidence that: 1. The proposed charter is likely to create noise which would adversely affect the use or enjoyment of the waters of Newport Bay by members of the public, or interfere with the rights of those who own property on or near the waters of Newport Bay; 2. The proposed charter is likely to contribute to the problem of pollution or litter on and in the waters of Newport Bay; 3. The proposed charter does riot provide facili- ties to ensw-e adequate off-stroet parking, or the safe loading and unloading of passengers and supplies. For the purpose of this wxtion, parking shall be considered adequate only if one parking space is provided for each three passengers or the applicant can demonstrate, to the satisfaction of the Revenue Manager or Harbor Inspector, that fewer spaces are required because of written passenger commitments to carpool or use different forms of transportation, 4. The proposed charter, when viewed in con- junction with other anticipated charters and marine operations, is likely to create marine traffic conges- tion or otherwise interfere with the rights of others to use the waters of Newport Bay; 5. Ile applicant has misrepresented material facts in the application; 6. The applicant has, within theRTS�&n�gnine� (90) days, failed to comply with a condition im- _k�� on a previously issued marine cii��r �Permit' the applicant received notice of the violation, and 169 19.040 either failed to appeal the notice of violation or the decision on the notice of violation has become final; 7. The proposed charter would not comply with applicable City, County, State or Federal require- ments of law; 8. The vessel proposed to be used by the appli- cant has not been inspected and the sanitation sys- tem approved by the City for charter use; 9. The applicant has, within the preceding twelve (12) nonths, violated this ordinance and/or provisions ­ofFedieral or State law because the appli- cant has discharged, or permitted or allowed any other person on the vessel under his or her control or command to discharge any human or animal excreta from any head, toilet, holding tank or simi- lar facility on a vessel into the waters of Newport Bay, the applicant has received notice of the viola- tion, and a decision on the violation has become final. B. In the event the Revenue Manager or Harbor Inspector denies the application, the. applicant shall have the right to appeal the decision, to the City Manager, by filing a written appeal with the office of the City Manager within five working days from the date on which the applicant has notice of the decision, or at least two working days before the date and time of the proposed charter, whichever provides the most time for consideration of the appeaL The City Manager shall consider the appeal and render a decision within twenty-four (24) hours (exclusive of weekends and holidays) from the date of the appeal. The decision of the City Manager shall be final. C. Ile term of the permit shall extend only for the duration of the charter for which the permit was issued. (Ord. 94-33 § I (part), 1994: Ord. 88-37 § I (part), 1988) 5.18.0-45 Conditions. A. The License Supervisor may impose any condition on the permit reasonably ncctssary to insure the proposed charter provides adequate park- ing facilities, does not create noise, does not pollute or litter the waters of Newport Bay, does not create marine traffic congestion and does not otherwise 170 adversely affect the persons using, working in, or living around Newport Bay. Failure -to comply with conditions imposed on any marine charter permit shall constitute a violation of this chapter. B. All permits issued pursuant to this chapter are subject to the following standard conditions: 1. Adequate off-street parking shall be provided for all passengers on the bareboat charter or certifi- cated charter, 2. No passenger loading or unloading is to occur at any gas -dock or public dock; 3. Passengers transported to or from the charter shall not be picked up from, or unloaded on, City streets; 4. All passengers shall be loaded and unloaded only from docks or piers in commercially -zoned districts; 5. No amplified sound shall be allowed to ema- nate from the interior of the vessel; 6. No music or sound shall be audible at a point fifty (50) feet from the bull of the vessel; 7. Music, live entertainment� and all forms of amplified sound are prohibited after ten p.rrL; 8. Air horns, whistles, bells, and other noisemaking equipment shall not be used; 9. All trash and litter generated by the charter shall be properly disposed of in private trash recep- tacle; � 10. All charters shall operate in main navigational channels, as far from shore as practicaL and the route of travel must be at least one hundred (100) feet from any residence; 11. Each vessel shall be equipped with Coast Guard -approved holding tanks for raw sewage; 12. All Federal, State, County and City statutes, rules, ordinances, laws and regulations shall be obeyed. (Ord. 88-37 § I (part), 1988) 5.18.050 Indemnification. Permittee shall defend, indemnify, and hold City harmless from and against any loss, liability, claim, damage or injury that is in any way related to the bareboat charter or certificated charter for which a pen -nit is granted pursuam to this chapter. (Ord. 88-37 § I (part), 1988) 5.18.055 Transfer Prohibited. No permit issued pursuant to this chapter shall be transferred, sold or assigned. Any attempt to U=s- fer, sell or assign the permit shall render the permit void and of no force and effect. (Ord. 88-37 § I (part), 1988) 5.18.060 Penalty. Any person violating the provisions of this cbap- ter shall be guilty of a misderneanor. (Ord. 88-37 § 1 (part), 1988) 171 5.1-8.055 Chapter 5.20 PAWNBROKERS, SECONDHAND DEALERS AND JUNK DEALERS Sections: 5.20.010 Pawnbroker Defined. 5.20.020 Pawnshop Defined. 5.20.030 Secondhand Dealer Defined. 5.20.040 Junk Dealer and Junk CoBector Defined. 5.20.050 Permits. 5.20.060 License Fees. 5.20.070 Reports to Police. 5.20.080 Records Required to be Kept. 5.20.090 Failure to Comply Unlawful. 5.20.100 Disposition of Articles. 5.20.110 Exempt Transactions. 5.20.120 Hours of Operation. 5.20.130 Property Received from Outside State. 5.20.140 Application of Reports and Records Provisions to Other Merchants Selling Secondhand Artidles. 5.20.010 Pawnbroker Defined. The term "Pawnbroker" shall mean a person, firm or corporation engaged in conducting, ma aging or carrying on the business of loaning money, for himself or for any other person, upon personal prop- erty, personal security, pawns or pledges, or the business of purchasing articles of personal property and reseUing or agreeing to resell such articles to the vendors or their assignees, at prices agreed upon at or before the time of such purchase. (Ord. 1295 § I (part), 1969) 5.20.020 Pawnshop Defined. The term "pawnshop" shall mean any room store or place in which business or activity described in Section 5.20.010 is engaged in, carried on or con- ducted. (Ord. 1295 § I (part), 1969) h. Application No. 5-00-308 (Marvin Engineering, Newport Beach) Application of Marvin Engineering Co. Inc. Dba Lido Marina Village to modify commercial dock to accommodate new charter vessel for Electra Cruises, at 3400 Via Oporto, #104, I I 4�,wport Beach, Orange County. (ALK -LB) [APPROVED WITH CONDITIONS] PO. BOX 1768, NEWTIPORT BEACH, CA 92658-8915 /Qpo�z July 20, 2000 Ian Bruce, President Newport Sailing Club 3424 Via Oporto, Suite 204 Newport Beach, Ca 92663 Dear Mr. Bruce: Your recent letter requested a response to the question is the City being selective in enforcement of berthing regulations for commercial marinas. No, the enforcement will be unifonn throughout the harbor. In the past, inspection of commercial marinas was complaint driven. Our newly formed Harbor Resources Division has the mission to inspect all marinas relative to the City Council Harbor Permit Policies and Municipal Code regulations. It just so happens that Lido Village Marina was one of the first to be inspected and therefore, your club and Windward Sailinar Club the first sailing clubs on ZD notice to comply with the berthing regulations. The Harbor Resources Division wants to thank you for your cooperation in this matter and please feel free to call us at 644-3043 if you require additional information. Sincerely, Wes Armand Harbor Inspector Cc: Dave Kiff Tony Melum 3300 Newport Boulevard, Newport Beach NEWPORT SAILING CLUB ACADEMY OF SAIL Wednesday, July 12, 2000 Mr. Tony Mellum Dept. of Harbor Resources City of Newport Beach 3300 Newport Blvd, Newport Beach, Ca. 92663 Dear Mr. Mellum, I The Newport Sailing Club has made every attempt to comply with the various edicts and regulations regarding the disbursement of their charter fleet as per the instructions from the City of Newport Beach. It has meant a substantial financial loss to the NSC. It seem's that these requirements are indeed selective. I made a cruise by launch and by foot of our competition, namely Windward Sailing Club and specifically the Lido Sailing Club. I would like to'lodge a complaint against the docking procedures of the Lido Sailing Club. They are in total disregard of the very laws to which we have complied. There were in excess of seven violations visible on Sunday, July tenth. One instance showed it required removal of a minimum of two vessels to access the fairway. Thank you for correcting this matter. Sincerely, lan'Bruce President Newport Sailing Club Cc David Kiff TEL (949) 675-7100 IN LIDO MARINA VILLAGE FAX : (949) 675- 2417 3424 VIA OPORTO, SUITE 204, NEWPORT BEACH, CALIF. 92663 CITY OF NEWPORT BEACH FIRE MARINE DEPARTMENT HARBOR PERMIT APPLICATION (Please print all information) Z 1. Apolicant (Property Owner) Address; Telephone 3-Llee V/�I- 4ek5�,04- 2. Project Address (Street Address) Harbor Permit Number 3. New Construction Revision. Maintenance , Dredging 4. Fee ;2-2 Check No. -7 Date 5. Brief Description of Proposed Work: sv foegAw---� S:�� J- 6. Submit 8 1/2" x 11 " Drawings (3), Include: 1). Location and dimension of proposed structure including piles and location of existing structures. on adjacent properties. 2). Location of bulkhead, pierhead and project lines. 3). Location of property lines. 4). Location of channel markers within 200 feet. 5). Lot sizes and lot numbers, if available. 6). Existing ground profile beneath proposed structure. 7). Elevation of top and bottom of bulkheads and piles with respect to M.L.L.W. 8). Area and profile of any proposed dredging with elevations showing depths with respect of M. L. L.W. 9). Any special conditions affecting the construction or affecting boating operations, 1 0).Complete all information required in information block, bottom of sheet. Note that the OWNER. of the property is the applicant. 11). Drawing size shall be 8 - 1/2" x 11 12).Scale shall be adequate to clearly show the above information. 13).Existing structures shall be shown in lighWs_h'�s. New work shall be shown in heavy solid lines. 7. Owner -Builder Declaration must be mple d (on rev side of this sheet) 8. Applicant's/Agent's Signature: 2i ldf-- Date: _&/C� C7 - Joint Permittee Signature (if applicable':' ) Date: 9. Work can begin once the City has received evidence of the following additional approvals and you have been notified to proceed. If you begin prior to the notice you will be in violation of the Newport Beach Municipal Code and subject to penalties. 10. Your permit will not be final until we have conducted an on site inspection once construction is completed as per Municipal Code, Section 17.24, if we have not been contacted for a final inspection. OFFICE E ONLY V Approval in Concept. Approval of the City of Newport Beach Council. v'."Approval of the Army Corps of Engineers V- Approval of the California Coastal Commission. �Approval of the City's Public Works Department. __J��`Approval of the City's Building Department Approval of County of Orange. Electrical and/or plumbing permit (Building Department) Issued. (Permit is stamped drawing) Site Inspection. (call 644-3043 for appointment) Site Re -inspection Conditions: Date Date Date Date Date Date Date Date Date Date Date HARBOR PERMIT APPLICATION (Please print all information) Elecbra Cruises 3405 Via Oporto, Newporb Beach (949) 723-1069 1. Applicant (Property Owner) Address Telephone 3400 Via Oporto, Newport; Beach 7,�4 - I q- 0 6) 2. Project Address (Street Address) Harbor Permit Number 3. New Construction Revision X Maintenance - Dredging 4. Fee $351.00 71�clheck No. 2741 — Date -8/24/99 Brief Description of Proposed Work: modify dock 6. Submit 8 1/2" x 11" Drawings (3), Include: 1. Location and dimension of proposed structure. 2. Location of bulkhead. 3. Location of property lines and lot size. 4. Location of channel markers within 200 feet of proposed project. 5. Existing ground profile, and area and profile of any dredging with elevations showing depth relative to MLLW. 6. Elevations of top and bottom of piles and bulkheads with respect to MLLW. 7. Any special conditions affecting the construction or affecting boating operations, 8. Owner Builder/Contractor Declaration/Insurance Information. 7. Owner -Builder Declaration must be completed (on reverse side of this sheet) X 8. Applicant's/Agent's Signature: Date: August; 25, 1999 9. Work can begin once the City has received evidence of the following additional approvals and you have been notified to proceed. If you begin prior to the notice you will be in violation of the Newport Beach Municipal Code and subject to penalties. 10. Your permit will not be final until we have conducted an on site inspection once construction is completed as per Municipal Code, Section 17.24, if we have not been contacted for a final inspection. OFFICE USE ONLY Approval in Concept. Date Approval of the City of Newport Beach Council. Date pproval of the Army Corps of Engineers Date ���Approval of the California Coastal Commission. Date v"' Approval of the City's Public Works Department. Date Approval of the City's Building Department. Date Approval of County of Orange. Date ssued. (Permit is stamped drawing. Date 72� Site Inspection. (call 644-3043 for appointment) Date Site Re -inspection Date Conditions: OWNER -BUILDER DECLARATION I hereby affirm that I am exempt from the contractor's license law for the following reasons: (Sec. 7031d.5, Business and Professions Code). Any City or County which requires a permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provision of the Contractors License Law (Chapter 9, commencing with Section 7000) of Division 3 of the �aitness and Professions Code) or that he is exempt therefrom and the basis for the alleged exemption. violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty for not,more than five hundred dollars ($500). 1, as owner of the property, or my employees wit4� wages as, t,0eir sole compensation, will do the work, and the structure is not intended or1offerqdJdrsa16�(Sec. 7044,kBusiness and Professions Code: The Contractor's License Law does not.apl5ly-to anbwh ei�-& property who builds or improves thereon, and who does such work himself or throu�o hi: loyees, provided own Imp that such improvements are not intended or offered for s4'eY"4,f,PNowever' the building or improvement is sold within one year of completion, the owner -builder will h6�e-i:14 burden.,of proving that he did not build or improve for the purpose of sale.) 1, as owner of the property, am exclusjve,� contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to, an owner of property who builds or improves thereon, and' who contracts for such projects, who builds or improves thereon, and who contracts for such projects with a Contractor'(s) License pursuant to the Contractor's License Law)., I am exempt under Sec. of Business and Professional Code for this reason: Owner's Signature: XXXXXX Date: XXXXXX Contractor: Shellmaker Inc. Telephone:(949) 548-5359 Address: 875 B West 15th Street, Newport Beach, CA 92663-2701 License class A&B 'State Board No. 561434 City License No. 9 6 0 0 2 2 10 LICENSED CONTRACTOR'S DECLARATION I hereby affirm that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and P�Tfessions Code, and my license is in full force and effect. Contractor's Signature ,4 C Date: August 25, 1999. C�_ GROUND LEASE, A R T I M5 Tile r)artj.QS tr,:this Gro' und Lease (t.jje ­Lc.av are r SAV,1YJVP an,.! rL, :,A!'L G. ]AN01', r�,. SAV. YER, husband and wife (herc�inafter refe,-raa 'LO as "LES.c3C)RF,) . and DONALD ;.I. 1,,OLL and D0.11ZOTRY 13. '01,, Wife, (hf_,j-ein,.Lf-,3r referied to as "LE.-,Sr,_r­ 2. PROP;�M-ITY LEASno LESSOP' lictrob y LBsS-"E and LESS­ ZE leases froTM LESSOR, UPOn the terms aiid conditions set fojeth hereim, the property de-scribad i1i Exhibit �iattached bereto (.Lll-- "Pro orty"), subject p to easements and rights Of way of record for utility purp-oses. 3. 3.1 Initial Term The' initi: �al term Of this Lease (hereinafter ref" to as "Lease Term"), -erred- for a period of -a fiftY-five_(5��)-yv rs commencing nJune li 197$lan) shall terninate Upon the lapse of such period unl C: -G under "3.2 22��� EX -tend "_ b-- low, to extend..t�e,, L . . . I ease.. Tej7 m.' I:h. no event shall-the'Lease-Term--continue beyond t�60-�ez iod -Our --(94) rom its'-cOrMlencement. '2 c) Extend at his Option be entitled to LEES'�k�, extend the Lea�el�,*�rm undo"' �':Ithe terms anci Conditions of this Lease, .j, except as s IT Pecified iii 4 R E'N T 1 4.2 Rent al Adjustme,nt" below, for one (1) additional thirt Yrnine (39) Year period by the tj mely exercise 0, the op— tion--toiextend as granted'herein. LESSEE shall exercise the Option to extend.by mailing-to-LESSoR., 'on ths p . rior to the termination of the initial -term, written notica of LESSP-E's intention to extend. (fir '7.ST0RAT10';4 op I . ­ .I; I a-nythi21g ill this Loase to t C t :y 110 on ral. :. LrSS)MI With P2.0per notification to suhtcnallts 1511t Wjtljou� prior Of LESSOR, May de;nali-h and rc, r,,�ovn all i) P c; Its 11 ro., .C? r Orl the Property and reconstruct such ot1l' :1 er ir-,PrOvOmentS as LESS17E .shall deem appropriate. This rigIlt sl_ '1 include, but, is not - 'a, limited to, the right to demolish, remove 'and/or rearrange the boat slips and piers. If duri'14 the term hereof improvements, if co:lstructed on the.Property or any part thereof, shall be damaged -Or destroyed by fire or other Casualty, LESSEE may,*at his cost and expense either (i) repair, replace or restore the improvements, or (ii) tear down and remove the same from the Property. if LESSEE shz4ll elect to repair, replace ' or restore the improve"ments, the work thereon shall be Commenced within one hundred fi'fty (150) days after the dawage occurs and shall be Completed i.,Ti' th due diligence after the commencement of the work. If LES�SEE shall elect not to repair or restore the improvements, LESSEE s . hall, within one hundred fifty (1:50) days after th*e danrage occurs, tear down and . remove all parts -thereof -then remaining an' d the debris resulting from the �Fire or other casualty a' nd otherwise clean -up the Property. Regardless- of any such damage*Oz'.destruc tion, this Lease " shall continue in force and effect until termination as elsewhere prov'ided in this Lease. Provided, however, that if LESSEE's inteXest-in this Lease is subject to an encumbrance, LESSEE shall.be required to repair, replace or restore the improvements in the event of such damage or destruction . to the extent that the Proceeds of an insurance under the Provisions of y LI�SURAINCV below, are available, unless the encumbrancer otherwise agrees. �AIVJ � le r COVENANTi" jW LESSOR covenants with LESSEE that he is lawfully seised in fee simple'of the Property; that he has the right to lease it; that he warrants and will defend the title of, the Property against the lawful claims and demands of all person., ata th4t he will do any further acts for the purpose Of Perfecting the titl . e that LESSEE May reasonably require. 25. QUIET ENJOYMENT LESSOR agrees that he will not disturb the quiet enjo . Yment of the Property and that he will defend such quiet enjoyment against the lawful claims and demands Of all persons. 1-n-this-regard,LESSOR hereby assigns to LISSEE any and.all-v -roperty—and-pier_-rights ana tidelands use permits issued to LES _j�. Is representatives. or nominee, - by - the City of Newport Beach or the County Of Orange. LESSOR hereby agrees I to execute any and all documents necessary to effect such an assignment. 26. COOPERATION LESSOR agrees to cooperate fully with LESSEE in LEssE.Els .development of the Property inclUding the dedication, easement�' of any portion of in fee or as the Property required to be . dedicated a condition to LESsEEs use or improvement of the Property, but in the event of such dedication the,lessening of the area of the Property shall not result in a reduction of any rental due hereunder .Further, LESSOR. agrees tO-cooperate in and execute an documents necessary to y secure zoning changes, conditions use permits or varla * nces necessary for any use Of the Property by LESSEE Or any .other documents or instruments.. 27. CERTIFICATE OF ESTOPPEL 'LESSEE agrees that at any time and from t ime t0 -time Upon 17 I'll, tr � LESSEE: M. nc 7 DOROTHY B; KOLL �V/ L) P7, I lurc 29.5 Ti . is hereby declared to be of the this Lease. es'sellce 30. BXECUTIoN .OcUtad 1973. LESSEE: M. nc 7 DOROTHY B; KOLL �V/ L) P7, I lurc CMQUND LF,'ASP PARTJJ�S The parties 'to thiS Grounic! (the are EARL G. jAU'YER and ELEANOR r SAWYER, hUsband aild reforred to as "LLSSOR"). and DC)',-1.ALD M1. YOLL anet DC)2,,C1* T11.1 B. wife, (hereinafter referred to as "LESSEE"). 2. PPrj'PP.-.,)Tv LESSOR, hereby leases to _TLSSE-Z and LEs SEE leases from LESSOP., upon the terras and conditi OnS set forth herein., the prol.-jarty described in Exhibit "All attached hereto (the "property,,), s ubject to easements and rights of way Of r . ecord. for utility purposes. 3. TERM 3.1 Initial Term The initial 'term of this Lease (herainafter referred to as "Lease TeriI-") -shall be for a period Of fifty-five� -ars YL COM.Mencing on J . une .1, 1973.and shall terminate upon the IaPs6` Of such period unless LESSEE elects under "3.2 Option to Extend" below, to extend the Lease Ter.n. In no event shall the _,_Lease- Term--continun beyond the: -period of I In lfietYiiiiifour� (94) y,','e �rO.M -its commencement 3_ 2 Ex t -tend.' Ll hall at his option be entitled to extend the Leas�e',:�`T'erm under 4'�-1 the terms and conditions of this Lease, except as Specified in "4. RENT, 4.2 Rental Adjust. -I ent" below, for one (1) additional thirt -nine (39) year period by the timely y exercise of the option to extend as granted h*erein. LESSEE shall exercise the option to extend by mailing 'to LESSOR, sLc (6) Inonths prior to the termination of the initial term, wr'itten notice c,�' LESSEE's intention to extend. e Not-WithMianding anything in this Luasc, to the coil tr.-Lj"y LESSEE with propoi: notification to subtenants Iyut N.,ithout prior conr,ent of LrSSOR, may dc,,w)lish Fuld rcno%?C 0.1 improvd."..'ents frolz the Property and reconstruct. such other improvemonts as LFISSEC shilll Clecm appropriate. This right shall il-Iclude., but is no�' limited to, the right to delrolisil, remove and/or rearrange the boat slips and piers. If during.the term hereof the improvements, if any, constructed on the Property or any part th�areof, shall be damaged or destroyed by f ire or other casualty, LESSE2.-. may, ',It his cost and expense either (i) repair, replace o r restore the improvements, or (ii) tear clown and remove . the same from the Property. If LESSEE shall elec�t to repair, replace or restore the improvements, the WorR thereon shall be commenced within one hun'dred fifty (150) days after the damage occurs and shall be completed with due diligence after the commencement of the work. If LESSEE shall elect not to repair or restore the inprovements, LESSEE shall, withi n one hundred fifty (150) days after the damage occurs,'tcar down and remove all parts thereof then remaining and the debris resulting from the fire or other casualty and other%..,ise clean up the Property. Reqardless�cf any such damage or*destruction, this Lease shall continue in force'and effect until termination as elsewhere provided in this Lease. Provided, ho,,,.,ever, that iT LESSEk's interest in this Lease is subject to an 'encumbrance, LESSEE shall be req-uired to repair, replace or"re'store the improvements in the event of such damage 6r destruction to the extent that the proceeds of any insurance under t ' he provisions of "9. INSURANCE" 'belowf are available, unless the encumbrancer otherwise agrees. 24. Cov HANT: LEISSOA Ully of t)1Q J.'rop(:rty; that ),.a tho to that lic. i-,,arrants and e?j.l.l clefe, titlu Of tho 11ropurty againot .)d t13L the laV.-ful. claims and cl'enlelne"s Of kill persons; and that Ile %.,.ill etc any fu2.t.1,,ra r acts for the purposo of po3.-,' lecting the title t)lat 1.1., ,FSEE may reasonTl.):tly requi—re, 25. QUIET ENJOYMMNIT LESSOR agrees that Ile will not disturb the quiet enjoyment of ths� Property aric, that Ile will defend such quiet en�oy.,---ent acrainsL i the la�-,!f ul claims and demands of all persai '*s regard L1,tSO1j is. In thl hereby asSigns to L1;'.SSEE ally ane all pro perty and pier rights and' tidelancls u!,e permits issued to LESSOR, his representatives or norninee, by the city of Newport Beach or t1he 'County of or ange LESSOR hereby a grees to execu,te any and all documents nocessarylto effect such an assignment. 26, COOPZPAT10!:1 LESSOR agrees to cooperate full y with LESSEE in LESSEE's development of the Property.including the dedication, in fee or easement, Of ally P02.tion of the Property required to be dedlicated as a condition to LESSEE's use or improvement of the Property, but in the event of such dedi6ation the lessening*. of the area of the . Property shall not result in a reduction of any rental due hereunder. Further, LESSOR agrees to cooperate in and e'xecute any documents necessary to secure zoning changes, conditions use permits 'or variances necessary for any use . of the Property by LESSEE or any other documents or instruments. 27. CERTIFICATE OF ESTOPPEL LESSEE agrees that at any time and from time to time upon,/ 1 17 Z( ),� t?Lr 29.5 Time is heruby to be of tjjc� ess'ence of t.tiis Lease. 30. 'This Lease is executed this o da y f 1973. Is G. —'spoil'y" in� LESSEE: DONALD ne DOROTHY B./KOLL 19 G H 0 11 -Y 3) 7, E A S 7.1 made thin '21nd day of. by and C.ATWINT G RO-,!RS and' ARLEEINT-E, L.* R011 -F -S husbezd and -...-If e (herei naf . te--r; referred to as "Less'or" and jA!--1ES W. BERKSHIRE and PAU,.T,T BEM.-SI-11KE, husband and i -life (herej;jafter 0011ectivel� re-fe=ad to as "Lessee") ARTICLE I Property Lessed- For and In consideration of the palqnen-'- of the rents and '.2Y.es and other charges and o--:-' the performance of all of the covo- nants and conditions of this Lease by Lessee, Lessor"hereby leases to Lessee that certain parcel of 'bed i' land descri n '-Px'-n--!b 1- t " All , toge-6.her with all and other t, cnances-'s*1't;ug1ed, thereon; attached hereto and r.p-de a part of L 6, L. ?his Lease (her'-.zinaft.er re�errad to as Ifthe Property"), sulb�eat to existing leases now on the -Property, and also subiect to p ease - e ts, rights, righti.,of wray, covenants, condit-i-ons, and rest'riclUiones za -ap;;a::-ent. or of ARTICLE 11 Term of Lease The Property is leased for the term of ninet -nin-e ye az s j c e.n c I ng j-an-",ary 1, 1060' and enndinS December :-1, 220614�; . subject, tO earlier tarminatio-ti,as hereinafter provided. AR,27CL-Z R. -= n 1,; a I j 1- Sab'ect to `A.Just"Ment as hereinafter In tvhis section br- o.­,tj.t:LC'd to rcactvt" f, 3�0,-bl the, 'Lo,-,jllr f '111'01ult' COUZ"L; T11 -_Y JUdge 1:0 be reazojl�ablc for th-0 sorvices romlie-oad the PartY P"OVE1.11inre :Lri any su�cj' Ul I action 01" AnTICIAE� X%,V.,[ 0 �_,_ L, 1iC LJL_ � i- _tj - e s le-lasor shall have the right -to. -use L, _ mj_inside-tie O�nt slip on the PrOPertyj-not to I _. . -:4 ex`eec thi-rtY-two- (32) In length, at U "Y 011. E. -Il times t1uring 'he trDrin hereof., by GivIng Lessee thir,-,, (30) days, Prior notice of Lessorin int nd-iol I'to do so. Lessor agrees, hov.,c.,Ver., that Laasec-r,_jy a month-tO-Montb basis -or other -wise use s�uch, boat slip during period when. Lessor is not usinf,' it, Provided that LaSsee shall do not n -hi 9 - to PrOvent-tho .814 from becomjjjg._aVAj2.able�_to.. Lesso32,u- ,.,.(30) days notice. Lessor shall notify -Le' _ 4 w ssee oa. -Ssoris intent to discon- tInue use of the boat -sliP ten (10) days prior to cOnmencing dis- continuance. .of, Art"Icle Xv): aunigns, MlcccL;novr, ancl tilibt-clumtj of Lousco. T -V More than olle per,,,011, t1le cove'nants vuid. obli- Lossee )!P-rallinelka� shall.ba tho Joint Pnd soveral covo- In tb-10 ZnUmana., Gander 'IM)AIdes the fer,.,-�ritne 'and nc-ii-e* a-hd t1he sirigular in-cllla�-s the plural, Yff-leriever t1le c.ozitex,; so r' equiraz. VIINUMSOFI, the parties bereto have oxecut-lad th-is Lease the day and year finzt above writtell. BBRKSHxkE . p 71 WE f-0, h r� LEA�;E AGREC-MCNT PARTIES The par�tics Eo this Loase.Ag rO.Cm.011t (the "Lnast--11) JUNE JOMN'SON (berainafter rofe3�red to as "LESSOR,") and DONALD M. I'OLL (h,:B'rciin�fter-referr ed to as ".LESSEE,,). 2. PROPZ-.:-.Y LEASED' LESSOR hercby leases to LESSEEI.: and LESSEE leases fro�_, LESSPR,-upon the terijis and condition's set torth harein, the ��ZOPGrtuY descrilied in Exhibit "A" atitachad hareto, togeLher with all buildings, structures, ins tall at ions,. �nd improvcj� ,C!nts located thereon, including pier rignts and all boat sliz .5 co-inected thereto Che-�einafter referred to as tj�e uLeased premises" TER -M 3.1 Initial'Term The' initial term of this Lease (hereinafter re ferred &to as "Lease Tern,") shall be for a period of thirty (30) years commencing on January 1, 197.4 and.shall terminate upon the lapse Of such period unless LE ct S under "3.2 SSEE ele 0 Rant .Extend" belOw, to extend the Lease Term. 3.2 pqption to Extend LESSEE shall �-t his option be entitled to extend the Lease Term Under all the terms and conditions of this Lease, except as specified.in REZIM, 4.2 Rental 'Adju st-.Ie'nt" below, for two (2) 'additional fifteen (15) year 'periods by "he itimmly oxa.rcisc of the option to extend as granted herein. LESSEE shall .exercise the opti .1 on to extend by Mailing to LESSOR, six (6) manths prior to the termination of tle then existing term, viritte`nt notice of' LESSEE's intention to extend. tahin�j to tho next r(!ntal adjuf;LiiinnL d0LU 01: to UIL, dilt:0. OF' expiration of- the torm of this Lease, whichuvcr dziLc is sconor Such ronta 1 adjustment shall be madc by rc:ducing thc )�asic Rental payable by LESSEE in the ratio that the fair. juarlzat value of thc ..-Leased Premises at the 'data of taking, as datermined by LESSOR bcars to the fair market value of the Lcascd Promises inLmediatcly thereafter. 'In the event of a dispute bctween LUSSOn and as to the fair market value, the dispute shall be settled by arbitration as provided in Article "28. ARBITRATION". 23. COVENAINTS LESSOR covenants with LESSEE that she is lai-.rfully scisod ,_in fee simple of the Leased Promises; that she has the right to lease it; that she warrants and will defend the title of the Lcased -Premises against the lawful claims and demands of all persons; and that she will do any further acts for the purpose of perfecting the title that LESSEE may reasonably require. 24. QUIET ENJOY11-IMNIT LESSOR agrees that she will not disturb the quiet cri-joy- ment of the Leased Premises -and that she will defend such quiet, enjoyment against the lawful claims and demands of all persons. In this regard LESSOR hereby assigns to LESSEE any and all property and pier..r�g��s and tidelands use permits issued.to LESSOR, her representatives or nominee, by the City of Newport Beach or the County of Orange.- LESSOR hereby agrees to execute any and all documents necessary to effect such an,assignment. .25. CONDITION OF PREMISES LESSEE accepts -the buildings and improvemcnts on the Leased Premiscs in their prcsont condition and without any representation of warranty by the LESSOR as to the condition of 25 - 111_fi�W­l with tho land and shall inurc to the bvilafit Of and ?.m bilICU)Ig upon alld onforccabIc agaiiist, as the casc may be, the succossors and assigns, of tllc partics. 31.5 Time is hereby declared to be of the esseiicc� of this Lease. 32. EXECTITIONT This Lease is executed tkiis q. ilk day of 1973. LESSSOR: JUNE J01INSON LESSEE: DONALD M. KOLL -29- Sri,, L S A'PSE'. C; Zzi, 1E" PARTIES to this Lease Agree- "Lease"") T�e par ment (the -Lre SAVINGS ;t_'M LO,'�\T ASSOCIATION OF NZ_V_',0O-RT-P-:�S-:kD hereina-Eter referred to as IILESSCR,,$�.* and DONALD M. KOLL, hereinafter referred to as 'IfESSEE.-T. PROPERTY LEASED IXSSOR hereby leases to-' LESSEE c�nd.-LESSEHF leases fron., =-SSOI.R u:Don I -he te-'-.ns 2ina con-CHIZ-4ans set f o r th he-ein the (the -property described in Exhibit "A attached heret- Ill. T E IF LN I A. corumencemen The term of this .-ease sha-11- I—'SSEF, has obta-;ncd -4..he consent of the City of'�Iewpa::t :% oa-- be :She! I no, L 2 ,C_ obtaiy-� ro c withh-eld. L -S S shall diI4 ;;a - Y -a a t Lr_SSEEVs e: . 4pens-e Provided LE-SSOF, reasonably ch ronsent a by. -tine.-Ci-Y of' Uvan Issuance of a bui1e__"r1.0' c -t -d "lPort Beach3 LESSEE agrees to construct Shore Conne C3 Ci -,y of N :0POrt Bap -ch conformalrice with the d floats In the L them commeercip-2-2-Y -durin. policies and operate %- a-C;ons by an the Lease unless prevented from con rjU;,-jg op . er = th e ithill one (1) yeaA. of C_over.rj:__enjCP_j entity W cad, Lease ate of t1his. Lease the tezla nas not, co -.w. -.en -C aii -4.s shall be relieved 0;.. hall terz-Snate and the p2x LESSEE s th P ,bligat-iOns .�-Then t e te ---.a ho -S co nt d-a-ce.o. the =cyrtlh the co7nm.ence,.�e :0 LESSOR p 2 _et-er s et -0 �Ah; s; Lease. ,ease2 which -she- . 11 be- dear -ed arendment Initial Term B. .The' initial term 0-c this Lease:, Chereinaf shall Term be ;ror a, period'o, refe-rred to -as. above (20) years to corraence as specified in -he lapse of such pera_c,:� Imless and sha-11 te=inate upon -11 3 belor,2., -to LESSE'Z elects under ODtion to zxtend '_7 CO3. j. 50) c: 0, -,Ln, e n c e;n. a n t C. oDtion to Extend LESSE-7 shall at his option, be entitled to ex:tend Lease Te ---.n under all the terms and cionditions of this Le -ase for three (3) ae-ditional ten (10) year per; o -7s. by the tim ely exerc., of the option --a ex -t -end as c Tranted herein. LESSEE shal-I exercise the oDtjon to extend by mailing to LEESSO."D' Wri't.-'%-_-en notice o� L_PSSEE,S intention to do s6 as provided below. LESSEE shall, if he desires to extend the Lease Term for Iten (10) years to a total exter.6ed Lease Te='.'n of thirty (30) years, mail.notice to LESSOR at any time before the. end of the na-nefteenth (I -h) -he initial Lease 9' year under-; Te= LESSE-7 s1h a 1- 1 If he Olesires to extend th -Lease. for an aEdit-iona.1 tert (10) years to a totai to LESSOR e-Xtenaed Lease Te= o"forty years*, inail na"%ice t at any time be -Fare the e _n el oA-:-- *the twenty-n;nth year uxidr-r the --nded above- -Lease Ter= as exzt.., -3- o (3) S`- 51' a 1 the Lease Term fo.- an additional t -en (10) Yea.rs -'0 a ex --s, mail not'ce to LESSOR tended Lease Tern, of- Afif ty (50) yea (39th) year uncer any time before t1le end of the thirty- -,nth the Lease Term as exl.:ended. above. IV RENT Commencement -Rent es deter= -Lined herein shall cor;zaence an.d C e d accrue to LESSOR upon ccimpletion of th(i shore co'nnecl er.L-* -piers a-nd floats described in Exhibit on the Pro -p "Y by LESSEEE or within six (C) nonths ro-. the date LESSEE -receives a building permit from -the City of tewport­ B'e?-ch -and ioats, whichever to consiElzu c I-- the shore connecIt-ed piers. an d OCCU-7-s f irit. com-oletion of the shore connected pi.ers floats shall be evidenced by the -inal, wri tt en approval of the Newporiz Beach.Harboz Coordinator.'. B.* DetterMination o--::' Reserved. Re n At LESSE-7 agrees to pay to L'-:-SSOR, at- s ---C*- -Place or places as may be aesignated fro,-., ti me to ti -me by LESSOR, -4- bk-,-A D. Where the consent o—. approval of a pa�-tY required in this Lease, such consent o:- approval will. no -C be urreasonably withheld. %4 xxv]: EXECUT10i -ZE�d in duplicate in Ore-n,7e This Lease is execu C 0 Un ty C a 1 1:-"o rn a t'. -i I s; day of. 7 1972. L�SSOR. IMPERIAL SAVINGS AND LOAN. ASSOCIATION OF NEWPORT—PA-SALENA By� LESS EE: DOINALD Ti. L -EXHIBIT A TO LEASZ B E T I z:,N I. SAVINGS' AND L 0.; N ASSOCiATioz; OF N '6:73--'POR-J-PAS;0E.NA, LZ:Sk.-R, tAND DON'RLD KOLT, LESSE:E: The* rights, as an own-er of land abutt--inq Newport Bay to the extent' such iiahts -ned by LESSOR, to install, are o,6 maintainp and replace boz-,- sliDs Umon' tl-.= Waj- %- - - A I - ters of the turning basin Of Ne�N--00rt BaY adjacent to the hereinafter describea real propert the right of access to said real Y property-... That real prome'r-tv in 'he City o'A New-oort -B�eachl L Coun-Ity of Orange, Sl -.ate of Calilforaia, described as the north -was--,t-- a= ly 20 feet a' Lol- 7, all of Lots 8,, 9, 13, and 14, and the southeasterl 40 feet. Of Lot 15 in. Tract 1622 Y a..s shown On a Map. recorded in Book 47, Page 39 0'Aff Ki s c e: Ilan,40us 1-11aps, regords of said cO,-,-,-1ty. i Y,E,7�SE AGIUQ,)2ifZT . I TIIIS LEhSE made as of the Ist day of Dccerjj)Qr . 1971, Y'etvecy, jjjjrry M. 1,,c. ..I.so %,�I-jose adOrcss is post 0-fice D ox 1.4 5 5 , 1\1 e vZ) o r t- yj e a c 1) CalifOX-21iEs., hereinafter refer).ed to as I 'LESSOR, I, and Donalcl 1-1. r,011, a married . jr.zIn, as his s I ole and scParatc property, whose address is 17755 Sky Park, CiX-cle, Irvine, Californial hereinafter rct-r-, erred to as ''LESSEE.— . 1. PROPERTY LEASED ror and In consideratioyl of the payr.,.c.-nt of th' a rent and taxes and other charges, and the P02.7"Lorm-ance- of all the Covenants and conditions Of this Lease by LESSEE, LESSOR hereby leases to LESSEE that certairl lot of land situated at 3432 Via Oporto in th . e City of Njewport Beach, County of'Orange, State of California (the "Property''), raor C particularly described as follows: Lot 24 and the orth'* n Wcsterly 20 feet of Lot 23, Tract 1.622, as record�d; in Book 47'11 Page 39 ol. misc ellaneous Maps, r1ecolrds of 0 fange'COuDtY, California. S:ubject to: and any il--PrOVIMICI'Itr� thoreon frce of wec-dr, and rubbisl), anci in a c.-I'Can, cnan"Ltaj:� and riazit conflitio-1, c0n5truc.t, maintain and repair all fa"Cilities and othcr imP)-()VeM0'ntr, Which may be raquirc-.,d a t any time by law upon or .aCljoining or in connection with or f --or the use o' the Prop3rty or any part the roof, and LESSEE shall. makc any an(I all cl i ons dd ti to, Or altGratiOns irl ZMY buildings -and structures on tile Property %-,,hich may'be requircd by and shal). otherwise observe and comply With any and all public laws, ordinances and regulations for. . the time being applic.able to the Property ard- the'improvements thO3700171, LLSSEE agrees to7indemnify and hold LESSOR hi=.less. against all actions, claims and-damagcs by reason of LESSEE's failure to keep and maintain the Property and any buildings and imlirovement5 thereon as hereinabove provided, or by reason of his nonobservance or nonperformance Of any law, ordinancc and regulation apiDlicablo thereto. X1. RE)"LACBMENT OF IMPROVErIENTS Notwithitanding anything in this Lease to the contrary, LESSEE with prb)�er notification to subtenants but without -r)br ccnsenti.61�',,: LESSOR, may demolish and remove all mprovemen ts fr"m the Property and reconstruct such other improvements as LESSEE shall deem appropriate after a Deed of Trust is recorded evidencing - a- loa'n- to- be utilized.by :I: LESSEE for the.donstruction of new;%' -on the improvements Property. Thi!�'right shall -include*,- but--is--not--limited -10- K-110- (�e thO right to Clemolish, romove ancl/or rQa373:,11-j�10 the boa L slips zand picr,; XII. DAMIAGE OR DESTRUCTION in the event the improvcment-s co'lstructcd on the Prop�� I rty by LESSEE are damaged from ally cause', LESSEE shall, to the extent of the ay.jilaj.)j0 innurance pro,�Ceds, resto I ra the improvements as n ea).- as possible to their prior condition or, at LBssBn,s election, construct impro,,,cjjjjcjjts of a : 'different nature but having a substzintially equivalent value. In either event the proceeds of' the insurance described in I Vj. A. above, shall be paid to LESSEE and applied to the cost of rebuild ing the improvements Oi the construction of lew improvement -c. Nothwithstanding anything contained herein to the contrary, either LESSOR Or LESSEE may terminate this Lease without further obligation to the other'except as provided in . "XXVIII. TERMINATION". below, if the improvemonts are Aamaged to an extent of twenty-five percent (25%) or more during the last five (5) years of the term of this Lease. in the event of the termination of the Lease hereunder'. LESSEE'agrees �hat LESSOR shall receive the proceeds of the insurance. Time is of the essence in this Lease. XXX. EXECUTION This Lease is executed in duplicate in orange County, this/---1�7-day of/e-5)Ae2VP2-&0L-1971. LESSOR Ha y 14. K so LESSEE Donald M. Koll -28- - — — - - -------------- 982ta)(15.1) ATTORNEY OR PARTY WITHOUT ATTORNEY (Name, state bar number, and address): FOR COURT USE ONLY —Joseph E. Thomas (Bar No. 101443) McDERMOTT, WILL & EMERY 18191 Von Karman, Suite 500 Irvine, CA 92612 TELEPHONE NO.: (949) 851-0633 FAX NO.: (949) 851-9348 ATTORNEY FOR (Name): Plaintiff LW3 Lido Partners NAME OF COURT: SUPERIOR COURT OF THE STATE OF CALIFORNIA STREET ADDRESS: 700 Civic Center Drive West MAILING ADDRESS: P.O. Box 1994 CITY AND ZIP CODE: Santa Ana, CA 92702-1994 BRANCH NAME: PLAINTIFF/ PETITIONER: LWB Lido Partners, LLC DEFENDANT/ RESPONDENT: Marvin Eng ineering Co., Inc. CIVIL SUBPOENA (DUCES TECUM) for Personal Appearance CASE NUMBER:, and Production of Documents and Things at Trial or Hearing OOCC-02974 AND DECLAR-AT!ON rHE PEOPLE OF THE STATE OF CALIFORNIA, TO (name, address, and telephone number of witness, if known): Tony Mellum, City of Newport Beach (Fire & Marine Dept) 949/644-3041 1. YOU ARE ORDERED TO APPEAR AS A WITNESS in this action at the date, time, and place shown in the box below UNLESS your appearance is excused as indicated in, box 3b below or you make an agreement with the person named in item 4 below. a. Date: June 2 5, 2 0 0 1 Time: 9: 0 0 a.m. � x � Dept.: C14 1� Div.: Room: b. Address: 700 Civic Center Drive West, Santa Ana, CA 92702 2. IF YOU HAVE BEEN SERVED WITH THIS SUBPOENA AS A CUSTODIAN OF CONSUMER OR EMPLOYEE RECORDS UNDER CODE OF CIVIL PROCEDURE SECTION 1985.3 OR 1985.6 AND A MOTION TO QUASH OR AN OBJECTION HAS BEEN SERVED ON YOU, A COURT ORDER OR AGREEMENT OF THE PARTIES, WITNESSES, AND CONSUMER OR EMPLOYEE AFFECTED MUST BE OBTAINED BEFORE YOU ARE REQUIRED TO PRODUCE CONSUMER OR EMPLOYEE RECORDS. 3. YOU ARE (item a orb must be checked): a. __x_ Ordered to appear in person and to produce the records described in the declaration on page two or the attached declaration or affidavit. The personal attendance of the custodian or other qualified witness and the production of the original records are required by this subpoena. The procedure authorized by Evidence Code sections 1560(b), 1561, and 1562 will not be deemed sufficient compliance with this subpoena. b., Not required to appear in person if you produce (i) the records described in the declaration on page two or the attached declaration or affidavit and (ii) a completed declaration of custodian of records in compliance with Evidence Code sections 1560, 1561, 1562, and 1271. (1) Place a copy of the records in an envelope (or other wrapper). Enclose the original declaration of the custodian with the records. Seal the envelope. (2) Attach a copy of this subpoena to the envelope or write on the envelope the case name and number; your name; and the date, time, and place from item I in the box above. (3) Place this first emvelope in an outer envelope, seal it, and mail it to the clerk of the court at the address in item 1. (4) Mail a copy of your declaration to the attorney or party listed at the top of this form. 4. IF YOU HAVE ANY QUESTIONS ABOUT THE TIME OR DATE YOU ARE TO APPEAR, OR IF YOU WANT TO BE CERTAIN THAT YOUR PRESENCE IS REQUIRED, CONTACT THE FOLLOWING PERSON BEFORE THE DATE ON WHICH YOU ARE TO APPEAR: a. Name of subpoenaing party or attorney: Joseph E. Thomas, b. Telephone number: 949/851-0633 Esq 5. 'Witness �ees: You are entitled to witness fees and mileage actually traveled both ways, as provided by law, if you request them at the time of service. You may request them before your scheduled appearance from the person named in item 4. DISOBEDIENCE OF THIS SUBPOENA MAY BE PUNISHED AS CONTEMPT P�"HIS COURT. YOU WILL ALSO BE LIABLE FOR THE SUM OF FIVE HUNDRED DOLLARS AND ALL DAMAGES RFSULIING FROM YO"ILURE TO OBEY. Date issued: June kj 2001 .Josepja. 1�.. :T�ipn�as, . Es.q .. . . . . . . . . . . . . (TYPE OR PRINT NAME) II61GINtT�E 6F PER60N ISSUING SUBPOENA) Attorn4Zf Plaintiff (Declaration in support of subpoena on reverse) (TITLE) Page one of three Form Adopted for Mandatory Use Code of Civil Procedure, Judicial Council of California CIVIL SUBPOENA (DUCES TECUM) FOR PERSONAL APPEARANCE zk�� § 1985 et seq 982(a)(15.1) [Rev. January 1. 2000] AND PRODUCTION OF DOCUMENTS AND THINGS CGOLIkowuncm AT TRIAL OR HEARING AND DECLARATION PLAINTIFF/PETITIONER: LWB Lido Partners, LLC CASE NUMBER: OOCC-02974 DEFENDANT/RESPONDENT: Marvin Engineering Co., Inc. The production of the documents or the other things sought by the subpoena on page one is supported by (check one): the attached affidavit or declaration 1 x- ; the following declaration: DECLARATION IN SUPPORT OF CIVIL SUBPOENA (DUCES TECUM) FOR PERSONAL APPEARANCE AND PRODUCTION OF DOCUMENTS AND THINGS AT TRIAL OR HEARING (CodeCiv. Proc., §§ 1985,1987.5) 1. 1, the undersigned, declare I am the plaintiff 7 defendant L_ petitioner respondent X attorney for (specify): P 1 a int i f f LWB L other (specify): Lido Partners LLC in the above -entitled action. 2. The witness has possession or control of the following documents or other things and shall produce them at the time and place specified in the Civil Subpoena for Personal Appearance and Production of Documents and Things at Trial or Hearing on page one of this form (specify the exact documents or other things to be produced): SEE ATTACHMENT 11211 X Continued on Attachment 2. 3. Good cause exists for the production of the documents or other things described in paragraph 2 for the following reasons: The requested documents are material to the case in that they relate to plaintiff's claim for specific performance and breach of contract in connection with the Purchase and Sale Agreement and Joint Escrow Instructions for the p.roperty known as Lido Marina Village located in Newport Beach, CA. Continued on Attachment 3. 4. These documents or other things described in paragraph 2 are material to the issues involved in this case for the following reasons: That said documents are material to the case and matters which are at issue in this matter. Continued on Attachment 4 I declare under penalty of perjury under the laws of the State of California that the fo Date: June k\ 2 0 0 1 jQPIE211. F, Tliqmap, . Eqq .. . . . . . . . . . . . . . (TYPE OR PRINT NAME) (SIGNATURE 0 (Proof of service ( true 982(a)(15.1) [Rev. January 1, 2000] CIVIL SUBPOENA (DUCES TECUM) FOR PER E� 'A P P EP AND PRODUCTION OF DOCUMENTS AND THINGS AT TRIAL OR HEARING AND DECLARATION PARTY ATTORNEY FOR SUBPOENAING PARTY) CE Page two of three PI-A.INTIFF/PETITIONER: LWB Lido Partners, LLC CASE NUMBER: OOCC-02974 DEFENDANT/RESPONDENT: -Marvin Engineering Co. , Inc. PROOF OF SERVICE OF CIVIL SUBPOENA (DUCES TECUM) FOR PERSONAL APPEARANCE AND PRODUCTION OF DOCUMENTS AND THINGS AT TRIAL OR HEARING AND DECLARATION I served this Civil Subpoena (Duces Tecum) for Personal Appearance and Production of Documents and Things at Trial or Hearing and Declaration by personally delivering a copy to the person served as follows: a. Person served (name): b. Address where served: c. Date of delivery: d. Time of delivery: e. Witness fees (check one): (1) were offered or demanded and paid. Amount: ...... $ (2) were not demanded or paid. f. Fee for service: .................. $ 2. 1 received this subpoena for service on (date): 3. Person serving: a. Not a registered California process server. b. California sheriff or marshal. C. Registered California process server. d. Employee or independent contractor of a registered California process server. e. Exempt from registration under Business and Professions Code section 22350(b). f. Registered professional photocopier. 9. Exempt from registration under Business and Professions Code section 22451. h. Name, address, telephone number, and, if applicable, county of registration and number: I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Date: (SIGNATURE) (For California sheriff or marshal use only) I certify that the foregoing is true and correct. Date: (SIGNATURE) 982(a)(15.1) [Rev. January 1, 2000] PROOF OF SERVICE OF CIVIL SUBPOENA (DUCES TECUM) FOR Page three of three PERSONAL APPEARANCE AND PRODUCTION OF DOCUMENTS AND THINGS AT TRIAL OR HEARING AND DECLARATION LWB LIDO PARTNERS LLC v. MARVIN ENGINEERING CO., INC. ATTACHMENT "2?1 Civil Subpoena (Duces Tecum) for Personal Appearance and Production of Documents and Things at Trial or Hearing and Declaration 1) All documents relating to the property known as Lido Marina Village, Newport Beach, CA. Documents include but are not limited to correspondence, memorandums, notes, minutes, permits,. reports, drawings, inspections, investigations, citations, violations and fines. � t t 2) All documents relating to Marvin Engineering Co.., Inc. in canjuudion wiih the property known as Lido Marina Village Newport Beach, CA. Documents include but are not limited to correspondence, memorandums, notes, minutes, permits, reports, drawings, inspections, investigations, citations, violations and fines. 3) All documents relating to any building or marine tenant at the property known as Lido Marina Village Newport Beach, CA. Documents include but are not limited to correspondence, memorandums, notes, minutes, permits, reports, drawings, inspections, investigations, citations, violations and fines. ORC 271941-1.05886 1.0011 982(a)(1 5.1) ,-,TTORNEY0,R PARTY WITHOUT ATTORNEY (Name, state bar number, and address): —,Marc' Railsback 82918 y FORCOURTUSEONLY Browne & Woods LLP 450 North Roxbury'Drive, 7th Floor. Beverly Hills, CA 90210 TELEPHONE No., 310-274-7100 FAX No.: 310-275-5697 ATTORNEY FOR (Name�. Defendant MARVIN ENGINEERING CO., INC. NAME OF COURT:Orange County 8uperior Gourt STREET ADDRESS:700 Civic Center Drive West MAILING ADDRESS:P.O. Box 1994 CITY AND ZIP CODE:Santa Ana, CA 92702 BRANCH NAME:Central Justice Center PLAINTIFF/PETITIONER: LWB Udo Partners LLU DEFEN DANIT/RESPON DENT: M arvi n Engineering Co., Inc. CIVIL SUBPOENA (DUCES TECUM) for Personal Appearance CASE NUMBER: and Production of Documents and Things at Trial or Hearing OOCCO2974 AND DECLARATION THE PEOPLE OF THE STATE OF CALIFORNIA, TO (name, address, and telephone number of witness, if known): Tony Melum Newport Beach Fire and Marine Department, 3300 Newport Blvd. Newport Beach, CA 92658 1. YOU ARE ORDERED TO APPEAR AS A WITNESS in this action at the date, time, and place shown in the box below UNLESS your appearance is excused as indicated in box 3b below or you make an agreement with the person named in item 4 below. a. Date: June 25,2DDT-- Time: 9:00 AM Lj Dept.: G1 4 1 1 Div.: Lj Room: b. Address: 700 Civic Center Drive West, Santa Ana, CA 92702 2. IF YOU HAVE BEEN SERVED WITH THIS SUBPOENA ASA CUSTODIAN OF CONSUMER OR EMPLOYEE RECORDS UNDER CODE OF CIVIL PROCEDURE SECTION 1985.3 OR 1985.6 AND A MOTION TO QUASH OR AN OBJECTION HAS BEEN SERVED ON YOU, A COURT ORDER OR AGREEMENT OF THE PARTIES, WITNESSES, AND CONSUMER OR EMPLOYEE AFFECTED MUST BE OBTAINED BEFORE YOU ARE REQUIRED TO PRODUCE CONSUMER OR EMPLOYEE RECORDS. 3. YOU ARE (item a orb must be checked): a. ZI Ordered to appear in person and to produce the records described in the declaration on page two or the attached declaration or affidavit. The personal attendance of the custodian or other qualified witness and the production of the original records are required by this subpoena. The procedure authorized by Evidence Code sections 1560(b), 1561, and 1562 will not be deemed sufficient compliance with this subpoena. b. L] Not required to appear in person if you produce (i) the records described in the declaration on page two or the attached declaration or affidavit and (ii) a completed declaration of custodian of records in compliance with Evidence Code sections 1560, 1561, 1562, and 1271. (1) Place a copy of the records in an envelope (or other wrapper). Enclose the original declaration of the custodian with the records. Seal the envelope. (2) Attach a copy of this subpoena to the envelope or write on the envelope the case name and number; your name; and the date, time, and place from item 1 in the box above. (3) Place this first envelope in an outer envelope, seal it, and mail it to the clerk of the court at the address in item 1. (4) Mail a copy of your declaration to the attorney or party listed at the top of this form. 4. IF YOU HAVE ANY QUESTIONS ABOUT THE TIME OR DATE YOU ARE TO APP A ' IF YOU WANT TO BE CERTAIN THAT YOUR PRESENCE IS REQUIRED, CONTACT THE FOLLOWING E ON BEFOl �' "T�HEE ATE ON WHICH YOU ARE TO APPEAR: a. Name of subpoenaing party or attorney: Marcy Railsbac b elephte number: 310-274-7100 11 as _v 5. Witness Fees: You are entitled to witness fees and mileage actuall a led both a ided by law, if you request them u fro at the time of service. You may request them before your sched le rance t e p4on nfamedki item 4. DISOBEDIENCE OF THIS SUBPOENA MAY BE PUNISHED AS NMPT By F SO BE LIABLE k F%RT. Y04FVILL AL FOR THE SUA OF FIVE HUNDRED DOLLARS AND ALL DA S R -SU M) OUqKAILURE TO OBEY. Date issued:june 2001 Mar.cy..Rai.Is.back,..E1q . .............. .................................................................................... (TYPE OR PRINT NAME) (JIGNAWE OF �ERSI Wf!��'LIING SUBPOENA) A 't r Vs fc t vs fdr Defendants (TITLE) (Declaration in support of subpoena on reverse) Page one of three Form AdTed for Mandatory Use CIVIL SUBPOENA (DUCES TECUM) FOR PERSONAL APPEARANCE Code of Civil Procedure, Judicial ouncil of California § 1985 et seq. 982(a)(15.1) [Rev. January 1, 2000] AND PRODUCTION OF DOCUMENTS AND THINGS Martin Dean's Essential Forms TM AT TRIAL OR HEARING AND DECLARATION6670-001 PLAINTIFF/PETITIONER: DEFENDANT/RESPONDENT:Marvin Engineering Co., Inc. CASE NUMBER: OOCCO2974 The production of the documents or the other things sought by the subpoena on page one is supported by (check one): L3 the attached affidavit or declaration Co the following declaration: of Marcy Railsback DECLARATION IN SUPPORT OF CIVIL SUBPOENA (DUCES TECUM) FOR PERSONAL APPEARANCE AND PRODUCTION OF DOCUMENTS AND THINGS AT TRIAL OR HEARING (Code Civ. Proc., §§1985,1987.5) 1, the undersigned, declare I am the L3 plaintiff L3 defendant LJ petitioner L3 respondent a] attorney for (specify): Defendant L3 other (specify): in the above -entitled action. 2. The witness has possession or control of the following documents or other things and shall produce them at the time and place specified in the Civil Subpoena for Personal Appearance and Production of Documents and Things at Trial or Hearing on page one of this form (specify the exact documents or other things to be produced): All documents and files relating to the property referred to as the Lido Marina Village. Including but not limited to all documents and files regarding Harbor Permit 124-3400 and Pier Permit 1243001. La Continued on Attachment 2. 3. Good cause exists for the production of the documents or other things described in paragraph 2 for the following reasons: The subject matter of the complaint is related directly to the contents and writings contained in the files maintained by the witness. In order for the trier of fact to see and hear all relevant evidence, it is necessary to request the production of the documents. LJ Continued on Attachment 3. These documents or other things described in paragraph 2 are material to the issues involved in this case for the following reasons: The issues that are raised in the Complaint directly relate to the documents in the possession of the witness. Without access to these documents, the defendant will not be able to accurately represent all of the facts of the allegations raised in the Complaint. LJ Continued on Attachment 4. I declare unde perjury under the laws of the State of Califo Date: June 747 2001 Mar.cy..Rai.Isb.ack,..Esq ......................................................................................... (TYPE OR PRINT NAME) (Proof of servicE 982(a)(15.1) [Rev. January 1, 2000] CIVIL SUBPOENA (DUCES TECUM) FOR PERSONAL APPEARANCE Page two of three Martin Dean's Essential Forms TM AND PRODUCTION OF DOCUMENTS AND THINGS AT TRIAL OR HEARING AND DECLARATION 6670-001 SidleY & AUStin 04/14/2000 4:17; PAGE 002/8 SIDLEY & AuSTIN A FARTNERSHIP INCLUDING FRCFESSIONAL CORPORA71ONS CHICAGO 555 WEST FIFTH STREET DALLAS Los AzNcn.�:s, CALIFORNIA 90013-1010 NFW YORK TELFiHoNE 213 896 6000 WASHINGTON, D.C. FACSIMILE 213 896 6600 FOUNDED1866 WR17SR'S OIREC7 NUMBEY, (213) 896-6068 Aprlil 14, 2000 VIA FACSMME Debbie Alca= Administrative Assistant City Attorneys'Office City of Newport Beach 3300 Newport Boulevard Newport Beach, CA 9266' )-3884 RightFAX Re� LWB Lido Partners LLC v. Marvin EnLyineering Cc,, Inc. Dear Debbie: HONG KONG LONDON SHANGHAI SINGAPORE iOKYO -YVRITEF'5 E-MAIL ADDRESS opedzoza@sidley.com Pursuant to our telephone conversation of this afternoon, I am forwarding to you those letters produced in response to the various subpoenas we served on the City of Newport Beach that reference several recent surveys and inspections of the LidoM.Larina Village conducted by various City departments, Said reports, surveys and the underlying documentation appear not to have been made available for inspection and copying in response to the subpoenas. It also appears that not all of the documents relating to the -pending application by Marvin Engineering for a pier permit (which is referenced in the March 30, 2000 letter from Wes Armand) were produced. Accordingly, we request that the City review its files again for the specific purpose of locating the reports, surveys and underlying documentation referenced in the attached letters, as well as all documents relating to Marvin Engineering's pending application for a pier permit. Thank you again for all of your help. You and all of the City staff I met with on Tuesday were very courteous and helpful- ! ow - Enclosures cc: Richard H. Berger, Esq. (via facsimile) Howard J. Rubinroit, Esq. ry truly yours, ry cta ;ioA. Pedroza AFR-14-2020 16:34 Sidley & Austin 56% P. -22 Sidley & Austin 04/14/2000 4:17: PAGE 003/8 RightFAX I CITY OF NEWPORT BEACH PC- BOX 1768, NEW= BEACH. CA 92658-8915 March 3 0, 2000 Lido Village Property Management Marvin Engineering 3.400 Via Oporto, Suite 104 "Newport Beach, Ca 92663-6302 Re: Pier Permit CP12434001 Sirs: Tic City of Newport Beach Fire and Marine Departtnent has received a request to transfer pier permit CP12434001 for the Lido Village Marina- The facility was inspected by the City of Newport Beach Marine Environmental Division, the City's Deputy Fire Marshai, and the City's Senior Building Inspector. We cannot transfer the pier permit until the following deficiencies have been corrected and we have been notified of the corrections. 1. Chapter 17.20.020 Vessel Tie-up Method. Vessels shall be fastened from both bow and stem. Vessels should not be rafted together. 2. There are several violations to the Uniform Fire Code Chapter 3-1 (a) which prohibits berthing vessels in locations that prevent other vessels from existing the slip or access - to the open water. 3. The structural deficiencies at the time of this inspection were large cracks in the cement walkway along the main headwalk- 4. The City Deputy Fire Marshall found several violations with the fire fighting equipment on the docks. Several fire hose cabinets need to have the glass replaced, the hose hanger mechanisms replaced- Some of the hoses in the fire cabinets must be re -hung. There should not be any used or discarded batteries an the dock. Also, there should not be the storage of propane tanks on the docks. 5. The City Senior Bluilding Inspector found several missing covers to the electrical the docks. The electrical mountings for ibe major disconnects to both the vessels Athena and Electra are nisted and need to be scraped, painted or replaced. 71e Overheadlight on the wooden docks needs to be wired with "hard wire" and a -switch installed. All nou-twist-lock extension cords should be removed from use on the docks (No GFI protection). Some main panel boxes are missing the "dead front" and need to be replaced. Some of the power distribution pack mounts are rusted and require maintenance. lim- f�l �WF-rebe a coaducted the marina had a .. ),:oximately 97 vessels berthed in the facility. The City Municipal requires -1/4 parking space"per berthed vessel. 5idley & Austin 04/14/2000 4:17: PAGE 004/8 RightFAX -The Newport Beacli City Council Harb or Permit Policies require that at the time of transfer, all harbor struc=es shall be inspected for compliance with the City's Tninimurn standards, and the conditions of the existing permit- All structural defi.ciencies must be corrected prior to t-ansfer of the permit ?lease advise this department when the above deficiencies have been corrected. Cail 644- 31043 if you require additional information in regards to this matter or to request a re- inspection. Sincerely, Wes Armand Fire and Marine Department Marine Environmental Management Division APR -14-2000 16:35 Sidley & Rustin 96% P.34 RightFAX Sidley & Austin 04/14/2000 4:17: PAGE 005/8 &T NEWPORT BEACH FIRE AND MARINE DEPARTMENT M January 21, 2000 Jerry King PSOMAS 3187 Red Hill Avenue, Suite 250 Costa Mesa� Ca 92626 Re: Lido Village Marina Dear Jerry: Thank you for taking the time to accompany ine on the walk through at the Lido Village Marina It is much better to do this an site rather via a letter. We discussed marina-bertEing requirements and viewed e?dsting violations within the Marina. There were several vessels berthed in locations that prevented others vessels from e�dt:ing the slip and access to the harbor. This is a violation to the Uniform Fire Code Chapter 3-1 (a)"Berthing and Storage Facilities". Several vessel rafted in violation to the City of Newport Beach Municipal Code 17.20.020 "Vessel Tie-up Method7and Section 17.20.010 "Docking Per:missiori Required7, Also one vessel berthed blocking �he Public Pumpout Station in violation to City M.C'. Section 17.30.020. "Pumpout -al deficiencies that require Facility RequireT'. In addition we saw some structn repairs. Regarding the berthing violations, -the problem stated above could be corrected if the marina management would bring the number of vessels down to the fifth -five (5 5) slips and eighteen (18) side ties authorized in the Harbor Penuit for this facility. Please adyise the escrow company handling the sale of the property that the harbor permit must -be transferred into the name of the new property owner. This is usually. handled during escrow since the buyer wants to know all the corrections that must be rnade prior to the transfer of the perrait. Sincerely, Wes Armand ire and Marine Department Cc. Tony Melum APR -14-2000 16:36 Sidley & Pustin P.25 Sidley & Austin 04/14/2000 4:17: PAGE 006/8 RightFAX ------------ 3— 9-00; :,1 6-%A, Mery In LZInCl SYS -C191713 :310 306 Sias 09 Z' FKM FAX NO. 94967-3eSJ 7 -o'- Oe 2000 05:31PM P, Po CITY OF NEWPORT BEACH OFFICE OF THE CITY ATTORNEY P.O. BOX 1769, NEWPORT BEACH, CA 92658-8915 (949) '644-3131 November 9, 1999 Donna Larson Ll DO MARI NA %F1 LLAG E U00 Via Porto Suite 104 Newport Beach, CA, 92M3 RE: HARBOR PERMIT COMPLIANCE ISSUES WITHIN LIDO MARINA VILLAGE Dear Ms. Larson: This lettervAll outline the results of staffs recent review of -the Lida Marina Vulage's current compliance -with conditions attached to Harbor Fermit No. 124-34CO- Follomiing 2n Ocicber 5, 1999 survey af the =nditJons of the Marina we have reached the fbilowing =ncluslons regarding compliance: 1. Berthina Requirements: Boaft in the Marina are not being berthed in a manner that complies with City Council Policy and the Municipal Code. The Harbor Permit was approved on May 29, 1973 and authorized constructon of the Marina to include ffftV-ffve (55) slips and eighteen (18) side ties for a total of seventy-three (73) docking spaces. Afthough the PermA does not specfflca3y limit the number of boats, all- boats must tp prope iy �e surveyed the � On October 5, 1999, Marine Olvision 7. Marina and found one hundred four (104) b.cats berthe�vAffibthe Marina. At least thirty (30) boats were berthed in 2 manner thaf violated', Sections of 1720-010 and 17.20.020 of the Municipal. Code an�-�=Wpclicy H-1, Moorings. PI ensure th ' at all boatr. berthed,Jn,ths Madra comp� wrth the cited Newport Beach Municipal Codes and Council Policies. 2. Parking Ftectutrerneolp, The. Marina does not appear t o provide the parking required by the Harbor Permit. The Hartor Permit requires the Marina to comply with the parking, safety and sanitary requirements found in Sections 17, 18 and 19 of Council Harbor Permit Policies- While some Council Policies may have changed since 1973, ths parking requirements for commercial marinas have not. Council Policy requires commercial marinas to provide .75 spaces for each single boat slip and -75 parking spaces foi each twenty-five feet q5j cf 3300 Newport Boulcvard� Newport Btarh RPR -14-2000 16:37 Sidley Austin '36% P.06 I Sidley & Austin 04/14/2000 4:17: PAGE 007/8 RightFAX 3- 9-00: 1 i6PKA:Mary In Land Svstems :110 SOB S'08 sz FROM FFIX NO. S49s-mesi7 09 2OW 05: 31PM P2 Page 2 November 9,1999 moonng space: not classified as a slip. Therefore, as approved in 1973, 1he sevent��three (73) slips and side fas -required. fifty-five (55) parking spaces. Planning Cepaftent records indicate *that 25 of the required spaces are provided In 1he parking structure- Please provide Firis and Marine Department with the location where ft rarrialning 30, spaces are bein provided. -r,4 19=r- On*w 3. Charter Operations: Charter operations out of the Marine appear to not be providing the required paridng. The Revenue Division reperts that since August 1, 1998 Lido Marina Village was used for 797 charters With over 84,367. passMsers- The City is concemed that parking for these charters has bee� provided with parking that Is already encumbered for other uses within Lido Madina Village. This is true particulady during the daythe when 211 of the parking in the parKing structure is dedicated to otther uses per current eAsting use parmiLs. A ttached to this later * a ' parking survey, prepared by the Planning Department staff ftt Indicates. that n either the pi?rdng structure. or the 32nd Street lot has available parJdngjbr-.charteA 'durin'g- the daytIme. only eighty-five (85) spaces are:availa I ble -within. t ' � " - ' ' ":' - ho, Parldng'--stTucture and seventy-two (72) spaces are available.at 32nd Sireet after,$. p.m. By -copy of this latter, we are asking the Revenue Olv1sion to make sure that Charter Permits are not approved unless the designated parking for the Charter is unencumbered by other uses. 4. Dock Conditions: Many of the docks are being maintained in fair to poor condition. These conditions have already been brought to your attenton by the Fre and Marine Department and, I have been Provided correspondence that indicates that you have taken Pro'mpt action to make the necessary repairs. Finally, Planning'06partment staff has noted that there are several parking spaces withinthe parking structure thatare rose . rved for specife tenan I ts Reserved parking it not allowed under the Use Permit.that authorized construction of the,pa . rkIng structure. RPR -14-2020 16:37 Sidley Austin 96% P.3? Sidley & Austin 04/14/2000 4:17: PAGE 008/8 RightFAX 9-r1c: :I G�M:tj..— I, SOO -SYSTOMS ;3!0 306 5108 5 FAX NO- 94%7--Z517 08 2000 05:32PM P3 Page 3 November 9, 1999 If you would 1ke to request a meetng to discuss the issues raked in this leter, I would be happy to arrange a meeting. Otherwise, your prompt atteintion to Nis letter is appreciated.. City staff Yvill follow up to confirm compliance With the Issues raised on or after 30 dayi fmm the date. of th�. LeHer. Very trul ours, Robin L Clauson Assistant City�Attomey fbr the City of NewpcdSmch- RC:da Homer Bludau, City Manager Sharon Wood, Assistant QV Manager Glen Everroad, FZevwue Director, Administrative Evvices Tim Riley, Fire & Marine Chief, Fire & Marine Department RPR -14-2000 16:37 Sidley i�ustin 96% P.08 Sidley & Austin 04/14/2000 4:17: PACE 001/8 RightFAX I D L E Y & AU S TI A PARTNERS141P INCLUDING PROFESSIONAL CORPORATIONS 555 WEST FIFTH STREET CHICAGO Los ANGELES, CALIFORNIA 90013-1010 HONGKONG DALLAS TELEPHONE 213 896 6000 LONDON NEW YORK FACSIMILE 213 896 6600 SHANGHAI WASHINGTON, D.C., FOUNDED 1866 SINGAPORE TOKYO FACSINULEIMLECOPIER TRANSMISSION Name: Octavio Pedroza (213) 896-6068 Voice Phone: Rosalyn (213) 896-6841 To: Name: Debbie Alcaraz Company: Fa csimile #: 949-644-31.39 Voice Phone: Subject: LW13 Lido Partners LLC v. Marvhi Engineering Co., Inc. Message: Date: 04/14/00 Time: 04:15 PM No. Pages (Including Cover): THIS MESSAGE IS INTENDED ONLY FOP, THE USE OF THE INDIVIDUAL OR ENTITY TO WHICH IT IS ADDRESSED AND MAY CONTAIN INFORMATION THAT IS PRIVILEGED, CONFIDENTTAL AND EXEMPT FROM D15CLOSURE UNDER APPLICABLE LAW. IF THE READER OF THIS MESSAGE IS NOT THE INTENDED RECIPIENT OR THE EMPLOYEE OR AGENT RESPONSIBLE FOP, DELIVERING THE MESSAGE TO THE INTENDED RECIPIENT, YOU ARE HEREBY NOTIFIED THAT ANY DISSEMINA71ON , DISTRIBUTION OR COPYING OF THIS COMMUNICATION IS STRICTLY PROHIBITED. IF YOU HAVE RECEIVED THIS COMMUNICATION IN ERROR, N07IFY IMMEDIATELY BY TELEPHONE, AND RETURN THE ORIGINAL MESSAGE TO US AT THE ABOVE ADDRESS VIA THE US PCS7AL SERVICE. THANK YOU. NOTE: IF YOU DO NOT RECEIVE ALL THE PAGES, PLEASE CALL: Rosalyn (213) 896-6841 APR -14-2000 16:34 Sidley & Austin 96% P.01 S 1 D L E Y & AUST 1 N A PARTNERSH;P 011CLUJING t�f�,)Ff.5�10NAL coV*0P,,TJ0N5 553 WEST F11VTH STREET L Q N t� OALLAS Las ANGELES, CALIF011NIA 90013-1011NAR 2t.*: 2000 N2,N YCRK TELEF14(DNe 213 896 6000 IN,SHIN67C'N D (2 :ACSIMILE 213 896 6600 Four,jDvri 1866 wr.:TEs'-,� E11qFizF NuMs2A WrITCq E-1—, . 2 13) 8 9 6 -6 0 6 8 March 23, 2000 V;,i Facsimile & Federal Express Debbie Alcara-z Administrative Assistant City Attorneys' Off"Ice City of 'Newport Beach - - 00 Newport Boulevard N�wport Beach, CA 92663-3884 "U" <:J Lj Re, J -WB Lido Pamel-s LLC v. Marvin Engineer�ng Co., Inc./ Deposition,Sub�eria for roduction ofBusinm PLecords Dear Ms Alcaraz: This letter is in response to your request that we provide the City of Newpolt Beach with an explanation of the types of records that are the subject of the Deposition Subperia ror Production of Business Records sefvcd or the Office of the City Attomey, OffIce c)ftile Clt'y Man q I Ine DeFartment and ,er, Planning Department, Building Department, F�re & TMari Adnalnistrative Services Department. -fhe types of records whose production is calle6 for by n�e Subpenas include the following'. I . All permits, permit applications, co7espondence and other writings in Uhle Files of the City and/or its agericies that concern the beat slips at Lido Marina Village. 2, All permits. permit applications, correspondence an6 other writi rigs in the �iles of the City and/or its a gencies that concern the physical condition and operation of theboat, slips and/or any other improvernents at Lido Marina Village, 3. All d1ocuments in the files of the City andlor its agencies which relate to the attached two letters or their subject matter, The first letter is ftorn Robin L. Clauson, Assitani C ity-, Attorney, to Donna Larson of Marvin Engineering Co , Inc, dated November 9, 1999 regarding harbor permit cornpliance issues at the Lido Mar�na Village, in particular berthing and parking requirements, charter operations and dock conditions The second leLter is from Wes Aj,rriond� of the Fire & Marine Department toJerry Kirig i-egarding severail code viclations exlstitig at the Lido Marina Village, including violations relating to benhing and storage zo 3s�.)C� 3NP�VK36L� H08 ic�N 0ZTSVV96t6 t�g :90 000Z/6e/t?A- SICLEY & AUST[N,' Debbie Alcaraz March 23, A2000 Page 2 LOS ANGELES faCllitieS, VC,�Sel tie -Up methods, docking permission, the "pumpout" fa�;:Ilvy, Structural �teficlencies and the transfer of the harbor permit, 4� All, documents in the filles of the City and/or its agencies that concern ,arking �eculred for the Udo -Marina Villaize andlor �ts operations 5. All documents in the files of the City and/or its a-encies that concern arry code vinlations. by Marvin Engineering Co,, Inc Fespecting the Lido N'larina Villiage, Please be advise� that, the foregoing list is not interided to be exhau�,tive, out rather is 'Intended to give you and the personnel responsible for Sathering the records examples of -,he types of records we are interested in and whosse production is called for by the Subpe.-as Please be advised that the street addresses for the facilities iocated at t�e L,�do I �vfarina V'lj'age are as fUows. 3390 Via 1-I'do -)434 Via Lido 345'. Via Oporto Z636 Newport Boulevard 3450 Via Oporto 3440 VIE, Oporto 3 -700 Centmi Avenue 3424 Via Ot)orto '4'� 1 Via Oporto 3420 Via Oporto Porto 3404 Vi a 0 Should you have any further questions, please do not hesitate tQ --ontact rr.t at th�. above -noted telephone number. Your assistance and cooperation in this matter is a-ly gre apprec-iatei. 'VeTy tn�,ly yours r Q Octavio A. Fedroza n-,A,P o a p cc Ric'hard H. Berger, F -sq, Nia facsimlle) Hc -ward J. Rubinroit, Esc, EO -3SV6 3NI6M�33�ii-� HOE 1CN 03TCVV9GV6 t1q :91a 000�7 ,lSollpo Sidley & Austin 05/05/2000 4:34: PAGE 002/17 RightFAX C 1i I CA 50 I- I AS NEw YoRK WA5AINGTON, D.C. WRITEX'9 DIRECT NUMBPR (213) 896- 6 0 6 8 Via Facsimile S I -D L E Y & Aus T I N A FAFTNERSFIF INCLUDINr FROFESSMNAT. CORFOXATrONS 555 WEST FIFTH STFEET Los ANGELES, CALIFORNIA 90013-1010 TELEPHONE 213 896 6000. FACSIMILE 213 896 6600 Debbie Alcaraz Administrative Assistant City Attomeys'Office City of Newport Beach 3300 Newport Boulevard Newport Beach, CA 92663-3884 Dear Debbie: FOUNUhl.) 1866 May 5, 2000 Re: LWB Lido Partners LLC v, Marvin Engineering Co., Inc. H ONG K 0 N G Lo,, ooN S11 ANGII A[ SINGAPORE 7()izyo WRITER'5 E-MAII AIMRF�', oped rozassid ley. c om As I discussed with you this morning, there appears to be additional documents and materials that apparently were not produced in response to the various subpoenas we served on the City of Newport Beach. First, several of the documents that were produced refer to meetings by the City Council at which matters relating to the Lido Marina Village were discussed. Accordingly, we are requesting that the City make available for inspection the minutes of the meetings of the City Council from January 1, 1998 to the present. I am available to review the minutes and the additional documents described below at your offices either on May 81h, 91h, I Oth or 12"', whichever day is most convenient. Other documents that appear to be missing are documents relating to the several inspections of the Lido Marina Village conducted by City inspectors over the course of the past year. I have attached to this letter letters from City inspectors which were produced and which reference code violations and other deficiencies existing at the Lido Marina Village. We request that any other such letters and all the underlying documentation (e.g,, inspector's notes) be made available for inspection and copying as well. Please be advised we have been informed by Wes Armand of the Fire and Marine Department that some notes do exist with regard to at least certain of the inspections, but those have not been produce to us to date, The third category of "missing" documents relates to two parking surveys concerning the Lido Marina Village performed by the City, copies of which are also attached to this letter. We request that all documents relating to these two surveys, including all underlying documentation and notes, be produced as well. MAY -05-2020 16: 51 Sidley & Austin '36% P.02 Sidley & Austin 05/05/2000 4:34: PAGE 003/17 RightFAX S4DLEY & AuSTIN Los ANGELES Debbie Alcara-z May 5, 2000 Page 2 Finally, we are hopeful that th ' e search for the foregoing may turn up other documents which may have been overlooked. Thank you again for all of your help, Your professional courtesy is greatly appreciated. YTry truly yours, ctavlo A'. Pedroza Enclosures y I It. Richard H. Berger, Esq, (via facsimile w/ encls.) Howard I Rubinroit, Esq. (w/o encls.) MRY-05-2000 16:51 Sidley & Austin 96% P. 03 Sidley & Austin 05/05/2000 4:34: PAGE 004/17 RightFAX NEWPORT BEACH FIRE AND MARINE DEPARTMENT August 26, 1999 Donna Larson Lido Manina Village 3400 Via Oporto. Suite 104 Newport Beach. Ca 92663) Re: dock inspection Dear Donna; This letter and attachments will cover the scope of repairs that must be made to the docks following today's inspection. The City of Newport Beach Harbor Permit policies require the pier permitice to "keep the structures in good repair at all times. Failure jo repair. when written notice has been given by the Fire and Manine DeparTment shall be cause for revocation of the permit." (Section 4H) The City of Newport Beach Municipal Code requires the CitY, , uponleaming to immediately notify the that any pier is in a defective or dangerous condition owner or other persons having charge of the same in Wrliting, requiring that repairs be done immediately, or to put up barriers to prevent persons from going upon it. Therefore, please submit to the Marine Environmental Management Division a schedule for the repairs. Included should be the time frame for a) applying for the maintenanc I e permit. b) Completion of the itemized repairs. If you have any questions regarding the repairs as, specified on the attached forms, or the maintenancc permit process. call 644-3043. MRY-05-2000 16:52 Sidley & Austin 96% P. 04 Sidley & Austin 05/05/2000 4:34: PAGE 005/17 RightFAX MRY-05-2000 16:52 C fj Sidley & Rustin LA '36% on Austin 05/05/2000 4:34: PAGE 006/17 RightFAX 1�1 X, �.j > r .0 -,,a C� 7- :3 CL r— ej w m m M. C6 C, Q. cr R4 'E' ca 0 :3 Lh MRY-05-2000 16:52 Y. �jl Sidley & Rustin '36% P.06 Sidley & Austin 05/05/2000 4:34: PAGE 007/17 RightFAX CITY OF NEWPORT BE A (�H OFFICE OF THE CITY ATTORNEY P.O. BOX 1768, NEWPORT BEACH, CA 92658-8915 (949) 644-3131 November 9, 1999 Donna Larson LIDO MARINA VILLAGE 3400 Via Porto Suite 104 Newport Beach, CA, 92663 RE- H A DOMPPER I MIT COMPLIANCE ISSUES WITHIN LIDO MARINA VILLAGE Dear Ms. Larson: This letter will outline the results of staff s recent review of the Lido Marina Village's current compliance with conditions attached to Harbor Permit No. 124-3400. Following an October 5, 1999 survey of the conditions of the Marina we have reached the following conclusions regarding compliance: Berthina Reauirements: Boats in the Marina are not being berthed in a manner that complies with City Council Policy and the Municipal Code. The Harbor Permit was approved on May 29. 1973 and authorized construction of the Marina to include fifty-five (55) slips and eighteen (18) side ties for a total of seventy-three (73) docking spaces. Although the Permit does not specifically limit the number of boats, all boats must be properly berthed. On October 5, 1999, Marine Division staff surveyed the Marina and found one hundred four (104) boats berthed within the Marina.. At least thirty (30) boats were berthed in a manner that violated Sections of 17.20.010 and 17.20-020 of the Municipal Code and Council Policy H-1, Moorings. Please ensure that all boats berthed in the. Marina comply with the cited Newport Beach Municipal Codes and Council Policies. 2. Park ng Reauirements: The Marina does not appear to provide the parking required by the Harbor Permit. The Harbor Permit requires the Marina to comply with the parking, safety and sanitary requirements found in Sections 17, 18 and 19 of Council Harbor Permit Policies. While some Council Policies may have changed since 1973, the parking requirements for commercial marinas have not. Council Policy requires commercial marinas to provide .75 spaces -for each -five feet (25') of single boat slip and .75 parking spaces for each twenty 3300 Newport Botdcvard, Newport Beach NRY-05-2000 16:53 Sidley & Rustin 136% P.O? Sidley & Austin Page 2 November 9, 1999 05/05/2000 4:34: PAGE 008/17 RightFAX moolring space not classified as a slip. Therefore, as approved in 1973, the seventy-three (73) slips and side ties required fifty-five (55) parking spaces. Planning Department records indicate that 25 of the required spaces are provided in the parking structure. Please provide Fire and Marine Department with the location where the remaining 30 spaces are being provided. 3. Charter Operations: Charter operations out of the Marina appear to not be providing the required parking. The Revenue Division reports that since August 1, 1998 Lido Marina Village was used for 797 charters with over ' 54,367 passengers. The City is concerned that parking for these charters has been provided with parking that is already encumbered for other uses within Lido Marina Village. This is true particularly during the daytime when ail of the parking in the parking structure is dedicated to other uses per current existing use permits. —.Attached to this letter is a parking survey prepared by the Planning Department staff that indicates that neither the parking structure or the 32nd Street lot has available parking for charters during the daytime. Only eighty-five (85) spaces are available within the parking structure and seventy-two (72) spaces are available at 32nd Street after 6 p.m. By copy of this letter, we are asking the Revenue Division to make sure that Charter Permits are not approved unless the designated parking for the Charter is unencumbered by other uses. 4. Dock Conditions: Many of the docks are being maintained in fair to poor condition. These conditions have already been brough t to your attention by the Fire and Marine Department and I have been provided correspondence that indicates that you have taken'prompt action to make the necessary repairs. Finally, Planning Department staff has noted that there are several parking spaces within the parking structure that are reserved for specific tenants. Reserved parking is not allowed under the Use Permit that authorized construction of the parking structure. MRY-05-2000 16:53 Sidley & Rustin 96% P.08 Sidley & Austin 05/05/2000 4:34: PAGE 009/17 RightFAX Page 3 November 9, 1999 if you would like to request a meeting to discuss the issues raised in this letter, I would be happy to arrange a meeting. Otherwise, your prompt attention to this letter is appreciated. City staff will follow up to confirm compliance with the issues raised on or after 30 days from the date of this letter. Very trul ours, ou Robin L. Clauson Assistant City Attorney for the City of Newport Beach RC'da cc: Homer Bludau, City Manager Sharon Wood, Assistant City Manager Glen Everroad, Revenue Director, Administrative Services Tim Riley, Fire & Marine Chief, Fire & Marine Department F-\users�cat\sh are d\CodeENfcrcekLidoM adnaviii age\Ietter\0 Lparking. doc MPY-05-2000 16:53 Sid ley & Rustin 136% P.09 Sidley & Austin 05/05/2000 4:34: PAGE 010/17 RightFAX NEWPORT BEACH FIRE AND MARINE DEPARTMENT January 21, 2000 Jerry King PSOMAS 187 Red Hill Avenue, Suite 250 Costa Mesa, Ca 92626 Re: Lido Village Marina Dear Jerry: Thank you for taking the time to accompany me on the walk through at the Lido Village Marina. It is much better to do this on site rather -via a letter. We discussed marina -berthing requirements and viewed existing violations within the Marina. T%ere were several vessels berthed in locations tha prevented others vessels from exiting the slip and access to the harbor. T"his is a violation to the Uniform Fire Code Chapter 3-1 (a)"Berthing and Storage Facilities". Several vessel rafted in violation to the City of Newport Beach Municipal Code 17.20.020 "Vessel Tie-up Method7and Section 17.20.010 "Docking Permission RequirccV'. Also one vessel berthed blocking �thc Public ?umpout Station in violation to City M.C. Section 17.30.020. "Pumpout Facility Required". In addition we saw some structural deficiencies that require repairs. Regarding the berthing violations, the problem stated above could be - corrected if the marina management would bring the number of vessels down to the fifth -five (5 5) slips and eighteen (18) side ties authorized in the Harbor Permlit for this facility. Please advise the escrow company handling the sale of the Property that the harbor permit must be transferred into the name of the new property owner. Thi s is usually. handled. during escrow since the buyer wants to know all the corrections that must be made prior to the transfer of the permit. Sincerel �/, y, Wes Armand Fire and Marine Department Cc: Tony Meltim MRY-05-2000 16:54 Sidley & Rustin 96% P.10 U Sidley & Austin 05/05/2000 4:34: PAGE 011/17 RightFAX NEWPORT BEACH FIRE AND MARINE DEPARTMENT Febnmry 4,-2000 Dwight Bel -den Watttson Breevast 3600 Birch SL, Suite 250 Newport Beach, Ca 92660 Re: Lido Village Marina Dear Mr, Belden: The Fire and Marine Department has been informed by you that a sale of the Lido Manina Village is in the final process and could be completed within the next two weeks. The Newport Beach Harbor Permit Policies I O.B states: "Whenever a permittee sea the abutting upland property, a request shall be made to the City to transfer the permit. Forms for this purpose may be obtained from the Marine Division." An inspection is required of the facility for structaral. reqifirements relative to safety violations, electrical code violations, sanitary violations, and other requiramcuts as specified in Chapter 17 of the Municipal Code or the appropriate sections of the Harbor Permit Policies, The City has the authority to refuse to consent to a transfer of a harbor permit when the permittee is in violation of Title 17 of the Newport Beach Municipal Code or applicable Harbor Policies. Specifically, the Harbor Policy prohibits the transfer of any permit when there am I structural deficiencies". In recent months the Lido Village Marina has had in�pections related to structural deficiencies, berthing, and parking requirements by this division. In addition, the Fire Marshall's Of5ce has recently conducted an inspection of the marina. Call 949-644-3106 in regards to the inspection. A Letter listing the deficiencies was send to the Lido management (see attached). Most of the structural deficiencies noted in the report have been corrected, but them are still some corrections remaining. Continued berthing violations were noted in a separate letter (attaclied) and have not been corrected. Compliance for parking is still an issue. Harbor Permit Policy 17.A. "All commercially operated boat docking facilities shall provide 0.75 parking stalls for each single boat slip and 0.75 parking stalls for each 25 feet of available mooring space not classified as a slip." The City Planning Depar=ent has notified this office that Lido Vi I llage Marina does not provide adequate parking for the number of slips for their marina tenants or for the Comm ercial charter boats passengers - Sidley & Austin 96% P. 11 Sidley & Austin 05/05/2000 4:34: PAGE 012/17 RightFAX it is this of Face's position that a transfer of the Harbor Permit is not possible until aLl violations are corrected. If you require additional information, p,lea5e call 949-644-3043. Sincerely, Wes Armand Fire and Marine Department Marine Environmental Management Division Cc: Robin Clauson Patricia Temple TonyMelum MRY-05-2000 16*55 Sidley & Rustin 96% Sidley & Austin 0 fk March 30. 2000 05/05/2000 4:34: PAGE 013/17 RightFAX ITY OF NEWPORT BEACH RO. BOX 1768, NEWPORT BEACH, CA 92658-8915 Lido Village Propertv Manaizement Marvin Engineering 3400 Via Oporto, Suite 104 Newport Beach, Ca 92663-6302 Re. pier Permit CP12434001 Sirs: The City of Newport Beach Fire and Marine Department has received a request to transfer pier permit CP 12434001 for the Lido Village Marina. The facility was inspected by the City of Newport Beach Marine Environmental Division. the City's. Deputy Fire Marshal. and the Citv*s Senior Building Inspector. We cannot transfer the pier pennit 'I he following d�ficiencies have been corrected and we have been notified of the unti t - corrections. 1. Chapter 17.20.020 Vessel Tie-up Method. Vessels shall be fastened from both bow and stem. Vessels should not be rafted together. 2. There are several violations to the Uniform Fire Code Chapter 3-1 (a) which prohibits berthing vessels in locations that prevent other vessels from existing the slip or access to the open water. 3. The structural deficiencies at the time of this inspection were targe cracks in the cement,walkway along the main headwalk. 4. The City Deputy Fire Marshall found several violations with the fire fighting equipment on the docks. Several fire hose cabinets need to have the glass replaced. the hose hanger mechanisms replaced. -Some of the hoses in the fire cabinets must be 0 r re -hung. There should not be any used or discarded batteries on the dock. Also, there should not be the storage of propane tanks on the docks. Ic 5. The City Senior Building Inspector found several missing covers to the electr' al the docks. The electrical mountings for the major disconnects to both the vessels Athena and Electra are rusted and need to be scraped. painted or replaced. The Overhead I ight on the wooden docks needs to be wired with "hard wife" and a switch Installed. All non -twist lock extension cords should be removed from use in panel boxes are missiniz the "dead on the docks (No GFI protection). Some ma front" and. nf�r�,l to be replaced. Some of the power distribution pack mounts are rus, ,,,Id require maintenance. When these inspections were beine conducted the marina had approximately 97 vessels berthed In the Facihty. The City Municipal requires 114 parking space per berthed vessel. 3300 Newport Boulevard, Newport Beach MAY -05-2000 16:56 Sidley & Rustin 96% P. 13 Sidley Austin 05/05/2000 4:34: PAGE 014/17 RightFAX The Newpon Beach city Council Harbor Permit Policies require that at the time of transfer. all harbor structures shall be inspected for compliance with the City's minimum standards. and the conditions of the existing permit. All structural deficiencies must be corrected prior to transfer ofthe permit. Please advise this department when the above deficiencies have been corrected. Call 644 - is matter or to request a re - 3043 if you require additional information in regards to thi inspection. Sincerely, Wes Armand Fire and Marine Department Marine Environmental Management Division MAY -05-2000 16:56 Sidley & Rustin 96% P. 14 Sidley & Austin GA00 L.IPA 05/05/2000 4:34: PAGE 015/17 RightFAX MRY-05-2000 16:56 OEM x L U -1 -0 �= �S 0 I I - -U .�= 8 Uj LU 0 0 0 m 0 0 (U CM 0 m 0 Li- D LL 0 IL 0 L.L 0 LL IL 2 U, =t joqj cn LL z U ql, E m 0 m 14%(ea rr E w LU :3 -"-kv U 0 m z E eo, mz U cm L . Ifle MRY-05-2000 16:56 OEM x L U -1 -0 �= �S 0 I I - -U .�= 8 Uj LU 0 0 0 m 0 0 (U CM 0 m 0 Li- D LL 0 IL 0 L.L 0 LL IL 2 =t cn LL E m 0 m rr E w LU :3 U 0 m z E mz cm 7 U- LL- CL Sidley & Rustin 96% P.15 x L U -1 -0 �= �S 0 I I - -U .�= 8 Uj LU 0 0 0 m 0 0 (U CM 0 m 0 Li- D LL 0 IL 0 L.L 0 LL IL 2 =t cn LL E m 0 m rr E w LU :3 U 0 m z E mz cm 7 U- LL- CL Sidley & Rustin 96% P.15 Sioley & Austin 05/05/2000 4:34: PAGE 016/17 RightFAX FROM FAX No. : '34967--QS17 08 20120 05!33PM PS v1po VILLAGE AREA PARKING INVENTORY ?ARK (i FID C 66 5paCCS N1[;HT1 WAIVF12 114 spaces Vac2nt Nagic Island) 0 0 1819 0 (1/40)-' Warchous . c ResLaurazr 0 266 175 91 (1/40) Le Bistro Restaurant 16 5 16 5 (1/40) Lc Bistro Coffee Shop 5 1 5 1 (1/75) George's Camelot 10 29 10 (1140) Bavfroni Cafe 6 0 (1/75) Mama )vfia Restaurant 3 6 3 6 (1/40) Vac=t (previous Greek Reslaurant) 3 L 3 1 (1175) Vor-Ant (RnrciRl?v Food) 1 0 5 0 (It250) Rcstaumrit Usts:' 66 5paCCS 289 spa= 430 spaces 114 spaces 0frice Uses (11250) 132 0 0 0 Remil Uses (In -50) 9 0 0 Boat Sli q (91 shm Q 1 ffmcZ1,75 64 0 64 a Lido Village� (1,'250) �rs 8 0. 64 0 Lidn Sholn (F-agmsVig Lida) fl/250) 35 0— 0, 0 TOTAL 389 spaces 289 spaces 494 spaces 114 spaces 13ay.Lido Officc Bldg. 47 0 0 a Lido Towcr (Travel Max) 79 0 0 0 f3ank of Amcrica RL41ding. so 0 0 0 TOTAL 176 0 0 () TOTAL PARKING REQUIRED 565 spaces 0 494 spaces 0 PARKING AVATI-ABLE (PUBLIC) Municipal Parking Lot 27 0 On-Str= Parldng (Cenwal Me.) 17 17 On -Street Parking (Behind Lido Shops) 1 D 10 On- Street Parking an Via Lido 13 13 (PRIVATE) Parking Strucrare 7 373 373 32nd Srrccl ParkjU Lo� 43 '43 TOTAL FARKEVG AVAILABLE 483 spa,es 456 spaces Nlot W��z is Alft i I nj:iLatcrwAcd at a rwic at I spams for achQsq. & or-im:pWic4m� kcqwrfc�d numter of parking iw= rare=h asperUvehmineu per anlW"W uwpwrnit fiks Ni;ht parkLnz asnaTwn rw rmi I or offim parklm dammmit au, I ding sqijam rwUZcpwwidtd W i9paicable Ci:y=vamis fikswidUdo Mwin&VIIIL" MwL3*c"wMCor"y MearrolL Huildinp-which'no longri hawc aic or W Lido MxAmPz6-4ng Scracstm. but sUl draw ispan the LvaWaparidrigiplocs istthCVMAV&M& Numbcr ofspam�ia sarmw is bwcd on a ftid cmunt of va by Code FnautzrMw (Pirviourly lwtcdm 395L This and -m Kraom 32za 5V"T ?azkjng Lot his na lcgW'.-y bindft off-SiLz pwidbo. z7==ru maded To it (pa tbe mma-gesnui ccmpwy� Lida Martha V1111fe awns And =11201% ft -duAm "Wa lot 4NY(43 pw�ivgxra�ft). MRY-05-2000 16:57 Sidley & Rustin 96% P.16 0 Sidley & Austin 05/05/2000 4:34: PAGE 017/17 RightFAX Lri-.j NMJAGZ ARRA PARMN(; M.. -,TORY COMMCIAL USF -S DAY WAIVF-D Naggr WArVE2 LrDO VIUAGE PAR nVG STR U=R Buzz Resmurant 200 ��-D 41 175 41 Lz Bistra R=murant 16 5 16 5 Le Bisrro Caffih- Shop 5 1 5 1 Gwrga's Camelot 28 10 28 10 Bayfract Cafe 6 0 6- a Mama NUa Romu=t 3 6 3 6 R=t=raw Uses (p4 mq,,d pa U..P.) 258 spaces 63 spacts 233 spaccs 63 spams Of E= USCS (L/=O) L-1 3 D4 0 0 0 F—etail TJs= (lmo) -14.8 0 a - a B-43a(Sb2$ M slips 0 1 sp=r-(-75 sligs) 55 0 55 9 Udo Village (IMO) . -337 0 55 0 11do Shom TIA;ja g Via Lido) o n5p) 24-- —0- 0 0 TOTAL PARK3NG REQLIRED 419 spacu 63 sp=w 288 spects 63 spa= BUIMING PAR=Q�"OVMED fN LMO MARINA Va.LAGE QARAQE Bay Lido Off= BkIg. 47 0 0 0 Udo Tcrwcr (Travel Max) 58 0 0 0 01ca Building (3366 Via Iidc),' .34-1 /0 0 0 B arik of America R Wine TOTAI- 0 TOTAL PAIU93NG DMVIAND &a spa=3 0 288 spaccs 0 TRWATE) Parking Szr==c nj 373 32nd Sm=t B=Idng r-ot 72 72 TOTAL PARMNG AVAMABLE 445 spacm 485 spaces ?xking RuMired for LWV 1.74 space Defje�t 197 spaca S!!T!u$--, 3aridng DemarA in LMV 363 Cpa Defiml Buzz and rzmcloc Rcstuimnts use per=ts reqLzire empioyees to park in the pArking suructure. Yight parldng i -I &fter 6 P=L Ni& parking aw-mes no retail or offlkc puking demand. Buildin; square foot2ge providrd W applicable Ciry use penmi Me& aM Lido Marina Village. Management Cozxrpany rent roll. R,equLmd a=bcr ofparking 3pac= foe cach r=pactyc business per applicable usc permit lues. Bu"ags which no tons= have use of 6c Lido Marina Parking Sawrurc have trrmixiated or allowed the off-sitc puk:inz w=z==nt to lapse, or have existing parldng ag=mectx with otbj--r locaLiocs. however they stW draw upon the avaLable padang spacei in the YW&gc 32ad Stree Park�g Lot has no Icg4y hinding off-sita parking agreem=Ls strLichcd to it (per the Managcn=nt Company) - Prepared I WMJ99, ;2nd Sweet Pzrkmg Lot. is mqtursd parlung far the buildinp locared aA 3366 and 3388 Via Lido (3366 Via Lido -NOT in L-M.V.)- A MRY-05-2000 16:57 TOTAL P,02 ''!IS/99 15:(�o Tk!RX N0.PF;:ZI, Sidley & Austin 96% �P.17 a 982(a)(15.4) ATTORNEY OR PARTY WITHOUT ATTORNEY (Name, state bar number, and address): FORCOURTUSEONLY Octavio A. Pedroza (SBN 178369) Howard J. Rubinroit (SBN 049742) SIDLEY & AUSTIN 555 West Fifth Street, Suite 4000 Los Angeles, California 90013-1010 TELEPHONE NO.: 213-896-6600 FAXNO.: 213-896-6600 A17ORNEY FOR (Narna): LWB LIDO PARTNERS LLC NAME OF COURT: SUPERIOR COURT OF THE STATE OF CALIFORNIA STREET ADDRESS: County of Orange MAILING ADDRESS: 700 Civic Center Drive West CITY AND ZIP CODE- Santa Ana, California 92702-1994 BRANCH NAME: PLAINTIFF/ PETITIONER: LWB LIDO PARTNERS LLC DEFENDANT/ RESPONDENT: MARVIN ENGINEERING CO., INC DEPOSITION SUBPOENA CASE NUMBER: For Personal Appearance and Production of Documents and Things 100 -CC -02974 THE PEOPLE OF THE STATE OF CALIFORNIA, TO (name, address, and telephone number of deponent, if known): Persons most knowledgable at the City of Newport Beach concerning the number, physical condition and permitted use of the boat slips and side tides at the Lido Marina Village 1. YOU ARE ORDERED TO APPEAR IN PERSON TO TESTIFY AS A WITNESS in this action at the following date, time, and place: FDate:August 23, 2000 Time-.,,, :00 p.m Address: Office of the City Attorney 3360 Newport Blvd, Newport Bch., CA a. F_X� Asa deponent who is not a natural person, you are ordered to designate one or more persons to testify on your behalf as to the matters described in item 4. (Code Civ. Proc., § 2025, subd. (d)(6).) b. You are ordered to produce the documents and things described in item 3. c. F_X7 This deposition will be recorded stenographically Ell through the instant visual display of testimony, and by = audiotape = videotape. d. = This videotape deposition is intended for possible use at trial under Code of Civil Procedure section 2025(u)(4). 2. The personal attendance of the custodian or other qualified witness and the production of the original records are required by this subpoena. The procedure authorized by Evidence Code sections 1560(b), 1561, and 1562 will not be deemed sufficient compliance with this subpoena. 3. The documents and things to be produced and any testing or sampling being sought are described as follows: A-11 documents relating to boat slips and/or side tides at the Lido Marina Village property produced or received from 4/11/00 to the present. = continued on Attachment 3. 4. If the witness is a representative of a business or other entity, the matters upon which the witness is to be examined are described asfollows: The number, physical condition and permitted use of the boat slips and side tides at the Lido Marina Village property. = Continued on Attachment 4. 5. IF YOU HAVE BEEN SERVED WITH THIS SUBPOENAAS A CUSTODIAN OF CONSUMER OR EMPLOYEE RECORDS UNDER CODE OF CIVIL PROCEDURE SECTION 1985.3 OR 1985.6 AND A MOTION TO QUASH ORAN OBJECTION HAS BEEN SERVED ON YOU, A COURT ORDER OR AGREEMENT OF THE PARTIES, WITNESSES, AND CONSUMER OR EMPLOYEE AFFECTED MUST BE OBTAINED BEFORE YOU ARE REQUIRED TO PRODUCE CONSUMER OR EMPLOYEE RECORDS. 6. At the deposition, you will be asked questions under oath. Questions and answers are recorded stenographically at the deposition; later they are transcribed for possible use at trial. You may read the written record and change any incorrect answers before you sign the deposition. You are entitled to receive witness fees and mileage actually traveled both ways- The money must be paid, at the option of the party giving notice of the deposition, either with service of this subpoena or at the time of the deposition. DISOBEDIENCE OF THIS SUBPOENA MAY BE PUNISHED AS CONTEMPT BY THIS COURT. YOU WILL ALSO BE LIABLE FOR THE SUM OF FIVE HUNDRED DOLLARS AND ALL DAMAGES RESULTING FROM YOUR FAIIWRE TO OBEY. Date issued: -�J( Lo.; -D Octavio A. Pedroza.(SBN 178369) .............. .............. (TYPE OR PRINT NAME) (SIGNATURE OF PERSON ISSUING Attornev for Plaintiff (Proof of service on reverse) (ME) Code of Civil Procedure, Form Adopted for Mandatory Use DEPOSITION SUBPOENA FOR PERSONAL APPEARANCE 4 Judicial Council of Califomia 5 §§ 2020,2025; 982(a)(15.4) [New January 1, 2000] AND PRODUCTION OF DOCUMENTS AND THINGS �La Lk"un"a?Govemment Code, § 68097.1 411[0�1' a 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PROOF OF SERVICE STATE OF CALIFORNIA ) ss COUNTY OF LOS ANGELES I am employed in the County of Los Angeles, State of California. I am over the age of 18 and not a party to the within action. My business address is 555 West Fifth Street� Suite 4000, Los Angeles, California 90013. On July 28, 2000, 1 caused the foregoing document described as DEPOSITION SUBPOENA OF PERSONS MOST KNOWLEDGEABLE AT THE CITY OF NEWPORT BEACH CONCERNING THE NUMBER, PHYSICAL CONDITION AND PERMITTED USE OF THE BOAT SLIPS AND SIDE TIDES AT TIIE LIDO MARINA VILLAGE to be served in this action by U.S. Mail to: Richard H. Berger 163 11 Ventura Boulevard Suite 1065 Encino, California 91436-2147 I caused the foregoing document to be served by U.S. Mail as follows: I placed true copies of the document in a sealed envelope addressed to interested party as shown above. I placed such envelope,. with postage thereon fully prepaid, for collection and mailing at Sidley & Austin, Los Angeles, California. I am readily familiar with Sidley & Austin's practice for collection and processing of correspondence for mailing with the United States Postal Service. Under that practice, the correspondence would be deposited in the United States Postal Service on that same day in the ordinary course of business. I declare under penalty of pe�ury under the laws of the State of California that the above is Itrue and correct. This service was made at the direction of a member of the bar of this Court. Executed on July 2A, 2000, at Los Angeles, California. Rosalyn�onf *4%k look a V ilk 'AOL C�ITY 0im" N W ORT ACH. UILD1,11,G.- D. �E ILI 11" v0, P's General 5 Harbor Permits and Drawings -7' W _J 0 --H W -0 P W1 I The construction of hgrborfacilibeg-shall accommodate the need for safety 5.1 Harbor permits shall be obtained per Harbor Permit Policy H-1. Detailed t w I 2.2.15 Dock (goal) minimum clear width for commercial passenger use' 4�� ffi and,durability as wen as convenience and appearance. Structural elements of construction plans (4 sets) and substantiating calculations (11 set) shall be 4LQC_4;g4._ - __ , -, submitted to Departmentwith the permit application for the 11 7 - - F3 shall. be adequate to safeguard human. life, boats long gangways, floats, piles, etc LZ Y > �i shall be 6 feet to 80 feet long and 8 feet for docks over 80 feet the Building _J 1:2 following Items: I and boating equipment. Boat berthing facilities 0all be designed to >� , I L ith an ample factor of safety. 2.2.16 Walkways or landing platforms shall not have less than 4 feet (N) 2-18" SO CONC _J adequately handle anticipated loads V 5.1.1 bulkheads and,groins V�7 PILES X 11 LL_ unobstructed width adjacent to gangways, nor 6 feet in front of 1.2 Materials of construction shall resist the corrosion of al s twater In order to =EJL gangways. at +7.5 foot M LLW water surface elevation. -AZO -E= assure low maintenance requirements and long life of the facllity� 51.2 piers and landings X W > *Ifflets at the connection of marginal walkways, main walkways 2.2.17 F �`X _j W 11.3 Floats shall be 4esi(, -buoyancy throughout the life of and finger floz, s ihall be -included In the berth designs and shall 5.1.3 gangways,.including hinge connections and hand railings ,,;�ed to assure stabil,ty and W ::i > 3i UJ the float. extend at least 44eetalong both floats. _j _j W W _j 5.1.4 anchor piles and guide piles, including roller assemblies F W - LU 2 W 1A Adequate utilities shall be proVided for the convenience and safety of boaters 2.2.18 Gangway (brow) slope for commercial passenger, multirOsidential -H a I:H W W and maintenance workers. 5.1.5 cantilevered patio decks VICINITY MAP N.T�& "1Z and smalt craft marina use shall not exceed I foot vertically for NN 7 each 3 feet of length when the tide is at -2.0 feet &I.W. All other NEWPORT BAY, CALIFORNIA NORTH UJ if UJ II gangway slopes shall not exceed I foot vertically for each 2 6.1.6 other harbor structures PROPOSED* 8' x 93' feet of len th,when the Ude is at -2.0 feet M LLW. FLOATING DOCK 2 Layout and Design .9 5.2 Plans and calculations for the above items shall be prepared by a Civil or 2.1 Designs for harbor facilities shall be based upon the useof the facility, defined 2.2.19 Walking surfaces of gangways (brows), piers and floats shall have Structural Engineer registered in the State of California, > UJ as follows: non-tkid finish, such as punched metal, unpointed timber, or grfl A% -I I _J I T W alled Rems: on- metal, Umber or plywood. 5.3 In addition, detailed. construction plans shall Include, but not be limited to, 2J.1 Single or joint residential indicating the following dimensions and det UJ W 2.2.20 Gangway (brow) minimum clear width for commercial passenger, 10 residential or small,craft marina use shall be 484nches. Ali 5.3.1 d. ck, pier gangway and anchor pile layout 2.1.2 Multiresidential and small craft marina. multl� other gangway minimum clear Width shall be 30 -Inches. 2.1.3 Commercial Passenger. 5.3.2 pontoon or float layout (with flotation calculations provided separately) (N) 20" SQ CONC 0 2.2.21 Gangways (brcws) for commercial passenger, multi-regidential or PILE TYP > 5.3,3 framing details including angles, bent plates, bolt and nail >W 2.2 Harbor st small -craft marina uses shall be equipped with self-closing, self- W ructures shall conform with "Layout Design Guidelines for Small (TOTAL OF 4) Z _J -I _j patterns, splices, bumpers, cleats, etc, d W latching gates P.t the bulkhead end. Gates shall notopen into 0 _J Craft Berthing Facilities' latest edition published by the State, of California W ::i W '060artmetit of Boating and Waterways (Gat Boating), 1629 "S" Street, intersecting walkways. La -H 0- 5.3.4 knee connections U_ W Z UJ -0 0 = I= M U-10 Sacramento, California 95814; telephone (916) 263-0784, except as modified W Y < 0 r--: W _J 0 2.2.22 Toe slept at the bottom of gangways (brows) for single or joint by the Cityt "Standard DiaOngs. for Harbor Constniction- or as follows. 0 D _J W If 0 5.3.5 guide pi e roller assemblies 0- M U_ residential use shall not exceed 9 Inches. Skid resistant too 0 W W W 2.2.1 Berths shall not be occupied by vessels more than a beam width Plates shall be installed on all other gangways., 5.3.6 pier piles and anchor pfles 4' x 4' CL longer than the b.etth nor larger than the vessel used in design FILLET TYP calculations, 2.2.23 Railings for single or joint. residential use shall be 36 -inches (E) FLOATING DOCK minimum height All other railings shall be 42 -inches minimum . 2.2.2 Maximum length vessel,is the largest vessel that shall be height. 5.3.7 top of bulkhead and pier deck elevations 5.3.8 maximum dredge contours (labeled as such) permitted to occupy a berth, % 2.2.24 Railings for commercial harbor structures shall be built such that a 5.3.9 Maximum length vessels used In design calculations for each - - - - - - - - - - - - - 2.2.3 Applied loads shall, be calculated for not lower,than -a +75 feet sphere 4 -inches in diameter cannot pass through.' berth, (circled within the berth). - - - - - - - - - - - - - 2.2.25 Railings for commercial passenge r, mult1wresidential or small craft (E) BULKHEAD Above MLLW water surface. 5.4 Harbor permits will be conditioned to, limit the size of vessels berthed in the PILE ELEVATION N.T.S. icular marina uses shall be facility; e.g., "The Harbor P 2.2�A Wind loads shall W calculated both parallel to and perpendi capable of resisting a horizontal force Of at ermit for this facility shall be conditioned to allow SOUNDINGS ARE EXPECTED IN FEET to maximum length vessels and structures. least 30pounds per linear foot applied at the top rail. All other AND DENOTE ELEVATIONS BASED ON berthing of one -70 loot and three- 45 foot maximum length vessels PILING LAYOUT harbor railings 9hall bercapable of supporting a -horizontal force of MEAN LOWER LOW WATER. N.T.S. 2.2.5 Wind loads"On lateral area of vessels or structures 'shall not be 20 pounds per linear foot applied at the top rail. 5.5 Future dredging in the vicinity of a permitted harbor facility Will be restricted; less than 15 Pounds per square foot. e.g., "Dredging not permitted below the contours shown hereon'. APLICANTS NAME LIDO MARINA VILLAGE LOT: TRACT: APLICANTS NAME : LIDO MARINA VILLAGE LOT: TRACT: JOB ADDRESS LIDO MARINA VILLAGE CONTRACTOR :SHELLMAKER, INC. DATE JOB ADDRESS LIDO MARINA VILLAGE CONTRACTOR :SHELLMAKER, INC. DATE 2.2.6 Lateral area of vessels for wind load calculations shall be equal to 3 Materials NEWPORT BEACH, CA 92663 2035 F PLACENTIA AVENUE 09/26/05 NEWPORT BEACH, CA,, 92663 2035 F PLACENTIA AVENUE 26/05 COSTA MESA, CA, 92627 COSTA MESA, CA 92627 09/� (0-15) X (maximum length vessel) X (maximum length vessel) PROCEDURES 3.1 Materials for harbor faciffies than conform to the "Standard Specifications for 2.2.7 Ten pprceht (10%) of the full wind load for an unshlelded vessel Public Works Constructt;n" published by Building News, Inc -except as PERMIT PROCESSING PROCEDURES shall be applied to each vessel in the' lee of the unshlelded vessel. APPROVALS modified as follows: SITE PLAN INSTRUCTIONS 2-2-8 Guide piles (those that provide lateral support for floats) shall be 1.� rill out a Building permit application at the Building Department permit The following checked (t/) approvals are required prior 16 issuing a guildin4 Permit: 3.2 Flbatation units shall consist of Provide a partial site plan in the space provided above drawn to an adequate scale to clearly'show the following positioned around berthing areas such that the centrold of lateral counter. information: Support provided at the +7.5 foot M tLW water surface elevation 3.2.1 Condtet6 cast around a solid, closed cell foarh core, - Approval in Concept Newport Beach Council coincides with the centroid of applied lateral loads. 2e Use city standard harbor construction drawings (cost:' $2.00 per sheet). Draw i. Location and dimension of proposed structure Including piles and locatilon of existing structures on adjacent 3.2.2 Fiberglass, polyethylene or p &firm fitUng solid, a site plan showing the scope of work and select the applicable details. Submit - Army Corps of Engineers California Coastal Commission jastic shell with' properties. 2.2.9 Pile penetration shall not bieless than 10 feet, nor calculated engineering calculations'as requited. Follow the instructions on drawings. penetration plus 3 feet closedcell foam core, or 3. L Three sets of drawings are required. Do step 2 on three sets or make copies. 2. Location of bulkhead, plerhead and project lines. AECEIVED -Public Works Department Building Department 3.2.3 A solid, closed cell foam core covered With an approved coating 2.2.10 Pile cutog elevation shall not be lower than +11.0 feet M LLW. �Soujb Coast Region to prevent physical damage. 3. Location of property lines. County of Orange 4. Permit Technician will process the permit application and charge the plan 2211 Floalation systems and piles shall be the products of check fees. 2, 0 2116 California Coastal Commission South Coast District ce manufacturers and contractors regularly engaged in the 3.3 Timber for d6cks'shall have a minimum net thickness of i % inches. 4. Location of channel markers within .200 feet. Site Inspection. Site Re -inspection production of such items for marine construction. , (, '! f� - �� � CALIFORNIA rmit N 5. One set of drawings is placed in the Building Department plan check stack. . ....... 3.4 Walking surfaces of gangways (brows), piers and floats shall have a non-skid The remaining two sets are given to the applicant to carry to Harbor 5. Lot sizes and lot numbers, it available. COASTAL COMMISSION Can (949) 644-3043 for appointment finish, such as punched metal, unpainted Umber, or grit on metal, timber or By: --- ------ ----------- 2.2.12 Sufficient flotation shall be provided to support dead load plus 20 Resources. pounds per square foot live load with A.freeboard of not less than: plywood. 6. Existing ground profile beneath proposed structure C., CONDITIONS Date: ...... .. .............. 3.5 Timber shall be treated with ammonlacal copper arsenate (AGA) chromated 6. Harbor Resources will review the drawings and stamp the drawings "Approved 7. Elevation of top and bottom of bulkheads and piles with respect to M LLW. 2,212.1 10 -inches for modular concrete flotation systems for in Concept". commercial, passenger use. copper arsenate (CCA) -or ammonlacal copper zinc arsenale (ACZA), per The Harbor Permit for this facility.shall be condifioned to allow the berthing of: AWPA Standard C2. Field cuts and bored holes shall receive a brush coat of 8. Area and profile of any proposed dredging with elevations shoVing depths with respect of M L.M. 2.2.12.2 concentrated CCA, ACA or ACZA. 7. The applicant W11 pick up these drawings from Harbor Resources and pursue Number of boats 77vo Maximum boat length 16X O -V feet /Z,�� 3a -117- 8 -Inches for modular concrete floatation systems for all state and federal approvals as required by Harbor Resources. Plan check may Any special conditions affecting the construction or Affecting boating operations. other uses. 3.6 Timber piles shall be dual treated per AWPA Standard C3. resume simultaneously while these approvals Are pending. 10. Existing structures shall be shown in light dashes. New work shall be shown in heavy solid lines. 2. . 2.12.3 3 -inches pontoon freeboard for detached pontoon 3.7 Rollers shall be fabricated from polyethylene or polyolefin material. 8. After the Building Department plan check has been completed, the applicant Rotation systems for commercial passenger use. Will pick up and resolve 'Building Department corrections. 2.2.12.4 1 -inch pontoon freeboard for detached pontoon flotation 3.8 Iron and steel (including fasteners) in harbor structures, except for 9. The applicant will resubmit to the Building Department the Building check set reinforcement covered by at least 3 inches of concrete, shall be stainless steel systems for 811 other uses, . and two sets bearing required state and federal approvals. alloy, hot -dip galvanized, or epoxy coated. HAKDOR ONSTRUCTION 'STANDARDS 2.2.13 Weight of treated Douglas Fir shall be assumed to'be 35 pounds 10. The Building Department will verify that the Building corrections have been CITY OF NEWPORT BEACH BUILDING DEPARTMENT per cubic foot. Weight of sea water shall be assumed to be 64 resolved and all the required federal and state approvals are on the dram' 10" ngs pounds' per cubic foot. 4 Allowable Stresses and issue the Harbor permit. The Building Department record set must bear all TITLE SHE�T & SPECIPICATIONS 451, 0 required approvals. DWG. SCALE 10 ;�w 101 1 z" > HARBOR RESOURCES APPROVAL i2.14 Finger floats with wood decks shall be equipped with 2 YrInch 4.1 Allowable stresses for harbor structures shall not exceed those recommended AS SHOWN.T­ AUGUST_ 25.. i6w minimum diameter steel pipe torsion bars along float centedines. in the "Uniform Building Code". 25.. i ibe DRAWING NO. BY: DATE: SHEET 01 -.7 SIK 09/26/05 VT 3 .41 ___(E) FLOATING DOCK TO REMAIN 5W, Z17 & BE PROTECTED TYP ?I; E;7: i g, 3 a (E) FLOATING DOCK AT HATCHED AREA TO BE REMOVED 0 30-010 81-01t PROPOSED FLOATING DOCK NDTH ;'z w, 4 FOR ENLARGED I H 21 R < z, TYP U. N. 0. TYP U. N. 0. PROPOSED FLOATING ag,�,_,- DOCK PLAN zoo IP- a U z c F1 n n n F1 F] n F1 F1 F] F1 F1 F1 F] cc U 0 C� z W D �, Q� x . a Lz, OW F_ -1 F-1 1-1 F -I <0, <1 <1 F1 n ri z ca. w 0 z :H LJ 5Z, UO <\ L J L_ __J L_ __j CID L j �_j L --i �_j L j L j L_ _j L_ _j 0z L J L J L J L J L J L J L J L L J L J L J L L \ :H %-1 1 w C6 " - - - - - - - - - - L - - - - - - 01 L L L F_ 'to 0 N <\ _j (E) RAMP TYP 39' (Tt _j F 0 �z U_ L - - - - - L 2� - - - CO) (VERIFIY) 0 I Id 251-p" 25fj60$ (n r - - - - - - - _j L - - - - - - - L - - - - - - - - _H 0 co C4 %.a -H (VERI (VE14IFY) '0 - - - - - - - > 0 L - - - - - - - - - - - - - - - - - - - - L - - - - - - - \ -- - - - - - - - U_ r 0 500" a- LLJ I Fr L - - - - - - - - - - - - - - - - - - - - - - - - - i ,t > -C'4 w IV I x E: - - - - :1 11 - - j - - - - - - rn R FY) r- - - - - - - - - L _j L__�__ I F - - - - - - - - - - - - - - - - - - - - - - - - - L - - - - - - - - - - - - - - - - - - - - - - Z U. L - - - - - - - - - - - - - - - - - - - - - F - - - - - - - - - - - orm cc w 0 - - - - - - - -- - - - - - F- LL ru (N) LOCATION OF THE I I CC 5 :i RELOCATED PILE- PROPOSED FLOSTING DOCK & PILES @ POCHED AREA, 00 15'-O"± I __(E) BROCKEN CONC PILE TO BE REPLACED 0 in I- Z i;: WITH ONE OF THE REMOVED DOCKS PILES cc 0 (0 (IF IN GOOD CONDITION) & BE RELOCATED 0 4C .. ON THE OTHER SIDE OF RAMP CL ul 0 0 qr 962'± 0 (VERIFY) CL z 0 V Ul CO Z NQIES:- 1. PROVIDE CLASS III STANDPIPE THE ADDRESS OF GEORGE'S CAMALOT RESTAUTANT ACROSS FROM THE PROPOSED 0 UA WITHIN 75' OF END OF DOCK FINGER. a0 2. PLANS AND PERMIT REQUIRED FOR FLOATING DOCK IS: 3420 \AA OPORTO, NEWPORT BEACH, CA 92663 DOCK PROTECTION SYSTEM. 3. DOCK PROTECTION WILL BE .j DEFERRED SUBMITTAL. � (7) ow > C3 0 0 Uj z z (n _j 0 0 LIDO MARINA VILLAGE FLOATING DOCKS LAYOUT N.T.S. K ow cr_ z z CL LLJ STRUCTURAL GENERAL NOTES 01C WO 0111111 iE-i < GENERAL REQUIREMENTS CONCRETE 0 j ca w NAILING AND FASTENERS ABBREVIATIONS j U_ 1. CONSTRUCTION SHALL BE IN CONFORMITY WITH THE 2001 EDITION OF THE 1. ALL CONCRETE MIX DESIGNS, CONFORMING TO CBC SEC11ONS 1904 & 1905, SHALL BE 1. ALL NAILS, FASTENERS AND HARDWARE SHALL BE STAINLESS, HOT DIP GALVANIZED U. 0 CALIFORNIA BUILDING CODE (CBC) AND ALL APPLICABLE LOCAL AND STATE SUBMITTED TO THE ENGINEER FOR REVIEW AND APPROVAL BEFORE ANY CONCRETE OR EPDXY COATED. A.6 . ........... ANCHOR BOLT N.T.& .......... NOT TO SCALE z CODES AND ORDINANCES. 2. ALL NAILS SHALL BE 16d (0.148" DIAMETER) HELICAL THREAD NAILS, WITH A.C.P . ......... ASPHALT CONCRETE PAVING O.0 . ............. ON CENTER 0 IS PLACED. ALL CONCRETE MIXES SHALL HAVE A MINIMUM CEMENT CONTENT MINIMUM BENDING YIELD STRENGTH OF FyB= 90,000 PSI, U.N.O. ADDL .......... ADDITIONAL OFF ............. OFFICE Uj 0 P= 2. SITE INSPECTION: THE CONTRACTOR SHALL EXAMINE THE PROJECT SITE & OF 6.0 SACKS OF CEMENT PER CUBIC YARD OF MIX, FOR USE IN A SALT WATER 3. NAILING SHALL BE IN ACCORDANCE WITH TABLES 23-11-B-1 & 23-11-8-2 A.F.F . ......... ABOVE FININSH FLOOR OPNG ........... OPENING Ca Uj < V) SHALL VERIFY ALL DIMENSIONS, LOCATIONS & ELEVATIONS OF THE EXISTING ENVIRONMENT. ALL CONCRETE MIXES SHALL BE CERTIFIED BY A CONCRETE TESTING OF THE CBC, U.N.O. ON DRAWINGS. ALT ............ ALTERNATE OPP HD ....... OPPOSITE HAND SYMBOLS 0 0 ,d CONSTRUCTION. THE CONTRACTOR SHALL ALSO DILLIGENTLY INVESTIGATE THE LABORATORY AND SIGNED BY A CALIFORNIA REGISTERED CIVIL ENGINEER. 0. s SITE FOR THE POSSIBLE EXISTENCE & LOCATION OF UNDERGROUND UTILITIES, 2. CONCRETE SHALL HAVE MINIMUM 28 DAY COMPRESSIVE STRENGTH OF 6000 PSI. 4. ALL HARDWARE SHALL BE MANUFACTORED BY "SIMPSON STRONG -TIE CO., INC." ARCHT ........ ARCHITECTURAL O.S.F . .......... OUTSIDE FACE @ .............. AT 0 a Uj i PRIOR TO ORDERING ANY MATERIAL AND/OR COMMENCING WORK AND SHALL THE MAXIMUM CONCRETE SLUMP SHALL NOT EXCEED 4". PLACING OF ANY CONCRETE AND SHALL HAVE A VALID ICSO NUMBER ON THE PRODUCT., ANY DEVIATION FROM B.B . ....... .... BOTTOM OF BEAM P -C . ............ PIPE COLUMN CENTER LINE 0 Z REPORT ANY DISCREPANCIES TO "WILLIAM SIMPSON & ASSOCIATES, INC." SHALL BE COhTINUOUSLY INSPECTED BY A REGISTERED DEPUTY INSPECTOR, PAID FOR THE APPROVED PRODUCTS MUST BE APPROVED IN THE PLAN CHECK OFFICE, BET .............. BETWEEN PL ................ PLATE OR PROPERTY LINE . ....... DIAMETER j HEREINAFTER CALLED "THE ENGINEER". BY THE OWNER. AND NOT BY THE FIELD INSPECTOR. BLDG ............ BUILDING PILAS .......... PILASTER 0 . .............. PLATE OR PROPERTY LINE 3. CONTRACTOR SHALL PROVIDE BARRICADES AND PEDESTRIAN PROTECTION AS 3. GROUT SHALL HAVE A MINIMUM 28 -DAY STRENGTH THE SAME AS THAT OF THE 5. ALL HARDWARE SHALL BE INSTALLED PER MANUFACTURER'S RECOMMENDATIONS. BM _ ......... BEAM PLYWD ..... ...PLYWOOD $ .............. STEP IN FOOTING REQUIRED BY STATE AND LOCAL CODES. PANELS. THE CONCRETE GROUT SHALL BE A SUITABLE MIX CONSISTING OF PEA BLIND NAILING SHALL NOT BE ACCEPTABLE AND WILL BE REJECTED. SOT ............. BOTTOM PSF ............ POUNDS PER SQUARE FOOT (E) ............. EXISTING B.W . .......... - BOTTOM OF WALL PSI ............. POUNDS PER SQUARE INCH (N) .............. NEW to 4. CONTRACTOR SHALL CONSULT WITH REPRESENTATIVES OF CITY AND UTILITY GRAVEL, SAND CEMENT AND WATER. MAXIMUM SLUMP SHALL BE 5 INCHES. AN a, M cn COMPANIES CONCERNING AVAILABLE FACILITIES BEFORE COMMENCING WORK OR STEEL C ................. CHANNEL REBAR ......... REINFORCING BAR W CONNECTING TO SEWER, PIPING OR WIRING, ETC., AND REPORT ANY PROBLEMS APPROVED SUPERPLASTICIZING ADMIXTURE MAY BE ADDED TO INCREASE THE SLUMP CANT .......... CANTILEVER R.B . ............. ROOF BEAM Califomia Coastal Commission LLJ TO MAXIMUM -,.5 INCHES. GROUT UNDER PLATES SHALL BE "POR -ROK" OR "FIVE STAR 1 . PLATES SHALL CONFORM TO A.S.T.M. A36, ie CL ................. CENTER LINE REQD ........... REQUIRED South Coast Di!�jict ffice LIU- TO THE ENGINEER. GROUT" OR A� APPROVED EQUAL. 2. STEEL PIPES SHALL CONFORM TO A.S.T.M. A53, GRADE B. CLG ............. . CEILING REINF ......... REINFORCING A z 5. OMISSIONS OR CONFLICTS BETWEEN VARIOUS ELEMENTS OF THE DRAWINGS, 4. PORTLAND CENENT SHALL BE TYPE V LOW ALKALI CONFORMING TO A.S.T.M. C150 AND CLR ............ CLEAR ermit N WHERE HIGH NOTES, AND DETAILS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER 3. ALL BOLTS SHALL CONFORM TO A.S.T.M. A337, UNLESS NOTED OTHERWISE. REF ............ REFERENCE Lou SHALL BE TESTED. AGGREGATES SHALL BE NORMAL WEIGHT (145 PCF) U.N.O. STRENGTH, (H.S.) BOLTS ARE SPECIFIED, THEY SHALL BE MINIMUM 3/4" DIAMETER AND C.M.0 . ......... CONCRETE MASONRY UNIT REV ............. REVISION z AND RESOLVED BEFORE PROCEEDING NTH THE WORK. CONFORMING 70 A.S.T.M. C33, WITH CONCRETE SHRINKAGE CHARACTERISTICS OF LESS CONFORM TO A.S.T.M. A325 SC CLASS A UNLESS NOTED OTHERWISE ON THE PLANS. COL ............ COLUMN y ------ ------ - --------- Z 6. CONTRACTOR SHALL INSTALL TEMPORARY TOILETS BEFORE START OF JOB. T.L . ............. TOP OF LEDGER 0 wo a, 0 THAN 0.050% WATER -CEMENT RA110 SHALL NOT EXCE�ED 0.40. THE INSTALLATION OF H.S. BOLTS SHALL BE INSPECTED BY A REGISTERED DEPUTY CONC ........... CONCRETE TS ............. TUBE STEEL z - C) -.1 7. NOTES AND DETAILS ON DRAWINGS SHALL TAKE PRECEDENCE OVER THESE 5. CONCRETE TEST SAMPLES SHALL BE TAKEN IN ACCORDANCE WITH A.S.T.M. AND CBC INSPECTOR APPROVED BY THE BUILDING DEPARTMENT. CONN .......... CONNECT10N EuFnFE - < GENERAL NOTES. STANDARDS. Rr-SULTS OF THE 7 & 28 DAY TESTS SHALL BE SUBMITTED TO THE 4. ALL BOLTS HOLES IN STEEL MEMBERS SHALL BE STANDARD HOLES, U.N.O. CONT Date* - ----- 2,1- z .......... CONTINUOUS C-) 8. TYPICAL DETAILS SHOWN SHALL APPLY WHERE NO SPECIAL DETAIL IS SHOWN. ENGINEER FOR HIS RECORDS. SLUMP TESTS ARE REQUIRED FOR ALL TEST SAMPLES 5. FABRICATION AND ERECTION SHALL CONFORM TO THE 9th EDIT10N OF A.I.S.C. SPECIFICATIONS. CONST ........ CONSTRUCTION C14 (n 9. WRITTEN DIMENSIONS (NOT SCALED DIMENSIONS) SHALL BE USED. AND MUST ALSO BE REPORTED. 6. ALL HOLES FOR BOLTS IN STRUCTURAL STEEL SHALL, BE DRILLED OR PUNCHED. BURNING CTR ........... CENTER to < D C14 V) 10. TEMPORARY ERECTION BRACING AND SHORING SHALL BE PROVIDED AS REQUIRED 6. SIDES OF DEADMAN FOOTINGS SHALL BE POURED AGAINST STABLE EARTH. OF HOLES SHALL NOT BE PERMITTED. DSL ............. DOUBLE RECEIVED co CF) 3: ON ALL STRUCTURES, ADEQUATE TO PROVIDE FULL STRUCTURAL STABILITY AND 7. ALL STEEL RENFORCING, ANCHOR BOLTS, DOWELS AND OTHER INSERTS SHALL'BE 7. ALL STEEL SHALL BE STAINLESS, HOT DIP GALVANIZED OR EPDXY COATED. DET ............. DETAIL < SAFETY. BRACING SHALL NOT BE REMOVED UNTIL THE ELEMENTS ARE FULLY SECURED IN P:)SITION AND INSPECTED BY THE LOCAL BUILDING DEPARTMENT DIAG ........... DIAGONAL Soutk Coast Region ce Q CONNECTED AND ARE CAPABLE OF SUPPORTING THE DESIGN LOADING. INSPECTOR, PRIOR TO THE PLACING OF ANY CONCRETE. SOLID SAWN MEMBERS AND GLU-LAM BEAMS DIAPH ......... DIAPHRAGM < 11. CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE 8. ALL NECESSAFY BRACES, STRONGBACKS, PICK-UP INSERTS, BOLTS, ETC., FOR DIA ............... DIAMETER 14N 2 0 2006 RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF PRECAST CONCRETE PANELS SHALL BE DESIGNED BY OTHERS FOR SAFE ERECTION OF 1 . ALL ROUGH LUMBER USED IN THE WORK SHALL BE SELECT STRUCTURAL DOUGLAS ............. DIMENSION CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND DIM m Uj THE PANELS. FIR -LARCH TREATED WITH ACZA PER THE LATEST AWPA STANDARD C-2, MIMIMUM ON .............. DOWN CL PROPERTY, THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT 9. NO FLY ASH SHALL BE USED IN ANY CONCRETE. NO CALCIUM CHLORIDE SHALL BE RETENTION 0.60 #/CF. CALIFORNIA Cl) H.P . ............... HIGH POINT C 0-45TkL COAk�!55--fCN 0 m BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL CL DEFEND, INDEMNIFY AND HOLD THE OWNER AND THE ENGINEER HARMLESS FROM USED IN ANY CONCRETE. 2� ALL BOLT HOLES IN WOOD MEMBERS SHALL BE A MINIMUM OF 1/32" TO A MAXIMUM OF 1/16" LDR ............. LEDGER (0 10. ALL CONCRETE TO BE CURED FOR A MINIMUM OF 3 DAYS BY A METHOD ACCEPTABLE LARGER THAN THE BOLT DIAMETER. WOOD MEMBERS NTH HOLES NOT MEETING THE ABOVE LG ...... ........ LONG ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNEC11ON WITH THE TO THE ENGINEER. CRITERIA SHALL BE REMOVED AND REPLACED BY THE CONTRACTOR AT HIS OWN EXPENSE. LLH .............. LONG LEG HORIZONTAL m PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING 11. FORMS MAY BE STRIPPED ONLY AFTER THE CONCRETE HAS REACHED A MINIMUM 3. FIELD CUTS AND BORED HOLES SHALL RECEIVE A BRUSH COAT OF CONCENTRATED ACZA. LLV ............ LONG LEG VERTICAL 0 FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE ENGINEER. COMPRESSIVE STRENGTH OF 3000 PSI. 4. WALKING SURFACES SHALL HAVE A SKID RESISTANT FINISH, SUCH AS UNPAID TIMBER OR LONGIT ........ LONGITUDINAL a- 12. THE CONTRACTOR SHALL EXERCISE EXTREME CAUTION NOT TO UNDERMINE ANY I m GRIT ON TIMBER. L.P . ............. LOW POINT CL ADJACENT STRUCTURE DURING THE COURSE OF CONSTRUCTION. REINFORCING STEEL 5. ALL GLUED LAMINATED MEMBERS SHALL COMPLY WITH STANDARD SPECIFI SCOPE OF WORK 13. CLEAN UP: NO PAINT, PLASTER, CEMENT, SOIL, MORTAR OR OTHER RESIDUE CATION LT ............... LIGHT SHALL BE ALLOWED TO ENTER THE BAY, STREETS, GUTTERS OR STORM DRAINS. FOR STRUCTURAL GLUED LAMINATED DOUGLAS FIR'LARCH (COAST REGION) MAX ... ........ MAXIMUM 1. ALL REINFORC14G STEEL, UNLESS NOTED OTHERWISE, SHALL CONFORM TO A.S.T.M. LUMBER, AITC 117 - THE LATEST EDITION. M.B . ............ MACHINE BOLT REPLACING THE EXISTING TWO APPROXIMATELY 47' LONG x 41' WIDE EACH ALL MATERIALS & WASTE SHALL BE REMOVED FROM THE SITE, NBMC 17.32.020. ss ,7,14. DEMOL111ON: ALL MATERIAL FROM THE EXISTING BULKHEAD THAT IS NOT USED SPECIFICATIONS A615 AND BE INTERMEDIATE GRADE 60 FOR BARS #4 AND A) GRADE COMBINATION 24F -V4. MECH .......... MECHANICAL FLOATING DOCKS NTH A NEW 9S LONG x 8' WIDE FLOATING DOCK. E N GREATER, AND GRADE 40 FOR BARS LESS THAN #4 AND ALL TIES AND DOWELS. B� INDUSTRIAL APPEARANCE GRADE (U.N.O.) MEZZ ......... MEZZANINE AS FILL SHALL BE REMOVED FROM THE SITE & DISPOSED OF IN AN OFFICIAL e<\ - DUMP SITE. 2. ALL REINFORCEMENT TO BE WELDED SHALL CONFORM TO A.S.T.M. A706, C ADHESIVE SHALL BE 'PHENOL- RESORCI NAL' CONFORMING TO THE LATEST MFD ............. MANUFACTURED m 15. SEE THE LATEST "GENERAL GRADING SPECIFICATIONS" OF THE BUILDING UNLESS NOTEE OTHERWISE. EDITON OF A.S.T.M. D 2559. MFR ............. MANUFACTURER S 3812 0- 3� REINFORCEMENT MARKED CONTINUOUS MAY BE SPLICED BY LAPPING 42 BAR D) TREATED NTH ACA OR ACZA PER THE LATEST AWPA STANDARD. MIN ............. MINIMUM DR 03/31/200 DEPARTMENT, CITY OF NEWPORT BEACH, FOR THE CITY'S: GENERAL NOTES, co EROSION CONTROLS, REQUIRED INSPECTIONS, GRADING FILLS/CUTS & ALL DIAMETERS IN CONCRETE AND 48 BAR DIAMETERS IN MASONRY NTH 24 INCH E) ENDS SHALL BE SEALED NTH PENETRA71NG SEALER. MISC ............ MISCELLANEOUS 1�_ NECESSARY DOCUMENTATION. MINIMUM LAP N EACH CASE, UNLESS OTHERWISE NOTED ON PLANS, ALL 6. ALL GLU-LAM MEMBERS SHALL BE CONSTRUCTED BY A LICENSED FABRICATION SHOP. M.F.0 . .......... METAL FRAMED OPENING T NR_ 16. DOCK STRUCTURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH CURRENT SPLICES WHEN DETAILED SHALL BE LOCATED WHERE SHOWN ON PLANS. 7. THE FABRICATORS SHALL PROVIDE PROTECTION FOR THE GLU-LAM MEMBERS MTL ............. METAL NOTE TO THE BIDDERSi 4. REINFORCING �TEEL SHALL BE ACCURATELY PLACED AND SECURED IN POSITION (N) ............. NEW m CITY STANDARD DRAWINGS AND SPECIFICATIONS FOR HARBOR CONSTRUCTION. DURING TRANSIT. THE ERECTOR SHALL BE RESPONSIBLE FOR PROPER CARE 17. PONTOONS SHALL BE AS MANUFACTURED BY HENDERSON MARINE SUPPLY, INC, WITH METAL OR CONCRETE BLOCKS, CHAIRS, SPACERS, ETC., BEFORE PLACING AND PROTECTION OF GLU-LAM MEMBERS DURING UNLOADING AND ERECTION. N.I.0 . ........... NOTIN CONTRACT AFTER THOROUGHLY EXAMINING'THE CONSTRUCTION DOCUMENTS 'AND THE SITE: S- 6 2 r0ru. 5 CONCRETE. 8. GLU-LAM FABRICATOR SHALL SUBMIT A CERTIFICATE OF INSPEC11ON TO THE NO . ............. NUMBER 1. NOTIFY THE ARCHITECT AND/OR THE ENGINEER IN WRITING, REGARDING ALL OR EQUAL AND SHALL HAVE A SOLID POLYSTYRENE FOAM CORE WITH 2.0 PCF 5. ADDITIONAL REINFORCING REQUIRED FOR ERECTION OF PRECAST CONCRETE SHALL N.S . ............. NELSON STUD OR NEAR SIDE' LOCAL BUILDING DEPARTMENT FOR EACH GLU-LAM MEMBER PRIOR TO ERECTION. DISCREPANCIES REQUIRING CLARIFICATION, PRIOR TO THE "BID SUBMITTAL". > > DENSITY AND )i" THICK TREATED EXTERIOR PLYWOOD LID. BE ADDED PER THE CONTRACTORS DETAILS. 0 0 >0 'or. n 18. CLEATS SHALL BE CAST DUCTILE IRON - HOT DIP GALVANIZED, AS 6. MINIMUM CONCRETE COVER FOR REINFORCING STEEL SHALL BE AS FOLLOWS, 2. IF THE ARCHITECT AND R THE ENGINEER IS NOT NOTIFIED, AS REQUIRED PER m < /0 1- U_ m MANUFACTURED BY HENDERSON MARINE SUPPLY, INC. OR EQUAL. UNLESS NOTED OTHERWISE. WELDING ITEM #1 ABOVE, IT SHALL MEAN THAT THE CONTRACTOR HAS CONSIDERED w 6 < U.1 w C14 CL CL 0- 0 a- t- '-, A ADEQUATE CONTINGENCY IN HIS BID TO COVER ALL COSTS TO COMPLY WITH w W w - < Cn ) CONCRETE BELOW GRADE OR IN CONTACT WITH SOIL: WHEN CAST AGAINST 1. ALL WELDING SHALL BE DONE USING THE SHIELDED ELECTRIC ARC PROCESS BY CERTIFIED tri < 0:1 FOUNDATIONS THE MOST STRINGENT CONDITIONS. 0 m 0- Q_ 00 0 -1 EARTH 3", MEN FORMED 2". WELDERS, USING E70XX ELECTRODES. 1. PILING DESIGN IS BASED ON THE RECOMMENDATIONS CONTAINED IN THE B) WALLS ABOVE GRADE: EXTERIOR FACE 11/2", INTERIOR FACE 1". 2. WELDING OF STEEL REINFORCING BARS SHALL BE DONE WITH LOW HYDROGEN ELECTRODES, 3. THE CONTRACTOR SHALL NOT BE ENTITLED TO ANY ADDITIONAL COMPENSATION TABLE 18-1-A OF THE CBC. C) PRECAST CONCRETE ELEMENTS: AS DETAILED. A233, CLASS E70XX SERIES. FOR ANY DISCREPANCY DISCOVERED AFTER THE "CLOSE OF THE BID". 00 3. WELDS IDENTIFIED AS REQUIRING CONTINUOUS OR PERIODIC SPECIAL INSPECTION NEED NOT 00 2 D) CONCRETE SLAB ON GRADE: REINFORCING STEEL AT CENTER OF SLAB, 0 UNLESS NOTED OTHERWISE. HAVE SPECIAL INSPEC11ON WHEN WELDING IS DONE IN AN APPROVED FABRICATOR'S SHOP, (0 7. REINFORCEMENT DETAILING SHALL BE IN ACCORDANCE NTH CBC SECTION 1907. HOWEVER, THE APPROVED FABRICATOR MUST SUBMIT A CERTIFICATE OF, COMPLIANCE IN ACCORDANCE NTH CBC SECTION 1701.7. 01 PAPR0JECTS\6088\S 1 �DWG, 9/2612005 1:09:3�5 PK archOl 52R 09/26/05 52C : 10/15/04 81-0-t S2D_ _1671370-4, S2E 10/11/04 5)8' x 7Y2" x S -O" LG GLE3 SPLICE 8t 41-0tg 41-04k BLOCK W/6-)/2'lo M.B. — CLEAT, WHERE 3Y8" x GLB ALL L 3 x 3 x Y+ FRAME W14 -Y2" OCCURS, CENTERED AROUND TYP 0 THRU BOLTS W/WALER TYP V-5 1$-,3y2ll 1 g - 2-y2la 2 x WOOD,DECKING W`/#1 2GA 3Y8" GLB SCREWS @ CROSS MEMBNERS g MAX 3" x 3)�" NOTCH 2h"O x STD PIPE TORSION BAR i en 5Y8" x GLB WALER TYP 5 c2go j T Z) tx�45 X ,q. 0 PLATE Y4 x 2% x 0'-Y 0 I I I TYP 0 0- TYP (TOTAL OF 8)----, 2x6 STRINGER IN SIMPSON /01/4 GALVANIZED "U'l HGR EA �gl:t�5 2 x FACIA M M wz IN— END TYP +1 V nt1� �i_ zt_84 N z Q_ (N) 18" SO CONC PILE, SEE _'ka 0 DETAIL N�TYP 0 zoo 2 x FACIA W/1 6d 2 x STRINGER TYP 2Y2" STD PIPE TORSION BAR 16d SCREW SHANK NAILS @ L K SCREW SHANK I z 2 x STRINGER ALT @ 6" O.C. ALL AROUND THRU TYP 0 2Y2"O x STD PIPE TORSION BAR NAILS @ 6" D.C. L 5 x 5 W/2-)�"O M. B. TYP TORSION BAR X" THICK TREATED EXTERIOR < < < Haz- Q STAGGERED @ LLJ 0 OM < < in TYP @ CLEAT TO TOP & BOTTO 3 x SHAPED OR 3,v8" GLB @ PLYWOOD BATS ct.� -1 BOTH SIDES OF EA PONTOON DOCK CONN 0 (TOTAL OF 14) 5 x 5 CLIP ANGLE 0 3 W/4-,V2"o M.B. 4' x 8' PONTOON (N) 18" SO CONC PILE _24S YO x 5" LG WHITE OR BLACK z 0 5Y8" GLB WALER TYP POLYURETHANE ROLLER ON TYP 00 Wfi" x 7X" GLB WALER TYP "T" 1 �'4tl SS SLEEVE �X"O BOLT TYP 0 LU t; NOTE STRINGERS NOT SHOWN 2Y2"O x STD PIPE TORSION BAR 2)4' Y. L PILE DIMENSION + 1" C* 0) SECTION N.T.S. nj (0 (N) 20" SO CONC PILE C WALER SPLICE NJ.& D INTERNAL PILE GUIDE N.T.S. =J (0 E 3)6" x 7Y2" GLB FRAMING S2H 02/10/05 CONC PILE CUR S2J :-10/1577-04- 52K 1071474 > t___Z_ PRESTRESSED CONCRETE PILE ALTERNATE DESIGN REQUIREMENTS 0 0 AROUND EA OPNG TYP 14-1/2"0 PRESTRESSING 0 -1 cf- TYP P STRANDS @ 1) CONCRETE X 7 0 WOOD DECKING 4t EQ SPACES Y2 "0 THRU M.B. W/NUT& MIN )4' to to MINIMUM COMPRESSIVE STRENGTH (F'c) @ 28 DAYS = 6000 PSI z LL 6— TYP @ WALER SPLICE x 2" SO WASHER EA END TYP @ TRANSPER = 4000 PSI U -h 1 PITC: v . " %. z Uj 0 171*" 0 W-4 SPIRAL U. 2) REINFORCING cc I 2Y2"O x STD PIPE TORSION BAR POLYURETHANE PRESTRESSING STEEL SHALL CONFORM TO ASTM A-416 GRADE 270. ;Y4" TYP ROLLER TYP t x x (0 d E CD f C SPIRAL SHALL CONFORM TO ASTM A-185 GRADE -70. 5 x 5 x X CUP ANGL TYP 0 ALL CONN, SEE DETAIL z Y, l, cr) 3) FACTORED LOADS, EXCLUDING THE WEIGHT OF THE PILE, ARE AS FOLLOW 0 ILI b n 3/4" CHAMFFR j D1 ATC7 V� TV0 T� TYP z K_ V_ y 1 11 -�_ 20" SO < b C14 x to LU I — (N) 20" SO CONC PILE, n CL _j ;4- z SEE DETAIL `-� TYP -,, = SECTION X—X LL_ 0 f H 'N - CD z N.T.S. 04 Lu _j Kalil 0 4% , & lu 0 Lai 0 W �P- (TENSION) (KIPS) - — — — — — — — — — — — — - INNNNN M- (BENDING) (FT-KIPS)-� FRAMING MEMBER TYP 0 W V- (SHEAR) (KIPS) z iii— W V_ . 2 x DECKING 2Y2"O x STD PIPE TORSION BAR TYP 0 0- 4) DESIGN IS BASED ON THE FOLLOWING LOAD COMBINATIONS RON LU Llj CL co z V) BENDING AND COMPRESSION 2 x 12 FACIA TYP ON 3 SIDES BENDING AND TENSION 0 0 0 4' x 8' PONTOON W W CO -1 a -1 OTHER, DESCRIBE FRAMING MEMBER Ul (.q (1) j (N) 20" SO CONC PILE TYP 11111111 z CO 0 C,4 HWI LD BILL" CAST DUCTILE 5) FLEXURAL LENGTH IS EQUAL TO 2/3 OF THE PILE LENGTH. L 3 x 3 TYP IL j C4 -1 � 1� 1, j [RON - HOT DIP GALVANISED 0 CLEAT W/2-%N'O THRU BOLTS N__ TYP (TOTAL OF 14) NOTE PILE STEEL FRAMING NOT SHOWN FOR CLARITY. 71- U_lil" z -7- 7>� 0 0 TYP @ STEEL CONCRETE PILE NJ.S. I P N N.T.S. N.T.S. H DOCK SECTIONS CONN i PILE GUIDE SECTION PIPE TORSION K S2N 01/10/05 BAR CONN CONC PIL (n E CUR PRESTRESSED CONCRETE PILE ALTERNATE DESIGN REQUIREMENTS 52P 10/18/04 S20 10/15/04 :E 10-1/2"0 PRESTRESSING z 2Y2"O x STD PIPE TORSION BAR TYP 2_,� 0 STD PIPE 11011111 STRANDS @ 1) CONCRETE 0 (N) 20" SO CONC PILE P EQ SPACES 0 LU W MINIMUM COMPRESSIVE STRENGTH (F'c) @ 28 DAYS = 6000 PSI PLATE Y4 x 3 x V-7" LG South Coast Region NN11W im 0 0 j W/4 -Y2 "0 THRU M.B. @ TRANSFER = 4000 PSI -I-' PITCH j 2Y2"O x STD PIPE TORSION BAR uo, v 0411 _W-4 SPIRAL WOOD DECKING W/NUTS EA END & MIN Y4 CAST DUCTILE IRON - IAN 2 0 2006 2) REINFORCING LL x 3" SO WASHER @ WOOD HOT DIP GALVANIZED i --- 44-A. x PRESTRESSING STEEL SHALL CONFORM TO ASTM A-416 GRADE 270. CLEAT CENTERED CALIFORNIA cc a 0 0 3) FACTORED LOADS, EXCLUDING THE WEIGHT OF THE PILE, ARE AS FOLLOW NO TYP (TOTAL OF 4 PLACES) 0 DOCK SECTIONS CONN SPIRAL SHALL CONFORM TO ASTM A-185 GRADE 70. W/WALER COASTAL COMMISSION P ON$ C6 0 uj Cr cc LOAD DUE TO DL DUE TO LL DUE TO E/W TOTAL LIJ 2 x DECKING TYP 0 LIJ 0 Z G (SHAPED TO Z) I TYP 3/4" CHAMFER i < 3 x 10 BLK 1 SO _j %-10 t: x P- (COMPRESSION) (KIPS) j 7,V2" DEEP) OR 3Y8" x 7Y2" CL LJ LL_ re) SECTION X—X _j GLB @ EA PONTOON TYP U_ P- (TENSION) (KIPS) 7 iE -,, -_ - (BENDING) (FT -KIPS—)_ z N.T.S. 1 129.0 LIJ @ Luy C14 to _j V- (SHEAR) (KIPS) N in 4.5 4.5 CROSS-LINKED 4' x 8' x V-9" W z 0 -HYLENE PONTOON X Uj 0 POLYET -t 't CL 4) DESIGN IS BASED ON THE FOLLOWING LOAD COMBINATIONS BELOW TYP �z z (TOTAL OF 10 PONTOONS) LIJ BENDING AND COMPRESSION z q V) C3 2)�'o x STD PIPE TORSION BAR LLJ F, BENDING AND TENSION z IC— 1 4#1 4-- ifornia Coastal Commission CL U ­* t 1--l", @j 3 x SHAPED BLKG Sou (mat WAIER Office Z 0 In, 0 OTHER, DESCRIBE OR 3)6" x GLB Cr rc AIN I-, - - V-7" < U0 1 PITCH t NO TIr? 0 z z 0 _j 5) FLEXURAL LENGTH IS EQUAL TO 2/3 OF THE PILE LENGTH. a- _J m < 'v EEFFE D C"i (n 0 (A cn 2 x 6 DECKING SPACED Y8" NOTE STRINGERS NOT SHOWN FOR CLARITY. FACIA NOT SHOWN FOR CLARITY. < Pi 0 NOIE Date -.............. --- 6 ........ APART WITH 2-#12GA x 3" 0 LNN�L 0 7 LG WOOD SCREWS PER CONCRETE PILE N.T.S. N.T.S. (n < 0- BOARD PER CROSS N TORSION BAR CONN P CLEAT DETAIL N.T.S. 04 :2 M 1 0 MEMBER S2U: WO/12/04 a- NE OF (E) BULKHEAD WALL 04 41 _j M LU CENTER LI V) < 0 OF PILE TYP T.0, PILE ELEV=+12.00' Ln CLEAT TYP 04, 10" < Z _X A 0 in (E) FLOATING DOCK 1.0 T M. L. L. W. TYP 4 x 6 IN SKEWED 32'-2%t'± lot -011 Cl F �5 0 10,_ -Olt lot -044 100-01t V SIMPSON "U" HGR 9 !L e- ----------------- TYP @ FILLET 77: 1� I Hoag 0 0 Ct cl� Hospital C) LIJ PROPOSED FLOSTING DOCK CL (c) F1 =01 L co U_ Q - tot 93 ]a rT R — — — — P.3 U — — — — — 4' H" - - I -0" L y ROJECT, pi6­ (E) DREDGE ELEV L4 -A 7 r CL LET� (E) DREDGE ELEV M TYP _F_= -1O.0'± M.L.L.W. (E) DREDGE ELEV ESS/ 11 61' 6 -6 9. 0'± M. L. L. W. e - - - � 1%� , _ " �_V, - - - (E) FLOATING DOCK (VERIFY) (VERIFY) (E) DREDGE ELEV Newport Beach �D L.L.W. --PROPOSED TWO 18" SO CONC 5 3812 N rt EXP� 03 - .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . PILES, SEE DETAIL or. YO _:,q 7 CL td I 1_=1 I 1=_1 — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — 32 n d--' r (E) DREDGE ELEV -TF ir L.L.W� I 11M I I- OF SE T PROPOSED FOUR 20" SO CONC (E) DREDGE ELEV CL Ocean M (E) BULKHEAD PILES, SEE DETAIL tl H CL > > > LO Li 0 0 0 T J < U_ 0- n- -3 CL W < W (0 W W BOT OF PIL ELE OF PILE ELEV BOT OF PILE ELEV BOT OF Ui 0 PILE ELEV W (x y Y�± LEW. =-2JN�bT± M.H.W. =-27.0'± M.L.L.W. -_2 -7. b 14. C. E 7W_. 0 OF PILE EL BOT OF PILE ELEV i.dr± k. W. =-3T.br± V) NOTE VERIFY THE ELEVATIONS. 00 000 ft 00 C4 0 N_T�S. I M =4 Yahoo I Inc, 62C6 NAVTEQ , (0 1 ENLARGED DOCK/PILE PLAN R PILE ELEVATION N.T.S. ca U VICINITY MAP v M 0 F`:\PR0JECTS\6088\S2.DWG, 9/26/2005 1:08:52 PK anh(n"`m"� 0 4% , & lu 0 Lai 0 W - — — — — — — — — — — — — - INNNNN FRAMING MEMBER TYP 0 W & 63P z iii— W V_ . 2 x DECKING 2Y2"O x STD PIPE TORSION BAR TYP 0 0- 4) DESIGN IS BASED ON THE FOLLOWING LOAD COMBINATIONS RON LU Llj CL co z V) BENDING AND COMPRESSION 2 x 12 FACIA TYP ON 3 SIDES BENDING AND TENSION 0 0 0 4' x 8' PONTOON W W CO -1 a -1 OTHER, DESCRIBE FRAMING MEMBER Ul (.q (1) j (N) 20" SO CONC PILE TYP 11111111 z CO 0 C,4 HWI LD BILL" CAST DUCTILE 5) FLEXURAL LENGTH IS EQUAL TO 2/3 OF THE PILE LENGTH. L 3 x 3 TYP IL j C4 -1 � 1� 1, j [RON - HOT DIP GALVANISED 0 CLEAT W/2-%N'O THRU BOLTS N__ TYP (TOTAL OF 14) NOTE PILE STEEL FRAMING NOT SHOWN FOR CLARITY. 71- U_lil" z -7- 7>� 0 0 TYP @ STEEL CONCRETE PILE NJ.S. I P N N.T.S. N.T.S. H DOCK SECTIONS CONN i PILE GUIDE SECTION PIPE TORSION K S2N 01/10/05 BAR CONN CONC PIL (n E CUR PRESTRESSED CONCRETE PILE ALTERNATE DESIGN REQUIREMENTS 52P 10/18/04 S20 10/15/04 :E 10-1/2"0 PRESTRESSING z 2Y2"O x STD PIPE TORSION BAR TYP 2_,� 0 STD PIPE 11011111 STRANDS @ 1) CONCRETE 0 (N) 20" SO CONC PILE P EQ SPACES 0 LU W MINIMUM COMPRESSIVE STRENGTH (F'c) @ 28 DAYS = 6000 PSI PLATE Y4 x 3 x V-7" LG South Coast Region NN11W im 0 0 j W/4 -Y2 "0 THRU M.B. @ TRANSFER = 4000 PSI -I-' PITCH j 2Y2"O x STD PIPE TORSION BAR uo, v 0411 _W-4 SPIRAL WOOD DECKING W/NUTS EA END & MIN Y4 CAST DUCTILE IRON - IAN 2 0 2006 2) REINFORCING LL x 3" SO WASHER @ WOOD HOT DIP GALVANIZED i --- 44-A. x PRESTRESSING STEEL SHALL CONFORM TO ASTM A-416 GRADE 270. CLEAT CENTERED CALIFORNIA cc a 0 0 3) FACTORED LOADS, EXCLUDING THE WEIGHT OF THE PILE, ARE AS FOLLOW NO TYP (TOTAL OF 4 PLACES) 0 DOCK SECTIONS CONN SPIRAL SHALL CONFORM TO ASTM A-185 GRADE 70. W/WALER COASTAL COMMISSION P ON$ C6 0 uj Cr cc LOAD DUE TO DL DUE TO LL DUE TO E/W TOTAL LIJ 2 x DECKING TYP 0 LIJ 0 Z G (SHAPED TO Z) I TYP 3/4" CHAMFER i < 3 x 10 BLK 1 SO _j %-10 t: x P- (COMPRESSION) (KIPS) j 7,V2" DEEP) OR 3Y8" x 7Y2" CL LJ LL_ re) SECTION X—X _j GLB @ EA PONTOON TYP U_ P- (TENSION) (KIPS) 7 iE -,, -_ - (BENDING) (FT -KIPS—)_ z N.T.S. 1 129.0 LIJ @ Luy C14 to _j V- (SHEAR) (KIPS) N in 4.5 4.5 CROSS-LINKED 4' x 8' x V-9" W z 0 -HYLENE PONTOON X Uj 0 POLYET -t 't CL 4) DESIGN IS BASED ON THE FOLLOWING LOAD COMBINATIONS BELOW TYP �z z (TOTAL OF 10 PONTOONS) LIJ BENDING AND COMPRESSION z q V) C3 2)�'o x STD PIPE TORSION BAR LLJ F, BENDING AND TENSION z IC— 1 4#1 4-- ifornia Coastal Commission CL U ­* t 1--l", @j 3 x SHAPED BLKG Sou (mat WAIER Office Z 0 In, 0 OTHER, DESCRIBE OR 3)6" x GLB Cr rc AIN I-, - - V-7" < U0 1 PITCH t NO TIr? 0 z z 0 _j 5) FLEXURAL LENGTH IS EQUAL TO 2/3 OF THE PILE LENGTH. a- _J m < 'v EEFFE D C"i (n 0 (A cn 2 x 6 DECKING SPACED Y8" NOTE STRINGERS NOT SHOWN FOR CLARITY. FACIA NOT SHOWN FOR CLARITY. < Pi 0 NOIE Date -.............. --- 6 ........ APART WITH 2-#12GA x 3" 0 LNN�L 0 7 LG WOOD SCREWS PER CONCRETE PILE N.T.S. N.T.S. (n < 0- BOARD PER CROSS N TORSION BAR CONN P CLEAT DETAIL N.T.S. 04 :2 M 1 0 MEMBER S2U: WO/12/04 a- NE OF (E) BULKHEAD WALL 04 41 _j M LU CENTER LI V) < 0 OF PILE TYP T.0, PILE ELEV=+12.00' Ln CLEAT TYP 04, 10" < Z _X A 0 in (E) FLOATING DOCK 1.0 T M. L. L. W. TYP 4 x 6 IN SKEWED 32'-2%t'± lot -011 Cl F �5 0 10,_ -Olt lot -044 100-01t V SIMPSON "U" HGR 9 !L e- ----------------- TYP @ FILLET 77: 1� I Hoag 0 0 Ct cl� Hospital C) LIJ PROPOSED FLOSTING DOCK CL (c) F1 =01 L co U_ Q - tot 93 ]a rT R — — — — P.3 U — — — — — 4' H" - - I -0" L y ROJECT, pi6­ (E) DREDGE ELEV L4 -A 7 r CL LET� (E) DREDGE ELEV M TYP _F_= -1O.0'± M.L.L.W. (E) DREDGE ELEV ESS/ 11 61' 6 -6 9. 0'± M. L. L. W. e - - - � 1%� , _ " �_V, - - - (E) FLOATING DOCK (VERIFY) (VERIFY) (E) DREDGE ELEV Newport Beach �D L.L.W. --PROPOSED TWO 18" SO CONC 5 3812 N rt EXP� 03 - .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . PILES, SEE DETAIL or. YO _:,q 7 CL td I 1_=1 I 1=_1 — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — 32 n d--' r (E) DREDGE ELEV -TF ir L.L.W� I 11M I I- OF SE T PROPOSED FOUR 20" SO CONC (E) DREDGE ELEV CL Ocean M (E) BULKHEAD PILES, SEE DETAIL tl H CL > > > LO Li 0 0 0 T J < U_ 0- n- -3 CL W < W (0 W W BOT OF PIL ELE OF PILE ELEV BOT OF PILE ELEV BOT OF Ui 0 PILE ELEV W (x y Y�± LEW. =-2JN�bT± M.H.W. =-27.0'± M.L.L.W. -_2 -7. b 14. C. E 7W_. 0 OF PILE EL BOT OF PILE ELEV i.dr± k. W. =-3T.br± V) NOTE VERIFY THE ELEVATIONS. 00 000 ft 00 C4 0 N_T�S. I M =4 Yahoo I Inc, 62C6 NAVTEQ , (0 1 ENLARGED DOCK/PILE PLAN R PILE ELEVATION N.T.S. ca U VICINITY MAP v M 0 F`:\PR0JECTS\6088\S2.DWG, 9/26/2005 1:08:52 PK anh(n"`m"� RECEIVED gion R.,ec JAN 2 0 2006 AY _PkA-it kaAd t COAS'iAL- COMMISSION 1p