HomeMy WebLinkAbout15 - Proposed City Hall Expansion OptionsCITY OF NEWPORT BEACH
CITY COUNCIL STAFF REPORT
Agenda Item No. 15
October 11, 2005
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: Office of the City Manager
Homer L. Bludau, City Manager
949 - 644 -3000, hbludau @city.newport- beach.ca.us
SUBJECT: COUNCIL CONSIDERATION OF EXPANSION OPTIONS FOR
PROPOSED CITY HALL STRUCTURE
ISSUE:
Does the City Council want to include either added space above the 72,000 sq. ft.
currently being planned, or engineer the structure for future additional space, so the
schematic phase of design can proceed?
RECOMMENDATION:
The Council Building Committee will make a recommendation; however, that decision
has not been reached by the time this agenda item had to go out.
BACKGROUND:
At the City Council meeting of September 27th, the City Council considered options and
made final decisions as to the site plan (spatial relationship of the three buildings to one
another) and the placement of the City Council chambers and the community room.
The City Council decided to support the original site plan, which had the parking garage
parallel to the City Hall, as opposed to perpendicular. In addition, the City Council
decided to "flip- flop" the positioning of the Council chambers and the community room,
to where the Council Chambers would now be facing Newport Boulevard and the front
lawn area. There is one remaining issue to be brought to the City Council for a final
decision — City Hall expansion option.
DISCUSSION:
There have been previous City Council discussions regarding whether 72,000 sq. ft. is
the right size for the proposed City Hall. That is the current size of the City Hall
Council Consideration of Expansion Options
for Proposed City Hall Structure
October 11, 2005
Page 2
program. For design schematics, the architect and engineers need to know if, as talked
about previously, the structure should be engineered to provide for some future
expansion. The obvious expansion potential is to take the two "wing" portions (5,000
and 3,000 sq. ft. respectively) and add the structural capability to add a second story at
some time in the future. Another option talked about at the Building Committee is to just
go ahead and include the 3,000 sq. ft. second floor space addition in the City Hall
project. Unless the engineering is provided now to accommodate a future expansion,
the cost of a future expansion of the 3,000 sq. ft. would be hugely expensive in the
future.
Currently 216 staff members work out of the City Hall complex. The project architect
feels the 72,000 sq. ft. space currently would ultimately provide for an additional 37
employees without reconfiguration of the office layout scheme. With such a
reconfiguration, it is estimated an ultimate total of 50 employees could be
accommodated. No additional staff hiring is contemplated with the new building.
It is important the City Council provide direction to the architect so the schematic design
phase can proceed, as this is an important factor in dealing with the structure of the
building.
FUNDING:
While there would be a cost to either add the 3,000 sq. ft. of space, or add the structural
requirements to add that space in the future, those additional costs would show up in
the overall construction cost of the project. There are no additional costs to the
schematic design phase for this decision to be made.
Submitted by:
(XVLI 14L,�-
Homer L. Blu u
City Manager
COUNCIL PRESENTATION
OCTOBER 11, 2005
.a`
What Will this
Presentation Cover?
Review Council Chamber Location
Option
Expansion Options
1
7
Council Chambers/ Community Room
�tZ'l (fM IILo)N
F
r
`A
R vised Lon
t- F T-4
I T
doJ
L7
First Level
rte;
EXPANSION OPTIONS
Building Committee Recommendations
o
E w
Expansion Option [ L r
i
8,000 SF
El
Growth Incorporated Within 72,000 SF
Current Staff Count (As provided 10 -5 -05) : 220
Office/ Work Station Count Proposed (72,000 SF): 251
Potential Growth Within Proposed Space Plan: 31 (14 %)
Additional Growth Potential (Reconfiguration): 13
Total Growth Potential Proposed: 44(20%)
Projections do not include shared work areas, consultant
areas, or any non - assigned staff areas.
Growth G�corporated tthin 7 ,000 SF
® 0
Y.
'11th ,1 L. _
Expansion does not require downsizing, file reduction or
elimination of offices or conference rooms.
13
5
Call Hall Comparisons
City Current Staff at
GSF
GSF/
Population Capacity
Staff
,Newport Beach 81,000 189
40,400y
,(existing)
Hesperia 63,000 85
_253
Moreno Valle
145,000
215
54;400
2„5�
Newport Beach
83,000
251
66,317,
284
(Planned)
Orange
130,000
239
80,535
337
Burbank(Admin
101,000
111
39,000
351
Bldg)
Hesperia
63,000
146
52,800
362
Burbank (Dev Svcs
101,000
154
56,000
384
Bldg
MissionV"�eo
95,000
86
39,600
460
Rancho Santa
48,000
33
17,168
520
Mar arBa
_
'282
SOMA Experience
—
—
-- f
Report
Addradeal esnamnom for space requirements perperson In adal lon t0physlcal work space include:
lodes, clttulltten, cenrarence rooms, st"ge apace. vertical access (alevalare and slafm), mechanical
areax erc.
How Can I Find Out More?
The Following Documents Are Available
On The City
Web Site:
www.c i ty. n ew po rt -bea c h. ca. u s
-Town Nall Presentations 1 Through 4
-Space Utilization Assessment
-Existing Facility Needs Assessment
-Space Requirement Draft
-White Paper Response To Council Inquiry
-August 9 Council Presentation
-August 23 Council Presentation
-September
27 Council Presentation
-Presentation
given to Council October 11
will be available later this week.
For additional Information Contact:
Homer Bludau At 949 - 644.3000
Web Site:
www.c i ty. n ew po rt -bea c h. ca. u s
-Town Nall Presentations 1 Through 4
-Space Utilization Assessment
-Existing Facility Needs Assessment
-Space Requirement Draft
-White Paper Response To Council Inquiry
-August 9 Council Presentation
-August 23 Council Presentation
-September
27 Council Presentation
-Presentation
given to Council October 11
will be available later this week.
For additional Information Contact:
Homer Bludau At 949 - 644.3000