Loading...
HomeMy WebLinkAbout06 - CEQA Document Preparation for West Coast Highway & Dover Drive ProjectCITY OF NEWPORT BEACH CITY COUNCIL STAFF REPORT Agenda Item No. 6 October 25, 2005 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Patty Temple, Planning Director 949/644 -3228 ptemple @city.newport- beach.ca.us SUBJECT: Amendment to Professional Services Agreement for preparation of CEQA documents for a project on West Coast Highway at Dover Drive RECOMMENDATIONS: 1) Approve Amendment No. Consulting of Irvine, California, Study and Mitigated Negative $46,455; and I to the Professional Services Agreement with RBF for additional work required for preparation of an Initial Declaration for an additional amount not to exceed 2) Authorize City Manager to sign Agreements. DISCUSSION: Allied Retail Partners proposes to construct a retail center comprising approximately 56,000 square feet of building area at the northwest comer of West Coast Highway and Dover Drive. In July 2004, City Council approved a Professional Services Agreement with RBF for preparation of appropriate environmental documentation for the proposed project. RBF is currently completing an Initial Study and Mitigated Negative Declaration for the project consistent with requirements of the California Environmental Quality Act (CEQA). Changes to the project since the Professional Services Agreement was approved, however, have necessitated additional work by RBF in completing these documents. A Scope of Work and a Schedule of Compensation for the additional tasks necessary to complete the Initial Study and Mitigated Negative Declaration are included in "Amendment No. 1 to Professional Services Agreement" (Attached). The expanded tasks and associated costs are as follow: Professional Services Agreement Amendment October 25, 2005 Page 2 Traffic Impact Analysis $32,200 Air Quality Analysis 1,000 Noise Analysis 1,750 Environmental Analysis 9,000 Graphics 755 Project Coordination 1.750 $46,455 Staff has reviewed the Scope of Work for additional tasks necessary to complete the Initial Study and Mitigated Negative Declaration and believes it is adequate to meet or exceed the minimum requirements set forth by the California Environmental Quality Act. The fees for tasks described in the Scope of Work have been reviewed by staff and are considered appropriate and warranted. Funding Availability: The cost for work performed under the original Professional Services Agreement and for work performed consistent with this Amendment to the Professional Services Agreement are the responsibility of Allied Retail Partners. Submitted by: PATRICIA TEMPLE Planning Director Prepared by: AVID LEPO Hogle- Ireland, Inc. Project Planner Attachments: 1. Draft Amendment No. 1 to Professional Services Agreement AMENDMENT NO. 1 TO PROFESSIONAL SERVICES AGREEMENT WITH RBF CONSULTING FOR CEQA DOCUMENTS FOR PROJECT ON WEST COAST HIGHWAY AT DOVER DRIVE THIS AMENDMENT is made and entered into as of this 25th day of October, 2005, by and between the CITY OF NEWPORT BEACH, a Municipal Corporation ( "City "), and RBF CONSULTING, a corporation, whose address is 14725 Alton Parkway, Irvine, California 92618 ( "Consultant'), and is made with reference to the following: RECITALS A. City is a municipal corporation duly organized and validly existing under the laws of the State of California with the power to carry on its business as it is now being conducted under the statutes of the State of California and the Charter of City. B. City and Consultant entered into a Professional Services Agreement (Agreement) for preparation of a mitigated negative declaration and other environmental documents in accordance with the California Environmental Quality Act for the project located at the northwesterly corner of Dover Drive and West Coast Highway in Newport Beach, California. C. Consultant performed certain of the duties set forth in the Agreement and was paid for such duties consistent with the Agreement. D. City desires to have Consultant complete additional duties determined necessary in addition to all duties set forth in the Agreement and not previously completed. NOW, THEREFORE, it is mutually agreed by and between the undersigned parties as follows: 1. TERM The term of the Agreement is extended until the 2e day of February 2006 unless terminated earlier as set forth in the Agreement. 2. SERVICES TO BE PERFORMED Consultant shall diligently perform all the services described in the Scope of Services attached to the Agreement and all the services described in the Scope of Services attached hereto as Exhibit A and incorporated herein by reference. The City may elect to delete certain tasks of the Scope of Services attached hereto at its sole discretion. 3. COMPENSATION TO CONSULTANT City shall pay Consultant for the services on a time and expense not -to- exceed basis in accordance with the provisions of this Section, the Schedule of Compensation attached to the Agreement as Exhibit B and the Schedule of Compensation attached hereto as Exhibit B and incorporated herein by reference, and the Billing Rates attached to the Agreement as Exhibit C and the Billing Rates attached hereto as Exhibit C, and incorporated herein by reference. Consultant's compensation for all work performed in accordance with the Agreement and with this Amendment, including all reimbursable items and subconsultant fees, shall not exceed ONE HUNDRED TEN THOUSAND NINE HUNDRED NINETY -NINE AND NO1100 ($110,995.00) without additional authorization from City. Consultant's compensation includes the Agreement amount of Sixty -four Thousand Five Hundred Forty Dollars and no /100 ($64,540.00) and the Amendment amount of Forty -six Thousand Four Hundred Fifty -five Dollars and no /100 ($46,455.00) for services in accordance with this Amendment. No billing rate changes shall be made during the term of this Amendment without the prior written approval of City. IN WITNESS WHEREOF, the parties have caused this Agreement to be executed on the day and year first written above. APPROVED AS TO FORM: Robin Clauson, City Attorney for the City of Newport Beach ATTEST: By: LaVonne Harkless, City Clerk CITY OF NEWPORT BEACH, A Municipal Corporation By: Homer Bludau, City Manager for the City of Newport Beach CONSULTANT: Gary Armstrong, Senior Vice President Attachments: Exhibit A - Scope of Services Exhibit B - Schedule of Compensation Exhibit C- Billing Rates 2 EXHIBIT "A" SCOPE OF SERVICES Traffic Impact Analysis The Agreement Scope of Services RBF was for preparation of a stand -alone traffic and parking analysis for the proposed project. Over the past year, RBF has been asked to prepare the following additional analyses: ■ Mariners Mile Gateway Project West Coast Highway /Gateway Drive Queing Evaluation — final draft submitted to the City on August 23, 2005. ■ Newport Gateway: Driveway 1NVest Coast Highway Traffic Signal Warrant Analysis — final draft submitted to the City on August 31, 2005. ■ Travel Time Analysis with Operational Analysis. This analysis was subsequently removed from the Traffic Impact Analysis at the direction of City Staff. ■ Visual Traffic Simulations using Synchro /Sim Traffic software. ■ Sensitivity Analysis for altemative trip generation scenarios. In addition to the aforementioned analyses, RBF has also: Revised the Traffic Impact Analysis several times to respond to changes in the project Site Plan and project description. ■ Participated in ongoing coordination and meetings with City Staff and Project Applicant to discuss Operational Analysis and Traffic Simulations. At the request of City Staff, RBF has included two meetings with Caltrans. Should additional meetings beyond the two meetings budgeted be necessary, they would be in addition to this contract addendum and billed on a time and materials basis. The cost for each meeting is estimated at $1,000 per meeting. Air Quality and Noise Analyses The existing conditions portions of these analyses were commenced over the last year, but the analyses were put on —hold until both the project description and traffic analysis were finalized. The additional costs for the two studies reflect the change in project description and the increase in staff billing rates since the contract was originally executed. 3 Environmental Analysis and Graphics As previously mentioned, the project has been ever evolving over the past year. The change in project description has required RBF to begin and put on -hold the preparation of the environmental analysis and associated graphics several times throughout the last year. Additional costs have been incurred to respond the changing project description. Project Coordination The extended timeframe for the project has necessitated additional coordination with the City, City Contract Staff and the Applicant Team. 4 EXHIBIT "B" SCHEDULE OF COMPENSTATION Scope of Services Task Additional Fee per Amendment Traffic Impact Analysis 32,200 Air Quality Analysis 1,000 Noise Analysis 1,750 Environmental Analysis 9,000 Graphics 755 Project Coordination 1,750 Total Addkional Fees $46,455 EXHIBIT "C" ............................... $150.00 BILLING RATES (HOURLY) ............................... 127.00 OFFICE PERSONNEL $ / Hr. SeniorPrincipal ..................................................................................................... ............................... $215.00 Principal................................................................................................................. ............................... 195.00 ProjectDirector ....................................................................................................... ............................... 175.00 ProjectManager ..................................................................................................... ............................... 152.00 StructuralEngineer ................................................................................................. ............................... 152.00 ElectricalEngineer ......................................................................... ............................... .........................134.00 Senior Engineer /Senior Planner ............................................................................. ............................... 135.00 LandscapeArchitect ............................................................................................... ............................... 123.00 Project Engineer/Project Planner ............................................................................ ............................... 116.00 EnvironmentalSpecialist ......................................................................................... ............................... 112.00 CorrosionEngineer ................................................................................................. ............................... 112.00 Design Engineer /Senior Designer/ Mapper .............................................................. ............................... 108.00 Designer /Planner ............................................................................ ............................... .......................... 94.00 GISAnalyst ..................................................................................... ............................... .......................... 90.00 GraphicArtist ............................................................................................................ ............................... 80.00 Environmental Analyst/Staff Planner ........................................................................ ............................... 80.00 DesignTechnician .................................................................................................... ............................... 78.00 AssistantEngineer / Planner ....................................................................................... ............................... 74.00 Enaineerina Aid /Planning Aid ................................................................................... ............................... 60.00 FIELD PERSONNEL 2- Person Survey Crew ......................................................................................... ............................... $200.00 1- Person Survey Crew .......................................................................................... ............................... 145.00 FieldSupervisor :................................................................................................... ............................... 138.00 CONSTRUCTION MANAGEMENT PERSONNEL ConstructionManager ........................................................................................... ............................... $150.00 Resident Engineer /Project Manager ....................................................................... ............................... 127.00 Senior Construction Inspector ................................................................................... ............................... 98.00 ConstructionInspector .............................................................................................. ............................... 95.00 FieldOffice Engineer ................................................................................................ ............................... 90.00 ConstructionTechnician ........................................................................................... ............................... 78.00 OTHER SERVICES AND FEES PermitProcessor .................................................................................................... ............................... $95.00 Clerical/Word Processing .......................................................................................... ............................... 50.00 Consultation Relative to Legal Actions .................................................................... ............................... 270.00 VehicleMileage .......................................................................................................... ............................... 0.50 /mile Note: Blueprinting, reproduction, messenger service and other direct expenses will be charged as an additional cost plus 15 %. A sub - consultant Management Fee of fifteen - percent (15 %) will be added to the direct cost of all sub - consultant services to provide for the cost of administration, sub - consultant consultation and insurance. 0